Loading...
HomeMy WebLinkAboutPA2019-112 CDP Exemption Ltr COMMUNITY DEVELOPMENT DEPARTMENT PLANNING DIVISION 100 Civic Center Drive, P.O. Box 1768, Newport Beach, CA 92658-8915 949-644-3200 Fax: 949-644-3229 www.newportbeachca.gov COASTAL DEVELOPMENT PERMIT EXEMPTION LETTER June 20, 2019 Frank Orozco M Squared Wireless 1387 Calle Avanzado San Clemente, CA 92673 forozco@interlinkpg.com Application No. Minor Use Permit No. UP2019-031 (PA2019-112) Address Public right-of-way adjacent to 1090 [CS] Bayside Drive (SLC4616) Project Description: Installation of a telecommunication devices on an existing street light. More specifically, the project includes: 1) replacement of an existing 28-foot high City of Newport Beach concrete streetlight, 2) installation of four remote radio units, a raycap disconnect, and an omni- directional antenna within a 12-inch diameter equipment shroud at the top of the streetlight at 34 feet in height, and 3) installation of a handhole and fiber box below grade adjacent to the streetlight. The project requires a minor use permit for AT&T small cell telecommunications on Streetlight No. 4616. The development will not result in an increase in luminaire height and the location of the existing utility pole will remain the same. This letter is to certify that this location and/or proposed project has been reviewed by City of Newport Beach Planning Division. A coastal development permit is not necessary for this project because the proposed development is an improvement to a structure other than a single -family residence or public works facility and is not subject to a permit requirement (Section 21.52.035 (Projects Exempt from Coastal Development Permit Requirements), Subsection C2). The proposed project is not anticipated to involve a risk of adverse environmental effect, adversely affect public access, or involve a change in land use contrary to the Coastal Act. Please be advised that only the project described above is exempt from the permit requirements for a Coastal Development Permit. Any change in the project may cause it to lose its exempt status. This certification is based on information provided by the re cipient of this letter. If, at a later date, this information is found to be incorrect or incomplete, this letter will become invalid, and any development occurring at that time must cease until a coastal development permit is obtained. By: UP2019-031 (PA2019-112) June 20, 2019 Page 2 of 2