Loading...
HomeMy WebLinkAbout05_122 Via Lido Nord, LLC Residence CDP_PA2024-0144 CITY OF NEWPORT BEACH ZONING ADMINISTRATOR STAFF REPORT December 12, 2024 Agenda Item No. 5 SUBJECT: 122 Via Lido Nord, LLC Residence (PA2024-0144) ▪ Coastal Development Permit SITE LOCATION: 122 Via Lido Nord APPLICANT: Olson Architects OWNER: 122 Via Lido Nord, LLC PLANNER: Jenny Tran, Associate Planner 949-644-3212, jtran@newportbeachca.gov LAND USE AND ZONING • General Plan Land Use Plan Category: RS-D (Single Unit Residential Detached) • Zoning District: R-1 (Single-Unit Residential) • Coastal Land Use Plan Category: RSD-C (Single Unit Residential Detached) – (10.0 – 19.9 DU/AC) • Coastal Zoning District: R-1 (Single-Unit Residential) PROJECT SUMMARY A request for a Coastal Development Permit (CDP) to allow the demolition of an existing single-unit dwelling and construction of a 2,577 square foot, two-story, single-unit dwelling with an attached 423 square foot two-car garage. The project includes property line fence/walls, raised pedistal decking, accessory structures, and subsurface drainage facilities all within the confines of private property. The project also includes reinforcing and raising the existing bulkhead. The project complies with all development standards and no deviations from the municipal code are requested. RECOMMENDATION 1) Conduct a public hearing; 2) Find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has no potential to have a significant effect on the environment; and 3) Adopt Draft Zoning Administrator Resolution No. _ approving Coastal Development Permit filed as PA2024-0144 (Attachment No. ZA 1). 1 122 Via Lido Nord, LLC Residence (PA2024-0144) Zoning Administrator, December 12, 2024 Page 2 DISCUSSION Land Use and Development Standards • The subject property is in the R-1 Coastal Zoning District, which provides for single- unit residential development and is consistent with the City’s Coastal Land Use Plan, General Plan, and Zoning Code. A coastal development permit is required, and the property is not eligible for a waiver for de minimis development because the property is in the Coastal Commission Appeal Area. • The property currently consists of one legal lot developed with a single-unit dwelling. The neighborhood is predominantly developed with two-story, single-unit dwellings. The proposed design, bulk, and scale of the development are consistent with the existing neighborhood pattern of development and expected future development consistent with applicable development standards. • The proposed single-unit dwelling and accessory structures conform to all applicable development standards, including floor area limit, setbacks, height, and off-street parking as evidenced by the project plans and illustrated in Table 1 below. Table 1 – Development Standards Development Standard Standard Proposed Setbacks (min.) Front (Bayside) 10 feet 10 feet Front (Via Lido Nord) 4 feet 4 feet Side 3 feet 3 feet Allowable Floor Area (max.) 3,648 square feet 3,001 square feet Open Space (min.) 273.6 square feet 285.7 square feet Parking (min.) 2-car garage 2-car garage Height (max.) 24-foot flat roof 29-foot sloped roof 24-foot flat roof 29-foot sloped roof Hazards • The development fronts the Newport Bay and is a private bay front parcel. The project site is protected by an existing bulkhead. A Coastal Hazards and Bulkhead Conditions Report was prepared by PMA Consulting, Inc. dated April 15, 2024, for the project. The current maximum bay water elevation is 7.70 NAVD88 (North American Vertical Datum of 1988) and may exceed the existing 7.90 feet NAVD88 top of bulkhead elevation during high tide or storm events. The report analyzes future sea level rise scenarios assuming a 3.15-foot increase in the maximum water level over the next 75 years (i.e. the life of the structure). Therefore, the sea level is estimated to reach approximately 10.85 feet NAVD88 (the likely range for sea level rise over the 75-year design life of the structure based on low-risk aversion estimates for sea level rise provided by the State of California, Sea Level 2 122 Via Lido Nord, LLC Residence (PA2024-0144) Zoning Administrator, December 12, 2024 Page 3 Rise Guidance: 2018 Update). The report concluded that the bulkhead should be repaired and reinforced through the installation of new tiebacks and new deadmen. The installation of the tiebacks and deadmen will occur after the demolition of the existing home is complete and prior to the construction of the new home. Once the bulkhead is reinforced in accordance with the enclosed drawings, no repair or replacement of the bulkhead is anticipated within the next 75 years • On March 23, 2021, the City Council approved updated Waterfront Project Design Guidelines and Standards, Harbor Design Criteria Commercial & Residential Facilities. The guidelines require that any bulkhead structure permitted within the years 2021 through 2025 must have a minimum bulkhead elevation of 10.9 feet (NAVD 88) with a design for adaptability elevation of 14.4 feet (NAVD 88). The project raising the bulkhead to an elevation of 11.36 feet (NAVD 88), which exceeds the City’s minimum standard of 10.9 feet NAVD88. PMA Consulting, Inc. has confirmed that the bulkhead can be raised up to 14.4 feet (NAVD 88) if needed in the future. • Once the existing seawall/bulkhead is repaired/reinforced/raised per the report’s recommendations, flooding, wave runup, and erosion will not significantly impact this property over the proposed 75-year economic life of the development. If needed, flood shields (sandbags and other barriers) can be deployed across the openings to protect and prevent flooding to the structure. The report concludes that the proposed project will be safe from flooding hazards for the next 75 years with the reinforced/capped bulkhead. Therefore, the project has been conditioned to raise the bulkhead up to 10.9 feet (NAVD88). • The finished floor elevation of the proposed single-unit dwelling is 11.29 feet (NAVD88), which complies with the minimum 9.00 feet (NAVD88) elevation standard. • As conditioned pursuant to Newport Beach Municipal Code (NBMC) Section 21.30.030(C)(3)(i)(iv) - (Bulkheads for nonresidential and residential waterfront development), the property owner will be required to enter into an agreement with the City waiving any potential right to protection to address situations in the future in which the development is threatened with damage or destruction by coastal hazards (e.g., waves, erosion, and sea level rise). The property owner will also be required to acknowledge any hazards present at the site and unconditionally waive any claim to damage or liability against the decision authority, consistent with NBMC Section 21.30.015(D)(3)(c) – (Waterfront Development, Development Standards). Both requirements are included as conditions of approval that will need to be satisfied prior to the issuance of building permits for construction. 3 122 Via Lido Nord, LLC Residence (PA2024-0144) Zoning Administrator, December 12, 2024 Page 4 • The property is in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved before the issuance of a building permit. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC before building permit issuance. Water Quality • The property is located adjacent to coastal waters. A Construction Erosion Control Plan was provided to implement temporary Best Management Practices (BMPs) during construction to minimize erosion and sedimentation and to minimize pollution of runoff and coastal waters derived from construction chemicals and materials. The project design also addresses water quality through the inclusion of a post- construction drainage system that includes drainage and percolation features designed to retain dry weather and minor rain event runoff on-site. Any water not retained on-site is directed to the City’s storm drain system. • Pursuant to NBMC Section 21.35.050, due to the proximity of the development to the shoreline and the development containing more than 75 percent of impervious surface area, a Water Quality and Hydrology Plan (WQHP) is required. A preliminary WQHP has been prepared for the project by Core Civil Engineering, Inc. dated, July 10, 2024. The WQHP includes a polluted runoff and hydrologic site characterization, a sizing standard for BMPs, the use of a LID approach to retain the design storm runoff volume on-site, and documentation of the expected effectiveness of the proposed BMPs. Public Access and Views • The project site is located between the nearest public road and the sea or shoreline. Implementation Plan Section 21.30A.040 (Water Quality and Hydrology Plan) requires that the provision of public access bear a reasonable relationship between the requirement and the project’s impact and be proportional to the impact. In this case, the project replaces an existing single-family residence located on a standard R-1 lot with a new single-family residence. Therefore, the project does not involve a change in land use, density, or intensity that will result in increased demand for public access and recreation opportunities. Furthermore, the project is designed and sited (appropriate height, setbacks, etc.) so as not to block or impede existing public access opportunities. • The closest public viewpoint is located at the bridge to Lido Island approximately 650 feet to the west. The proposed dwelling is not located near any coastal view roads as designated in the Coastal Land Use Plan. Due to the distance of the 4 122 Via Lido Nord, LLC Residence (PA2024-0144) Zoning Administrator, December 12, 2024 Page 5 proposed development from the public viewpoint, intervening development, and the project’s compliance with height and setbacks, the project will not impact coastal views. The project is within the viewshed of the bay. However, the proposed single-unit dwelling complies with all applicable Local Coastal Program (LCP) development standards and maintains a building envelope consistent with the existing neighborhood pattern of development. Therefore, the project does not have the potential to degrade the visual quality of the Coastal Zone or result in significant adverse impacts to public views. • Vertical and lateral access to the bay is available at the terminus of Via Antibes along Via Lido Nord where there is a small sandy beach and grass area. The project is approximately 70 feet away from this public beach area and does not include any features that would obstruct access along these routes. • The front of the proposed residence, which is visible from Via Lido Nord, includes substantial architectural treatment and visual interest, in-keeping with the design guidelines of the Zoning Code. The new structure would comply with required setbacks, build approximately 641 square feet less than the maximum floor area allowed by the NBMC, and reach a maximum height of 24 feet where a maximum of 29 feet is allowed by the NBMC. Therefore, the project does not have the potential to degrade the visual quality of the Coastal Zone or result in significant adverse impacts to existing public views. ENVIRONMENTAL REVIEW This project is exempt from the California Environmental Quality Act (CEQA) under Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3 because it has no potential to have a significant effect on the environment. The Class 3 exemption includes the construction of limited numbers of new, small structures, including up to three single-unit dwellings in urbanized areas. The proposed project is a new single-unit dwelling located in the R-1 Coastal Zoning District. The proposed project consists of the demolition of one single-family residence and the construction of a new 2,577-square-foot single-family residence with an attached 423- square-foot two-car garage and therefore qualifies within this exemption. There are no known exceptions listed in CEQA Guidelines Section 15300.2 that would invalidate the use of this exemption. The project location does not impact an environmental resource of hazardous or critical concern, does not result in cumulative impacts, does not have a significant effect on the environment due to unusual circumstances, does not damage scenic resources within a state scenic highway, is not a hazardous waste site, and is not identified as a historical resource. PUBLIC NOTICE 5 122 Via Lido Nord, LLC Residence (PA2024-0144) Zoning Administrator, December 12, 2024 Page 6 Notice of this public hearing was published in the Daily Pilot, mailed to all owners and residential occupants of property within 300 feet of the boundaries of the site (excluding intervening rights-of-way and waterways), including the applicant, and posted on the subject property at least 10 days before the scheduled hearing, consistent with the provisions of the Municipal Code. Additionally, the item appeared on the agenda for this meeting, which was posted at City Hall and on the city website. APPEAL PERIOD: This action shall become final and effective 14 days following the date the Resolution is adopted unless within such time an appeal or call for review is filed with the Community Development Director by the provisions of Title 21 (Local Coastal Program [LCP] Implementation Plan) of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 (Appeal to the Coastal Commission) of the City’s certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. For additional information on filing an appeal, contact the Planning Division at 949-644-3200. Prepared by: ____________________________ Jenny Tran, Associate Planner LAW/jt Attachments: ZA 1 Draft Resolution ZA 2 Vicinity Map ZA 3 Project Plans 6 Attachment No. ZA 1 Draft Resolution 7 01-10-2023 RESOLUTION NO. ZA2024-## A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH, APPROVING A COASTAL DEVELOPMENT PERMIT TO DEMOLISH AN EXISTING SINGLE- UNIT DWELLING AND CONSTRUCT A NEW TWO-STORY SINGLE-UNIT DWELLING AND ATTACHED TWO-CAR GARAGE LOCATED AT 122 VIA LIDO NORD (PA2024-0144) THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by Olson Architects, concerning property located at 122 Via Lido Nord, requesting approval of a coastal development permit. 2. The lot at 122 Via Lido Nord is legally described as Lot 864 of Tract No. 907. 3. The applicant requests a Coastal Development Permit (CDP) to allow the demolition of an existing single-unit dwelling and construction of a 2,577 square foot, two-story, single-unit dwelling with an attached 423 square foot two-car garage. The project includes property line fence/walls, raised pedistal decking, accessory structures, and subsurface drainage facilities all within the confines of private property. The project also includes reinforcing and raising the existing bulkhead. The project complies with all development standards and no deviations from the municipal code are requested. 4. The subject property is designated Single Unit Residential Detached (RS-D) by the General Plan Land Use Element and is located within the Single-Unit Residential (R-1) Zoning District. 5. The subject property is located within the coastal zone. The Coastal Land Use Plan category is Single Unit Residential Detached (RSD-C) – (10.0 – 19.9 DU/AC) and it is located within the Single-Unit Residential (R-1) Coastal Zoning District. 6. A public hearing was held on December 12, 2024, online via Zoom. A notice of the time, place, and purpose of the hearing was given by the Newport Beach Municipal Code (NBMC). Evidence, both written and oral, was presented to and considered by, the Zoning Administrator at this hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. This project is categorically exempt pursuant to Title 14 of the California Code of Regulations Section 15303, Division 6, Chapter 3, Guidelines for Implementation of the California Environmental Quality Act (CEQA) under Class 3 (New Construction or Conversion of Small Structures) because it has no potential to have a significant effect on the environment. 8 Zoning Administrator Resolution No. ZA2024-## Page 2 of 10 01-10-2023 2. Class 3 exempts the demolition, construction, or conversion of up to three single-unit dwellings in urbanized areas. The proposed project consists of the demolition of an existing single-unit dwelling and construction of a new 2,577 square foot, single-unit dwelling, and attached 423 square foot, two-car garage. 3. The exceptions to this categorical exemption under Section 15300.2 are not applicable. The project location does not impact an environmental resource of hazardous or critical concern, does not result in cumulative impacts, does not have a significant effect on the environment due to unusual circumstances, does not damage scenic resources within a state scenic highway, is not a hazardous waste site, and is not identified as a historical resource. SECTION 3. REQUIRED FINDINGS. By Section 21.52.015 (Coastal Development Permits, Findings, and Decision) of the Newport Beach Municipal Code, the following findings, and facts in support of such findings are set forth: Finding: A. Conforms to all applicable sections of the certified Local Coastal Program. Facts in Support of Finding: 1. The proposed development complies with applicable residential development standards including, but not limited to, floor area limitation, setbacks, height, and parking. a. The maximum floor area limitation is 3,648 square feet and the proposed floor area is 3,001 square feet. b. The proposed development provides the minimum required setbacks, which are 10 feet along the front property line abutting Newport Bay, 3 feet along each side property line, and 4 feet along the second front property line abutting the Via Lido Nord. c. The highest guardrail is less than 24 feet from the established grade (11.52 feet NAVD88) and the highest ridge is no more than 29 feet from the established grade, which complies with the maximum height requirements. d. The project includes garage parking for a total of two vehicles, complying with the minimum two-car garage parking requirement for single-unit dwellings with less than 4,000 square feet of habitable floor area. 2. The neighborhood is predominantly developed with two-story, single-unit dwellings. The proposed design, bulk, and scale of the development are consistent with the existing neighborhood pattern of development. 9 Zoning Administrator Resolution No. ZA2024-## Page 3 of 10 01-10-2023 3. A Coastal Hazards and Bulkhead Conditions Report was prepared by PMA Consulting, Inc. dated April 15, 2024, for the project. The current maximum bay water elevation is 7.70 NAVD88 (North American Vertical Datum of 1988 (NAVD88) and may exceed the existing 7.90 feet NAVD88 top of bulkhead elevation during high tide or storm events. The report analyzes future sea level rise scenarios assuming a 3.15-foot increase in the maximum water level over the next 75 years (i.e. the life of the structure). Therefore, the sea level is estimated to reach approximately 10.85 feet NAVD88 (the likely range for sea level rise over the 75-year design life of the structure based on low-risk aversion estimates for sea level rise provided by the State of California, Sea Level Rise Guidance: 2018 Update). The report concluded that the bulkhead should be repaired and reinforced through the installation of new tiebacks and new deadmen. The installation of the tiebacks and deadmen will occur after the demolition of the existing home is complete and prior to the construction of the new home. Once the bulkhead is reinforced in accordance with the enclosed drawings, no repair or replacement of the bulkhead is anticipated within the next 75 years 4. On March 23, 2021, the City Council approved updated Waterfront Project Design Guidelines and Standards, Harbor Design Criteria Commercial & Residential Facilities. The guidelines require that any bulkhead structure permitted within the years 2021 through 2025 must have a minimum bulkhead elevation of 10.9 feet (NAVD 88) with a design for adaptability elevation of 14.4 feet (NAVD 88). The project raising the bulkhead to an elevation of 11.36 feet (NAVD 88), which exceeds the City’s minimum standard of 10.9 feet NAVD88. PMA Consulting, Inc. has confirmed that the bulkhead can be raised up to 14.4 feet (NAVD 88) if needed in the future. 5. Once the existing seawall/bulkhead is repaired/reinforced/raised per the report’s recommendations, flooding, wave runup, and erosion will not significantly impact this property over the proposed 75-year economic life of the development. If needed, flood shields (sandbags and other barriers) can be deployed across the openings to protect and prevent flooding to the structure. The report concludes that the proposed project will be safe from flooding hazards for the next 75 years with the reinforced/capped bulkhead. Therefore, the project has been conditioned to raise the bulkhead up to 10.9 feet (NAVD88). 6. The finished floor elevation of the proposed single-unit dwelling is 11.29 feet (NAVD88), which complies with the minimum 9.00 feet (NAVD88) elevation standard. 7. As conditioned pursuant to Newport Beach Municipal Code (NBMC) Section 21.30.030(C)(3)(i)(iv) - (Bulkheads for nonresidential and residential waterfront development), the property owner will be required to enter into an agreement with the City waiving any potential right to protection to address situations in the future in which the development is threatened with damage or destruction by coastal hazards (e.g., waves, erosion, and sea level rise). The property owner will also be required to acknowledge any hazards present at the site and unconditionally waive any claim to damage or liability against the decision authority, consistent with NBMC Section 21.30.015(D)(3)(c) – (Waterfront Development, Development Standards). Both 10 Zoning Administrator Resolution No. ZA2024-## Page 4 of 10 01-10-2023 requirements are included as conditions of approval that will need to be satisfied prior to the issuance of building permits for construction. 8. The property is in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved before the issuance of building permits. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC before building permit issuance. 9. The property is located adjacent to coastal waters. A Construction Erosion Control Plan was provided to implement temporary Best Management Practices (BMPs) during construction to minimize erosion and sedimentation and to minimize pollution of runoff and coastal waters derived from construction chemicals and materials. The project design also addresses water quality through the inclusion of a post-construction drainage system that includes drainage and percolation features designed to retain dry weather and minor rain event runoff on-site. Any water not retained on-site is directed to the City’s storm drain system. 10. Pursuant to NBMC Section 21.35.050 (Water Quality and Hydrology Plan), due to the proximity of the development to the shoreline and the development containing more than 75% of impervious surface area, a Water Quality and Hydrology Plan (WQHP) is required. A preliminary WQHP has been prepared for the project by Core Civil Engineering, Inc. dated, July 10, 2024. The WQHP includes a polluted runoff and hydrologic site characterization, a sizing standard for BMPs, the use of a LID approach to retain the design storm runoff volume on-site, and documentation of the expected effectiveness of the proposed BMPs. 11. Proposed landscaping complies with Implementation Plan Section 21.30.075. A condition of approval is included that requires drought-tolerant species. Before the issuance of building permits, the final landscape plans will be reviewed to verify invasive species are not planted. 12. The closest public viewpoint is located at the bridge to Lido Island approximately 650 feet to the west. The proposed dwelling is not located near any coastal view roads as designated in the Coastal Land Use Plan. Due to the distance of the proposed development from the public viewpoint, intervening development, and the project’s compliance with height and setbacks, the project will not impact coastal views. The project is within the viewshed of the bay. However, the proposed single-unit dwelling complies with all applicable Local Coastal Program (LCP) development standards and maintains a building envelope consistent with the existing neighborhood pattern of development. Therefore, the project does not have the potential to degrade the visual quality of the Coastal Zone or result in significant adverse impacts to public views. 13. The front of the proposed residence, which is visible from Via Lido Nord, includes substantial architectural treatment and visual interest, in-keeping with the design guidelines of the Zoning Code. The new structure would comply with required setbacks, 11 Zoning Administrator Resolution No. ZA2024-## Page 5 of 10 01-10-2023 build approximately 641 square feet less than the maximum floor area allowed by the NBMC, and reach a maximum height of 24 feet where a maximum of 29 feet is allowed by the NBMC. Therefore, the project does not have the potential to degrade the visual quality of the Coastal Zone or result in significant adverse impacts to existing public views. Finding: B. Conforms with the public access and public recreation policies of Chapter 3 of the Coastal Act if the project is located between the nearest public road and the sea or shoreline of any body of water located within the coastal zone. Facts in Support of Finding: 1. The project site is located between the nearest public road and the sea or shoreline. Implementation Plan Section 21.30A.040 requires that the provision of public access bear a reasonable relationship between the requirement and the project’s impact and be proportional to the impact. In this case, the project replaces an existing single-family residence located on a standard R-1 lot with a new single-family residence. Therefore, the project does not involve a change in land use, density, or intensity that will result in increased demand for public access and recreation opportunities. Furthermore, the project is designed and sited (appropriate height, setbacks, etc.) so as not to block or impede existing public access opportunities. 2. Vertical and lateral access to the bay is available at the terminus of Via Antibes along Via Lido Nord where there is a small sandy beach and grass area. The project is approximately 70 feet away from this public beach area and does not include any features that would obstruct access along these routes. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Zoning Administrator of the City of Newport Beach hereby finds this project is categorically exempt from the California Environmental Quality Act under Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3 because it has no potential to have a significant effect on the environment. 2. The Zoning Administrator of the City of Newport Beach hereby approves Coastal Development Permit filed as PA2024-0144, subject to the conditions outlined in Exhibit “A,” which is attached hereto and incorporated by reference. 3. This action shall become final and effective 14 days following the date this Resolution was adopted unless within such time an appeal or call for review is filed with the Community Development Director by the provisions of Title 21 Local Coastal Program (LCP) Implementation Plan, of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 (Appeal to the Coastal Commission) of the City’s certified LCP and Title 14 12 Zoning Administrator Resolution No. ZA2024-## Page 6 of 10 01-10-2023 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. PASSED, APPROVED, AND ADOPTED THIS 12TH DAY OF DECEMBER, 2024. _____________________________________ Benjamin M. Zdeba, AICP, Zoning Administrator 13 Zoning Administrator Resolution No. ZA2024-## Page 7 of 10 01-10-2023 EXHIBIT “A” CONDITIONS OF APPROVAL 1. The development shall be in substantial conformance with the approved site plan, floor plans, and building elevations stamped and dated with the date of this approval (except as modified by applicable conditions of approval). 2. Prior to the final building permit inspection, the existing seawall shall be reinforced and raised/capped to at least 10.9 feet (NAVD 88) and capable to be raised up to 14.4 feet (NAVD 88), in compliance with the City of Newport Beach Waterfront Project Guidelines and Standards, Harbor Design Criteria Commercial & Residential Facilities 3. The existing seawall shall be reinforced by the recommendations provided in the Coastal Hazards Report and Sea Level Rise Analysis prepared by PMA Consulting, Inc. dated April 15, 2024. 4. Prior to the final building permit inspection, an agreement in a form approved by the City Attorney between the property owner and the City shall be executed and recorded waiving rights to the construction of future shoreline protection devices including the repair and maintenance, enhancement, reinforcement, or any other activity affecting the bulkhead, that results in any encroachment seaward of the authorized footprint of the bulkhead or other shoreline protective device. The agreement shall be binding against the property owners and successors and assigns. 5. Prior to issuance of a building permit, the property owner shall submit a notarized signed letter acknowledging all hazards present at the site, assuming the risk of injury or damage from such hazards, unconditionally waiving any claims of damage against the City from such hazards, and to indemnify and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs, and expenses (including without limitation, attorney’s fees, disbursements, and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of the development. This letter shall be scanned into the plan set before building permit issuance. 6. This approval does not authorize any new or existing improvements (including landscaping and dock improvements) on California Coastal Permit Jurisdiction, State tidelands, public beaches, or the public right-of-way. Any improvements located on tidelands, submerged lands, and/or lands that may be subject to the public trust shall require a coastal development permit (CDP) approved by the California Coastal Commission (Coastal Commission). 7. No demolition or construction materials, equipment debris, or waste, shall be placed or stored in a location that would enter the sensitive habitat, receiving waters, or storm drains or result in impacts to environmentally sensitive habitat areas, streams, the 14 Zoning Administrator Resolution No. ZA2024-## Page 8 of 10 01-10-2023 beach, wetlands or their buffers. No demolition or construction materials shall be stored on public property. 8. This Coastal Development Permit does not authorize any development seaward of the private property. 9. The applicant is responsible for compliance with the Migratory Bird Treaty Act (MBTA). In compliance with the MBTA, grading, brush removal, building demolition, tree trimming, and similar construction activities shall occur between August 16 and January 31, outside of the peak nesting period. If such activities must occur inside the peak nesting season from February 1 to August 15, compliance with the following is required to prevent the taking of native birds under MBTA: A. The construction area shall be inspected for active nests. If birds are observed flying from a nest or sitting on a nest, it can be assumed that the nest is active. Construction activity within 300 feet of an active nest shall be delayed until the nest is no longer active. Continue to observe the nest until the chicks have left the nest and activity is no longer observed. When the nest is no longer active, construction activity can continue in the nest area. B. It is a violation of state and federal law to kill or harm a native bird. To ensure compliance, consider hiring a biologist to assist with the survey for nesting birds, and to determine when it is safe to commence construction activities. If an active nest is found, one or two short follow-up surveys will be necessary to check on the nest and determine when the nest is no longer active. 10. Best Management Practices (BMPs) and Good Housekeeping Practices (GHPs) shall be implemented before and throughout the duration of construction activity as designated in the Construction Erosion Control Plan. 11. The discharge of any hazardous materials into storm sewer systems or receiving waters shall be prohibited. Machinery and equipment shall be maintained and washed in confined areas specifically designed to control runoff. A designated fueling and vehicle maintenance area with appropriate berms and protection to prevent spillage shall be provided as far away from storm drain systems or receiving waters as possible. 12. Debris from demolition shall be removed from work areas each day and removed from the project site within 24 hours of the completion of the project. Stockpiles and construction materials shall be covered, enclosed on all sites, not stored in contact with the soil, and located as far away as possible from drain inlets and any waterway. 13. Trash and debris shall be disposed of in proper trash and recycling receptacles at the end of each construction day. Solid waste, including excess concrete, shall be disposed of in adequate disposal facilities at a legal disposal site or recycled at a recycling facility. 14. Revisions to the approved plans may require an amendment to this Coastal Development Permit or the processing of a new coastal development permit. 15 Zoning Administrator Resolution No. ZA2024-## Page 9 of 10 01-10-2023 15. The project is subject to all applicable City ordinances, policies, and standards unless specifically waived or modified by the conditions of approval. 16. The applicant shall comply with all federal, state, and local laws. A material violation of any of those laws in connection with the use may be caused by the revocation of this Coastal Development Permit. 17. This Coastal Development Permit may be modified or revoked by the Zoning Administrator if determined that the proposed uses or conditions under which it is being operated or maintained are detrimental to the public health, and welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained to constitute a public nuisance. 18. Prior to issuance of a building permit, the applicant shall submit a final construction erosion control plan. The plan shall be subject to review and approval by the Building Division. 19. Prior to issuance of a building permit, the applicant shall submit a final drainage and grading plan. The plan shall be subject to review and approval by the Building Division. 20. Prior to issuance of a building permit, a copy of the Resolution, including conditions of approval Exhibit “A” shall be incorporated into the Building Division and field sets of plans. 21. Prior to issuance of a building permit, the applicant shall submit a final landscape and irrigation plan. These plans shall incorporate drought-tolerant plantings, non-invasive plant species, and water-efficient irrigation design. The plans shall be approved by the Planning Division. 22. Prior to issuance of a building permit, the final WQHP/WQMP shall be reviewed and approved by the Building Division. The implementation shall comply with the approved CPPP and WQHP/WQMP and any changes could require separate review and approval by the Building Division. 23. All landscape materials and irrigation systems shall be maintained by the approved landscape plan. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing, and trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. 24. Construction activities shall comply with Section 10.28.040 of the Newport Beach Municipal Code, which restricts hours of noise-generating construction activities that produce noise to between the hours of 7:00 a.m. and 6:30 p.m., Monday through Friday. Noise-generating construction activities are not allowed on Saturdays, Sundays, or Holidays. 25. All noise generated by the proposed use shall comply with the provisions of Chapter 16 Zoning Administrator Resolution No. ZA2024-## Page 10 of 10 01-10-2023 10.26 (Community Noise Control) and other applicable noise control requirements of the Newport Beach Municipal Code. 26. Prior to the issuance of the building permit, the applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 27. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by the current property owner or agent. 28. This Coastal Development Permit shall expire unless exercised within 24 months from the date of approval as specified in Section 21.54.060 (Time Limits and Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise granted. 29. To the fullest extent permitted by law, the applicant shall indemnify, defend and hold harmless the City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs, and expenses (including without limitation, attorney’s fees, disbursements, and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to the City’s approval of 122 Via Lido Nord, LLC Residence including but not limited to, Coastal Development Permit (PA2024-0144). This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorney’s fees, and other expenses incurred in connection with such claim, action, causes of action, suit, or proceeding whether incurred by the applicant, City, and/or the parties initiating or bringing such proceeding. The applicant shall indemnify the City for all the City's costs, attorneys' fees, and damages, which the City incurs in enforcing the indemnification provisions outlined in this condition. The applicant shall pay to the City upon demand any amount owed to the City under the indemnification requirements prescribed in this condition. 17 Attachment No. ZA 2 Vicinity Map 18 VICINITY MAP Coastal Development Permit PA2024-0144 122 Via Lido Nord Subject Property Subject Property 19 Attachment No. ZA 3 Project Plans 20 21 DESCRIPTIONISSUE DATE 7/29/24 6 j e n n e r , s u i t e 2 9 0 irv i n e , c a 9 2 6 1 8 (94 9 ) 4 5 0 . 0 0 9 3 inf o @ o l s o n a r c h i t e c t . c o m JOB NO. IN-HOUSE XX/XX/XX 2310 PLAN CHECK : - - - PLOT DATE 10/24/24 Be r g e r r e s i d e n c e CDP SUB 1 12 2 v i a l i d o n o r d ne w p o r t b e a c h , c a 9 2 6 6 3 ne w s i n g l e f a m i l y r e s i d e n c e ALL DRAWINGS, DESIGNS AND WRITTEN MATERIALAPPEARING HEREIN CONSTITUTE THE ORIGINAL ANDUNPUBLISHED WORK OF DAVID R OLSON ARCHITECTSAND THE SAME SHALL NOT BE DUPLICATED, USED,OR ASSIGNED TO ANY THIRD PARTY WITHOUT THEWRITTEN CONSENT OF DAVID R. OLSON ARCHITECTS. 10/24/24CITYSUB 1 / CDP SUB 2 ** t h e s e 3 D i m a g e s a r e f o r g e n e r a l r e f e r e n c e o n l y ; s e e o t h e r s h e e t s f o r t e c h n i c a l i n f o r m a t i o n . * * T1.2 3d images 22 3'-0 " SID E SET B A C K 3'-0 " SID E SET B A C K (N 29°00'00" E 90.00') (N 29°00'00" E 90.00') N 6 1 ° 0 0 ' 0 0 " W 3 0 . 0 2 ' N 6 1 ° 0 0 ' 0 0 " W 3 0 . 0 2 ' 4'-0" FRONTSETBACK 10'-0" FRONT SETBACK VI A L I D O N O R D NE W P O R T H A R B O R kitchen living dining elev pan pwd bath 2 bed 2 / den garage up up19 R @ 6.6918 T @ 19'- 1 1 " C L R . 19'-1" CLR. 20 ' - 1 1 " 4'-0"P.U.E 3'-0 " SID E SE T B A C K 3'-0 " SID E SET B A C K (N 29°00'00" E 90.00') (N 29°00'00" E 90.00') N 6 1 ° 0 0 ' 0 0 " W 3 0 . 0 2 ' N 6 1 ° 0 0 ' 0 0 " W 3 0 . 0 2 ' 4'-0"FRONTSETBACK 10'-0"FRONT SETBACK VIA L I D O N O R D NE W P O R T H A R B O R dn roof deck open open openb a 4 . 1 f a4 . 2 e a4 . 2 a a 4 . 1 c a 4 . 1 d a4 . 2 9 R @ 7.138 T @ 10.5 dn7 R @ 7.136 T @ 10.5 to switchbelow 16'- 1 1 12" 13'- 5 12" 6'-6" 3'-0 " 2'-0 " 3'-0 " 2'-0 " 2'-0 " 2'-0" 1'-4"2'-0" 1'-4" 96 s f 35 s f kitchen living dining elev pan pwd bath 2 bed 2 / den41 . 6 s f 4 s f 3 s f 17 s f 12 1 9 s f garage 42 1 s f up up b a 4 . 1 a a 4 . 1 c a 4 . 1 f a4 . 2 e a4 . 2 d a4 . 2 19 R @ 6.6918 T @ 3'-0 " SID E SET B A C K 3'-0 " SID E SET B A C K (N 29°00'00" E 90.00') (N 29°00'00" E 90.00') N 6 1 ° 0 0 ' 0 0 " W 3 0 . 0 2 ' N 6 1 ° 0 0 ' 0 0 " W 3 0 . 0 2 ' 4'-0"FRONTSETBACK 10'-0" FRONT SETBACK VI A L I D O N O R D NE W P O R T H A R B O R 6"6" 8" 4'-6"1'-3"11'-3 1/2"10"3'-6"4'-7 1 / 2 " 6'-9 " 1'-3"1'-8"2'-6"5'-4 " 6'-6 " 9'-1 " 4'-5 1/2" 16'-8 1/2"39'-4 1/2" 3 1/2" 1'-10"2'-10"3'-10 1/2"1'-0 " 10'-10" 1'-1 0 " 1'-9 " 16'- 1 1 " 21'-10 1/2"5 1/2"4'-10 1/4" 2'-9 3/4"13'-9 3/4"3'-9 3/4"15'-7"6'-6" 1'-0 " 13'- 1 1 / 2 " R10 ' - 1 0 3 / 4 " 7'-7 3/4" 2'-0 " 5 1/ 2 " 3'-9 " 2'-4 3/4" 4'- 2 " 6" 2'-5" 5'-1 1 " 6"1'-4 1 / 2 " 2'-6" 1'-4 1 / 2 " 10" 1'- 0 1 / 2 " 9" 27'-2 1/4" 20 ' - 6 " 75'-9" DESCRIPTIONISSUE DATE 7/29/24 6 j e n n e r , s u i t e 2 9 0 irv i n e , c a 9 2 6 1 8 (94 9 ) 4 5 0 . 0 0 9 3 inf o @ o l s o n a r c h i t e c t . c o m JOB NO. IN-HOUSE XX/XX/XX 2310 PLAN CHECK : - - - PLOT DATE 10/24/24 Be r g e r r e s i d e n c e CDP SUB 1 12 2 v i a l i d o n o r d ne w p o r t b e a c h , c a 9 2 6 6 3 ne w s i n g l e f a m i l y r e s i d e n c e ALL DRAWINGS, DESIGNS AND WRITTEN MATERIALAPPEARING HEREIN CONSTITUTE THE ORIGINAL ANDUNPUBLISHED WORK OF DAVID R OLSON ARCHITECTSAND THE SAME SHALL NOT BE DUPLICATED, USED,OR ASSIGNED TO ANY THIRD PARTY WITHOUT THEWRITTEN CONSENT OF DAVID R. OLSON ARCHITECTS. 10/24/24CITYSUB 1 / CDP SUB 2 D C A B E F G CONNECT ROOF DRAINS TO SUB-GRADE DRAINAGE SYSTEM; VERIFY WITH CIVIL ENGINEER ORLANDSCAPE ARCHITECT. WHERE ROOF DRAINS ARE REQUIRED, OVERFLOW DRAINS HAVINGTHE SAME SIZE AS THE ROOF, SHALL BE INSTALLED WITH THE INLET FLOOR LINE LOCATED 2"ABOVE THE LOW POINT OF THE ROOF. OVERFLOW DRAINS SHALL BE INDEPENDENT OF ROOFDRAINS, ALL ROOF DRAINS SHALL BE EQUIPPED WITH STRAINERS EXTENDING NOT LESS THAN4" ABOVE THE IMMEDIATE SURFACE. GANG ALL VENT STACKS WHEREVER POSSIBLE AND WHERE ALLOWED BY CODE TO MINIMIZEROOF PENETRATIONS, LOCATE IN AN ORDERLY MANNER AND IN AN AREA SO AS NOT TO BESEEN FROM ANY GRADE LEVEL SURROUNDING AREAS, PRIME AND PAINT TO MATCH GRAVELBALLAST. ICC NUMBER FOR BRISTOLITE SKYLIGHTS: ESR-3177 ALL B.U.R. AREAS TO SLOPE AT 1/4" PER FOOT MINIMUM PROVIDE ATTIC DRAFT STOP AT 3000 S.F. MAXIMUM ATTIC VENTILATION OPENINGS SHALL BE COVERED WITH CORROSION-RESISTANT METAL MESHWITH MESH OPENINGS OF 1/4" IN DIMENSION. DETAILS FOR VENT PIPE FLASHING 20/D1.3 ICC NUMBER FOR KALWALL SKYLIGHTS: ESR-2464 general notes L K J H G F E D C B A site plan general notes REFER TO CIVIL ENGINEERING PLANS FOR EXACT BUILDING LOCATIONS, GRADING,DRAINAGE, FLOWLINES, GUTTERS, CURBS, ETC. REFER TO LANDSCAPE PLANS FOR LANDSCAPE, SITE IRRIGATION, HARDSCAPE WALLS,GATES, POOL AND FOUNTAIN FEATURES, EXTERIOR SCULPTURE PEDESTALS, EXTERIOREQUIPMENT LOCATIONS (CONDENSING UNITS, ETC.), SITE LIGHTING, ETC. NOT A PART REFER TO CIVIL ENGINEERING PLANS FOR EXISTING UTILITY LOCATIONS, FIELDVERIFY REFER TO UTILITY PLAN FOR HOSE BIBBS/BBQ GAS STUB OUTS METER LOCATIONS ARE APPROXIMATE; DESIGN BUILD SUBCONTRACTOR TO FIELD VERIFYEXACT LOCATION AND TO RECEIVE APPROVAL FROM THE APPROPRIATE UTILITY COMPANYIN REGARD TO LOCATIONS (CONDENSING UNITS, ETC.), SITE LIGHTING, ETC. FRONT PROPERTY CORNERS TO BE LOCATED PRIOR TO CONSTRUCTION. POOLS, SPAS, WALLS, FENCES, PATIO COVERS AND OTHER FREESTANDING STRUCTURESREQUIRE SEPARATE REVIEWS AND PERMITS. ELECTRICAL SERVICE TO BE UNDERGROUND IF SERVICE IS RELOCATED OR A NEWSERVICE IS INSTALLED. GRADING INSPECTOR IS TO BE CONTACTED TO SCHEDULE A SITE PRE-CONSTRUCTIONMEETING 48 HRS PRIOR TO START OF GRADING OR CONSTRUCTION. ELECTRIC COMPANY APPROVAL IS REQUIRED FOR METER LOCATION PRIOR TOINSTALLATION. FIELD INSPECTORS TO REVIEW AND APPROVE UNDERGROUND SERVICE REQUIREMENTPRIOR TO CONCRETE PLACEMENT. 1 plan keynotes EXISTING PROPERTY LINE IN-WALL DRAIN, TIE TO CIVIL SYSTEM NEW HARDSCAPE PER LANDSCAPE DRAWINGS - NOT A PART OF THIS PERMIT RAISED PEDESTIAL DECKING LANDSCAPED AREA PER LANDSCAPE DRAWINGS - NOT A PART OF THIS PERMIT PROPERTY LINE FENCE / WALL PER LANDSCAPE DRAWINGS. MAXIMUM HEIGHT NOT TOEXCEED 6' EXCEPT AT RETAINING WALL CONDITION - NOT A PART OF THIS PERMIT DASHED LINES INDICATE BUILDING SETBACK LINE EXTERIOR BBQ AND COUNTER PER DETAILS; MAX 42" ABOVE F.F. CITY STANDARD PAVING IN PROW. GAS METER LOCATION NOT USED ELECTRICAL METER LOCATION - VERIFY WITH CIVIL SEWER LATERAL LOCATION - VERIFY WITH CIVIL UTILITIES AS NOTED - VERIFY WITH CIVIL AUTOMATICALLY ILLUMINATED BUILDING ADDRESS NUMBERS NEW 42" HIGH GLASS GUARDRAIL OVER SEAWALL 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 GATE OR FENCE PER LANDSCAPE DRAWINGS R1 R4 R5 R6 R3 R2 R7 R8 R9 3 PLY BUILT-UP ROOFING WITH GRAY GRAVEL BALLAST; (2) 15 LBS. FELT WITH 90 LBS. CAPSHEET; MAX SLOPE = 2:12. NAIL ALL BASE SHEETS PER CBC TABLE 1507.10.2, INSTALL OVERTAPERED INSULATION. ROOFING MATERIAL SHALL COMPLY WITH CLASS A FLAME SPREAD. VENT FOR GAS ONLY DIRECT VENT FIREPLACE. INSTALL PER MFG. REQUIREMENTS NO ROOFCLEARANCE REQUIRED PER CMC 802.8.2 LINE OF WALL BELOW PARAPET CAP PER DETAIL CRICKET AS REQUIRED FOR POSITIVE DRAINAGE 2" DIA.DECK DRAIN. INDIVIDUALLY ROUTE DRAINS THROUGH OUTSIDE WALL TO CIVIL SYSTEM.SEE DETAIL 6/D1.2 SADDLE PAINTED ALUMINUM ATTIC VENT; SELF FLASHING; PROVIDE INSECT SCREENS, SEECALCULATIONS SLATE ROOFING TILES, OVER NO 30 FELT OVER PLYWOOD SHEATHING. ROOF ASSEMBLY IS ACLASS "A" ROOF ASSEMBLY PER ICC ESR-2119.ROOF ASSEMBLY IS 10LBS PER S.F. INSTALLED. 3.5:12 SLOPE TYP. roof keynotes 18 EXISTING SEAWALL - REPAIR / MODIFICATION UNDERSEPARATE PERMIT site plan 1/4"=1'-0" A first floor / garage slab edge plan B 1/4"=1'-0" roof plan C1/4"=1'-0" 8 5 3 5 1 6 3 10 12 17 14 14 5 9 1 5 14171356334 1 16 18 16 4 PAD = 10.09F.F = 11.42 RA R1 R1 R2 R1 SLOPE3:12SLOPE3:12 HIP HIP SLOPE3:12 SLOPE3:12 RIDGE SLOPE3:12 SLOPE3:12 HIP HIP CURB = 12.40 F.F = 12.42 F.F = 12.09 CURB = 12.42 CURB = 12.40 F.F = 11.86F.F = 11.42 T.RAIL = 35.46 T.ROOF = 35.46 T.RIDGE = 23.21 5 10.80 E.G. 10.80 E.G. 10.80 E.G. 10.80 E.G. 10.89 E.G. T.CHIMNEY =38.46 E. GRADE = 11.52 E. GRADE = 11.52 E. GRADE = 11.52 RA K E RA K E PARAPET TRELLIS TRELLIS A1.1 site, slab edge & roof plans 23 From:Jim Mosher To:CDD Subject:Re: Comment on ZA agenda Item 5 (12/12/2024 meeting) Date:December 11, 2024 10:40:31 AM [EXTERNAL EMAIL] DO NOT CLICK links or attachments unless you recognize the sender and know the content is safe.Report phish using the Phish Alert Button above. With regard to Item 5 ( 122 Via Lido Nord, LLC Residence Coastal Development Permit, PA2024-0144) on the December 12, 2024, Newport Beach Zoning Administrator agenda -- On handwritten page 8, in the second sentence of Section 1.3 of the draft resolution, was "raised pedistal decking" was intended to read "raised pedestal decking"? That said, I am not sure what design feature this refers to. "Roof Keynotes - B" of the incomplete plans attached as the last page of the staff report refers to "EXTERIOR SCULPTURE PEDESTALS," although I do not know where those pedestals are. The same note refers to "POOL AND FOUNTAIN FEATURES." Does the project include a pool? Is it on the roof? -- Jim Mosher Zoning Administrator - December 12, 2024 Item No. 5a - Additional Materials Received 122 Via Lido Nord, LLC Residence Coastal Development Permit (PA2024-0144)