HomeMy WebLinkAbout08 - Proposal to Reduce Flashy Fuels and Restore Habitat in Buck Gully ReserveQ �EwPpRT
c
9C/FOR
TO:
FROM:
TITLE:
ABSTRACT:
CITY OF
NEWPORT BEACH
City Council Staff Report
February 11, 2025
Agenda Item No. 8
HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
Sean Levin, Recreation and Senior Services Director - 949-644-
3151, slevin@newportbeachca.gov
Proposal to Reduce Flashy Fuels and Restore Habitat in Buck Gully
Reserve
The recent Los Angeles County wildfires have heightened awareness of fire hazards
within Buck Gully. Staff from the Fire, Public Works and Recreation and Senior Services
Departments sought a proposal (Attachment A) from Irvine Ranch Conservancy (IRC),
the City's contract land manager for Buck Gully, to increase fire mitigation in the reserve.
RECOMMENDATIONS:
a) Find this project exempt from the California Environmental Quality Act (CEQA)
pursuant to Sections 15304 (Class 4 — Minor Alterations to Land) and 15308 (Class 8
— Actions Taken by Regulatory Agencies for Protection of the Environment) of the
CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3,
because it has no potential to have a significant effect on the environment;
b) Approve Budget Amendment No. 25-053 transferring $425,055 from the
unappropriated General Fund balance to the General Fund CIP and appropriating it
into Account No. 01201928-911047-BGFRR, and
c) Authorize the City Manager to execute a contract that is acceptable to the City
Attorney with Irvine Ranch Conservancy in the amount of $425,055 to reduce flashy
fuels and restore habitat in Buck Gully.
DISCUSSION:
Buck Gully consists of approximately 300 acres of open space and a creek bed within the
Orange County Central Coastal Natural Community Conservation Plan (NCCP) areas.
Land within the NCCP contains protected species and therefore was set aside in
perpetuity as mitigated land in exchange for development elsewhere. NCCP lands must
be managed in a specific manner to preserve their natural resources. The City of Newport
Beach became the property owner of Buck Gully in 2005, is responsible for its land
management, and is a signatory to the NCCP Implementation Agreement. The City has
contracted with IRC to manage Buck Gully through restoration, monitoring and education
since taking ownership.
8-1
Proposal to Reduce Flashy Fuels and Restore Habitat in Buck Gully Reserve
February 11, 2025
Page 2
Effective landscape restoration and mitigation measures are essential for reducing
wildfire risk in the community. By enhancing ecosystem resilience, minimizing fuel loads,
and establishing defensible spaces, these efforts protect lives, property and critical
infrastructure. Additionally, they promote a sustainable and manageable habitat that
supports long-term ecological health and fire -adaptive landscapes. Removing non-native
plant materials and replacing them with native vegetation, which grows slowly and retains
moisture for longer periods, is a long-term strategy for reducing fire risk. Additionally, the
establishment of native plant materials prevents the non-native plant materials from
regrowing. Dead, non-native vegetation lengthens the fire season and can endanger
nearby communities.
This proposal would remove fuels that are annual, non-native grasses and mustards that
grow rapidly in winter, before they deplete soil moisture, set seed, and desiccate by late
spring and replace them with native shrubs, bunchgrasses, wildflowers and cacti.
Irvine Ranch Conservancy has a proven track record of successfully completing
numerous restoration projects in Buck Gully and throughout Orange County.
The proposed project would span 8 years with the following outcomes:
• Reduce long-term maintenance needs in the Hazard Reduction Zone by replacing
flammable, non-native, annual vegetation with non-flammable cacti.
• Replace flammable, annual vegetation with less flammable coastal sage scrub —
grassland vegetation.
• Eliminate artichoke thistle (Cynara cardunculus), a highly invasive and unsightly
weed, from the 4.8 acres and nearby buffer areas.
• Create 4.8 acres of habitat for the California Gnatcatcher.
• Create 2.0 acres of habitat for the Coastal Cactus Wren.
FISCAL IMPACT:
The Budget Amendment No. 25-053 (Attachment B) transfers $425,055 from General
Fund unappropriated fund balance to the General Fund CIP (Fund 012), utilizing a portion
of the Fiscal Year 2024-25 General Fund operating surplus, and appropriating it to
account 01201928-911047-BGFRR.
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this project exempt from the California
Environmental Quality Act (CEQA) pursuant to Sections 15304 (Class 4 — Minor
Alterations to Land) and 15308 (Class 8 — Actions Taken by Regulatory Agencies for
Protection of the Environment) of the CEQA Guidelines, California Code of Regulations,
Title 14, Division 6, Chapter 3, because it has no potential to have a significant effect on
the environment. The Class 4 Exemption includes fire management activities to reduce
the volume of flammable vegetation, provided the activities will not result in the taking of
endangered, rare, or threatened plant or animal species or significant erosion and
sedimentation of surface waters. The Class 8 Exemption covers actions taken by a
regulatory agency to assure the maintenance, restoration, enhancement, or protection of
the environment.
8-2
Proposal to Reduce Flashy Fuels and Restore Habitat in Buck Gully Reserve
February 11, 2025
Page 3
The proposed maintenance project will remove annual nonnative fuels proximate to
structures that grow rapidly in winter and desiccate by late spring thereby increasing
flammability. The project will remove nonnative plantings and restore them with more
resilient native plantings that retain moisture for longer periods and reduce fire risk. The
project does not include any takings of sensitive biological resources and is intended to
minimize structure fires and wildfires that lead to environmental and natural resources
impacts, including loss of vegetation and biodiversity.
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
ATTACHMENTS:
Attachment A — Proposal to Restore Habitat and Reduce Flashy Fuels
Attachment B — Budget Amendment No. 25-053
8-3
AL ATTACHMENT A
It IRVINE RANCH
CONSERVANCY
Proposal to Restore Habitat and Reduce Flashy Fuels
at Buck Gully Reserve, City of Newport Beach
January 27, 2025
Cactus Planting Site (foreground) and CSS Restoration Site (background)
Robert Freese, PhD, Program Manager, Habitat Restoration & Enhancement
Irvine Ranch Conservancy
rfreese@irconservancy.org
Prepared for:
Sean Levin, Recreation Superintendent
City of Newport Beach
Slevin@newportbeachca.gov
1
IRVINE RANCH
CONSERVANCY
Introduction
Irvine Ranch Conservancy (IRC) understands that the City of Newport Beach (City) wishes to
reduce flashy fuels in Buck Gully Reserve (Reserve). Most of these fuels are annual non-native
grasses and mustards that grow rapidly in winter, deplete soil moisture, set seed, and desiccate
by late spring. This dead vegetation lengthens the fire season and can endanger nearby
communities. The native vegetation of shrubs, bunchgrasses, wildflowers, and cacti grow more
slowly and retain moisture for longer periods thereby delaying the fire season.
Native vegetation also provides considerable habitat value for wildlife. Management for the
Reserve must maintain or enhance the natural resources of the site, which are conserved under
the Natural Community Conservation Plan/ Habitat Conservation Plan (NCCP/HCP) for the
Central and Coastal Subregions of Orange County.
California Gnatcatcher (Polyoptila californica) is a state and federally listed threatened species
that nests and forages almost exclusively in open stands of coastal sage scrub (CSS)
vegetation. Cactus Wren (Campylorhynchus brunneicapillus) is a California state species of
special concern that nests in cactus scrub.
IRC has successfully managed restoration projects at the Reserve for several years. Figure I
shows the locations of several such projects. IRC proposes an eight -year project to restore
habitat and reduce flashy fuel loads in the Reserve. This new restoration project would include
two components shown in Figure 2:
• 4.8 acres of mixed CSS - grassland restoration near Canyon Terrace Drive.
• 2.0 acres of cactus scrub comprised of seven parcels within or adjacent to the Hazard
Reduction Zone (HRZ) of the Reserve.
Goals
Project goals include:
• Reduce long-term maintenance needs in the HRZ by replacing flammable, non-native,
annual vegetation with non-flammable cactus.
• Create 2.0 acres of habitat for the Coastal Cactus Wren.
• Replace flammable, annual vegetation with less flammable CSS — grassland vegetation.
• Create 4.8 acres of habitat for the California Gnatcatcher.
• Eliminate artichoke thistle (Cynara cardunculus), a highly invasive and unsightly weed,
from the 4.8 acres and nearby buffer areas.
2
8-5
IRVINE RANCH
CONSERVANCY
Buck Gully Restoration N
Proposed Restorations Active Restorations Past Restorations 0f 01 D 2 miles ,
Cactus Scrub Restoration (2.01 acres) Bobcat Waterwise 5
IRVINE RANCH
0 Canyon Terrace CSS restoration (4.82 acres) Sandcastle 0 Isabella Terrace
s�eie ,_,s,000
12242025
Castle Cove O Buck Gully Boundary Aerial Source Eagle Aerial, F11-2018
Figure 1. IRC Habitat Restoration Projects at Buck Gully
:.
IRVINE RANCH
CONSERVANCY
el
.... `_ \
Figure 3. Newly Planted Cactus Pads at Castlecove Site in the Reserve
Figure 4. Planted Cactus Pads at Silverado Canyon after 17 Months of Growth
5
::
IRVINE RANCH
CONSERVANCY
Conceptual Implementation Plan
Cactus Scrub: Planting will be a three-year process with only minor maintenance and
monitoring needed during the remaining five years of the project. Examples of cactus scrub
planting projects are shown in Figures 3 and 4. Implementation will involve the following steps:
• After nesting season, use weed whips to mow dead standing vegetation within the
seven proposed parcels. Ongoing HRZ clearance makes this a relatively minor task. Rake
any cut material from the sites.
• Harvest 3250 cactus (Opuntia littoralis) pads from existing stands of cactus following
protocols to protect integrity of existing cactus scrub vegetation.
• Select cactus planting beds and incorporate a four -inch layer of organic compost into
the soil.
• Pads shall be planted in four -foot diameter beds spaced seven feet on center allowing
for maintenance paths between beds.
• Install six cactus pads per bed and use water truck with hoses to irrigate each bed at
least three times per year during the first two years.
• Apply pre -emergent herbicide to all areas to provide at least two years of weed control,
allowing cactus to grow without competition.
• Conduct quarterly inspections to evaluate the condition of planting beds and identify
any remedial steps.
• Conduct maintenance measures including weed and erosion control, as needed.
• During the second year, replace cacti that failed to establish to ensure the desired
density.
• After three years, apply a second dose of pre -emergent herbicide to provide additional
years of control of annual vegetation.
• Continue to control weeds and monitor cactus growth and cover for the remaining five
years.
• Conduct performance monitoring.
CSS — Grassland: Restoration involves three years of site preparation followed by eight years of
maintenance. Implementation will involve the following steps:
• After nesting season, mow and remove any dead standing vegetation within the 4.8-
acre parcel using weed whips. Care will be taken to avoid existing patches of native
vegetation. Access to the site will be via Canyon Terrace Drive.
• For three years, conduct broadcast spray applications of herbicides to kill germinating
weeds. It will be necessary to park a trailer on Canyon Terrace Drive to access the site.
11
:•
IRVINE RANCH
CONSERVANCY
These grow -and -kill weed treatments are necessary to deplete the soil of accumulated
weed seeds in preparation for seeding.
• Prepare a diverse seed mix using seed derived from appropriate local sources (Table 1).
Due to the heavy clay soils at this site, we recommend including several grassland
species in the mix in addition to shrub species.
• Hand broadcast and rake the seed material into the soil in late fall/ early winter prior to
the first significant rainfall.
• Re -seed the following year to supplement areas where seedling establishment was
inadequate.
• Conduct weed control for five years to ensure establishment of desired vegetation using
a combination of manual techniques, spot mowing, and backpack spraying.
• Conduct quarterly inspections each year to evaluate the condition of the site and
identify remedial steps.
• Survey nesting bird activity each spring prior to intensive field work to avoid impacts. As
the planted vegetation matures, field staff trained in bird surveys will inspect the site
prior to any field operations.
• Conduct performance monitoring.
Timeline: Appendix A provides a comprehensive list of tasks and a project timeline.
Table 1. Plant Palette for CSS - Grassland Polygon
Common Name
Scientific Name
Seed Rate (PLS #/ acre)
Deerweed
Acmispon glaber
2
Sagebrush
Artemisia californica
1
Black sage
Salvia mellifera
1
Bush sunflower
Encelia californica
3
Goldenbush
Isocoma menziesh
0.5
Purple needlegrass
Stipa pulchra
3
California brome
Bromus carinatus
2
Melic grass
Melica imperfecta
1
Fiddleneck
Amsinkia intermedia
0.2
Coastal checkerbloom
Sidalcea malviflora
0.2
School bells
Dicholostemma capitatum
bulbs
Farewell -to -spring
Clarkia purpurea
0.2
Plantain
Plantago erecta
1
Gumplant
Grindelia camporum
0.5
Arroyo lupine
Lupinus succulentus
0.3
7
8-10
4 IRVINE RANCH
CONSERVANCY
Performance Standards, Monitoring, and Reporting
Performance Standards: The performance standards shown in Table 2 will guide project
activities, inform adaptive management strategies, and allow managers to assess progress.
Table 2. Performance Standards
Habitat
Absolute Cover of Vegetation
Native
Non-native
Cactus Scrub
> 65 percent, cactus only
< 15 percent
CSS - Grassland
> 65 percent
< 35 percent (including < 15 percent mustards)
Monitoring: Protocols will include:
• Photo documentation will be conducted each year from representative locations (three
stations in CSS — grassland and three stations in cactus scrub).
• Qualitative (rapid assessment) evaluations of vegetation cover will be done in the cactus
scrub on alternate years following protocols from California Native Plant Society.
• Quantitative monitoring (transect based) evaluations of vegetation cover will be done in
the CSS — grassland on alternate years.
Reporting: Annual project updates will be sent to the City at the end of each fiscal year and will
include a summary of activities, progress, and upcoming plans.
Budget
Appendix B shows the proposed budget for the project, which totals $425,055 over eight years.
Billable rates for labor classes are shown in Appendix C.
W
8-11
IRVINE RANCH
CONSERVANCY
Appendices
Appendix A. Project Timelines by Tasks and Fiscal Year (July — June)
Restoration Tasks (by type)
Fiscal Year of Project
Year 1
Year 2
Year 3
Year 4
Year 5
Year 6
Year 7
Year 8
Site mowing (All)
x
Cactus pad collection/ installation (Cactus Scrub)
x
x
Irrigation (Cactus Scrub)
x
x
Preemergent herbicide applications (Cactus
Scrub)
x
x
Site preparation (CSS — Grassland)
x
x
x
Seed Production (CSS — Grassland)
x
x
x
Seeding (CSS — Grassland)
x
x
Weed Control (All)
x
x
x
x
x
x
x
x
Pre -disturbance surveys (All)
x
x
x
x
x
x
x
x
Performance monitoring (All)
x
x
x
8-12
4 IRVINE RANCH
CONSERVANCY
Appendix B. Project Costs by Category and Fiscal Year (July -June)
Budget Categories
Fiscal Year of Project
Year 1
Year 2
Year 31
Year 41
Year 51
Year 61
Year 7
Year 8
Total
Management, Coordination,
Inspections
10,068
10,068
10,068
10,068
10,068
10,068
10,068
10,068
80,544
Plant Material Development
30,604
25,455
25,184
5,184
1
1
86,427
Site Preparation
16,088
1,692
2,256
20,036
Installation and Seeding
10,840
542
13,800
4,140
29,322
Maintenance
5,664
5,664
43,360
21,680
21,680
21,680
10,8401
10,840
141,408
Monitoring
296
296
296
2,146
296
2,146
296
2,146
7,918
Supplies and Miscellaneous
6,867
1,923
2,594
1,875
1,875
1,875
1,875
1,875
20,759
Sub -total (project costs)
80,427
45,640
97,558
45,093
33,919
35,769
23,079
24,929
386,414
Contingency (10 percent project costs)
8,043
4,564
9,756
4,509
3,392
3,577
2,308
2,493
38,641
Total
88,469
50,204
107,314
49,602
37,311
39,346
25,387
27,422
425,055
10
8-13
IRVINE RANCH
CONSERVANCY
Appendix C. Billable Rates
FY25 Billable Rates
Hourly Rate
Program Manager
$98.00
Project Manager
$78.00
Program Coordinator
$74.00
Program Specialist
$67.00
Program Technician
$67.00
Program Assistant
$59.00
Field Crew Member
$51.00
IRC Contractor
Hourly Rate
General Labor
$45.00
Specialty contractor (bird surveys)
$112.50
11
8-14
�[rFoaH`r
Department: Recreation & Sr Services
Requestor: Sean Levin
City of Newport Beach
BUDGET AMENDMENT
2024-25
❑ CITY MANAGER'S APPROVAL ONLY
0 COUNCIL APPROVAL REQUIRED
ONETIME: ❑ Yes ❑ No
Approvals
ATTACHMENT B
BA#: 25-053
Finance Director: G7 Date r1z91?,5
City Clerk: Date
EXPLANATION FOR REQUEST:
To transfer FY 2024-25 year-end surplus funds to the General Fund CIP Fund for Buck Gully Fire Risk Reduction. ❑ from existing budgetappropriatiom
❑ from additional estimated revenues
❑✓ from unappropriated fund balance
REVENUES
Fund #
Org
Object
Project Description
Increase or (Decrease) S
012
01299
691010
1NTERFUND TRANSFERS -TRANSFER IN GENERAL FUND
425,055.00
Subtotal
$ 425,055.00
EXPENDITURES
Fund #
Org
Object
Project Description
Increase or (Decrease) $
010
01099
991012
GENERAL FUND INTERFUND TRANSFR
-TRANSFER OUT CIP F
425,055.00
012
07201928
911047
BGFRR MISC & STUDIES - CAPITAL PROJECT
425,055.00
Subtotal
$ 85D,110.00
FUND BALANCE
Fund #
Object
Description
Increase or (Decrease) $
010
300000
GENERAL FUND
- FUND BALANCE CONTROL
(425,055.00)
012
300000
GENERAL FUND CAPITAL PROJECTS - FUND BALANCE CONTROL
Subtotal
$ (425,055.00)
Fund Balance Change Required
8-15