Loading...
HomeMy WebLinkAboutXR2023-1386 - MiscIrrigation Inspection Affidavit Irrigation Plan No:(23-102) Lot 41 Tr 7844 5 San Martin Way Corona Del Mar 92625 Project Name : (23-102) Lot 41 Tr 7844 5 San Martin Way Corona Del Mar 92625 Irrigation / Landscape Plan: Dale Waldo Landscape Architecture (#2528) 714.745.3952 Field Inspector CLIA : __Big Picture Landscape - Michael McMillen 714.394.6126___ Date (s) of Inspection: 09/27/2024 and 10/08/2024 This project was inspected within the limits of customary access for compliance with the approved irrigation plans on file in City Planning. At least two (2) inspections were conducted. The findings are as follows. Date Inspection: 09/27/2024 A. Inspections during construction to check mainline in open trench: Yes No 1. Location of mainline conforms to as-built plan _X_ ___ 2. Size of main line conforms to plan _X_ ___ 3. Depth of mainline conforms to plan _X_ ___ 4. Main line conditions is undamaged _X_ ___ 5. Main line pressure tested with water and meter to check for visible leaks _X_ ___ 6. Specific observations attached if needed _X _ ___ Date Inspection: 10/08/2024 B. Inspections after completion of system installation prior to sodding: Yes No 1. Irrigation POC has isolation valve _X_ ___ 2. System components (i.e., controller, backflow, rain sensor, etc.) _X_ ___ 3. Drip line GPH and spacing as specified _X_ ___ 4. System activated for observation of compliance _X_ ___ 5. Each station complies installed per plan _X_ ___ 6. Matched precipitation rates provided by zone _X_ ___ 7. As-built plan provided to owner _X_ ___ 8. Specific observations attached as needed _X_ ___ Summary of irrigation review: Pass . This project In Compliance as all Items listed on punch list have been addressed. I hereby certify that I am qualified to submit this irrigation inspection affidavit based on the qualification indicated below: Certified Landscape Irrigation Auditor Certified by The Irrigation Association. CLIA California #014256 IA. 703.536.7080 Respectfully, Michael McMillen Certified Irrigation Auditor #014256 Big Picture Landscapes 10/09/2024 LANDSCAPE IRRIGATION AUDIT REPORT Project: (23-102) Lot 41 Tr 7844 5 San Martin Way Corona Del Mar 92625 Landscape Design: Dale Waldo Landscape Architecture (#2528) 714.745.3952 Landscape Contractor: Ruiz Landscape 6 McLaren, Ste.H Irvine CA 92618 949.280.7030 Certified Landscape Irrigation Auditor (CLIA): Big Picture Landscape Michael McMillen / 714.394.6126 / Bigpicturelandscape@gmail.com Certified Irrigation Auditor #014256 All the hydrozones on the irrigation systems were evaluated with a visual inspection. As per your request, we evaluated the irrigation systems in accordance with the California Model Water Efficient Landscape Ordinance (MWELO). SUMMARY This audit was conducted to inspect the overall site irrigation systems within the limits of construction. The irrigation systems are new systems utilizing POTABLE water. IRRIGATION PLANS: Each hydrozone identified on the plans were executed in the field, (Total valve qty.10). Each system layout, components and functionality have met all the requirements of the Irrigation Plans. MWELO: The California Model Water Efficient Landscape Ordinance has been adopted by the City as the standard for new construction and irrigation installations based on AB1881. UNIFORMITY: There was no overhead irrigation on site. Any lawn areas were synthetic. Trees were on a drip system valve, and all landscaped areas utilized drip tubing. The dripline is subterranean, and the planting material has been installed. In lieu of the catch can test, a visual confirmation of drip line performance, spacing and staking was observed. This was conducted in multiple, random planters. Observed on site, was per the standard 90% efficiency for pressure compensating drip & low-flow irrigation per the Irrigation Association’s Guidelines. The Landscape Irrigation Auditor, 3rd edition book was used for the report. Shrub ZONES / STATION 1-10 · Irrigated Area: Zones separated based on Full/Partial sun South/ West side of project. · Plant Material: Shrubs - Low water · Plant Condition: Traditional · Microclimate: Full Sun · Soil Category: Silty Clay Loam · Root Depth: Approximately 6-8” · Slope: Overall site 1% 2:1 on SE side of property · Compaction: yes · Runoff: No runoff observed · Standing Water: None observed · Hydrozone Separation: Yes · Mulch in Beds: Yes · Febco 3/4 825Y RP Backflow / screened by shrubs at N of driveway / back of ROW. · Controller: Hunter PC-100, Solar Sync / wireless weather sensor / rain shutoff · Valves: PEB /Drip Kit - PEB-T-AL-FD75150-L · Emitter Type: RB XFCV-9-18 (.9 gph @ 18” o.c. row spacing @ 12”-18” o.c.) · Max Flow: 6.8 gpm · Distribution Uniformity: .90 / .77 · Precipitation Rate: 0.9 / 0.47 Punch list Items: 09/27/2024 (Compliance based on the following corrects during the maintenance period) · Complete controller charts for owner 10/09/2024 Zone Audit Conclusion: PASS, project IS within compliance to begin maintenance. The irrigation systems were evaluated and based on the Irrigation Association Audit rules/guidelines and MWELO requirements. Respectfully, Michael McMillen Certified Irrigation Auditor #014256 Big Picture Landscapes