HomeMy WebLinkAboutPlan Check Corrections
City of Newport Beach
Community Development Department
100 Civic Center Drive / P.O. Box 1768
Newport Beach, CA 92658
Phone: (949) 644-3200
www.newportbeachca.gov
PLANNING DIVISION
PLAN CHECK
CORRECTIONS
F:\Users\CDD\Shared\Admin\Planning_Division\Current_Templates Revised 08-29-17 – CDD
Plan Checker Liz Westmoreland
Phone No: 949.644.3234
Email Address: lwestmoreland@newportbeachca.gov:
PLAN CHECK NO. PA2018-141 ADDRESS: 4703 River
CORRECTION DATE: 8/22/18
CORRECTIONS:
Please make the following corrections to deem the application complete:
1. FYI – future parcel map will require its own cdp. Consider adding it to this application so only
one public hearing required.
2. Trash cannot be located within clear dimensions of carport. Can place in side yard, but
can only encroach in one side since at least 36” needs to be clear on one side yard.
3. Add rear setback label to site plan.
4. Need more formal floor area calculation sheets. For example, third floor is on its own tiny
sheet. Additionally, clearly label which areas are being excluded. Shows stairs wherever they
occur and count that sf on first level. Show PL and setbacks so that open volume can be
clearly labeled outside clear dimensions.
5. Show mansard roof section showing that it comes to a point or show the flat guardrail/parapet
behind it.
6. Provide labeled dimension and max elevation for the flat guardrail on the applicable elevations.
7. All elevations should include the established grade label.
8. Topo survey is stamped but not signed. Include signature.
9. Write third floor max SF (15% of buildable area) and proposed third floor sf where you show
similar info for max sf and open volume.
10. Why are there two numbers shown for the length on the topo?
11. Include 35’ tandem dimension not just individual labels for garage/carport depth.
12. Please pull back third floor square footage 5’ from property line per required third floor
stepbacks (2’ from side setback line).