HomeMy WebLinkAbout20170316_Notice of Incomplete FilingDocument1
Tmplt. 02/09/11
COMMUNITY DEVELOPMENT DEPARTMENT
PLANNING DIVISION
100 Civic Center Drive, P.O. Box 1768, Newport Beach, CA 92658-8915
949-644-3200 Fax: 949-644-3229
www.newportbeachca.gov
NOTICE OF INCOMPLETE FILING
March 16, 2017
Julie Laughton Design Build
28885 Woodspring Circle
Trabuco Canyon, CA 92679
Application No. CDP No. CD2017-016 (PA2017-041)
Address 715 W. Balboa Boulevard
Please be advised that after reviewing the subject application, your submittal has been
deemed incomplete and further information is required before we are able to proceed
with the application process.
The following documentation is required to complete the application:
1. Construction Pollution Prevention Plan (CPPP).
As this property is within 200 feet of a beach, please provide a Construction Pollution
Prevention Plan (CPPP) in compliance with Newport Beach Municipal Code (NBMC)
Section 21.35.030. The CPPP shall describe the temporary best management
practices (BMPs) the development will implement to minimize erosion and
sedimentation during construction, and to minimize pollution of runoff and coastal
waters by construction chemicals and materials. The level of detail provided to
address the plan’s requirements shall be commensurate with the type and scale of
development, and the potential for adverse water quality and hydrologic impacts to
coastal waters. Please reference cited Section for additional information.
2. Water Quality and Hydrology Plan (WQHP).
As 75 percent or more of the project site will be impervious surfaces, please provide
a Water Quality and Hydrology Plan (WQHP) in compliance with NBMC Section
21.35.050. The WQHP shall be required for developments of water quality concern,
which are specified categories of development that have a greater potential for
adverse water quality and hydrologic impacts due to the development size, type of
land use, and/or proximity to coastal waters. The WQHP shall be prepared by a
qualified licensed professional, and shall include a polluted runoff and hydrologic site
characterization, a sizing standard for BMPs, use of a low impact development (LID)
approach to retain the design storm runoff volume on site, and documentation of the
expected effectiveness of the proposed BMPs. Additional plan components that may
be required include an alternatives analysis, and a description of the treatment
control and/or runoff control BMPs the development will implement to minimize
Page 2
potential post-development water quality and hydrologic impacts. Please reference
cited Section for additional information
3. Geologic Stability Report
As the property is located in a liquefaction zone, a geologic/soils/geotechnical report
is required. The report is required to be prepared in accordance with Newport Beach
Municipal Code Section 21.30.015.E.4.
4. Additional Fee
A deposit of $1,500 is required for processing of water quality control plans (CPPP
and WQHP).
Upon verification of completion, the application will be processed and scheduled for a
Zoning Administrator Hearing. Should you have any questions regarding submittal
requirements, please contact Chelsea Crager, Assistant Planner at (949) 644-3227,
ccrager@newportbeachca.gov.
By:
c:
Brian and Debbie Huitt
27810 Mount Witney
Yorba Linda, CA 92688