Loading...
HomeMy WebLinkAbout07 - 16t" Street Pump Station Upgrades and Back-up Generator — NOC for Contract No. 7693-2 (18W13)Q �EwPpRT CITY OF s NEWPORT BEACH `q44:09 City Council Staff Report September 24, 2024 Agenda Item No. 7 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Ben Davis, Senior Civil Engineer - 949-644-3317, bdavis@newportbeachca.gov TITLE: 16t" Street Pump Station Upgrades and Back-up Generator — Notice of Completion for Contract No. 7693-2 (18W13) On July 13, 2021, the City Council awarded Contract No. 7693-2 for the 16t" Street Pump Station Upgrades and Back-up Generator project to R.I.C. Construction Co., Inc. This project involved installing three new variable frequency drives, check valves, an automatic transfer switch, and a diesel back-up generator. The required work is now complete and staff requests that the City Council accept the work and close out the contract. RECOMMENDATIONS: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project; b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of Civil Code; and c) Release Faithful Performance Bond one year after acceptance by the City Council. DISCUSSION: Overall Contract Cost/Time Summary Awarded Contract Final Total Contract Total Contract Percent Contract Amount Amount Change Amount Cost Change $2,508,905 $2,715,150.03 +$206,245.03 +8.2% Allowed Contract Time + Approved 534 Actual Time Used (Days) 534 Extensions (Days) _ 7-1 16th Street Pump Station Upgrades and Back-up Generator — Notice of Completion for Contract No. 7693-2 (18W13) September 24, 2024 Page 2 This project included the removal of three solid state soft starters; replacement of three vertical turbine pumps and five pump motors; and the installation of new control valves, three new variable frequency drives (VFD), three slanted check valves, an automatic transfer switch, and a 1,000-kW diesel back-up generator with a 4,000-gallon diesel storage tank. The new pumps, motors and VFDs are more reliable and energy efficient than the previous components and will improve the City of Newport Beach's water system. A change order was issued to complete the first phase of the Collins Island sewer lift station upgrade to expedite the completion of the final electrical panel location created by an opportunity to coordinate with a new home construction project. The new electrical panel is located in a cabinet structure that matches the architecture of the home it is attached to. The contractor has excellent experience constructing sewer lift stations, electrical panels and duct bank work, and due to the homeowner's schedule to complete his home, the City had a tight window of opportunity to complete the work, so it made sense to add this electrical work. Funding for this change order work was expended from the Wastewater Capital fund. The contracted work has been completed to the satisfaction of the Public Works Department. A summary of the contract construction costs are as follows: Original Bid Amount: $ 2,508,905.00 Actual Cost of Bid Items Constructed: $ 2,508,905.00 Total Change Orders: $ 206,245.03 Final Contract Cost: $ 2,715,150.03 The final total contract amount was $2,715,150.03, approximately 8.2% higher than the original bid amount. The cost increase includes the Collins Island work that was added to the project. Additional change orders for the 16th Street Pump Station project included work on concrete -encased electrical lines and installing a fuel tank monitoring system required to integrate with the new generator. A summary of the project schedule milestones is as follows: Estimated Start of Construction per Annual Baseline Schedule July 1, 2021 Actual Start of Construction Per Notice to Proceed September 13, 2021 Actual Substantial Construction Completion Date October 5, 2023 Extended Contract Completion Date Inclusive of Extra Work August 22, 2024 This project encountered delays due to supply chain issues that occurred in the manufacturing industry during the COVID-19 pandemic in 2022. The contracted bid item construction work at the 16th Street pump station was substantially completed on October 5, 2023. The contractor was provided an additional 20 working days for the Collins Island sewer lift station upgrades. The extra work started on July 25, 2024, and was completed on August 22, 2024. 7-2 16th Street Pump Station Upgrades and Back-up Generator — Notice of Completion for Contract No. 7693-2 (18W13) September 24, 2024 Page 3 FISCAL IMPACT: The 16t" Street Pump Station Upgrades and Back-up Generator project was included in the FY 2021-22 Capital Improvement Program budget. The Collins Island Sewer Lift Station project was included in the FY 2022-23 Capital Improvements Program budget. Funds for the construction contract were expended from the following account: Account Description Account Number Amount Wastewater Capital 71201-980000-23SO4 $ 117,787.98 Water Capital Master Plan 70201931-980000-18W13 $ 2,597,362.05 Total: $ 2,715,150.03 The Water Capital Distribution/Piping fund comes from the City's water service charges from residents and businesses within the City's service area. The Wastewater Capital fund comes from the City's wastewater service charges from residents and businesses within the City's service area. ENVIRONMENTAL REVIEW: On July 13, 2021, the City Council found this project exempt from the California Environmental Quality Act (CEQA) pursuant to Class 1 Section 15301(b) (existing facilities of publicly owned utilities used to provide electric power, natural gas, sewage or other public utility services) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENT: Attachment A — Location Map 7-3 Attachment A 16TH STREET PUMP STATION UPGRADES AND BACKUP GENERATOR LOCATION MAP CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT C-7693-1 18W 13 9/24/24 7-4