Loading...
HomeMy WebLinkAbout03_Santaniello Residence CDP_PA2024-0014CITY OF NEWPORT BEACH ZONING ADMINISTRATOR STAFF REPORT November 27, 2024 Agenda Item No. 3 SUBJECT: Santaniello Residence (PA2024-0014) ▪Coastal Development Permit SITE LOCATION: 1206 Blue Gum Lane APPLICANT: David Hohmann OWNER: Susan Santaniello PLANNER: Laura Rodriguez, Planning Technician 949-6443216 or lrodriguez@newportbeachca.gov LAND USE AND ZONING ●General Plan Land Use Plan Category: Single Unit Residential Detached (RS-D) ●Zoning District: Westcliff Grove Planned Community (PC22) ●Coastal Land Use Plan Category: Single Unit Residential Detached – (0.0 – 5.9 DU/AC) (RSD-A) ●Coastal Zoning District: Westcliff Grove Planned Community (PC22) PROJECT SUMMARY A coastal development permit (CDP) to allow the demolition of an existing single-unit residence and construct a 4,440-square-foot, two-story, single-unit residence with an attached 643-square-foot two-car garage. The project also includes landscaping, hardscaping, and site walls. The project complies with all applicable development standards and no deviations are requested. All improvements authorized by this CDP will be located on private property. RECOMMENDATION 1)Conduct a public hearing; 2) Find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has no potential to have a significant effect on the environment; and 3) Adopt Draft Zoning Administrator Resolution No.___ approving Coastal Development Permit No. PA2024-0014 (Attachment No. ZA 1). 1 Santaniello Residence (PA2024-0014) Zoning Administrator, November 27, 2024 Page 2 DISCUSSION Land Use and Development Standards ●The subject property is in the Westcliff Grove Planned Community (PC22) Coastal Zoning District, which provides for single-unit residential development and is consistent with the City’s Coastal Land Use Plan, General Plan, and Zoning Code. A coastal development permit is required, and the property is not eligible for a waiver for de minimis development because the property is in the Coastal Commission Appeal Area. ●The property currently consists of one legal lot developed with a single-unit residence. The neighborhood is predominantly developed with one and two-story, single-unit residences. The proposed design, bulk, and scale of the development are consistent with the existing neighborhood pattern of development. ●The proposed single-unit residence and accessory structures conform to all applicable development standards, including floor area limit, setbacks, height, and off-street parking as evidenced by the project plans and illustrated in Table 1 below. Figure 1: Oblique Aerial Image of Neighborhood Subject Property 2 Santaniello Residence (PA2024-0014) Zoning Administrator, November 27, 2024 Page 3 Table 1 – Development Standards (PC22 Westcliff Grove) Development Standard Standard Proposed Setbacks (min.) Front 20 feet 20 feet Sides 5 feet 5 feet Rear 10 feet 30 feet and 6 inches Site Coverage (max.) 3,958 square feet 3,182 square feet Parking (min.) 2-car garage 2-car garage Height (max.) 24 feet flat roof 28 feet sloped roof 24 feet flat roof 28 feet sloped roof Hazards • The project site is not located near a mean high tide line and is separated from the bay by several rows of residences and streets such as Cape Andover and Polaris Drive. ● The finished floor elevation of the proposed single-family residence is 82.0 feet based on the North American Vertical Datum of 1988 (NAVD 88), which complies with the minimum 9.00-foot NAVD 88 elevation standard for new structures. Water Quality ● The property is not located on the shoreline nor is it located within 100 feet of coastal waters. Under Section 21.35.030 (Construction Pollution Prevention Plan) of the Municipal Code, a Construction Pollution Prevention Plan (CPPP) is required to implement temporary Best Management Practices (BMPs) during construction to minimize erosion and sedimentation and to minimize pollution of runoff and coastal waters derived from construction chemicals and materials. A CPPP has been provided and construction plans and activities will be required to adhere to the CPPP. ● The project design addresses water quality with a construction erosion control plan and a post-construction drainage system that includes drainage and percolation features designed to retain dry weather runoff and minor rain event runoff on-site. Any water not retained on-site is directed to the City’s storm drain system. Public Access and Views ● The project site is located between the nearest public road and the sea or shoreline. Implementation Plan Section 21.30A.040 requires that the provision of public access bear a reasonable relationship between the requirement and the project’s impact and be proportional to the impact. In this case, the project replaces an existing single-family residence located in PC22 with a new single-family residence. Therefore, the project does not involve a change in land use, density, 3 Santaniello Residence (PA2024-0014) Zoning Administrator, November 27, 2024 Page 4 or intensity that will result in increased demand for public access and recreation opportunities. Furthermore, the project is designed and sited (appropriate height, setbacks, etc.) so as not to block or impede existing public access opportunities. ● The project is not located adjacent to a coastal view road, public access way, or Coastal Viewpoint as identified in the Coastal Land Use Plan. The nearest coastal viewpoint is Westcliff Park, which is approximately 900 feet south of the property. In addition, there are several coastal view points on the pedestrian/bike trail that is adjacent to Newport Back Bay and is accessible through Blue Gum Lane, Grove Lane, and Santiago Drive. Several other coastal view points are also available through Castaways Park, which is approximately 1,620 feet west of the Property. The surrounding viewpoints throughout the pedestrian/bike trail, Westcliff Park, or Castaways Park are not visible from the site. ● Vertical access to the bay is available adjacent to the site off Blue Gum Lane, Grove Lane, and Santiago Drive, where each street provides public access to an existing pedestrian/bike trail along the bluff. Lateral access is available on the same trail which is also accessible using Castaways Park. The project does not include any features that would obstruct access along these routes. ENVIRONMENTAL REVIEW This project is exempt from the California Environmental Quality Act (CEQA) under Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3 because it has no potential to have a significant effect on the environment. Class 3 exempts the demolition of up to three single-unit residences and new construction of a single-unit residence on any legal parcel. The proposed project consists of the demolition of one single-family residence and the construction of a new 4,440-square- foot single-unit residence with an attached 643 square-foot two-car garage and therefore qualifies within this exemption. There are no known exceptions listed in CEQA Guidelines Section 15300.2 that would invalidate the use of this exemption. The project location does not impact an environmental resource of hazardous or critical concern, does not result in cumulative impacts, does not have a significant effect on the environment due to unusual circumstances, does not damage scenic resources within a state scenic highway, is not a hazardous waste site, and is not identified as a historical resource. PUBLIC NOTICE Notice of this public hearing was published in the Daily Pilot, mailed to all owners and residential occupants of property within 300 feet of the boundaries of the site (excluding intervening rights-of-way and waterways), including the applicant, and posted on the subject property at least 10 days before the scheduled hearing, consistent with the 4 Santaniello Residence (PA2024-0014) Zoning Administrator, November 27, 2024 Page 5 provisions of the Municipal Code. Additionally, the item appeared on the agenda for this meeting, which was posted at City Hall and on the city website. APPEAL PERIOD: This action shall become final and effective 14 days following the date the Resolution is adopted unless within such time an appeal or call for review is filed with the Community Development Director by the provisions of Title 21 (Local Coastal Program [LCP] Implementation Plan) of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 (Appeal to the Coastal Commission) of the City’s certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. For additional information on filing an appeal, contact the Planning Division at 949- 644-3200. Prepared by: Laura Rodriguez, Planning Technician DL/lr Attachments: ZA 1 Draft Resolution ZA 2 Vicinity Map ZA 3 Project Plans 5 Attachment No. ZA 1 Draft Resolution 6 01-10-2023 RESOLUTION NO. ZA2024-### A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH APPROVING COASTAL DEVELOPMENT PERMIT TO DEMOLISH AN EXISTING SINGLE- UNIT RESIDENCE AND CONSTRUCT A NEW 2-STORY SINGLE- UNIT RESIDENCE AND ATTACHED 2-CAR GARAGE LOCATED AT 1206 BLUE GUM LANE (PA2024-0014) THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1.An application was filed by David Hohmann (Applicant), concerning property located at 1206 Blue Gum Lane and legally described as Lot 14 of Tract No. 9620 (Property), requesting approval of a coastal development permit (CDP). 2.The Applicant proposes the demolition of an existing single-unit residence and construct a 4,440-square-foot, two-story, single-unit residence with an attached 643-square-foot two-car garage. The project also includes landscaping, hardscaping, and site walls. The project complies with all applicable development standards and no deviations are requested. All improvements authorized by this CDP will be located on private property (Project). 3.The Property is designated Single Unit Residential Detached (RS-D) by the General Plan Land Use Element and is located in the Westcliff Grove Planned Community (PC22) Zoning District. 4.The Property is located in the coastal zone. The Coastal Land Use Plan category is Single Unit Residential Detached – (0.0 – 5.9 DU/AC) (RSD-A) and it is located within the Westcliff Grove Planned Community (PC22) Coastal Zoning District. 5.A public hearing was held on November 27, 2024, online via Zoom. A notice of the time, place, and purpose of the hearing was given by the Newport Beach Municipal Code (NBMC). Evidence, both written and oral, was presented to and considered by, the Zoning Administrator at this hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1.This Project is categorically exempt pursuant to Title 14 of the California Code of Regulations Section 15303, Division 6, Chapter 3, Guidelines for Implementation of the California Environmental Quality Act (CEQA) under Class 3 (New Construction or Conversion of Small Structures) because it has no potential to have a significant effect on the environment. 2.Class 3 exempts the demolition of up to 3 single-unit residences and new construction of a single-unit residence on any legal parcel. The Project consists of the demolition of 7 Zoning Administrator Resolution No. ZA2024-### Page 2 of 7 one single-unit residence and the construction of a new 4,440-square-foot, single-unit residence, and an attached 643-square-foot, two-car garage. 3. The exceptions to this categorical exemption under Section 15300.2 are not applicable. The Project location does not impact an environmental resource of hazardous or critical concern, does not result in cumulative impacts, does not have a significant effect on the environment due to unusual circumstances, does not damage scenic resources within a state scenic highway, is not a hazardous waste site, and is not identified as a historical resource. SECTION 3. REQUIRED FINDINGS. By Section 21.52.015 (Coastal Development Permits, Findings, and Decision) of the Newport Beach Municipal Code, the following findings, and facts in support of such findings are set forth: Finding: A. Conforms to all applicable sections of the certified Local Coastal Program. Facts in Support of Finding: 1. The proposed development complies with applicable residential development standards including, but not limited to, floor area limitation, setbacks, height, and parking. a. The maximum lot coverage is 60% (3,958 square feet of the 6,598-square-foot lot) and the proposed lot coverage is 48% (3,182 square feet), which includes roof overhangs and eaves. b. The proposed development provides the minimum required setbacks, which are 20 feet along the front property line abutting Blue Gum Lane, 5 feet along each side property line, and 10 feet along the rear property line which abuts an alley. c. The highest guardrail is less than 24 feet from the established grade and the highest ridge is no more than 28 feet from the established grade, which complies with the maximum height requirements as identified in the PC22 development standards. d. The PC22 development standards requires single-unit residences to provide a two- car garage. The Project is compliant with the minimum two-car garage parking requirement. 2. The neighborhood is predominantly developed with one and two-story, single-unit residences. The proposed design, bulk, and scale of the development are consistent with the existing neighborhood pattern of development. 3. The Project is located on an inland property in a developed area approximately 900 feet from the bay. The Property is separated from the bay by several rows of residences and 8 Zoning Administrator Resolution No. ZA2024-### Page 3 of 7 streets such as Cape Andover and Polaris Drive. The finished floor elevation of the first floor of the proposed structure is 82.00 feet based on the North American Vertical Datum of 1988 (NAVD88), which complies with the minimum 9.0-foot NAVD88 elevation standard for new structures. The identified distances from the coastal hazard areas coupled with the 82.00-foot NAVD 88 finish floor elevation will help to ensure the Project is reasonably safe for the economic life of the structure. 4.The Property is not located on the shoreline, nor is it located within 100 feet of coastal waters of coastal waters. A Construction Erosion Control Plan was provided to implement temporary Best Management Practices (BMPs) during construction to minimize erosion and sedimentation and to minimize pollution of runoff and coastal waters derived from construction chemicals and materials. The Project design also addresses water quality through the inclusion of a post-construction drainage system that includes drainage and percolation features designed to retain dry weather and minor rain event runoff on-site. Any water not retained on-site is directed to the City’s storm drain system. 5.Proposed landscaping complies with Implementation Plan Section 21.30.075. A condition of approval is included that requires drought-tolerant species. Before the issuance of building permits, the final landscape plans will be reviewed to verify invasive species are not planted. 6.The Property is not located adjacent to a coastal view road, public access way, or Coastal Viewpoint as identified in the Coastal Land Use Plan. The nearest coastal viewpoint is Westcliff Park, which approximately 900 feet south of the Property. In addition, there are several coastal view points on the pedestrian/bike trail that is adjacent to Newport Back Bay and is accessible through Blue Gum Lane, Grove Lane, and Santiago Drive. Several other coastal view points are also available through Castaways Park, which is approximately 1,620 feet west of the Property. The surrounding view points throughout the pedestrian/bike trail, Westcliff Park, or Castaways Park are not visible from the site. The Project complies with all applicable Local Coastal Program (LCP) development standards and maintains a building envelope consistent with the existing neighborhood pattern of development. Therefore, the Project does not contain any unique features that could degrade the visual quality of the coastal zone. Finding: B.Conforms with the public access and public recreation policies of Chapter 3 of the Coastal Act if the project is located between the nearest public road and the sea or shoreline of any body of water located within the coastal zone. Fact in Support of Finding: 1.The Property is located between the nearest public road and the sea or shoreline. Implementation Plan Section 21.30A.040 requires that the provision of public access bear a reasonable relationship between the requirement and the Project’s impact and be proportional to the impact. In this case, the Project replaces an existing single-unit residence located in PC22 with a new single-unit residence. Therefore, the Project does not involve a change in land use, density, or intensity that will result in increased demand 9 Zoning Administrator Resolution No. ZA2024-### Page 4 of 7 for public access and recreation opportunities. Furthermore, the Project is designed and sited (appropriate height, setbacks, etc.) so as not to block or impede existing public access opportunities. 2.Vertical access to the bay is available adjacent to the site off Blue Gum Lane, Grove Lane, and Santiago Drive, where each street provides public access to an existing pedestrian/bike trail along the bluff. Lateral access is available on the same trail which is also accessible using Castaways Park. The Project does not include any features that would obstruct access along these routes. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1.Zoning Administrator of the City of Newport Beach hereby finds this project is categorically exempt from the California Environmental Quality Act under Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3 because it has no potential to have a significant effect on the environment. 2.The Zoning Administrator of the City of Newport Beach hereby approves Coastal Development Permit No. PA2024-0014, subject to the conditions outlined in Exhibit “A,” which is attached hereto and incorporated by reference. 3.This action shall become final and effective 14 days following the date this Resolution was adopted unless within such time an appeal or call for review is filed with the Community Development Director by the provisions of Title 21 Local Coastal Program (LCP) Implementation Plan, of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 (Appeal to the Coastal Commission) of the City’s certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. PASSED, APPROVED, AND ADOPTED THIS 27TH DAY OF NOVEMBER, 2024. _____________________________________ Benjamin M. Zdeba, Zoning Administrator 10 Zoning Administrator Resolution No. ZA2024-### Page 5 of 7 EXHIBIT “A” CONDITIONS OF APPROVAL 1. The development shall be in substantial conformance with the approved site plan, floor plans, and building elevations stamped and dated with the date of this approval (except as modified by applicable conditions of approval). 2. No demolition or construction materials, equipment debris, or waste, shall be placed or stored in a location that would enter the sensitive habitat, receiving waters, or storm drains or result in impacts to environmentally sensitive habitat areas, streams, the beach, wetlands or their buffers. No demolition or construction materials shall be stored on public property. 3. The applicant is responsible for compliance with the Migratory Bird Treaty Act (MBTA). In compliance with the MBTA, grading, brush removal, building demolition, tree trimming, and similar construction activities shall occur between August 16 and January 31, outside of the peak nesting period. If such activities must occur inside the peak nesting season from February 1 to August 15, compliance with the following is required to prevent the taking of native birds under MBTA: A. The construction area shall be inspected for active nests. If birds are observed flying from a nest or sitting on a nest, it can be assumed that the nest is active. Construction activity within 300 feet of an active nest shall be delayed until the nest is no longer active. Continue to observe the nest until the chicks have left the nest and activity is no longer observed. When the nest is no longer active, construction activity can continue in the nest area. B. It is a violation of state and federal law to kill or harm a native bird. To ensure compliance, consider hiring a biologist to assist with the survey for nesting birds, and to determine when it is safe to commence construction activities. If an active nest is found, one or two short follow-up surveys will be necessary to check on the nest and determine when the nest is no longer active. 4. Best Management Practices (BMPs) and Good Housekeeping Practices (GHPs) shall be implemented before and throughout the duration of construction activity as designated in the Construction Erosion Control Plan. 5. The discharge of any hazardous materials into storm sewer systems or receiving waters shall be prohibited. Machinery and equipment shall be maintained and washed in confined areas specifically designed to control runoff. A designated fueling and vehicle maintenance area with appropriate berms and protection to prevent spillage shall be provided as far away from storm drain systems or receiving waters as possible. 6. Debris from demolition shall be removed from work areas each day and removed from the Property within 24 hours of the completion of the Project. Stockpiles and construction materials shall be covered, enclosed on all sites, not stored in contact with the soil, and located as far away as possible from drain inlets and any waterway. 11 Zoning Administrator Resolution No. ZA2024-### Page 6 of 7 7. Trash and debris shall be disposed of in proper trash and recycling receptacles at the end of each construction day. Solid waste, including excess concrete, shall be disposed of in adequate disposal facilities at a legal disposal site or recycled at a recycling facility. 8. Revisions to the approved plans may require an amendment to this Coastal Development Permit or the processing of a new coastal development permit. 9. The Project is subject to all applicable City ordinances, policies, and standards unless specifically waived or modified by the conditions of approval. 10. The Applicant shall comply with all federal, state, and local laws. A material violation of any of those laws in connection with the use may be caused by the revocation of this Coastal Development Permit. 11. This Coastal Development Permit may be modified or revoked by the Zoning Administrator if determined that the proposed uses or conditions under which it is being operated or maintained are detrimental to the public health, and welfare or materially injurious to Property or improvements in the vicinity or if the Property is operated or maintained to constitute a public nuisance. 12. Prior to the issuance of building permits, the Applicant shall submit a final construction erosion control plan. The plan shall be subject to review and approval by the Building Division. 13. Prior to the issuance of building permits, the Applicant shall submit a final drainage and grading plan. The plan shall be subject to review and approval by the Building Division. 14. Prior to issuance of a building permit, a copy of the Resolution, including conditions of approval Exhibit “A” shall be incorporated into the Building Division and field sets of plans. 15. Prior to the issuance of a building permit, the Applicant shall submit a final landscape and irrigation plan. These plans shall incorporate drought-tolerant plantings, non- invasive plant species, and water-efficient irrigation design. The plans shall be approved by the Planning Division. 16. All landscape materials and irrigation systems shall be maintained by the approved landscape plan. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing, and trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. 17. Construction activities shall comply with Section 10.28.040 of the Newport Beach Municipal Code, which restricts hours of noise-generating construction activities that produce noise to between the hours of 7:00 a.m. and 6:30 p.m., Monday through Friday, 12 Zoning Administrator Resolution No. ZA2024-### Page 7 of 7 and 8:00 a.m. and 6:00 p.m. on Saturday. Noise-generating construction activities are not allowed on Sundays, or Holidays. 18. All noise generated by the proposed use shall comply with the provisions of Chapter 10.26 and other applicable noise control requirements of the Newport Beach Municipal Code. 19. Prior to the issuance of the building permit, the Applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 20. Should the Property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by the current property owner or agent. 21. This Coastal Development Permit No. PA2024-0014 shall expire unless exercised within 24 months from the date of approval as specified in Section 21.54.060 (Time Limits and Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise granted. 22. To the fullest extent permitted by law, the Applicant shall indemnify, defend and hold harmless the City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs, and expenses (including without limitation, attorney’s fees, disbursements, and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of Santaniello Residence including but not limited to, Coastal Development Permit No. PA2024-0014 This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorney’s fees, and other expenses incurred in connection with such claim, action, causes of action, suit, or proceeding whether incurred by the Applicant, City, and/or the parties initiating or bringing such proceeding. The Applicant shall indemnify the City for all the City's costs, attorneys' fees, and damages, which the City incurs in enforcing the indemnification provisions outlined in this condition. The Applicant shall pay to the City upon demand any amount owed to the City under the indemnification requirements prescribed in this condition. 13 Attachment No. ZA 2 Vicinity Map 14 VICINITY MAP Coastal Development Permit No. PA2024-0014 1206 Blue Gum Lane Subject Property 15 Attachment No. ZA 3 Project Plans 16 17 18 SYMBOLS AND ABBREVIATIONS XX.XX TG XX.XX INVX XX.XX FG X 36"PROPOSED TREE NOTE: NOT ALL SYMBOLS USED HARDSCAPE DRIVEWAY BUILDING STORM DRAIN SUMP PUMP DISCHARGE ASSEMBLY GRADING LEGEND, PROPOSED RETAINING WALL PROPOSED SIDE PROPERTY WALL PROPOSED SITE SCREEN WALL PROPOSED ROOF DOWN SPOUT PROPOSED PLANTER DRAIN INLET PROPOSED SQ. GRATE DRAIN INLET PROPOSED PERFORATED SUBDRAIN PROPOSED 12" MAIN CATCH BASIN PROPOSED EARTHEN DRAINAGE SWALE PL PROPERTY LINE PROPOSED 4" STORM DRAIN LINE FG: FS: DS: INV: TOS: TG: FL: NG: TC: TW: TF: FF: GFF: FINISHED GRADE FINISHED SURFACE DOWNSPOUT INVERT ELEVATION TOP OF SLAB TOP OF GRATE (DRAIN INLET) FLOW LINE NATURAL GRADE ELEV TOP OF CURB TOP OF WALL TOP OF FOOTING FINISHED FLOOR GARAGE FINISHED FLOOR PROPOSED 6" STORM DRAIN LINE PERF SUBDRAIN 4" 6" PROPERTY LINE PROPOSED CHANNEL DRAIN PROPOSED CONCRETE DRAINAGE SWALE HP:HIGH POINT DG LAWN/TURF BOX LOCATION PLANTER AREA/ NATURAL GROUND FLOW ARROW POOL/ SPA/ WATER FEATURE DRAIN INLET CALLOUT CONSTRUCTION NOTE PROPOSED SPOT ELEVATION (XX.XX) FG EXISTING SPOT ELEVATION GRADE SLOPE PERCENTAGE XX % WOOD DECK PROPOSED TRENCH DRAIN DS CO V E R S H E E T 1 5 G-01 VICINITY MAPPROPOSED REDEVELOPMENT ARCHITECT: G-02 PRECISE GRADING PLAN COVER SHEET SHEET INDEX G-01 CIVIL ENGINEER: EARTHWORK QUANTITIES SOILS ENGINEER: NOTES TO OWNER, CONTRACTOR & ARCHITECT CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONSTRUCTION CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND CONSTRUCTION CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CNNECTION WITH THE PERFORMANCE OF WORK ON PROJECT. THE ESTIMATE OF QUANTITIES AS SHOWN HEREON ARE PROVIDED ONLY FOR THE PURPOSE OF SATISFYING PLAN INFORMATION REQUIREMENTS. THE CONTRACTOR SHALL PERFORM AN INDEPENDENT ESTIMATE OF ALL QUANTITIES AS A BASIS FOR HIS BIDS AND CONTRACTS. GRADING & DRAINAGE DETAILS DRAINAGE METHODOLOGY THE PROPOSED METHOD OF DRAINAGE FOR THIS PROJECT INVOLVES THE COLLECTION OF SURFACE DRAINAGE IN LANDSCAPED AREAS AND THE COLLECTION OF FLOWS VIA AREA DRAINS AND ENTRANCE INTO A SUBTERRANEAN DRAIN PIPE NETWORK TO SAFELY DISCHARGE STORM RUNOFF TO THE EXISTING MAINLINE STORM DRAIN SYSTEM. ROOF DOWNSPOUTS AND DECK DRAINS WILL CONNECT DIRECTLY TO NEAREST AREA DRAINS. ALL EXISTING TOPOGRAPHY AND PROPOSED GRADES SHOULD BE FIELD VERIFIED. NO UTILITY SEARCH WAS CONDUCTED. A UTILITY SEARCH BY THE CONTRACTOR SHOULD BE CONDUCTED AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES OR STRUCTURE FOUND ON THE SITE AND TO NOTIFY THE OWNERS OF THE UTILITIES IMMEDIATELY UPON THEIR DISCOVERY. EARTHWORK AND OTHER CONSTRUCTION ITEM QUANTITIES SHOWN ON THESE PLANS ARE ESTIMATES FOR AGENCY SUBMITTAL AND NOT TO BE USED FOR CONSTRUCTION COST ESTIMATES FOR BIDDING PURPOSES. CONTRACTOR (S) MUST DEVELOP OWN QUANTITIES FOR BIDDING PURPOSES. A SOILS INVESTIGATION MUST BE MADE BY A QUALIFIED SOILS ENGINEER AND/OR GEOLOGIST. SOIL AND EARTH ACCEPTABILITY ARE NOT UNDER PURVIEW OR THE RESPONSIBITLITY OF DESIGN ENGINEER FOR THIS PLAN. DZNE, INC. DOES NOT TEST OR OBSERVE SOIL CONDITIONS PRIOR TO, DURING OR AFTER CONSTRUCTION AND HAS NO RESPONSIBILITY FOR SOILS (EARTH) STRUCTURES. ALL RETAINING WALL DESIGNS ARE TO BE BUILT PER STRUCTURAL ENGINEER'S PLAN AND NOT BY INFORMATION SHOWN ON THIS PLAN. DESIGN OF RETAINING WALL IS BY OTHERS, NOT DZNE, INC. 1. 2. 3. 4. 5. 6. PROJECT TEAM ALL WORK SHALL CONFORM TO CHAPTER 15 OF THE NEWPORT BEACH MUNICIPAL CODE (NBMC),THE PROJECT SOILS REPORT AND SPECIAL REQUIREMENTS OF THE PERMIT. 1. DUST SHALL BE CONTROLLED BY WATERING AND/OF JUST PALLIATIVE.2. SANITARY FACILITIES SHALL BE MAINTAINED ON THE SITE DURING CONSTRUCTION PERIOD.3. WORK HOURS ARE LIMITED FROM 7:00 AM TO 6:30 PM MONDAY THROUGH FRIDAY; 8:00 AM TO 6:00 PM SATURDAYS; AND NO WORK ON SUNDAYS AND HOLIDAYS PER SECTION 10-28 OF THE NBMC.4. NOISE, EXCAVATION, DELIVERY AND REMOVAL SHALL BE CONTROLLED PER SECTION 10-28 OF THE NBMC.5. THE STAMPED SET OF THE APPROVED PLANS SHALL BE ON THE JOB SITE AT ALL TIMES.6. PERMITTEE AND CONTRACTOR ARE RESPONSIBLE FOR LOCATING AND PROTECTING UTILITIES.7. APPROVED SHORING, DRAINAGE PROVISION AND PROTECTIVE MEASURES MUST BE USED TO PROTECT ADJOINING PROPERTIES DURING THE GRADING OPERATION. 8. CESSPOOLS AND SEPTIC TANKS SHALL BE ABANDONED IN COMPLIANCE WITH THE UNIFORM PLUMBING CODE AND APPROVED BY THE BUILDING OFFICIAL. 9. HAUL ROUTES FOR IMPORT OR EXPORT OF MATERIALS SHALL BE APPROVED BY THE CITY TRAFFIC ENGINEER AND PROCEDURES SHALL CONFORM WITH CHAPTER 15 OF THE NBMC. 10. POSITIVE DRAINAGE SHALL BE MAINTAINED AWAY FROM ALL BUILDINGS AND SLOPE AREAS.11. FAILURE TO REQUEST INSPECTIONS AND/OR HAVE REMOVABLE EROSION CONTROL DEVICES ON-SITE AT THE APPROPRIATE TIMES SHALL RESULT IN A "STOP WORK" ORDER. 12. ALL PLATIC DRAINAGE PIPES SHALL CONSIST OF PVC OR ABS PLASTIC SCHEDULE 40 OR SDR 35 OR ADS 3000 WITH GLUED JOINTS. 13. TEMPORARY EROSION CONTROL PLANS ARE REQUIRED FROM OCTOBER 15 TO MAY 15.1. EROSION CONTROL DEVICES SHALL BE AVAILABLE ON-SITE BETWEEN OCTOBER 15 AND MAY 15.2. BETWEEN OCTOBER 15 AND MAY 15, EROSION CONTROL MEASURES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHENEVER THE FIVE-DAY PROBABILITY OF RAIN EXCEEDS 30 PERCENT. DURING THE REMAINDER OF THE YEAR, THEY SHALL BE IN PLACE AT THE END OF WORKING DAY, WHENEVER THE DAILY RAINFALL PROBBABILITY EXCEEDS 50 PERCENT. 3. TEMPORARY DESILTING BASINS, WHEN REQUIRED, SHALL BE INSTALLED FOR THE DURATION OF THE PROJECT.4. A PRE-GRADING MEETING SHALL BE SCHEDULED 48 HOURS PRIOR TO START OF GRADING WITH THE FOLLOWING PEOPLE PRESENT: OWNER, GRADING CONTRACTOR, DESIGN CIVIL ENGINEER, SOILS ENGINEER, GEOLOGISTS, CITY BUILDING INSPECTOR OR THEIR REPRESENTATIVES. REQUIRED FIELD INSPECTIONS WILL BE OUTLINED AT THE MEETING. 1. A PRE-PAVING MEETING SHALL BE SCHEDULED 48 HOURS PRIOR TO START OF THE SUB-GRADE PREPARATION FOR THE PAVING WITH THE FOLLOWING PEOPLE PRESENT: OWNER, PAVING CONTRACTORS, DESIGN CIVIL ENGINEER, SOILS ENGINEER, CITY BULDING INSPECTOR OR THEIR REPRESENTATIVES. REQUIRED FIELD INSPECTIONS WILL BE OUTLINED AT THE MEETING. 2. NO PAINT, PLASTER, CEMENT, SOIL, MORTAR OR OTHER RESIDUE, SHALL BE ALLOWED TO ENTER STREETS CURBS, GUTTERS OR STORM DRAINS. ALL MATERIAL SHALL AND WASTE SHALL BE REMOVED FROM THE SITE.14. EROSION CONTROL REQUIRED INSPECTIONS AREAS TO RECEIVE FILL SHALL BE CLEARED OF ALL VEGETATION AND DEBRIS, SCARIFIED AND APPROVED BY THE SOILS ENGINEER PRIOR TO PLACING OF THE FILL.4. FILLS SHALL BE KEYED OR BENCHED INTO COMPETENT MATERIAL.5. ALL EXISTING FILLS SHALL BE APPROVED BY THE SOILS ENGINEER OR REMOVED BEFORE ANY ADDITIONAL FILLS ARE ADDED.6. ANY EXISTING IRRIGATION LINES AND CISTERNS SHALL BE REMOVED OR CRUSHED IN PLACE AND BACKFILLED AND APPROVED BY THE SOILS ENGINEER. 7. THE ENGINEERING GEOLOGIST AND SOILS ENGINEER SHALL, AFTER CLEARING AND PRIOR TO THE PLACEMENT OF FILL IN CANYONS, INSPECT EACH CANYONS FOR AREAS OF ADVERSE STABILITY AND DETERMINE THE PRESENCE OF, OR POSSIBILITY OF FUTURE ACCUMULATION OF, SUBSURFACE WATER OR SPRING FLOW. IF NEEDED, DRAINS WILL BE DESIGNED AND CONSTRUCTED PRIOR TO THE PLACEMENT OF FILL IN EACH RESPECTIVE CANYON. 8. THE EXACT LOCATION OF THE SUBDRAINS SHALL BE SURVEYED IN THE FIELD FOR LINE AND GRADE.9. ALL TRENCH BACKFILLS SHALL BE COMPACTED THROUGHOUT THE MINIMUM OF 90 PERCENT RELATIVE COMPACTION, AND APPROVED BY THE SOILS ENGINEER. THE BUILDING DEPARTMENT MAY REQUIRED CORING OF CONCRETE FLATWORK PLACED OVER UNTESTED BACKFILLS TO FACILITATE TESTING. 10. THE STOCKPILLING OF EXCESS MATERIAL SHALL BE APPROVED BY THE BUILDING DEPARTMENT.11. LANDSCAPING OF ALL SLOPES AND PADS SHALL BE IN ACCORDANCE WITH CHAPTER 15 OF THE NBMC.12. ALL CUT SLOPES SHALL BE INVESTIGATED BOTH DURING AND AFTER GRADING BY AN ENGINEERING GEOLOGIST TO A DETERMINE IF ANY STABILITY PROBLEM EXISTS. SHOULD EXCAVATION DISCLOSE ANY GEOLOGICAL HAZARDS OR POTENTIAL GEOLOGICAL HAZARDS, THE ENGINEERING GEOLOGISTS SHALL RECOMMEND AND SUBMIT NECESSARY TREATMENT TO THE BUILDING DEPARTMENT FOR APPROVAL. 13. WHERE SUPPORT OR BUTTRESSING OF CUT AND NATURAL SLOPE IS DETERMINED TO BE NECESSARY BY THE ENGINEERING GEOLOGIST AND SOILS ENGINEER, THE SOILS ENGINEER WILL OBTAIN APPROVAL OF DESIGN, LOCATIONS AND CALCULATIONS FROM THE BUILDING DEPARTMENT PRIOR TO CONSTRUCTION. 14. THE ENGINEERING GEOLOGIST AND SOILS ENGINEER SHALL INSPECT AND TEST THE CONSTRUCTION OF ALL BUTTRESS FILLS AND ATTEST TO THE STABILITY OF THE SLOPE AND ADJACENT STRUCTURES UPON COMPLETION 15. WHEN CUT PADS ARE BROUGHT TO NEAR GRADE THE ENGINEERING GEOLOGIST SHALL DETERMINE OF THE BEDROCK IF EXTENSIVELY FRACTURED OR FAULTED AND WILL READILY TRANSMIT WATER. IF CONSIDERED NECESSARY BY THE ENGINEERING GEOLOGIST AND SOILS ENGINEER, A COMPACTED FILL BLANKET WIL BE PLACED. 16. THE ENGINEERING GEOLOGIST SHALL PERFORM PERIODIC INSPECTIONS DURING GRADING.17. NOTIFICATION OF NONCOMPLIANCE: IF, IN THE CURSE OF FULLFILLING THEIR RESPONSIBILITY, THE CIVIL ENGINEER, THE SOILS ENGINEER, THE ENGINEERING GEOLOGIST OR THE TESTING AGENCY FINDS THAT THE WORK IS NOT BEING DONE IN CONFORMANCE WITH THE APPROVED GRADING PLANS, THE DISCREPANCIES SHALL BE REPORTED IMMEDIATELY IN WRITING TO THE PERSON IN CHARGE OF THE GRADING WORK AND TO THE BUILDING INSPECTOR. RECOMMENDATIONS FOR CORRECTIVE MEASURES, IF NECESSARY, SHALL BE SUBMITTED TO THE BUILDING DEPARTMENT FOR APPROVAL. 18. DOCUMENTATION AN AS-BUILT GRADING PLAN SHALL BE PREPARED BY THE CIVIL ENGINEER INCLUDING ORIGINAL GROUND SURFACE ELEVATIONS, AS GRADED GROUND SURFACE ELEVATIONS, LOT DRAINAGE PATTERNS AND LOCATIONS AND ELEVATIONS OF ALL SURFACE AND SUBSURFACE DRAINAGE FACILITIES. HE/SHE SHALL PROVIDE WRITTEN APPROVAL THAT THE WORK WAS DONE IN ACCORDANCE WITH THE FINAL APPROVED GRADING PLAN AND STATE THE NUMBER OF YARDS OF CUT AND/OR FILL MOVED DURING THE OPERATION. 1. A SOILS GRADING REPORT PREPARED BY THE SOILS ENGINEER, INCLUDING LOCATIONS AND ELEVATIONS OF FIELD DENSITY TEST. SUMMARIES OF FIELD AND LABORATORY RESULTS AND OTHER SUBSTANTIATED DATA AND COMMENTS ON ANY CHANGES MADE DURING GRADING AND THEIR EFFECT ON THE RECOMMENDATIONS MADE IN THE SOILS ENGINEER INVESTIGATION REPORT. HE SHALL PROVIDE WRITTEN APROVALAS TO THE ADEQUACY OF THE SITE FOR THE INTENDED USE AND COMPLETION OF WORK IN ACCORDANCE WITH THE JOB SPECIFIACATIONS. 2. A GEOLOGIC GRADING REPORT PREPARED BY THE ENGINEERING GEOLOGIST, INCLUDING A FINAL DESCRIPTION OF THE GEOLOGY OF THE SITE, INCLUDING ANY NEW INFORMATION DISCLOSED DURING THE GRADING AND THE EFFECT OF SAME ON RECOMMENDATIONS INCORPORATED IN THE APPROVED GRADING PLAN. HE/SHE SHALL PROVIDE WRITTEN APPROVAL AS TO THE ADEQUACY OF THE SITE FOR THE INTENDED USE AFFECTED BY THE GEOLOGIC FACTORS. 3. GENERAL ITEM DESCRIPTION QTY RAW FILL 10 CY NET EXPORT 55 CY 1 2 3 OVER EXCAVATION (3 FT) 467 CY4SOILS AND GEOLOGIST CERTIFICATION THIS GRADING PLAN HAS BEEN REVIEWED BY THE UNDERSIGNED AND FOUND TO BE IN CONFORMANCE WITH THE RECOMMENDATIONS AS OUTLINED IN THE FOLLOWING SOILS AND GEOLOGIST REPORT FOR THIS PROJECT. DATE BY: BY: ENTITLED: DATED: FIRM NAME: JOB NUMBER: DATE RAW CUT 65 CY GRADED SLOPES SHALL BE NO STEEPER THAN 2 HORIZONTAL TO 1 VERTICAL.1. FILL SLOPES SHALL BE COMPACTED TO NO LESS THAN 90 PERCENT RELATIVE COMPACTION OUT TO THE FINISHED SURFACE. 2. GRADING FILLS/CUTS ALL FILLS SHALL BE COMPACTED THROUGHOUT TO THE MINIMUM OF 90 PERCENT RELATIVE COMPACTION AS DETERMINED BY ASTM TEST METHOD 1557, AND APPROVED BY THE SOILS ENGINEER. COMPACTION TEST SHALL BE PERFORMED APPROXIMATELY EVERY TWO FEET IN VERTICAL HEIGHT AND OF SUFFICIENT QUANTITY TO ATTEST TO THE OVERALL COMPACTION EFFORT APPLIED TO THE FILL AREAS. 3. 1206 BLUE GUM LANE, NEWPORT BEACH, CA 92660 LAND SURVEYOR: ISSUANCE OF A BUILDING PERMIT BY THE CITY OF NEWPORT BEACH DOES NOT RELIEVE APPLICANTS OF THE LEGAL REQUIREMENTS TO OBSERVE COVENANTS, CONDITIONS AND RESTRICTIONS WHICH MAY BE RECORDED AGAINST THE PROPERTY OR TO OBTAIN PLANS. YOU SHOULD CONTACT YOUR COMMUNITY ASSOCIATIONS PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION AUTHORIZED BY THIS PERMIT. 7. G-03 EROSION CONTROL PLAN GRADING NOTES DAVID HOHMANN 250 BAKER ST. E COSTA MESA, CA 92626 PHONE: 714 241-3600 dhohmann@sbcglobal.net RdM SURVEYING, INC. 23016 LAKE FOREST DRIVE #409 LAGUNA HILLS, CA 92653 CONTACT: RON MEDIEMA, L.S. 4653 P : (949) 858-2924 C: (949) 422-1869 rdmsurveying@cox.net G-04 SOILS RECOMMENDATIONS NOT TO SCALE POOLS, SPAS, WALLS, FENCES, PATIO COVERS AND OTHER FREESTANDING STRUCTURES REQUIRE SEPARATE REVIEWS AND PERMITS.15. FENCES, HEDGES, WALLS, RETAINING WALLS, GUARDRAILS AND HANDRAILS OR ANY COMBINATION THEREOF SHALL NOT EXCEED 42 INCHES FROM EXISTING GRADE PRIOR TO CONSTRUCTION WITHIN THE REQUIRED FRONT SETBACK AREA(S). 16. G-05 1. ALL EXISTING TOPOGRAPHY AND PROPOSED GRADES SHOULD BE FIELD VERIFIED. 2. NO UTILITY SEARCH WAS CONDUCTED. CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT UTILITIES OR STRUCTURES FOUND ON THE SITE AND TO NOTIFY OWNER/ENGINEER IMMEDIATELY TO RESOLVE ANY CONFLICTS OR ISSUES WITH PROPOSED GRADING DESIGN 3. GRADING AND/OR LANDSCAPE CONTRACTOR SHALL GRADE ALL AREAS TO POSITIVE DRAIN (2% MIN) AND SHALL EXERCISE CARE IN CONSTRUCTION OF MOUNDS AND SWALES SO PONDING WILL NOT OCCUR. 4. UNLESS OTHERWISE NOTED, FINISHED FLOOR ELEVATION MUST BE ABOVE ADJACENT FINISHED GRADE OR SURFACE AS SHOWN BELOW: 5. COMPLY WITH MINIMUM SLOPE AT THE FOLLOWING AREAS: EARTH (FG) 5% (MINIMUM) FLATWORK (FS) 2% (MINIMUM) SLOPE DRAIN LINES 1% (MINIMUM) 6. PAD ELEVATION IS ASSUMED TO BE BASED ON SOILS REPORT & STRUCTURAL PLANS. CONTRACTOR TO VERIFY WITH LATEST SOILS REPORT AND STRUCTURAL ENGINEER FOR EXACT DESIGN RECOMMENDATIONS. 7. ALL ROOF SHALL BE GUTTERED AND DOWNSPOUTS CONNECTED TO THE NEAREST AREA DRAIN INLET TO THE STORM DRAIN SYSTEM. 8. TREE BOXES SHALL HAVE ROOT BARRIERS PER LANDSCAPE PLANS.TOPOGRAPHIC SURVEY SHOWN ON THE PRECISE GRADING PLAN SET IS FOR REFERENCE PURPOSES ONLY. 9. TOPOGRAPHIC SURVEY SHOWN ON THE PRECISE GRADING PLAN SET IS FOR REFERENCE PURPOSES ONLY 10. LAND SURVEYOR SHALL PERMANENTLY MONUMENT PROPERTY CORNERS OR OFFSETS BEFORE STARTING GRADING WORK.. GRADING NOTES grading plans for: 3" * FOR GRADES LOCATED WITHIN 10 FT OF BUILDING FOUNDATION PER [CRC R401.3] FF PER PLAN 8" FF PER PLAN 5% MIN2% MIN FINISHED GRADE (FG)FINISHED SURFACE (FS) DZN ENGINEERNG 166 MATISSE CIRCLE ALISO VIEJO, CA 92656 TEL: 949-305-8920 CONTACT: RONIE DEMA-ALA d'zn engineering PLANS PREPARED BY: 30 A 2 0 2 4 2 2 4 7 G R D S t i l l d THESE PLANS WERE PREPARED UNDER THE SUPERVISION OF: IN M ISS ED AL ON L A-A ENG A E P R DINOISTERE ROF .L No. C54067 E REG LI A IALFORNIICS EXP. ETATOF V 12/31/25 C EER 166 MATISSE CIRCLE ALISO VIEJO, CA 92656 TEL: (949) 305-8920 CLIENT/OWNER: SUSAN SANTANIELLO 1206 BLUE GUM LANENEWPORT BEACH, CA 92660 SHEET TITLE PROJECT_ADDRESS 1206 BLUE GUM LANE NEWPORT BEACH, CA 92660 BENCHMARK - - APN: 425-122-03 DATE: 22 FEB 2024 ENGINEER: R. DEMA-ALA CHECKER:R. DEMA-ALA PROJECT_No:2247 REVISIONS STATUS: SUBMITTAL 1 SHEET OF SHEETS A.IMPERVIOUS 1. BUILDING EXISTING PERVIOUS AREAS IN SF DESCRIPTION B. PROPOSED ADDED/ REPLACED 943 TOTAL SITE DATA LOT SIZE 3. HARDSCAPE 4. POOL/ SPA 5. WOOD DECK TOTAL 0 573 2, 652 2. DRIVEWAY 0 4, 168 2, 432 6, 600 4, 947 1, 653 (779) 779 1, 437 141 327 3, 042 (390) 246 (494) (141) 0 PROJECT SITE THIS IS NOT A SIGNIFICANT REDEVELOPMENT PROJECT AS THE TOTAL IMPERVIOUS AREA THAT HAS BEEN ADDED/REPLACED IS LESS THAN 5,000 SF. THUS, A WQMP IS NOT REQUIRED. “ANY CHANGES TO THE HARDSCAPE / LANDSCAPE MUST BE INDICATED ON A REVISED PRECISE GRADING PLAN, APPROVED BY THE CITY, AND MAY TRIGGER A WATER QUALITY MANAGEMENT PLAN (WQMP) CONSISTENT WITH THE MODEL WQMP, EXHIBIT 7.II.” EGA CONSULTANTS, INC. 375-C MONTE VISTA AVENUE COSTA MESA, CA 92627 PHONE (949) 642 9309 FAX (949) 642-1290 GEOTECHNICAL INVESTIGATION RD456.1 EGA CONSULTANTS, INC. SEPTEMBER 25, 2023 DAVID WORTHINGTON, CEG 2124 PRINCIPAL ENGINEERING GEOLOGIST PAUL DURAND, PE, RCE 58364 SR. PROJECT ENGINEER 19 N 50°10'30" W 119.96' N 3 9 ° 4 9 ' 3 0 " E 5 5 . 0 0 ' N 50°10'30" W 119.96' N 3 9 ° 4 9 ' 3 0 " E 5 5 . 0 0 ' LOT 14 BL U E G U M L A N E BUILDING BUILDING GM GARAGE AC U N I T GRAVELGRAVELGRAVEL MULT I TRU N K END FENCE PILEA S T E R TYP I C A L (98.34)RIDGE (95.41)RIDGE (101.97)RIDGE (80 . 8 N G ) (82.98NG) (79.2) (79. 0 9 N G ) (78.8) (78.72FS) (78.6) (83.2N G ) (81 . 5 5 N G ) (81.34 N G ) (81. 0 1 N G ) X X X X (78.2 7 F L ) (78.34FL) (78 . 9 1 T C X ) (78.3 6 F L ) (78. 5 1 F L ) (79. 0 3 T C X ) (78.79FL) (79.21TC) (78.76 F L ) (78.70FL) 3" OU T L E T 3" O U T L E T 3" OUTLET (79 . 9 6 N G ) WM (79 . 1 4 T C ) CA B L E T V CABLE TV EDISON (79. 1 3 F S ) 12" T R E E (79 . 1 6 F S ) (79.5 5 F S ) (79. 5 6 F S ) (79 . 2 7 F S ) (81 . 1 3 F S ) (80.79FS) (81.43GF) (80. 9 6 F S ) (81. 1 5 F S ) (81 . 2 2 F S ) (81. 9 6 F F ) (81.3 N G ) (81.3 8 F S ) (81.50FS)(82.88FS) (81.04FS) (81 . 4 9 F S ) (81 . 0 4 F S ) (80.91TG)(80.91TG) (81.70FS) X X X X X X X X XX X X XX (82.21 T W ) (81 . 8 8 T W ) CATCH BASIN BO X 20.1 28.0 4.0 6.0 CF.W. 2.0 GUTTER 5.0 5.0 4.9 4.5 28.0 MAI L B O X (81. 3 N G ) (79. 3 7 F S ) (78.90TC) (78.93TC) (79 . 4 9 F S ) (80.13TW) X (81 . 5 F S ) (81.5 F S ) (81. 5 F S ) (82.9 F S ) (82.9F S ) (82.9F S ) (81.4 F S ) (81.4F S ) (81. 4 F S ) 19.7 (81.9 T W ) PROPERTYLINE PROPERTYLINE PROPERTYLINE PROPERTYLINE CENTERLINE SEARCHED,FOUND NOTHING SEARCHED,FOUND NOTHING SEARCHED,FOUND NOTHING SEARCHED,FOUND NOTHING N 50°10'30" W 119.96' N 3 9 ° 4 9 ' 3 0 " E 5 5 . 0 0 ' N 50°10'30" W 119.96' N 3 9 ° 4 9 ' 3 0 " E 5 5 . 0 0 ' LOT 14 BL U E G U M L A N E BUILDING BUILDING GM GARAGE AC U N I T GRAVELGRAVELGRAVEL MULT I TRU N K END FENCE PILEA S T E R TYP I C A L (98.34)RIDGE (95.41)RIDGE (101.97)RIDGE (80 . 8 N G ) (82.98NG) (79.2) (79. 0 9 N G ) (78.8) (78.72FS) (78.6) (83.2N G ) (81 . 5 5 N G ) (81.34 N G ) (81. 0 1 N G ) X X X X (78.2 7 F L ) (78.34FL) (78 . 9 1 T C X ) (78.3 6 F L ) (78. 5 1 F L ) (79. 0 3 T C X ) (78.79FL) (79.21TC) (78.76 F L ) (78.70FL) 3" OU T L E T 3" O U T L E T 3" OUTLET (79 . 9 6 N G ) WM (79 . 1 4 T C ) CA B L E T V CABLE TV EDISON (79. 1 3 F S ) 12" T R E E (79 . 1 6 F S ) (79.5 5 F S ) (79. 5 6 F S ) (79 . 2 7 F S ) (81 . 1 3 F S ) (80.79FS) (81.43GF) (80. 9 6 F S ) (81. 1 5 F S ) (81 . 2 2 F S ) (81. 9 6 F F ) (81.3 N G ) (81.3 8 F S ) (81.50FS)(82.88FS) (81.04FS) (81 . 4 9 F S ) (81 . 0 4 F S ) (80.91TG)(80.91TG) (81.70FS) X X X X X X X X XX X X XX (82.21 T W ) (81 . 8 8 T W ) CATCH BASIN BO X 20.1 28.0 4.0 6.0 CF.W. 2.0 GUTTER 5.0 5.0 4.9 4.5 28.0 MAI L B O X (81. 3 N G ) (79. 3 7 F S ) (78.90TC) (78.93TC) (79 . 4 9 F S ) (80.13TW) X (81 . 5 F S ) (81.5 F S ) (81. 5 F S ) (82.9 F S ) (82.9F S ) (82.9F S ) (81.4 F S ) (81.4F S ) (81. 4 F S ) 19.7 (81.9 T W ) PROPERTYLINE PROPERTYLINE PROPERTYLINE PROPERTYLINE CENTERLINE SEARCHED,FOUND NOTHING SEARCHED,FOUND NOTHING SEARCHED,FOUND NOTHING SEARCHED,FOUND NOTHING PROPERTY LINE & LIMITS OF GRADING PERMIT PROPERTY LINE & LIMITS OF GRADING PERMIT PROPERTY LINE & LIMITS OF GRADING PERMIT (83.0 ) FG 15.10' (78.79) FL 3" OUTLET 1 81.07 TG 80.07 INV 80 . 0 0 T G 79. 0 0 I N V 3 (81.7 8 ) NG (81. 0 ) NG 81.0 TG 79.60 INV 2 80.82 TG 79.87 INV3 80.67 TG 79.67 INV3 79.47 INV 8.1.00 TG 80.30 INV 3 79.98 INV 3 82 . 8 3 T G 80 . 1 2 I N V 5% 2% 1" 80.40 TG 79.35 INV2 80.20TG 79.15 INV2 80.05 TG 79.00 INV2 79.85 TG 78.80 INV2 79.68 TG 78.63 INV2 81.75 FS 81.71 FS 2% 79.54 TG 78.54 INV1 78.20 TC 78.88 INV31 3'- 0 " 83.13 TG80.24 INV 2 79.04 INV 80.84 TG 79.32 INV 3 81.34 TG 79.52 INV 381.84 TG 79.72 INV 382.34 TG 79.92 INV 3 8 21 81.75 FS 80.7 2 FS 7.38% 79.16 FS 10%2% 82.0 TOS ____ PAD 1" 12" 81 . 0 G F F 1% 80.72 FS (8 0 . 8 0 G F F ) 0.9% 79.38 FS 2% 81.75 FS 81.91 FS 81.91 FS 81.75 FS 2% 4 4 4 5 5 5 80.39 TG79.14 INV 3 6 6 21 1% 1% 25 ' - 0 " 3'- 0 " (M A X . ) DS 7 DS 7 DS7 DS7 DS 7 DS 7 PROPERTY LINE & LIMITS OF GRADING PERMIT 79.08 FS (78.34 FL) 3" OUTLET 78.96 TC78.46 INV31 78.4 8 FS 79.30 FS 78.7 0 FS 79.18 T C 78.6 2 F L 81.33 FG 81.77 FS 81.33 FG 81.5 FG 81.33 FG 81.33 FG 6.34% 21 81.33 FG 81.33 FG SECTION A1 SECTION A1 SECTION A2 SECTION A2 SE C T I O N B SE C T I O N B s s s s 33 32 34 35 22 WM 87.71 TW 87.7 1 TW 84 82 80 78 (81. 7 8 ) NG (81. 4 8 ) NG (81. 5 ) NG 5% MIN. SLOPE 79.6 INV 2 81.3 3 FG (81.5 ) FS PL (81.4 ) FS PL (81.5 ) FS (78 . 7 1 ) FL (80 . 8 ) NG (85. 6 7 ) TW EXISTING FENCE 79.6 INV 2 81.33 FG 82.0 TOS 1% 81.0 GFF 80.8 0 GFF 80.7 2 FS 7.38% 79.1 6 FS 78.4 8 FS 8 PROPOSED GRADE EXISTING GRADE 79.0 8 FS (79. 2 7 ) FS (78 . 3 4 F L ) 3" O U T L E T 2%10% 5% 3.0 0 ' 3' OVER-EXCAVATION AS PER SOIL'S REPORT 4 5 SYMBOLS AND ABBREVIATIONS XX.XX TG XX.XX INVX XX.XX FG X 36"PROPOSED TREE NOTE: NOT ALL SYMBOLS USED HARDSCAPE DRIVEWAY BUILDING STORM DRAIN SUMP PUMP DISCHARGE ASSEMBLY GRADING LEGEND, PROPOSED RETAINING WALL PROPOSED SIDE PROPERTY WALL PROPOSED SITE SCREEN WALL PROPOSED ROOF DOWN SPOUT PROPOSED PLANTER DRAIN INLET PROPOSED SQ. GRATE DRAIN INLET PROPOSED PERFORATED SUBDRAIN PROPOSED 12" MAIN CATCH BASIN PROPOSED EARTHEN DRAINAGE SWALE PL PROPERTY LINE PROPOSED 4" STORM DRAIN LINE FG: FS: DS: INV: TOS: TG: FL: NG: TC: TW: TF: FF: GFF: FINISHED GRADE FINISHED SURFACE DOWNSPOUT INVERT ELEVATION TOP OF SLAB TOP OF GRATE (DRAIN INLET) FLOW LINE NATURAL GRADE ELEV TOP OF CURB TOP OF WALL TOP OF FOOTING FINISHED FLOOR GARAGE FINISHED FLOOR PROPOSED 6" STORM DRAIN LINE PERF SUBDRAIN 4" 6" PROPERTY LINE PROPOSED CHANNEL DRAIN PROPOSED CONCRETE DRAINAGE SWALE HP:HIGH POINT DG LAWN/TURF BOX LOCATION PLANTER AREA/NATURAL GROUND FLOW ARROW POOL/ SPA/ WATER FEATURE DRAIN INLET CALLOUT CONSTRUCTION NOTE PROPOSED SPOT ELEVATION (XX.XX) FG EXISTING SPOT ELEVATION GRADE SLOPE PERCENTAGE XX % WOOD DECK PROPOSED TRENCH DRAIN DS 1. ALL WORK RELATED TO WATER IN THE PUBLIC RIGHT-OF-WAY SHALL BE PERFORMED BY A C-34 LICENSED PIPELINE CONTRACTOR OR AN A LICENSED GENERAL ENGINEERING CONTRACTOR. 2. ALL WORK RELATED TO WASTEWATER IN THE PUBLIC RIGHT-OF-WAY SHALL BE PERFORMED BY A C-42 LICENSED SANITATION SEWER CONTRACTOR OR AN A LICENSED GENERAL ENGINEERING CONTRACTOR. 3. A CAL-OSHA PERMIT IS REQUIRED FOR EXCAVATIONS DEEPER THAN 5' AND FOR SHORING AND UNDERPINNING.” 4. PRIOR TO PERFORMING ANY WORK IN THE CITY RIGHT-OF-WAY AN ENCROACHMENT PERMIT MUST BE OBTAINED FROM THE PUBLIC WORKS DEPARTMENT. 5. SURVEYOR OR ENGINEER SHALL PERMANENTLY MONUMENT PROPERTY CORNERS OR OFFSETS BEFORE STARTING GRADING. 6. A PUBLIC WORKS DEPARTMENT ENCROACHMENT PERMIT INSPECTION IS REQUIRED BEFORE THE BUILDING DEPARTMENT PERMIT FINAL CAN BE ISSUED. AT THE TIME OF PUBLIC WORKS DEPARTMENT INSPECTION, IF ANY OF THE EXISTING PUBLIC IMPROVEMENTS SURROUNDING THE SITE IS DAMAGED, NEW CONCRETE SIDEWALK, CURB AND GUTTER, AND ALLEY/STREET PAVEMENT WILL BE REQUIRED. ADDITIONALLY, IF EXISTING UTILITIES INFRASTRUCTURE ARE DEEMED SUBSTANDARD, A NEW 1-INCH WATER SERVICE, WATER METER BOX, SEWER LATERAL AND/OR CLEANOUT WITH BOX AND LID WILL BE REQUIRED. 100% OF THE COST SHALL BE BORNE BY THE PROPERTY OWNER (MUNICIPAL CODES 14.24.020 AND 14.08.030). SAID DETERMINATION AND THE EXTENT OF THE RECONSTRUCTION WORK SHALL BE MADE AT THE DISCRETION OF THE PUBLIC WORKS INSPECTOR. CONTRACTOR IS RESPONSIBLE TO MAINTAIN THE PUBLIC RIGHT OF WAY AT ALL TIMES DURING THE CONSTRUCTION PROJECT. A STOP WORK NOTICE MAY BE ISSUED FOR ANY DAMAGE OR UNMAINTAINED PORTION OF THE PUBLIC RIGHT OF WAY. 7. AN ENCROACHMENT AGREEMENT IS REQUIRED FOR ALL NON-STANDARD IMPROVEMENTS WITHIN THE PUBLIC RIGHT OF WAY. ALL NON-STANDARD IMPROVEMENTS SHALL COMPLY WITH CITY COUNCIL POLICY L-6." PUBLIC WORKS GENERAL NOTES: 84 82 80 78 (81.7 8 ) NG 5% MIN. SLOPE 79.6 INV 2 (82. 9 ) FS PL (81. 4 ) FS PL (81.4 ) FS(82. 9 8 ) NG (83 . 6 6 ) TW EXISTING FENCE 80.0 7 INV 2 81.3 3 FG 82.0 TOS 2% 81.7 4 FS 81.9 1 FS 2% 81.91 FS 81.5 0 FS 79.1 4 TC80.1 3 TW (79. 4 9 ) FS (81. 6 9 ) FS (81. 9 6 ) FF (81 . 3 ) NG (81.1 5 ) FS 3.0 0 ' 3' OVER-EXCAVATION AS PER SOIL'S REPORT 5% 4 5 4" OF 34" GRAVEL 2" SAND 21 PLPL 82.0 TOS 2% 81.75 FS 2% 81.9 1 FS (81. 5 5 ) NG 81.7 5 FS 81.6 9 FS81.6 8 FS (78 . 6 ) FS (81.9 ) TW (82. 8 8 ) FS (82. 9 0 ) FS(81. 5 0 ) FS 84 82 80 78 (81. 0 4 ) FS (81. 4 9 ) FS 3.0 0 ' PROPOSED GRADE EXISTING GRADE 3' OVER-EXCAVATION AS PER SOIL'S REPORT 4 4" OF 3 4" GRAVEL 2" SAND PR E C I S E G R A D I N G P L A N 2 5 G-0220 GRAPHIC SCALE: 1"= 10' 10 300 SCALE: 1"=10' PRECISE GRADING PLAN SCALE: 1/8"=1'-0"SECTION A1 SCALE: 1/8"=1'-0" SECTION B-B SCALE: 1/8"=1'-0" SECTION A2 d'zn engineering PLANS PREPARED BY: THESE PLANS WERE PREPARED UNDER THE SUPERVISION OF: IN M ISS ED AL ON L A-A ENG A E P R D INOISTERE ROF .L No. C54067 E REG LI A IALFORNIICSEXP. E TATOF V 12/31/25 C EER 166 MATISSE CIRCLE ALISO VIEJO, CA 92656 TEL: (949) 305-8920 CLIENT/OWNER: SUSAN SANTANIELLO 1206 BLUE GUM LANENEWPORT BEACH, CA 92660 SHEET TITLE PROJECT_ADDRESS 1206 BLUE GUM LANE NEWPORT BEACH, CA 92660 BENCHMARK - - APN: 425-122-03 DATE: 22 FEB 2024 ENGINEER: R. DEMA-ALA CHECKER:R. DEMA-ALA PROJECT_No:2247 REVISIONS STATUS: SUBMITTAL 1 SHEET OF SHEETS CONSTRUCTION NOTES: ROOF DOWNSPOUT DISCHARGE DIRECT-CONNECT TO SITE DRAINAGE PIPING AS PER SOILS REPORT RECOMMENDATIONS. SEE DETAIL 7 ON G-03. 1 4 22 21 2 3 6INSTALL 18x18 SHALLOW CATCH BASIN-PER FLO-GARD, LOPRO, FG-M1818 OR APPROVED EQUAL. SEE DETAIL 1 ON G-03. (TIE INTO EXISTING CURB OUTLET). INSTALL 6" SQUARE GRATE & ADAPTER, NDS 640 OR EQUAL. SEE DETAIL 2 ON G-03. INSTALL 4" MAINLINE DRAIN PIPE, SDR 35 PVC OR EQUAL. INSTALL 6" PLANTER DRAIN W/ ATRIUM GRATE, NDS 80 OR EQUAL SEE DETAIL 3 ON G-03. 5 INSTALL 4" LATERAL DRAIN PIPE, SDR 35 PVC OR EQUAL INSTALL CHANNEL DRAIN WITH TRAFFIC RATED GRATE. SEE DETAIL 8 ON G-03.8 CONSTRUCT DRIVEWAY PER CITY DETAIL STD-162. CONSTRUCT NEW PROPERTY WALL PER ARCHITECTURAL PLANS. 7 INSTALL 6" PERFORATED SCH 40 PIPE SURROUNDED BY 1 CUBIC FEET OF CRUSHED ROCK, WRAPPED WITH GEO FABRIC PER SOILS REPORT. PIPE LENGTH=15'. SEE DETAIL 6 ON SHEET G-03. 33 INSTALL NEW SEWER CLEANOUT OVER EXISTING LATERAL PER CITY DETAIL STD-406. 32 RELOCATE WATER METER. 34 RELOCATE MAIL BOX AS PER ARCH./SITE/LANDSCAPE PLAN. 35 RELOCATE CABLE TV BOX. 31 CONNECT TO EXISTING CURB OUTLET PER CITY STD-184. 20 1 7 2% SLOPE EXTERIOR ROOF DOWNSPOUNT DRAIN LOCATION PER PLAN CONCRETE FLOOR SLAB PAD ELEVATION SLA B O N G R A D E PER S O I L S R E P O R T A N D STR U C T U R A L F O U N D A T I O N D E T A I L S 24" CONCRETE SWALE FLOWLINE ELEVATION PER PLAN 6" 2% SLOPE COMPACTEDSUBGRADE PER SOIL REPORT FF SCALE 1 1/2"=1'-0" IN-WALL DOWNSPOUT/ DECK DRAIN DIRECTLY CONNECTED TO DRAIN LINE 8 4" ( M I N ) (INV) ELEVATION PER PLAN (TG) ELEVATION PER PLAN FINISHED SURFACE PER PLAN MICRO CHANNEL DRAIN WITH STRUCTURAL FOAMPOLYOLEFIN CHANNEL GRATE WITH UV INHIBITOR AND PER NDS 500 (CHANNEL) & 543 (GRATE) OR APPROVED EQUAL CONCRETE FLATWORK ON GRADE (4" MIN) PER SOILS REPORT NDS ANCHOR STAKE OR APPROVED EQUAL COMPACTED SUBGRADEPER SOILS REPORT SCALE: 1 1/2"=1'-0"CHANNEL DRAIN/GRATE (FINISHED SURFACE) 4" 6" DEP T H AS REQ U I R E D SCALE:1 1/2"=1'-0" AREA DRAIN - ATRIUM GRATE(FINISHED GRADE) 4" ATRIUM GRATE, FLAT TOP STRUCTURAL FOAM POLYOLEFIN GRATE WITH UV INHIBITOR PER NDS 75 OR APPROVED EQUAL 4" DIA. PVC 90deg. ELBOW FITTING 5% MIN. SLOPE(TG) ELEVATION PER PLAN 5% MIN. SLOPE FINISH GRADE PER PLAN 4" DIA. PVC PIPE RISER AS REQUIRED TO MAIN LINE DRAIN DE P T H A S R E Q U I R E D 6"x6"x4" SQUARE GRATE & ADAPTER (LOW PROFILE) & STRUCTURAL FOAM POLYOLEFIN REMOVABLE GRATE WITH UV INHIBITOR AND STAINLESS STEEL SCREWS PER NDS 640 OR APPROVED EQUAL SCALE:1 1/2"=1'-0" AREA DRAIN - SQUARE GRATE(FINISHED SURFACE) COMPACTEDSUBGRADE PER SOIL REPORT 4" DIA. PVC 90deg. ELBOW FITTING MAIN TO DRAIN LINE 4" DIA. PVC PIPE RISER AS REQUIREDCONCRETE FLATWORK ON GRADE (4" MIN.) PER SOILS REPORT 2 2% MIN. SLOPE 2% MIN. SLOPE(TG) ELEVATION PER PLAN FINISH GRADE PER PLAN 3 6 SCALE:1 1/2"=1'-0" PERFORATED DRAIN/TRENCH DETAIL 1'-0" 1'-6 " 4" DIA MIN. FRENCH DRAIN PERFORATION AT BOTTOM 34" CRUSHED ROCK 4" CONCRETE OR 6" TOPSOIL FILTER CLOTH LAP 12" AT TOPSHALLOW CONCRETE CATCH BASIN INV PER P A N GRATE OR SOLID COVER FG-M1818 INLET FLUME WITH RUBBER GASKET BYPASS WEIR FRAME MATRIX FILTER BODY WITH GEOTEXTILE COVER CLIP-IN "FOSSIL ROCK" ABSORBENT POUCH SCALE 1 1/2"=1'-0" MAIN DRAIN OUTLET - LOW PROFILE 4" PVC PIPE DR A I N A G E D E T A I L S 3 5 G-03 d'zn engineering PLANS PREPARED BY: THESE PLANS WERE PREPAREDUNDER THE SUPERVISION OF: IN M ISS ED AL ON LA-AENG A E P R DINOISTERE ROF .L No. C54067 E REG LI A IALFORNIICS EXP. E TATOFV 12/31/25 C EER 166 MATISSE CIRCLEALISO VIEJO, CA 92656 TEL: (949) 305-8920 CLIENT/OWNER: SUSAN SANTANIELLO 1206 BLUE GUM LANE NEWPORT BEACH, CA 92660 SHEET TITLE PROJECT_ADDRESS 1206 BLUE GUM LANE NEWPORT BEACH, CA 92660 BENCHMARK - - APN: 425-122-03 DATE: 22 FEB 2024ENGINEER: R. DEMA-ALA CHECKER:R. DEMA-ALA PROJECT_No:2247 REVISIONS STATUS: SUBMITTAL 1 SHEET OF SHEETS 21 1.WIND EROSION BMPS (DUST CONTROL) SHAL BE IMPLEMENTED. 2. SEDIMENT CONTROL BMPS SHALL BE INSTALLED AND MAINTAINED AT ALL OPERATIONAL STORM DRAIN INLETS. 3. BMPS TO CONTROL OFF-SITE SEDIMENT TRACKING SHALL BE IMPLEMENTED AND MAINTAINED. 4. APPROPRIATE WASTE MANAGEMENT AND MATERIALS POLLUTION CONTROL BMPS SHALL BE IMPLEMENTED TO PREVENT THE CONTAMINATION OF STORM WATER BY WASTES AND CONSTRUCTION MATERIALS. 5. APPROPRIATE NON-STORM WATER BMPS SHALL BE IMPLEMENTED TO PREVENT THE CONTAMINATION OF STORM WATER FROM CONSTRUCTION ACTIVITIES. 6. THERE SHALL BE A "WEATHER TRIGGERED" ACTION PLAN AND THE ABILITY TO DEPLOY STANDBY SEDIMENT CONTROL BMPS AS NEEDED TO COMPLETELY PROTECT THE EXPOSED PORTIONS OF THE SITE WITHIN 48 HOURS OF A PREDICTED STORM EVENT (A PREDICTED STORM IS DEFINED AS A FORECASTED, 50% CHANCE OF RAIN). 7. SUFFICIENT MATERIALS NEEDED TO INSTALL STANDBY SEDIMENT CONTROL BMPS (AT THE SITE PERIMETER, SITE SLOPES AND OPERATIONAL INLETS WITHIN THE SITE) NECESSARY TO PREVENT SEDIMENT DISCHARGES FROM EXPOSED PORTIONS OF THE SITE SHALL BE STORED ON SITE. AREAS THAT HAVE ALREADY BEEN PROTECTED FROM EROSION USING PHYSICAL STABILIZATION OR ESTABLISHED VEGETATION STABILIZATION BMPS AS DESCRIBEDIN ITEM H ARE NOT CONSIDERED TO BE "EXPOSED" FOR PURPOSES OF THIS REQUIREMENT. 8. DEPLOYMENT OF PERMANENT EROSION CONTROL BMPS (PHYSICAL OR VEGETATION) SHOULD COMMENCE AS SOON AS PRACTICAL ON SLOPES THATARE COMPLETED FOR ANY PORTION OF THE SITE. STANDBY BMP MATERIALS SHOULD NOT BE RELIED UPON TO PREVENT EROSION OF SLOPES THAT HAVE BEEN COMPLETED. 1. IN CASE OF EMERGENCY, CALL AT OFFICE PHONE # 2. SEDIMENT FROM AREAS DISTURBED BY CONSTRUCTION SHALL BE RETAINED ON SITE USING STRUCTURAL CONTROLS TO THE MAXIMUM EXTENT PRACTICABLE. 3. STOCKPILES OF SOIL SHALL BE PROPERLY CONTAINED TO MINIMIZE SEDIMENT TRANSPORT FROM THE SITE TO STREETS. DRAINAGE FACILITIES OR ADJACENT PROPERTIES VIA RUNOFF, VEHICLE TACKING, OR WIND. 4. APPROPRIATE BMP'S FOR CONSTRUCTION-RELATED MATERIALS, WASTES, AND SPILLS, SHALL BE IMPLEMENTED TOMINIMIZE TRANSPORT FROM THE SITE TO STREETS, DRAINAGE FACILITIES, OR ADJOINING PROPERTIES BY WIND OR RUNOFF. 5. RUNOFF FROM EQUIPMENT AND VEHICLE WASHING SHALL BE CONTAINED AT CONSTRUCTION SITES UNLESS TREATED TO REDUCE OR REMOVE SEDIMENT AND OTHER POLLUTANTS. 6. ALL CONSTRUCTION CONTRACTOR AND SUBCONTRACTOR PERSONNEL ARE TO BE MADE AWARE OF THE REQUIRED BEST MANAGEMENT PRACTICES AND GOOD HOUSEKEEPING MEASURES FOR THE PROJECT SITES AND ANYASSOCIATED CONSTRUCTION STAGING AREAS. 7. AT THE END OF EACH DAY OF CONSTRUCTION ACTIVITY ALL CONSTRUCTION DEBRIS AND WASTE MATERIALS SHALL BE COLLECTED AND PROPERLY DISPOSED IN TRASH OR RECYCLE BINS. 8. CONSTRUCTION SITES SHALL BE MAINTAINED IN SUCH A CONDITION THAT AN ANTICIPATED STORM DOES NOT CARRY WASTES OR POLLUTANTS OFF THE SITE. DISCHARGES OF MATERIAL OTHER THAN STORMWATER ONLY WHEN NECESSARY FOR PERFORMANCE AND COMPLETION OF CONSTRUCTION PRACTICES AND WHERE THEY DO NOT: CAUSE OR CONTRIBUTE TO A VIOLATION OF ANY WATER QUALITY STANDARD: CAUSE OR THREATEN TO CAUSE POLLUTION, CONTAMINATION, OR NUISANCE: OR CONTAIN A HAZARDOUS SUBSTANCE IN A QUANTITY REPORTABLE UNDER FEDERAL REGULATIONS 40 CFR PARTS 117 & 302. 9. POTENTIAL POLLUTANTS INCLUDE BUT ARE NOT LIMITED TO: SOLID OR LIQUID CHEMICAL SPILLS; WASTES FROMPAINTS, STAINS, SEALANTS, GLUES, LIMES, PESTICIDES, HERBICIDES, WOOD PRESERVATIVES AND SOLVENTS; ASBESTOS FIBERS, PAINT FLAKES OR STUCCO FRAGMENTS: FUELS, OILS, LUBRICANTS, AND HYDRAULIC, RADIATOR OR BATTERY FLUIDS; FERTILIZERS, VEHICLES/ EQUIPMENT WASH WATER AND CONCRETE WASH WATER; CONCRETE,DETERGENT OR FLOATABLE WASTES; WASTES FROM ANY ENGINE/EQUIPMENT STEAM CLEANING OR CHEMICAL DEGREASING; AND SUPER CHLORINATED POTABLE WATER LINE FLUSHING. DURING CONSTRUCTION, PERMITEE SHALL DISPOSE OF SUCH MATERIALS IN A SPECIFIED AND CONTROLLED TEMPORARY AREA ON SITE. PHYSICALLY SEPARATED FROM POTENTIAL STORM WATER RUNOFF, WITH ULTIMATE DISPOSAL IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REQUIREMENTS. 10. DEWATERING OF CONTAMINATED GROUNDWATER, OR DISCHARGING CONTAMINATED SOILS VIA SURFACE EROSION IS PROHIBITED. DEWATERING OF NON-CONTAMINATED GROUNDWATER REQUIRES A NATIONAL POLLUTANT DISCHARGEELIMINATION SYSTEM PERMIT FROM THE RESPECTIVE STATE REGIONAL WATER QUALITY CONTROL BOARD. 11. GRADED AREAS ON THE PERMITTED AREA PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPES AT THE CONCLUSION OF EACH WORKING DAY. DRAINAGE IS TO BE DIRECTED TOWARD DESILTING FACILITIES. 12. THE PERMITEE AND CONTRACTOR SHALL BE RESPONSIBLE AND TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TREPASS ONTO AREAS WHERE IMPOUNDED WATER CREATES A HAZARDOUS CONDITION. 13. THE PERMITEE AND CONTRACTOR SHALL INSPECT THE EROSION CONTROL WORK AND INSURE THAT THE WORK IS IN ACCORDANCE WITH THE APPROVED PLANS. 14. THE PERMITEE AND CONTRACTOR SHALL NOTIFY ALL GENERAL CONTRACTORS, SUBCONTRACTORS, MATERIAL SUPPLIERS, LESSEES, AND PROPERTY OWNERS: THAT DUMPING OF CHEMICALS INTO THE STORM DRAIN SYSTEM OR THE WATERSHED IS PROHIBITED. 15. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON. NECESSARY MATERIALS SHALL BE AVAILABLE ON SITE AND STOCKPILED AT CONVENIENT LACATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY DEVICES WHEN RAIN IS IMMINENT. 16. ALL REMOVABLE EROSION PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN 5-DAY RAIN PROBABILITY FORECAST EXCEEDS 40%. 17. SEDIMENTS FROM AREAS DISTURBED BY CONSTRUCTION SHALL BE RETAINED ON SITE USING AN EFFECTIVECOMBINATION OF EROSION AND SEDIMENT CONTROLS TO THE MAXIMUM EXTENT PRACTICABLE, AND STOCKPILES OF SOILS SHALL BE PROPERLY CONTAINED TO MINIMIZE SEDIMENT TRANSPORT FROM THE SITE STREETS, DRAINAGE FACILITIES OF ADJACENT PROPERTIES VIA RUNOFF, VEHICLE TRACKING, OR WIND. 18. APPROPRIATE BMPS FOR CONSTRUCTION-RELATED MATERIALS, WASTES SPILLS OR RESIDUES SHALL BE IMPLEMENTED AND RETAINED ON SITE TO MINIMIZE TRANSPORT FROM THE THE SITE TO STREETS, DRAINAGE FACILITIES, OR ADJOINING PROPERTY BY WIND OR RUNOFF. RAY RUTTER DRY SEASON REQUIREMENTS (MAY-SEPTEMBER) WET SEASON REQUIREMENTS (OCTOBER-APRIL) N.P.D.E.S. NOTES: (949) 863-1298 1. WHERE APPROPRIATE SEDIMENT CONTROL BMPS SHALL BE IMPLEMENTED AT THE SITE PERIMETER, AT ALL OPERATIONAL STORM DRAIN INLETS, AND AT ALL NON-ACTIVE SLOPES, TO PROVIDE SUFFICIENT PROTECTION FOR STORMS LIKELY TO OCCUR DURING THE RAINY SEASON. 2. ADEQUATE PHYSICAL OR VEGETATION EROSION CONTROL BMPS (TEMPORARY OR PERMANENT) SHALL BE INSTALLED AND ESTABLISHED FOR ALL COMPLETED SLOPES PRIOR TO THE START OF THE RAINY SEASON. THESE BMPS MUST BE MAINTAINED THROUGHOUT THE RAINY SEASON. IF A SLECTED BMPS FAILS, IT MUST BE REPAIRED AND IMPROVED, OR REPLACED WITH AN ACCEPTABLE ALTERNATE AS SOON AS IT IS SAFE TO DO SO. THE FAILUREOF A BMP MAY INDICATE THAT THE BMP, AS INSTALLED, WAS NOT ADEQUATE FOR THE CIRCUMSTANCES IN WHICH IT WAS USED. REPAIRS OR REPLACEMENTS MUST RESULT IN A MORE ROBUST BMP, OR ADDITIONAL BMPS SHOULD BE INSTALLED TO PROVIDE ADEQUATE PROTECTION. 3. THE AMOUNT OF EXPOSED SOIL ALLOWED AT ONE TIME SHAL NOT EXCEED THAT WHICH CAN BE ADEQUATELY PROTECTED BY DEPLOYING STANDBY EROSION CONTROL AND SEDIMENT CONTROL BMPS PRIORT TO A PREDICTED RAINSTORM. 4. A DISTURBED AREA THAT IS NOT COMPLETED BY THAT IS NOT BEING ACTIVELY GRADED (NON-ACTIVE AREA) SHALL BE FULLY PROTECTED FROM EROSION WITH TEMPORARY OR PERMANENT BMPS (EROSION AND SEDIMENT CONTROL). THE ABILITY TO DEPLOY STANDBY BMP MATERIALS IS NOT SUFFICIENT FOR THESE AREAS. EROSION AND SEDIMENT CONTROL BMPS MUST ACTUALLY BE DEPLOYED. THIS INCLUDES ALL BUILDING PADS,UNFINISHED ROADS, AND SLOPES. 5. SUFFICIENT MATERIALS NEEDED TO INSTALL STANDBY EROSION AND SEDIMENTS BMPS NECESSARY TO COMPLETELY PROTECT THE EXPOSED PORTIONS OF THE SITE FROM EROSION AND TO PREVENT SDEIMENT DISCHARGES SHALL BE STORED ON-SITE. AREAS THAT HAVE ALREADY BEEN PROTECTED FROM EROSION USING PERMANENT PHYSICAL STABLILZATION OR ESTABLISHED VEGETATION STABILIZATION BMPS ARE NOT CONSIDERED TO BE "EXPOSED" FOR PURPOSES OF THIS REQUIREMENT. N 50°10'30" W 119.96' N 3 9 ° 4 9 ' 3 0 " E 5 5 . 0 0 ' N 50°10'30" W 119.96' N 3 9 ° 4 9 ' 3 0 " E 5 5 . 0 0 ' LOT 14 BL U E G U M L A N E BUILDING BUILDING GM GARAGE AC U N I T GRAVELGRAVELGRAVEL MULTI TRU N K END FENCE PILEA S T E R TYP I C A L (98.34)RIDGE (95.41)RIDGE (101.97)RIDGE (80. 8 N G ) (82.98NG) (79.2) (79. 0 9 N G ) (78. 8 ) (78.72FS) (78. 6 ) (83 . 2 N G ) (81 . 5 5 N G ) (81.3 4 N G ) (81.0 1 N G ) XXXX (78.27FL) (78.34FL) (78 . 9 1 T C X ) (78.3 6 F L ) (78.51 F L ) (79. 0 3 T C X ) (78. 7 9 F L ) (79.21TC) (78.7 6 F L ) (78.70FL) 3" O U T L E T 3" OUTLET 3" OUTLET (79 . 9 6 N G ) WM (79.14T C ) CA B L E T V CABLE TV EDISON (79. 1 3 F S ) 12" T R E E (79 . 1 6 F S ) (79.5 5 F S ) (79. 5 6 F S ) (79 . 2 7 F S ) (81 . 1 3 F S ) (80.79FS) (81.43GF) (80. 9 6 F S ) (81. 1 5 F S ) (81 . 2 2 F S ) (81. 9 6 F F ) (81. 3 N G ) (81 . 3 8 F S ) (81.50FS)(82.88FS) (81.04FS) (81.49F S ) (81 . 0 4 F S ) (80.91TG)(80.91TG) (81.70FS) X X X X X X X X XX X X XX (82.21 T W ) (81 . 8 8 T W ) CATCHBASIN BO X 20.1 28.0 4.0 6.0 CF.W. 2.0 GUTTER 5.0 5.0 4.9 4.5 28.0 MAI L B O X (81. 3 N G ) (79. 3 7 F S ) (78.90TC) (78.93TC) (79. 4 9 F S ) (80.13TW) X (81.5 F S ) (81.5F S ) (81. 5 F S ) (82.9F S ) (82 . 9 F S ) (82. 9 F S ) (81.4 F S ) (81 . 4 F S ) (81. 4 F S ) 19.7 (81. 9 T W ) PROPERTYLINE PROPERTYLINE PROPERTYLINE PROPERTYLINE CENTERLINE SEARCHED,FOUND NOTHING SEARCHED,FOUND NOTHING SEARCHED,FOUND NOTHING SEARCHED,FOUND NOTHING WM ER O S I O N C O N T R O L P L A N 4 5 G-04SCALE:1"=10' EROSION CONTROL PLAN 1 2 3 4 5 STREET SWEEPING AND VACUUMING AS REQUIRED - SE-7 BMP INSTALL SANITARY/SEPTIC WASTE MANAGEMENT - WM-9 BMP INSTALL STOCKPILE MANAGEMENT - WM-3 BMP INSTALL TEMPORARY EROSION CONTROL GRAVEL BAGS (2 HIGH) SE-6 BMP COMBINATION INSTALL TEMPORARY CONCRETE WASH OUT BASIN WITH PLASTIC LINER-WM-8 BMP EROSION CONTROL NOTES d'zn engineering PLANS PREPARED BY: 30 A 2 0 2 4 2 2 4 7 G R D S t i l l d THESE PLANS WERE PREPARED UNDER THE SUPERVISION OF: IN M ISS ED AL ON L A-A ENG A E P R DINOISTERE ROF .L No. C54067 E REG LI A IALFORNIICS EXP. E TATOF V 12/31/25 C EER 166 MATISSE CIRCLE ALISO VIEJO, CA 92656 TEL: (949) 305-8920 CLIENT/OWNER: SUSAN SANTANIELLO 1206 BLUE GUM LANE NEWPORT BEACH, CA 92660 SHEET TITLE PROJECT_ADDRESS 1206 BLUE GUM LANE NEWPORT BEACH, CA 92660 BENCHMARK - - APN: 425-122-03 DATE: 22 FEB 2024 ENGINEER: R. DEMA-ALA CHECKER:R. DEMA-ALA PROJECT_No:2247 REVISIONS STATUS: SUBMITTAL 1 SHEET OF SHEETS 2 4 5 3 1 1 22 SO I L S R E C O M M E N D A T I O N S 5 5 G-05 d'zn engineering PLANS PREPARED BY: 30 A 2 0 2 4 2 2 4 7 G R D S t i l l d THESE PLANS WERE PREPARED UNDER THE SUPERVISION OF: IN M ISS ED AL ON L A-A ENG A E P R DINOISTERE ROF .L No. C54067 E REG LI A IALFORNIICSEXP. E TATOFV 12/31/25 C EER 166 MATISSE CIRCLE ALISO VIEJO, CA 92656 TEL: (949) 305-8920 CLIENT/OWNER: SUSAN SANTANIELLO 1206 BLUE GUM LANE NEWPORT BEACH, CA 92660 SHEET TITLE PROJECT_ADDRESS 1206 BLUE GUM LANE NEWPORT BEACH, CA 92660 BENCHMARK - - APN: 425-122-03 DATE: 22 FEB 2024 ENGINEER: R. DEMA-ALA CHECKER:R. DEMA-ALA PROJECT_No:2247 REVISIONS STATUS: SUBMITTAL 1 SHEET OF SHEETS 23 24 25 26 27 28 29 30 31 32 33 Sheet No. Description Landscape Designer: Richard King TITLE PAGE Revision No. Date: July 29, 2024 Sheet Title Project Name 1206 Blue Gum Lane VICINITY MAP Newport Beach, CA 92660 SHEET INDEX L-1 HARDSCAPE PLAN L-0 L-0 TITLE PAGE/WORKSHEETS ww w . e x t e r i o r s i n c . n e t r i c k @ e x t e r i o r s i n c . n e t C e l l 9 4 9 2 8 5 9 6 9 2 24 6 8 2 D e l P r a d o A v e n u e D a n a P o i n t , C A 9 2 6 2 9 RESIDENCERUTTER 1206 Blue Gum Ln.Newport Beach, CA92660 Lot #14 Tract 9620 L-2 PLANTING PLAN Per City Comments10/30/2024 34 N 50°10'30" W 119.96' N 3 9 ° 4 9 ' 3 0 " E 5 5 . 0 0 ' N 50°10'30" W 119.96' N 3 9 ° 4 9 ' 3 0 " E 5 5 . 0 0 ' LOT 14 BL U E G U M L A N E BUILDING BUILDING GM 24" TREE PALM PO O L EQ U I P M E N T PA L M GARAGE AC U N I T POST POST POS T POST POST SPA GRAVELGRAVELGRAVEL PALM PALM MUL T I TRU N K MU L T I TRU N K END FENCE PIL E A S T E R TYPIC A L (98.34)RIDGE (95.41)RIDGE (101.97)RIDGE (80.8 N G ) (82.98NG) (79 . 2 ) (79. 0 9 N G ) (78 . 8 ) (78.72FS) (78.6) (83 . 2 N G ) (81. 5 5 N G ) (81 . 3 4 N G ) (81 . 0 1 N G ) XXXX (78.27FL) (78.34FL) (78 . 9 1 T C X ) (78.3 6 F L ) (78 . 5 1 F L ) (79 . 0 3 T C X ) (78. 7 9 F L ) (79.21TC) (78. 7 6 F L ) (78.70FL ) 3" OU T L E T 3" OUTLET 3" OUTLET (79 . 9 6 N G ) WM (79 . 1 4 T C ) CABLE TV CABLE TV EDISON (79. 1 3 F S ) 12" TR E E (79.16 F S ) (79.5 5 F S ) (79 . 5 6 F S ) (79. 2 7 F S ) (81 . 1 3 F S ) (80.79FS) (81.43GF) (80 . 9 6 F S ) (81. 1 5 F S ) (81.22 F S ) (81 . 9 6 F F ) (81. 3 N G ) (81 . 3 8 F S ) (81.50FS)(82.88FS) (81.04FS) (81 . 4 9 F S ) (81. 0 4 F S ) (80.91TG)(80.91TG)(81.30FS)(81.57FS) (81.70FS) (81.71FS) (82. 0 3 F F ) (81. 7 4 F S ) (81.69 F S ) (81 . 4 8 N G ) X X X X X X X X XX X X XX (82.2 1 T W ) (81.8 8 T W ) (83.0 9 T W ) (85.72TW) (85.67TW) (8 3 . 6 6 T W ) (83.98 T W ) (82.16TW) (83.54TW) (83 . 6 6 T W ) CATCH BASIN BOX 20.1 28.0 4.0 6.0 CF.W. 2.0 GUTTER 5.0 5.0 4.9 4.5 28.0 MAI L B O X (81.3N G ) (79 . 3 7 F S ) (78.90TC) (78.93TC) (79 . 4 9 F S ) (80.13TW) (83.62TW) (81.78NG) (85 . 7 9 T W ) (81 . 5 9 N G ) (82.48 T G ) (81 . 6 N G ) X (81. 5 F S ) (81. 5 F S ) (81 . 5 F S ) (81 . 5 N G ) (81.5 N G ) (81.6NG) (82 . 9 F S ) (82. 9 F S ) (82. 9 F S ) (81 . 4 F S ) (81 . 4 F S ) (81 . 4 F S ) 19.7 (81. 9 T W ) 12.1 PROPERTYLINE PROPERTYLINE PROPERTYLINE PROPERTYLINE CENTERLINE SEARCHED,FOUND NOTHING SEARCHED,FOUND NOTHING SEARCHED,FOUND NOTHING SEARCHED,FOUND NOTHING Ele v a t o r Kitc h e n Grea t R o o m Cov e r e d L o g g i a Pow d e r Med i a R o o m 3-C a r G a r a g e Ent r y F o y e r Stai r w e l l Hall w a y Din i n g A r e a Entr y C o u r t y a r d Ope n t o a b o v e Pan t r y Pow d e r W.i. c . 5 Coa tVes t i b u l e PLAN L-1 Sheet No. Landscape Designer: Richard King N Revision No. Scale: 1/8" = 1'-0" Date: January 18, 2024 Description 24 6 8 2 D e l P r a d o S t e . 2 3 0 D a n a P o i n t , C A 9 2 6 2 9 C e l l 9 4 9 2 8 5 9 6 9 2 ww w . e x t e r i o r s i n c . n e t r i c k @ e x t e r i o r s i n c . n e t HARDSCAPE Sheet Title Project Name RESIDENCERUTTER 1206 Blue Gum Ln.Newport Beach, CA92660 Per City Comments Lot #14 Tract 9620 7-29-2024 Per City Comments10/30/2024 35 N 50°10'30" W 119.96' N 3 9 ° 4 9 ' 3 0 " E 5 5 . 0 0 ' N 50°10'30" W 119.96' N 3 9 ° 4 9 ' 3 0 " E 5 5 . 0 0 ' LOT 14 BL U E G U M L A N E BUILDING BUILDING GM 24" TREE PALM PO O L EQ U I P M E N T PA L M GARAGE AC U N I T POS T PO S T POST POS T POST SPA GRAVELGRAVELGRAVEL PALM PALM MUL T I TR U N K MUL T I TRU N K END FENCE PILEA S T E R TY P I C A L (98.34)RIDGE (95.41)RIDGE (101.97)RIDGE (80 . 8 N G ) (82.98NG) (79 . 2 ) (79.09 N G ) (78 . 8 ) (78.72FS) (78 . 6 ) (83.2 N G ) (81.55 N G ) (81.3 4 N G ) (81.01 N G ) XXXX (78. 2 7 F L ) (78.34FL) (78 . 9 1 T C X ) (78 . 3 6 F L ) (78 . 5 1 F L ) (79 . 0 3 T C X ) (78.79FL) (79.21TC) (78.76 F L ) (78.70FL) 3" O U T L E T 3" OUTLET 3" OUTLET (79 . 9 6 N G ) WM (79 . 1 4 T C ) CA B L E T V CABLE TV EDISON (79 . 1 3 F S ) 12" T R E E (79.16 F S ) (79. 5 5 F S ) (79. 5 6 F S ) (79. 2 7 F S ) (81 . 1 3 F S ) (80.79FS) (81.43GF) (80 . 9 6 F S ) (81 . 1 5 F S ) (81.22 F S ) (81 . 9 6 F F ) (81.3 N G ) (81. 3 8 F S ) (81.50FS)(82.88FS) (81.04FS) (81 . 4 9 F S ) (81 . 0 4 F S ) (80.91TG)(80.91TG)(81.30FS)(81.57FS) (81.70FS) (81.71FS) (82 . 0 3 F F ) (81.7 4 F S ) (81.69 F S ) (81 . 4 8 N G ) X X X X X X X X XX X X XX (82.21 T W ) (81 . 8 8 T W ) (83. 0 9 T W ) (85.72TW) (85.67TW) (83 . 6 6 T W ) (83 . 9 8 T W ) (82.16TW) (83.54TW) (83.66 T W ) CATCH BASIN BOX 20.1 28.0 4.0 6.0 CF.W. 2.0 GUTTER 5.0 5.0 4.9 4.5 28.0 MAI L B O X (81 . 3 N G ) (79. 3 7 F S ) (78.90TC) (78.93TC) (79 . 4 9 F S ) (80.13TW) (83.62TW) (81.78NG) (85 . 7 9 T W ) (81 . 5 9 N G ) (82. 4 8 T G ) (81.6N G ) X (81 . 5 F S ) (81.5F S ) (81. 5 F S ) (81.5N G ) (81 . 5 N G ) (81. 6 N G ) (82. 9 F S ) (82. 9 F S ) (82 . 9 F S ) (81 . 4 F S ) (81.4F S ) (81 . 4 F S ) 19.7 (81 . 9 T W ) 12.1 PROPERTYLINE PROPERTYLINE PROPERTYLINE PROPERTYLINE CENTERLINE SEARCHED,FOUND NOTHING SEARCHED,FOUND NOTHING SEARCHED,FOUND NOTHING SEARCHED,FOUND NOTHING Elev a t o r Kit c h e n Gre a t R o o m Cov e r e d L o g g i a Pow d e r Med i a R o o m 3-C a r G a r a g e Ent r y F o y e r Sta i r w e l l Hal l w a y Dini n g A r e a Entr y C o u r t y a r d Ope n t o a b o v e Pan t r y Pow d e r W.i.c . 5 CoatVes t i b u l e PLAN L-2 Sheet No. N Revision No. Scale: 1/8" = 1'-0" Date: January 18, 2024 Description 24 6 8 2 D e l P r a d o S t e . 2 3 0 D a n a P o i n t , C A 9 2 6 2 9 C e l l 9 4 9 2 8 5 9 6 9 2 ww w . e x t e r i o r s i n c . n e t r i c k @ e x t e r i o r s i n c . n e t PLANTING Sheet Title Project Name RESIDENCERUTTER 1206 Blue Gum Ln.Newport Beach, CA92660 Per City Comments Field Grown Olive Australian Willow Silver Bush Gray Box Westringia Lavender Mother in Law Tongue Blue Flax Lily Mundi Westringia Dwarf Rosemary Bay Hedge Dwarf Karo 7-29-2024 Landscape Designer: Richard King Lot #14 Tract 9620 Per City Comments10/30/2024 36 November 27, 2024, Zoning Administrator Item 3 Comments These comments on a Newport Beach Zoning Administrator agenda item are submitted by: Jim Mosher (jimmosher@yahoo.com ), 2210 Private Road, Newport Beach 92660 (949-548-6229). Item No. 3. Santaniello Residence Coastal Development Permit (PA2024-0014) Handwritten page 7, Section 1.2: “construct” was presumably intended to read “construction of”. Is the 643-square-foot garage counted as part of the 4,440-square-foot residence, or in addition to it? Handwritten page 8, Fact 3.A.1.b: Does the rear property line really abut an alley? The aerial photo provides no evidence of this. If there is an alley, how would it be accessed? Handwritten page 8, Fact 3.A.1.d: While PC22 is said to require only a 2-car garage, doesn’t the final drawing on handwritten page 36 depict something expected to be used as a three-car garage? Handwritten page 8, Fact 3.A.6: Isn’t Castaways Park more southwest than west of this site? Zoning Administrator - November 27, 2024 Item No. 3a - Additional Materials Received Santaniello Residence Coastal Development Permit (PA2024-0014)