January 3, 2013
PROJECT 3355 and 3303 Via Lido
REGARDING Environmental Information Response
Dear Mr. Jim Campbell,
The following is our response to the information requested as part of the
City’s Environmental Information Form.
C. Environmental Setting
1. The subject parcel is made up of two properties. The first property is
occupied by the Lido Building, a commercial three story office
building at 3355 Via Lido. Immediately adjacent at 3303 Via Lido is
the First Church of Christ Scientist property. The existing buildings
on the site are tired, old and unredeemed by architectural merit. The
remainder of the site is given over to parking for these existing uses.
The site is flat, developed and without issues pertaining to plants
and animals or to cultural, historical or scenic aspects. Please refer
to Sheet D-1 for photographs of the existing property.
2. The project site is part of what the Lido Village Conceptual Plan calls
the Lido Triangle. It is bordered by Via Lido , Via Malaga and Via
Oporto. Across Via Lido are two story single family waterfront
residential properties. To the south facing the site on Via Malaga is
Saint James Anglican Church. Opposite on Via Oporto is parking for
Via Lido Plaza. Occupying the northern-most tip of the triangle is a
one story commercial building that houses a real estate office. The
submittal includes a site section on Sheet D-17 that indicates
heights and setbacks as they relate to the existing context. Also
included on Sheet D-2 are photographs that illustrate the existing
site context.
D. Potential Environmental Effects
i. Aesthetics. The existing properties are fully developed along Via Lido
and afford no public or private scenic views through the site. The
proposed development is broken into 5 buildings which will afford a
number of view corridors through the site. In addition, the proposed
project has been designed with animated, street focused facades
3890 La Cumbre Plaza Lane, Suite 200
SANTA BARBARA, CA 93105
T. 805.966.2802 • F. 805.966.3002
that will enhance pedestrian and vehicular view corridors. Exterior
lighting will be designed to reduce light and glare impacts on
surrounding properties
ii. Agricultural & Forest Resources. None
iii. Air Quality. Dust Control measures such as dampening soils and
construction roadways will be used during construction to prevent
blowing dust to adjacent properties. Also Low VOC products and
materials will be used whenever possible during the construction
phase of the project.
iv. Biological Resources. None
v. Cultural Resources. The site was previously developed from imported
fill so there will be no archaeological or paleontological impact on
the site. The project will cause no adverse physical or aesthetic
effects to any building, structure or object having historical or
religious significance.
vi. Greenhouse Gas Emissions. Site constraints and logistics will limit
the use of large equipment during the construction process. When
possible natural gas lifts/equipment will be used. Energy
conservation measures such as dual glazing, better insulation than
required by T-24, low energy lighting, the use of ENERGY STAR
appliances and fixtures, solar water heating and drought-tolerant
landscaping will be part of the project development. Amenities are in
walking distance of ¼ mile around the project and public
transportation is available.
vii. Geology & Soils. A Geotechnical Report was prepared by Professional
Services Industries, Inc. (PSI) dated August 24th, 2012. The report
characterizes the site soils as soft and compressible. Deep
foundation systems have been recommended to support the
proposed structures.
Proposed grading for the site will be designed to match existing
surface elevations as much as possible. Building finish floors are
slightly elevated to provide minimum freeboard to estimated 100-
year water surface elevations.
3890 La Cumbre Plaza Lane, Suite 200
SANTA BARBARA, CA 93105
T. 805.966.2802 • F. 805.966.3002
It is estimated that less than 800 cy of fill will be required to achieve
the desired proposed grade.
viii. Hazards & Hazardous Material. There is no risk to public health due
to normal operations or due to an explosion or due to the release of
hazardous substances. There is no known possibility of previous
contamination. The site is designated within the 0.2 percent annual
chance of flood hazard. The area is not located in the 100 year flood
zone.
ix. Hydrology & Water Quality. The proposed development is located on
the Balboa Peninsula, in the City of Newport Beach. The Pacific
Ocean is located about 2,000 feet to the west of the site, and the
Newport Bay is located about 170 feet to the east of the site. The
topography of the site slopes gently in a northwest direction, at a
rate of no more than a third of a percent.
Underground storm drain facilities do not exist adjacent to the site.
Storm water runoff presently surface flows off the site to the
adjacent public streets (Via Lido, Via Oporto and Via Malaga) where
they are collecting in surface gutters and conveyed to the north.
From there flows are collecting in an off-site catch basin where they
empty into the adjacent Newport Bay.
The property is designated in FEMA Flood Zone “X” shaded, areas
considered to be outside of the 100-year floodplain, but inside the
500-year floodplain.
Typical to the Balboa Peninsula area, groundwater was found at
shallow depths (up to five feet from the surface).
Existing land use consists of multiple structures and a parking lot.
The existing property is considered to be nearly all impervious. The
proposed development will improve this situation by providing some
landscaped features in common areas and the front of the proposed
homes. Overall peak flows from the property are anticipated to be
less than or equal to existing pre development flows.
In landscaped areas, the use of area drain inlets will be employed to
reduce storm water from transporting sediments over flatwork
3890 La Cumbre Plaza Lane, Suite 200
SANTA BARBARA, CA 93105
T. 805.966.2802 • F. 805.966.3002
improvements. Area drains will curb core to adjacent public streets
per public standards.
Water quality BMPs will be employed per City of Newport Beach
Model WQMP requirements. Hydraulic Conditions of Concern are not
anticipated because the proposed development will not be
increasing overall storm water runoff volumes.
x. Land Use & Planning. For a description of the existing site and
context please refer to Section C above. Lido Village is primarily
developed with commercial uses including a grocery store,
restaurants, salons, home furnishings, apparel, and other specialty
shops. It also includes Lido Marina Village, a pedestrian-oriented
waterfront development that includes visitor-serving commercial
uses, specialty stores, and marine uses. The guiding General Plan
goal for Lido Village is to create a mixture of land uses within a
pedestrian-oriented village environment. To facilitate these uses, a
portion of the Lido Village General Plan subarea has been designated
Multiple Residential (RM(20/ac)). The RM(20/ac) designation is
intended to provide multi-family residential development containing
attached or detached dwelling units up to 20 dwelling units per acre.
The subject parcel is made up of two properties. The first property at
3355 Via Lido is zoned RM. Immediately adjacent on Via Lido is the
First Church of Christ Scientist property. It is currently zoned PI. We
request the required City approvals and a Local Coastal Program,
Coastal Land Use Plan (CLUP) Amendment to change the land use
designation of the property at 3303 and 3315 Via Lido to an RM
(Multiple Unit Residential) land use designation and density as part
of this application.
xi. Mineral Resources. For energy conservation measures, please refer
to Section D.vi above. Additionally, there is no known mineral
resource of future value to the region or the state onsite.
xii. Noise. Construction will be limited to the city’s approved work hours.
Sources of noise during construction will be concrete saws,
jackhammers and demolition equipment during the demolition
phase. Concrete trucks and metal saws will generate noise during
the new construction phase.
3890 La Cumbre Plaza Lane, Suite 200
SANTA BARBARA, CA 93105
T. 805.966.2802 • F. 805.966.3002
xiii. Population & Housing. Based on the residential capacities calculated
in the Housing Element of the City’s General Plan, approximately 70
new residential units could realistically be developed in Lido Village
as new and replacement housing. In the proposed project, there are
24 townhouses that will be market rate with an average selling price
between $2-2.5 million per unit. Units will have between 2 -3
bedrooms per unit an expected average household size of 2-3.
xiv. Public Services. The proposed development of 24 townhouses will
be less intensive than the existing commercial and church
development in terms of demand on government services (fire,
police, schools, transportation).
xv. Recreation. The 24 unit project will not impact demand for regional
parks or other recreational opportunities.
xvi. Transportation / Traffic. The project will include a public pedestrian
path at the north end of the site that will improve pedestrian
circulation in the Lido Triangle.
xvii. Utilities & Service Systems.
Sewer / Wastewater:
Public sewer infrastructure exists near the proposed development. A
15-inch mainline exists in Via Lido and will serve as the connection
point for the site.
Each townhome will be individually sewered and connect to a public
mainline on-site. A specific capacity report was not available from
the City Public Works department to confirm if capacity was
available, although conversations with City staff indicate that no
capacity issues are expected. A week long sewer monitoring report
will be prepared to confirm existing sewer capacity is adequate to
serve the proposed project.
Existing sewer laterals to the site will be capped off at the right-of-
way. The existing laterals served the on-site buildings which are
proposed to be demolished.
Storm Water Drainage:
No underground storm drain exists directly adjacent to the site. The
proposed development is designed to convey storm water flows
3890 La Cumbre Plaza Lane, Suite 200
SANTA BARBARA, CA 93105
T. 805.966.2802 • F. 805.966.3002
through surface drainage to adjacent public streets or by collection
into small area drain systems on-site which curb core to the adjacent
public streets.
Domestic Water:
Public water mains exist in Via Lido, Via Oporto and Via Malaga. An
on-site public water main is proposed to service the development.
Each townhouse will be individually metered from the public on-site
system.
On December 17, 2012 a fire flow test was performed by City staff at
the southeast corner of the property to confirm water pressure and
capacity. Available flow was estimated to be in excess of 3,500 gpm
at 20 psi minimum. No upgrades to the existing perimeter water
system are proposed.
Best regards,
Sieglinde Pukke, AIA