Loading...
HomeMy WebLinkAboutPC2025-003 - SUPERSEDING USE PERMIT NO. UP1939, AND APPROVING A MAJOR SITE DEVELOPMENT REVIEW, STAFF APPROVAL, AND TRAFFIC STUDY FOR THE CONVERSION OF AN EXISTING PROFESSIONAL OFFICE BUILDING INTO A MEDICAL OFFICE BUILDING, WAIVING A PORTION OF THE OFF-SRESOLUTION NO. PC2025-003 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF NEWPORT BEACH, CALIFORNIA, SUPERSEDING USE PERMIT NO. UP1939, AND APPROVING A MAJOR SITE DEVELOPMENT REVIEW, STAFF APPROVAL, AND TRAFFIC STUDY FOR THE CONVERSION OF AN EXISTING PROFESSIONAL OFFICE BUILDING INTO A MEDICAL OFFICE BUILDING, WAIVING A PORTION OF THE OFF-STREET PARKING REQUIREMENT, AND CONSTRUCTING AN ON-SITE PARKING STRUCTURE FOR THE PROPERTY LOCATED AT 3300 IRVINE AVENUE (PA2024-0070) THE PLANNING COMMISSION OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by Chad Manista, of Real Estate Development Associates, LLC (“Applicant”), concerning property located at 3300 Irvine Avenue, and legally described as Parcel 1 of Parcel Map 79-721 (“Property”). 2. The City Council approved Use Permit No. UP1939 on May 12, 1980, and allowed for the construction of an approximately 42-foot-tall, three-story, 79,581-square-foot professional office building, and 270 space surface parking lot. The existing building shares vehicular access with the adjacent, single-story, Orange County American Institute of Architects building located at 1981 Orchard Drive. 3. The Applicant requests a Major Site Development Review, Staff Approval, and Traffic Study to convert the existing building from professional office use to medical office use. To partially accommodate the increased parking demand from medical office use, the existing surface parking lot will be restriped and a three-level parking structure with solar canopy will be constructed. The parking structure will be connected to the medical office building via a pedestrian bridge. Interior renovations to the building include remodeling of the existing lobby to create a new atrium-style lobby with common areas and new stairways between floors. While the footprint of the lobby will expand, internal changes to create additional volume will result in a 1,352-gross-square-foot reduction of floor area, reducing the building from 79,581 square feet to 78,229 square feet. The project also includes significant remodeling to the exterior of the building and new rooftop architectural features including a decorative glass parapet measuring 41-feet, 6-inches from existing grade and an entry atrium parapet, measuring 45-feet from existing grade (“Project”). 4. The following approvals are required from the City of Newport Beach (“City”) to implement the Project: • Major Site Development Review (“SDR”): To allow an increase in height in accordance with Section 20.52.080 (Site Development Reviews) of the Newport Docusign Envelope ID: 2FA025FF-02F7-490D-B67E-DFEC9AD2E41D Planning Commission Resolution No. PC2025-003 Page 2 of 24 07-29-24 Beach Municipal Code (“NBMC”) for the proposed architectural features (i.e., parapets), which are proposed at 41-feet, 6-inches above existing grade and 45 feet above existing grade, respectively; • Staff Approval: To waive 61 of the 392 required parking spaces, or 15.5% of the parking requirement, in accordance with Section 20.40.110(D) (Adjustments to Off- Street Parking Requirements) of the NBMC; and • Traffic Study: To consider the projected 1,496 net increase in average daily trips (ADTs), pursuant to Section 15.40.030(A) (Traffic Phasing Ordinance) of the NBMC. 5. Section 20.40.110(D) (Adjustments to Off-Street Parking Requirements) of the NBMC allows for the Community Development Director to reduce the number of required parking spaces by a maximum of 20%. However, Section 20.50.30 (Multiple Permit Applications) of the NBMC requires that multiple applications for the same project be processed concurrently and be reviewed and approved, modified, or denied by the highest review authority, which in this case is the Planning Commission. 6. Approval of this Project will supersede Use Permit No. UP1939, which would be rendered null and void. 7. The Property is categorized General Commercial Office (CO-G) by the General Plan Land Use Element and is located within the Office-General (OG) Zoning District. 8. The Property is not located within the Coastal Zone; therefore, a coastal development permit is not required. 9. A public hearing was held on January 23, 2025, in the Council Chambers at 100 Civic Center Drive, Newport Beach, California. A notice of the time, place, and purpose of the hearing was given in accordance with Government Code Section 54950 et seq. (“Ralph M. Brown Act”) and Chapter 20.62 (Public Hearings) of the NBMC. Evidence, both written and oral, was presented to and considered by, the Planning Commission at this hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. This Project is exempt from the California Environmental Quality Act (“CEQA”) pursuant to Section 15332 under Class 32 (In-Fill Development Projects) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3 because it has no potential to have a significant effect on the environment. 2. Class 32 exempts in-fill development that meets the following criteria: (1) is consistent with the applicable General Plan designation and applicable policies, as well as applicable zoning designations and regulations, (2) would occur on a site less than five acres, (3) the project site must have no habitat value, (4) the project would not result in significant traffic, noise, air quality, or water quality effects, and (5) the site can be Docusign Envelope ID: 2FA025FF-02F7-490D-B67E-DFEC9AD2E41D Planning Commission Resolution No. PC2025-003 Page 3 of 24 07-29-24 adequately served by all required utilities and public services. If a project meets the criteria and qualifies for the Class 32 exemption, the project is categorically exempt from CEQA unless one of the exceptions to exemptions apply. The exemption is not limited to any use type and may apply to residential, commercial, industrial, public facility, and/or mixed-use projects. 3. The Project meets all the requirements and is exempt under Class 32 (In-Fill Development Projects) based on the following: a. General Plan and Zoning Consistency: The Property is categorized as General Commercial Office (CO-G) by the General Plan Land Use Element and is located within the Office-General (OG) Zoning District. The General Commercial Office (CO-G) category provides for areas appropriate for administrative, professional, and medical offices with limited accessory retail and service uses. The Project is consistent with the purpose and intent of the General Commercial Office (CO-G) category, as it enhances and improves the viability of an existing multi-tenant professional office building by allowing for a higher ratio of medical users and providing a parking facility. Additionally, the proposed medical office land use is allowed by right in the Office-General (OG) Zoning District. b. Less Than 5 Acres: The Property is approximately 3.14 acres, which is less than 5 acres. c. No Habitat Value: The Property is currently developed with a 79,581-square-foot, three-story, commercial building known as Newport Irvine Center. The Project proposes to remodel the building and construct a parking structure to allow sufficient parking for medical uses. The Property is unlikely to provide value as habitat for endangered, rare, or threatened species. d. No Significant Traffic, Noise, Air Quality or Water Quality Effects: The Project will generate a net increase of 1,496 daily trips on a typical weekday. A Traffic Impact Analysis (“TIA”) was prepared for the Project. The TIA found that the 15 studied intersections will continue to operate at a satisfactory level of service as defined by the City’s Traffic Phasing Ordinance. An analysis of noise and vibration impacts was prepared by LSA and concluded that short-term construction-related impacts would be less than significant and any long-term project-related traffic impacts would be less than significant. An analysis of the air quality and greenhouse gas (“GHG”) impacts of the Project was prepared by EPD Solutions, which found that the Project will not have significant impacts to air quality on a project or cumulative level and that the Project would have a less than significant impact on GHG emissions. Odors produced by construction of the Project would be minimal and temporary, and the Project involves land uses that typically do not generate significant odor complaints. Docusign Envelope ID: 2FA025FF-02F7-490D-B67E-DFEC9AD2E41D Planning Commission Resolution No. PC2025-003 Page 4 of 24 07-29-24 A preliminary Water Quality Management plan (“WQMP”), Grading Plan, and Drainage Plans have been reviewed and approved by the Building Division. The plans comply with state, regional, and City water quality requirements. e. Utilities and Public Services: The Property is within a developed area of the City and is adequately served by existing utilities. All public services are adequate to accommodate the Project. SECTION 3. REQUIRED FINDINGS. Major Site Development Review In accordance with Section 20.52.080(F) (Site Development Reviews – Findings and Decisions) of the NBMC, the findings and facts in support of such findings are set forth as follows: Finding: A. The proposed development is allowed within the subject Zoning District. Facts in Support of Finding: 1. The Property is located within the Office-General (OG) zoning district, which is intended for administrative, professional, and medical office uses with limited accessory retail and service uses. Pursuant to Table 2-4 (Allowed Uses and Permit Requirements) of Section 20.20.020 (Commercial Zoning Districts Land Uses and Permit Requirements) of the NBMC, medical and dental office uses are permitted in the Office-General (OG) zoning district. The tenant mix currently consists of professional offices, medical offices, and health/fitness facilities. Additional medical offices and the construction of a parking structure are consistent with the uses permitted by the Office-General (OG) zoning district. 2. The Office-General (OG) zoning district requires a 0-foot front setback, 0-foot interior side setback, 15-foot street side setback, and a 0-foot rear setback. The Project complies with the required setbacks as it proposes a 39-foot front setback, 10-foot interior side setback, 25-foot street side setback, and a 2-foot rear setback. 3. The Office-General (OG) zoning district allows for a maximum building height of 32 feet for a flat roof and 37 feet for a sloped roof with a minimum 3/12 pitch. The existing building exceeds the height limit, as authorized by UP1939. The Project includes increasing the maximum height of the building to accommodate the new parapets. Therefore, a site development review for increased height is required pursuant to Section 20.52.080 (Site Development Reviews) of the NBMC. The facts in support of findings are included under Findings D through G. 4. The Property is located within the Nonresidential, Nonshoreline Height Limit Area. The height of a structure may be increased up to a maximum 50 feet with a flat roof or 55 Docusign Envelope ID: 2FA025FF-02F7-490D-B67E-DFEC9AD2E41D Planning Commission Resolution No. PC2025-003 Page 5 of 24 07-29-24 feet with a sloped roof through the approval of an SDR. While the Project requires the approval of an SDR to implement, the proposed height of the parapet will comply with the maximum 50-foot height limit, allowed with an SDR. 5. Table 3-10 (Off-Street Parking Requirements) of Section 20.40.040 (Off-Street Parking Spaces Required) of the NBMC provides that the number of parking spaces for a medical office use is one per every 200 square feet of gross floor area. Therefore, the Project requires a total of 392 parking spaces. As the Project provides only 331 parking spaces, a parking demand analysis dated December 4, 2024, was prepared by RK Engineering (“Parking Study”), which is attached hereto as Exhibit “B” and incorporated herein by reference, to establish the parking demand for the Project. The Parking Study concluded that 331 spaces are adequate to serve the Project. The request for a 15.5% parking waiver is evaluated and substantiated in Finding H below. Finding: B. The proposed development is in compliance with all of the following applicable criteria: i. Compliance with this section, the General Plan, this Zoning Code, any applicable specific plan, and other applicable criteria and policies related to the use or structure; ii. The efficient arrangement of structures on the site and the harmonious relationship of the structures to one another and to other adjacent developments; and whether the relationship is based on standards of good design; iii. The compatibility in terms of bulk, scale, and aesthetic treatment of structures on the site and adjacent developments and public areas; iv. The adequacy, efficiency, and safety of pedestrian and vehicular access, including drive aisles, driveways, and parking and loading spaces; v. The adequacy and efficiency of landscaping and open space areas and the use of water efficient plant and irrigation materials; and vi. The protection of significant views from public right(s)-of-way and compliance with NBMC Section 20.30.100 (Public View Protection). Facts in Support of Finding: 1. The Property is categorized as General Commercial Office (CO-G) by the Land Use Element of the General Plan. The General Commercial Office (CO-G) category provides for areas appropriate for administrative, professional, and medical offices with limited accessory retail and service uses. The Project is consistent with the purpose and intent of the General Commercial Office (CO-G) category, as it allows for a medical office building that will serve the community. Docusign Envelope ID: 2FA025FF-02F7-490D-B67E-DFEC9AD2E41D Planning Commission Resolution No. PC2025-003 Page 6 of 24 07-29-24 2. Figure LU-11 of the Land Use Element establishes a maximum floor-area-to-land ratio (“FAR”) of 0.50 for the project site. Implementation of the project would reduce the existing gross floor area of building from 79,581 square feet to 78,229 square feet and results in an FAR of 0.55. Therefore, the project would reduce the development intensity to be more consistent with the intended FAR for the property. Parking structures do not qualify as gross floor area per Section 20.70 (Definitions) of the NBMC and are not included in the gross floor area of the building or the FAR. 3. The Project is consistent with General Plan Land Use goals and policies, including, but not limited to the following: a. Land Use Element Policy LU 5.1.2 (Compatible Interfaces). Requires that the height of development in nonresidential areas and higher-density residential areas transition as it nears lower-density residential areas to minimize the conflicts at the interface between the different types of development. The tallest parapet is proposed for the side of the building fronting Irvine Avenue. The nearest residential zoning district is 500 feet away and begins at 2173 Orchard Drive. The three-story parking structure and then the intervening office buildings between the property and the low-density residential uses on Birch Street, which are typically two-stories tall, provide a gradual transition in height from the project to residential uses. b. Land Use Policy LU 5.4.2 (Development Form and Architecture). Requires that new development of business park, office, and supporting buildings be designed to convey a unified and high-quality character through consistent architectural design vocabulary, articulation, materials, and color palette and with architectural treatment of parking structures consistent with their primary commercial office building, among other considerations. The Project includes the construction of a new parking structure and updating the building exterior to include additional articulation and new materials matching the parking structure for a consistent architectural design and color palette throughout the Project. 4. Facts 1 through 4 in support of Finding A are hereby incorporated by reference. 5. The Property is not located within a Specific Plan Area. 6. The existing building was constructed in 1980 with a dark, unarticulated, glass panel exterior. The Project will significantly remodel the exterior façade of the building and upgrade the overall look of the building. Exterior remodeling includes an update of the building to a contemporary architectural style, with light and transparent glazing. While the Project still uses glass as the main finish material, the Project introduces beige and bronze paneling with dark accents around office windows and a coordinated color palette. The color palette of the building will complement the parking structure with a similarly light color on the exterior finish and wood-textured aluminum louvers at its entrances. The proposed parapet introduces articulation and visual interest using a Docusign Envelope ID: 2FA025FF-02F7-490D-B67E-DFEC9AD2E41D Planning Commission Resolution No. PC2025-003 Page 7 of 24 07-29-24 variable height roof plane. The mass of the building is softened by introducing a new glass atrium entryway. 7. The Property is bounded by Irvine Avenue to the north, Orchard Drive to the south, and office developments to both the east and west. The majority of land uses within the vicinity are professional or medical office and are located within multi-tenant commercial office buildings. There is one non-conforming residential use adjacent to the Project, across Orchard Drive, and several other non-conforming single-unit residences approximately 375 feet southeast of the Property, on Birch Street. There is also a golf-course with a restaurant 850 feet to the west on Irvine Avenue and an apartment complex 550 feet to the east on Birch Street. The nearby nonconforming residential uses are within the Business Park area of the Santa Ana Heights Specific Plan (“SP-7 Business Park”) which prohibits residential uses but allows for the expansion of existing nonconforming uses with the approval of a conditional use permit. The nonconforming residential uses are located closer to the parking structure and not the building. The tallest parapet is proposed for the side of the building fronting Irvine Avenue. These distances should help prevent any shadows or negative impacts to the nonconforming uses. The Project does not propose any architectural features that are likely to negatively affect the surrounding development as detailed in Fact 8 in support of Finding B, Fact 1 in support of Finding E, and Fact 1 in support of Finding F. 8. The Project is adjacent to the SP-7 (Business Park) District. Pursuant to Section 20.90.030 (Design Guidelines) of the NBMC, SP-7 (Business Park) includes design guidelines that regulate color and materials. The design guidelines are intended to allow the business park to blend in with and complement the residential areas of the community. While the Project site is not located within SP-7 Business Park and therefore not bound by its design guidelines, the Project nonetheless complies with these guidelines as an additional project amenity and further enhances the compatibility of the Project with its surroundings. In harmony with Section 20.90.030(B) (Architectural Guidelines for Business Park Uses) of the NBMC, the Project implements a color palette ranging from white to earth tones and subdues existing glass elements by repurposing glazing to light the interior spaces. The accent materials and colors are coordinated to achieve a continuity of design with the overall structure and surrounding structures. 9. The parking structure is located on the eastern portion of the Property, in the rear, and will be screened from Irvine Avenue by the upgraded office building, landscaping, and a portion of the surface parking lot. From Orchard Drive, the new parking structure is setback 132 feet and will be partially screened by landscaping and surface parking. 10. The parking structure is immediately adjacent to the surface parking lots of the abutting office buildings that front Birch Street. The properties fronting Birch Street are zoned SP-7 (BP). The height limit of SP-7 (BP) allows for buildings up to a maximum height of 37 feet. The parapets will not appear overly tall or incompatible with these buildings and the parking structure provides a harmonious transition from the Project to the abutting office buildings. Docusign Envelope ID: 2FA025FF-02F7-490D-B67E-DFEC9AD2E41D Planning Commission Resolution No. PC2025-003 Page 8 of 24 07-29-24 11. Existing vehicular and pedestrian access points to the Property will be maintained as part of the Project. Pedestrian access between the parking structure and medical office will be provided through a pedestrian bridge connecting the top level of the parking structure to the building. 12. The Property is currently improved with approximately 26,862 square feet of landscaping. Most of the landscaping is provided as turf. Of the 26,862 square feet, 2,494 square feet will be rehabilitated, and 495 square feet will be added. The Project includes new landscaping along Orchard Drive, within the public right of way. This off-site landscaping includes seven Brisbane box trees totaling 1,366 square feet. Brisbane box trees can grow anywhere from 30 to 70 feet tall and reach approximately 25 to 30 feet wide. The projected height and size of the trees makes for an efficient and adequate method of buffering between the Property and adjacent uses, including the nonconforming residential uses. All new and rehabilitated landscaping shall comply with Section 14.17 (Water Efficient Landscaping) of the NBMC, including the installation and maintenance of drought tolerant and noninvasive species. 13. The Project is not adjacent to or near a designated coastal view road or point and there are no public views through or across the Property. Therefore, the Project is not anticipated to impact any public views. Finding: C. Not detrimental to the harmonious and orderly growth of the City, nor will it endanger, jeopardize, or otherwise constitute a hazard to the public convenience, health, interest, safety, or general welfare of person residing or working in the neighborhood of the proposed development. Fact in Support of Finding: 1. The Project is similar to and compatible with other office uses in the vicinity. 2. The Project is not anticipated to be detrimental to nearby residential uses or the nearby golf course due to the office nature of the business. Medical offices typically operate during the week with normal business hours when residents are not at home. Medical uses typically do not generate public inconveniences such as noise, light, or odors and the Project is therefore not anticipated to impact the nearby residents or golf course. 3. The Project is consistent with the planned land use for the site and the intent of General Commercial Office (CO-G) category of the General Plan Land Use Element and the Office-General (OG) Zoning District. The site is suitable for the type and intensity of development proposed because the infrastructure serving the site and surrounding area has been designed and developed to accommodate the commercial development use of the site. The Project would also reduce the floor area of the building, which would bring the property closer to compliance with the maximum FAR of the Zoning District. Therefore, the operation of the medical office use is not detrimental. Docusign Envelope ID: 2FA025FF-02F7-490D-B67E-DFEC9AD2E41D Planning Commission Resolution No. PC2025-003 Page 9 of 24 07-29-24 4. A traffic study titled “Traffic Impact Analysis – Newport Irvine Medical Office” dated October 2024 (“Traffic Impact Analysis”), which is attached hereto as Exhibit “C” and incorporated herein by reference, was prepared by Ganddini Group Inc., under the supervision of the City Traffic Engineer for the Project in compliance with Chapter 15.40 (Traffic Phasing Ordinance) and Appendix A of the NBMC. As discussed further in Finding L, the Project does not result in a traffic impact. Therefore, the operation of the medical office use is not anticipated to be detrimental to the surrounding neighborhood. 5. Condition of Approval No. 19 establishes operational noise standards while Condition of Approval No. 21 restricts noise-generating construction activities. Both have been included to ensure that the proposed use does not create any adverse noise impacts to the community, in accordance with Section 20.30.080 (Noise) of the NBMC. 6. Conditions of Approval Nos. 23 and 24 are included to ensure adequate trash storage facilities for the commercial tenants are provided in screened areas on private property, thereby preventing any odor or related issues for the abutting residential uses. 7. The Project includes Condition of Approval No. 15 which prevents excessive illumination of the site and enables the Director to dim light sources or require other remediation upon finding the site to be excessively illuminated. 8. A preliminary Construction Management Plan has been provided to ensure that short- term construction traffic issues are properly addressed. A final construction management plan will need to be approved prior to the issuance of a building permit, as referenced in Condition of Approval No. 69. Height Increase The Property is a nonresidential use located within the Nonresidential, Nonshoreline Height Limit Area. In this height limit area, the base height limit for nonresidential and mixed-use structures with flat roofs is 32 feet and the base height limit for structures with sloped roofs is 37 feet. The height of a structure may be increased up to a maximum of 50 feet with a flat roof or 55 feet with a sloped roof through the approval of a Site Development Review. In accordance with Section 20.30.060(C)(3) (Height Limits and Exceptions - Required Findings) of the NBMC, the Planning Commission may approve a site development review to allow an increase in the height of a structure above the base height only after first making all the following findings in addition to the findings required pursuant to Section 20.52.080(F) (Site Development Reviews – Findings and Decision): Finding: D. The project applicant is providing additional project amenities beyond those that are otherwise required. Examples of project amenities include, but are not limited to: i. Additional landscaped open space; ii. Increased setback and open areas; iii. Enhancement and protection of public views; Docusign Envelope ID: 2FA025FF-02F7-490D-B67E-DFEC9AD2E41D Planning Commission Resolution No. PC2025-003 Page 10 of 24 07-29-24 Facts in Support of Finding: 1. Use Permit No. UP1939 allowed the structure to exceed the base height limit of the Office-General (OG) zoning district. The justification for the height increase was partially based on the project providing additional open space, as the building mass was concentrated to the center of the lot. The Project implements vertical construction, rather than horizontal. 2. The footprint of the building is not increasing as part of the Project. Further, the floor area of the structure will decrease, despite the increase in height for the architectural features. 3. While the footprint of the building will expand at the northern entrance to create the atrium style lobby and the parking structure will reduce the amount of lot area left undeveloped and open, approximately 80,251 square feet will remain undeveloped, or 57% of the lot will remain undeveloped. Both the building and the parking structure provide greater setbacks than what is required pursuant to Table 2-6 (Development Standards for Commercial Office Zoning Districts) of Section 20.20.030 (Commercial Zoning Districts General Development Standards) of the NBMC, as referenced in Fact 3 of Finding A. 4. Facts 12 and 13 in support of Finding B are hereby incorporated by reference. Finding: E. The architectural design of the project provides visual interest through the use of light and shadow, recessed planes, vertical elements, and varied roof planes; Facts in Support of Finding: 1. The Project increases the height of the building by constructing new architectural features. These features provide visual interest by incorporating light and shadow through the use of glass. Vertical elements are highlighted through symmetry and contrasting angles, and a cohesive color palette and varied roof plane further contribute to visual interest. 2. In addition to providing visual interest, the proposed parapets are also functional. The parapet will screen existing visible rooftop mechanical equipment and bring the Project into compliance with Section 20.30.020 (Buffering and Screening) of the NBMC. Finding: F. The increased height will not result in undesirable or abrupt scale changes or relationships being created between the proposed structure(s) and existing adjacent developments or public spaces. Where appropriate, the proposed structure(s) provides a gradual transition to taller or shorter structures on abutting properties. Docusign Envelope ID: 2FA025FF-02F7-490D-B67E-DFEC9AD2E41D Planning Commission Resolution No. PC2025-003 Page 11 of 24 07-29-24 Facts in Support of Finding: 1. Use Permit No. UP1939 justified the increased building height by citing that the Project would not result in abrupt changes of building heights between the office building and nearby existing developments and public spaces. The Project’s parking structure with solar canopy above measures approximately 28-feet, 3-inches above grade is situated between the existing structure and property line. It will provide for a smooth transition in building heights, up to the office buildings fronting Birch Street. 2. There is a large retaining wall to the southwest of the Property. The retaining wall runs along the northbound side of Irvine Avenue. The retaining wall creates an elevated building pad, much higher than Irvine Avenue. On the top of the pad, there is a cluster of multi-tenant office buildings addressed as 20251 through 20271 Acacia Avenue. Furthermore, the properties across Orchard Drive and addressed as 20251 through 20271 Acacia Avenue are zoned SP-7 (BP). The height limit of SP-7 (BP) allows for buildings up to a maximum height of 37 feet. The Project does not have a retaining wall or elevated building pad and sits at a similar height as Irvine Avenue. These properties at 20251 through 20271 Acacia Avenue appear higher than the subject property, which results in a smooth, gradual, transition in building heights along the highly traveled Irvine Avenue. Finding: G. The structure will have no more floor area than could have been achieved without the approval of the height increase. Fact in Support of Finding: 1. The proposed height increase does not result in an increase in floor area. The increase in height is to allow glass parapets as exterior-only architectural features. As stated in Fact 2 in support of Finding B, the Project reduces the gross floor area. 2. The building footprint is limited to the center portion of the lot, and the Project does not expand the footprint of the building. Staff Approval for Parking Waiver In accordance with Section 20.40.110(D) (Adjustments to Off-Street Parking Requirements) of the NBMC, the Community Development Director may authorize a reduction of off-street parking by a maximum of 20% using a combination of the following: Finding: H. The applicant has provided sufficient data, including a parking study if required by the Director, to indicate that parking demand will be less than the required number of spaces or that other parking is available. Docusign Envelope ID: 2FA025FF-02F7-490D-B67E-DFEC9AD2E41D Planning Commission Resolution No. PC2025-003 Page 12 of 24 07-29-24 Facts in Support of Finding: 1. Pursuant to Section 20.40.040 (Off-Street Parking Spaces Required) of the NBMC, medical offices require one parking space for every 200 square feet of gross floor area. At 78,229 square feet, the Project requires 392 parking spaces. Because the Project provides only 331 parking spaces, a 61 space, or 15.5%, parking waiver is required. 2. The Applicant provided the Parking Study, which analyzed two non-urgent care, medical office, locations of comparable size: Pacific Medical Plaza located in Costa Mesa at 1640 Newport Boulevard, and Newport Heights Medical Campus located at 20350-20360 SW Birch Street. Each building had a variety of medical tenants, including but not limited to dentists, dermatologists, and pediatricians. 3. Observational parking counts were taken by Counts Unlimited, Inc. (a third-party data collection company) from 8:00 a.m. to 6:00 p.m., at one-hour intervals, on a typical Tuesday, Wednesday, and Thursday in October of 2024. The observed parking counts determined a peak parking demand ratio for each site. The higher of the two ratios observed was used as a baseline for estimating the peak parking demand of the project. 4. To account for parking demand fluctuations, a 10% increase was added to baseline. This resulted in a peak parking demand ratio for the Project of 3.94 parking spaces per 1,000 gross square feet 5. Applying the peak parking demand ratio for the Project results in a minimum parking requirement of 309 spaces. As the project will provide 331 parking spaces, the project is projected to have approximately 22 available surplus parking spaces, or 7.11% of spaces available, during peak projected parking demand periods. Therefore, the Parking Study concludes that the project provides a sufficient number of parking spaces to support the conversion. 6. The Parking Study was reviewed and accepted by the City Traffic Engineer. 7. The Property allows for shared access to the existing surface parking lot with the adjacent parcel, 1981 Orchard Drive. A reciprocal Easement Agreement, Avigational Easement, and Agreement Affecting Real Property (“Easement Agreement”) was recorded with the County of Orange in 1980. The Easement Agreement dedicates 23 spaces within the surface parking of 1981 Orchard Drive be reserved for the exclusive use of 1981 Orchard Drive. These 23 spaces have not been included in the 331 parking spaces provided by the Project. Findings I. On-Site Bicycle Facilities. Required nonresidential off-street parking may be reduced where there is a demonstrated use of bicycles as a mode of transportation. The Director may reduce the number of required parking spaces by one space for every Docusign Envelope ID: 2FA025FF-02F7-490D-B67E-DFEC9AD2E41D Planning Commission Resolution No. PC2025-003 Page 13 of 24 07-29-24 three bicycle parking spaces provided on the same site they serve, up to 5% of the total requirement in compliance with the following conditions: i. The applicant has provided sufficient evidence to substantiate that there exists a demand for bicycle parking; and ii. The bicycle parking spaces are located completely within the private property they serve. iii. An additional 5% reduction may be allowed when enhanced end-of trip facilities are provided on the same site they serve, including, but not limited to, showers and locker facilities. Fact in Support of Finding: Bicycle facilities are not used as justification for the reduction in parking. Findings J. Space for Shared Mobility. Required nonresidential off-street parking may be reduced by up to 10% in compliance with the following conditions: i. Exclusive of curb space needed for emergency access purposes (e.g., a fire lane), the development includes at least 20 linear and contiguous feet of on-site dedicated curb- space located entirely on private property; or ii. There is one off-street parking space designated and with proper signage for the use of shared-mobility vehicles and/or pick-up/drop-off located on private property and on the same site it is intended to serve. Fact in Support of Finding: Shared Mobility spaces are not used as justification for the reduction in parking. Traffic Study In accordance with Section 15.40.030(A) (Traffic Phasing Ordinance) of the NBMC, the following findings and fact in support of such findings are set forth herein: Finding: K. That a traffic study for the project has been prepared in compliance with this NBMC Chapter 15.40 and Appendix A. Fact in Support of Finding: The Traffic Impact Analysis, which is attached hereto as Exhibit “C” and incorporated herein by reference, was prepared by Ganddini Group Inc., under the supervision of the City Traffic Engineer for the Project in compliance with Chapter 15.40 (Traffic Phasing Ordinance) and Appendix A of the NBMC. Finding: Docusign Envelope ID: 2FA025FF-02F7-490D-B67E-DFEC9AD2E41D Planning Commission Resolution No. PC2025-003 Page 14 of 24 07-29-24 L. That, based on the weight of the evidence in the administrative record, including the traffic study, one of the findings for approval in subsection 15.40.030(B) can be made: 1. Construction of the project will be completed within 60 months of project approval in accordance with Section 15.40.030(B)(1) of the NBMC. 2. Additionally, the project will neither cause nor make worse an unsatisfactory level of traffic service at any impacted intersection in accordance with Section 15.40.030(B)(1)(a) of the NBMC. Facts in Support of Finding: 1. Construction of the Project is expected to be completed by May of 2026. 2. The Traffic Impact Analysis included eight study intersections that were analyzed for potential impacts based on the City’s Intersection Capacity Utilization (“ICU”) methodology, which is expressed in terms of level of service (“LOS”). Utilizing these methodologies, the Traffic Impact Analysis determined that implementation of the Project will neither cause nor make worse an unsatisfactory level of traffic service at any impacted primary intersection within the City of Newport Beach. The City Traffic Engineer concurs with this conclusion. Finding: M. That the project proponent has agreed to make or fund the improvements, or make the contributions, that are necessary to make the findings for approval and to comply with all conditions of approval. Fact in Support of Finding: No improvements or mitigation are necessary because implementation of the Project with the will neither cause nor make worse an unsatisfactory level of traffic service at any impacted primary intersection within the City of Newport Beach. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Planning Commission of the City of Newport Beach hereby finds this Project is categorically exempt from the California Environmental Quality Act under Section 15332 under Class 32 (In-Fill Development Projects) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3 because it has no potential to have a significant effect on the environment. 2. The Planning Commission of the City of Newport Beach hereby approves a Major Site Development Review, Staff Approval, and Traffic Study (PA2024-0070), subject to the Docusign Envelope ID: 2FA025FF-02F7-490D-B67E-DFEC9AD2E41D Planning Commission Resolution No. PC2025-003 Page 15 of 24 07-29-24 conditions outlined in Exhibit A, and the Applicant’s implementation of the recommendations prescribed within the Parking Analysis included as Exhibit “B,” and the Traffic Impact Analysis included as Exhibit “C,” which are attached hereto and incorporated by reference. 3. This action shall become final and effective 14 days following the date this Resolution was adopted unless within such time an appeal is filed with the City Clerk by the provisions of Title 20 (Planning and Zoning), of the Newport Beach Municipal Code. 4. This resolution supersedes Planning Commission Use Permit No. 1939, which upon vesting of the rights authorized by this conditional use permit, shall become null and void. PASSED, APPROVED, AND ADOPTED THIS 23RD DAY OF JANUARY, 2025. AYES: Ellmore, Harris, Lowrey, Rosene, and Salene NOES: None RECUSED: Langford ABSENT: None BY:_________________________ Mark Rosene, Chair BY:_________________________ David Salene, Secretary Docusign Envelope ID: 2FA025FF-02F7-490D-B67E-DFEC9AD2E41D Planning Commission Resolution No. PC2025-003 Page 16 of 24 07-29-24 EXHIBIT “A” CONDITIONS OF APPROVAL (Project-specific conditions are in italics) Planning Division 1. The development shall be in substantial conformance with the approved site plan, floor plans, and building elevations stamped and dated with the date of this approval (except as modified by applicable conditions of approval). 2. PA2024-0070 shall expire unless exercised within 24 months from the date of approval as specified in Section 20.54.060 (Time Limits and Extensions) of the NBMC, unless an extension is otherwise granted. 3. The Project is subject to all applicable City ordinances, policies, and standards unless specifically waived or modified by the conditions of approval. 4. The Applicant shall comply with all federal, state, and local laws. Violation of any of those laws in connection with the use may be cause for revocation of this approval. 5. The parking structure shall serve tenants and visitors to the Property. Parking spaces shall not be rented or sold for off-site uses without first notifying the Community Development Director. The use of the parking structure as a parking facility, as defined in Chapter 20.70 (Definitions) of the NBMC, may require an amendment to PA2024-0070 and the processing of a Use Permit. 6. Employees shall be required to park on-site. Employees shall not park on Orchard Drive, Irvine Avenue, or any nearby public parking spaces. 7. The location, number, and dimensions of all parking spaces shall be in substantial conformance with the plans stamped and dated with the date of this approval. The final design of all on-site parking, vehicular circulation, and pedestrian circulation shall be subject to the approval of the City Traffic Engineer. 8. All mechanical equipment shall be fully screened from view from the public right of way and the surrounding properties in accordance with 20.30.020 (Buffering and Screening) of the NBMC. 9. The Applicant is required to implement the recommendations of the parking management plan included in the December 12, 2024 parking study prepared by RK Engineering Group. Emergency Health Facilities as defined in Chapter 20.70 of the Newport Beach Municipal Code may be allowed subject to review and approval by the Community Development Director and based on information that demonstrates parking supply is adequate to meet expected demand. Docusign Envelope ID: 2FA025FF-02F7-490D-B67E-DFEC9AD2E41D Planning Commission Resolution No. PC2025-003 Page 17 of 24 07-29-24 10. PA2024-0070 may be modified or revoked by the Planning Commission or City Council should they determine that the proposed uses or conditions under which it is being operated or maintained is detrimental to the public health, welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained so as to constitute a public nuisance. 11. Any change in operational characteristics, expansion in the area, or other modification to the approved plans, shall require subsequent Planning Division review and potentially the processing of an amendment to this approval or the processing of a new entitlement. 12. Prior to the issuance of a building permit, a copy of the Resolution, including conditions of approval Exhibit “A” shall be incorporated into the Building Division and field sets of plans. 13. Prior to the issuance of a building permit, the Applicant shall submit to the Planning Division an additional copy of the approved architectural plans for inclusion in the project file. The plans shall be identical to those approved by all City departments for building permit issuance. The approved copy shall include architectural sheets only and shall be reduced in size to 11 inches by 17 inches. The plans shall accurately depict the elements approved by PA2024-0070 and shall highlight the approved elements such that they are readily discernible from other elements of the plans. 14. Prior to the issuance of a building permit, the Applicant shall submit a landscape and irrigation plan prepared by a licensed landscape architect. These plans shall incorporate drought-tolerant plantings and water-efficient irrigation practices, and the plans shall be approved by the Planning Division. 15. All landscape materials and irrigation systems shall be maintained by the approved landscape plan. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing, and trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. 16. The site shall not be excessively illuminated based on the luminance recommendations of the Illuminating Engineering Society of North America, or, in the opinion of the Director of Community Development, the illumination creates an unacceptable negative impact on surrounding land uses or environmental resources. The Director may order the dimming of light sources or other remediation upon finding that the site is excessively illuminated. 17. Prior to the issuance of a building permit, the Applicant shall prepare a photometric study in conjunction with a final lighting plan for approval by the Planning Division. The survey shall show that lighting values are “1” or less at all property lines. Docusign Envelope ID: 2FA025FF-02F7-490D-B67E-DFEC9AD2E41D Planning Commission Resolution No. PC2025-003 Page 18 of 24 07-29-24 18. Prior to the issuance of a building permit, the Applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 19. Prior to any change in use from general office or health/fitness facility to medical office, the Applicant shall pay Fair Share Fees in accordance with Chapter 15.38 (Fair Share Traffic Contribution Ordinance) of the NBMC. The fee may be paid in advance for the entire conversion or incrementally based on individual tenant improvements at the rates in effect at time of conversion. 20. All noise generated by the proposed use shall comply with the provisions of Chapter 10.26 (Community Noise Control), under Sections 10.26.025 (Exterior Noise Standards) and 10.26.030 (Interior Noise Standards), and other applicable noise control requirements of the NBMC. 21. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by either the current business owner, property owner or leasing agent. 22. Construction activities shall comply with Section 10.28.040 (Construction Activity— Noise Regulations) of the NBMC, which restricts hours of noise-generating construction activities that produce noise to between the hours of 7:00 a.m. and 6:30 p.m., Monday through Friday, and 8:00 a.m. and 6:00 p.m. on Saturday. Noise-generating construction activities are not allowed on Sundays, or Holidays. 23. No outside paging system shall be utilized in conjunction with this establishment. 24. All trash shall be stored within the building or within dumpsters stored in the trash enclosure (three walls and a self-latching gate) or otherwise screened from view of neighboring properties, except when placed for pick-up by refuse collection agencies. The trash enclosure shall have a decorative solid roof for aesthetic and screening purposes. 25. Trash receptacles for patrons shall be conveniently located both inside and outside of the establishment, however, not located on or within any public property or right-of-way. 26. The exterior of the business shall be always maintained free of litter and graffiti. The owner or operator shall provide for daily removal of trash, litter debris, and graffiti from the premises and on all abutting sidewalks within 20 feet of the premises. 27. The Applicant shall ensure that the trash dumpsters and/or receptacles are maintained to control odors. This may include the provision of either fully self-contained dumpsters or periodic steam cleaning of the dumpsters if deemed necessary by the Planning Division. Cleaning and maintenance of trash dumpsters shall be done in compliance with the provisions of Title 14, including all future amendments (including Water Quality related requirements). Docusign Envelope ID: 2FA025FF-02F7-490D-B67E-DFEC9AD2E41D Planning Commission Resolution No. PC2025-003 Page 19 of 24 07-29-24 28. Deliveries and refuse collection for the facility shall be prohibited between the hours of 10:00 p.m. and 7:00 a.m. on weekdays and Saturdays and between the hours of 10:00 p.m. and 9:00 a.m. on Sundays and Federal holidays unless otherwise approved by the Director of Community Development and may require an amendment to this approval. 29. Storage outside of the building in the front or at the rear of the property shall be prohibited, except for the required trash container enclosure. 30. A Special Events Permit is required for any event or promotional activity outside the normal operating characteristics of the approved use, as conditioned, or that would attract large crowds, involve the sale of alcoholic beverages, include any form of on-site media broadcast, or any other activities as specified in the NBMC to require such permits. 31. To the fullest extent permitted by law, the applicant shall indemnify, defend and hold harmless the City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs, and expenses (including without limitation, attorney’s fees, disbursements, and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of Newport Irvine Medical Center including, but not limited to the Site Development Review, Staff Approval, and Traffic Study filed as PA2024-0070. This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorney’s fees, and other expenses incurred in connection with such claim, action, causes of action, suit, or proceeding whether incurred by the applicant, City, and/or the parties initiating or bringing such proceeding. The applicant shall indemnify the City for all the City's costs, attorneys' fees, and damages that which City incurs in enforcing the indemnification provisions outlined in this condition. The applicant shall pay to the City upon demand any amount owed to the City under the indemnification requirements prescribed in this condition. Fire Department 32. Any modifications to the fire sprinkler system shall require a building permit reviewed and approved by the Newport Beach Fire Department (NBFD). 33. The parking structure shall require an automatic fire sprinkler system in compliance with NFPA 13. 34. Exterior canopies shall require fire sprinklers to be added in compliance with NFPA 13. 35. Occupancies with atriums connecting more than two stories shall have a fire alarm system installed with smoke detection in locations required by a rational analysis, to be reviewed by the NBFD. 36. A smoke control system shall be installed for the atrium. Docusign Envelope ID: 2FA025FF-02F7-490D-B67E-DFEC9AD2E41D Planning Commission Resolution No. PC2025-003 Page 20 of 24 07-29-24 37. Analysis of the current hydrant system shall be provided. Hydrants shall be required to be installed in compliance with Chapter 5 and Appendix B of the California Fire Code (CFC). 38. The atrium shall comply with Chapter 4 of the California Building Code (CBC). 39. Exterior wall coverings shall comply with Chapter 14 of the CBC. 40. Fire lane widths shall comply with NBFD Guideline C.01. 41. Fire lanes shall be identified in accordance with NBFD Guideline C.02. 42. The parking structure and existing primary structure shall have an Emergency Responder Communication Coverage installed and permitted through NBFD and the Orange County Sheriffs Communications. 43. The address on the exterior of the building shall comply with Section 9.04.170 (Amendments to Section 505.1.1 Premises Identification) of the NBMC. 44. The solar canopy above the parking structure shall comply with Chapter 12 of the CFC. 45. Egress for the structure and the atrium shall comply with Chapters 4 and 10 of the CBC/CFC. 46. Prior to the issuance of a building permit, a Fire Master Plan shall be submitted, reviewed, and approved by the NBFD. 47. Prior to the issuance of a building permit, a construction plan shall be submitted, reviewed, and approved by the NBFD to identify fire department access. All weather access shall be provided during construction. Construction cannot begin until fire department access is approved by NBFD. 48. An 800 MHZ system for the medical office and parking structure is required, unless otherwise demonstrated by the Applicant. To satisfy the condition, tests of the existing building’s current system can be submitted to the NBPD for review and approval Building Division 49. The building shall comply with the allowable area, number of stories and maximum height per Chapter 5 of the CBC. 50. Exterior wall and opening protection between buildings and to the property line shall comply with Section 705 of the CBC. 51. The atrium shall comply with Section 404 the CBC. Docusign Envelope ID: 2FA025FF-02F7-490D-B67E-DFEC9AD2E41D Planning Commission Resolution No. PC2025-003 Page 21 of 24 07-29-24 52. Exterior stairs shall comply with Section 1027 of the CBC. 53. Interior exit access stair shall comply with the Section 1019 of the CBC. 54. The plumbing fixture shall comply with Table 422.1 of the California Plumbing Code (“CPC”). 55. An accessible path of travel is required from both the public right of way and the parking areas to the building and tenant space. 56. Circulation paths contiguous to vehicular traffic shall be physically separated from vehicular traffic pursuant to 11B-250.1 of the CBC. 57. Separate parking counts shall be provided for the parking structure and the surface parking lot. Counts shall include the required accessible parking for each type of parking, pursuant to 11B-208 of the CBC, 58. Pursuant to Table 5.106.5.3.1A of CalGreen, a table showing the required Electric Vehicle (EV) parking shall be provided. Locations of EV Capable and EVCS shall be shown on plans. 59. Accessible EV charging shall be provided. Accessible parking spaces shall not count toward the requirement of EV accessible parking. 60. Bicycle parking shall comply with 5.1-6.4 of CalGreen standards. Public Works Department 61. Parking layouts shall comply with City Standard 805. All dead-end drive aisle shall provide a dedicated turn around area and 5-minimum drive aisle extension. 62. During construction, the temporary tenant parking layout shall comply with City Standard 805. Temporary tenant parking areas with dead-end drive aisle shall provide a dedicated turn around area and 5-minimum drive aisle extension. 63. Temporary construction fencing shall be located to provide adequate sight distance at all driveways, per City Standard 105. 64. All construction deliveries shall be accommodated on-site. No construction deliveries shall occur within the public right-of-way. 65. No construction staging or queuing shall occur within the public right-of-way. 66. All construction vehicle parking shall occur on-site. No construction vehicle parking is permitted within the public right-of-way. Docusign Envelope ID: 2FA025FF-02F7-490D-B67E-DFEC9AD2E41D Planning Commission Resolution No. PC2025-003 Page 22 of 24 07-29-24 67. No lane closures are permitted as part of the proposed construction activity unless a temporary street and sidewalk closure permit has been obtained from the Public Works Department. Traffic control plans shall be prepared and stamped by a registered California Traffic Engineer. Plans shall be reviewed and approved by City of Newport Beach Traffic Engineering. 68. Prior to any hauling activity, a haul route permit shall be obtained from the Public Works Department. 69. Prior to Issuance of a building permit, a final Construction Management Plan shall be reviewed and approved by the City Traffic Engineer and Community Development Director. 70. All damaged or broken curb, gutter, and sidewalk along the Orchard Drive and/or Irvine Avenue frontages shall be reconstructed per City Standards. Extent of reconstruction shall be determined by Public Works Inspection staff. 71. All proposed City trees along the Orchard Drive frontage shall be installed per City Standard and City Council Policy G-6. 72. The driveways along the Irvine Avenue (1) and Orchard Drive (2) shall be reconstructed per City Standard 161. The extent of reconstruction shall be determined by Public Works inspection staff. 73. Prior to Issuance of a building permit, Costa Mesa Sanitary District (CMSD) and Irvine Ranch Water District (IRWD) shall review and approve the project. Documentation of CMSD and IRWD approvals shall be required. Docusign Envelope ID: 2FA025FF-02F7-490D-B67E-DFEC9AD2E41D Planning Commission Resolution No. PC2025-003 Page 23 of 24 07-29-24 EXHIBIT “B” PARKING STUDY AND PARKING MANAGEMENT RECOMMENDATIONS Available separately due to bulk at: https://www.newportbeachca.gov/Pln/PC_TEMP_LINK/PA2024-0070_Parking_Study.pdf Docusign Envelope ID: 2FA025FF-02F7-490D-B67E-DFEC9AD2E41D DECEMBER 12, 2024 Mr. Chadwick Manista REDA NEWPORT IRVINE, LLC 4450 MacArthur Boulevard, Suite 100 Newport Beach, CA 92660 SUBJECT: 3300 IRVINE AVENUE MEDICAL OFFICE CONVERSION PARKING REVIEW, CITY OF NEWPORT BEACH Dear Mr. Manista: INTRODUCTION RK Engineering Group, Inc. (RK) is pleased to provide a parking analysis for the 3-story general office building at 3300 Irvine Avenue in Newport Beach. The existing building primarily consists of general office tenants and includes a small amount (less than 20%) of medical office tenants. The building consists of approximately 79,551 gross square feet (75,751 gross square feet of general office use and 3,800 gross square feet of basement/mechanical room). The project site has approximately 273 parking spaces on a surface parking lot that tenants of the building share. Access to the project is provided along Irvine Avenue to the north and two (2) driveways along Orchard Drive to the west. Located on the northwest side of the property (1981 Orchard Drive) is a single-tenant general office building consisting of the American Institute of Architects (“AIA”) Orange County. The building has approximately 5,750 gross square feet and 23 dedicated parking spaces. The building and parking spaces are separate and are not included as part of this project. PROJECT DESCRIPTION The project representatives propose to convert the building at 3300 Irvine Avenue to 100% medical office use. The existing parking lot will be re-striped to provide 131 parking spaces. A two-level parking structure is planned at the property's southeast corner, adding 202 parking spaces. This will bring the total number of onsite parking spaces to 333. However, two (2) parking spaces on the surface lot may be eliminated to accommodate a generator. Therefore, the project assumes a parking inventory of 331 on-site parking spaces for this analysis. To accommodate the medical office conversion, the building size will be reduced to 78,229 gross square feet. This is a slight reduction from the existing 79,551 gross square foot building. RK20268 // 3223-2024-01 2 Typical medical office tenants will include non-urgent medical/dental routine outpatient care that is appointment-based. Examples of potential tenants include the following: • Dental Office • Physical Therapy • Chiropractor • Cosmetic Laser • Dermatology • Optometry • Pediatrics • Sleep Center • Urology, etc. Typical operating hours for the proposed medical office tenants are expected to be weekdays 8:00 AM – 6:00 PM with some tenants operating during the weekends. The objective of the parking analysis is to determine the adequacy of parking for the proposed conversion from general office use to medical-dental office use. This will be accomplished by obtaining observed parking demand counts at local and comparable medical-dental office buildings and reviewing published data for medical-dental office use. Exhibit A shows the location map of the project. Exhibit B shows the proposed project’s site plan and parking area. The exhibits can be found in the Exhibits Section at the end of the report. CITY OF NEWPORT BEACH PARKING REQUIREMENTS Based on the City of Newport Beach Municipal Code Chapter 20.40.040 Table 3-10, a parking ratio of one (1) parking space per 200 square feet (5.0 parking spaces per 1,000 square feet) for medical office use is required. The project consists of 78,229 gross square feet, the medical office conversion, and would require 392 parking spaces. Since the proposed project provides 331 parking spaces, there is a parking code deficiency of 61 parking spaces, or 15.56% deficient per code. Due to the parking requirement deficiency, representatives of the project are seeking a parking waiver for the project. The project may convert a portion of the building area to an “Outpatient Surgery Facility”. This use requires 1 parking space for every 250 square feet (or 4.0 parking spaces for 1,000 square feet). This use has a lower parking rate compared to the medical-dental rate of 1 parking space for every 200 square feet (5.0 parking spaces per 1,000 square feet) and as a result would not require additional parking. RK20268 // 3223-2024-01 3 Due to the parking code deficiency on site, a parking review of local and comparable medical office buildings has been completed to determine if adequate parking spaces are provided to serve the proposed medical office building use. Table 1 | 3300 Irvine Avenue, Newport Beach Municipal Parking Code Chapter 20.40.040 (Table 3-10 Off-Street Parking Requirements) 100% Medical Office Use Conversion (Non-Urgent Care) Land Use Size (Gross Square Feet) Required Parking Rate1 Required Number of Parking Spaces Parking Supply Ratio (Parking Spaces per 1,000 SF) Medical Office 78,229 1 per 200 gross square feet 392 5.00 4.23 Total 78,229 Total Required Parking 392 Total Number of Parking Spaces Provided On-Site2 331 Number of Parking Spaces Deficient per Parking Code -61 Percent of Parking Spaces Deficient per Parking Code -15.56% 1 Fractional parking spaces are rounded up to the next whole space. 2 The existing parking lot will be re-striped to provide 131 parking spaces. Additionally, a two-level parking structure is planned at the property's southwest corner, adding 202 parking spaces. This will bring the total number of parking spaces to 333. However, two (2) parking spaces may be eliminated to accommodate a generator. Therefore, for this analysis, the project assumes a parking inventory of 331 parking spaces. The project will have a parking ratio of approximately 4.23 parking spaces per 1,000 gross square feet of building area. This is below the City of Newport Beach parking requirement for medical office buildings, calculated at one parking space per 200 gross square feet or 5.0 parking spaces per 1,000 gross square feet of building area. MEDICAL OFFICE BUILDING OBSERVED PARKING STUDY SITES RK conducted weekday parking surveys at two (2) comparable non-urgent care medical office buildings to determine a parking rate for the proposed medical-dental office conversion. These buildings include typical tenants like dentists, dermatologists, and pediatricians, similar to those expected in the proposed project. The site locations and survey times were reviewed and approved by City staff before obtaining the parking demand data. The counts were conducted by Counts Unlimited Inc. (a third-party data collection company) during typical conditions. Furthermore, it was confirmed that employees and visitors of the medical office building study sites exclusively use all the study area parking lots. RK20268 // 3223-2024-01 4 The parking demand was surveyed from 8:00 AM to 6:00 PM at one (1) hour intervals on a typical Tuesday, Wednesday, and Thursday in October of 2024. A total of 44 hours of observed parking counts were completed at both medical office building study sites. The study hours observed reflect the typical operating hours of the study sites and the proposed project. The results of the observed parking counts determine the peak parking demand ratio for each site. The parking ratio is calculated by dividing the peak hourly parking demand by the occupied gross square feet of the building. As a result, the parking ratio can be applied to the proposed project. The following two (2) locations were selected as comparable non-urgent care medical office building study sites: 1. PACIFIC MEDICAL PLAZA: 1640 NEWPORT BOULEVARD, COSTA MESA, CA The property consists of approximately 76,880 square feet of medical-dental office building. The building is currently 97.4% occupied. As a result, the building has 74,881 square feet of occupied medical tenant space. The site includes a total of 457 parking spaces. The City of Costa Mesa parking requirement is 6 parking spaces per 1,000 square feet. An aerial of the Pacific Medical Plaza Study Area is located in Exhibit C. The exhibits can be found in the Exhibits Section at the end of the report. 2. NEWPORT HEIGHTS MEDICAL CAMPUS: 20350-20360 SW BIRCH STREET, NEWPORT BEACH, CA The property consists of approximately 61,745 square feet of medical-dental office building. The building is currently 100% occupied. The site includes 325 parking spaces. An aerial of the Newport Heights Medical Campus Study Area is located in Exhibit D. The exhibits can be found in the Exhibits Section at the end of the report. RK20268 // 3223-2024-01 5 OBSERVED PARKING DEMAND FINDINGS Wednesday, October 9, 2024 - 1640 Newport Boulevard, Costa Mesa The peak parking demand, as observed, was at 9:00 AM, with 269 vehicles parked on-site. Given that the project comprises 74,881 square feet of occupied medical space, the parking rate is calculated to be 3.59 parking spaces per 1,000 gross square feet of occupied building area. This figure represents the overall peak parking demand for the analysis. Table 2 | Medical Office Building Observed Parking Survey Pacific Medical Plaza (Nonurgent Care) 1640 Newport Boulevard, Costa Mesa, CA Wednesday, October 9, 20241 Description: 76,880 Square Feet / 97.4% Tenant Occupied Occupied Square Feet: 74,881 Parking Spaces Provided: 457 Hour Total Parking Inventory Observed Parking Demand Observed Parking Rate (Vehicles per 1,000 SF)2 1 8:00 AM 112 1.50 2 9:00 AM 269 3.59 3 10:00 AM 238 3.18 4 11:00 AM 244 3.26 5 12:00 PM 210 2.80 6 1:00 PM 184 2.46 7 2:00 PM 206 2.75 8 3:00 PM 228 3.04 9 4:00 PM 215 2.87 10 5:00 PM 91 1.22 11 6:00 PM 27 0.36 Peak Observed Parking Ratio 3.59 Parking Supply Ratio (Parking Spaces per 1,000 SF)3 5.94 1 Hourly parking demand was surveyed during typical hours of operation and typical weather conditions. 2 Parking Rate is based on the number of observed vehicles parked divided by the occupied square feet of the building. 3 The parking supply ratio is calculated by dividing the parking supply by the total occupied gross square feet of the building. RK20268 // 3223-2024-01 6 Thursday, October 10, 2024 – 1640 Newport Boulevard, Costa Mesa The peak parking demand, as observed, was at 11:00 AM, with 247 vehicles parked on-site. Given that the project comprises 74,881 square feet of occupied medical space, the parking rate is calculated to be 3.30 parking spaces per 1,000 gross square feet of occupied building area. Table 3 | Medical Office Building Observed Parking Survey Pacific Medical Plaza (Nonurgent Care) 1640 Newport Boulevard, Costa Mesa, CA Thursday, October 10, 20241 Description: 76,880 Square Feet / 97.4% Tenant Occupied Occupied Square Feet: 74,881 Parking Spaces Provided: 457 Hour Total Parking Inventory Observed Parking Demand Observed Parking Rate (Vehicles per 1,000 SF)2 1 8:00 AM 117 1.56 2 9:00 AM 205 2.74 3 10:00 AM 231 3.08 4 11:00 AM 247 3.30 5 12:00 PM 199 2.66 6 1:00 PM 200 2.67 7 2:00 PM 214 2.86 8 3:00 PM 216 2.88 9 4:00 PM 173 2.31 10 5:00 PM 64 0.85 11 6:00 PM 27 0.36 Peak Observed Parking Ratio 3.30 Parking Supply Ratio (Parking Spaces per 1,000 SF)3 5.94 1 Hourly parking demand was surveyed during typical hours of operation and typical weather conditions. 2 Parking Rate is based on the number of observed vehicles parked divided by the occupied square feet of the building. 3 The parking supply ratio is calculated by dividing the parking supply by the total occupied gross square feet of the building. RK20268 // 3223-2024-01 7 Tuesday, October 8, 2024 – 20350-20360 SW Birch Street, Newport Beach The peak parking demand, as observed, was at 2:00 PM, with 169 vehicles parked on-site. Given that the project comprises 61,745 square feet of occupied medical space, the parking rate is calculated to be 2.74 parking spaces per 1,000 gross square feet of occupied building area. Table 4 | Medical Office Building Observed Parking Survey Newport Heights Medical Campus (Nonurgent Care) 20350-20360 SW Birch Street, Newport Beach, CA Tuesday, October 8, 2024 Description: 61,745 Square Feet / 100% Tenant Occupied Occupied Square Feet: 61,745 Parking Spaces Provided: 325 Hour Total Parking Inventory Observed Parking Demand Observed Parking Rate (Vehicles per 1,000 SF)2 1 8:00 AM 108 1.75 2 9:00 AM 142 2.30 3 10:00 AM 163 2.64 4 11:00 AM 157 2.54 5 12:00 PM 165 2.67 6 1:00 PM 161 2.61 7 2:00 PM 169 2.74 8 3:00 PM 143 2.32 9 4:00 PM 107 1.73 10 5:00 PM 40 0.65 11 6:00 PM 20 0.32 Peak Observed Parking Ratio 2.74 Parking Supply Ratio (Parking Spaces per 1,000 SF)3 5.26 1 Hourly parking demand was surveyed during typical hours of operation and typical weather conditions. 2 Parking Rate is based on the number of observed vehicles parked divided by the occupied square feet of the building. 3 The parking supply ratio is calculated by dividing the parking supply by the total occupied gross square feet of the building. RK20268 // 3223-2024-01 8 Wednesday, October 9, 2024 – 20350-20360 SW Birch Street, Newport Beach The peak parking demand, as observed, was at 11:00 AM, with 203 vehicles parked on-site. Given that the project comprises 61,745 square feet of occupied medical space, the parking rate is calculated to be 3.29 parking spaces per 1,000 gross square feet of occupied building area. Table 5 | Medical Office Building Observed Parking Survey Newport Heights Medical Campus (Nonurgent Care) 20350-20360 SW Birch Street, Newport Beach, CA Wednesday, October 9, 20241 Description: 61,745 Square Feet / 100% Tenant Occupied Occupied Square Feet: 61,745 Parking Spaces Provided: 325 Hour Total Parking Inventory Observed Parking Demand Observed Parking Rate (Vehicles per 1,000 SF)2 1 8:00 AM 101 1.64 2 9:00 AM 175 2.83 3 10:00 AM 197 3.19 4 11:00 AM 203 3.29 5 12:00 PM 179 2.90 6 1:00 PM 167 2.70 7 2:00 PM 165 2.67 8 3:00 PM 139 2.25 9 4:00 PM 104 1.68 10 5:00 PM 41 0.66 11 6:00 PM 17 0.28 Peak Observed Parking Ratio 3.29 Parking Supply Ratio (Parking Spaces per 1,000 SF)3 5.26 1 Hourly parking demand was surveyed during typical hours of operation and typical weather conditions. 2 Parking Rate is based on the number of observed vehicles parked divided by the occupied square feet of the building. 3 The parking supply ratio is calculated by dividing the parking supply by the total occupied gross square feet of the building. RK20268 // 3223-2024-01 9 Table 6 summarizes parking data from both study sites. The peak parking ratio, 3.59 spaces per 1,000 square feet, was recorded on Wednesday, October 9, 2024, at 1640 Newport Boulevard in Costa Mesa. A 10% increase was added as standard practice to account for parking demand fluctuations, resulting in a peak parking demand rate of 3.94 parking spaces per 1,000 gross square feet for the proposed project. The proposed project will provide 331 parking spaces, equating to 4.23 parking spaces per 1,000 gross square feet of floor area. According to the observed parking analysis, the peak parking demand ratio is estimated at 3.94 parking spaces per 1,000 gross square feet of occupied building area or 309 parking spaces. Consequently, the project will have approximately 22 available parking spaces, or 7.11%, during peak projected parking demand periods. Therefore, the proposed project provides a sufficient number of parking spaces to support its conversion into medical office use. Appendix A contains the raw parking demand data conducted by Counts Unlimited, Inc. RK20268 // 3223-2024-01 10 Table 6 | 3300 Irvine Avenue, Newport Beach Summary of Peak Observed Parking Demand Observed Medical Office Buildings (Nonurgent Care) Projected 78,229 Square Feet Medical Office Building Parking Demand Table Medical Office Building Study Site Peak Hour Observed Parking Survey Date Occupied Square Feet Peak Observed Parking Rate (Parked Vehicles per 1,000 SF) 2 1640 Newport Boulevard, Costa Mesa, CA Wednesday, October 9, 2024, at 9:00 AM 74.881 3.59 281 3 1640 Newport Boulevard, Costa Mesa, CA Thursday, October 10, 2024, at 11:00 AM 74.881 3.30 259 4 20350-20360 SW Birch Street, Newport Beach, CA Tuesday, October 8, 2024, at 2:00 PM 61.745 2.74 215 5 20350-20360 SW Birch Street, Newport Beach, CA Wednesday, October 9, 2024, at 11:00 AM 61.745 3.29 258 Maximum Observed Parking Demand Rate 3.59 281 Add Parking Demand Fluctuation (10%)1 0.35 28 Peak Parking Demand Rate + 10% 3.94 309 Total Number of Parking Spaces Provided On-Site (Proposed Parking Rate 4.23) 331 Number of Parking Spaces in Surplus per Projected Peak Parking Demand 22 Percent of Parking Spaces in Surplus per Projected Peak Parking Demand 7.11% 1 Ten percent was added to the peak parking demand rate (281 x 10% = 28 parking spaces) to account for potential fluctuations in parking demand. RK20268 // 3223-2024-01 11 MEDICAL OFFICE TENANT RECOMMENDATIONS The Institute of Transportation Engineers (ITE) description of a “Land Use 720: Medical-Dental Office Building” is as follows: “A medical-dental office building is a facility or clinic with one or more tenants that provide diagnoses and outpatient care on a routine basis. Tenants range from individual private physicians and dentists to large medical practices. Patient visits are by appointment only.” To provide sufficient parking, representatives of the building shall only tenant the buildings with nonurgent care medical-dental routine outpatient care type practices as outlined in the ITE Parking Generation Manual, 6th Edition. These practices typically provide specialized care on an appointment- only basis. Examples of potential tenants include the following:  Dental Office  Physical Therapy  Chiropractor  Cosmetic Laser  Dermatology  Optometry  Pediatrics  Sleep Center  Urology, etc. Uses such as urgent care, medical clinics, and other high-turnover operations that generate higher parking demands should be avoided. RK20268 // 3223-2024-01 12 PARKING MANAGEMENT PLAN An effective parking management plan is essential for maximizing the use of on-site parking spaces, easing congestion, eliminating off-site and overflow parking, and improving safety and accessibility. Below are recommendations for the project: 1. Reserved Parking for AIA Orange County: 23 parking spaces dedicated to the American Institute of Architects Orange County at 1981 Orchard Drive should be marked with signs and/or stencils as reserved. These spaces are exclusively for AIA members, and medical office visitors and employees are prohibited from using them. Representatives of the proposed project should contact AIA to coordinate this recommendation before implementation. See Exhibit E for details. 2. Employee Parking: Encourage employees to park on the south side of the building, specifically in the upper levels of the new parking structure. This will free up convenient parking spaces for visitors and patients. 3. Rideshare and Pick-Up/Drop-Off Area: Establish a dedicated parking space near the front entrance of the building for rideshare services (such as Uber and Lyft) and general pick-up and drop-off, as detailed in Exhibit E. 4. Promote Alternative Transportation: Share transit opportunities in a common area of the building to encourage tenants/employees to use carpooling, public transportation, ride- sharing, and alternative modes of transportation such as walking and bicycling. Post the OCTA bus schedule and local bus stop locations in a common area. A bus stop (OCTA Bus Line 178) is located along Irvine Avenue adjacent to the project site. Every OCTA bus is equipped with at least one (1) bike rack that can carry at least three (3) bikes and is free to use and is accepted on a first-come, first-serve basis. 5. Bicycle Racks: To encourage bicycle usage, the project will incorporate eighteen (18) long-term and eighteen (18) short-term bicycle racks. The long-term bicycle racks will be accessible to employees and located in a secure room activated by a key card or fob. The short-term bicycle racks will be available for guest use. The bicycle racks will be located on the first floor of the parking structure and will be available for both visitors and employees as detailed in Exhibit E-1. 6. Recommended Uses: Uses such as urgent care, medical clinics, and other high-turnover operations that generate higher parking demands should be avoided. RK20268 // 3223-2024-01 13 CONCLUSIONS The proposed project provides 331 parking spaces in a parking lot and a new parking structure to accommodate the conversion to nonurgent care medical office use. Since the building consists of 78,229 gross square feet, the parking ratio is equal to 4.23 parking spaces per 1,000 gross square feet of building area. When considering the City of Newport Beach parking requirements, the conversion of 100% of the total square feet of the building from general office use to medical office use, the project has a code- required parking deficiency of 61 parking spaces. As a result, an observed parking analysis was completed at comparable medical office sites to determine if the proposed project has enough parking to accommodate the nonurgent care medical-dental office conversion. Based on 44 hours of observed parking data at local and comparable nonurgent care medical office buildings, the proposed medical office conversion would have an adequate number of parking spaces available during peak parking demand times at full medical office tenant occupancy. The project should consist of nonurgent medical office tenants. Uses such as urgent care, medical clinics, and other high-turnover operations that generate higher parking demands should be avoided. A parking management plan is included in the project to maximize on-site parking efficiency, ease congestion, eliminate off-site and overflow parking, and improve safety and accessibility. Based on the results of the parking analysis and a parking management plan, the project has a sufficient amount of parking spaces available to accommodate the proposed medical office conversion. RK Engineering Group, Inc. appreciates this opportunity to collaborate with REDA Newport Irvine LLC and the City of Newport Beach on the 3300 Irvine Avenue Medical Office Conversion Parking Review. If you have any questions regarding this review or need further clarification, please contact us at (949) 474-0809. Sincerely, RK ENGINEERING GROUP, INC. Rogier Goedecke President Attachments Exhibits rkengineer.com ENGINEERINGGROUP INC. Legend = Project Site Boundary Exhibit A Location Map 3223-2024-01 3300 IRVINE AVENUE MEDICAL OFFICE CONVERSION PARKING REVIEW // CITY OF NEWPORT BEACH N Irvine A v e nue O r c h a r d D r i v e Legend = Reserved Parking Spaces for AIA Building Exhibit B Site Plan 3223-2024-01 3300 IRVINE AVENUE MEDICAL OFFICE CONVERSION PARKING REVIEW // CITY OF NEWPORT BEACH ENGINEERINGGROUP INC. N American Institute of Architects (AIA) 23 Spaces Not Part of Project. 202 Spaces. Available Parking Surface Lot Parking Structure Subtotal 131 202 333 Generator Displacement -2 Total Parking Supply 331 Legend = Study Site Boundary Exhibit C Observed Study Site - Pacific Medical Plaza 1640 Newport Boulevard, Costa Mesa, CA 3223-2024-01 3300 IRVINE AVENUE MEDICAL OFFICE CONVERSION PARKING REVIEW // CITY OF NEWPORT BEACH ENGINEERINGGROUP INC. N Ne w p o r t B o u l e v a r d 1 2 1 = Study Site Size - 76,880 S.F. 2 = Provided Parking - 457 Spaces E 1 6 th St Ora n g e A v e n u e Legend = Study Site Boundary Exhibit D Observed Study Site - Newport Heights Medical Campus 20350-20360 Southwest Birch Street, Newport Beach, CA 3223-2024-01 3300 IRVINE AVENUE MEDICAL OFFICE CONVERSION PARKING REVIEW // CITY OF NEWPORT BEACH ENGINEERINGGROUP INC. 1 = Study Site Size - 61,745 S.F. 2 = Provided Parking - 325 Spaces N Birch Street SW. M e s a D r i v e 1 2 Legend = Reserved Parking Spaces for AIA Orange County Exhibit E Recommendations 3223-2024-01 3300 IRVINE AVENUE MEDICAL OFFICE CONVERSION PARKING REVIEW // CITY OF NEWPORT BEACH ENGINEERINGGROUP INC. N American Institute of Architects (AIA) 23 Reserved Spaces (Not Part of Project). Bike Rack Locations (See Exhibit E-1). Available Parking Surface Lot Parking Structure Subtotal 131 202 333 Generator Displacement -2 Total Parking Supply 331 = Proposed Bike Rack Location (See Exhibit E-1) Total Bike Parking Supply 36 18 Available Bike Parking = New Electric Vehicle Parking Spaces E.V. Spaces (4 Spaces) = Rideshare Space 18 E.V. Spaces (15 Spaces) Short-term Bike Parking (Visitor) Long-term Bike Parking (Employee) Legend Exhibit E-1 Recommendations Parking Structure - Level 1 3223-2024-01 3300 IRVINE AVENUE MEDICAL OFFICE CONVERSION PARKING REVIEW // CITY OF NEWPORT BEACH ENGINEERINGGROUP INC. Total Bike Parking Supply 36 18 Available Bike Parking = New Electric Vehicle Parking Spaces = Proposed Bike Rack Location 18 N E.V. Spaces (14 Spaces) Short-term Bike Parking (18 Spaces)Long-term Bike Parking (18 Spaces)E.V. Spaces (8 Spaces) Short-term Bike Parking (Visitor) Long-term Bike Parking (Employee) rkengineer.com Appendix A Counts Unlimited, Inc. Observed Parking Demand Data 20350-20360 SW Birch Street Medical Office Building Newport Beach, CA Tuesday, October 8th, 2024 Inventory 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM Regular 226 79 105 117 114 120 120 124 102 73 26 13 Handicap 12 1 0 7 2 2 0 4 4 2 2 1 Reserved 56 24 31 33 34 33 29 32 28 23 7 2 Clean Air 25 3 6 6 7 8 10 9 9 9 5 3 Patient Drop Off 6 1 0 0 0 2 2 0 0 0 0 1 Subtotal 325 108 142 163 157 165 161 169 143 107 40 20 Total Occupancy 325 108 142 163 157 165 161 169 143 107 40 20 Total Percent 33%44%50%48%51%50%52%44%33%12%6% Counts Unlimited, Inc. PO Box 1178 Corona, CA 92878 951-268-6268 1640 Newport Boulevard Medical Plaza Office Building Costa Mesa, CA Wednesday, October 9th, 2024 Inventory 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM Regular 427 106 247 215 222 193 169 187 204 201 86 25 Handicap 30 6 22 23 22 17 15 19 24 14 5 2 Subtotal 457 112 269 238 244 210 184 206 228 215 91 27 Total Occupancy 457 112 269 238 244 210 184 206 228 215 91 27 Total Percent 25%59%52%53%46%40%45%50%47%20%6% 20350-20360 SW Birch Street Medical Office Building Newport Beach, CA Wednesday, October 9th, 2024 Inventory 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM Regular 226 85 140 152 154 136 127 126 102 71 30 13 Handicap 12 1 2 6 8 3 3 3 4 3 2 1 Reserved 56 13 25 30 30 29 25 27 24 23 6 2 Clean Air 25 1 8 7 11 11 11 8 9 7 3 1 Patient Drop Off 6 1 0 2 0 0 1 1 0 0 0 0 Subtotal 325 101 175 197 203 179 167 165 139 104 41 17 Total Occupancy 325 101 175 197 203 179 167 165 139 104 41 17 Total Percent 31%54%61%62%55%51%51%43%32%13%5% Counts Unlimited, Inc. PO Box 1178 Corona, CA 92878 951-268-6268 1640 Newport Boulevard Medical Plaza Office Building Costa Mesa, CA Thursday, October 10th, 2024 Inventory 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM Regular 427 115 192 216 228 184 180 197 196 162 63 27 Handicap 30 2 13 15 19 15 20 17 20 11 1 0 Subtotal 457 117 205 231 247 199 200 214 216 173 64 27 Total Occupancy 457 117 205 231 247 199 200 214 216 173 64 27 Total Percent 26%45%51%54%44%44%47%47%38%14%6% Counts Unlimited, Inc. PO Box 1178 Corona, CA 92878 951-268-6268 Planning Commission Resolution No. PC2025-003 Page 24 of 24 07-29-24 EXHIBIT “C” TRAFFIC IMPACT ANALYSIS Available separately due to bulk at: https://www.newportbeachca.gov/Pln/PC_TEMP_LINK/PA2024-0070_Traffic_Impact_Analysis.pdf Docusign Envelope ID: 2FA025FF-02F7-490D-B67E-DFEC9AD2E41D Tra!c Engineering # Transporta%on Planning # Parking # Noise & Vibra%on Air Quality # Global Climate Change # Health Risk Assessment NEWPORT IRVINE MEDICAL OFFICE (3300 IRVINE AVE) TRAFFIC IMPACT ANALYSIS City of Newport Beach October 8, 2024 prepared by Bryan Crawford Giancarlo Ganddini, PE, PTP GANDDINI GROUP, INC. 555 Parkcenter Drive, Suite 225 Santa Ana, California 92705 (714) 795-3100 | ganddini.com Project No. 19742 NEWPORT IRVINE MEDICAL OFFICE (3300 IRVINE AVE) TRAFFIC IMPACT ANALYSIS City of Newport Beach October 8, 2024 Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis i 19742 TABLE OF CONTENTS EXECUTIVE SUMMARY ................................................................................................................................................. III 1. INTRODUCTION .................................................................................................................................................... 1 Project Description .......................................................................................................................................................... 1 Study Area ......................................................................................................................................................................... 1 Analysis Scenarios ........................................................................................................................................................... 1 2. METHODOLOGY ................................................................................................................................................... 4 Traffic Phasing Ordinance Analytical Methodology ............................................................................................... 4 Intersection Capacity Utilization Methodology ........................................................................................... 4 Performance Standards ...................................................................................................................................... 4 Substantial Operational Deficiency Criteria .................................................................................................. 5 3. EXISTING CONDITIONS ...................................................................................................................................... 6 Existing Roadway System .............................................................................................................................................. 6 Pedestrian Facilities ......................................................................................................................................................... 6 Bicycle Routes .................................................................................................................................................................. 6 Transit Facilities ................................................................................................................................................................ 6 General Plan Context ..................................................................................................................................................... 6 Existing Traffic Volumes ................................................................................................................................................ 6 Existing Intersection Level of Service......................................................................................................................... 7 4. PROJECT FORECASTS ....................................................................................................................................... 16 Project Trip Generation .............................................................................................................................................. 16 Project Trip Distribution and Assignment .............................................................................................................. 16 5. FUTURE VOLUME FORECASTS ...................................................................................................................... 22 City of Newport Beach Approved Projects ........................................................................................................... 22 Ambient Growth ........................................................................................................................................................... 22 TPO Year 2027 Volume Forecasts .......................................................................................................................... 22 6. TPO ANALYSIS ..................................................................................................................................................... 27 TPO Year 2027 One-Percent Threshold Analysis ............................................................................................... 27 TPO Impact Assessment ............................................................................................................................................. 27 7. CONGESTION MANAGEMENT PROGRAM ................................................................................................. 30 Background .................................................................................................................................................................... 30 CMP-Monitored Intersections .................................................................................................................................. 30 Requirements for Improvements .............................................................................................................................. 30 Criteria for Preparation of CMP Impact Analysis ................................................................................................. 30 8. SITE ACCESS AND CIRCULATION .................................................................................................................. 31 Site Access ...................................................................................................................................................................... 31 On-Site Circulation ....................................................................................................................................................... 31 9. CONCLUSIONS .................................................................................................................................................... 32 Project Trip Generation .............................................................................................................................................. 32 TPO Impact Analysis .................................................................................................................................................... 32 Congestion Management Program .......................................................................................................................... 32 Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis ii 19742 APPENDICES Appendix A Glossary Appendix B Volume Count Worksheets Appendix C Level of Service Worksheets Appendix D Approved Projects List Appendix E TPO One-Percent Threshold Analysis LIST OF TABLES Table 1. Existing (2024) Intersection Levels of Service ............................................................................................. 8 Table 2. Project Trip Generation ................................................................................................................................... 17 Table 3. TPO One-Percent Threshold Analysis Summary ...................................................................................... 28 Table 4. TPO Year 2027 Intersection Levels of Service and Impact Assessment ........................................... 29 LIST OF FIGURES Figure 1. Project Location Map .......................................................................................................................................... 2 Figure 2. Site Plan .................................................................................................................................................................. 3 Figure 3. Existing Lane Geometry and Intersection Traffic Controls ....................................................................... 9 Figure 4. Existing Pedestrian Facilities .......................................................................................................................... 10 Figure 5. Orange County Transportation Authority System Map ......................................................................... 11 Figure 6. City of Newport Beach General Plan Master Plan of Streets and Highways ................................... 12 Figure 7. City of Newport Beach General Plan Roadway Cross-Sections .......................................................... 13 Figure 8. Existing AM Peak Hour Intersection Turning Movement Volumes ..................................................... 14 Figure 9. Existing PM Peak Hour Intersection Turning Movement Volumes ..................................................... 15 Figure 10. Project Outbound Trip Distribution ............................................................................................................. 18 Figure 11. Project Inbound Trip Distribution ................................................................................................................. 19 Figure 12. Project (Net) AM Peak Hour Intersection Turning Movement Volumes ........................................... 20 Figure 13. Project (Net) PM Peak Hour Intersection Turning Movement Volumes ............................................ 21 Figure 14. TPO Year 2027 Without Project AM Peak Hour Intersection Turning Movement Volumes ............................................................................................................................................................... 23 Figure 15. TPO Year 2027 Without Project PM Peak Hour Intersection Turning Movement Volumes ............................................................................................................................................................... 24 Figure 16. TPO Year 2027 With Project AM Peak Hour Intersection Turning Movement Volumes............. 25 Figure 17. TPO Year 2027 With Project PM Peak Hour Intersection Turning Movement Volumes ............. 26 Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis iii 19742 EXECUTIVE SUMMARY The purpose of this study is to evaluate the potential for transportation impacts resulting from development of the proposed project in the context of the City of Newport Beach’s discretionary authority for conformance with locally established operational standards. Although this is a technical report, effort has been made to write the report clearly and concisely. A glossary is provided in Appendix A to assist the reader with terms related to transportation engineering. This study was prepared in consultation with City of Newport Beach staff and in accordance with the procedures and methodologies for assessing transportation impacts established by the City of Newport Beach. To assess the project’s conformance with local operational standards, this study evaluates the project’s effect on traffic operations in accordance with the City’s Traffic Phasing Ordinance (TPO) and, if necessary, identifies recommended improvements or corrective measures to alleviate operational deficiencies substantially caused or worsened by the proposed project. In addition to existing (2024) conditions, this report analyzes forecast traffic conditions for year 2027 (one year after project opening). Project Description The 3.24-acre project site is addressed at 3300 Irvine Avenue, generally situated east of Irvine Avenue and north of Orchard Drive, in the City of Newport Beach, California. The project site is currently developed with an existing 79,551 square foot office building (containing 61,365 square feet of general office and 18,186 square feet of medica/dental office) and surface level parking. The proposed project involves construction of a parking structure and remodel to convert the existing building to 78,229 gross square feet of medical office uses. Vehicular access is proposed to be maintained at Irvine Avenue via the existing project driveway and at Orchard Drive via two existing driveways. The proposed project is anticipated to be fully operational by year 2026. Existing Conditions The study intersections currently operate at Levels of Service D or better during the peak hours for Existing (2024) conditions. Project Trip Generation The existing project site land use is estimated to generate approximately 1,320 daily trips, including 150 trips during the AM peak hour and 160 trips during the PM peak hour. The proposed project site land use is forecast to generate approximately 2,816 daily trips, including 243 trips during the AM peak hour and 307 trips during the PM peak hour. Therefore, the proposed project is forecast to result in a net increase of approximately 1,496 net new daily trips, including 93 net new trips during the AM peak hour and 147 net new trips during the PM peak hour. TPO Impact Analysis The addition of project-generated trips is not forecast to cause any study intersection to operate deficiently (Level of Service E or F) or worsen a deficient intersection operation by more than one percent of capacity; therefore, the proposed project is forecast to result in no Level of Service impacts at the study intersections for TPO Year 2027 With Project conditions and no improvements are required. Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis iv 19742 Congestion Management Program (CMP) Since the proposed project has indirect access to a CMP facility (e.g., MacArthur Boulevard or Jamboree Road) and is forecast to generate less than 2,400 net new daily trips, the proposed project does not satisfy the criteria for preparation of a separate CMP impact analysis. Site Access and Circulation Vehicular access is proposed to be maintained at Irvine Avenue via one existing driveway and at Orchard Drive via two existing driveways. There is an existing two-way left turn median on Irvine Avenue which currently allows full access at the project driveway. The trip distribution patterns used for the project trip assignment in this analysis assume right in/out only access at the project driveway on Irvine Avenue. This provides a conservative assessment of potential impacts to adjacent streets since additional project trips are assigned to the intersection of Irvine Avenue/Orchard Drive. Full access at the project driveway on Irvine Avenue may continue to be permitted subject to compliance with City of Newport Beach standards. Based on the forecast project trip distribution patterns, the majority of peak hour project trips are expected to access the site via the project driveways at Orchard Drive. Orchard Drive is an unclassified local street with relatively low volume that connects local businesses in the project vicinity and low-density residential to the east with other arterial and regional roadways. Traffic flow along Orchard Drive at the project driveway will operate in free-flow conditions. Right turns into the project site from Orchard Drive will have no conflicting vehicular movements and are therefore expected to cause minimal to no delays along Orchard Drive. Left turns into the project site may cause minor delays for following through vehicles; however, queues are expected to be minimal due to the relatively low inbound project trip generation, relatively low conflicting volumes along Orchard Drive, and multiple site access points. Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis 1 19742 1. INTRODUCTION This section describes the project location, project description, study area, and analysis scenarios. PROJECT DESCRIPTION The 3.24-acre project site is addressed at 3300 Irvine Avenue, generally situated east of Irvine Avenue and north of Orchard Drive, in the City of Newport Beach, California. The project site is currently developed with an existing 79,551 square foot office building (containing 61,365 square feet of general office and 18,186 square feet of medica/dental office) and surface level parking. Figure 1 shows the project location map. The proposed project involves construction of a parking structure and remodel to convert the existing building to 78,229 gross square feet of medical office uses. Vehicular access is proposed to be maintained at Irvine Avenue via the existing project driveway and at Orchard Drive via the two existing driveways. The proposed project is anticipated to be fully operational by year 2026. Figure 2 illustrates the project site plan. STUDY AREA Based on scoping discussions with City of Newport Beach staff, the study area consists of the following study intersections within the City of Newport Beach, four of which share jurisdiction with the City of Irvine or County of Orange: Study Intersections1 Jurisdiction 1. MacArthur Boulevard (NS) at Campus Drive (EW) Newport Beach/Irvine 2. MacArthur Boulevard (NS) at Birch Street (EW) Newport Beach 3. MacArthur Boulevard (NS) at Jamboree Road (EW) Newport Beach/Irvine 4. Campus Drive (NS) at Bristol Street North (EW) Newport Beach 5. Irvine Avenue/Campus Drive (NS) at Bristol Street South (EW) Newport Beach 6. Birch Street (NS) at Bristol Street North (EW) Newport Beach 7. Birch Street (NS) at Bristol Stret South (EW) Newport Beach 8. Jamboree Road (NS) at Bristol Street North (EW) Newport Beach 9. Jamboree Road (NS) at Bristol Street South (EW) Newport Beach 10. Irvine Avenue (NS) at Orchard Drive (EW) Newport Beach 11. Birch Street (NS) at Orchard Drive (EW) Newport Beach 12. Mesa Drive (NS) at Birch Street (EW) Newport Beach 13. Acacia Street (NS) at Birch Street (EW) Newport Beach 14. Irvine Avenue (NS) at Mesa Drive (EW) Newport Beach/Orange County 15. Irvine Avenue (NS) at University Drive (EW) Newport Beach/Orange County ANALYSIS SCENARIOS In accordance with the City of Newport Beach Traffic Phasing Ordinance (TPO), this traffic report evaluates the following analysis scenarios based on one year after the anticipated project opening year: a) Existing (2024) Conditions; b) TPO Year 2027 Without Project; and c) TPO Year 2027 With Project 1 (NS) = North-South roadway; (EW) = East-West roadway 1 Figure 1 Project Location Map Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis19742 N 73 Site IRVINE AVE C A M PUS D R BIRC H ST ME SA DR M ES A DR B RIST O L ST N B RIST O L ST S MACARTHUR BLVD JA M B O R EE R D O R C H A R D D R A C A CIA ST Study Intersection Legend # 14 10 13 12 11 5 7 4 6 1 2 8 9 3 15 U NIVE RSITY D R 2 Figure 2 Site Plan Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis19742NTHREE STORY MEDICAL OFFICE BUILDING 138.0 137.0 OR C H A R D D R 12 5 ' - 2 " 10 ' - 1 " 300 ' - 2 " 123456789101112 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 40 41 42 43 44 45 46 47 48 49 60 59 58 57 56 55 54 53 52 51 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 8061 93 94 95 96 97 98 99 8281 82 85 86 87 88 89 90 91 107 108 105 106 114 115 119 120 121 116 123 109 110 111 112 113 100 101 102 103 104 92 124 125 126 118 122.0 104.0122.0 104.0 019.0 NEW PARKING STRUCTURE 10'-1" (TO P.L.)289'-0"133'-2" 432'-3" 330 ' - 3 " 314'-3" 117 10' - 5 " 130.0132.0 014.0 124.0 24'-11" (TO P.L.) 171'-11" ASSUMED P.L. ASSUMED P.L. 121'-9" 013.0013.0 013.0 013.0 013.0 002.0 002.0 002.0 002.0 137.0 137.0 002.0 002.0 002.0 002.0 002.0 002.0 002.0 002.0 137.0002.0 002.0 002.0 002.0 002.0 002.0 002.0 002.0 002.0 002.0 002.0 002.0 002.0 002.0 137.0 133.0 134.0 131.0 014.0015.0 002.0 002.0 025.0 025.0 025.0 002.0 014.0 104.0 104.0 104.0 137.0 114.0 MIN.18'-0" 108 ' - 2 " ( T O P . L . ) 45' - 5 " ( T O P . L . ) 136.0136.0 013.0 134.0 032.0 132.0 7'-3 " 14 ' - 7 " 27' - 4 " 4'-1 1 " 93' - 5 " 5'- 3 " 23 ' - 1 1 " 18' - 0 " 29'-1"25'-9"41'-2"26'-1" 2'-0 " ( T O P L . ) 136.0 138.0 028.0 027.0 001.0 034.0 034.0 034.0 8'-8"5'-0"11'-3" 135.0 030.0 002.0 035.0 027.0 034.0TYP. 8'-6" TYP.16'-3" 035.0 4'-0" 4'-2" 14'-0"28'-10"27'-6"7'-3" 77'-4" (TO PL.) 034.0 001.0 001.0 001.0 001.0 035.0035.0035.0 TYP.035.0 035.0 035.0 TYP.035.0 210'-10"(TOP.L.) 39 50 83 84 122 150.0 392 SF. TYP. 10'-0" TYP. 18'-0" TYP. 9'-0" TYP. 18'-0" 29'-8"22'-7"5'-8"16'-3" 23'-5" 3 Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis 4 19742 2. METHODOLOGY This section discusses the analysis methodologies used to assess transportation facility performance as adopted by the respective jurisdictional agencies. TRAFFIC PHASING ORDINANCE ANALYTICAL METHODOLOGY To establish consistency with the City of Newport Beach General Plan and other City requirements, all proposed land use projects generating 300 or more daily trips are required to prepare a Level of Service analysis for transportation impacts consistent with Chapter 15.40 (Traffic Phasing Ordinance) of the City of Newport Beach Municipal Code. The TPO requires assessment of development project impacts on the City’s arterial circulation system based on the Intersection Capacity Utilization (ICU) methodology. Intersection Capacity Utilization Methodology In accordance with City of Newport Beach requirements, level of service analysis of signalized intersections is based on the ICU methodology. The ICU methodology compares the volume of traffic using the intersection to the capacity of the intersection. The resulting volume-to-capacity (V/C) ratio represents that portion of the hour required to provide sufficient capacity to accommodate all intersection traffic if all approaches operate at capacity. The volume-to-capacity ratio is then correlated to a performance measure known as level of service based on the following thresholds: Level of Service Volume/Capacity Ratio A ≤ 0.60 B > 0.60 to ≤ 0.70 C > 0.70 to ≤ 0.80 D > 0.80 to ≤ 0.90 E > 0.90 to ≤ 1.00 F > 1.00 Source: Transportation Research Board, Interim Materials on Highway Capacity, Transportation Research Circular No. 212, January 1980. Level of service is used to qualitatively describe the performance of a roadway facility, ranging from Level of service A (free-flow conditions) to Level of Service F (extreme congestion and system failure). The ICU and Level of Service calculations for this study were performed using the Traffix software. In accordance with City of Newport Beach TPO requirements, the ICU calculations assume a lane capacity of 1,600 vehicles per hour per lane and no factor for yellow time. The project-related increase in ICU is rounded to three decimal places and then rounded to two decimal places. Performance Standards The City of Newport Beach has established Level of Service D as the minimum acceptable Level of Service for its arterial roadway system, except at the following locations where Level of Service E or better is acceptable:  Any intersection in the Airport Area shared with City of Irvine;  Dover Drive at Coast Highway; and  Any intersections in Corona Del Mar. 4 Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis 5 19742 Substantial Operational Deficiency Criteria In accordance with the City’s TPO, the following criteria are used to determine if a proposed project will result in a substantial Level of Service impact and is required to provide improvements/corrective measures:  A substantial project impact is defined to occur if the addition of project-generated trips is forecast to cause/worsen a deficient intersection operation (generally Level of Service E or F) and increase the intersection capacity utilization by one percent or more of capacity (i.e., V/C increases by 0.010 or more). If a project is forecast to cause or worsen a substantial Level of Service impact, the project must construct or provide funding for improvements, to the extent feasible, such that the project-related increase in capacity utilization does not exceed the City-established criteria. 5 Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis 6 19742 3. EXISTING CONDITIONS This section describes the existing transportation setting in the project vicinity. EXISTING ROADWAY SYSTEM Figure 3 identifies the lane geometry and intersection traffic controls for existing conditions based on a field survey of the study area. Regional access to the project area is provided by the San Joaquin Hills Corridor (State Route 73) freeway north of the project site running between Bristol Street North and Bristol Street South. The key north-south roadways providing local circulation are Irvine Avenue, Campus Drive, Acacia Street, Birch Street, MacArthur Boulevard, and Jamboree Road. The key east-west roadways providing local circulation are Bristol Street North, Bristol Street South, Orchard Drive, Mesa Drive, and University Drive. PEDESTRIAN FACILITIES Existing pedestrian facilities in the project vicinity are shown on Figure 4. BICYCLE ROUTES On-street bicycle facilities are provided in the project area along Irvine Avenue. Irvine Avenue adjacent to the project site has Class II Bike Lane (On-Road Striped). Also, Irvine Avenue (east side) from Orchard Avenue to Bristol Street allows bicycle riding on the sidewalk. Roadways that provide on-street bicycle facilities near the project site include Campus Drive, Bristol Street North, Bristol Street South, Birch Street, and Mesa Drive. TRANSIT FACILITIES Figure 5 shows the existing transit routes available in the project vicinity. As shown on Figure 5, Orange County Transportation Authority Community Route 178 services MacArthur Boulevard near the project site. GENERAL PLAN CONTEXT Figure 6 shows the City of Newport Beach General Plan Master Plan of Streets and Highways roadway classifications map. This figure shows the nature and extent of arterial and collector highways that are needed to adequately serve the ultimate development depicted by the Land Use Element of the General Plan. The City of Newport Beach General Plan roadway cross-sections are depicted on Figure 7. EXISTING TRAFFIC VOLUMES Existing peak hour intersection volumes were developed from intersection turning movement counts collected in March 2023, and February, March, May, and July 2024 during typical weekday AM and PM peak periods of commuter traffic. The AM peak period was counted between 7:00 AM and 9:00 AM and the PM peak period was counted between 4:00 PM and 6:30 PM. The actual peak hour within the peak period is the four consecutive 15-minute periods with the highest total volume of all approaches. Thus, the PM peak hour at one intersection may occur at 4:45 PM to 5:45 PM if those four consecutive 15-minute periods have the highest combined volume. Count worksheets are provided in Appendix B. Based on the project’s application date, existing volume and Level of Service conditions were established for year 2024. Intersection volumes collected prior to 2024 were adjusted by applying the City’s Regional Traffic Annual Growth Rate of one percent (1.0%) per year to the measured volumes along applicable arterial highways (Irvine Avenue, Jamboree Road, and MacArthur Boulevard). This equates to a growth factor of 1.01 along those arterials with counts conducted in 2023. Intersection volumes shown in the figures and Level of Service calculations are based on the measured count data with the adjustments for Existing (2024) conditions as described herein. 6 Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis 7 19742 Figure 8 and Figure 9 show the Existing AM peak hour and PM peak hour intersection turning movement volumes. EXISTING INTERSECTION LEVEL OF SERVICE Existing intersection Levels of Service are summarized in Table 1. Detailed Level of Service worksheets are provided in Appendix C. As shown in Table 1, the study intersections currently operate at Levels of Service D or better during the peak hours for Existing (2024) conditions. 7 V/C2 LOS3 V/C2 LOS3 1.MacArthur Blvd (NS) at Campus Dr (EW)4 TS 0.36 A 0.51 A 2. MacArthur Blvd (NS) at Birch St (EW)TS 0.27 A 0.33 A 3.MacArthur Blvd (NS) at Jamboree Rd (EW)4 TS 0.47 A 0.52 A 4. Campus Dr (NS) at Bristol St North (EW)TS 0.40 A 0.53 A 5. Irvine Ave/Campus Dr (NS) at Bristol St South (EW)TS 0.56 A 0.45 A 6. Birch St (NS) at Bristol St North (EW)TS 0.50 A 0.50 A 7. Birch St (NS) at Bristol St South (EW)TS 0.38 A 0.35 A 8. Jamboree Rd (NS) at Bristol St North (EW)TS 0.32 A 0.39 A 9. Jamboree Rd (NS) at Bristol St South (EW)TS 0.59 A 0.54 A 10. Irvine Ave (NS) at Orchard Dr (EW)TS 0.29 A 0.43 A 11. Birch St (NS) at Orchard Dr (EW)TS 0.24 A 0.30 A 12. Mesa Dr (NS) at Birch St (EW)TS 0.18 A 0.22 A 13. Acacia St (NS) at Birch St (EW)TS 0.14 A 0.22 A 14. Irvine Ave (NS) at Mesa Dr (EW)TS 0.36 A 0.45 A 15. Irvine Ave (NS) at University Dr (EW)TS 0.52 A 0.54 A Notes: (1) TS = Traffic Signal (2) V/C = Volume/Capacity (3) LOS = Level of Service (4) Level of Service E is acceptable; shared jurisdiction with City of Irvine. ID Study Intersection Traffic Control1 PM Peak HourAM Peak Hour Table 1 Existing (2024) Intersection Levels of Service Newport Irvine Medical Office (3300 Irvine Avenue) Traffic Impact Analysis 197428 Figure 3 Existing Lane Geometry and Intersection Traffic Controls Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis19742 N 73 Site IRVINE AVE C A M PUS D R BIRC H ST ME SA DR M ES A DR B RIST O L ST N B RIST O L ST S MACARTHUR BLVD JA M B O R EE R D O R C H A R D D R A C A CIA ST14 10 13 12 11 5 7 4 6 1 2 8 9 3 15 U NIVE RSITY D R 1 MacArthur Blvd (NS)/ Campus Dr (EW) 2 MacArthur Blvd (NS)/ Birch St (EW) 3 MacArthur Blvd (NS)/ Jamboree Rd (EW) 4 Campus Dr (NS)/ Bristol St N (EW) 5 Irvine Ave (NS)/ Bristol St S (EW) 6 Birch St (NS)/ Bristol St N (EW) 7 Birch St (NS)/ Bristol St S (EW) 8 Jamboree Rd (NS)/ Bristol St N (EW) 9 Jamboree Rd (NS)/ Bristol St S (EW) 10 Irvine Ave (NS)/ Orchard Dr (EW) 11 Birch St (NS)/ Orchard Dr (EW) 12 Mesa Dr (NS)/ Birch St (EW) 13 Acacia St (NS)/ Mesa Dr (EW) 14 Irvine Ave (NS)/ Mesa Dr (EW) 15 Irvine Ave (NS)/ University Dr (EW) F RT O F F RTO #U #D Legend Free Right Turn Lane Right Turn Overlap Existing Lane #-Lane Undivided Roadway #-Lane Divided Roadway Traffic Signal 4D 4D 6D 6D 6D 4D 4D 4D 8D 8D 6D 6D 7D 7D 8D 4D 4D 4D 2U 2U 2U 2U 2U 2U 2U 2U 4 4 4 4 4 3 FREE SP L I T SP L I T Split Signal PhasingSPLIT 9 Figure 4 Existing Pedestrian Facilities Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis19742 N I R V I N E A V E BIR C H ST O R C H A RD D R A C A CIA ST Sidewalk Legend Cross Walk Bus StopB B Site 10 Figure 5 Orange County Transportation Authority System Map Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis19742 N Source: Orange County Transportation Authority Project Location 11 Figure 6 City of Newport Beach General Plan Master Plan of Streets and Highways Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis19742 Source: City of Newport Beach N Project Location 12 Figure 7 City of Newport Beach General Plan Roadway Cross-Sections Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis19742 Source: City of Newport Beach 13 Figure 8 Existing AM Peak Hour Intersection Turning Movement Volumes Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis19742 N 73 Site IRVINE AVE C A M PUS D R BIRC H ST ME SA DR M ES A DR B RIST O L ST N B RIST O L ST S MACARTHUR BLVD JA M B O R EE R D O R C H A R D D R A C A CIA ST Study Intersection Legend # 14 10 13 12 11 5 7 4 6 1 2 8 9 3 15 U NIVE RSITY D R 1 MacArthur Blvd (NS)/ Campus Dr (EW) 49 40 036 16 8 70 8 27 1 38545667 2419932 2 MacArthur Blvd (NS)/ Birch St (EW) 32 46 461 4852 3 20 4 7017359 1412430 3 MacArthur Blvd (NS)/ Jamboree Rd (EW) 10 8 92 4 31 6 7037 7 34 0 355727154 336678130 4 Campus Dr (NS)/ Bristol St N (EW) 38 0 11 4 9 24 2 14 9 259778185 5 Irvine Ave (NS)/ Bristol St S (EW) 68 7 23 8 9041 0 8051465415 6 Birch St (NS)/ Bristol St N (EW) 94 70 6 13 1 10 5 4071114228 7 Birch St (NS)/ Bristol St S (EW) 23 6 24 2 14 4 39 7 5651035221 8 Jamboree Rd (NS)/ Bristol St N (EW) 59 5 14 1 7 55 1 68 7 43 2 9 Jamboree Rd (NS)/ Bristol St S (EW) 15 4 0 23 73 8 8243651284 10 Irvine Ave (NS)/ Orchard Dr (EW) 0 89 152 11 7 71 0 36 34 11 Birch St (NS)/ Orchard Dr (EW) 3 36 940 5927 9 10 0 3798 163655 12 Mesa Dr (NS)/ Birch St (EW) 3607 302 542433 812317 13 Acacia St (NS)/ Mesa Dr (EW) 27 40461 1555 14 Irvine Ave (NS)/ Mesa Dr (EW) 85 92 7 28 3 765 3 43 102226182 126227 15 Irvine Ave (NS)/ University Dr (EW) 12 7 11 4 5 57 6279 8 64 12769186 232823 14 Figure 9 Existing PM Peak Hour Intersection Turning Movement Volumes Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis19742 N 73 Site IRVINE AVE C A M PUS D R BIRC H ST ME SA DR M ES A DR B RIST O L ST N B RIST O L ST S MACARTHUR BLVD JA M B O R EE R D O R C H A R D D R A C A CIA ST Study Intersection Legend # 14 10 13 12 11 5 7 4 6 1 2 8 9 3 15 U NIVE RSITY D R 1 MacArthur Blvd (NS)/ Campus Dr (EW) 12 5 72 417 12 9 64 8 34 4 25932655 30654108 2 MacArthur Blvd (NS)/ Birch St (EW) 51 52 024 3155 7 99 20116019 38243139 3 MacArthur Blvd (NS)/ Jamboree Rd (EW) 20 6 80 7 28 4 15 4 10 0 5 38 3 31480832 431694108 4 Campus Dr (NS)/ Bristol St N (EW) 49 0 63 7 59 6 55 1 257160389 5 Irvine Ave (NS)/ Bristol St S (EW) 63 5 24 1 15 2 70 2 451826460 6 Birch St (NS)/ Bristol St N (EW) 16 1 27 6 33 0 52 7 4191367128 7 Birch St (NS)/ Bristol St S (EW) 23 9 27 4 18 8 46 0 253894105 8 Jamboree Rd (NS)/ Bristol St N (EW) 61 7 15 3 8 93 4 64 5 64 0 9 Jamboree Rd (NS)/ Bristol St S (EW) 20 2 5 71 64 7 738566901 10 Irvine Ave (NS)/ Orchard Dr (EW) 0 76 313 3613 4 2 72 164 11 Birch St (NS)/ Orchard Dr (EW) 4 26 020 5858 4 61 40116 246056 12 Mesa Dr (NS)/ Birch St (EW) 3006 905 015648 156045 13 Acacia St (NS)/ Mesa Dr (EW) 829 4196 6354 14 Irvine Ave (NS)/ Mesa Dr (EW) 78 56 4 13 2 1491 0 32 1 5643145 31024021 15 Irvine Ave (NS)/ University Dr (EW) 11 2 73 831 4711 2 3 14 6 7949130 395158 15 Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis 16 19742 4. PROJECT FORECASTS This section describes how project trip generation, trip distribution, and trip assignment forecasts were developed. The forecast project volumes are illustrated on figures contained in this section. PROJECT TRIP GENERATION Table 2 shows the project trip generation based upon trip generation rates obtained from the Institute of Transportation Engineers (ITE) Trip Generation Manual (11th Edition, 2021). Based on review of the ITE land use description, trip generation rates for general office building (Land Use Code 710) and medical-dental office building (Land Use Code 720) were determined to adequately represent the existing and proposed land uses and were selected for use in this analysis. The project trip generation forecast is determined by multiplying the trip generation rates by the land use quantities. As shown in Table 2, the existing project site land uses are estimated to generate approximately 1,320 daily trips, including 150 trips during the AM peak hour and 160 trips during the PM peak hour. The proposed project site land use is forecast to generate approximately 2,816 daily trips, including 243 trips during the AM peak hour and 307 trips during the PM peak hour. Therefore, the proposed project is forecast to result in a net increase of approximately 1,496 net new daily trips, including 93 net new trips during the AM peak hour and 147 net new trips during the PM peak hour. PROJECT TRIP DISTRIBUTION AND ASSIGNMENT Figure 10 and Figure 11 show the forecast directional distribution patterns for the project generated trips. The project trip distribution patterns were developed in consultation with City of Newport Beach staff based on review of existing volume data, surrounding land uses, and the local and regional roadway facilities in the project vicinity. It is noted that there is an existing two-way left turn median on Irvine Avenue which currently allows full access at the project driveway. The trip distribution patterns used for the project trip assignment in this analysis assume right in/out only access at the project driveway on Irvine Avenue. This provides a conservative assessment of potential impacts to adjacent streets since additional project trips are assigned to the intersection of Irvine Avenue/Orchard Drive. The project-generated AM and PM peak hour intersection turning movement volumes are shown on Figure 12 and Figure 13. 16 % In % Out Rate % In % Out Rate General Office Building ITE 710 TSF 88%12%1.52 17%83%1.44 10.84 Medical-Dental Office (Stand-Alone)ITE 720 TSF 79%21%3.10 30%70%3.93 36.00 In Out Total In Out Total Existing General Office Building 61.365 TSF 82 11 93 15 74 89 665 Medical-Dental Office (Stand-Alone)18.186 TSF 45 12 57 21 50 71 655 Subtotal 127 23 150 36 124 160 1,320 Proposed Medical-Dental Office (Stand-Alone)78.229 TSF 192 51 243 92 215 307 2,816 NET PROJECT TRIPS GENERATED +65 +28 +93 +56 +91 +147 +1,496 Notes: (1) ITE = Institute of Transportation Engineers Trip Generation Manual (11th Edition, 2021); ### = Land Use Code (2) TSF = Thousand Square Feet (Gross Floor Area) Daily Trip Generation Rates Trips Generated Daily Table 2 Project Trip Generation Land Use Quantity Unit2 AM Peak Hour PM Peak Hour Land Use Source1 Unit2 AM Peak Hour PM Peak Hour Newport Irvine Medical Office (3300 Irvine Avenue) Traffic Impact Analysis 1974217 Figure 10 Project Outbound Trip Distribution Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis19742 N 73 Site IRVINE AVE C A M PUS D R BIRC H ST ME SA DR M ES A DR B RIST O L ST N B RIST O L ST S MACARTHUR BLVD O R C H A R D D R A C A CIA STU NIVE RSITY D R 15% 10% 5%50% 35% 25% 10% 5% 10% 45% 15% 5% 15% 10% Percent From Project Legend 10% JA MB O R EE R D 5% 18 Figure 11 Project Inbound Trip Distribution Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis19742 N 73 SiteIRVINE AVE C A M PUS D R BIRC H ST ME SA DR M ES A DR B RIST O L ST N B RIST O L ST S MACARTHUR BLVD O R C H A R D D R A C A CIA STU NIVE RSITY D R 15% 30% 5% 55% 5% 25% 5% 10% 40% 15% 15% 10% Percent To Project Legend 10% JA MB O R EE R D 5% 10% 10%90% 20% 10% 5% 45% 19 Figure 12 Project (Net) AM Peak Hour Intersection Turning Movement Volumes Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis19742 N 73 Site IRVINE AVE C A M PUS D R BIRC H ST ME SA DR M ES A DR B RIST O L ST N B RIST O L ST S MACARTHUR BLVD JA M B O R EE R D O R C H A R D D R A C A CIA ST Study Intersection Legend # 14 10 13 12 11 5 7 4 6 1 2 8 9 3 15 U NIVE RSITY D R 1 MacArthur Blvd (NS)/ Campus Dr (EW) 000 007 300 000 2 MacArthur Blvd (NS)/ Birch St (EW) 000 000 010 030 3 MacArthur Blvd (NS)/ Jamboree Rd (EW) 1000 000 034 070 4 Campus Dr (NS)/ Bristol St N (EW) 73 70 000 5 Irvine Ave (NS)/ Bristol St S (EW) 100 07 0313 6 Birch St (NS)/ Bristol St N (EW) 01 30 2900 7 Birch St (NS)/ Bristol St S (EW) 113 033 003 8 Jamboree Rd (NS)/ Bristol St N (EW) 1070 016 9 Jamboree Rd (NS)/ Bristol St S (EW) 100 0 714 10 Irvine Ave (NS)/ Orchard Dr (EW) 070 200 3 0 11 Birch St (NS)/ Orchard Dr (EW) 000 0036 1400 000 12 Mesa Dr (NS)/ Birch St (EW) 000 000 000 000 13 Acacia St (NS)/ Mesa Dr (EW) 01 30 00 14 Irvine Ave (NS)/ Mesa Dr (EW) 073 030 000 100 15 Irvine Ave (NS)/ University Dr (EW) 0100 040 000 000 20 Figure 13 Project (Net) PM Peak Hour Intersection Turning Movement Volumes Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis19742 N 73 Site IRVINE AVE C A M PUS D R BIRC H ST ME SA DR M ES A DR B RIST O L ST N B RIST O L ST S MACARTHUR BLVD JA M B O R EE R D O R C H A R D D R A C A CIA ST Study Intersection Legend # 14 10 13 12 11 5 7 4 6 1 2 8 9 3 15 U NIVE RSITY D R 1 MacArthur Blvd (NS)/ Campus Dr (EW) 000 006 900 000 2 MacArthur Blvd (NS)/ Birch St (EW) 000 000 050 030 3 MacArthur Blvd (NS)/ Jamboree Rd (EW) 800 000 0914 060 4 Campus Dr (NS)/ Bristol St N (EW) 239 60 000 5 Irvine Ave (NS)/ Bristol St S (EW) 320 06 0311 6 Birch St (NS)/ Bristol St N (EW) 05 30 2500 7 Birch St (NS)/ Bristol St S (EW) 541 028 003 8 Jamboree Rd (NS)/ Bristol St N (EW) 8230 014 9 Jamboree Rd (NS)/ Bristol St S (EW) 80 0 23514 10 Irvine Ave (NS)/ Orchard Dr (EW) 060 170 9 0 11 Birch St (NS)/ Orchard Dr (EW) 000 0031 4600 000 12 Mesa Dr (NS)/ Birch St (EW) 000 000 000 000 13 Acacia St (NS)/ Mesa Dr (EW) 05 30 00 14 Irvine Ave (NS)/ Mesa Dr (EW) 063 090 000 500 15 Irvine Ave (NS)/ University Dr (EW) 080 0140 000 000 21 Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis 22 19742 5. FUTURE VOLUME FORECASTS This section describes how future volume forecasts for the TPO scenarios were developed. Forecast study area volumes are illustrated on figures contained in this section. CITY OF NEWPORT BEACH APPROVED PROJECTS The City of Newport Beach staff provided a list of approved projects within the study area for use in the TPO analysis. The approved project list consists of future developments that have been approved, but have not been fully constructed and occupied. The approved project data is contained in Appendix D. Trips associated with the following 19 projects are included in the TPO analysis:  Fashion Island Expansion  Temple Bat Yahm Expansion  Hoag Hospital Phase III  St. Mark Presbyterian Church  2300 Newport Blvd (Vue)  Hoag Health Center 500-540 Superior  North Newport Center  Back Bay Landing 300 ECH  Balboa Marina West  Newport Crossings  Museum House – Vivante Senior Center  Uptown Newport: Phase 1 – Trans Devel Rights (TDR)  Uptown Newport: Phase 2 only  Residences at 4400 VK  Picerne Residential (1300 Bristol St N)  2510 WCH Residential and Mother’s Market  Pacifica Christian HS  1400 Bristol St N Residences  Sage Hill Middle School Expansion AMBIENT GROWTH To account for ambient growth on roadways, existing volumes were increased by a growth rate of one percent (1.0%) per year through year 2027 along applicable arterial highways (Irvine Avenue, Jamboree Road, and MacArthur Boulevard) in accordance with the City of Newport Beach Regional Traffic Annual Growth Rate. This equates to a growth factor of 1.03 along arterials with counts conducted in 2024 and 1.04 along arterials with counts conducted in 2023. TPO YEAR 2027 VOLUME FORECASTS TPO Year 2027 Without Project volume forecasts were developed by adding ambient growth and approved projects trips to existing volumes. TPO Year 2027 Without Project AM and PM peak hour intersection turning movement volumes are shown on Figure 14 and Figure 15. TPO Year 2027 With Project volume forecasts were developed by adding project-generated trips to TPO Year 2027 Without Project volumes. TPO Year 2027 With Project AM and PM peak hour intersection turning movement volumes are shown on Figure 16 and Figure 17. 22 Figure 14 TPO Year 2027 Without Project AM Peak Hour Intersection Turning Movement Volumes Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis19742 N 73 Site IRVINE AVE C A M PUS D R BIRC H ST ME SA DR M ES A DR B RIST O L ST N B RIST O L ST S MACARTHUR BLVD JA M B O R EE R D O R C H A R D D R A C A CIA ST Study Intersection Legend # 14 10 13 12 11 5 7 4 6 1 2 8 9 3 15 U NIVE RSITY D R 1 MacArthur Blvd (NS)/ Campus Dr (EW) 51 50 637 17 5 76 3 27 1 38245667 2419937 2 MacArthur Blvd (NS)/ Birch St (EW) 33 49 462 6256 7 21 0 11018659 1413380 3 MacArthur Blvd (NS)/ Jamboree Rd (EW) 99 96 4 33 0 7641 8 36 6 375793163 387807145 4 Campus Dr (NS)/ Bristol St N (EW) 37 3 11 5 3 24 2 14 9 276878185 5 Irvine Ave (NS)/ Bristol St S (EW) 69 9 24 3 9042 6 8101460402 6 Birch St (NS)/ Bristol St N (EW) 94 70 6 13 7 12 8 4251209248 7 Birch St (NS)/ Bristol St S (EW) 23 6 22 9 19 9 36 5 5651030218 8 Jamboree Rd (NS)/ Bristol St N (EW) 59 6 15 0 8 58 5 76 7 49 9 9 Jamboree Rd (NS)/ Bristol St S (EW) 16 0 3 24 81 9 8443811314 10 Irvine Ave (NS)/ Orchard Dr (EW) 0 91 354 10 0 75 4 33 34 11 Birch St (NS)/ Orchard Dr (EW) 3 37 040 5928 0 64 2398 163655 12 Mesa Dr (NS)/ Birch St (EW) 3607 302 542433 812317 13 Acacia St (NS)/ Mesa Dr (EW) 26 37461 1555 14 Irvine Ave (NS)/ Mesa Dr (EW) 88 95 1 28 9 769 0 44 102226182 126227 15 Irvine Ave (NS)/ University Dr (EW) 13 1 11 7 3 59 6483 9 66 12769186 232823 23 Figure 15 TPO Year 2027 Without Project PM Peak Hour Intersection Turning Movement Volumes Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis19742 N 73 Site IRVINE AVE C A M PUS D R BIRC H ST ME SA DR M ES A DR B RIST O L ST N B RIST O L ST S MACARTHUR BLVD JA M B O R EE R D O R C H A R D D R A C A CIA ST Study Intersection Legend # 14 10 13 12 11 5 7 4 6 1 2 8 9 3 15 U NIVE RSITY D R 1 MacArthur Blvd (NS)/ Campus Dr (EW) 12 9 79 918 13 9 74 5 35 5 25932655 30654111 2 MacArthur Blvd (NS)/ Birch St (EW) 52 56 025 8461 2 10 2 21316919 38255166 3 MacArthur Blvd (NS)/ Jamboree Rd (EW) 22 7 85 8 33 5 17 1 10 4 7 42 2 33796131 462786118 4 Campus Dr (NS)/ Bristol St N (EW) 49 0 65 1 60 0 55 1 260164089 5 Irvine Ave (NS)/ Bristol St S (EW) 65 8 26 5 15 2 70 8 461841460 6 Birch St (NS)/ Bristol St N (EW) 16 1 27 7 33 4 53 7 4211400133 7 Birch St (NS)/ Bristol St S (EW) 24 0 27 8 19 2 46 1 253927105 8 Jamboree Rd (NS)/ Bristol St N (EW) 66 3 17 2 3 99 2 69 1 74 4 9 Jamboree Rd (NS)/ Bristol St S (EW) 21 6 9 73 69 2 832574927 10 Irvine Ave (NS)/ Orchard Dr (EW) 0 80 713 3713 8 8 72 164 11 Birch St (NS)/ Orchard Dr (EW) 4 26 520 5858 5 61 40116 246056 12 Mesa Dr (NS)/ Birch St (EW) 3006 905 015648 156045 13 Acacia St (NS)/ Mesa Dr (EW) 829 4196 6354 14 Irvine Ave (NS)/ Mesa Dr (EW) 80 59 9 13 7 1494 5 33 1 5643145 31124021 15 Irvine Ave (NS)/ University Dr (EW) 11 5 77 932 4811 6 6 15 0 7949130 395158 24 Figure 16 TPO Year 2027 With Project AM Peak Hour Intersection Turning Movement Volumes Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis19742 N 73 Site IRVINE AVE C A M PUS D R BIRC H ST ME SA DR M ES A DR B RIST O L ST N B RIST O L ST S MACARTHUR BLVD JA M B O R EE R D O R C H A R D D R A C A CIA ST Study Intersection Legend # 14 10 13 12 11 5 7 4 6 1 2 8 9 3 15 U NIVE RSITY D R 1 MacArthur Blvd (NS)/ Campus Dr (EW) 51 50 637 17 5 76 3 27 8 38545667 2419937 2 MacArthur Blvd (NS)/ Birch St (EW) 33 49 462 6256 7 21 0 11018759 1413680 3 MacArthur Blvd (NS)/ Jamboree Rd (EW) 10 9 96 4 33 0 7641 8 36 6 375796167 387814145 4 Campus Dr (NS)/ Bristol St N (EW) 38 0 11 5 6 24 9 14 9 276878185 5 Irvine Ave (NS)/ Bristol St S (EW) 70 9 24 3 9043 3 8101463415 6 Birch St (NS)/ Bristol St N (EW) 94 70 7 14 0 12 8 4541209248 7 Birch St (NS)/ Bristol St S (EW) 23 7 24 2 19 9 39 8 5651030221 8 Jamboree Rd (NS)/ Bristol St N (EW) 60 6 15 1 5 58 5 76 7 51 5 9 Jamboree Rd (NS)/ Bristol St S (EW) 16 1 3 24 81 9 8513821318 10 Irvine Ave (NS)/ Orchard Dr (EW) 0 92 054 12 0 75 4 36 34 11 Birch St (NS)/ Orchard Dr (EW) 3 37 040 5928 0 10 0 3798 163655 12 Mesa Dr (NS)/ Birch St (EW) 3607 302 542433 812317 13 Acacia St (NS)/ Mesa Dr (EW) 27 40461 1555 14 Irvine Ave (NS)/ Mesa Dr (EW) 88 95 8 29 2 769 3 44 102226182 127227 15 Irvine Ave (NS)/ University Dr (EW) 13 1 11 8 3 59 6484 3 66 12769186 232823 25 Figure 17 TPO Year 2027 With Project PM Peak Hour Intersection Turning Movement Volumes Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis19742 N 73 Site IRVINE AVE C A M PUS D R BIRC H ST ME SA DR M ES A DR B RIST O L ST N B RIST O L ST S MACARTHUR BLVD JA M B O R EE R D O R C H A R D D R A C A CIA ST Study Intersection Legend # 14 10 13 12 11 5 7 4 6 1 2 8 9 3 15 U NIVE RSITY D R 1 MacArthur Blvd (NS)/ Campus Dr (EW) 12 9 79 918 13 9 74 5 36 1 26832655 30654111 2 MacArthur Blvd (NS)/ Birch St (EW) 52 56 025 8461 2 10 2 21317419 38258166 3 MacArthur Blvd (NS)/ Jamboree Rd (EW) 23 5 85 8 33 5 17 1 10 4 7 42 2 33797045 462792118 4 Campus Dr (NS)/ Bristol St N (EW) 51 3 66 0 60 6 55 1 260164089 5 Irvine Ave (NS)/ Bristol St S (EW) 69 0 26 5 15 2 71 4 461844471 6 Birch St (NS)/ Bristol St N (EW) 16 1 28 2 33 7 53 7 4461400133 7 Birch St (NS)/ Bristol St S (EW) 24 5 31 9 19 2 48 9 253927108 8 Jamboree Rd (NS)/ Bristol St N (EW) 67 1 17 4 6 99 2 69 1 75 8 9 Jamboree Rd (NS)/ Bristol St S (EW) 21 7 7 73 69 2 855579941 10 Irvine Ave (NS)/ Orchard Dr (EW) 0 81 313 5413 8 8 81 164 11 Birch St (NS)/ Orchard Dr (EW) 4 26 520 5858 5 92 86116 246056 12 Mesa Dr (NS)/ Birch St (EW) 3006 905 015648 156045 13 Acacia St (NS)/ Mesa Dr (EW) 834 7196 6354 14 Irvine Ave (NS)/ Mesa Dr (EW) 80 60 5 14 0 1495 4 33 1 5643145 31624021 15 Irvine Ave (NS)/ University Dr (EW) 11 5 78 732 4811 8 0 15 0 7949130 395158 26 Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis 27 19742 6. TPO ANALYSIS Detailed intersection Level of Service calculation worksheets for each of the following analysis scenarios are provided in Appendix C. TPO YEAR 2027 ONE-PERCENT THRESHOLD ANALYSIS Table 3 summarizes the City of Newport Beach TPO one-percent threshold analysis. In accordance with the City of Newport Beach TPO requirements, if project-generated peak hour approach volumes are greater than or equal to one percent of the forecast peak hour volumes on any approach of an intersection, then a detailed ICU analysis is required to assess the project-related change in ICU. The TPO one-percent analysis calculation worksheets are contained in Appendix E. The following fourteen study intersections are forecast to exceed the TPO one-percent threshold and require ICU analysis: 1. MacArthur Boulevard (NS) at Campus Drive (EW) 2. MacArthur Boulevard (NS) at Birch Street (EW) 3. MacArthur Boulevard (NS) at Jamboree Road (EW) 4. Campus Drive (NS) at Bristol Street North (EW) 5. Irvine Avenue/Campus Drive (NS) at Bristol Street South (EW) 6. Birch Street (NS) at Bristol Street North (EW) 7. Birch Street (NS) at Bristol Street South (EW) 8. Jamboree Road (NS) at Bristol Street North (EW) 9. Jamboree Road (NS) at Bristol Street South (EW) 10. Irvine Avenue (NS) at Orchard Drive (EW) 11. Birch street (NS) at Orchard Drive (EW) 13. Acacia Street (NS) at Birch Street (EW) 14. Irvine Avenue (NS) at Mesa Drive (EW) 15. Irvine Avenue (NS) at University Drive (EW) TPO IMPACT ASSESSMENT ICU and Levels of Service at the applicable study intersections for TPO Year 2027 Without and With Project conditions are shown in Table 4. As shown in Table 4, the study intersections are forecast to operate at Levels of Service D or better during the peak hours for TPO Year 2027 Without and With Project conditions. Table 4 also calculates the net change in ICU at the applicable study intersections for TPO Year 2027 With Project conditions. As shown in Table 4, the addition of project-generated trips is not forecast to cause any study intersection to operate deficiently (Level of Service E or F) or worsen a deficient intersection operation by more than one percent of capacity; therefore, the proposed project is forecast to result in no Level of Service impacts at the study intersections for TPO Year 2027 With Project conditions and no improvements are required. 27 Northbound Southbound Eastbound Westbound AM No No No No PM No No Yes No AM No No No Yes PM No No Yes No AM No No No No PM No No Yes No AM No Yes No No PM Yes No No No AM Yes Yes No No PM Yes No No No AM No Yes No Yes PM Yes No No Yes AM Yes Yes No No PM Yes Yes No No AM No Yes No No PM No No No No AM No No No No PM No No Yes No AM No Yes No Yes PM No Yes No Yes AM No Yes Yes No PM No Yes Yes No AM No No No No PM No No No No AM No Yes No No PM No Yes Yes No AM No No No No PM Yes No No No AM No No No No PM No Yes No No Notes: Jamboree Rd (NS) at Bristol St North (EW) Irvine Ave (NS) at Orchard Dr (EW) Mesa Dr (NS) at Birch St (EW) (1) If the project is forecast to contribute 1% or more of the projected TPO analysis year peak hour volume, then detailed Intersection Capacity Utilization analysis is required in accordance with the City of Newport Beach Traffic Phasing Ordinance. 1. 2. MacArthur Blvd (NS) at Campus Dr (EW) MacArthur Blvd (NS) at Birch St (EW) 3. 4. 5. 6. 7. 8. 9. 10. MacArthur Blvd (NS) at Jamboree Rd (EW) Campus Dr (NS) at Bristol St North (EW) Irvine Ave/Campus Dr (NS) at Bristol St South (EW) Birch St (NS) at Bristol St North (EW) Birch St (NS) at Bristol St South (EW) Table 3 TPO One-Percent Threshold Analysis Summary ID Study Intersection Peak Hour Project Trips Exceed One Percent?1 14. Irvine Ave (NS) at Mesa Dr (EW) 15. Irvine Ave (NS) at University Dr (EW) Jamboree Rd (NS) at Bristol St South (EW) 11. Birch St (NS) at Orchard Dr (EW) 12. 13. Acacia St (NS) at Birch St (EW) Newport Irvine Medical Office (3300 Irvine Avenue) Traffic Impact Analysis 1974228 V/C2 LOS3 V/C2 LOS3 V/C2 LOS3 V/C2 LOS3 AM PM 1.MacArthur Blvd (NS) at Campus Dr (EW)4 TS 0.36 A 0.52 A 0.37 A 0.53 A +0.01 +0.01 No 2. MacArthur Blvd (NS) at Birch St (EW)TS 0.30 A 0.38 A 0.30 A 0.39 A 0.00 +0.01 No 3.MacArthur Blvd (NS) at Jamboree Rd (EW)4 TS 0.51 A 0.56 A 0.51 A 0.56 A 0.00 0.00 No 4. Campus Dr (NS) at Bristol St North (EW)TS 0.41 A 0.54 A 0.41 A 0.55 A 0.00 +0.01 No 5. Irvine Ave/Campus Dr (NS) at Bristol St South (EW)TS 0.56 A 0.46 A 0.56 A 0.47 A 0.00 +0.01 No 6. Birch St (NS) at Bristol St North (EW)TS 0.52 A 0.51 A 0.52 A 0.51 A 0.00 0.00 No 7. Birch St (NS) at Bristol St South (EW)TS 0.40 A 0.36 A 0.40 A 0.37 A 0.00 +0.01 No 8. Jamboree Rd (NS) at Bristol St North (EW)TS 0.34 A 0.36 A 0.35 A 0.36 A +0.01 0.00 No 9. Jamboree Rd (NS) at Bristol St South (EW)TS 0.61 B 0.57 A 0.62 B 0.58 A +0.01 +0.01 No 10. Irvine Ave (NS) at Orchard Dr (EW)TS 0.29 A 0.44 A 0.31 A 0.44 A +0.02 0.00 No 11. Birch St (NS) at Orchard Dr (EW)TS 0.24 A 0.30 A 0.25 A 0.34 A +0.01 +0.04 No 13. Acacia St (NS) at Birch St (EW)TS 0.14 A 0.22 A 0.14 A 0.23 A 0.00 +0.01 No 14. Irvine Ave (NS) at Mesa Dr (EW)TS 0.37 A 0.46 A 0.37 A 0.46 A 0.00 0.00 No 15. Irvine Ave (NS) at University Dr (EW)TS 0.54 A 0.55 A 0.54 A 0.56 A 0.00 +0.01 No Notes: (1) TS = Traffic Signal (2) V/C = Volume/Capacity (3) LOS = Level of Service (4) Level of Service E is acceptable; shared jurisdiction with City of Irvine. AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour Table 4 TPO Year 2027 Intersection Levels of Service and Impact Assessment ID Study Intersection Traffic Control1 TPO Without Project TPO With Project V/C Increase Significant Impact? Newport Irvine Medical Office (3300 Irvine Avenue) Traffic Impact Analysis 1974229 Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis 30 19742 7. CONGESTION MANAGEMENT PROGRAM This section provides analysis of the project impacts at County facilities in accordance with typical Orange County Congestion Management Program (CMP) requirements. BACKGROUND The Orange County CMP is a result of Proposition 111, which was a statewide initiative approved by the voters in June 1990. To prevent gas tax revenues from being used to promote future development, the legislation requires that a traffic impact analysis be prepared for new development. The traffic impact analysis is prepared to monitor and mitigate traffic impacts caused by new development. In Orange County, the Measure M Growth Management Program requires similar efforts; however, compliance with the CMP is required for local jurisdictions to receive Measure M2 funds. The Legislature requires that adjacent jurisdictions use a standard methodology for conducting a traffic impact analysis. Although details vary from one county to another, the general approach selected by each county for conducting traffic impact analyses has common elements. The Orange County CMP uses the Intersection Capacity Utilization methodology for analysis of intersections within the designated CMP roadway system. CMP-MONITORED INTERSECTIONS The following intersections in the City of Newport Beach are part of the CMP Highway System that require monitoring to ensure that Level of Service standards are maintained:  Newport Boulevard at Coast Highway  MacArthur Boulevard at Jamboree Road  MacArthur Boulevard at Coast Highway REQUIREMENTS FOR IMPROVEMENTS To determine whether the addition of project-generated trips results in an operational impact at a CMP study intersection, and thus requires improvements, the Orange County CMP utilizes the following requirements:  An operational project impact is defined to occur when a proposed project is forecast to increase traffic demand at a CMP study facility by more than three percent of capacity (V/C > 0.03), causing or worsening Level of Service F (V/C > 1.00). CRITERIA FOR PREPARATION OF CMP IMPACT ANALYSIS The Orange County CMP uses the following criteria to determine if a proposed development requires analysis:  Development projects forecast to generate 2,400 daily trips or more and have indirect access to a CMP facility; or development projects forecast to generate 1,600 daily trips or more and have direct access to a CMP facility; or  Projects with a potential to create an impact of more than three percent of Level of Service E capacity. Since the proposed project has indirect access to a CMP facility (e.g., MacArthur Boulevard or Jamboree Road) and is forecast to generate less than 2,400 net new daily trips, the proposed project does not satisfy the criteria for preparation of a separate CMP impact analysis. 30 Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis 31 19742 8. SITE ACCESS AND CIRCULATION This section includes a description of project improvements necessary to provide site access and an evaluation of site access and circulation. The following section is based on the site plan used in this traffic impact analysis. SITE ACCESS Vehicular access is proposed to be maintained at Irvine Avenue via one existing driveway and at Orchard Drive via two existing driveways. There is an existing two-way left turn median on Irvine Avenue which currently allows full access at the project driveway. As previously noted, the trip distribution patterns used for the project trip assignment in this analysis assume right in/out only access at the project driveway on Irvine Avenue. This provides a conservative assessment of potential impacts to adjacent streets since additional project trips are assigned to the intersection of Irvine Avenue/Orchard Drive. Full access at the project driveway on Irvine Avenue may continue to be permitted subject to compliance with City of Newport Beach standards. Based on the forecast project trip distribution patterns, the majority of peak hour project trips are expected to access the site via the project driveways at Orchard Drive. Orchard Drive is an unclassified local street with relatively low volume that connects local businesses in the project vicinity and low-density residential to the east with other arterial and regional roadways. Traffic flow along Orchard Drive at the project driveway will operate in free-flow conditions. Right turns into the project site from Orchard Drive will have no conflicting vehicular movements and are therefore expected to cause minimal to no delays along Orchard Drive. Left turns into the project site may cause minor delays for following through vehicles; however, queues are expected to be minimal due to the relatively low inbound project trip generation, relatively low conflicting volumes along Orchard Drive, and multiple site access points. ON-SITE CIRCULATION The project site plan shows two-way on-site circulation from Irvine Avenue and Orchard Drive to both the surface level parking and the parking structure, with multiple entry/exit points. The final parking layout and circulation will be reviewed and approved by the City of Newport Beach. The project shares driveway access with 1981 Orchard Drive. 31 Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis 32 19742 9. CONCLUSIONS This section summarizes the findings of this study. PROJECT TRIP GENERATION The existing project site land uses are estimated to generate approximately 1,320 daily trips, including 150 trips during the AM peak hour and 160 trips during the PM peak hour. The proposed project site land use is forecast to generate approximately 2,816 daily trips, including 243 trips during the AM peak hour and 307 trips during the PM peak hour. Therefore, the proposed project is forecast to result in a net increase of approximately 1,496 net new daily trips, including 93 net new trips during the AM peak hour and 147 net new trips during the PM peak hour. TPO IMPACT ANALYSIS The addition of project-generated trips is not forecast to cause any study intersection to operate deficiently (Level of Service E or F) or worsen a deficient intersection operation by more than one percent of capacity; therefore, the proposed project is forecast to result in no Level of Service impacts at the study intersections for TPO Year 2027 With Project conditions and no improvements are required. CONGESTION MANAGEMENT PROGRAM Since the proposed project has indirect access to a CMP facility (e.g., MacArthur Boulevard or Jamboree Road) and is forecast to generate less than 2,400 net new daily trips, the proposed project does not satisfy the criteria for preparation of a separate CMP impact analysis. 32 Newport Irvine Medical Office (3300 Irvine Ave) Traffic Impact Analysis 33 19742 APPENDICES Appendix A Glossary Appendix B Volume Count Worksheets Appendix C Level of Service Worksheets Appendix D Approved Projects List Appendix E TPO One-Percent Threshold Analysis Apx-1 APPENDIX A GLOSSARY Apx-2 ACRONYMS AC Acres ADT Average Daily Traffic Caltrans California Department of Transportation DU Dwelling Unit ICU Intersection Capacity Utilization GFA Gross Floor Area LOS Level of Service PCE Passenger Car Equivalent SP Service Population TSF Thousand Square Feet V/C Volume/Capacity VMT Vehicle Miles Traveled TERMS ACTUATED SIGNAL CONTROL: A type of traffic signal control in which display of each phase depends on whether the corresponding phase detector has registered a service call or the phase is on recall. ACTUATION: Detection of a roadway user that is forwarded to the signal controller. AVERAGE DAILY TRAFFIC: The average 24-hour volume for a stated period divided by the number of days in that period. For example, Annual Average Daily Traffic is the total volume during a year divided by 365 days. BANDWIDTH: The number of seconds of green time available for through traffic in a signal progression. BOTTLENECK: A point of constriction along a roadway that limits the amount of traffic that can proceed downstream from its location. CALL: An indication within a signal controller that a particular phase is waiting for service, either through actuation from a roadway user or phase recall. CAPACITY: The maximum number of vehicles that can be reasonably expected to pass through a roadway facility during a specified period. CHANNELIZATION: The separation of conflicting traffic movements by use of pavement markings, raised curbs, or other suitable means to facilitate free flow movement. CLEARANCE INTERVAL: Equal to the yellow plus all-red time, if any, when a traffic signal changes between phases (i.e., the amount of time between the end of a green light from one movement to the beginning of a green light for the next). COORDINATED SIGNAL CONTROL: A type of traffic signal control in which non-coordinated phases associated with minor movements are constrained such that the coordinated phases are served at a specific time during the signal cycle, thus maintaining the efficient progression of traffic flow along the major roadway. CONTROL DELAY: The portion of delay attributed to the intersection traffic control (such as a traffic signal or stop sign). It includes initial deceleration, queue move-up time, stopped delay, and final acceleration delay. CORDON: An imaginary boundary line around or across a study area across which vehicles, persons, or other information can be collected for survey and analytical purposes. Apx-3 CORNER SIGHT DISTANCE: The minimum sight distance required by the driver of a vehicle to cross or enter the lanes of the major roadway without requiring approaching traffic traveling at a given speed to radically alter their speed or trajectory. CYCLE: A complete sequence of signal indications for all phases. CYCLE LENGTH: The total time for a traffic signal to complete one full cycle. DAILY CAPACITY: A theoretical value representing the daily traffic volume that will typically result in a peak hour volume equal to the capacity of the roadway. DELAY: The total additional travel time experienced by a roadway user (driver, passenger, bicyclist, or pedestrian) beyond that required to travel at a desired speed. DENSITY: The number of vehicles occupying in a unit length of the through traffic lanes of a roadway at any given instant. Usually expressed in vehicles per mile. DETECTOR: A device used to count or determine the presence of a roadway user. DESIGN SPEED: A speed used for purposes of designing horizontal and vertical alignments of a highway. DIRECTIONAL SPLIT: The percent of two-way traffic traveling in a specified direction. DIVERSION: The rerouting of traffic from a normal path of travel between two points, such as to avoid congestion or perform a secondary trip. FREE FLOW: Traffic flow that is unaffected by a traffic control and/or or upstream or downstream conditions. GAP: Time or distance between two vehicles measured from rear bumper of the front vehicle to front bumper of the second vehicle. GAP ACCEPTANCE: The method by which a driver accepts an available gap in traffic to enter or cross the road. HEADWAY: Time or distance between two successive vehicles measured from same point on both vehicles (i.e., front bumper to front bumper). LEVEL OF SERVICE: A grading scale of quantitative performance measures representing the quality of service of a transportation facility or service from an average traveler’s perspective. LOOP DETECTOR: A vehicle detector consisting of a loop of wire embedded in the roadway, energized by alternating current and producing an output circuit closure when passed over by a vehicle. MULTI-MODAL: More than one mode, such as automobile, transit, bicycle, and pedestrian. OFFSET: The time interval between the beginning of a traffic signal cycle at one intersection and the beginning of signal cycle an adjacent intersection. PLATOON: A set of vehicles traveling at similar speed and moving as a general group with clear separation between other vehicles ahead and behind. PASSENGER CAR EQUIVALENT: A metric used to assess the impact of larger vehicles, such as trucks, recreational vehicles, and buses, by converting the traffic volume of larger vehicles to an equivalent number of passenger cars. Apx-4 PEDESTRIAN CLEARANCE INTERVAL: Also known as the “Flashing Don’t Walk” interval, it signals the end of pedestrian entry into the crosswalk following the “Walk” indication and provides time for pedestrians who have already entered the crosswalk to finishing crossing. PEAK HOUR: The hour within a day in which the maximum volume occurs. PEAK HOUR FACTOR: The peak hour volume divided by the four times the peak 15-minute flow rate. This PHASE: In traffic signals, the green, yellow, and red clearance intervals assigned to a specified traffic movement. PRETIMED SIGNAL: A traffic signal operation in which the cycle length, phasing sequence, and phasing times are predetermined and fixed, regardless of actual demand for any given traffic movement. Also known as a fixed time signal. PROGRESSION: The coordinated movement of vehicles through signalized intersections along a corridor. QUEUE: The number of vehicles waiting at a service area such as a traffic signal, stop sign, or access gate. QUEUE LENGTH: The length of vehicle queue, typically expressed in feet, waiting at a service area such as a traffic signal, stop sign, or access gate. RECALL: A signal phasing operation in which a specified phase places a call to the signal controller each time a conflicting phase is served, thus ensuring the specified phase will be serviced again. SEMI-ACTUATED CONTROL: A type of traffic signal control in which only the minor movements are provided detection. SIGHT DISTANCE: The continuous length of roadway visible to a driver or roadway user. STACKING DISTANCE: The length of area available behind a service area, such as a traffic signal or gate, for vehicle queuing to occur. STOPPING SIGHT DISTANCE: The minimum distance required by the driver of a vehicle traveling at a given speed to bring the vehicle to a stop after an object on the road becomes visible, including reaction and response time. TRIP OR TRIP END: The one-directional movement of a person or vehicle. Every trip has an origin and a destination at its respective ends (i.e., trip ends). In terms of site trip generation, the same vehicle entering and exiting a site generates two trips: one inbound trip and one outbound trip. TRIP GENERATION RATE: The rate at which a land use generates trips per the specified land use variable, such per dwelling unit or per thousand square feet. TRUCK: A heavy motor vehicle generally used for transporting goods. VEHICLE MILES TRAVELED: A measure of the amount and distance of automobile travel essentially calculated as the sum of each trip times the trip length. Apx-5 APPENDIX B VOLUME COUNT WORKSHEETS Apx-6 File Name : MA4300 Site Code : 00000000 Start Date : 3/8/2023 Page No : 1 City: NEWPORT BEACH N-S Direction: MACARTHUR BOULEVARD E-W Direction: CAMPUS DRIVE Groups Printed- Turning Movement Count MACARTHUR BOULEVARD Southbound CAMPUS DRIVE Westbound MACARTHUR BOULEVARD Northbound CAMPUS DRIVE Eastbound Start Time Right Thru Left U Turns Right Thru Left U Turns Right Thru Left U Turns Right Thru Left U Turns Int. Total 07:00 40 118 18 0 5 25 4 0 4 48 7 0 4 57 28 0 358 07:15 61 145 40 0 9 33 2 0 3 51 6 1 6 87 44 0 488 07:30 50 174 28 1 9 37 3 0 7 77 8 0 8 93 65 0 560 07:45 60 172 41 0 7 50 7 0 13 85 9 0 15 125 104 2 690 Total 211 609 127 1 30 145 16 0 27 261 30 1 33 362 241 2 2096 08:00 56 177 38 0 5 52 7 0 12 95 8 2 17 101 99 6 675 08:15 67 171 40 0 13 55 5 0 4 89 16 4 19 124 91 0 698 08:30 78 181 47 0 7 42 5 0 7 127 10 0 16 106 75 5 706 08:45 72 187 53 0 16 39 6 0 6 115 5 3 13 95 69 3 682 Total 273 716 178 0 41 188 23 0 29 426 39 9 65 426 334 14 2761 16:30 81 127 15 0 16 131 6 0 7 193 28 1 15 56 81 3 760 16:45 72 143 12 0 30 177 5 0 6 153 26 0 20 67 56 7 774 Total 153 270 27 0 46 308 11 0 13 346 54 1 35 123 137 10 1534 17:00 97 143 16 0 33 205 7 0 3 212 40 0 12 66 69 4 907 17:15 94 148 24 0 24 144 10 0 8 189 41 0 5 81 65 3 836 17:30 79 180 32 0 21 165 7 0 3 155 23 0 21 90 56 3 835 17:45 71 171 56 0 30 140 6 0 3 161 20 0 17 89 56 3 823 Total 341 642 128 0 108 654 30 0 17 717 124 0 55 326 246 13 3401 18:00 74 168 36 0 22 119 4 0 4 147 30 0 2 64 47 2 719 18:15 76 156 22 0 21 112 7 0 3 138 24 0 9 63 61 1 693 Grand Total 1128 2561 518 1 268 1526 91 0 93 2035 301 11 199 1364 1066 42 11204 Apprch %26.8 60.9 12.3 0 14.2 81 4.8 0 3.8 83.4 12.3 0.5 7.5 51.1 39.9 1.6 Total %10.1 22.9 4.6 0 2.4 13.6 0.8 0 0.8 18.2 2.7 0.1 1.8 12.2 9.5 0.4 Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-7 File Name : MA4300 Site Code : 00000000 Start Date : 3/8/2023 Page No : 2 City: NEWPORT BEACH N-S Direction: MACARTHUR BOULEVARD E-W Direction: CAMPUS DRIVE MACARTHUR BOULEVARD Southbound CAMPUS DRIVE Westbound MACARTHUR BOULEVARD Northbound CAMPUS DRIVE Eastbound Start Time Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 07:45 60 172 41 0 273 7 50 7 0 64 13 85 9 0 107 15 125 104 2 246 690 08:00 56 177 38 0 271 5 52 7 0 64 12 95 8 2 117 17 101 99 6 223 675 08:15 67 171 40 0 278 13 55 5 0 73 4 89 16 4 113 19 124 91 0 234 698 08:30 78 181 47 0 306 7 42 5 0 54 7 127 10 0 144 16 106 75 5 202 706 Total Volume 261 701 166 0 1128 32 199 24 0 255 36 396 43 6 481 67 456 369 13 905 2769 % App. Total 23.1 62.1 14.7 0 12.5 78 9.4 0 7.5 82.3 8.9 1.2 7.4 50.4 40.8 1.4 PHF .837 .968 .883 .000 .922 .615 .905 .857 .000 .873 .692 .780 .672 .375 .835 .882 .912 .887 .542 .920 .981 MACARTHUR BOULEVARD C A M P U S D R I V E C A M P U S D R I V E MACARTHUR BOULEVARD Right 261 Thru 701 Left 166 U Turns 0 InOut Total 797 1128 1925 Rig h t 32 Th r u 19 9 Le f t 24 U Tu r n s 0 Ou t To t a l In 65 8 25 5 91 3 Left 43 Thru 396 Right 36 U Turns 6 Out TotalIn 792 481 1273 Le f t 36 9 Th r u45 6 Ri g h t 67 U Tu r n s 13 To t a l Ou t In 50 3 90 5 14 0 8 Peak Hour Begins at 07:45 Turning Movement Count Peak Hour Data North Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-8 File Name : MA4300 Site Code : 00000000 Start Date : 3/8/2023 Page No : 3 City: NEWPORT BEACH N-S Direction: MACARTHUR BOULEVARD E-W Direction: CAMPUS DRIVE MACARTHUR BOULEVARD Southbound CAMPUS DRIVE Westbound MACARTHUR BOULEVARD Northbound CAMPUS DRIVE Eastbound Start Time Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Int. Total Peak Hour Analysis From 16:30 to 18:15 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 17:00 17:00 97 143 16 0 256 33 205 7 0 245 3 212 40 0 255 12 66 69 4 151 907 17:15 94 148 24 0 266 24 144 10 0 178 8 189 41 0 238 5 81 65 3 154 836 17:30 79 180 32 0 291 21 165 7 0 193 3 155 23 0 181 21 90 56 3 170 835 17:45 71 171 56 0 298 30 140 6 0 176 3 161 20 0 184 17 89 56 3 165 823 Total Volume 341 642 128 0 1111 108 654 30 0 792 17 717 124 0 858 55 326 246 13 640 3401 % App. Total 30.7 57.8 11.5 0 13.6 82.6 3.8 0 2 83.6 14.5 0 8.6 50.9 38.4 2 PHF .879 .892 .571 .000 .932 .818 .798 .750 .000 .808 .531 .846 .756 .000 .841 .655 .906 .891 .813 .941 .937 MACARTHUR BOULEVARD C A M P U S D R I V E C A M P U S D R I V E MACARTHUR BOULEVARD Right 341 Thru 642 Left 128 U Turns 0 InOut Total 1071 1111 2182 Ri g h t 10 8 Th r u 65 4 Le f t 30 U Tu r n s 0 Ou t To t a l In 47 1 79 2 12 6 3 Left 124 Thru 717 Right 17 U Turns 0 Out TotalIn 727 858 1585 Le f t 24 6 Th r u32 6 Rig h t 55 U Tu r n s 13 To t a l Ou t In 11 1 9 64 0 17 5 9 Peak Hour Begins at 17:00 Turning Movement Count Peak Hour Data North Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-9 File Name : ma4295 Site Code : 00000000 Start Date : 3/9/2023 Page No : 1 City: Newport Beach N-S Direction: MacArthur Blvd E-W Direction: Birch St Groups Printed- Turning Movements MacArthur Blvd Southbound Birch St Westbound MacArthur Blvd Northbound Birch St Eastbound Start Time Right Thru Left U Turns Right Thru Left U Turns Right Thru Left U Turns Right Thru Left U Turns Int. Total 07:00 30 84 8 0 5 10 1 0 3 35 6 0 2 15 11 0 210 07:15 31 81 6 1 4 11 1 0 9 39 2 0 6 15 7 0 213 07:30 41 120 7 0 8 12 2 0 11 45 3 0 6 23 11 0 289 07:45 45 132 8 0 10 24 3 0 10 106 3 0 17 40 24 0 422 Total 147 417 29 1 27 57 7 0 33 225 14 0 31 93 53 0 1134 08:00 51 111 13 0 8 30 3 0 19 110 8 0 18 41 15 0 427 08:15 41 126 10 0 4 23 5 0 15 109 5 1 20 45 21 0 425 08:30 55 155 7 0 10 28 5 0 16 119 7 0 16 45 15 0 478 08:45 55 126 15 3 8 40 1 0 10 121 10 1 5 41 19 0 455 Total 202 518 45 3 30 121 14 0 60 459 30 2 59 172 70 0 1785 16:30 23 109 1 1 32 54 17 0 2 136 8 3 6 41 35 0 468 16:45 25 124 13 0 31 53 8 0 6 132 12 1 6 36 46 0 493 Total 48 233 14 1 63 107 25 0 8 268 20 4 12 77 81 0 961 17:00 29 114 6 0 40 74 16 0 5 134 12 3 2 52 66 0 553 17:15 23 150 7 0 36 60 9 0 6 129 11 1 4 48 49 0 533 17:30 21 163 4 1 32 56 5 0 7 120 10 0 7 24 40 0 490 17:45 23 138 4 0 27 80 4 0 2 110 9 1 3 21 49 0 471 Total 96 565 21 1 135 270 34 0 20 493 42 5 16 145 204 0 2047 18:00 12 142 2 0 27 34 5 0 2 101 8 0 6 22 45 0 406 18:15 12 143 1 0 13 29 7 0 1 74 7 0 6 24 38 0 355 Grand Total 517 2018 112 6 295 618 92 0 124 1620 121 11 130 533 491 0 6688 Apprch %19.5 76.1 4.2 0.2 29.4 61.5 9.2 0 6.6 86.4 6.4 0.6 11.3 46.2 42.5 0 Total %7.7 30.2 1.7 0.1 4.4 9.2 1.4 0 1.9 24.2 1.8 0.2 1.9 8 7.3 0 Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-10 File Name : ma4295 Site Code : 00000000 Start Date : 3/9/2023 Page No : 2 City: Newport Beach N-S Direction: MacArthur Blvd E-W Direction: Birch St MacArthur Blvd Southbound Birch St Westbound MacArthur Blvd Northbound Birch St Eastbound Start Time Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 08:00 51 111 13 0 175 8 30 3 0 41 19 110 8 0 137 18 41 15 0 74 427 08:15 41 126 10 0 177 4 23 5 0 32 15 109 5 1 130 20 45 21 0 86 425 08:30 55 155 7 0 217 10 28 5 0 43 16 119 7 0 142 16 45 15 0 76 478 08:45 55 126 15 3 199 8 40 1 0 49 10 121 10 1 142 5 41 19 0 65 455 Total Volume 202 518 45 3 768 30 121 14 0 165 60 459 30 2 551 59 172 70 0 301 1785 % App. Total 26.3 67.4 5.9 0.4 18.2 73.3 8.5 0 10.9 83.3 5.4 0.4 19.6 57.1 23.3 0 PHF .918 .835 .750 .250 .885 .750 .756 .700 .000 .842 .789 .948 .750 .500 .970 .738 .956 .833 .000 .875 .934 MacArthur Blvd B i r c h S t B i r c h S t MacArthur Blvd Right 202 Thru 518 Left 45 U Turns 3 InOut Total 559 768 1327 Rig h t 30 Th r u 12 1 Le f t 14 U Tu r n s 0 Ou t To t a l In 27 7 16 5 44 2 Left 30 Thru 459 Right 60 U Turns 2 Out TotalIn 591 551 1142 Le f t 70 Th r u17 2 Ri g h t 59 U Tu r n s 0 To t a l Ou t In 35 3 30 1 65 4 Peak Hour Begins at 08:00 Turning Movements Peak Hour Data North Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-11 File Name : ma4295 Site Code : 00000000 Start Date : 3/9/2023 Page No : 3 City: Newport Beach N-S Direction: MacArthur Blvd E-W Direction: Birch St MacArthur Blvd Southbound Birch St Westbound MacArthur Blvd Northbound Birch St Eastbound Start Time Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Int. Total Peak Hour Analysis From 16:30 to 18:15 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:45 16:45 25 124 13 0 162 31 53 8 0 92 6 132 12 1 151 6 36 46 0 88 493 17:00 29 114 6 0 149 40 74 16 0 130 5 134 12 3 154 2 52 66 0 120 553 17:15 23 150 7 0 180 36 60 9 0 105 6 129 11 1 147 4 48 49 0 101 533 17:30 21 163 4 1 189 32 56 5 0 93 7 120 10 0 137 7 24 40 0 71 490 Total Volume 98 551 30 1 680 139 243 38 0 420 24 515 45 5 589 19 160 201 0 380 2069 % App. Total 14.4 81 4.4 0.1 33.1 57.9 9 0 4.1 87.4 7.6 0.8 5 42.1 52.9 0 PHF .845 .845 .577 .250 .899 .869 .821 .594 .000 .808 .857 .961 .938 .417 .956 .679 .769 .761 .000 .792 .935 MacArthur Blvd B i r c h S t B i r c h S t MacArthur Blvd Right 98 Thru 551 Left 30 U Turns 1 InOut Total 855 680 1535 Ri g h t 13 9 Th r u 24 3 Le f t 38 U Tu r n s 0 Ou t To t a l In 21 4 42 0 63 4 Left 45 Thru 515 Right 24 U Turns 5 Out TotalIn 608 589 1197 Le f t 20 1 Th r u16 0 Rig h t 19 U Tu r n s 0 To t a l Ou t In 38 6 38 0 76 6 Peak Hour Begins at 16:45 Turning Movements Peak Hour Data North Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-12 File Name : h2402026 Site Code : 00000000 Start Date : 5/7/2024 Page No : 1 City: NEWPORT BEACH N-S Direction: MACARTHUR BOULEVARD E-W Direction: JAMBOREE ROAD Groups Printed- Turning Movement Count MACARTHUR BOULEVARD Southbound JAMBOREE ROAD Westbound MACARTHUR BOULEVARD Northbound JAMBOREE ROAD Eastbound Start Time Right Thru Left U Turns Right Thru Left U Turns Right Thru Left U Turns Right Thru Left U Turns Int. Total 07:00 28 53 8 0 13 135 50 0 26 77 11 0 15 101 32 0 549 07:15 34 70 5 1 26 136 67 1 37 95 15 0 25 142 34 0 688 07:30 44 84 15 0 37 206 80 1 46 154 17 1 42 180 35 1 943 07:45 56 97 11 0 40 180 57 0 83 207 22 0 58 166 78 0 1055 Total 162 304 39 1 116 657 254 2 192 533 65 1 140 589 179 1 3235 08:00 94 72 15 0 29 188 118 0 77 179 19 1 29 169 96 3 1089 08:15 82 111 9 0 25 158 78 0 62 247 18 1 46 192 81 3 1113 08:30 80 93 19 0 36 166 72 0 94 290 32 1 37 168 95 2 1185 08:45 84 101 27 0 40 159 68 0 83 208 26 0 38 195 75 0 1104 Total 340 377 70 0 130 671 336 0 316 924 95 3 150 724 347 8 4491 16:00 84 186 37 3 20 148 100 0 87 194 42 5 6 193 70 2 1177 16:15 81 176 20 1 19 130 106 0 78 173 41 0 10 251 87 1 1174 16:30 74 216 27 0 32 152 95 0 80 234 42 3 8 179 67 1 1210 16:45 81 215 39 0 18 158 98 0 68 192 45 3 17 181 81 1 1197 Total 320 793 123 4 89 588 399 0 313 793 170 11 41 804 305 5 4758 17:00 103 252 43 0 28 180 99 0 69 197 57 3 5 212 65 2 1315 17:15 106 305 28 0 32 158 125 0 71 260 45 3 3 199 87 3 1425 17:30 93 233 41 3 30 198 109 0 76 158 47 3 7 216 73 2 1289 17:45 74 199 34 0 26 180 82 0 78 159 34 4 6 209 44 1 1130 Total 376 989 146 3 116 716 415 0 294 774 183 13 21 836 269 8 5159 18:00 80 235 25 0 25 136 64 0 43 113 48 5 16 157 55 0 1002 18:15 54 123 23 0 14 153 67 0 47 70 23 3 4 185 31 1 798 Grand Total 1332 2821 426 8 490 2921 1535 2 1205 3207 584 36 372 3295 1186 23 19443 Apprch %29 61.5 9.3 0.2 9.9 59 31 0 23.9 63.7 11.6 0.7 7.6 67.6 24.3 0.5 Total %6.9 14.5 2.2 0 2.5 15 7.9 0 6.2 16.5 3 0.2 1.9 16.9 6.1 0.1 Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-13 File Name : h2402026 Site Code : 00000000 Start Date : 5/7/2024 Page No : 2 City: NEWPORT BEACH N-S Direction: MACARTHUR BOULEVARD E-W Direction: JAMBOREE ROAD MACARTHUR BOULEVARD Southbound JAMBOREE ROAD Westbound MACARTHUR BOULEVARD Northbound JAMBOREE ROAD Eastbound Start Time Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 08:00 94 72 15 0 181 29 188 118 0 335 77 179 19 1 276 29 169 96 3 297 1089 08:15 82 111 9 0 202 25 158 78 0 261 62 247 18 1 328 46 192 81 3 322 1113 08:30 80 93 19 0 192 36 166 72 0 274 94 290 32 1 417 37 168 95 2 302 1185 08:45 84 101 27 0 212 40 159 68 0 267 83 208 26 0 317 38 195 75 0 308 1104 Total Volume 340 377 70 0 787 130 671 336 0 1137 316 924 95 3 1338 150 724 347 8 1229 4491 % App. Total 43.2 47.9 8.9 0 11.4 59 29.6 0 23.6 69.1 7.1 0.2 12.2 58.9 28.2 0.7 PHF .904 .849 .648 .000 .928 .813 .892 .712 .000 .849 .840 .797 .742 .750 .802 .815 .928 .904 .667 .954 .947 MACARTHUR BOULEVARD J A M B O R E E R O A D J A M B O R E E R O A D MACARTHUR BOULEVARD Right 340 Thru 377 Left 70 U Turns 0 InOut Total 1401 787 2188 Rig h t 13 0 Th r u 67 1 Le f t 33 6 U Tu r n s 0 Ou t To t a l In 11 1 0 11 3 7 22 4 7 Left 95 Thru 924 Right 316 U Turns 3 Out TotalIn 863 1338 2201 Le f t 34 7 Th r u72 4 Ri g h t 15 0 U Tu r n s 8 To t a l Ou t In 11 0 6 12 2 9 23 3 5 Peak Hour Begins at 08:00 Turning Movement Count Peak Hour Data North Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-14 File Name : h2402026 Site Code : 00000000 Start Date : 5/7/2024 Page No : 3 City: NEWPORT BEACH N-S Direction: MACARTHUR BOULEVARD E-W Direction: JAMBOREE ROAD MACARTHUR BOULEVARD Southbound JAMBOREE ROAD Westbound MACARTHUR BOULEVARD Northbound JAMBOREE ROAD Eastbound Start Time Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Int. Total Peak Hour Analysis From 16:00 to 18:15 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:45 16:45 81 215 39 0 335 18 158 98 0 274 68 192 45 3 308 17 181 81 1 280 1197 17:00 103 252 43 0 398 28 180 99 0 307 69 197 57 3 326 5 212 65 2 284 1315 17:15 106 305 28 0 439 32 158 125 0 315 71 260 45 3 379 3 199 87 3 292 1425 17:30 93 233 41 3 370 30 198 109 0 337 76 158 47 3 284 7 216 73 2 298 1289 Total Volume 383 1005 151 3 1542 108 694 431 0 1233 284 807 194 12 1297 32 808 306 8 1154 5226 % App. Total 24.8 65.2 9.8 0.2 8.8 56.3 35 0 21.9 62.2 15 0.9 2.8 70 26.5 0.7 PHF .903 .824 .878 .250 .878 .844 .876 .862 .000 .915 .934 .776 .851 1.00 .856 .471 .935 .879 .667 .968 .917 MACARTHUR BOULEVARD J A M B O R E E R O A D J A M B O R E E R O A D MACARTHUR BOULEVARD Right 383 Thru 1005 Left 151 U Turns 3 InOut Total 1221 1542 2763 Ri g h t 10 8 Th r u 69 4 Le f t 43 1 U Tu r n s 0 Ou t To t a l In 12 4 3 12 3 3 24 7 6 Left 194 Thru 807 Right 284 U Turns 12 Out TotalIn 1468 1297 2765 Le f t 30 6 Th r u80 8 Rig h t 32 U Tu r n s 8 To t a l Ou t In 12 7 1 11 5 4 24 2 5 Peak Hour Begins at 16:45 Turning Movement Count Peak Hour Data North Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-15 File Name : H2402007 Site Code : 00000000 Start Date : 2/8/2024 Page No : 1 City: NEWPORT BEACH N-S Direction: CAMPUS DRIVE E-W Direction: BRISTOL ST-NORTH Groups Printed- Turning Movement Count CAMPUS DRIVE Southbound BRISTOL ST-NORTH Westbound CAMPUS DRIVE Northbound BRISTOL ST-NORTH Eastbound Start Time Right Thru Left U Turns Right Thru Left U Turns Right Thru Left U Turns Right Thru Left U Turns Int. Total 07:00 17 46 0 0 23 74 23 0 0 103 57 0 0 0 0 0 343 07:15 19 48 0 0 13 119 30 0 0 124 76 0 0 0 0 0 429 07:30 24 51 0 0 28 186 40 0 0 220 115 0 0 0 0 0 664 07:45 23 69 0 0 29 191 56 0 0 269 124 0 0 0 0 0 761 Total 83 214 0 0 93 570 149 0 0 716 372 0 0 0 0 0 2197 08:00 33 58 0 0 40 190 56 0 0 295 94 0 0 0 0 0 766 08:15 34 63 0 0 47 208 68 0 0 264 105 0 0 0 0 0 789 08:30 43 60 0 0 41 168 51 0 0 302 70 0 0 0 0 0 735 08:45 39 54 0 0 57 212 84 0 0 285 104 0 0 0 0 0 835 Total 149 235 0 0 185 778 259 0 0 1146 373 0 0 0 0 0 3125 16:00 131 104 0 0 26 361 84 0 0 171 134 0 0 0 0 0 1011 16:15 125 125 0 0 25 408 67 0 0 146 132 0 0 0 0 0 1028 16:30 141 132 0 0 26 410 76 0 0 128 126 0 0 0 0 0 1039 16:45 139 118 0 0 37 417 73 0 0 145 108 0 0 0 0 0 1037 Total 536 479 0 0 114 1596 300 0 0 590 500 0 0 0 0 0 4115 17:00 119 153 0 0 10 394 60 0 0 194 136 0 0 0 0 0 1066 17:15 152 193 0 0 16 382 48 0 0 170 120 0 0 0 0 0 1081 17:30 134 140 0 0 11 403 71 0 0 148 86 0 0 0 0 0 993 17:45 110 114 0 0 22 383 82 0 0 131 93 0 0 0 0 0 935 Total 515 600 0 0 59 1562 261 0 0 643 435 0 0 0 0 0 4075 18:00 95 100 0 0 21 324 61 0 0 117 107 0 0 0 0 0 825 18:15 79 88 0 0 23 305 67 0 0 89 112 0 0 0 0 0 763 Grand Total 1457 1716 0 0 495 5135 1097 0 0 3301 1899 0 0 0 0 0 15100 Apprch %45.9 54.1 0 0 7.4 76.3 16.3 0 0 63.5 36.5 0 0 0 0 0 Total %9.6 11.4 0 0 3.3 34 7.3 0 0 21.9 12.6 0 0 0 0 0 Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-16 File Name : H2402007 Site Code : 00000000 Start Date : 2/8/2024 Page No : 2 City: NEWPORT BEACH N-S Direction: CAMPUS DRIVE E-W Direction: BRISTOL ST-NORTH CAMPUS DRIVE Southbound BRISTOL ST-NORTH Westbound CAMPUS DRIVE Northbound BRISTOL ST-NORTH Eastbound Start Time Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 08:00 33 58 0 0 91 40 190 56 0 286 0 295 94 0 389 0 0 0 0 0 766 08:15 34 63 0 0 97 47 208 68 0 323 0 264 105 0 369 0 0 0 0 0 789 08:30 43 60 0 0 103 41 168 51 0 260 0 302 70 0 372 0 0 0 0 0 735 08:45 39 54 0 0 93 57 212 84 0 353 0 285 104 0 389 0 0 0 0 0 835 Total Volume 149 235 0 0 384 185 778 259 0 1222 0 1146 373 0 1519 0 0 0 0 0 3125 % App. Total 38.8 61.2 0 0 15.1 63.7 21.2 0 0 75.4 24.6 0 0 0 0 0 PHF .866 .933 .000 .000 .932 .811 .917 .771 .000 .865 .000 .949 .888 .000 .976 .000 .000 .000 .000 .000 .936 CAMPUS DRIVE B R I S T O L S T - N O R T H B R I S T O L S T - N O R T H CAMPUS DRIVE Right 149 Thru 235 Left 0 U Turns 0 InOut Total 1331 384 1715 Rig h t 18 5 Th r u 77 8 Le f t 25 9 U Tu r n s 0 Ou t To t a l In 0 12 2 2 12 2 2 Left 373 Thru 1146 Right 0 U Turns 0 Out TotalIn 494 1519 2013 Le f t 0 Th r u 0 Ri g h t 0 U Tu r n s 0 To t a l Ou t In 13 0 0 0 13 0 0 Peak Hour Begins at 08:00 Turning Movement Count Peak Hour Data North Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-17 File Name : H2402007 Site Code : 00000000 Start Date : 2/8/2024 Page No : 3 City: NEWPORT BEACH N-S Direction: CAMPUS DRIVE E-W Direction: BRISTOL ST-NORTH CAMPUS DRIVE Southbound BRISTOL ST-NORTH Westbound CAMPUS DRIVE Northbound BRISTOL ST-NORTH Eastbound Start Time Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Int. Total Peak Hour Analysis From 16:00 to 18:15 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:30 16:30 141 132 0 0 273 26 410 76 0 512 0 128 126 0 254 0 0 0 0 0 1039 16:45 139 118 0 0 257 37 417 73 0 527 0 145 108 0 253 0 0 0 0 0 1037 17:00 119 153 0 0 272 10 394 60 0 464 0 194 136 0 330 0 0 0 0 0 1066 17:15 152 193 0 0 345 16 382 48 0 446 0 170 120 0 290 0 0 0 0 0 1081 Total Volume 551 596 0 0 1147 89 1603 257 0 1949 0 637 490 0 1127 0 0 0 0 0 4223 % App. Total 48 52 0 0 4.6 82.2 13.2 0 0 56.5 43.5 0 0 0 0 0 PHF .906 .772 .000 .000 .831 .601 .961 .845 .000 .925 .000 .821 .901 .000 .854 .000 .000 .000 .000 .000 .977 CAMPUS DRIVE B R I S T O L S T - N O R T H B R I S T O L S T - N O R T H CAMPUS DRIVE Right 551 Thru 596 Left 0 U Turns 0 InOut Total 726 1147 1873 Ri g h t 89 Th r u 16 0 3 Le f t 25 7 U Tu r n s 0 Ou t To t a l In 0 19 4 9 19 4 9 Left 490 Thru 637 Right 0 U Turns 0 Out TotalIn 853 1127 1980 Le f t 0 Th r u 0 Rig h t 0 U Tu r n s 0 To t a l Ou t In 26 4 4 0 26 4 4 Peak Hour Begins at 16:30 Turning Movement Count Peak Hour Data North Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-18 File Name : H2402003 Site Code : 00000000 Start Date : 2/8/2024 Page No : 1 City: NEWPORT BEACH N-S Direction: CAMPUS DR/IRVINE AVE E-W Direction: BRISTOL ST - SOUTH Groups Printed- Turning Movement Count CAMPUS DRIVE Southbound BRISTOL ST - SOUTH Westbound IRVINE AVENUE Northbound BRISTOL ST - SOUTH Eastbound Start Time Right Thru Left U Turns Right Thru Left U Turns Right Thru Left U Turns Right Thru Left U Turns Int. Total 07:00 0 51 10 0 0 0 0 0 25 61 0 0 94 234 108 0 583 07:15 0 63 12 0 0 0 0 0 30 82 0 0 90 250 124 0 651 07:30 0 75 20 0 0 0 0 0 41 138 0 0 85 267 177 0 803 07:45 0 108 18 0 0 0 0 0 65 184 0 0 105 383 190 0 1053 Total 0 297 60 0 0 0 0 0 161 465 0 0 374 1134 599 0 3090 08:00 0 94 25 0 0 0 0 0 60 166 0 0 97 362 215 0 1019 08:15 0 105 19 0 0 0 0 0 60 169 0 0 110 355 195 0 1013 08:30 0 96 28 0 0 0 0 0 53 158 0 0 90 362 205 0 992 08:45 0 109 23 0 0 0 0 0 57 196 0 0 97 325 180 0 987 Total 0 404 95 0 0 0 0 0 230 689 0 0 394 1404 795 0 4011 16:00 0 139 39 1 0 0 0 0 59 159 0 0 113 217 134 0 861 16:15 0 155 31 0 0 0 0 0 52 171 0 0 103 189 97 0 798 16:30 0 159 49 0 0 0 0 0 61 133 0 0 102 191 98 0 793 16:45 0 154 27 1 0 0 0 0 49 159 0 0 133 233 118 0 874 Total 0 607 146 2 0 0 0 0 221 622 0 0 451 830 447 0 3326 17:00 0 169 28 0 0 0 0 0 68 177 0 0 121 235 121 0 919 17:15 0 220 46 1 0 0 0 0 63 166 0 0 104 167 114 0 881 17:30 0 169 46 0 0 0 0 0 67 147 0 0 87 189 77 0 782 17:45 0 149 29 1 0 0 0 0 60 118 0 0 107 193 87 0 744 Total 0 707 149 2 0 0 0 0 258 608 0 0 419 784 399 0 3326 18:00 0 123 22 0 0 0 0 0 46 158 0 0 104 119 71 0 643 18:15 0 121 36 0 0 0 0 0 40 115 0 0 99 128 79 0 618 Grand Total 0 2259 508 4 0 0 0 0 956 2657 0 0 1841 4399 2390 0 15014 Apprch %0 81.5 18.3 0.1 0 0 0 0 26.5 73.5 0 0 21.3 51 27.7 0 Total %0 15 3.4 0 0 0 0 0 6.4 17.7 0 0 12.3 29.3 15.9 0 Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-19 File Name : H2402003 Site Code : 00000000 Start Date : 2/8/2024 Page No : 2 City: NEWPORT BEACH N-S Direction: CAMPUS DR/IRVINE AVE E-W Direction: BRISTOL ST - SOUTH CAMPUS DRIVE Southbound BRISTOL ST - SOUTH Westbound IRVINE AVENUE Northbound BRISTOL ST - SOUTH Eastbound Start Time Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 07:45 0 108 18 0 126 0 0 0 0 0 65 184 0 0 249 105 383 190 0 678 1053 08:00 0 94 25 0 119 0 0 0 0 0 60 166 0 0 226 97 362 215 0 674 1019 08:15 0 105 19 0 124 0 0 0 0 0 60 169 0 0 229 110 355 195 0 660 1013 08:30 0 96 28 0 124 0 0 0 0 0 53 158 0 0 211 90 362 205 0 657 992 Total Volume 0 403 90 0 493 0 0 0 0 0 238 677 0 0 915 402 1462 805 0 2669 4077 % App. Total 0 81.7 18.3 0 0 0 0 0 26 74 0 0 15.1 54.8 30.2 0 PHF .000 .933 .804 .000 .978 .000 .000 .000 .000 .000 .915 .920 .000 .000 .919 .914 .954 .936 .000 .984 .968 CAMPUS DRIVE B R I S T O L S T - S O U T H B R I S T O L S T - S O U T H IRVINE AVENUE Right 0 Thru 403 Left 90 U Turns 0 InOut Total 1482 493 1975 Rig h t 0 Th r u 0 Le f t 0 U Tu r n s 0 Ou t To t a l In 17 9 0 0 17 9 0 Left 0 Thru 677 Right 238 U Turns 0 Out TotalIn 805 915 1720 Le f t 80 5 Th r u 14 6 2 Ri g h t 40 2 U Tu r n s 0 To t a l Ou t In 0 26 6 9 26 6 9 Peak Hour Begins at 07:45 Turning Movement Count Peak Hour Data North Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-20 File Name : H2402003 Site Code : 00000000 Start Date : 2/8/2024 Page No : 3 City: NEWPORT BEACH N-S Direction: CAMPUS DR/IRVINE AVE E-W Direction: BRISTOL ST - SOUTH CAMPUS DRIVE Southbound BRISTOL ST - SOUTH Westbound IRVINE AVENUE Northbound BRISTOL ST - SOUTH Eastbound Start Time Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Int. Total Peak Hour Analysis From 16:00 to 18:15 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:30 16:30 0 159 49 0 208 0 0 0 0 0 61 133 0 0 194 102 191 98 0 391 793 16:45 0 154 27 1 182 0 0 0 0 0 49 159 0 0 208 133 233 118 0 484 874 17:00 0 169 28 0 197 0 0 0 0 0 68 177 0 0 245 121 235 121 0 477 919 17:15 0 220 46 1 267 0 0 0 0 0 63 166 0 0 229 104 167 114 0 385 881 Total Volume 0 702 150 2 854 0 0 0 0 0 241 635 0 0 876 460 826 451 0 1737 3467 % App. Total 0 82.2 17.6 0.2 0 0 0 0 27.5 72.5 0 0 26.5 47.6 26 0 PHF .000 .798 .765 .500 .800 .000 .000 .000 .000 .000 .886 .897 .000 .000 .894 .865 .879 .932 .000 .897 .943 CAMPUS DRIVE B R I S T O L S T - S O U T H B R I S T O L S T - S O U T H IRVINE AVENUE Right 0 Thru 702 Left 150 U Turns 2 InOut Total 1086 854 1940 Rig h t 0 Th r u 0 Le f t 0 U Tu r n s 0 Ou t To t a l In 12 1 7 0 12 1 7 Left 0 Thru 635 Right 241 U Turns 0 Out TotalIn 1162 876 2038 Le f t 45 1 Th r u 82 6 Ri g h t 46 0 U Tu r n s 0 To t a l Ou t In 0 17 3 7 17 3 7 Peak Hour Begins at 16:30 Turning Movement Count Peak Hour Data North Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-21 File Name : H2402008 Site Code : 00000000 Start Date : 3/19/2024 Page No : 1 City of Newport Beach N-S Direction: Birch St E-W Direction: Bristol St North Groups Printed- Turning Movements Birch St Southbound Bristol St North Westbound Birch St Northbound Bristol St North Eastbound Start Time Right Thru Left U Turn Right Thru Left U Turn Right Thru Left U Turn Right Thru Left U Turn Int. Total 07:00 9 14 0 0 6 107 30 0 0 78 9 0 0 0 0 0 253 07:15 13 10 0 0 10 142 61 0 0 90 17 0 0 0 0 0 343 07:30 16 19 0 0 21 257 51 0 0 105 13 0 0 0 0 0 482 07:45 17 34 0 0 24 271 74 0 0 168 23 0 0 0 0 0 611 Total 55 77 0 0 61 777 216 0 0 441 62 0 0 0 0 0 1689 08:00 21 34 0 0 39 246 74 0 0 167 30 0 0 0 0 0 611 08:15 33 29 0 0 65 257 101 0 0 172 13 0 0 0 0 0 670 08:30 15 30 0 0 67 300 93 0 0 176 28 0 0 0 0 0 709 08:45 36 35 0 0 57 311 110 0 0 190 23 0 0 0 0 0 762 Total 105 128 0 0 228 1114 378 0 0 705 94 0 0 0 0 0 2752 16:00 112 60 0 0 34 362 66 0 0 79 44 0 0 0 0 0 757 16:15 105 69 0 0 33 327 78 0 0 82 28 0 0 0 0 0 722 16:30 113 73 0 0 43 379 99 0 0 63 48 0 0 0 0 0 818 16:45 101 77 0 0 30 389 85 0 0 59 35 0 0 0 0 0 776 Total 431 279 0 0 140 1457 328 0 0 283 155 0 0 0 0 0 3073 17:00 171 94 0 0 19 332 97 0 0 79 45 0 0 0 0 0 837 17:15 142 86 0 0 36 267 138 0 0 75 33 0 0 0 0 0 777 17:30 106 71 0 0 25 380 95 0 0 55 28 0 0 0 0 0 760 17:45 102 50 0 0 23 336 82 0 0 70 31 0 0 0 0 0 694 Total 521 301 0 0 103 1315 412 0 0 279 137 0 0 0 0 0 3068 18:00 90 55 0 0 13 299 73 0 0 49 38 0 0 0 0 0 617 18:15 81 42 0 0 25 291 56 0 0 45 25 0 0 0 0 0 565 Grand Total 1283 882 0 0 570 5253 1463 0 0 1802 511 0 0 0 0 0 11764 Apprch %59.3 40.7 0 0 7.8 72.1 20.1 0 0 77.9 22.1 0 0 0 0 0 Total %10.9 7.5 0 0 4.8 44.7 12.4 0 0 15.3 4.3 0 0 0 0 0 Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-22 File Name : H2402008 Site Code : 00000000 Start Date : 3/19/2024 Page No : 2 City of Newport Beach N-S Direction: Birch St E-W Direction: Bristol St North Birch St Southbound Bristol St North Westbound Birch St Northbound Bristol St North Eastbound Start Time Right Thru Left U Turn App. Total Right Thru Left U Turn App. Total Right Thru Left U Turn App. Total Right Thru Left U Turn App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 08:00 21 34 0 0 55 39 246 74 0 359 0 167 30 0 197 0 0 0 0 0 611 08:15 33 29 0 0 62 65 257 101 0 423 0 172 13 0 185 0 0 0 0 0 670 08:30 15 30 0 0 45 67 300 93 0 460 0 176 28 0 204 0 0 0 0 0 709 08:45 36 35 0 0 71 57 311 110 0 478 0 190 23 0 213 0 0 0 0 0 762 Total Volume 105 128 0 0 233 228 1114 378 0 1720 0 705 94 0 799 0 0 0 0 0 2752 % App. Total 45.1 54.9 0 0 13.3 64.8 22 0 0 88.2 11.8 0 0 0 0 0 PHF .729 .914 .000 .000 .820 .851 .895 .859 .000 .900 .000 .928 .783 .000 .938 .000 .000 .000 .000 .000 .903 Birch St B r i s t o l S t N o r t h B r i s t o l S t N o r t h Birch St Right 105 Thru 128 Left 0 U Turn 0 InOut Total 933 233 1166 Rig h t 22 8 Th r u 11 1 4 Le f t 37 8 UTu r n 0 Ou t To t a l In 0 17 2 0 17 2 0 Left 94 Thru 705 Right 0 U Turn 0 Out TotalIn 506 799 1305 Le f t 0 Th r u 0 Ri g h t 0 U Tu r n 0 To t a l Ou t In 13 1 3 0 13 1 3 Peak Hour Begins at 08:00 Turning Movements Peak Hour Data North Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-23 File Name : H2402008 Site Code : 00000000 Start Date : 3/19/2024 Page No : 3 City of Newport Beach N-S Direction: Birch St E-W Direction: Bristol St North Birch St Southbound Bristol St North Westbound Birch St Northbound Bristol St North Eastbound Start Time Right Thru Left U Turn App. Total Right Thru Left U Turn App. Total Right Thru Left U Turn App. Total Right Thru Left U Turn App. Total Int. Total Peak Hour Analysis From 16:00 to 18:15 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:30 16:30 113 73 0 0 186 43 379 99 0 521 0 63 48 0 111 0 0 0 0 0 818 16:45 101 77 0 0 178 30 389 85 0 504 0 59 35 0 94 0 0 0 0 0 776 17:00 171 94 0 0 265 19 332 97 0 448 0 79 45 0 124 0 0 0 0 0 837 17:15 142 86 0 0 228 36 267 138 0 441 0 75 33 0 108 0 0 0 0 0 777 Total Volume 527 330 0 0 857 128 1367 419 0 1914 0 276 161 0 437 0 0 0 0 0 3208 % App. Total 61.5 38.5 0 0 6.7 71.4 21.9 0 0 63.2 36.8 0 0 0 0 0 PHF .770 .878 .000 .000 .808 .744 .879 .759 .000 .918 .000 .873 .839 .000 .881 .000 .000 .000 .000 .000 .958 Birch St B r i s t o l S t N o r t h B r i s t o l S t N o r t h Birch St Right 527 Thru 330 Left 0 U Turn 0 InOut Total 404 857 1261 Ri g h t 12 8 Th r u 13 6 7 Le f t 41 9 UTu r n 0 Ou t To t a l In 0 19 1 4 19 1 4 Left 161 Thru 276 Right 0 U Turn 0 Out TotalIn 749 437 1186 Le f t 0 Th r u 0 Rig h t 0 U Tu r n 0 To t a l Ou t In 20 5 5 0 20 5 5 Peak Hour Begins at 16:30 Turning Movements Peak Hour Data North Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-24 File Name : H2402004 Site Code : 00000000 Start Date : 2/8/2024 Page No : 1 City: NEWPORT BEACH N-S Direction: BIRCH STREET E-W Direction: BRISTOL ST-SOUTH Groups Printed- Turning Movement Count BIRCH STREET Southbound BRISTOL ST-SOUTH Westbound BIRCH STREET Northbound BRISTOL ST- SOUTH Eastbound Start Time Right Thru Left U Turns Right Thru Left U Turns Right Thru Left U Turns Right Thru Left U Turns Int. Total 07:00 0 37 13 0 0 0 0 0 18 24 0 0 30 162 68 0 352 07:15 0 36 16 0 0 0 0 0 35 26 0 0 43 183 80 0 419 07:30 0 76 15 0 0 0 0 0 72 41 0 0 32 225 90 0 551 07:45 0 68 24 0 0 0 0 0 76 54 0 0 44 270 146 0 682 Total 0 217 68 0 0 0 0 0 201 145 0 0 149 840 384 0 2004 08:00 0 101 39 0 0 0 0 0 53 60 0 0 69 267 139 0 728 08:15 0 94 35 0 0 0 0 0 50 58 0 0 52 238 155 0 682 08:30 0 101 46 0 0 0 0 0 50 63 0 0 53 260 125 0 698 08:45 0 96 50 0 0 0 0 0 66 69 0 0 34 223 132 0 670 Total 0 392 170 0 0 0 0 0 219 250 0 0 208 988 551 0 2778 16:00 0 80 50 0 0 0 0 0 65 67 0 0 26 219 57 0 564 16:15 0 117 58 0 0 0 0 0 59 62 0 0 28 202 63 0 589 16:30 0 112 53 0 0 0 0 0 74 61 0 0 20 217 63 0 600 16:45 0 100 41 0 0 0 0 0 74 49 0 0 29 208 71 0 572 Total 0 409 202 0 0 0 0 0 272 239 0 0 103 846 254 0 2325 17:00 0 131 36 0 0 0 0 0 67 67 0 0 28 267 56 0 652 17:15 0 154 30 0 0 0 0 0 49 54 0 0 25 212 45 0 569 17:30 0 130 54 0 0 0 0 0 51 60 0 0 25 228 40 0 588 17:45 0 90 34 0 0 0 0 0 44 53 0 0 20 212 46 0 499 Total 0 505 154 0 0 0 0 0 211 234 0 0 98 919 187 0 2308 18:00 0 91 46 0 0 0 0 0 46 41 0 0 24 156 24 0 428 18:15 0 56 30 0 0 0 0 0 20 25 0 0 19 167 32 0 349 Grand Total 0 1670 670 0 0 0 0 0 969 934 0 0 601 3916 1432 0 10192 Apprch %0 71.4 28.6 0 0 0 0 0 50.9 49.1 0 0 10.1 65.8 24.1 0 Total %0 16.4 6.6 0 0 0 0 0 9.5 9.2 0 0 5.9 38.4 14.1 0 Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-25 File Name : H2402004 Site Code : 00000000 Start Date : 2/8/2024 Page No : 2 City: NEWPORT BEACH N-S Direction: BIRCH STREET E-W Direction: BRISTOL ST-SOUTH BIRCH STREET Southbound BRISTOL ST-SOUTH Westbound BIRCH STREET Northbound BRISTOL ST- SOUTH Eastbound Start Time Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 07:45 0 68 24 0 92 0 0 0 0 0 76 54 0 0 130 44 270 146 0 460 682 08:00 0 101 39 0 140 0 0 0 0 0 53 60 0 0 113 69 267 139 0 475 728 08:15 0 94 35 0 129 0 0 0 0 0 50 58 0 0 108 52 238 155 0 445 682 08:30 0 101 46 0 147 0 0 0 0 0 50 63 0 0 113 53 260 125 0 438 698 Total Volume 0 364 144 0 508 0 0 0 0 0 229 235 0 0 464 218 1035 565 0 1818 2790 % App. Total 0 71.7 28.3 0 0 0 0 0 49.4 50.6 0 0 12 56.9 31.1 0 PHF .000 .901 .783 .000 .864 .000 .000 .000 .000 .000 .753 .933 .000 .000 .892 .790 .958 .911 .000 .957 .958 BIRCH STREET B R I S T O L S T - S O U T H B R I S T O L S T - S O U T H BIRCH STREET Right 0 Thru 364 Left 144 U Turns 0 InOut Total 800 508 1308 Rig h t 0 Th r u 0 Le f t 0 U Tu r n s 0 Ou t To t a l In 14 0 8 0 14 0 8 Left 0 Thru 235 Right 229 U Turns 0 Out TotalIn 582 464 1046 Le f t 56 5 Th r u 10 3 5 Ri g h t 21 8 U Tu r n s 0 To t a l Ou t In 0 18 1 8 18 1 8 Peak Hour Begins at 07:45 Turning Movement Count Peak Hour Data North Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-26 File Name : H2402004 Site Code : 00000000 Start Date : 2/8/2024 Page No : 3 City: NEWPORT BEACH N-S Direction: BIRCH STREET E-W Direction: BRISTOL ST-SOUTH BIRCH STREET Southbound BRISTOL ST-SOUTH Westbound BIRCH STREET Northbound BRISTOL ST- SOUTH Eastbound Start Time Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Int. Total Peak Hour Analysis From 16:00 to 18:15 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:15 16:15 0 117 58 0 175 0 0 0 0 0 59 62 0 0 121 28 202 63 0 293 589 16:30 0 112 53 0 165 0 0 0 0 0 74 61 0 0 135 20 217 63 0 300 600 16:45 0 100 41 0 141 0 0 0 0 0 74 49 0 0 123 29 208 71 0 308 572 17:00 0 131 36 0 167 0 0 0 0 0 67 67 0 0 134 28 267 56 0 351 652 Total Volume 0 460 188 0 648 0 0 0 0 0 274 239 0 0 513 105 894 253 0 1252 2413 % App. Total 0 71 29 0 0 0 0 0 53.4 46.6 0 0 8.4 71.4 20.2 0 PHF .000 .878 .810 .000 .926 .000 .000 .000 .000 .000 .926 .892 .000 .000 .950 .905 .837 .891 .000 .892 .925 BIRCH STREET B R I S T O L S T - S O U T H B R I S T O L S T - S O U T H BIRCH STREET Right 0 Thru 460 Left 188 U Turns 0 InOut Total 492 648 1140 Ri g h t 0 Th r u 0 Le f t 0 U Tu r n s 0 Ou t To t a l In 13 5 6 0 13 5 6 Left 0 Thru 239 Right 274 U Turns 0 Out TotalIn 565 513 1078 Le f t 25 3 Th r u89 4 Rig h t 10 5 U Tu r n s 0 To t a l Ou t In 0 12 5 2 12 5 2 Peak Hour Begins at 16:15 Turning Movement Count Peak Hour Data North Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-27 File Name : H2402009 Site Code : 00000000 Start Date : 2/8/2024 Page No : 1 City: NEWPORT BEACH N-S Direction: JAMBOREE ROAD E-W Direction: BRISTOL ST- NORTH Groups Printed- Turning Movement Count JAMBOREE ROAD Southbound SR-73 NB ON RAMP Westbound JAMBOREE ROAD Northbound BRISTOL STREET Eastbound Start Time Right Thru Left U Turns Right Thru Left U Turns Right Thru Left U Turns Right Thru Left U Turns Int. Total 07:00 54 113 0 0 0 0 0 0 114 183 62 0 0 0 0 0 526 07:15 50 113 0 0 0 0 0 0 131 219 92 0 0 0 0 0 605 07:30 82 174 0 0 0 0 0 0 168 276 112 0 0 0 0 0 812 07:45 89 205 0 0 0 0 0 0 147 299 106 0 0 0 0 0 846 Total 275 605 0 0 0 0 0 0 560 977 372 0 0 0 0 0 2789 08:00 97 176 0 0 0 0 0 0 134 329 139 0 0 0 0 0 875 08:15 108 173 0 0 0 0 0 0 155 359 138 0 0 0 0 0 933 08:30 96 167 0 0 0 0 0 0 137 368 143 0 0 0 0 0 911 08:45 115 171 0 0 0 0 0 0 125 354 165 0 0 0 0 0 930 Total 416 687 0 0 0 0 0 0 551 1410 585 0 0 0 0 0 3649 16:00 139 124 0 0 0 0 0 0 224 347 150 0 0 0 0 0 984 16:15 137 130 0 0 0 0 0 0 256 416 170 0 0 0 0 0 1109 16:30 147 166 0 0 0 0 0 0 241 390 153 0 0 0 0 0 1097 16:45 167 154 0 0 0 0 0 0 203 372 136 0 0 0 0 0 1032 Total 590 574 0 0 0 0 0 0 924 1525 609 0 0 0 0 0 4222 17:00 189 195 0 0 0 0 0 0 234 360 158 0 0 0 0 0 1136 17:15 133 192 0 0 0 0 0 0 240 327 134 1 0 0 0 0 1027 17:30 119 180 0 0 0 0 0 0 175 311 111 0 0 0 0 0 896 17:45 134 148 0 0 0 0 0 0 206 330 122 0 0 0 0 0 940 Total 575 715 0 0 0 0 0 0 855 1328 525 1 0 0 0 0 3999 18:00 130 116 0 0 0 0 0 0 195 279 103 0 0 0 0 0 823 18:15 111 115 0 0 0 0 0 0 181 270 117 0 0 0 0 0 794 Grand Total 2097 2812 0 0 0 0 0 0 3266 5789 2311 1 0 0 0 0 16276 Apprch %42.7 57.3 0 0 0 0 0 0 28.7 50.9 20.3 0 0 0 0 0 Total %12.9 17.3 0 0 0 0 0 0 20.1 35.6 14.2 0 0 0 0 0 Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-28 File Name : H2402009 Site Code : 00000000 Start Date : 2/8/2024 Page No : 2 City: NEWPORT BEACH N-S Direction: JAMBOREE ROAD E-W Direction: BRISTOL ST- NORTH JAMBOREE ROAD Southbound SR-73 NB ON RAMP Westbound JAMBOREE ROAD Northbound BRISTOL STREET Eastbound Start Time Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 08:00 97 176 0 0 273 0 0 0 0 0 134 329 139 0 602 0 0 0 0 0 875 08:15 108 173 0 0 281 0 0 0 0 0 155 359 138 0 652 0 0 0 0 0 933 08:30 96 167 0 0 263 0 0 0 0 0 137 368 143 0 648 0 0 0 0 0 911 08:45 115 171 0 0 286 0 0 0 0 0 125 354 165 0 644 0 0 0 0 0 930 Total Volume 416 687 0 0 1103 0 0 0 0 0 551 1410 585 0 2546 0 0 0 0 0 3649 % App. Total 37.7 62.3 0 0 0 0 0 0 21.6 55.4 23 0 0 0 0 0 PHF .904 .976 .000 .000 .964 .000 .000 .000 .000 .000 .889 .958 .886 .000 .976 .000 .000 .000 .000 .000 .978 JAMBOREE ROAD B R I S T O L S T R E E T S R - 7 3 N B O N R A M P JAMBOREE ROAD Right 416 Thru 687 Left 0 U Turns 0 InOut Total 1410 1103 2513 Ri g h t 0 Th r u 0 Le f t 0 U Tu r n s 0 Ou t To t a l In 55 1 0 55 1 Left 585 Thru 1410 Right 551 U Turns 0 Out TotalIn 687 2546 3233 Le f t 0 Th r u 0 Rig h t 0 U Tu r n s 0 To t a l Ou t In 10 0 1 0 10 0 1 Peak Hour Begins at 08:00 Turning Movement Count Peak Hour Data North Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-29 File Name : H2402009 Site Code : 00000000 Start Date : 2/8/2024 Page No : 3 City: NEWPORT BEACH N-S Direction: JAMBOREE ROAD E-W Direction: BRISTOL ST- NORTH JAMBOREE ROAD Southbound SR-73 NB ON RAMP Westbound JAMBOREE ROAD Northbound BRISTOL STREET Eastbound Start Time Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Int. Total Peak Hour Analysis From 16:00 to 18:15 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:15 16:15 137 130 0 0 267 0 0 0 0 0 256 416 170 0 842 0 0 0 0 0 1109 16:30 147 166 0 0 313 0 0 0 0 0 241 390 153 0 784 0 0 0 0 0 1097 16:45 167 154 0 0 321 0 0 0 0 0 203 372 136 0 711 0 0 0 0 0 1032 17:00 189 195 0 0 384 0 0 0 0 0 234 360 158 0 752 0 0 0 0 0 1136 Total Volume 640 645 0 0 1285 0 0 0 0 0 934 1538 617 0 3089 0 0 0 0 0 4374 % App. Total 49.8 50.2 0 0 0 0 0 0 30.2 49.8 20 0 0 0 0 0 PHF .847 .827 .000 .000 .837 .000 .000 .000 .000 .000 .912 .924 .907 .000 .917 .000 .000 .000 .000 .000 .963 JAMBOREE ROAD B R I S T O L S T R E E T S R - 7 3 N B O N R A M P JAMBOREE ROAD Right 640 Thru 645 Left 0 U Turns 0 InOut Total 1538 1285 2823 Rig h t 0 Th r u 0 Le f t 0 U Tu r n s 0 Ou t To t a l In 93 4 0 93 4 Left 617 Thru 1538 Right 934 U Turns 0 Out TotalIn 645 3089 3734 Le f t 0 Th r u 0 Ri g h t 0 U Tu r n s 0 To t a l Ou t In 12 5 7 0 12 5 7 Peak Hour Begins at 16:15 Turning Movement Count Peak Hour Data North Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-30 File Name : H2402006 Site Code : 00000000 Start Date : 2/8/2024 Page No : 1 City: NEWPORT BEACH N-S Direction: JAMBOREE ROAD E-W Direction: BRISTOL STREET-SOUTH Groups Printed- Turning Movement Count JAMBOREE ROAD Southbound SR-73 SB ON RAMP Westbound JAMBOREE ROAD Northbound BRISTOL ST-SOUTH Eastbound Start Time Right Thru Left U Turns Right Thru Left U Turns Right Thru Left U Turns Right Thru Left U Turns Int. Total 07:00 0 127 0 0 0 0 0 0 4 209 0 0 275 66 132 0 813 07:15 0 124 0 0 0 0 0 0 5 277 0 0 261 63 158 0 888 07:30 0 152 0 0 0 0 0 0 3 296 0 0 308 91 210 0 1060 07:45 0 203 0 0 0 0 0 0 7 301 0 0 355 99 228 0 1193 Total 0 606 0 0 0 0 0 0 19 1083 0 0 1199 319 728 0 3954 08:00 0 205 0 0 0 0 0 0 4 424 0 0 322 84 194 0 1233 08:15 0 154 0 0 0 0 0 0 4 349 0 0 306 94 189 0 1096 08:30 0 176 0 0 0 0 0 0 8 456 0 0 297 87 206 0 1230 08:45 0 176 0 0 0 0 0 0 13 378 0 0 286 91 191 0 1135 Total 0 711 0 0 0 0 0 0 29 1607 0 0 1211 356 780 0 4694 16:00 0 129 0 0 0 0 0 0 9 532 0 0 257 136 172 0 1235 16:15 0 144 0 0 0 0 0 0 20 504 0 0 208 129 169 0 1174 16:30 0 145 0 0 0 0 0 0 16 465 0 0 260 161 188 0 1235 16:45 0 167 0 0 0 0 0 0 20 567 0 0 218 134 165 0 1271 Total 0 585 0 0 0 0 0 0 65 2068 0 0 943 560 694 0 4915 17:00 0 191 0 0 0 0 0 0 15 489 0 0 215 142 216 0 1268 17:15 0 162 0 0 0 0 0 0 12 423 0 0 222 141 150 0 1110 17:30 0 193 0 0 0 0 0 0 14 458 0 0 260 127 164 0 1216 17:45 0 138 0 0 0 0 0 0 15 388 0 0 227 124 185 0 1077 Total 0 684 0 0 0 0 0 0 56 1758 0 0 924 534 715 0 4671 18:00 0 111 0 0 0 0 0 0 16 423 0 0 182 100 159 0 991 18:15 0 135 0 0 0 0 0 0 12 416 0 0 184 95 131 0 973 Grand Total 0 2832 0 0 0 0 0 0 197 7355 0 0 4643 1964 3207 0 20198 Apprch %0 100 0 0 0 0 0 0 2.6 97.4 0 0 47.3 20 32.7 0 Total %0 14 0 0 0 0 0 0 1 36.4 0 0 23 9.7 15.9 0 Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-31 File Name : H2402006 Site Code : 00000000 Start Date : 2/8/2024 Page No : 2 City: NEWPORT BEACH N-S Direction: JAMBOREE ROAD E-W Direction: BRISTOL STREET-SOUTH JAMBOREE ROAD Southbound SR-73 SB ON RAMP Westbound JAMBOREE ROAD Northbound BRISTOL ST-SOUTH Eastbound Start Time Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Int. Total Peak Hour Analysis From 07:00 to 11:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 07:45 0 203 0 0 203 0 0 0 0 0 7 301 0 0 308 355 99 228 0 682 1193 08:00 0 205 0 0 205 0 0 0 0 0 4 424 0 0 428 322 84 194 0 600 1233 08:15 0 154 0 0 154 0 0 0 0 0 4 349 0 0 353 306 94 189 0 589 1096 08:30 0 176 0 0 176 0 0 0 0 0 8 456 0 0 464 297 87 206 0 590 1230 Total Volume 0 738 0 0 738 0 0 0 0 0 23 1530 0 0 1553 1280 364 817 0 2461 4752 % App. Total 98.5 14.8 33.2 PHF .000 .900 .000 .000 .900 .000 .000 .000 .000 .000 .719 .839 .000 .000 .837 .901 .919 .896 .000 .902 .964 JAMBOREE ROAD B R I S T O L S T - S O U T H S R - 7 3 S B O N R A M P JAMBOREE ROAD Right 0 Thru 738 Left 0 U Turns 0 InOut Total 2347 738 3085 Rig h t 0 Th r u 0 Le f t 0 U Tu r n s 0 Ou t To t a l In 38 7 0 38 7 Left 0 Thru 1530 Right 23 U Turns 0 Out TotalIn 2018 1553 3571 Le f t 81 7 Th r u 36 4 Ri g h t 12 8 0 U Tu r n s 0 To t a l Ou t In 0 24 6 1 24 6 1 Peak Hour Begins at 07:45 Turning Movement Count Peak Hour Data North Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-32 File Name : H2402006 Site Code : 00000000 Start Date : 2/8/2024 Page No : 3 City: NEWPORT BEACH N-S Direction: JAMBOREE ROAD E-W Direction: BRISTOL STREET-SOUTH JAMBOREE ROAD Southbound SR-73 SB ON RAMP Westbound JAMBOREE ROAD Northbound BRISTOL ST-SOUTH Eastbound Start Time Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Int. Total Peak Hour Analysis From 12:00 to 18:15 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:15 16:15 0 144 0 0 144 0 0 0 0 0 20 504 0 0 524 208 129 169 0 506 1174 16:30 0 145 0 0 145 0 0 0 0 0 16 465 0 0 481 260 161 188 0 609 1235 16:45 0 167 0 0 167 0 0 0 0 0 20 567 0 0 587 218 134 165 0 517 1271 17:00 0 191 0 0 191 0 0 0 0 0 15 489 0 0 504 215 142 216 0 573 1268 Total Volume 0 647 0 0 647 0 0 0 0 0 71 2025 0 0 2096 901 566 738 0 2205 4948 % App. Total 0 100 0 0 0 0 0 0 3.4 96.6 0 0 40.9 25.7 33.5 0 PHF .000 .847 .000 .000 .847 .000 .000 .000 .000 .000 .888 .893 .000 .000 .893 .866 .879 .854 .000 .905 .973 JAMBOREE ROAD B R I S T O L S T - S O U T H S R - 7 3 S B O N R A M P JAMBOREE ROAD Right 0 Thru 647 Left 0 U Turns 0 InOut Total 2763 647 3410 Ri g h t 0 Th r u 0 Le f t 0 U Tu r n s 0 Ou t To t a l In 63 7 0 63 7 Left 0 Thru 2025 Right 71 U Turns 0 Out TotalIn 1548 2096 3644 Le f t 73 8 Th r u56 6 Rig h t 90 1 U Tu r n s 0 To t a l Ou t In 0 22 0 5 22 0 5 Peak Hour Begins at 16:15 Turning Movement Count Peak Hour Data North Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-33 T012524 DATE:LOCATION:PROJECT #:SC4778 Wed, Jul 10, 24 NORTH & SOUTH:LOCATION #:10 EAST & WEST:CONTROL:SIGNAL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTLLANES:0 X 0 X X X X 3 1 1 3 X 0 0 1 0 7:00 AM 5 0 7 0 0 0 0 79 4 8 106 0 209 0 0 1 0 17:15 AM 4 0 11 0 0 0 0 112 8 10 96 0 241 0 0 0 0 0 7:30 AM 2 0 6 0 0 0 0 156 7 13 127 0 311 0 0 0 0 07:45 AM 7 0 15 0 0 0 0 223 16 24 195 0 480 0 0 1 0 18:00 AM 6 0 6 0 0 0 0 188 8 19 197 0 424 0 0 0 0 0 8:15 AM 10 0 10 0 0 0 0 226 14 28 186 0 474 0 0 1 1 2 8:30 AM 10 0 4 0 0 0 0 218 11 19 155 0 417 0 0 0 0 08:45 AM 7 0 14 0 0 0 0 252 19 31 172 0 495 0 0 1 0 1VOLUMES5107300001,454 87 152 1,234 0 3,056 0 0 4 1 5 APPROACH %41%0%59%0%0%0%0%94%6%11%89%0%APP/DEPART 124 /0 0 /239 1,545 /1,528 1,387 /1,289 0BEGIN PEAK HR VOLUMES 33 0 34 0 0 0 0 884 52 97 710 0 1,813 0 0 2 1 APPROACH %49%0%51%0%0%0%0%94%6%12%88%0%PEAK HR FACTOR 0.798 0.000 0.862 0.935 0.914APP/DEPART 67 /0 0 /149 938 /919 808 /745 0 4:00 PM 16 0 40 0 0 0 0 198 3 7 272 0 536 0 0 1 1 24:15 PM 9 0 30 0 0 0 0 208 7 9 288 0 551 0 0 1 0 14:30 PM 17 0 42 0 0 0 0 191 4 7 271 0 532 0 0 4 0 4 4:45 PM 21 0 27 0 0 0 0 207 4 15 309 0 583 0 0 3 0 3 5:00 PM 13 0 70 0 0 0 0 202 4 7 279 0 575 0 0 4 0 45:15 PM 20 0 30 0 0 0 0 184 4 8 403 0 649 0 0 2 2 45:30 PM 18 0 37 0 0 0 0 170 1 6 351 0 583 0 0 4 1 5 5:45 PM 13 0 25 0 0 0 0 163 3 8 269 0 481 0 0 4 1 5 6:00 PM 7 0 39 0 0 0 0 142 7 7 301 0 503 0 0 7 0 76:15 PM 9 0 17 0 0 0 0 158 4 2 285 0 475 0 0 7 0 7VOLUMES143035700001,823 41 76 3,028 0 5,510 0 0 37 5 42 APPROACH %29%0%71%0%0%0%0%96%2%2%97%0%APP/DEPART 500 /0 0 /117 1,901 /2,185 3,109 /3,208 0BEGIN PEAK HR VOLUMES 72 0 164 0 0 0 0 763 13 36 1,342 0 2,406 0 0 13 3 APPROACH %31%0%69%0%0%0%0%97%2%3%97%0%PEAK HR FACTOR 0.711 0.000 0.922 0.836 0.921APP/DEPART 236 /0 0 /49 789 /930 1,381 /1,427 0 Orchard Dr NORTH LEG Irvine Ave WEST LEG EAST LEG Irvine Ave SOUTH LEG Orchard Dr INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com Newport Beach Orchard Dr Irvine Ave U-TURNS Orchard Dr Orchard Dr Irvine Ave Irvine Ave AM 8:00 AM PM 4:45 PM Apx-34 0 0 0 0 TOTAL 0 0 0 0 0 PM 0 0 0 0 0 AM 0 1, 3 8 7 3, 1 0 9 4, 4 9 6 4, 4 9 7 3, 2 0 8 1, 2 8 9 0 0 0 1, 2 3 4 3, 0 2 8 4, 2 6 2 TO T A L PM AM 15 2 76 22 8 0 0 0 AM PM TO T A L 3, 2 7 7 1, 8 2 3 1, 4 5 4 12 8 41 87 1, 5 2 8 2, 1 8 5 3, 7 1 3 3, 4 4 6 1, 9 0 1 1, 5 4 5 239 AM 51 0 73 124 117 PM 143 0 357 500 356 TOTAL 194 0 430 624 0 0 0 0 TOTAL 0 0 0 0 0 PM 0 0 0 0 0 AM 0 80 8 1, 3 8 1 2, 1 8 9 2, 1 7 2 1, 4 2 7 74 5 0 0 0 71 0 1, 3 4 2 2, 0 5 2 TO T A L PM AM AM 8:00 AM 9:45 AM 97 36 13 3 0 0 0 #N/A AM PM TO T A L 1, 6 4 7 76 3 88 4 PM 4:45 PM 6:45 PM 65 13 52 91 9 93 0 1, 8 4 9 1, 7 2 7 78 9 93 8 149 AM 33 0 34 67 49 PM 72 0 164 236 198 Total 105 0 198 303 AimTD LLC TURNING MOVEMENT COUNTS Orchard Dr Ir v i n e A v e Ir v i n e A v e ALL HOURS Newport Beach SC4778 Orchard Dr Orchard Dr Orchard Dr Ir v i n e A v e Ir v i n e A v e PEAK HOUR Apx-35 T012524 DATE:LOCATION:PROJECT #:SC4778 Wed, Jul 10, 24 NORTH & SOUTH:LOCATION #:11 EAST & WEST:CONTROL:SIGNAL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTLLANES:1 1 0 1 1 0 1 2 0 1 2 0 0 0 0 0 7:00 AM 0 9 8 2 2 1 0 38 4 4 35 3 106 0 0 0 0 07:15 AM 3 6 7 4 1 0 2 48 3 4 29 8 115 0 0 0 0 0 7:30 AM 1 2 7 4 1 1 1 60 3 6 45 14 145 0 0 0 0 07:45 AM 1 8 13 3 4 2 2 77 4 10 67 16 207 0 0 0 0 08:00 AM 3 10 13 1 2 1 0 81 3 12 66 16 208 0 0 0 0 0 8:15 AM 3 7 8 7 0 3 1 91 10 22 85 19 256 0 0 0 0 0 8:30 AM 4 5 21 10 1 1 0 101 14 10 53 12 232 0 0 0 0 08:45 AM 6 14 13 5 6 3 2 96 13 15 75 17 265 0 0 0 0 0VOLUMES216190361712859254834551051,534 0 0 0 0 0 APPROACH %12%35%52%55%26%18%1%91%8%13%71%16%APP/DEPART 172 /174 65 /154 654 /718 643 /488 0BEGIN PEAK HR VOLUMES 16 36 55 23 9 8 3 369 40 59 279 64 961 0 0 0 0 APPROACH %15%34%51%58%23%20%1%90%10%15%69%16%PEAK HR FACTOR 0.811 0.714 0.896 0.798 0.907APP/DEPART 107 /103 40 /108 412 /447 402 /303 0 4:00 PM 6 9 10 11 1 2 0 89 5 11 88 12 244 0 0 0 0 04:15 PM 3 10 8 8 2 1 0 73 4 13 104 12 238 0 0 0 0 04:30 PM 3 18 9 13 4 1 0 88 7 14 108 10 275 0 0 0 0 0 4:45 PM 5 14 18 5 1 4 1 80 7 10 128 14 287 0 0 0 0 0 5:00 PM 7 13 14 19 6 1 1 70 6 13 118 12 280 0 0 0 0 05:15 PM 7 18 10 7 3 1 2 55 5 20 171 20 319 0 0 0 0 05:30 PM 5 15 14 9 1 0 0 55 2 15 167 15 298 0 0 0 0 0 5:45 PM 8 11 10 7 2 1 0 46 4 12 121 11 233 0 0 0 0 0 6:00 PM 7 7 8 12 4 1 2 44 4 13 82 6 190 0 0 0 0 06:15 PM 3 6 8 7 2 3 1 42 2 13 64 5 156 0 0 0 0 0VOLUMES541211099826157642461341,151 117 2,520 0 0 0 0 0 APPROACH %19%43%38%71%19%11%1%92%7%10%82%8%APP/DEPART 284 /245 139 /206 695 /849 1,402 /1,220 0BEGIN PEAK HR VOLUMES 24 60 56 40 11 6 4 260 20 58 584 61 1,184 0 0 0 0 APPROACH %17%43%40%70%19%11%1%92%7%8%83%9%PEAK HR FACTOR 0.946 0.548 0.807 0.833 0.928APP/DEPART 140 /125 57 /89 284 /356 703 /614 0 Orchard Dr NORTH LEG SW Birch St WEST LEG EAST LEG SW Birch St SOUTH LEG Orchard Dr INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com Newport Beach Orchard Dr SW Birch St U-TURNS Orchard Dr Orchard Dr SW Birch St SW Birch St AM 8:00 AM PM 4:45 PM Apx-36 204 27 43 134 TOTAL 419 139 15 26 98 PM 245 65 12 17 36 AM 174 64 3 1, 4 0 2 2, 0 4 5 1, 7 0 8 1, 2 2 0 48 8 10 5 11 7 22 2 45 5 1, 1 5 1 1, 6 0 6 TO T A L PM AM 83 13 4 21 7 15 7 8 AM PM TO T A L 1, 2 3 4 64 2 59 2 10 0 46 54 71 8 84 9 1, 5 6 7 1, 3 4 9 69 5 65 4 154 AM 21 61 90 172 206 PM 54 121 109 284 360 TOTAL 75 182 199 456 97 14 20 63 TOTAL 228 57 6 11 40 PM 125 40 8 9 23 AM 103 40 2 70 3 1, 1 0 5 91 7 61 4 30 3 64 61 12 5 27 9 58 4 86 3 TO T A L PM AM AM 8:00 AM 9:45 AM 59 58 11 7 7 4 3 #N/A AM PM TO T A L 62 9 26 0 36 9 PM 4:45 PM 6:45 PM 60 20 40 44 7 35 6 80 3 69 6 28 4 41 2 108 AM 16 36 55 107 89 PM 24 60 56 140 197 Total 40 96 111 247 AimTD LLC TURNING MOVEMENT COUNTS Orchard Dr SW B i r c h S t SW B i r c h S t ALL HOURS Newport Beach SC4778 Orchard Dr Orchard Dr Orchard Dr SW B i r c h S t SW B i r c h S t PEAK HOUR Apx-37 T012524 DATE:LOCATION:PROJECT #:SC4778 Wed, Jul 10, 24 NORTH & SOUTH:LOCATION #:12b EAST & WEST:CONTROL:SIGNAL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTLLANES:0 1 0 0 1 0 1 2 0 1 2 0 0 0 0 0 7:00 AM 2 0 0 1 0 0 2 44 1 1 9 4 64 0 0 0 0 07:15 AM 1 0 1 0 0 1 4 52 2 3 7 4 75 0 0 0 0 0 7:30 AM 1 0 2 2 0 0 4 67 7 0 14 4 101 0 0 0 0 07:45 AM 7 0 2 0 0 0 0 92 2 2 24 6 135 0 0 0 0 08:00 AM 10 0 1 0 0 1 1 93 5 0 23 9 143 0 0 0 0 0 8:15 AM 5 0 2 0 0 1 2 99 10 2 32 4 157 0 0 0 0 0 8:30 AM 6 0 2 2 0 0 0 119 10 3 31 1 174 0 0 0 0 08:45 AM 15 0 2 1 0 0 2 113 8 3 37 3 184 0 0 0 0 0VOLUMES47012603156794514177351,033 0 0 0 0 0 APPROACH %80%0%20%67%0%33%2%92%6%6%78%15%APP/DEPART 59 /50 9 /59 739 /697 226 /227 0BEGIN PEAK HR VOLUMES 36 0 7 3 0 2 5 424 33 8 123 17 658 0 0 0 0 APPROACH %84%0%16%60%0%40%1%92%7%5%83%11%PEAK HR FACTOR 0.632 0.625 0.895 0.860 0.894APP/DEPART 43 /22 5 /41 462 /434 148 /161 0 4:00 PM 9 0 5 0 0 2 0 40 4 4 98 2 164 0 0 0 0 04:15 PM 11 0 3 1 0 2 0 45 9 2 105 1 179 0 0 0 0 04:30 PM 8 0 2 4 0 2 1 47 5 2 107 1 179 0 0 0 1 1 4:45 PM 6 0 2 4 0 1 0 45 16 4 124 2 204 0 0 0 0 0 5:00 PM 5 0 2 2 0 2 0 34 5 4 142 1 197 0 0 0 0 05:15 PM 11 0 1 3 0 1 0 45 16 4 174 1 256 0 0 0 0 05:30 PM 8 0 1 0 0 1 0 32 11 3 164 1 221 0 0 0 0 0 5:45 PM 7 0 1 0 0 1 0 35 5 2 130 0 181 0 0 0 0 0 6:00 PM 5 0 4 1 0 0 0 27 9 2 91 0 139 0 0 0 0 06:15 PM 6 0 4 1 0 0 0 18 3 2 70 0 104 0 0 0 0 0VOLUMES7602516012136883291,205 9 1,825 0 0 0 1 1 APPROACH %75%0%25%57%0%43%0%81%18%2%97%1%APP/DEPART 101 /10 28 /112 452 /410 1,244 /1,293 0BEGIN PEAK HR VOLUMES 30 0 6 9 0 5 0 156 48 15 604 5 878 0 0 0 0 APPROACH %83%0%17%64%0%36%0%76%24%2%97%1%PEAK HR FACTOR 0.750 0.700 0.836 0.872 0.857APP/DEPART 36 /5 14 /63 204 /171 624 /639 0 Driveway NORTH LEG Mesa Dr WEST LEG EAST LEG SW Birch St SOUTH LEG Mesa Dr AM 8:00 AM PM 4:45 PM U-TURNS Mesa Dr Driveway Mesa Dr SW Birch St INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com Newport Beach Mesa Dr SW Birch St Apx-38 37 15 0 22 TOTAL 60 28 12 0 16 PM 10 9 3 0 6 AM 50 22 6 1, 2 4 4 1, 4 7 0 1, 5 2 0 1, 2 9 3 22 7 35 9 44 17 7 1, 2 0 5 1, 3 8 2 TO T A L PM AM 14 29 43 16 1 15 AM PM TO T A L 1, 0 4 7 36 8 67 9 12 8 83 45 69 7 41 0 1, 1 0 7 1, 1 9 1 45 2 73 9 59 AM 47 0 12 59 112 PM 76 0 25 101 171 TOTAL 123 0 37 160 19 7 0 12 TOTAL 27 14 5 0 9 PM 5 5 2 0 3 AM 22 14 8 62 4 77 2 80 0 63 9 16 1 17 5 22 12 3 60 4 72 7 TO T A L PM AM AM 8:00 AM 9:45 AM 8 15 23 5 0 5 #N/A AM PM TO T A L 58 0 15 6 42 4 PM 4:45 PM 6:45 PM 81 48 33 43 4 17 1 60 5 66 6 20 4 46 2 41 AM 36 0 7 43 63 PM 30 0 6 36 104 Total 66 0 13 79 Mesa Dr Mesa Dr Driveway Me s a D r SW B i r c h S t PEAK HOUR AimTD LLC TURNING MOVEMENT COUNTS Driveway Me s a D r SW B i r c h S t ALL HOURS Newport Beach SC4778 Apx-39 T012524 DATE:LOCATION:PROJECT #:SC4778 Wed, Jul 10, 24 NORTH & SOUTH:LOCATION #:12a EAST & WEST:CONTROL:SIGNAL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTLLANES:X X X 1 X 1 1 2 X X 2 0 0 0 0 0 7:00 AM 0 0 0 1 0 0 3 46 0 0 11 0 61 0 0 0 0 07:15 AM 0 0 0 1 0 0 1 57 0 0 8 1 68 0 0 0 0 0 7:30 AM 0 0 0 0 0 1 2 78 0 0 13 1 95 0 0 0 0 07:45 AM 0 0 0 0 0 1 2 95 0 0 28 3 129 0 0 0 0 08:00 AM 0 0 0 1 0 0 5 98 0 0 34 0 138 0 0 0 0 0 8:15 AM 0 0 0 0 0 3 9 111 0 0 36 2 161 0 0 0 0 0 8:30 AM 0 0 0 0 0 3 12 129 0 0 35 1 180 0 0 0 0 08:45 AM 0 0 0 1 0 0 11 123 0 0 50 2 187 0 0 0 0 0VOLUMES0004084573700215101,019 0 0 0 0 0 APPROACH %0%0%0%33%0%67%6%94%0%0%96%4%APP/DEPART 0 /55 12 /0 782 /741 225 /223 0BEGIN PEAK HR VOLUMES 0 0 0 2 0 6 37 461 0 0 155 5 666 0 0 0 0 APPROACH %0%0%0%25%0%75%7%93%0%0%97%3%PEAK HR FACTOR 0.000 0.667 0.883 0.769 0.890APP/DEPART 0 /42 8 /0 498 /463 160 /161 0 4:00 PM 0 0 0 2 0 8 1 42 0 0 109 0 162 0 0 0 0 04:15 PM 0 0 0 1 0 9 0 53 0 0 116 2 181 0 0 0 0 04:30 PM 0 0 0 1 0 8 0 54 0 0 115 1 179 0 0 0 0 0 4:45 PM 0 0 0 2 0 5 2 59 0 0 131 0 199 0 0 0 0 0 5:00 PM 0 0 0 2 0 16 1 37 0 0 149 0 205 0 0 0 0 05:15 PM 0 0 0 3 0 6 0 58 0 0 184 2 253 0 0 0 0 05:30 PM 0 0 0 1 0 2 1 42 0 0 171 2 219 0 0 0 0 0 5:45 PM 0 0 0 1 0 7 3 39 0 0 136 1 187 0 0 0 0 0 6:00 PM 0 0 0 1 0 7 1 36 0 0 95 1 141 0 0 0 0 06:15 PM 0 0 0 1 0 4 0 20 0 0 75 1 101 0 0 1 0 1VOLUMES000150729440001,281 10 1,828 0 0 1 0 1 APPROACH %0%0%0%17%0%83%2%98%0%0%99%1%APP/DEPART 0 /19 87 /0 450 /455 1,291 /1,354 0BEGIN PEAK HR VOLUMES 0 0 0 8 0 29 4 196 0 0 635 4 876 0 0 0 0 APPROACH %0%0%0%22%0%78%2%98%0%0%99%1%PEAK HR FACTOR 0.000 0.514 0.820 0.859 0.866APP/DEPART 0 /8 37 /0 200 /204 639 /664 0 SW Acacia St NORTH LEG Mesa Dr WEST LEG EAST LEG Mesa Dr SOUTH LEG SW Acacia St INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com Newport Beach SW Acacia St Mesa Dr U-TURNS SW Acacia St SW Acacia St Mesa Dr Mesa Dr AM 8:00 AM PM 4:45 PM Apx-40 99 80 0 19 TOTAL 74 87 72 0 15 PM 19 12 8 0 4 AM 55 22 5 1, 2 9 1 1, 5 1 6 1, 5 7 7 1, 3 5 4 22 3 10 10 20 21 5 1, 2 8 1 1, 4 9 6 TO T A L PM AM 0 0 0 54 9 45 AM PM TO T A L 1, 1 7 7 44 0 73 7 0 0 0 74 1 45 5 1, 1 9 6 1, 2 3 2 45 0 78 2 0 AM 0 0 0 0 0 PM 0 0 0 0 0 TOTAL 0 0 0 0 45 35 0 10 TOTAL 50 37 29 0 8 PM 8 8 6 0 2 AM 42 16 0 63 9 79 9 82 5 66 4 16 1 5 4 9 15 5 63 5 79 0 TO T A L PM AM AM 8:00 AM 9:45 AM 0 0 0 41 4 37 #N/A AM PM TO T A L 65 7 19 6 46 1 PM 4:45 PM 6:45 PM 0 0 0 46 3 20 4 66 7 69 8 20 0 49 8 0 AM 0 0 0 0 0 PM 0 0 0 0 0 Total 0 0 0 0 AimTD LLC TURNING MOVEMENT COUNTS SW Acacia St Me s a D r Me s a D r ALL HOURS Newport Beach SC4778 SW Acacia St SW Acacia St SW Acacia St Me s a D r Me s a D r PEAK HOUR Apx-41 File Name : H2402021 Site Code : 00000000 Start Date : 2/13/2024 Page No : 1 City: NEWPORT BEACH N-S Direction: IRVINE AVENUE E-W Direction: MESA DRIVE Groups Printed- Turning Movement Count IRVINE AVENUE Southbound MESA DRIVE Westbound IRVINE AVENUE Northbound MESA DRIVE Eastbound Start Time Right Thru Left U Turns Right Thru Left U Turns Right Thru Left U Turns Right Thru Left U Turns Int. Total 07:00 3 103 1 0 0 0 8 0 24 81 5 0 16 17 16 0 274 07:15 8 96 1 0 0 4 12 0 38 169 10 0 25 17 15 0 395 07:30 10 117 0 1 1 4 16 0 52 189 13 0 28 38 24 0 493 07:45 11 186 0 0 1 3 27 0 74 216 16 0 54 55 29 0 672 Total 32 502 2 1 2 11 63 0 188 655 44 0 123 127 84 0 1834 08:00 8 166 1 0 1 6 29 0 68 223 22 0 64 70 33 0 691 08:15 10 161 1 2 3 7 39 0 68 230 28 0 33 48 25 0 655 08:30 14 137 3 0 2 6 30 0 70 251 19 0 31 53 15 0 631 08:45 13 138 1 1 2 7 21 0 58 203 15 0 26 46 28 0 559 Total 45 602 6 3 8 26 119 0 264 907 84 0 154 217 101 0 2536 16:00 34 226 0 1 5 22 73 0 49 181 14 0 33 13 8 0 659 16:15 22 217 1 0 4 43 71 0 38 180 10 0 36 13 7 0 642 16:30 34 216 1 1 6 29 62 0 28 152 25 2 32 4 20 0 612 16:45 58 254 0 0 9 37 89 0 39 133 16 1 11 4 32 0 683 Total 148 913 2 2 24 131 295 0 154 646 65 3 112 34 67 0 2596 17:00 63 226 6 1 1 67 89 0 29 160 23 0 49 17 11 0 742 17:15 103 224 4 2 6 74 55 0 36 156 21 0 41 11 7 0 740 17:30 97 206 0 1 5 62 77 0 28 115 17 0 44 11 6 0 669 17:45 43 214 0 0 2 36 86 0 29 108 17 0 33 17 9 0 594 Total 306 870 10 4 14 239 307 0 122 539 78 0 167 56 33 0 2745 18:00 31 195 1 1 1 21 64 0 22 131 21 0 25 13 4 0 530 18:15 24 185 0 0 2 15 42 0 22 112 14 0 26 12 4 0 458 Grand Total 586 3267 21 11 51 443 890 0 772 2990 306 3 607 459 293 0 10699 Apprch %15.1 84.1 0.5 0.3 3.7 32 64.3 0 19 73.4 7.5 0.1 44.7 33.8 21.6 0 Total %5.5 30.5 0.2 0.1 0.5 4.1 8.3 0 7.2 27.9 2.9 0 5.7 4.3 2.7 0 Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-42 File Name : H2402021 Site Code : 00000000 Start Date : 2/13/2024 Page No : 2 City: NEWPORT BEACH N-S Direction: IRVINE AVENUE E-W Direction: MESA DRIVE IRVINE AVENUE Southbound MESA DRIVE Westbound IRVINE AVENUE Northbound MESA DRIVE Eastbound Start Time Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 07:45 11 186 0 0 197 1 3 27 0 31 74 216 16 0 306 54 55 29 0 138 672 08:00 8 166 1 0 175 1 6 29 0 36 68 223 22 0 313 64 70 33 0 167 691 08:15 10 161 1 2 174 3 7 39 0 49 68 230 28 0 326 33 48 25 0 106 655 08:30 14 137 3 0 154 2 6 30 0 38 70 251 19 0 340 31 53 15 0 99 631 Total Volume 43 650 5 2 700 7 22 125 0 154 280 920 85 0 1285 182 226 102 0 510 2649 % App. Total 6.1 92.9 0.7 0.3 4.5 14.3 81.2 0 21.8 71.6 6.6 0 35.7 44.3 20 0 PHF .768 .874 .417 .250 .888 .583 .786 .801 .000 .786 .946 .916 .759 .000 .945 .711 .807 .773 .000 .763 .958 IRVINE AVENUE M E S A D R I V E M E S A D R I V E IRVINE AVENUE Right 43 Thru 650 Left 5 U Turns 2 InOut Total 1029 700 1729 Ri g h t 7 Th r u 22 Le f t 12 5 U Tu r n s 0 Ou t To t a l In 51 1 15 4 66 5 Left 85 Thru 920 Right 280 U Turns 0 Out TotalIn 957 1285 2242 Le f t 10 2 Th r u22 6 Rig h t 18 2 U Tu r n s 0 To t a l Ou t In 15 0 51 0 66 0 Peak Hour Begins at 07:45 Turning Movement Count Peak Hour Data North Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-43 File Name : H2402021 Site Code : 00000000 Start Date : 2/13/2024 Page No : 3 City: NEWPORT BEACH N-S Direction: IRVINE AVENUE E-W Direction: MESA DRIVE IRVINE AVENUE Southbound MESA DRIVE Westbound IRVINE AVENUE Northbound MESA DRIVE Eastbound Start Time Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Int. Total Peak Hour Analysis From 16:00 to 18:15 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:45 16:45 58 254 0 0 312 9 37 89 0 135 39 133 16 1 189 11 4 32 0 47 683 17:00 63 226 6 1 296 1 67 89 0 157 29 160 23 0 212 49 17 11 0 77 742 17:15 103 224 4 2 333 6 74 55 0 135 36 156 21 0 213 41 11 7 0 59 740 17:30 97 206 0 1 304 5 62 77 0 144 28 115 17 0 160 44 11 6 0 61 669 Total Volume 321 910 10 4 1245 21 240 310 0 571 132 564 77 1 774 145 43 56 0 244 2834 % App. Total 25.8 73.1 0.8 0.3 3.7 42 54.3 0 17.1 72.9 9.9 0.1 59.4 17.6 23 0 PHF .779 .896 .417 .500 .935 .583 .811 .871 .000 .909 .846 .881 .837 .250 .908 .740 .632 .438 .000 .792 .955 IRVINE AVENUE M E S A D R I V E M E S A D R I V E IRVINE AVENUE Right 321 Thru 910 Left 10 U Turns 4 InOut Total 641 1245 1886 Rig h t 21 Th r u 24 0 Le f t 31 0 U Tu r n s 0 Ou t To t a l In 18 5 57 1 75 6 Left 77 Thru 564 Right 132 U Turns 1 Out TotalIn 1365 774 2139 Le f t 56 Th r u 43 Ri g h t 14 5 U Tu r n s 0 To t a l Ou t In 63 8 24 4 88 2 Peak Hour Begins at 16:45 Turning Movement Count Peak Hour Data North Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-44 File Name : H2402020 Site Code : 00000000 Start Date : 2/13/2024 Page No : 1 City: NEWPORT BEACH N-S Direction: IRVINE AVENUE E-W Direction: UNIVERSITY DRIVE Groups Printed- Turning Movement Count IRVINE AVENUE Southbound UNIVERSITY DRIVE Westbound IRVINE AVENUE Northbound UNIVERSITY DRIVE Eastbound Start Time Right Thru Left U Turns Right Thru Left U Turns Right Thru Left U Turns Right Thru Left U Turns Int. Total 07:00 9 101 8 0 0 7 6 0 5 89 11 0 17 13 11 0 277 07:15 5 102 3 2 4 3 5 0 6 166 6 0 16 11 17 0 346 07:30 7 152 5 2 5 9 3 0 7 222 22 0 30 9 26 0 499 07:45 9 210 16 0 8 5 4 0 7 276 38 0 56 13 29 0 671 Total 30 565 32 4 17 24 18 0 25 753 77 0 119 46 83 0 1793 08:00 13 217 17 1 8 11 7 0 12 248 31 0 48 21 34 0 668 08:15 20 207 18 2 5 4 9 0 18 294 27 0 49 17 32 0 702 08:30 22 160 8 0 2 8 3 0 20 317 31 0 33 18 32 0 654 08:45 19 138 15 0 6 14 6 0 8 257 16 0 32 30 23 0 564 Total 74 722 58 3 21 37 25 0 58 1116 105 0 162 86 121 0 2588 16:00 29 278 11 2 14 3 4 0 8 204 25 0 36 13 7 0 634 16:15 26 265 18 3 14 28 10 0 8 174 33 0 18 16 28 0 641 16:30 34 276 18 0 14 10 9 0 7 197 32 0 22 14 15 0 648 16:45 38 270 10 1 12 13 13 0 8 168 16 0 47 15 29 0 640 Total 127 1089 57 6 54 54 36 0 31 743 106 0 123 58 79 0 2563 17:00 32 287 8 0 21 14 9 0 13 180 26 0 32 11 18 0 651 17:15 42 290 10 0 11 14 8 0 3 193 38 0 29 9 17 0 664 17:30 26 291 5 1 12 25 14 0 7 139 32 0 40 6 9 0 607 17:45 19 287 15 1 10 15 17 0 4 143 28 0 36 12 15 0 602 Total 119 1155 38 2 54 68 48 0 27 655 124 0 137 38 59 0 2524 18:00 28 290 20 2 12 14 6 0 5 120 27 0 26 7 7 0 564 18:15 21 223 5 0 8 9 8 0 6 138 33 1 31 3 13 0 499 Grand Total 399 4044 210 17 166 206 141 0 152 3525 472 1 598 238 362 0 10531 Apprch %8.5 86.6 4.5 0.4 32.4 40.2 27.5 0 3.7 84.9 11.4 0 49.9 19.9 30.2 0 Total %3.8 38.4 2 0.2 1.6 2 1.3 0 1.4 33.5 4.5 0 5.7 2.3 3.4 0 Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-45 File Name : H2402020 Site Code : 00000000 Start Date : 2/13/2024 Page No : 2 City: NEWPORT BEACH N-S Direction: IRVINE AVENUE E-W Direction: UNIVERSITY DRIVE IRVINE AVENUE Southbound UNIVERSITY DRIVE Westbound IRVINE AVENUE Northbound UNIVERSITY DRIVE Eastbound Start Time Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 07:45 9 210 16 0 235 8 5 4 0 17 7 276 38 0 321 56 13 29 0 98 671 08:00 13 217 17 1 248 8 11 7 0 26 12 248 31 0 291 48 21 34 0 103 668 08:15 20 207 18 2 247 5 4 9 0 18 18 294 27 0 339 49 17 32 0 98 702 08:30 22 160 8 0 190 2 8 3 0 13 20 317 31 0 368 33 18 32 0 83 654 Total Volume 64 794 59 3 920 23 28 23 0 74 57 1135 127 0 1319 186 69 127 0 382 2695 % App. Total 7 86.3 6.4 0.3 31.1 37.8 31.1 0 4.3 86.1 9.6 0 48.7 18.1 33.2 0 PHF .727 .915 .819 .375 .927 .719 .636 .639 .000 .712 .713 .895 .836 .000 .896 .830 .821 .934 .000 .927 .960 IRVINE AVENUE U N I V E R S I T Y D R I V E U N I V E R S I T Y D R I V E IRVINE AVENUE Right 64 Thru 794 Left 59 U Turns 3 InOut Total 1285 920 2205 Rig h t 23 Th r u 28 Le f t 23 U Tu r n s 0 Ou t To t a l In 18 5 74 25 9 Left 127 Thru 1135 Right 57 U Turns 0 Out TotalIn 1003 1319 2322 Le f t 12 7 Th r u 69 Ri g h t 18 6 U Tu r n s 0 To t a l Ou t In 21 9 38 2 60 1 Peak Hour Begins at 07:45 Turning Movement Count Peak Hour Data North Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-46 File Name : H2402020 Site Code : 00000000 Start Date : 2/13/2024 Page No : 3 City: NEWPORT BEACH N-S Direction: IRVINE AVENUE E-W Direction: UNIVERSITY DRIVE IRVINE AVENUE Southbound UNIVERSITY DRIVE Westbound IRVINE AVENUE Northbound UNIVERSITY DRIVE Eastbound Start Time Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Right Thru Left U Turns App. Total Int. Total Peak Hour Analysis From 16:00 to 18:15 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:30 16:30 34 276 18 0 328 14 10 9 0 33 7 197 32 0 236 22 14 15 0 51 648 16:45 38 270 10 1 319 12 13 13 0 38 8 168 16 0 192 47 15 29 0 91 640 17:00 32 287 8 0 327 21 14 9 0 44 13 180 26 0 219 32 11 18 0 61 651 17:15 42 290 10 0 342 11 14 8 0 33 3 193 38 0 234 29 9 17 0 55 664 Total Volume 146 1123 46 1 1316 58 51 39 0 148 31 738 112 0 881 130 49 79 0 258 2603 % App. Total 11.1 85.3 3.5 0.1 39.2 34.5 26.4 0 3.5 83.8 12.7 0 50.4 19 30.6 0 PHF .869 .968 .639 .250 .962 .690 .911 .750 .000 .841 .596 .937 .737 .000 .933 .691 .817 .681 .000 .709 .980 IRVINE AVENUE U N I V E R S I T Y D R I V E U N I V E R S I T Y D R I V E IRVINE AVENUE Right 146 Thru 1123 Left 46 U Turns 1 InOut Total 875 1316 2191 Ri g h t 58 Th r u 51 Le f t 39 U Tu r n s 0 Ou t To t a l In 12 6 14 8 27 4 Left 112 Thru 738 Right 31 U Turns 0 Out TotalIn 1292 881 2173 Le f t 79 Th r u 49 Rig h t 13 0 U Tu r n s 0 To t a l Ou t In 30 9 25 8 56 7 Peak Hour Begins at 16:30 Turning Movement Count Peak Hour Data North Transportation Studies, Inc 2640 Walnut Avenue, Suite L Tustin, CA. 92780 Apx-47 APPENDIX C LEVEL OF SERVICE WORKSHEETS Apx-48 EXISTING Apx-49 Default Scenario Tue Oct 1, 2024 18:13:07 Page 2-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #1 MacArthur Blvd (NS) at Campus Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.357 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 4 0 1 1 0 4 0 1 2 0 2 1 0 2 0 3 0 1 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 49 396 36 166 701 261 382 456 67 24 199 32 Growth Adj: 1.01 1.01 1.01 1.01 1.01 1.01 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 49 400 36 168 708 264 382 456 67 24 199 32 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 49 400 36 168 708 264 382 456 67 24 199 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 49 400 36 168 708 264 382 456 67 24 199 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVolume: 49 400 36 168 708 264 382 456 67 24 199 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 4.00 1.00 1.00 4.00 1.00 2.00 2.62 0.38 2.00 3.00 1.00 Final Sat.: 1600 6400 1600 1600 6400 1600 3200 4185 615 3200 4800 1600 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.03 0.06 0.02 0.10 0.11 0.16 0.12 0.11 0.11 0.01 0.04 0.00 Crit Moves: **** **** **** **** ******************************************************************************** Apx-50 Default Scenario Tue Oct 1, 2024 18:13:07 Page 3-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #2 MacArthur Blvd (NS) at Birch St (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.271 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 1 0 1 1 0 1 0 1 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 32 459 60 48 518 202 70 172 59 14 121 30 Growth Adj: 1.01 1.01 1.01 1.01 1.01 1.01 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 32 464 61 48 523 204 70 172 59 14 121 30 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 32 464 61 48 523 204 70 172 59 14 121 30 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 32 464 61 48 523 204 70 172 59 14 121 30 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 32 464 61 48 523 204 70 172 59 14 121 30 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 1.00 1.00 1.41 0.59 1.00 1.60 0.40 Final Sat.: 1600 4800 1600 1600 4800 1600 1600 2259 941 1600 2564 636 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.02 0.10 0.04 0.03 0.11 0.13 0.04 0.08 0.06 0.01 0.05 0.05 Crit Moves: **** **** **** **** ******************************************************************************** Apx-51 Default Scenario Tue Oct 1, 2024 18:13:07 Page 4-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #3 MacArthur Blvd (NS) at Jamboree Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.465 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Ovl Ignore Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 1 2 0 3 0 1 2 0 3 1 0 3 0 3 0 1 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 98 924 316 70 377 340 355 724 150 336 671 130 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 98 924 316 70 377 340 355 724 150 336 671 130 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 98 924 316 70 377 0 355 724 150 336 671 130 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 98 924 316 70 377 0 355 724 150 336 671 130 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 98 924 316 70 377 0 355 724 150 336 671 130 OvlAdjVol: 204 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.31 0.69 3.00 3.00 1.00 Final Sat.: 3200 4800 1600 3200 4800 1600 3200 5302 1098 4800 4800 1600 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.03 0.19 0.20 0.02 0.08 0.00 0.11 0.14 0.14 0.07 0.14 0.08 OvlAdjV/S: 0.13 Crit Moves: **** **** **** **** ******************************************************************************** Apx-52 Default Scenario Tue Oct 1, 2024 18:13:07 Page 5-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #4 Campus Dr (NS) at Bristol St North (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.401 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Permitted Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 0 0 0 4 0 3 0 0 0 0 0 1 0 3 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 373 1146 0 0 235 149 0 0 0 259 778 185 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 373 1146 0 0 235 149 0 0 0 259 778 185 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 373 1146 0 0 235 149 0 0 0 259 778 185 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 373 1146 0 0 235 149 0 0 0 259 778 185 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 373 1146 0 0 235 149 0 0 0 259 778 185 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 0.00 0.00 4.00 3.00 0.00 0.00 0.00 1.00 3.23 0.77 Final Sat.: 3200 4800 0 0 6400 4800 0 0 0 1600 5171 1229 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.12 0.24 0.00 0.00 0.04 0.03 0.00 0.00 0.00 0.16 0.15 0.15 Crit Moves: **** **** ******************************************************************************** Apx-53 Default Scenario Tue Oct 1, 2024 18:13:07 Page 6-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #5 Campus Dr/Irvine Ave (NS) at Bristol St South (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.559 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 1 0 3 0 0 1 1 2 0 2 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 677 238 90 403 0 805 1462 402 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 677 238 90 403 0 805 1462 402 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 677 238 90 403 0 805 1462 402 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 677 238 90 403 0 805 1462 402 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 677 238 90 403 0 805 1462 402 0 0 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.00 1.00 1.00 3.00 0.00 1.42 2.58 2.00 0.00 0.00 0.00 Final Sat.: 0 6400 1600 1600 4800 0 2273 4127 3200 0 0 0 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.11 0.15 0.06 0.08 0.00 0.35 0.35 0.13 0.00 0.00 0.00 Crit Moves: **** **** **** ******************************************************************************** Apx-54 Default Scenario Tue Oct 1, 2024 18:13:07 Page 7-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #6 Birch St (NS) at Bristol St North (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.500 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Permitted Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 0 0 0 0 1 1 2 0 0 0 0 0 1 1 2 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 94 705 0 0 128 105 0 0 0 378 1114 228 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 94 705 0 0 128 105 0 0 0 378 1114 228 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 94 705 0 0 128 105 0 0 0 378 1114 228 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 94 705 0 0 128 105 0 0 0 378 1114 228 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 94 705 0 0 128 105 0 0 0 378 1114 228 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 0.00 0.00 2.00 2.00 0.00 0.00 0.00 1.01 3.48 0.51 Final Sat.: 3200 3200 0 0 3200 3200 0 0 0 1621 5563 815 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.03 0.22 0.00 0.00 0.04 0.03 0.00 0.00 0.00 0.23 0.20 0.28 Crit Moves: **** **** ******************************************************************************** Apx-55 Default Scenario Tue Oct 1, 2024 18:13:07 Page 8-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #7 Birch St (NS) at Bristol St South (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.379 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 2 1 1 2 0 2 0 0 1 1 2 1 0 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 235 229 144 364 0 565 1035 218 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 235 229 144 364 0 565 1035 218 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 235 229 144 364 0 565 1035 218 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 235 229 144 364 0 565 1035 218 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 235 229 144 364 0 565 1035 218 0 0 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 2.03 1.97 2.00 2.00 0.00 1.41 3.07 0.52 0.00 0.00 0.00 Final Sat.: 0 3241 3159 3200 3200 0 2260 4905 835 0 0 0 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.07 0.07 0.05 0.11 0.00 0.25 0.21 0.26 0.00 0.00 0.00 Crit Moves: **** **** **** ******************************************************************************** Apx-56 Default Scenario Tue Oct 1, 2024 18:13:07 Page 9-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #8 Jamboree Rd (NS) at Bristol St North (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.321 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Permitted Permitted Permitted Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 1 1 0 0 3 1 1 0 0 0 0 0 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 585 1410 551 0 687 416 0 0 0 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 585 1410 551 0 687 416 0 0 0 0 0 0 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 585 1410 0 0 687 416 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 585 1410 0 0 687 416 0 0 0 0 0 0 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 585 1410 0 0 687 416 0 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 1.00 0.00 3.11 1.89 0.00 0.00 0.00 0.00 0.00 0.00 Final Sat.: 3200 4800 1600 0 4983 3017 0 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.18 0.29 0.00 0.00 0.14 0.14 0.00 0.00 0.00 0.00 0.00 0.00 Crit Moves: **** **** ******************************************************************************** Apx-57 Default Scenario Tue Oct 1, 2024 18:13:07 Page 10-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #9 Jamboree Rd (NS) at Bristol St South (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.594 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Protected Protected Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 0 0 4 0 0 1 1 1 0 2 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 1530 23 0 738 0 817 364 1280 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 1530 23 0 738 0 817 364 1280 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 1530 23 0 738 0 817 364 1280 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 1530 23 0 738 0 817 364 1280 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 1530 23 0 738 0 817 364 1280 0 0 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.93 0.07 0.00 4.00 0.00 2.00 1.00 2.00 0.00 0.00 0.00 Final Sat.: 0 7882 118 0 6400 0 3200 1600 3200 0 0 0 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.19 0.19 0.00 0.12 0.00 0.26 0.23 0.40 0.00 0.00 0.00 Crit Moves: **** **** **** ******************************************************************************** Apx-58 Default Scenario Tue Oct 1, 2024 18:13:07 Page 11-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #10 Irvine Ave (NS) at Orchard Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.287 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 0 0 0 0 0 0 0 0 0 1! 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 884 52 97 710 0 0 0 0 33 0 34 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 884 52 97 710 0 0 0 0 33 0 34 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 884 52 97 710 0 0 0 0 33 0 34 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 884 52 97 710 0 0 0 0 33 0 34 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 884 52 97 710 0 0 0 0 33 0 34 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 0.00 0.00 0.00 0.00 0.49 0.00 0.51 Final Sat.: 1600 4800 1600 1600 4800 0 0 0 0 788 0 812 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.18 0.03 0.06 0.15 0.00 0.00 0.00 0.00 0.02 0.00 0.04 Crit Moves: **** **** **** ******************************************************************************** Apx-59 Default Scenario Tue Oct 1, 2024 18:13:07 Page 12-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #11 Birch St (NS) at Orchard Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.236 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 1 1 0 1 0 1 1 0 1 0 0 1 0 1 0 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 3 369 40 59 279 64 23 9 8 16 36 55 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 3 369 40 59 279 64 23 9 8 16 36 55 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 3 369 40 59 279 64 23 9 8 16 36 55 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 3 369 40 59 279 64 23 9 8 16 36 55 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 3 369 40 59 279 64 23 9 8 16 36 55 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.80 0.20 1.00 1.63 0.37 1.00 0.53 0.47 1.00 0.40 0.60 Final Sat.: 1600 2887 313 1600 2603 597 1600 847 753 1600 633 967 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.13 0.13 0.04 0.11 0.11 0.01 0.01 0.01 0.01 0.06 0.06 Crit Moves: **** **** **** **** ******************************************************************************** Apx-60 Default Scenario Tue Oct 1, 2024 18:13:07 Page 13-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #12 Mesa Dr (NS) at Birch St (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.177 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 1! 0 0 0 0 1! 0 0 1 0 1 1 0 1 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 36 0 7 3 0 2 5 424 33 8 123 17 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 36 0 7 3 0 2 5 424 33 8 123 17 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 36 0 7 3 0 2 5 424 33 8 123 17 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 36 0 7 3 0 2 5 424 33 8 123 17 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 36 0 7 3 0 2 5 424 33 8 123 17 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.84 0.00 0.16 0.60 0.00 0.40 1.00 1.86 0.14 1.00 1.76 0.24 Final Sat.: 1340 0 260 960 0 640 1600 2969 231 1600 2811 389 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.02 0.00 0.03 0.00 0.00 0.00 0.00 0.14 0.14 0.01 0.04 0.04 Crit Moves: **** **** **** **** ******************************************************************************** Apx-61 Default Scenario Tue Oct 1, 2024 18:13:07 Page 14-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #13 Acacia St (NS) at Birch St (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.144 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Protected Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 0 0 0 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 0 0 2 0 6 37 461 0 0 155 5 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 0 2 0 6 37 461 0 0 155 5 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 0 2 0 6 37 461 0 0 155 5 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 0 0 2 0 6 37 461 0 0 155 5 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 0 0 2 0 6 37 461 0 0 155 5 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 0.00 0.00 1.00 0.00 1.00 1.00 2.00 0.00 0.00 1.94 0.06 Final Sat.: 0 0 0 1600 0 1600 1600 3200 0 0 3100 100 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.14 0.00 0.00 0.05 0.05 Crit Moves: **** **** ******************************************************************************** Apx-62 Default Scenario Tue Oct 1, 2024 18:13:07 Page 15-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #14 Irvine Ave (NS) at Mesa Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.355 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 0 1 1 0 1 1 0 2 0 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 85 920 280 7 650 43 102 226 182 125 22 7 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 85 920 280 7 650 43 102 226 182 125 22 7 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 85 920 280 7 650 43 102 226 182 125 22 7 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 85 920 280 7 650 43 102 226 182 125 22 7 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 85 920 280 7 650 43 102 226 182 125 22 7 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 1.00 1.00 1.11 0.89 2.00 0.76 0.24 Final Sat.: 1600 4800 1600 1600 4800 1600 1600 1773 1427 3200 1214 386 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.05 0.19 0.17 0.00 0.14 0.03 0.06 0.13 0.13 0.04 0.02 0.02 Crit Moves: **** **** **** **** ******************************************************************************** Apx-63 Default Scenario Tue Oct 1, 2024 18:13:07 Page 16-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #15 Irvine Ave (NS) at University Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.524 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 0 1 1 0 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 127 1135 57 62 794 64 127 69 186 23 28 23 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 127 1135 57 62 794 64 127 69 186 23 28 23 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 127 1135 57 62 794 64 127 69 186 23 28 23 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 127 1135 57 62 794 64 127 69 186 23 28 23 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 127 1135 57 62 794 64 127 69 186 23 28 23 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 0.55 0.45 Final Sat.: 1600 3200 1600 1600 3200 1600 1600 1600 1600 1600 878 722 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.08 0.35 0.04 0.04 0.25 0.04 0.08 0.04 0.12 0.01 0.03 0.03 Crit Moves: **** **** **** **** ******************************************************************************** Apx-64 Default Scenario Tue Oct 1, 2024 18:13:35 Page 2-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #1 MacArthur Blvd (NS) at Campus Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.511 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 4 0 1 1 0 4 0 1 2 0 2 1 0 2 0 3 0 1 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 124 717 17 128 642 341 259 326 55 30 654 108 Growth Adj: 1.01 1.01 1.01 1.01 1.01 1.01 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 125 724 17 129 648 344 259 326 55 30 654 108 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 125 724 17 129 648 344 259 326 55 30 654 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 125 724 17 129 648 344 259 326 55 30 654 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVolume: 125 724 17 129 648 344 259 326 55 30 654 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 4.00 1.00 1.00 4.00 1.00 2.00 2.57 0.43 2.00 3.00 1.00 Final Sat.: 1600 6400 1600 1600 6400 1600 3200 4107 693 3200 4800 1600 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.08 0.11 0.01 0.08 0.10 0.22 0.08 0.08 0.08 0.01 0.14 0.00 Crit Moves: **** **** **** **** ******************************************************************************** Apx-65 Default Scenario Tue Oct 1, 2024 18:13:35 Page 3-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #2 MacArthur Blvd (NS) at Birch St (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.333 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 1 0 1 1 0 1 0 1 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 50 515 24 31 551 98 201 160 19 38 243 139 Growth Adj: 1.01 1.01 1.01 1.01 1.01 1.01 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 51 520 24 31 557 99 201 160 19 38 243 139 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 51 520 24 31 557 99 201 160 19 38 243 139 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 51 520 24 31 557 99 201 160 19 38 243 139 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 51 520 24 31 557 99 201 160 19 38 243 139 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.40 0.60 1.58 1.27 0.15 1.00 1.27 0.73 Final Sat.: 1600 4800 1600 1600 5434 966 2534 2025 241 1600 2036 1164 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.03 0.11 0.02 0.02 0.10 0.10 0.08 0.08 0.08 0.02 0.12 0.12 Crit Moves: **** **** **** **** ******************************************************************************** Apx-66 Default Scenario Tue Oct 1, 2024 18:13:35 Page 4-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #3 MacArthur Blvd (NS) at Jamboree Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.516 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Ovl Ignore Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 1 2 0 3 0 1 2 0 3 1 0 3 0 3 0 1 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 206 807 284 154 1005 383 314 808 32 431 694 108 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 206 807 284 154 1005 383 314 808 32 431 694 108 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 206 807 284 154 1005 0 314 808 32 431 694 108 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 206 807 284 154 1005 0 314 808 32 431 694 108 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 206 807 284 154 1005 0 314 808 32 431 694 108 OvlAdjVol: 140 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.85 0.15 3.00 3.00 1.00 Final Sat.: 3200 4800 1600 3200 4800 1600 3200 6156 244 4800 4800 1600 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.06 0.17 0.18 0.05 0.21 0.00 0.10 0.13 0.13 0.09 0.14 0.07 OvlAdjV/S: 0.09 Crit Moves: **** **** **** **** ******************************************************************************** Apx-67 Default Scenario Tue Oct 1, 2024 18:13:35 Page 5-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #4 Campus Dr (NS) at Bristol St North (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.532 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Permitted Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 0 0 0 4 0 3 0 0 0 0 0 1 0 3 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 490 637 0 0 596 551 0 0 0 257 1603 89 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 490 637 0 0 596 551 0 0 0 257 1603 89 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 490 637 0 0 596 551 0 0 0 257 1603 89 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 490 637 0 0 596 551 0 0 0 257 1603 89 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 490 637 0 0 596 551 0 0 0 257 1603 89 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 0.00 0.00 4.00 3.00 0.00 0.00 0.00 1.00 3.79 0.21 Final Sat.: 3200 4800 0 0 6400 4800 0 0 0 1600 6063 337 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.15 0.13 0.00 0.00 0.09 0.11 0.00 0.00 0.00 0.16 0.26 0.26 Crit Moves: **** **** **** ******************************************************************************** Apx-68 Default Scenario Tue Oct 1, 2024 18:13:35 Page 6-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #5 Campus Dr/Irvine Ave (NS) at Bristol St South (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.445 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 1 0 3 0 0 1 1 2 0 2 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 635 241 152 702 0 451 826 460 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 635 241 152 702 0 451 826 460 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 635 241 152 702 0 451 826 460 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 635 241 152 702 0 451 826 460 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 635 241 152 702 0 451 826 460 0 0 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.00 1.00 1.00 3.00 0.00 1.41 2.59 2.00 0.00 0.00 0.00 Final Sat.: 0 6400 1600 1600 4800 0 2260 4140 3200 0 0 0 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.10 0.15 0.10 0.15 0.00 0.20 0.20 0.14 0.00 0.00 0.00 Crit Moves: **** **** **** ******************************************************************************** Apx-69 Default Scenario Tue Oct 1, 2024 18:13:35 Page 7-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #6 Birch St (NS) at Bristol St North (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.496 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Permitted Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 0 0 0 0 1 1 2 0 0 0 0 0 1 1 2 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 161 276 0 0 330 527 0 0 0 419 1367 128 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 161 276 0 0 330 527 0 0 0 419 1367 128 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 161 276 0 0 330 527 0 0 0 419 1367 128 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 161 276 0 0 330 527 0 0 0 419 1367 128 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 161 276 0 0 330 527 0 0 0 419 1367 128 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 0.00 0.00 1.54 2.46 0.00 0.00 0.00 1.00 3.74 0.26 Final Sat.: 3200 3200 0 0 2464 3936 0 0 0 1600 5989 411 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.05 0.09 0.00 0.00 0.13 0.13 0.00 0.00 0.00 0.26 0.23 0.31 Crit Moves: **** **** **** ******************************************************************************** Apx-70 Default Scenario Tue Oct 1, 2024 18:13:35 Page 8-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #7 Birch St (NS) at Bristol St South (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.352 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 2 1 1 2 0 2 0 0 1 1 2 1 0 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 239 274 188 460 0 253 894 105 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 239 274 188 460 0 253 894 105 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 239 274 188 460 0 253 894 105 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 239 274 188 460 0 253 894 105 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 239 274 188 460 0 253 894 105 0 0 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 2.00 2.00 2.00 2.00 0.00 1.00 3.68 0.32 0.00 0.00 0.00 Final Sat.: 0 3200 3200 3200 3200 0 1600 5895 505 0 0 0 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.07 0.09 0.06 0.14 0.00 0.16 0.15 0.21 0.00 0.00 0.00 Crit Moves: **** **** ******************************************************************************** Apx-71 Default Scenario Tue Oct 1, 2024 18:13:35 Page 9-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #8 Jamboree Rd (NS) at Bristol St North (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.393 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Permitted Permitted Permitted Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 1 1 0 0 3 1 1 0 0 0 0 0 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 617 1538 934 0 645 640 0 0 0 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 617 1538 934 0 645 640 0 0 0 0 0 0 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 617 1538 0 0 645 640 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 617 1538 0 0 645 640 0 0 0 0 0 0 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 617 1538 0 0 645 640 0 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 1.00 0.00 3.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 Final Sat.: 3200 4800 1600 0 4800 3200 0 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.19 0.32 0.00 0.00 0.13 0.20 0.00 0.00 0.00 0.00 0.00 0.00 Crit Moves: **** **** ******************************************************************************** Apx-72 Default Scenario Tue Oct 1, 2024 18:13:35 Page 10-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #9 Jamboree Rd (NS) at Bristol St South (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.544 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Protected Protected Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 0 0 4 0 0 1 1 1 0 2 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 2025 71 0 647 0 738 566 901 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 2025 71 0 647 0 738 566 901 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 2025 71 0 647 0 738 566 901 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 2025 71 0 647 0 738 566 901 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 2025 71 0 647 0 738 566 901 0 0 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.83 0.17 0.00 4.00 0.00 1.70 1.30 2.00 0.00 0.00 0.00 Final Sat.: 0 7729 271 0 6400 0 2717 2083 3200 0 0 0 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.26 0.26 0.00 0.10 0.00 0.27 0.27 0.28 0.00 0.00 0.00 Crit Moves: **** **** **** ******************************************************************************** Apx-73 Default Scenario Tue Oct 1, 2024 18:13:35 Page 11-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #10 Irvine Ave (NS) at Orchard Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.427 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 0 0 0 0 0 0 0 0 0 1! 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 763 13 36 1342 0 0 0 0 72 0 164 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 763 13 36 1342 0 0 0 0 72 0 164 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 763 13 36 1342 0 0 0 0 72 0 164 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 763 13 36 1342 0 0 0 0 72 0 164 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 763 13 36 1342 0 0 0 0 72 0 164 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 0.00 0.00 0.00 0.00 0.31 0.00 0.69 Final Sat.: 1600 4800 1600 1600 4800 0 0 0 0 488 0 1112 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.16 0.01 0.02 0.28 0.00 0.00 0.00 0.00 0.05 0.00 0.15 Crit Moves: **** **** **** ******************************************************************************** Apx-74 Default Scenario Tue Oct 1, 2024 18:13:35 Page 12-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #11 Birch St (NS) at Orchard Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.302 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 1 1 0 1 0 1 1 0 1 0 0 1 0 1 0 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 4 260 20 58 584 61 40 11 6 24 60 56 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 4 260 20 58 584 61 40 11 6 24 60 56 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 4 260 20 58 584 61 40 11 6 24 60 56 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 4 260 20 58 584 61 40 11 6 24 60 56 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 4 260 20 58 584 61 40 11 6 24 60 56 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.86 0.14 1.00 1.81 0.19 1.00 0.65 0.35 1.00 0.52 0.48 Final Sat.: 1600 2971 229 1600 2897 303 1600 1035 565 1600 828 772 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.09 0.09 0.04 0.20 0.20 0.03 0.01 0.01 0.02 0.07 0.07 Crit Moves: **** **** **** **** ******************************************************************************** Apx-75 Default Scenario Tue Oct 1, 2024 18:13:35 Page 13-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #12 Mesa Dr (NS) at Birch St (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.218 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 1! 0 0 0 0 1! 0 0 1 0 1 1 0 1 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 30 0 6 9 0 5 0 156 48 15 604 5 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 30 0 6 9 0 5 0 156 48 15 604 5 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 30 0 6 9 0 5 0 156 48 15 604 5 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 30 0 6 9 0 5 0 156 48 15 604 5 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 30 0 6 9 0 5 0 156 48 15 604 5 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.83 0.00 0.17 0.64 0.00 0.36 1.00 1.53 0.47 1.00 1.98 0.02 Final Sat.: 1333 0 267 1029 0 571 1600 2447 753 1600 3174 26 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.02 0.00 0.02 0.01 0.00 0.01 0.00 0.06 0.06 0.01 0.19 0.19 Crit Moves: **** **** **** **** ******************************************************************************** Apx-76 Default Scenario Tue Oct 1, 2024 18:13:35 Page 14-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #13 Acacia St (NS) at Birch St (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.220 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Protected Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 0 0 0 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 0 0 8 0 29 4 196 0 0 635 4 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 0 8 0 29 4 196 0 0 635 4 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 0 8 0 29 4 196 0 0 635 4 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 0 0 8 0 29 4 196 0 0 635 4 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 0 0 8 0 29 4 196 0 0 635 4 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 0.00 0.00 1.00 0.00 1.00 1.00 2.00 0.00 0.00 1.99 0.01 Final Sat.: 0 0 0 1600 0 1600 1600 3200 0 0 3180 20 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.00 0.00 0.01 0.00 0.02 0.00 0.06 0.00 0.00 0.20 0.20 Crit Moves: **** **** **** ******************************************************************************** Apx-77 Default Scenario Tue Oct 1, 2024 18:13:35 Page 15-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #14 Irvine Ave (NS) at Mesa Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.447 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 0 1 1 0 1 1 0 2 0 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 78 564 132 14 910 321 56 43 145 310 240 21 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 78 564 132 14 910 321 56 43 145 310 240 21 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 78 564 132 14 910 321 56 43 145 310 240 21 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 78 564 132 14 910 321 56 43 145 310 240 21 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 78 564 132 14 910 321 56 43 145 310 240 21 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 1.00 1.00 1.00 1.00 2.00 0.92 0.08 Final Sat.: 1600 4800 1600 1600 4800 1600 1600 1600 1600 3200 1471 129 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.05 0.12 0.08 0.01 0.19 0.20 0.04 0.03 0.09 0.10 0.16 0.16 Crit Moves: **** **** **** **** ******************************************************************************** Apx-78 Default Scenario Tue Oct 1, 2024 18:13:35 Page 16-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) Existing PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) ******************************************************************************** Intersection #15 Irvine Ave (NS) at University Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.538 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 0 1 1 0 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 112 738 31 47 1123 146 79 49 130 39 51 58 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 112 738 31 47 1123 146 79 49 130 39 51 58 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 112 738 31 47 1123 146 79 49 130 39 51 58 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 112 738 31 47 1123 146 79 49 130 39 51 58 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 112 738 31 47 1123 146 79 49 130 39 51 58 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 0.47 0.53 Final Sat.: 1600 3200 1600 1600 3200 1600 1600 1600 1600 1600 749 851 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.07 0.23 0.02 0.03 0.35 0.09 0.05 0.03 0.08 0.02 0.07 0.07 Crit Moves: **** **** **** **** ******************************************************************************** Apx-79 TPO YEAR 2027 WITHOUT PROJECT Apx-80 Default Scenario Tue Oct 1, 2024 18:14:12 Page 2-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #1 MacArthur Blvd (NS) at Campus Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.362 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 4 0 1 1 0 4 0 1 2 0 2 1 0 2 0 3 0 1 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 49 396 36 166 701 261 382 456 67 24 199 32 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 51 412 37 173 729 271 382 456 67 24 199 32 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 94 0 2 34 0 0 0 0 0 0 5 Initial Fut: 51 506 37 175 763 271 382 456 67 24 199 37 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 51 506 37 175 763 271 382 456 67 24 199 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 51 506 37 175 763 271 382 456 67 24 199 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVolume: 51 506 37 175 763 271 382 456 67 24 199 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 4.00 1.00 1.00 4.00 1.00 2.00 2.62 0.38 2.00 3.00 1.00 Final Sat.: 1600 6400 1600 1600 6400 1600 3200 4185 615 3200 4800 1600 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.03 0.08 0.02 0.11 0.12 0.17 0.12 0.11 0.11 0.01 0.04 0.00 Crit Moves: **** **** **** **** ******************************************************************************** Apx-81 Default Scenario Tue Oct 1, 2024 18:14:12 Page 3-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #2 MacArthur Blvd (NS) at Birch St (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.296 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 1 0 1 1 0 1 0 1 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 32 459 60 48 518 202 70 172 59 14 121 30 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 33 477 62 50 539 210 70 172 59 14 121 30 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 17 0 12 28 0 40 14 0 0 12 50 Initial Fut: 33 494 62 62 567 210 110 186 59 14 133 80 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 33 494 62 62 567 210 110 186 59 14 133 80 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 33 494 62 62 567 210 110 186 59 14 133 80 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 33 494 62 62 567 210 110 186 59 14 133 80 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 1.00 1.00 1.50 0.50 1.00 1.25 0.75 Final Sat.: 1600 4800 1600 1600 4800 1600 1600 2404 796 1600 1998 1202 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.02 0.10 0.04 0.04 0.12 0.13 0.07 0.08 0.07 0.01 0.07 0.07 Crit Moves: **** **** **** **** ******************************************************************************** Apx-82 Default Scenario Tue Oct 1, 2024 18:14:12 Page 4-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #3 MacArthur Blvd (NS) at Jamboree Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.510 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Ovl Ignore Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 1 2 0 3 0 1 2 0 3 1 0 3 0 3 0 1 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 98 924 316 70 377 340 355 724 150 336 671 130 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 Initial Bse: 101 952 325 72 388 350 366 746 155 346 691 134 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: -2 12 5 4 30 16 9 47 8 41 116 11 Initial Fut: 99 964 330 76 418 366 375 793 163 387 807 145 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 99 964 330 76 418 0 375 793 163 387 807 145 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 99 964 330 76 418 0 375 793 163 387 807 145 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 99 964 330 76 418 0 375 793 163 387 807 145 OvlAdjVol: 201 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.32 0.68 3.00 3.00 1.00 Final Sat.: 3200 4800 1600 3200 4800 1600 3200 5311 1089 4800 4800 1600 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.03 0.20 0.21 0.02 0.09 0.00 0.12 0.15 0.15 0.08 0.17 0.09 OvlAdjV/S: 0.13 Crit Moves: **** **** **** **** ******************************************************************************** Apx-83 Default Scenario Tue Oct 1, 2024 18:14:12 Page 5-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #4 Campus Dr (NS) at Bristol St North (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.413 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Permitted Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 0 0 0 4 0 3 0 0 0 0 0 1 0 3 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 373 1146 0 0 235 149 0 0 0 259 778 185 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 373 1146 0 0 235 149 0 0 0 259 778 185 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 7 0 0 7 0 0 0 0 17 100 0 Initial Fut: 373 1153 0 0 242 149 0 0 0 276 878 185 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 373 1153 0 0 242 149 0 0 0 276 878 185 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 373 1153 0 0 242 149 0 0 0 276 878 185 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 373 1153 0 0 242 149 0 0 0 276 878 185 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 0.00 0.00 4.00 3.00 0.00 0.00 0.00 1.00 3.30 0.70 Final Sat.: 3200 4800 0 0 6400 4800 0 0 0 1600 5286 1114 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.12 0.24 0.00 0.00 0.04 0.03 0.00 0.00 0.00 0.17 0.17 0.17 Crit Moves: **** **** ******************************************************************************** Apx-84 Default Scenario Tue Oct 1, 2024 18:14:12 Page 6-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #5 Campus Dr/Irvine Ave (NS) at Bristol St South (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.563 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 1 0 3 0 0 1 1 2 0 2 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 677 238 90 403 0 805 1462 402 0 0 0 Growth Adj: 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 697 245 90 403 0 805 1462 402 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 2 -2 0 23 0 5 -2 0 0 0 0 Initial Fut: 0 699 243 90 426 0 810 1460 402 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 699 243 90 426 0 810 1460 402 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 699 243 90 426 0 810 1460 402 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 699 243 90 426 0 810 1460 402 0 0 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.00 1.00 1.00 3.00 0.00 1.43 2.57 2.00 0.00 0.00 0.00 Final Sat.: 0 6400 1600 1600 4800 0 2284 4116 3200 0 0 0 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.11 0.15 0.06 0.09 0.00 0.35 0.35 0.13 0.00 0.00 0.00 Crit Moves: **** **** **** ******************************************************************************** Apx-85 Default Scenario Tue Oct 1, 2024 18:14:12 Page 7-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #6 Birch St (NS) at Bristol St North (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.524 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Permitted Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 0 0 0 0 1 1 2 0 0 0 0 0 1 1 2 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 94 705 0 0 128 105 0 0 0 378 1114 228 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 94 705 0 0 128 105 0 0 0 378 1114 228 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 1 0 0 9 23 0 0 0 47 95 20 Initial Fut: 94 706 0 0 137 128 0 0 0 425 1209 248 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 94 706 0 0 137 128 0 0 0 425 1209 248 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 94 706 0 0 137 128 0 0 0 425 1209 248 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 94 706 0 0 137 128 0 0 0 425 1209 248 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 0.00 0.00 2.00 2.00 0.00 0.00 0.00 1.04 3.45 0.51 Final Sat.: 3200 3200 0 0 3200 3200 0 0 0 1665 5518 817 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.03 0.22 0.00 0.00 0.04 0.04 0.00 0.00 0.00 0.26 0.22 0.30 Crit Moves: **** **** ******************************************************************************** Apx-86 Default Scenario Tue Oct 1, 2024 18:14:12 Page 8-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #7 Birch St (NS) at Bristol St South (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.395 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 2 1 1 2 0 2 0 0 1 1 2 1 0 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 235 229 144 364 0 565 1035 218 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 235 229 144 364 0 565 1035 218 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 1 0 55 1 0 0 -5 0 0 0 0 Initial Fut: 0 236 229 199 365 0 565 1030 218 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 236 229 199 365 0 565 1030 218 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 236 229 199 365 0 565 1030 218 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 236 229 199 365 0 565 1030 218 0 0 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 2.03 1.97 2.00 2.00 0.00 1.42 3.06 0.52 0.00 0.00 0.00 Final Sat.: 0 3248 3152 3200 3200 0 2267 4894 838 0 0 0 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.07 0.07 0.06 0.11 0.00 0.25 0.21 0.26 0.00 0.00 0.00 Crit Moves: **** **** **** ******************************************************************************** Apx-87 Default Scenario Tue Oct 1, 2024 18:14:12 Page 9-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #8 Jamboree Rd (NS) at Bristol St North (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.344 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Permitted Permitted Permitted Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 1 1 0 0 3 1 1 0 0 0 0 0 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 585 1410 551 0 687 416 0 0 0 0 0 0 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 603 1452 568 0 708 428 0 0 0 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: -7 56 17 0 59 71 0 0 0 0 0 0 Initial Fut: 596 1508 585 0 767 499 0 0 0 0 0 0 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 596 1508 0 0 767 499 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 596 1508 0 0 767 499 0 0 0 0 0 0 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 596 1508 0 0 767 499 0 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 1.00 0.00 3.03 1.97 0.00 0.00 0.00 0.00 0.00 0.00 Final Sat.: 3200 4800 1600 0 4844 3156 0 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.19 0.31 0.00 0.00 0.16 0.16 0.00 0.00 0.00 0.00 0.00 0.00 Crit Moves: **** **** ******************************************************************************** Apx-88 Default Scenario Tue Oct 1, 2024 18:14:12 Page 10-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #9 Jamboree Rd (NS) at Bristol St South (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.614 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: B ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Protected Protected Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 0 0 4 0 0 1 1 1 0 2 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 1530 23 0 738 0 817 364 1280 0 0 0 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 1576 24 0 760 0 817 364 1280 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 27 0 0 59 0 27 17 34 0 0 0 Initial Fut: 0 1603 24 0 819 0 844 381 1314 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 1603 24 0 819 0 844 381 1314 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 1603 24 0 819 0 844 381 1314 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 1603 24 0 819 0 844 381 1314 0 0 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.93 0.07 0.00 4.00 0.00 2.00 1.00 2.00 0.00 0.00 0.00 Final Sat.: 0 7883 117 0 6400 0 3200 1600 3200 0 0 0 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.20 0.20 0.00 0.13 0.00 0.26 0.24 0.41 0.00 0.00 0.00 Crit Moves: **** **** **** ******************************************************************************** Apx-89 Default Scenario Tue Oct 1, 2024 18:14:12 Page 11-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #10 Irvine Ave (NS) at Orchard Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.294 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 0 0 0 0 0 0 0 0 0 1! 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 884 52 97 710 0 0 0 0 33 0 34 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 911 54 100 731 0 0 0 0 33 0 34 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 2 0 0 23 0 0 0 0 0 0 0 Initial Fut: 0 913 54 100 754 0 0 0 0 33 0 34 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 913 54 100 754 0 0 0 0 33 0 34 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 913 54 100 754 0 0 0 0 33 0 34 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 913 54 100 754 0 0 0 0 33 0 34 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 0.00 0.00 0.00 0.00 0.49 0.00 0.51 Final Sat.: 1600 4800 1600 1600 4800 0 0 0 0 788 0 812 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.19 0.03 0.06 0.16 0.00 0.00 0.00 0.00 0.02 0.00 0.04 Crit Moves: **** **** **** ******************************************************************************** Apx-90 Default Scenario Tue Oct 1, 2024 18:14:12 Page 12-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #11 Birch St (NS) at Orchard Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.236 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 1 1 0 1 0 1 1 0 1 0 0 1 0 1 0 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 3 369 40 59 279 64 23 9 8 16 36 55 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 3 369 40 59 279 64 23 9 8 16 36 55 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 1 0 0 1 0 0 0 0 0 0 0 Initial Fut: 3 370 40 59 280 64 23 9 8 16 36 55 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 3 370 40 59 280 64 23 9 8 16 36 55 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 3 370 40 59 280 64 23 9 8 16 36 55 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 3 370 40 59 280 64 23 9 8 16 36 55 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.80 0.20 1.00 1.63 0.37 1.00 0.53 0.47 1.00 0.40 0.60 Final Sat.: 1600 2888 312 1600 2605 595 1600 847 753 1600 633 967 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.13 0.13 0.04 0.11 0.11 0.01 0.01 0.01 0.01 0.06 0.06 Crit Moves: **** **** **** **** ******************************************************************************** Apx-91 Default Scenario Tue Oct 1, 2024 18:14:12 Page 13-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #12 Mesa Dr (NS) at Birch St (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.177 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 1! 0 0 0 0 1! 0 0 1 0 1 1 0 1 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 36 0 7 3 0 2 5 424 33 8 123 17 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 36 0 7 3 0 2 5 424 33 8 123 17 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 36 0 7 3 0 2 5 424 33 8 123 17 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 36 0 7 3 0 2 5 424 33 8 123 17 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 36 0 7 3 0 2 5 424 33 8 123 17 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 36 0 7 3 0 2 5 424 33 8 123 17 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.84 0.00 0.16 0.60 0.00 0.40 1.00 1.86 0.14 1.00 1.76 0.24 Final Sat.: 1340 0 260 960 0 640 1600 2969 231 1600 2811 389 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.02 0.00 0.03 0.00 0.00 0.00 0.00 0.14 0.14 0.01 0.04 0.04 Crit Moves: **** **** **** **** ******************************************************************************** Apx-92 Default Scenario Tue Oct 1, 2024 18:14:12 Page 14-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #13 Acacia St (NS) at Birch St (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.144 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Protected Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 0 0 0 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 0 0 2 0 6 37 461 0 0 155 5 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 0 2 0 6 37 461 0 0 155 5 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 0 0 0 2 0 6 37 461 0 0 155 5 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 0 2 0 6 37 461 0 0 155 5 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 0 0 2 0 6 37 461 0 0 155 5 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 0 0 2 0 6 37 461 0 0 155 5 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 0.00 0.00 1.00 0.00 1.00 1.00 2.00 0.00 0.00 1.94 0.06 Final Sat.: 0 0 0 1600 0 1600 1600 3200 0 0 3100 100 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.14 0.00 0.00 0.05 0.05 Crit Moves: **** **** ******************************************************************************** Apx-93 Default Scenario Tue Oct 1, 2024 18:14:12 Page 15-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #14 Irvine Ave (NS) at Mesa Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.369 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 0 1 1 0 1 1 0 2 0 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 85 920 280 7 650 43 102 226 182 125 22 7 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 88 948 288 7 670 44 102 226 182 125 22 7 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 3 1 0 20 0 0 0 0 1 0 0 Initial Fut: 88 951 289 7 690 44 102 226 182 126 22 7 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 88 951 289 7 690 44 102 226 182 126 22 7 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 88 951 289 7 690 44 102 226 182 126 22 7 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 88 951 289 7 690 44 102 226 182 126 22 7 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 1.00 1.00 1.11 0.89 2.00 0.76 0.24 Final Sat.: 1600 4800 1600 1600 4800 1600 1600 1773 1427 3200 1214 386 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.05 0.20 0.18 0.00 0.14 0.03 0.06 0.13 0.13 0.04 0.02 0.02 Crit Moves: **** **** **** **** ******************************************************************************** Apx-94 Default Scenario Tue Oct 1, 2024 18:14:12 Page 16-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #15 Irvine Ave (NS) at University Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.537 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 0 1 1 0 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 127 1135 57 62 794 64 127 69 186 23 28 23 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 131 1169 59 64 818 66 127 69 186 23 28 23 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 4 0 0 21 0 0 0 0 0 0 0 Initial Fut: 131 1173 59 64 839 66 127 69 186 23 28 23 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 131 1173 59 64 839 66 127 69 186 23 28 23 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 131 1173 59 64 839 66 127 69 186 23 28 23 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 131 1173 59 64 839 66 127 69 186 23 28 23 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 0.55 0.45 Final Sat.: 1600 3200 1600 1600 3200 1600 1600 1600 1600 1600 878 722 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.08 0.37 0.04 0.04 0.26 0.04 0.08 0.04 0.12 0.01 0.03 0.03 Crit Moves: **** **** **** **** ******************************************************************************** Apx-95 Default Scenario Tue Oct 1, 2024 18:14:44 Page 2-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #1 MacArthur Blvd (NS) at Campus Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.519 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 4 0 1 1 0 4 0 1 2 0 2 1 0 2 0 3 0 1 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 124 717 17 128 642 341 259 326 55 30 654 108 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 129 746 18 133 668 355 259 326 55 30 654 108 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 53 0 6 77 0 0 0 0 0 0 3 Initial Fut: 129 799 18 139 745 355 259 326 55 30 654 111 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 129 799 18 139 745 355 259 326 55 30 654 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 129 799 18 139 745 355 259 326 55 30 654 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVolume: 129 799 18 139 745 355 259 326 55 30 654 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 4.00 1.00 1.00 4.00 1.00 2.00 2.57 0.43 2.00 3.00 1.00 Final Sat.: 1600 6400 1600 1600 6400 1600 3200 4107 693 3200 4800 1600 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.08 0.12 0.01 0.09 0.12 0.22 0.08 0.08 0.08 0.01 0.14 0.00 Crit Moves: **** **** **** **** ******************************************************************************** Apx-96 Default Scenario Tue Oct 1, 2024 18:14:44 Page 3-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #2 MacArthur Blvd (NS) at Birch St (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.384 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 1 0 1 1 0 1 0 1 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 50 515 24 31 551 98 201 160 19 38 243 139 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 52 536 25 32 573 102 201 160 19 38 243 139 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 24 0 52 39 0 12 9 0 0 12 27 Initial Fut: 52 560 25 84 612 102 213 169 19 38 255 166 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 52 560 25 84 612 102 213 169 19 38 255 166 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 52 560 25 84 612 102 213 169 19 38 255 166 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 52 560 25 84 612 102 213 169 19 38 255 166 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.43 0.57 1.60 1.26 0.14 1.00 1.21 0.79 Final Sat.: 1600 4800 1600 1600 5486 914 2552 2021 227 1600 1938 1262 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.03 0.12 0.02 0.05 0.11 0.11 0.08 0.08 0.08 0.02 0.13 0.13 Crit Moves: **** **** **** **** ******************************************************************************** Apx-97 Default Scenario Tue Oct 1, 2024 18:14:44 Page 4-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #3 MacArthur Blvd (NS) at Jamboree Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.558 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Ovl Ignore Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 1 2 0 3 0 1 2 0 3 1 0 3 0 3 0 1 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 206 807 284 154 1005 383 314 808 32 431 694 108 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 Initial Bse: 212 831 293 159 1035 394 323 832 33 444 715 111 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 15 27 42 12 12 28 14 129 -2 18 71 7 Initial Fut: 227 858 335 171 1047 422 337 961 31 462 786 118 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 227 858 335 171 1047 0 337 961 31 462 786 118 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 227 858 335 171 1047 0 337 961 31 462 786 118 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 227 858 335 171 1047 0 337 961 31 462 786 118 OvlAdjVol: 181 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.88 0.12 3.00 3.00 1.00 Final Sat.: 3200 4800 1600 3200 4800 1600 3200 6200 200 4800 4800 1600 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.07 0.18 0.21 0.05 0.22 0.00 0.11 0.16 0.16 0.10 0.16 0.07 OvlAdjV/S: 0.11 Crit Moves: **** **** **** **** ******************************************************************************** Apx-98 Default Scenario Tue Oct 1, 2024 18:14:44 Page 5-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #4 Campus Dr (NS) at Bristol St North (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.538 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Permitted Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 0 0 0 4 0 3 0 0 0 0 0 1 0 3 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 490 637 0 0 596 551 0 0 0 257 1603 89 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 490 637 0 0 596 551 0 0 0 257 1603 89 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 14 0 0 4 0 0 0 0 3 37 0 Initial Fut: 490 651 0 0 600 551 0 0 0 260 1640 89 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 490 651 0 0 600 551 0 0 0 260 1640 89 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 490 651 0 0 600 551 0 0 0 260 1640 89 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 490 651 0 0 600 551 0 0 0 260 1640 89 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 0.00 0.00 4.00 3.00 0.00 0.00 0.00 1.00 3.79 0.21 Final Sat.: 3200 4800 0 0 6400 4800 0 0 0 1600 6071 329 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.15 0.14 0.00 0.00 0.09 0.11 0.00 0.00 0.00 0.16 0.27 0.27 Crit Moves: **** **** **** ******************************************************************************** Apx-99 Default Scenario Tue Oct 1, 2024 18:14:44 Page 6-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #5 Campus Dr/Irvine Ave (NS) at Bristol St South (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.464 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 1 0 3 0 0 1 1 2 0 2 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 635 241 152 702 0 451 826 460 0 0 0 Growth Adj: 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 654 248 152 702 0 451 826 460 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 4 17 0 6 0 10 15 0 0 0 0 Initial Fut: 0 658 265 152 708 0 461 841 460 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 658 265 152 708 0 461 841 460 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 658 265 152 708 0 461 841 460 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 658 265 152 708 0 461 841 460 0 0 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.00 1.00 1.00 3.00 0.00 1.42 2.58 2.00 0.00 0.00 0.00 Final Sat.: 0 6400 1600 1600 4800 0 2266 4134 3200 0 0 0 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.10 0.17 0.10 0.15 0.00 0.20 0.20 0.14 0.00 0.00 0.00 Crit Moves: **** **** **** ******************************************************************************** Apx-100 Default Scenario Tue Oct 1, 2024 18:14:44 Page 7-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #6 Birch St (NS) at Bristol St North (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.506 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Permitted Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 0 0 0 0 1 1 2 0 0 0 0 0 1 1 2 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 161 276 0 0 330 527 0 0 0 419 1367 128 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 161 276 0 0 330 527 0 0 0 419 1367 128 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 1 0 0 4 10 0 0 0 2 33 5 Initial Fut: 161 277 0 0 334 537 0 0 0 421 1400 133 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 161 277 0 0 334 537 0 0 0 421 1400 133 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 161 277 0 0 334 537 0 0 0 421 1400 133 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 161 277 0 0 334 537 0 0 0 421 1400 133 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 0.00 0.00 1.53 2.47 0.00 0.00 0.00 1.00 3.74 0.26 Final Sat.: 3200 3200 0 0 2454 3946 0 0 0 1600 5984 416 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.05 0.09 0.00 0.00 0.14 0.14 0.00 0.00 0.00 0.26 0.23 0.32 Crit Moves: **** **** **** ******************************************************************************** Apx-101 Default Scenario Tue Oct 1, 2024 18:14:44 Page 8-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #7 Birch St (NS) at Bristol St South (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.362 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 2 1 1 2 0 2 0 0 1 1 2 1 0 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 239 274 188 460 0 253 894 105 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 239 274 188 460 0 253 894 105 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 1 4 4 1 0 0 33 0 0 0 0 Initial Fut: 0 240 278 192 461 0 253 927 105 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 240 278 192 461 0 253 927 105 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 240 278 192 461 0 253 927 105 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 240 278 192 461 0 253 927 105 0 0 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 2.00 2.00 2.00 2.00 0.00 1.00 3.69 0.31 0.00 0.00 0.00 Final Sat.: 0 3200 3200 3200 3200 0 1600 5912 488 0 0 0 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.08 0.09 0.06 0.14 0.00 0.16 0.16 0.22 0.00 0.00 0.00 Crit Moves: **** **** **** ******************************************************************************** Apx-102 Default Scenario Tue Oct 1, 2024 18:14:44 Page 9-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #8 Jamboree Rd (NS) at Bristol St North (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.359 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Permitted Permitted Permitted Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 1 1 0 0 3 1 1 0 0 0 0 0 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 617 1538 934 0 645 640 0 0 0 0 0 0 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 636 1584 962 0 664 659 0 0 0 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 27 139 30 0 27 85 0 0 0 0 0 0 Initial Fut: 663 1723 992 0 691 744 0 0 0 0 0 0 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 663 1723 0 0 691 744 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 663 1723 0 0 691 744 0 0 0 0 0 0 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 663 1723 0 0 691 744 0 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 1.00 0.00 3.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 Final Sat.: 3200 4800 1600 0 4800 3200 0 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.21 0.36 0.00 0.00 0.14 0.23 0.00 0.00 0.00 0.00 0.00 0.00 Crit Moves: **** ******************************************************************************** Apx-103 Default Scenario Tue Oct 1, 2024 18:14:44 Page 10-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #9 Jamboree Rd (NS) at Bristol St South (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.573 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Protected Protected Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 0 0 4 0 0 1 1 1 0 2 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 2025 71 0 647 0 738 566 901 0 0 0 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 2086 73 0 666 0 738 566 901 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 83 0 0 26 0 94 8 26 0 0 0 Initial Fut: 0 2169 73 0 692 0 832 574 927 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 2169 73 0 692 0 832 574 927 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 2169 73 0 692 0 832 574 927 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 2169 73 0 692 0 832 574 927 0 0 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.84 0.16 0.00 4.00 0.00 1.78 1.22 2.00 0.00 0.00 0.00 Final Sat.: 0 7739 261 0 6400 0 2840 1960 3200 0 0 0 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.28 0.28 0.00 0.11 0.00 0.29 0.29 0.29 0.00 0.00 0.00 Crit Moves: **** **** **** ******************************************************************************** Apx-104 Default Scenario Tue Oct 1, 2024 18:14:44 Page 11-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #10 Irvine Ave (NS) at Orchard Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.437 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 0 0 0 0 0 0 0 0 0 1! 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 763 13 36 1342 0 0 0 0 72 0 164 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 786 13 37 1382 0 0 0 0 72 0 164 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 21 0 0 6 0 0 0 0 0 0 0 Initial Fut: 0 807 13 37 1388 0 0 0 0 72 0 164 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 807 13 37 1388 0 0 0 0 72 0 164 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 807 13 37 1388 0 0 0 0 72 0 164 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 807 13 37 1388 0 0 0 0 72 0 164 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 0.00 0.00 0.00 0.00 0.31 0.00 0.69 Final Sat.: 1600 4800 1600 1600 4800 0 0 0 0 488 0 1112 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.17 0.01 0.02 0.29 0.00 0.00 0.00 0.00 0.05 0.00 0.15 Crit Moves: **** **** **** ******************************************************************************** Apx-105 Default Scenario Tue Oct 1, 2024 18:14:44 Page 12-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #11 Birch St (NS) at Orchard Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.302 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 1 1 0 1 0 1 1 0 1 0 0 1 0 1 0 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 4 260 20 58 584 61 40 11 6 24 60 56 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 4 260 20 58 584 61 40 11 6 24 60 56 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 5 0 0 1 0 0 0 0 0 0 0 Initial Fut: 4 265 20 58 585 61 40 11 6 24 60 56 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 4 265 20 58 585 61 40 11 6 24 60 56 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 4 265 20 58 585 61 40 11 6 24 60 56 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 4 265 20 58 585 61 40 11 6 24 60 56 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.86 0.14 1.00 1.81 0.19 1.00 0.65 0.35 1.00 0.52 0.48 Final Sat.: 1600 2975 225 1600 2898 302 1600 1035 565 1600 828 772 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.09 0.09 0.04 0.20 0.20 0.03 0.01 0.01 0.02 0.07 0.07 Crit Moves: **** **** **** **** ******************************************************************************** Apx-106 Default Scenario Tue Oct 1, 2024 18:14:44 Page 13-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #12 Mesa Dr (NS) at Birch St (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.218 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 1! 0 0 0 0 1! 0 0 1 0 1 1 0 1 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 30 0 6 9 0 5 0 156 48 15 604 5 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 30 0 6 9 0 5 0 156 48 15 604 5 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 30 0 6 9 0 5 0 156 48 15 604 5 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 30 0 6 9 0 5 0 156 48 15 604 5 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 30 0 6 9 0 5 0 156 48 15 604 5 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 30 0 6 9 0 5 0 156 48 15 604 5 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.83 0.00 0.17 0.64 0.00 0.36 1.00 1.53 0.47 1.00 1.98 0.02 Final Sat.: 1333 0 267 1029 0 571 1600 2447 753 1600 3174 26 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.02 0.00 0.02 0.01 0.00 0.01 0.00 0.06 0.06 0.01 0.19 0.19 Crit Moves: **** **** **** **** ******************************************************************************** Apx-107 Default Scenario Tue Oct 1, 2024 18:14:44 Page 14-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #13 Acacia St (NS) at Birch St (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.220 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Protected Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 0 0 0 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 0 0 8 0 29 4 196 0 0 635 4 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 0 8 0 29 4 196 0 0 635 4 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 0 0 0 8 0 29 4 196 0 0 635 4 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 0 8 0 29 4 196 0 0 635 4 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 0 0 8 0 29 4 196 0 0 635 4 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 0 0 8 0 29 4 196 0 0 635 4 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 0.00 0.00 1.00 0.00 1.00 1.00 2.00 0.00 0.00 1.99 0.01 Final Sat.: 0 0 0 1600 0 1600 1600 3200 0 0 3180 20 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.00 0.00 0.01 0.00 0.02 0.00 0.06 0.00 0.00 0.20 0.20 Crit Moves: **** **** **** ******************************************************************************** Apx-108 Default Scenario Tue Oct 1, 2024 18:14:44 Page 15-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #14 Irvine Ave (NS) at Mesa Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.455 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 0 1 1 0 1 1 0 2 0 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 78 564 132 14 910 321 56 43 145 310 240 21 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 80 581 136 14 937 331 56 43 145 310 240 21 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 18 1 0 8 0 0 0 0 1 0 0 Initial Fut: 80 599 137 14 945 331 56 43 145 311 240 21 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 80 599 137 14 945 331 56 43 145 311 240 21 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 80 599 137 14 945 331 56 43 145 311 240 21 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 80 599 137 14 945 331 56 43 145 311 240 21 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 1.00 1.00 1.00 1.00 2.00 0.92 0.08 Final Sat.: 1600 4800 1600 1600 4800 1600 1600 1600 1600 3200 1471 129 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.05 0.12 0.09 0.01 0.20 0.21 0.04 0.03 0.09 0.10 0.16 0.16 Crit Moves: **** **** **** **** ******************************************************************************** Apx-109 Default Scenario Tue Oct 1, 2024 18:14:44 Page 16-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 Without Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #15 Irvine Ave (NS) at University Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.554 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 0 1 1 0 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 112 738 31 47 1123 146 79 49 130 39 51 58 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 115 760 32 48 1157 150 79 49 130 39 51 58 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 19 0 0 9 0 0 0 0 0 0 0 Initial Fut: 115 779 32 48 1166 150 79 49 130 39 51 58 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 115 779 32 48 1166 150 79 49 130 39 51 58 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 115 779 32 48 1166 150 79 49 130 39 51 58 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 115 779 32 48 1166 150 79 49 130 39 51 58 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 0.47 0.53 Final Sat.: 1600 3200 1600 1600 3200 1600 1600 1600 1600 1600 749 851 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.07 0.24 0.02 0.03 0.36 0.09 0.05 0.03 0.08 0.02 0.07 0.07 Crit Moves: **** **** **** **** ******************************************************************************** Apx-110 TPO YEAR 2027 WITH PROJECT Apx-111 Default Scenario Tue Oct 1, 2024 18:18:11 Page 2-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #1 MacArthur Blvd (NS) at Campus Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.368 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 4 0 1 1 0 4 0 1 2 0 2 1 0 2 0 3 0 1 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 49 396 36 166 701 261 382 456 67 24 199 32 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 51 412 37 173 729 271 382 456 67 24 199 32 Added Vol: 0 0 0 0 0 7 3 0 0 0 0 0 PasserByVol: 0 94 0 2 34 0 0 0 0 0 0 5 Initial Fut: 51 506 37 175 763 278 385 456 67 24 199 37 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 51 506 37 175 763 278 385 456 67 24 199 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 51 506 37 175 763 278 385 456 67 24 199 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVolume: 51 506 37 175 763 278 385 456 67 24 199 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 4.00 1.00 1.00 4.00 1.00 2.00 2.62 0.38 2.00 3.00 1.00 Final Sat.: 1600 6400 1600 1600 6400 1600 3200 4185 615 3200 4800 1600 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.03 0.08 0.02 0.11 0.12 0.17 0.12 0.11 0.11 0.01 0.04 0.00 Crit Moves: **** **** **** **** ******************************************************************************** Apx-112 Default Scenario Tue Oct 1, 2024 18:18:11 Page 3-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #2 MacArthur Blvd (NS) at Birch St (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.297 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 1 0 1 1 0 1 0 1 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 32 459 60 48 518 202 70 172 59 14 121 30 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 33 477 62 50 539 210 70 172 59 14 121 30 Added Vol: 0 0 0 0 0 0 0 1 0 0 3 0 PasserByVol: 0 17 0 12 28 0 40 14 0 0 12 50 Initial Fut: 33 494 62 62 567 210 110 187 59 14 136 80 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 33 494 62 62 567 210 110 187 59 14 136 80 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 33 494 62 62 567 210 110 187 59 14 136 80 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 33 494 62 62 567 210 110 187 59 14 136 80 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 1.00 1.00 1.50 0.50 1.00 1.26 0.74 Final Sat.: 1600 4800 1600 1600 4800 1600 1600 2406 794 1600 2015 1185 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.02 0.10 0.04 0.04 0.12 0.13 0.07 0.08 0.07 0.01 0.07 0.07 Crit Moves: **** **** **** **** ******************************************************************************** Apx-113 Default Scenario Tue Oct 1, 2024 18:18:11 Page 4-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #3 MacArthur Blvd (NS) at Jamboree Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.511 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Ovl Ignore Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 1 2 0 3 0 1 2 0 3 1 0 3 0 3 0 1 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 98 924 316 70 377 340 355 724 150 336 671 130 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 Initial Bse: 101 952 325 72 388 350 366 746 155 346 691 134 Added Vol: 10 0 0 0 0 0 0 3 4 0 7 0 PasserByVol: -2 12 5 4 30 16 9 47 8 41 116 11 Initial Fut: 109 964 330 76 418 366 375 796 167 387 814 145 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 109 964 330 76 418 0 375 796 167 387 814 145 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 109 964 330 76 418 0 375 796 167 387 814 145 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 109 964 330 76 418 0 375 796 167 387 814 145 OvlAdjVol: 201 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.31 0.69 3.00 3.00 1.00 Final Sat.: 3200 4800 1600 3200 4800 1600 3200 5293 1107 4800 4800 1600 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.03 0.20 0.21 0.02 0.09 0.00 0.12 0.15 0.15 0.08 0.17 0.09 OvlAdjV/S: 0.13 Crit Moves: **** **** **** **** ******************************************************************************** Apx-114 Default Scenario Tue Oct 1, 2024 18:18:11 Page 5-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #4 Campus Dr (NS) at Bristol St North (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.413 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Permitted Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 0 0 0 4 0 3 0 0 0 0 0 1 0 3 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 373 1146 0 0 235 149 0 0 0 259 778 185 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 373 1146 0 0 235 149 0 0 0 259 778 185 Added Vol: 7 3 0 0 7 0 0 0 0 0 0 0 PasserByVol: 0 7 0 0 7 0 0 0 0 17 100 0 Initial Fut: 380 1156 0 0 249 149 0 0 0 276 878 185 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 380 1156 0 0 249 149 0 0 0 276 878 185 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 380 1156 0 0 249 149 0 0 0 276 878 185 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 380 1156 0 0 249 149 0 0 0 276 878 185 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 0.00 0.00 4.00 3.00 0.00 0.00 0.00 1.00 3.30 0.70 Final Sat.: 3200 4800 0 0 6400 4800 0 0 0 1600 5286 1114 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.12 0.24 0.00 0.00 0.04 0.03 0.00 0.00 0.00 0.17 0.17 0.17 Crit Moves: **** **** ******************************************************************************** Apx-115 Default Scenario Tue Oct 1, 2024 18:18:11 Page 6-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #5 Campus Dr/Irvine Ave (NS) at Bristol St South (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.563 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 1 0 3 0 0 1 1 2 0 2 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 677 238 90 403 0 805 1462 402 0 0 0 Growth Adj: 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 697 245 90 403 0 805 1462 402 0 0 0 Added Vol: 0 10 0 0 7 0 0 3 13 0 0 0 PasserByVol: 0 2 -2 0 23 0 5 -2 0 0 0 0 Initial Fut: 0 709 243 90 433 0 810 1463 415 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 709 243 90 433 0 810 1463 415 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 709 243 90 433 0 810 1463 415 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 709 243 90 433 0 810 1463 415 0 0 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.00 1.00 1.00 3.00 0.00 1.43 2.57 2.00 0.00 0.00 0.00 Final Sat.: 0 6400 1600 1600 4800 0 2281 4119 3200 0 0 0 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.11 0.15 0.06 0.09 0.00 0.36 0.36 0.13 0.00 0.00 0.00 Crit Moves: **** **** **** ******************************************************************************** Apx-116 Default Scenario Tue Oct 1, 2024 18:18:11 Page 7-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #6 Birch St (NS) at Bristol St North (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.524 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Permitted Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 0 0 0 0 1 1 2 0 0 0 0 0 1 1 2 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 94 705 0 0 128 105 0 0 0 378 1114 228 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 94 705 0 0 128 105 0 0 0 378 1114 228 Added Vol: 0 1 0 0 3 0 0 0 0 29 0 0 PasserByVol: 0 1 0 0 9 23 0 0 0 47 95 20 Initial Fut: 94 707 0 0 140 128 0 0 0 454 1209 248 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 94 707 0 0 140 128 0 0 0 454 1209 248 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 94 707 0 0 140 128 0 0 0 454 1209 248 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 94 707 0 0 140 128 0 0 0 454 1209 248 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 0.00 0.00 2.00 2.00 0.00 0.00 0.00 1.09 3.40 0.51 Final Sat.: 3200 3200 0 0 3200 3200 0 0 0 1747 5436 817 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.03 0.22 0.00 0.00 0.04 0.04 0.00 0.00 0.00 0.26 0.22 0.30 Crit Moves: **** **** ******************************************************************************** Apx-117 Default Scenario Tue Oct 1, 2024 18:18:11 Page 8-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #7 Birch St (NS) at Bristol St South (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.398 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 2 1 1 2 0 2 0 0 1 1 2 1 0 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 235 229 144 364 0 565 1035 218 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 235 229 144 364 0 565 1035 218 0 0 0 Added Vol: 0 1 13 0 33 0 0 0 3 0 0 0 PasserByVol: 0 1 0 55 1 0 0 -5 0 0 0 0 Initial Fut: 0 237 242 199 398 0 565 1030 221 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 237 242 199 398 0 565 1030 221 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 237 242 199 398 0 565 1030 221 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 237 242 199 398 0 565 1030 221 0 0 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 2.00 2.00 2.00 2.00 0.00 1.42 3.05 0.53 0.00 0.00 0.00 Final Sat.: 0 3200 3200 3200 3200 0 2267 4885 848 0 0 0 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.07 0.08 0.06 0.12 0.00 0.25 0.21 0.26 0.00 0.00 0.00 Crit Moves: **** **** **** ******************************************************************************** Apx-118 Default Scenario Tue Oct 1, 2024 18:18:11 Page 9-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #8 Jamboree Rd (NS) at Bristol St North (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.349 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Permitted Permitted Permitted Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 1 1 0 0 3 1 1 0 0 0 0 0 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 585 1410 551 0 687 416 0 0 0 0 0 0 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 603 1452 568 0 708 428 0 0 0 0 0 0 Added Vol: 10 7 0 0 0 16 0 0 0 0 0 0 PasserByVol: -7 56 17 0 59 71 0 0 0 0 0 0 Initial Fut: 606 1515 585 0 767 515 0 0 0 0 0 0 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 606 1515 0 0 767 515 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 606 1515 0 0 767 515 0 0 0 0 0 0 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 606 1515 0 0 767 515 0 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 1.00 0.00 3.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 Final Sat.: 3200 4800 1600 0 4800 3200 0 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.19 0.32 0.00 0.00 0.16 0.16 0.00 0.00 0.00 0.00 0.00 0.00 Crit Moves: **** **** ******************************************************************************** Apx-119 Default Scenario Tue Oct 1, 2024 18:18:11 Page 10-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #9 Jamboree Rd (NS) at Bristol St South (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.616 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: B ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Protected Protected Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 0 0 4 0 0 1 1 1 0 2 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 1530 23 0 738 0 817 364 1280 0 0 0 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 1576 24 0 760 0 817 364 1280 0 0 0 Added Vol: 0 10 0 0 0 0 7 1 4 0 0 0 PasserByVol: 0 27 0 0 59 0 27 17 34 0 0 0 Initial Fut: 0 1613 24 0 819 0 851 382 1318 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 1613 24 0 819 0 851 382 1318 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 1613 24 0 819 0 851 382 1318 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 1613 24 0 819 0 851 382 1318 0 0 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.93 0.07 0.00 4.00 0.00 2.00 1.00 2.00 0.00 0.00 0.00 Final Sat.: 0 7884 116 0 6400 0 3200 1600 3200 0 0 0 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.20 0.20 0.00 0.13 0.00 0.27 0.24 0.41 0.00 0.00 0.00 Crit Moves: **** **** **** ******************************************************************************** Apx-120 Default Scenario Tue Oct 1, 2024 18:18:11 Page 11-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #10 Irvine Ave (NS) at Orchard Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.310 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 0 0 0 0 0 0 0 0 0 1! 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 884 52 97 710 0 0 0 0 33 0 34 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 911 54 100 731 0 0 0 0 33 0 34 Added Vol: 0 7 0 20 0 0 0 0 0 3 0 0 PasserByVol: 0 2 0 0 23 0 0 0 0 0 0 0 Initial Fut: 0 920 54 120 754 0 0 0 0 36 0 34 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 920 54 120 754 0 0 0 0 36 0 34 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 920 54 120 754 0 0 0 0 36 0 34 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 920 54 120 754 0 0 0 0 36 0 34 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 0.00 0.00 0.00 0.00 0.51 0.00 0.49 Final Sat.: 1600 4800 1600 1600 4800 0 0 0 0 823 0 777 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.19 0.03 0.07 0.16 0.00 0.00 0.00 0.00 0.02 0.00 0.04 Crit Moves: **** **** **** ******************************************************************************** Apx-121 Default Scenario Tue Oct 1, 2024 18:18:11 Page 12-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #11 Birch St (NS) at Orchard Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.245 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 1 1 0 1 0 1 1 0 1 0 0 1 0 1 0 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 3 369 40 59 279 64 23 9 8 16 36 55 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 3 369 40 59 279 64 23 9 8 16 36 55 Added Vol: 0 0 0 0 0 36 14 0 0 0 0 0 PasserByVol: 0 1 0 0 1 0 0 0 0 0 0 0 Initial Fut: 3 370 40 59 280 100 37 9 8 16 36 55 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 3 370 40 59 280 100 37 9 8 16 36 55 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 3 370 40 59 280 100 37 9 8 16 36 55 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 3 370 40 59 280 100 37 9 8 16 36 55 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.80 0.20 1.00 1.47 0.53 1.00 0.53 0.47 1.00 0.40 0.60 Final Sat.: 1600 2888 312 1600 2358 842 1600 847 753 1600 633 967 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.13 0.13 0.04 0.12 0.12 0.02 0.01 0.01 0.01 0.06 0.06 Crit Moves: **** **** **** **** ******************************************************************************** Apx-122 Default Scenario Tue Oct 1, 2024 18:18:11 Page 13-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #12 Mesa Dr (NS) at Birch St (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.177 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 1! 0 0 0 0 1! 0 0 1 0 1 1 0 1 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 36 0 7 3 0 2 5 424 33 8 123 17 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 36 0 7 3 0 2 5 424 33 8 123 17 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 36 0 7 3 0 2 5 424 33 8 123 17 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 36 0 7 3 0 2 5 424 33 8 123 17 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 36 0 7 3 0 2 5 424 33 8 123 17 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 36 0 7 3 0 2 5 424 33 8 123 17 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.84 0.00 0.16 0.60 0.00 0.40 1.00 1.86 0.14 1.00 1.76 0.24 Final Sat.: 1340 0 260 960 0 640 1600 2969 231 1600 2811 389 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.02 0.00 0.03 0.00 0.00 0.00 0.00 0.14 0.14 0.01 0.04 0.04 Crit Moves: **** **** **** **** ******************************************************************************** Apx-123 Default Scenario Tue Oct 1, 2024 18:18:11 Page 14-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #13 Acacia St (NS) at Birch St (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.144 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Protected Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 0 0 0 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 0 0 2 0 6 37 461 0 0 155 5 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 0 2 0 6 37 461 0 0 155 5 Added Vol: 0 0 0 0 0 1 3 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 0 0 0 2 0 7 40 461 0 0 155 5 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 0 2 0 7 40 461 0 0 155 5 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 0 0 2 0 7 40 461 0 0 155 5 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 0 0 2 0 7 40 461 0 0 155 5 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 0.00 0.00 1.00 0.00 1.00 1.00 2.00 0.00 0.00 1.94 0.06 Final Sat.: 0 0 0 1600 0 1600 1600 3200 0 0 3100 100 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.00 0.00 0.00 0.00 0.00 0.03 0.14 0.00 0.00 0.05 0.05 Crit Moves: **** **** ******************************************************************************** Apx-124 Default Scenario Tue Oct 1, 2024 18:18:11 Page 15-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #14 Irvine Ave (NS) at Mesa Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.371 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 0 1 1 0 1 1 0 2 0 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 85 920 280 7 650 43 102 226 182 125 22 7 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 88 948 288 7 670 44 102 226 182 125 22 7 Added Vol: 0 7 3 0 3 0 0 0 0 1 0 0 PasserByVol: 0 3 1 0 20 0 0 0 0 1 0 0 Initial Fut: 88 958 292 7 693 44 102 226 182 127 22 7 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 88 958 292 7 693 44 102 226 182 127 22 7 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 88 958 292 7 693 44 102 226 182 127 22 7 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 88 958 292 7 693 44 102 226 182 127 22 7 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 1.00 1.00 1.11 0.89 2.00 0.76 0.24 Final Sat.: 1600 4800 1600 1600 4800 1600 1600 1773 1427 3200 1214 386 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.05 0.20 0.18 0.00 0.14 0.03 0.06 0.13 0.13 0.04 0.02 0.02 Crit Moves: **** **** **** **** ******************************************************************************** Apx-125 Default Scenario Tue Oct 1, 2024 18:18:11 Page 16-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project AM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #15 Irvine Ave (NS) at University Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.540 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 0 1 1 0 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 127 1135 57 62 794 64 127 69 186 23 28 23 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 131 1169 59 64 818 66 127 69 186 23 28 23 Added Vol: 0 10 0 0 4 0 0 0 0 0 0 0 PasserByVol: 0 4 0 0 21 0 0 0 0 0 0 0 Initial Fut: 131 1183 59 64 843 66 127 69 186 23 28 23 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 131 1183 59 64 843 66 127 69 186 23 28 23 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 131 1183 59 64 843 66 127 69 186 23 28 23 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 131 1183 59 64 843 66 127 69 186 23 28 23 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 0.55 0.45 Final Sat.: 1600 3200 1600 1600 3200 1600 1600 1600 1600 1600 878 722 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.08 0.37 0.04 0.04 0.26 0.04 0.08 0.04 0.12 0.01 0.03 0.03 Crit Moves: **** **** **** **** ******************************************************************************** Apx-126 Default Scenario Tue Oct 1, 2024 18:17:14 Page 2-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #1 MacArthur Blvd (NS) at Campus Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.526 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Include Include Include Ignore Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 4 0 1 1 0 4 0 1 2 0 2 1 0 2 0 3 0 1 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 124 717 17 128 642 341 259 326 55 30 654 108 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 129 746 18 133 668 355 259 326 55 30 654 108 Added Vol: 0 0 0 0 0 6 9 0 0 0 0 0 PasserByVol: 0 53 0 6 77 0 0 0 0 0 0 3 Initial Fut: 129 799 18 139 745 361 268 326 55 30 654 111 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 PHF Volume: 129 799 18 139 745 361 268 326 55 30 654 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 129 799 18 139 745 361 268 326 55 30 654 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 FinalVolume: 129 799 18 139 745 361 268 326 55 30 654 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 4.00 1.00 1.00 4.00 1.00 2.00 2.57 0.43 2.00 3.00 1.00 Final Sat.: 1600 6400 1600 1600 6400 1600 3200 4107 693 3200 4800 1600 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.08 0.12 0.01 0.09 0.12 0.23 0.08 0.08 0.08 0.01 0.14 0.00 Crit Moves: **** **** **** **** ******************************************************************************** Apx-127 Default Scenario Tue Oct 1, 2024 18:17:14 Page 3-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #2 MacArthur Blvd (NS) at Birch St (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.386 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Split Phase Split Phase Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 1 0 1 1 0 1 0 1 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 50 515 24 31 551 98 201 160 19 38 243 139 Growth Adj: 1.04 1.04 1.04 1.04 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 52 536 25 32 573 102 201 160 19 38 243 139 Added Vol: 0 0 0 0 0 0 0 5 0 0 3 0 PasserByVol: 0 24 0 52 39 0 12 9 0 0 12 27 Initial Fut: 52 560 25 84 612 102 213 174 19 38 258 166 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 52 560 25 84 612 102 213 174 19 38 258 166 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 52 560 25 84 612 102 213 174 19 38 258 166 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 52 560 25 84 612 102 213 174 19 38 258 166 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.43 0.57 1.58 1.28 0.14 1.00 1.22 0.78 Final Sat.: 1600 4800 1600 1600 5486 914 2521 2055 224 1600 1947 1253 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.03 0.12 0.02 0.05 0.11 0.11 0.08 0.08 0.08 0.02 0.13 0.13 Crit Moves: **** **** **** **** ******************************************************************************** Apx-128 Default Scenario Tue Oct 1, 2024 18:17:14 Page 4-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #3 MacArthur Blvd (NS) at Jamboree Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.562 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Ovl Ignore Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 1 2 0 3 0 1 2 0 3 1 0 3 0 3 0 1 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 206 807 284 154 1005 383 314 808 32 431 694 108 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 Initial Bse: 212 831 293 159 1035 394 323 832 33 444 715 111 Added Vol: 8 0 0 0 0 0 0 9 14 0 6 0 PasserByVol: 15 27 42 12 12 28 14 129 -2 18 71 7 Initial Fut: 235 858 335 171 1047 422 337 970 45 462 792 118 User Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 235 858 335 171 1047 0 337 970 45 462 792 118 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 235 858 335 171 1047 0 337 970 45 462 792 118 PCE Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 235 858 335 171 1047 0 337 970 45 462 792 118 OvlAdjVol: 181 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 1.00 2.00 3.00 1.00 2.00 3.82 0.18 3.00 3.00 1.00 Final Sat.: 3200 4800 1600 3200 4800 1600 3200 6117 283 4800 4800 1600 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.07 0.18 0.21 0.05 0.22 0.00 0.11 0.16 0.16 0.10 0.16 0.07 OvlAdjV/S: 0.11 Crit Moves: **** **** **** **** ******************************************************************************** Apx-129 Default Scenario Tue Oct 1, 2024 18:17:14 Page 5-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #4 Campus Dr (NS) at Bristol St North (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.545 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Permitted Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 3 0 0 0 0 4 0 3 0 0 0 0 0 1 0 3 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 490 637 0 0 596 551 0 0 0 257 1603 89 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 490 637 0 0 596 551 0 0 0 257 1603 89 Added Vol: 23 9 0 0 6 0 0 0 0 0 0 0 PasserByVol: 0 14 0 0 4 0 0 0 0 3 37 0 Initial Fut: 513 660 0 0 606 551 0 0 0 260 1640 89 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 513 660 0 0 606 551 0 0 0 260 1640 89 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 513 660 0 0 606 551 0 0 0 260 1640 89 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 513 660 0 0 606 551 0 0 0 260 1640 89 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 0.00 0.00 4.00 3.00 0.00 0.00 0.00 1.00 3.79 0.21 Final Sat.: 3200 4800 0 0 6400 4800 0 0 0 1600 6071 329 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.16 0.14 0.00 0.00 0.09 0.11 0.00 0.00 0.00 0.16 0.27 0.27 Crit Moves: **** **** **** ******************************************************************************** Apx-130 Default Scenario Tue Oct 1, 2024 18:17:14 Page 6-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #5 Campus Dr/Irvine Ave (NS) at Bristol St South (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.465 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 1 0 3 0 0 1 1 2 0 2 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 635 241 152 702 0 451 826 460 0 0 0 Growth Adj: 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 654 248 152 702 0 451 826 460 0 0 0 Added Vol: 0 32 0 0 6 0 0 3 11 0 0 0 PasserByVol: 0 4 17 0 6 0 10 15 0 0 0 0 Initial Fut: 0 690 265 152 714 0 461 844 471 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 690 265 152 714 0 461 844 471 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 690 265 152 714 0 461 844 471 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 690 265 152 714 0 461 844 471 0 0 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.00 1.00 1.00 3.00 0.00 1.41 2.59 2.00 0.00 0.00 0.00 Final Sat.: 0 6400 1600 1600 4800 0 2261 4139 3200 0 0 0 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.11 0.17 0.10 0.15 0.00 0.20 0.20 0.15 0.00 0.00 0.00 Crit Moves: **** **** **** ******************************************************************************** Apx-131 Default Scenario Tue Oct 1, 2024 18:17:14 Page 7-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #6 Birch St (NS) at Bristol St North (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.506 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Permitted Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 0 0 0 0 1 1 2 0 0 0 0 0 1 1 2 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 161 276 0 0 330 527 0 0 0 419 1367 128 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 161 276 0 0 330 527 0 0 0 419 1367 128 Added Vol: 0 5 0 0 3 0 0 0 0 25 0 0 PasserByVol: 0 1 0 0 4 10 0 0 0 2 33 5 Initial Fut: 161 282 0 0 337 537 0 0 0 446 1400 133 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 161 282 0 0 337 537 0 0 0 446 1400 133 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 161 282 0 0 337 537 0 0 0 446 1400 133 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 161 282 0 0 337 537 0 0 0 446 1400 133 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 2.00 0.00 0.00 1.54 2.46 0.00 0.00 0.00 1.00 3.74 0.26 Final Sat.: 3200 3200 0 0 2468 3932 0 0 0 1600 5984 416 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.05 0.09 0.00 0.00 0.14 0.14 0.00 0.00 0.00 0.28 0.23 0.32 Crit Moves: **** **** **** ******************************************************************************** Apx-132 Default Scenario Tue Oct 1, 2024 18:17:14 Page 8-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #7 Birch St (NS) at Bristol St South (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.368 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 2 1 1 2 0 2 0 0 1 1 2 1 0 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 239 274 188 460 0 253 894 105 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 239 274 188 460 0 253 894 105 0 0 0 Added Vol: 0 5 41 0 28 0 0 0 3 0 0 0 PasserByVol: 0 1 4 4 1 0 0 33 0 0 0 0 Initial Fut: 0 245 319 192 489 0 253 927 108 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 245 319 192 489 0 253 927 108 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 245 319 192 489 0 253 927 108 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 245 319 192 489 0 253 927 108 0 0 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 2.00 2.00 2.00 2.00 0.00 1.00 3.69 0.31 0.00 0.00 0.00 Final Sat.: 0 3200 3200 3200 3200 0 1600 5899 501 0 0 0 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.08 0.10 0.06 0.15 0.00 0.16 0.16 0.22 0.00 0.00 0.00 Crit Moves: **** **** ******************************************************************************** Apx-133 Default Scenario Tue Oct 1, 2024 18:17:14 Page 9-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #8 Jamboree Rd (NS) at Bristol St North (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.364 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Permitted Permitted Permitted Rights: Ignore Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 1 1 0 0 3 1 1 0 0 0 0 0 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 617 1538 934 0 645 640 0 0 0 0 0 0 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 636 1584 962 0 664 659 0 0 0 0 0 0 Added Vol: 8 23 0 0 0 14 0 0 0 0 0 0 PasserByVol: 27 139 30 0 27 85 0 0 0 0 0 0 Initial Fut: 671 1746 992 0 691 758 0 0 0 0 0 0 User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 671 1746 0 0 691 758 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 671 1746 0 0 691 758 0 0 0 0 0 0 PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 671 1746 0 0 691 758 0 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 3.00 1.00 0.00 3.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 Final Sat.: 3200 4800 1600 0 4800 3200 0 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.21 0.36 0.00 0.00 0.14 0.24 0.00 0.00 0.00 0.00 0.00 0.00 Crit Moves: **** ******************************************************************************** Apx-134 Default Scenario Tue Oct 1, 2024 18:17:14 Page 10-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #9 Jamboree Rd (NS) at Bristol St South (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.580 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Protected Protected Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 4 1 0 0 0 4 0 0 1 1 1 0 2 0 0 0 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 2025 71 0 647 0 738 566 901 0 0 0 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 2086 73 0 666 0 738 566 901 0 0 0 Added Vol: 0 8 0 0 0 0 23 5 14 0 0 0 PasserByVol: 0 83 0 0 26 0 94 8 26 0 0 0 Initial Fut: 0 2177 73 0 692 0 855 579 941 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 2177 73 0 692 0 855 579 941 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 2177 73 0 692 0 855 579 941 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 2177 73 0 692 0 855 579 941 0 0 0 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 4.84 0.16 0.00 4.00 0.00 1.79 1.21 2.00 0.00 0.00 0.00 Final Sat.: 0 7740 260 0 6400 0 2862 1938 3200 0 0 0 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.28 0.28 0.00 0.11 0.00 0.30 0.30 0.29 0.00 0.00 0.00 Crit Moves: **** **** **** ******************************************************************************** Apx-135 Default Scenario Tue Oct 1, 2024 18:17:14 Page 11-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #10 Irvine Ave (NS) at Orchard Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.442 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 0 0 0 0 0 0 0 0 0 1! 0 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 763 13 36 1342 0 0 0 0 72 0 164 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 786 13 37 1382 0 0 0 0 72 0 164 Added Vol: 0 6 0 17 0 0 0 0 0 9 0 0 PasserByVol: 0 21 0 0 6 0 0 0 0 0 0 0 Initial Fut: 0 813 13 54 1388 0 0 0 0 81 0 164 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 813 13 54 1388 0 0 0 0 81 0 164 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 813 13 54 1388 0 0 0 0 81 0 164 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 813 13 54 1388 0 0 0 0 81 0 164 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 0.00 0.00 0.00 0.00 0.33 0.00 0.67 Final Sat.: 1600 4800 1600 1600 4800 0 0 0 0 529 0 1071 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.17 0.01 0.03 0.29 0.00 0.00 0.00 0.00 0.05 0.00 0.15 Crit Moves: **** **** **** ******************************************************************************** Apx-136 Default Scenario Tue Oct 1, 2024 18:17:14 Page 12-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #11 Birch St (NS) at Orchard Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.340 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 1 1 0 1 0 1 1 0 1 0 0 1 0 1 0 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 4 260 20 58 584 61 40 11 6 24 60 56 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 4 260 20 58 584 61 40 11 6 24 60 56 Added Vol: 0 0 0 0 0 31 46 0 0 0 0 0 PasserByVol: 0 5 0 0 1 0 0 0 0 0 0 0 Initial Fut: 4 265 20 58 585 92 86 11 6 24 60 56 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 4 265 20 58 585 92 86 11 6 24 60 56 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 4 265 20 58 585 92 86 11 6 24 60 56 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 4 265 20 58 585 92 86 11 6 24 60 56 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 1.86 0.14 1.00 1.73 0.27 1.00 0.65 0.35 1.00 0.52 0.48 Final Sat.: 1600 2975 225 1600 2765 435 1600 1035 565 1600 828 772 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.09 0.09 0.04 0.21 0.21 0.05 0.01 0.01 0.02 0.07 0.07 Crit Moves: **** **** **** **** ******************************************************************************** Apx-137 Default Scenario Tue Oct 1, 2024 18:17:14 Page 13-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #12 Mesa Dr (NS) at Birch St (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.218 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 1! 0 0 0 0 1! 0 0 1 0 1 1 0 1 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 30 0 6 9 0 5 0 156 48 15 604 5 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 30 0 6 9 0 5 0 156 48 15 604 5 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 30 0 6 9 0 5 0 156 48 15 604 5 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 30 0 6 9 0 5 0 156 48 15 604 5 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 30 0 6 9 0 5 0 156 48 15 604 5 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 30 0 6 9 0 5 0 156 48 15 604 5 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.83 0.00 0.17 0.64 0.00 0.36 1.00 1.53 0.47 1.00 1.98 0.02 Final Sat.: 1333 0 267 1029 0 571 1600 2447 753 1600 3174 26 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.02 0.00 0.02 0.01 0.00 0.01 0.00 0.06 0.06 0.01 0.19 0.19 Crit Moves: **** **** **** **** ******************************************************************************** Apx-138 Default Scenario Tue Oct 1, 2024 18:17:14 Page 14-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #13 Acacia St (NS) at Birch St (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.225 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Permitted Permitted Protected Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 0 0 0 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 0 0 0 8 0 29 4 196 0 0 635 4 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 0 8 0 29 4 196 0 0 635 4 Added Vol: 0 0 0 0 0 5 3 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 0 0 0 8 0 34 7 196 0 0 635 4 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 0 8 0 34 7 196 0 0 635 4 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 0 0 8 0 34 7 196 0 0 635 4 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 0 0 0 8 0 34 7 196 0 0 635 4 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 0.00 0.00 1.00 0.00 1.00 1.00 2.00 0.00 0.00 1.99 0.01 Final Sat.: 0 0 0 1600 0 1600 1600 3200 0 0 3180 20 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.00 0.00 0.00 0.01 0.00 0.02 0.00 0.06 0.00 0.00 0.20 0.20 Crit Moves: **** **** **** ******************************************************************************** Apx-139 Default Scenario Tue Oct 1, 2024 18:17:14 Page 15-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #14 Irvine Ave (NS) at Mesa Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.455 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 3 0 1 1 0 3 0 1 1 0 1 1 0 2 0 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 78 564 132 14 910 321 56 43 145 310 240 21 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 80 581 136 14 937 331 56 43 145 310 240 21 Added Vol: 0 6 3 0 9 0 0 0 0 5 0 0 PasserByVol: 0 18 1 0 8 0 0 0 0 1 0 0 Initial Fut: 80 605 140 14 954 331 56 43 145 316 240 21 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 80 605 140 14 954 331 56 43 145 316 240 21 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 80 605 140 14 954 331 56 43 145 316 240 21 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 80 605 140 14 954 331 56 43 145 316 240 21 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 3.00 1.00 1.00 3.00 1.00 1.00 1.00 1.00 2.00 0.92 0.08 Final Sat.: 1600 4800 1600 1600 4800 1600 1600 1600 1600 3200 1471 129 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.05 0.13 0.09 0.01 0.20 0.21 0.04 0.03 0.09 0.10 0.16 0.16 Crit Moves: **** **** **** **** ******************************************************************************** Apx-140 Default Scenario Tue Oct 1, 2024 18:17:14 Page 16-1 -------------------------------------------------------------------------------- Newport Irvine Medical Center (3300 Irvine Avenue) TPO 2027 With Project PM Peak Hour -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative) ******************************************************************************** Intersection #15 Irvine Ave (NS) at University Dr (EW) ******************************************************************************** Cycle (sec): 100 Critical Vol./Cap.(X): 0.558 Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 100 Level Of Service: A ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------|---------------||---------------||---------------||---------------| Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 0 1 1 0 0 1 0 ------------|---------------||---------------||---------------||---------------| Volume Module: Base Vol: 112 738 31 47 1123 146 79 49 130 39 51 58 Growth Adj: 1.03 1.03 1.03 1.03 1.03 1.03 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 115 760 32 48 1157 150 79 49 130 39 51 58 Added Vol: 0 8 0 0 14 0 0 0 0 0 0 0 PasserByVol: 0 19 0 0 9 0 0 0 0 0 0 0 Initial Fut: 115 787 32 48 1180 150 79 49 130 39 51 58 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 115 787 32 48 1180 150 79 49 130 39 51 58 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 115 787 32 48 1180 150 79 49 130 39 51 58 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 FinalVolume: 115 787 32 48 1180 150 79 49 130 39 51 58 ------------|---------------||---------------||---------------||---------------| Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 0.47 0.53 Final Sat.: 1600 3200 1600 1600 3200 1600 1600 1600 1600 1600 749 851 ------------|---------------||---------------||---------------||---------------| Capacity Analysis Module: Vol/Sat: 0.07 0.25 0.02 0.03 0.37 0.09 0.05 0.03 0.08 0.02 0.07 0.07 Crit Moves: **** **** **** **** ******************************************************************************** Apx-141 APPENDIX D APPROVED PROJECTS LIST Apx-142 Apx-143 Apx-144 Apx-145 Apx-146 Irvine Ave / University Dr NB SB EB WB NL NT NR SL ST SR EL ET ER WL WT WR AM 4 21 0 0 0 4 0 0 21 0 0 0 0 0 0 0 PM 19 9 0 0 0 19 0 0 9 0 0 0 0 0 0 0 Irvine Ave / Orchard Dr NB SB EB WB NL NT NR SL ST SR EL ET ER WL WT WR AM 2 23 0 0 0 2 0 0 23 0 0 0 0 0 0 0 PM 21 6 0 0 0 21 0 0 6 0 0 0 0 0 0 0 Birch St / Orchard Dr NB SB EB WB NL NT NR SL ST SR EL ET ER WL WT WR AM 1 1 0 0 0 1 0 0 1 0 0 0 0 0 0 0 PM 5 1 0 0 0 5 0 0 1 0 0 0 0 0 0 0 Mesa Dr/ Acacia St and Birch St NB SB EB WB NL NT NR SL ST SR EL ET ER WL WT WR AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Apx-147 APPENDIX E TPO ONE-PERCENT THRESHOLD ANALYSIS Apx-148 NB SB EB WB NB SB EB WB NB SB EB WB NB SB EB WB 1. MacArthur Blvd (NS) at Campus Dr (EW)4 594 1209 905 260 6 13 10 3 0 7 3 0 No No No No 2. MacArthur Blvd (NS) at Birch St (EW)589 839 355 227 6 9 4 3 0 0 1 3 No No No Yes 3. MacArthur Blvd (NS) at Jamboree Rd (EW)4 1393 860 1331 1339 15 9 14 14 10 0 7 7 No No No No 4. Campus Dr (NS) at Bristol St North (EW)1526 391 0 1339 16 4 0 14 10 7 0 0 No Yes No No 5. Irvine Ave/Campus Dr (NS) at Bristol St South (EW)942 516 2672 0 10 6 27 0 10 7 16 0 Yes Yes No No 6. Birch St (NS) at Bristol St North (EW)800 265 0 1882 9 3 0 20 1 3 0 29 No Yes No Yes 7. Birch St (NS) at Bristol St South (EW)465 564 1813 0 5 6 19 0 14 33 3 0 Yes Yes No No 8. Jamboree Rd (NS) at Bristol St North (EW)2689 1266 0 0 28 13 0 0 17 16 0 0 No Yes No No 9. Jamboree Rd (NS) at Bristol St South (EW)1627 819 2539 0 17 9 26 0 10 0 12 0 No No No No 10. Irvine Ave (NS) at Orchard Dr (EW)967 854 0 67 10 9 0 1 7 20 0 3 No Yes No Yes 11. Birch St (NS) at Orchard Dr (EW)413 403 40 107 5 5 1 2 0 36 14 0 No Yes Yes No 12. Mesa Dr (NS) at Birch St (EW)43 5 462 148 1 1 5 2 0 0 0 0 No No No No 13. Acacia St (NS) at Birch St (EW)0 8 498 160 0 1 6 2 0 1 3 0 No Yes No No 14. Irvine Ave (NS) at Mesa Dr (EW)1328 741 510 155 14 8 6 2 10 3 0 1 No No No No 15. Irvine Ave (NS) at University Dr (EW)1363 969 382 74 14 10 4 1 10 4 0 0 No No No No NB SB EB WB NB SB EB WB NB SB EB WB NB SB EB WB 1. MacArthur Blvd (NS) at Campus Dr (EW)4 946 1239 640 795 10 13 7 8 0 6 9 0 No No Yes No 2. MacArthur Blvd (NS) at Birch St (EW)637 798 401 459 7 8 5 5 0 0 5 3 No No Yes No 3. MacArthur Blvd (NS) at Jamboree Rd (EW)4 1420 1640 1329 1366 15 17 14 14 8 0 23 6 No No Yes No 4. Campus Dr (NS) at Bristol St North (EW)1141 1151 0 1989 12 12 0 20 32 6 0 0 Yes No No No 5. Irvine Ave/Campus Dr (NS) at Bristol St South (EW)923 860 1762 0 10 9 18 0 32 6 14 0 Yes No No No 6. Birch St (NS) at Bristol St North (EW)438 871 0 1954 5 9 0 20 5 3 0 25 Yes No No Yes 7. Birch St (NS) at Bristol St South (EW)518 653 1285 0 6 7 13 0 46 28 3 0 Yes Yes No No 8. Jamboree Rd (NS) at Bristol St North (EW)3378 1435 0 0 35 15 0 0 31 14 0 0 No No No No 9. Jamboree Rd (NS) at Bristol St South (EW)2242 692 2333 0 23 7 24 0 8 0 42 0 No No Yes No 10. Irvine Ave (NS) at Orchard Dr (EW)820 1425 0 236 9 15 0 3 6 17 0 9 No Yes No Yes 11. Birch St (NS) at Orchard Dr (EW)289 704 57 140 3 8 2 2 0 31 46 0 No Yes Yes No 12. Mesa Dr (NS) at Birch St (EW)36 14 204 624 1 1 3 7 0 0 0 0 No No No No 13. Acacia St (NS) at Birch St (EW)0 37 200 639 0 1 3 7 0 5 3 0 No Yes Yes No 14. Irvine Ave (NS) at Mesa Dr (EW)816 1290 244 572 9 13 3 6 9 9 0 5 Yes No No No 15. Irvine Ave (NS) at University Dr (EW)926 1364 258 148 10 14 3 2 8 14 0 0 No Yes No No ID Study Intersection Traffic Phasing Ordinance (TPO) One-Percent Threshold Calculations ID Study Intersection PM Peak Hour Approach Totals TPO Year 2027 Without Project AM Peak Hour Approach Totals TPO Year 2027 Without Project Threshold Met? Threshold Met? 1% of TPO Volume 1% of TPO Volume PM Peak Hour Project Volume AM Peak Hour Project Volume Apx-149 GANDDINI GROUP INC. 714.795.3100 | ganddini.com