Loading...
HomeMy WebLinkAboutXR2022-3286 - MiscIrrigation Inspection Affidavit Irrigation Plan No: CRONE Residence _ Project Name: 821 Bellis St. Newport Beach_ Irrigation Plan Designer: _David A. Pedersen Landscape Architect 949.251.8999____ Field Inspector: __Michael McMillen_BPL Irrigation Auditor__714.394.6126_ ____ This project was inspected within the limits of customary access for compliance with the approved irrigation plans on file in City Planning. At least two (2) inspections were conducted. The findings are as follows. Date Inspection: 08/15/2024 A. Inspections during construction to check mainline in open trench: Yes No 1. Location of mainline conforms to as-built plan _X_ ___ 2. Size of main line conforms to plan _X_ ___ 3. Depth of mainline conforms to plan _X_ ___ 4. Main line conditions is undamaged _X_ ___ 5. Main line pressure tested with water and meter to check for visible leaks _X_ ___ 6. Specific observations attached if needed _X_ _ _ Date Inspection: 08/30/2024 B. Inspections after completion of system installation prior to sodding: Yes No 1. Irrigation POC has isolation valve _X_ ___ 2. System components (i.e., controller, backflow, rain sensor, etc.) _X_ ___ 3. Drip line GPH and spacing as specified _X_ ___ 4. System activated for observation of compliance _X_ ___ 5. Each station complies installed per plan _X_ ___ 6. Matched precipitation rates provided by zone _X_ ___ 7. As-built plan provided to owner _X_ ___ 8. Specific observations attached as needed _X_ ___ Summary of irrigation review: THE IRRIGATION SYSTEM IS IN COMPLIANCE. SEE THE ATTACTED PUNCH LIST ITEMS REQUIRED FOR A CERTIFICATION OF COMPLETION. THESE ITEMS MAY BE COMPLETED DURING THE 90 DAY MAINTENACE PERIOD. THE OWNER / DEVELOPER WILL DETERMINE WHEN THE MAINTENACE PERIOD WILL BEGIN. I hereby certify that I am qualified to submit this irrigation inspection affidavit based on the qualification indicated below: Certified Landscape Irrigation Auditor Certified by The Irrigation Association. Respectfully, Michael McMillen Certified Irrigation Auditor #014256 Big Picture Landscapes Landscape Watering Guidelines The costs of water maintenance, plant loss and replacement, and decreased property values are all financial impacts on homeowners. Recent local studies show that many landscapes are over-watered as much as 400 percent. Overwatering encourages excessive growth diseases and other maintenance problems. Deep infrequent watering encourages strong healthy root systems that can better tolerate intense heat and periods of drought. Effective irrigation system design, installation and maintenance are important. Sprinklers should serve only the required turf areas and not spray on buildings, fences or non-landscaped areas. Excess water on sidewalks, pavement and block walls causes damage, increases liability and wastes water. Watering should be done before sunrise to reduce evaporation losses. Turf areas, planters, trees and shrubs should be watered separately to meet varying water needs. Always irrigate the entire depth and width of the root zone regardless of the time of year. Automatic times and moisture sensors make it easier to manage irrigations. Once or twice a year, water twice as long to leach out salts and buildup in our soils. Landscape Watering Guidelines Seasonal Frequency - Days Between Waterings Spring Mar - May Summer May - Oct Fall Oct - Dec Winter Dec - Mar Water This Deeply Trees Desert Adapted 14 - 30 days 7 - 21 days 14 - 30 days 30 - 60 days 24" - 36" High Water Use 7 - 12 days 7 - 10 days 7 - 12 days 14 - 30 days 24" - 36" Shrubs Desert Adapted 14 - 30 days 7 - 21 days 14 - 30 days 30 - 45 days 18" - 24" High Water Use 7 - 10 days 5 - 7 days 7 - 10 days 10 - 14 days 18" - 24" Groundcovers and Vines Desert Adapted 14 - 30 days 7 - 21 days 14 - 30 days 21 - 45 days 8" - 12" High Water Use 7 - 10 days 2 - 5 days 7 - 10 days 10 - 14 days 8" - 12" Cacti and Succulents 21 - 45 days 14 - 30 days 21 - 45 days If needed 8" - 12" Annuals 3 - 7 days 2 - 5 days 3 - 7 days 5 - 10 days 8" - 12" Warm Season Grass (Bermuda, etc) 4 - 14 days 3 - 6 days 6 - 21 days 15 - 30 days 6" - 10" Cool Season Grass (Rye, Fescue) 3 - 7 days None 3 - 10 days 7 - 14 days 6" - 10" These guidelines are for established plants (1 year for shrubs, 3 years for trees). Additional water is needed for new plantings or unusually hot or dry weather. Less water is needed during cool or rainy weather. Drip run times are typically 2 hours or more for each watering. Watering Schedule for Newly Planted Desert Adapted Plants How much and How Often Spring Summer Fall Winter Mar - May May - Oct Oct - Dec Dec - Mar Weeks 1 and 2 every 3 - 4 days every 1 - 2 days every 3 - 4 days every 3 - 4 days Weeks 3 and 4 every 6 - 7 days every 3 - 4 days every 6 - 7 days every 6 - 7 days Weeks 5 and 6 every 7 - 10 days every 4 - 6 days every 7 - 10 days every 7 - 10 days Weeks 7 and 8 every 10 - 14 days every 7 days every 10 - 14 days every 10 - 14 days After Week 8 Gradually extend the time between irrigations until plants are established. NOTE: After the eighth week, move the drip emitters to the outer edge of the root ball. High water -use plants may require more frequent irrigations. Water deeply to 24 - 36 inches for trees, 18 - 24 inches for shrubs, 8 - 12 inches for ground cover, vines, cactus, succulents and annuals, and 6 - 10 inches for warm and cool season grasses. Based on information provided by the University of Arizona and Arizona Municipal Water Users Be sure to visit the City of Chandler Water Conservation web pages for free landscape workshops, landscaping tips, rebates, frequently asked questions and more. www.chandleraz.gov/water City of Chandler Water Conservation Office conserve@chandleraz.gov 480-782-3580 1-30-26 8-22-24 WATERING GUIDELINES FOR - 821 BELLIS 33 Appendix E LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION I hereby certify that: (1) I am a professional appropriately licensed in the State of California to provide professional landscape design services. (2) The landscape project for the property located at (provide street address or parcel number(s)) was installed by me or under my supervision. (3) The landscaping for the identified property has been installed in substantial conformance with the approved Landscape Documentation Package and complies with the requirements of the City of Newport Beach Water Efficient Landscape Ordinance (Municipal Code Section 14.17) and the City of Newport Beach Standards for Implementation of the City of Newport Beach Water Efficient Landscape Ordinance for the efficient use of water in the landscape. (4) The following elements are attached hereto: a. Irrigation scheduling parameters used to set the controller; b. Landscape and irrigation maintenance schedule; c. Irrigation audit report; and d. Soil analysis report, if not submitted with Landscape Documentation Package, and documentation verifying implementation of the soil report recommendations. (5) The site installation complies with the following: a. The required irrigation system has been installed according to approved plans and specifications and if applicable, any prior approved irrigation system alternatives. _____ Yes ____ No b. Sprinklers comply with ASABE/ICC 802 -2014 Landscape Irrigation Sprinkler & Emitter Standard. _____ Yes ____ No (6) The information I have provided in this Landscape Installation Certificate of Completion is true and correct and is hereby submitted in compliance with the City of Newport Beach Design Standards for Implementation of the City of Newport Beach Water Efficient Landscape Ordinance. x x 821 BELLIS 34 Print Name Date Signature License Number Address Telephone E-mail Address Landscape Design Professional’s Stamp (If Appropriate) DAVID PEDERSEN 3400 IRVINE AVE., STE. 203 NEWPORT BEACH CA. 92660 949-251-8999 8-21-24 3895 DAVE@DPLANDSCAPE.COM 1-30-26 6-25-24