HomeMy WebLinkAboutXR2022-3286 - MiscIrrigation Inspection Affidavit
Irrigation Plan No: CRONE Residence _ Project Name: 821 Bellis St. Newport Beach_
Irrigation Plan Designer: _David A. Pedersen Landscape Architect 949.251.8999____
Field Inspector: __Michael McMillen_BPL Irrigation Auditor__714.394.6126_ ____
This project was inspected within the limits of customary access for compliance with the approved
irrigation plans on file in City Planning. At least two (2) inspections were conducted. The findings are as
follows.
Date Inspection: 08/15/2024
A. Inspections during construction to check mainline in open trench: Yes No
1. Location of mainline conforms to as-built plan _X_ ___
2. Size of main line conforms to plan _X_ ___
3. Depth of mainline conforms to plan _X_ ___
4. Main line conditions is undamaged _X_ ___
5. Main line pressure tested with water and meter to check for visible leaks _X_ ___
6. Specific observations attached if needed _X_ _ _
Date Inspection: 08/30/2024
B. Inspections after completion of system installation prior to sodding: Yes No
1. Irrigation POC has isolation valve _X_ ___
2. System components (i.e., controller, backflow, rain sensor, etc.) _X_ ___
3. Drip line GPH and spacing as specified _X_ ___
4. System activated for observation of compliance _X_ ___
5. Each station complies installed per plan _X_ ___
6. Matched precipitation rates provided by zone _X_ ___
7. As-built plan provided to owner _X_ ___
8. Specific observations attached as needed _X_ ___
Summary of irrigation review:
THE IRRIGATION SYSTEM IS IN COMPLIANCE. SEE THE ATTACTED PUNCH LIST ITEMS REQUIRED FOR A
CERTIFICATION OF COMPLETION. THESE ITEMS MAY BE COMPLETED DURING THE 90 DAY MAINTENACE
PERIOD. THE OWNER / DEVELOPER WILL DETERMINE WHEN THE MAINTENACE PERIOD WILL BEGIN.
I hereby certify that I am qualified to submit this irrigation inspection affidavit based on the qualification
indicated below: Certified Landscape Irrigation Auditor Certified by The Irrigation Association.
Respectfully,
Michael McMillen
Certified Irrigation Auditor #014256
Big Picture Landscapes
Landscape Watering Guidelines The costs of water maintenance, plant loss and replacement, and decreased property values are all financial impacts on homeowners. Recent local studies show that many landscapes are over-watered as much as 400 percent. Overwatering encourages excessive growth diseases and other maintenance problems. Deep infrequent watering encourages strong healthy root systems that can better tolerate intense heat
and periods of drought.
Effective irrigation system design, installation and maintenance are important. Sprinklers should
serve only the required turf areas and not spray on buildings, fences or non-landscaped areas.
Excess water on sidewalks, pavement and block walls causes damage, increases liability and
wastes water. Watering should be done before sunrise to reduce evaporation losses. Turf
areas, planters, trees and shrubs should be watered separately to meet varying water needs.
Always irrigate the entire depth and width of the root zone regardless of the time of year.
Automatic times and moisture sensors make it easier to manage irrigations. Once or twice a
year, water twice as long to leach out salts and buildup in our soils.
Landscape Watering Guidelines
Seasonal Frequency - Days Between Waterings
Spring
Mar - May
Summer
May - Oct
Fall
Oct - Dec
Winter
Dec - Mar
Water
This
Deeply
Trees Desert Adapted 14 - 30 days 7 - 21 days 14 - 30 days 30 - 60 days 24" - 36"
High Water Use 7 - 12 days 7 - 10 days 7 - 12 days 14 - 30 days 24" - 36"
Shrubs Desert Adapted 14 - 30 days 7 - 21 days 14 - 30 days 30 - 45 days 18" - 24"
High Water Use 7 - 10 days 5 - 7 days 7 - 10 days 10 - 14 days 18" - 24"
Groundcovers
and Vines
Desert Adapted 14 - 30 days 7 - 21 days 14 - 30 days 21 - 45 days 8" - 12"
High Water Use 7 - 10 days 2 - 5 days 7 - 10 days 10 - 14 days 8" - 12"
Cacti and Succulents 21 - 45 days 14 - 30 days 21 - 45 days If needed 8" - 12"
Annuals 3 - 7 days 2 - 5 days 3 - 7 days 5 - 10 days 8" - 12"
Warm Season Grass
(Bermuda, etc) 4 - 14 days 3 - 6 days 6 - 21 days 15 - 30 days 6" - 10"
Cool Season Grass
(Rye, Fescue) 3 - 7 days None 3 - 10 days 7 - 14 days 6" - 10"
These guidelines are for established plants (1 year for shrubs, 3 years for trees). Additional water is needed
for new plantings or unusually hot or dry weather. Less water is needed during cool or rainy weather. Drip run
times are typically 2 hours or more for each watering.
Watering Schedule for Newly Planted Desert Adapted Plants
How much and
How Often Spring Summer Fall Winter
Mar - May May - Oct Oct - Dec Dec - Mar
Weeks 1 and 2 every 3 - 4 days every 1 - 2 days every 3 - 4 days every 3 - 4 days
Weeks 3 and 4 every 6 - 7 days every 3 - 4 days every 6 - 7 days every 6 - 7 days
Weeks 5 and 6 every 7 - 10 days every 4 - 6 days every 7 - 10 days every 7 - 10 days
Weeks 7 and 8 every 10 - 14 days every 7 days every 10 - 14 days every 10 - 14 days
After Week 8 Gradually extend the time between irrigations until plants are established.
NOTE: After the eighth week, move the drip emitters to the outer edge of the root ball. High water -use plants
may require more frequent irrigations. Water deeply to 24 - 36 inches for trees, 18 - 24 inches for shrubs, 8 -
12 inches for ground cover, vines, cactus, succulents and annuals, and 6 - 10 inches for warm and cool
season grasses.
Based on information provided by the University of Arizona and Arizona Municipal Water Users
Be sure to visit the City of Chandler Water Conservation web pages for free landscape workshops,
landscaping tips, rebates, frequently asked questions and more.
www.chandleraz.gov/water
City of Chandler
Water Conservation Office
conserve@chandleraz.gov
480-782-3580
1-30-26
8-22-24
WATERING GUIDELINES FOR - 821 BELLIS
33
Appendix E
LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION
I hereby certify that:
(1) I am a professional appropriately licensed in the State of California to provide
professional landscape design services.
(2) The landscape project for the property located at
(provide street
address or parcel number(s)) was installed by me or under my supervision.
(3) The landscaping for the identified property has been installed in substantial
conformance with the approved Landscape Documentation Package and complies with
the requirements of the City of Newport Beach Water Efficient Landscape Ordinance
(Municipal Code Section 14.17) and the City of Newport Beach Standards for
Implementation of the City of Newport Beach Water Efficient Landscape Ordinance for
the efficient use of water in the landscape.
(4) The following elements are attached hereto:
a. Irrigation scheduling parameters used to set the controller;
b. Landscape and irrigation maintenance schedule;
c. Irrigation audit report; and
d. Soil analysis report, if not submitted with Landscape Documentation Package,
and documentation verifying implementation of the soil report
recommendations.
(5) The site installation complies with the following:
a. The required irrigation system has been installed according to approved plans
and specifications and if applicable, any prior approved irrigation system
alternatives.
_____ Yes ____ No
b. Sprinklers comply with ASABE/ICC 802 -2014 Landscape Irrigation Sprinkler &
Emitter Standard.
_____ Yes ____ No
(6) The information I have provided in this Landscape Installation Certificate of
Completion is true and correct and is hereby submitted in compliance with the City of
Newport Beach Design Standards for Implementation of the City of Newport Beach
Water Efficient Landscape Ordinance.
x
x
821 BELLIS
34
Print Name Date
Signature License Number
Address
Telephone E-mail Address
Landscape Design Professional’s Stamp
(If Appropriate)
DAVID PEDERSEN
3400 IRVINE AVE., STE. 203 NEWPORT BEACH CA. 92660
949-251-8999
8-21-24
3895
DAVE@DPLANDSCAPE.COM
1-30-26
6-25-24