HomeMy WebLinkAboutPA2019-112 CDP Exemption Ltr COMMUNITY DEVELOPMENT DEPARTMENT
PLANNING DIVISION
100 Civic Center Drive, P.O. Box 1768, Newport Beach, CA 92658-8915
949-644-3200 Fax: 949-644-3229
www.newportbeachca.gov
COASTAL DEVELOPMENT PERMIT EXEMPTION LETTER
June 20, 2019
Frank Orozco
M Squared Wireless
1387 Calle Avanzado
San Clemente, CA 92673
forozco@interlinkpg.com
Application No. Minor Use Permit No. UP2019-031 (PA2019-112)
Address Public right-of-way adjacent to 1090 [CS] Bayside Drive (SLC4616)
Project Description: Installation of a telecommunication devices on an existing street light. More
specifically, the project includes: 1) replacement of an existing 28-foot high City of Newport Beach
concrete streetlight, 2) installation of four remote radio units, a raycap disconnect, and an omni-
directional antenna within a 12-inch diameter equipment shroud at the top of the streetlight at 34 feet
in height, and 3) installation of a handhole and fiber box below grade adjacent to the streetlight. The
project requires a minor use permit for AT&T small cell telecommunications on Streetlight No. 4616.
The development will not result in an increase in luminaire height and the location of the existing utility
pole will remain the same.
This letter is to certify that this location and/or proposed project has been reviewed by City of Newport
Beach Planning Division. A coastal development permit is not necessary for this project because the
proposed development is an improvement to a structure other than a single -family residence or
public works facility and is not subject to a permit requirement (Section 21.52.035 (Projects Exempt
from Coastal Development Permit Requirements), Subsection C2). The proposed project is not
anticipated to involve a risk of adverse environmental effect, adversely affect public access, or
involve a change in land use contrary to the Coastal Act.
Please be advised that only the project described above is exempt from the permit requirements for
a Coastal Development Permit. Any change in the project may cause it to lose its exempt status.
This certification is based on information provided by the re cipient of this letter. If, at a later date, this
information is found to be incorrect or incomplete, this letter will become invalid, and any
development occurring at that time must cease until a coastal development permit is obtained.
By:
UP2019-031 (PA2019-112)
June 20, 2019
Page 2 of 2