Loading...
HomeMy WebLinkAbout20170316_Notice of Incomplete FilingDocument1 Tmplt. 02/09/11 COMMUNITY DEVELOPMENT DEPARTMENT PLANNING DIVISION 100 Civic Center Drive, P.O. Box 1768, Newport Beach, CA 92658-8915 949-644-3200 Fax: 949-644-3229 www.newportbeachca.gov NOTICE OF INCOMPLETE FILING March 16, 2017 Julie Laughton Design Build 28885 Woodspring Circle Trabuco Canyon, CA 92679 Application No.  CDP No. CD2017-016 (PA2017-041) Address 715 W. Balboa Boulevard Please be advised that after reviewing the subject application, your submittal has been deemed incomplete and further information is required before we are able to proceed with the application process. The following documentation is required to complete the application: 1. Construction Pollution Prevention Plan (CPPP). As this property is within 200 feet of a beach, please provide a Construction Pollution Prevention Plan (CPPP) in compliance with Newport Beach Municipal Code (NBMC) Section 21.35.030. The CPPP shall describe the temporary best management practices (BMPs) the development will implement to minimize erosion and sedimentation during construction, and to minimize pollution of runoff and coastal waters by construction chemicals and materials. The level of detail provided to address the plan’s requirements shall be commensurate with the type and scale of development, and the potential for adverse water quality and hydrologic impacts to coastal waters. Please reference cited Section for additional information. 2. Water Quality and Hydrology Plan (WQHP). As 75 percent or more of the project site will be impervious surfaces, please provide a Water Quality and Hydrology Plan (WQHP) in compliance with NBMC Section 21.35.050. The WQHP shall be required for developments of water quality concern, which are specified categories of development that have a greater potential for adverse water quality and hydrologic impacts due to the development size, type of land use, and/or proximity to coastal waters. The WQHP shall be prepared by a qualified licensed professional, and shall include a polluted runoff and hydrologic site characterization, a sizing standard for BMPs, use of a low impact development (LID) approach to retain the design storm runoff volume on site, and documentation of the expected effectiveness of the proposed BMPs. Additional plan components that may be required include an alternatives analysis, and a description of the treatment control and/or runoff control BMPs the development will implement to minimize Page 2 potential post-development water quality and hydrologic impacts. Please reference cited Section for additional information 3. Geologic Stability Report As the property is located in a liquefaction zone, a geologic/soils/geotechnical report is required. The report is required to be prepared in accordance with Newport Beach Municipal Code Section 21.30.015.E.4. 4. Additional Fee A deposit of $1,500 is required for processing of water quality control plans (CPPP and WQHP). Upon verification of completion, the application will be processed and scheduled for a Zoning Administrator Hearing. Should you have any questions regarding submittal requirements, please contact Chelsea Crager, Assistant Planner at (949) 644-3227, ccrager@newportbeachca.gov. By: c: Brian and Debbie Huitt 27810 Mount Witney Yorba Linda, CA 92688