Loading...
HomeMy WebLinkAboutXR2023-2236 - MiscCITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive j P.O. Box 1768 1 Newport Beach, CA 926588915 www.newportbeachca.gov j (949) 644-3200 wail l.oa..+,bh SETBACKS AND TOP OF SLAWFLOOR ELEVATION CERTIFICATE The purpose of this certificate is to insure that the structure is located properly on site per the approved drawings. This certificate also verifies the top of slab/floor elevation noted on the approved drawings. After the top of slab/floor elevation is veri ied to match the elevation specified on the approved drawings, the contractor and inspector can measure the height of the structure to the top of slab/floor to verify that it is equal or less than the dimension shown on building sections and elevations. This form must be filled out by a registered surveyor or civil engineer authorized to perform surveys. The survey must be done after the concrete forms are in place or preferable after the concrete slab is poured or raised flog is built, but prior to starting wall framing. Engineer/Surveyor's!Jame A �j /f/11 C�L rit1 _— License L 00 W 7 # ------- Engineer/Surveyor's Address 2,% (�, 1-1*1 5+ � � �—OZ3 `gD ,t0+0% A^ e5*1 Job Address Vat-7 YIS+V' 7'PVeI�� Setbacks: Sketch a site plan and specify surveyed setbacks (use back page). * Top of slab/floor elevation: /V/0h * If slab/floor elevation varies, sketch a plan or section through slab on the back page and specify the elevations. Use same datum used in the survey of record. I certify that the setbacks are M. are not J, per City approved plans. Describe arty deviations from plans: - - _--- I certify that top of slab/floor e;evation(s) is Q, is not U, per City approved drawings. Describe any deviations font plans: ___ 46 _ _ _ _ __ 10-10-7,pZ --- Date 4VV Engineer/Surveyor's stamp and signature =_::.A FormslSetbacksandTepoMabElevation.Cent. 8421 OF 5gl4.3 G ►►vim, 7Cc7 evv ,ey,nJ.- a1.5►n Z. %Sb