HomeMy WebLinkAboutXR2023-2236 - MiscCITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive j P.O. Box 1768 1 Newport Beach, CA 926588915
www.newportbeachca.gov j (949) 644-3200
wail l.oa..+,bh
SETBACKS AND TOP OF SLAWFLOOR
ELEVATION CERTIFICATE
The purpose of this certificate is to insure that the structure is located properly on site per the approved
drawings. This certificate also verifies the top of slab/floor elevation noted on the approved drawings.
After the top of slab/floor elevation is veri ied to match the elevation specified on the approved
drawings, the contractor and inspector can measure the height of the structure to the top of slab/floor to
verify that it is equal or less than the dimension shown on building sections and elevations.
This form must be filled out by a registered surveyor or civil engineer authorized to perform surveys.
The survey must be done after the concrete forms are in place or preferable after the concrete slab is
poured or raised flog is built, but prior to starting wall framing.
Engineer/Surveyor's!Jame A �j /f/11 C�L rit1 _— License L 00 W
7 # -------
Engineer/Surveyor's Address 2,% (�, 1-1*1 5+ � � �—OZ3 `gD ,t0+0% A^ e5*1
Job Address Vat-7 YIS+V' 7'PVeI��
Setbacks: Sketch a site plan and specify surveyed setbacks (use back page).
* Top of slab/floor elevation: /V/0h
* If slab/floor elevation varies, sketch a plan or section through slab on the back page and specify the
elevations. Use same datum used in the survey of record.
I certify that the setbacks are M. are not J, per City approved plans. Describe arty deviations
from plans: - - _---
I certify that top of slab/floor e;evation(s) is Q, is not U, per City approved drawings. Describe
any deviations font plans: ___ 46 _ _ _ _ __
10-10-7,pZ ---
Date
4VV
Engineer/Surveyor's stamp and signature
=_::.A
FormslSetbacksandTepoMabElevation.Cent. 8421
OF
5gl4.3 G
►►vim, 7Cc7 evv
,ey,nJ.- a1.5►n
Z.
%Sb