Loading...
HomeMy WebLinkAbout20130107_Response to Incomplete Ltr 403 E. MONTECITO STREET, #2A SANTA BARBARA, CA 93101 T. 805.966.2802 • F. 805.966.3002 January 5, 2013 PROJECT 3355 and 3303 Via Lido REGARDING Response to Notice of Incomplete Filing dated 11. 21. 2012 APPLICATION NO. Code Amendment No. CA2012-008 General Plan Amendment No. GP2012-005 Planned Development permit No. PL2012-003 (PA2012- 146) Dear Ms. Makana Nova, DART development is pleased to submit this 24 unit townhouse project with the additions and revisions requested in your Notice of Incomplete Filing dated November 21, 2012. The following letter notes our responses in detail and corresponds by point to that notice. 1. Property Ownership a. Steve Mills is authorized to sign as Managing Member. His signature is the only signature that is required as evidenced by the Operating Agreement provided. b. Escrow for the property at 3303 and 3315 Via Lido closed on December 12, 2012. Newport Townhome LLLP is the current owner for all properties under the project application. 2. Project Plans. Twelve sets of 24 inch by 36 inch revised plans are included which include: a. Occupancy. The subject project consists of 22 townhouses which have an R-2 occupancy and one Duplex of R-3 occupancy. The R-2 occupanies will comply to 2010 CBC. The Duplex will comply with the RBC. b. Fire Flow. Testing for fire flow was performed on December 18, 2012 according to Newport Beach Guideline B.01. Results are included in the resubmittal on C-5. c. Existing Structures. Calculations for the gross floor area and net floor area for the existing buildings to be demolished are provided on the Title Sheet, Sheet D-0 of the submittal. d. Site Plan. The submitted Site Plan, Sheet D-3, has been revised to include: 403 E. MONTECITO STREET, #2A SANTA BARBARA, CA 93101 T. 805.966.2802 • F. 805.966.3002 i. Property Lines. All property lines are dimensioned per the topographic survey. ii. Buildable Area. The proposed buildable area and setbacks are identified on the Site Plan Sheet D-3. iii. Dwelling Units. After lengthy consideration of your suggestion to reorient Units 10 and 11, we concluded that such a revision would not result in better parking on-site. Units 10 and 11 remain oriented to the bay to take advantage of the best views afforded on the project site. Circulation and street parking are addressed below. iv. Circulation. The Vehicular Access Diagram, Sheet D-16,indicates vehicular access patterns and the Site Plan , Sheet D-3, provides dimensions for all parking spaces and drive aisles. 1. The interior drive aisles provided are two way 20 feet wide drive aisles with 14 feet clearance in height in coordination with the requirements of The Newport Beach Fire Department. Back- out spaces of 26 feet are provided for each garage 2. In keeping with the Lido Village Conceptual Plan, there are no driveway approaches proposed for Via Lido. Driveway approaches on Via Oporto have been widened to two-way 20 feet wide approaches – also in coordination with the Newport Beach Fire Department. 3. The driveway on Via Malaga has been increased to 20 feet wide per your request. 4. An emergency access aisle, 20 feet wide and 14 feet high clear, is provided through the middle of the project and is indicated on the Site Plan, Sheet D-3. Please refer to the revised Site Plan for the locations of existing and proposed fire hydrants and the required Fire Department signage and markings. v. Street Parking. There is no net loss of on-street parking because of the proposed project. On-street parking that is lost by the driveway widening that is requested by the Newport Beach Fire Department and Public Works is balanced by additional parking, see C-3 for parking diagram. The conversion of the existing loading zone for the existing commercial uses on Via Lido to public on- street parking would result in an increase in public parking around the project. vi. Site Walls. Site Walls are indicated on the Site Plan. vii. Trash Areas. Trash is accommodated in the garages of each unit. e. Fire Department Requirements. Please note: i. Note for Fire Sprinkler requirement is on the Title Sheet D-0. ii. Fire Department Connections are noted on the Hose Pull / Hydrant plan, Sheet C-5. 403 E. MONTECITO STREET, #2A SANTA BARBARA, CA 93101 T. 805.966.2802 • F. 805.966.3002 iii. Smoke Detector requirement is noted on the Title Sheet D-0. f. Utilities. Please refer to Utility Plan on Sheet C-4. Tentative Tract Map to follow. g. Open Space. Please refer to D-17 and L-8 for updated open space calculation: i. Common Open Space. Please refer to the Landscape Plan L-8 for the Common Open Space areas that exclude setback areas. ii. Private Open Space. Please refer to the private open Space Diagram on Sheet D-17 for calcs and dimensions. h. Topographic Survey. Please refer to Existing Survey, Sheet c-1 and C- 2. i. Height. Please refer to Unit Sections Sheet D-13 for the overall height from existing grade per the Topographic Survey. j. Landscaping. Please refer to the Landscape Planting Plan, Sheet L-8 that indicates the new proposed landscaping. Since the landscape area exceeds 2500 square feet, a ministerial or discretionary application is requested. 3. Project Description and Justification. a. Ownership Units. The subject project consists of 24 townhouses which will be a small lot subdivision. b. Setbacks. The proposed setbacks along all the street frontages are 5 feet to the second floor façade and 10 feet to the first floor façade. These proposed setbacks allow for an increased buffer compared to the existing condition of no setback on Via Lido while still allowing for the street focused edge encouraged by the design guidelines outlined in the Lido Village Conceptual Plan. The requested setbacks allow for image defining facades with a street orientation in keeping with the referenced guidelines. c. Utilities. Please refer to the Title sheet and to Proposed Utility plan, Sheet C-4 for the proposed utilities. d. Via Lido Design Guidelines. The proposed project complies with the standards of the Via Lido Deign guidelines as follows: i. Building Orientation and Site Planning.  The buildings create a unified and consistent alignment to define and address Via Lido, Via Oporto and Via Malaga.  The buildings are arranged to create a nodal opportunity at the intersection of Via Lido and Via Malaga.  The units are designed to maximize view opportunities.  The units have fully openable walls and through ventilation to take advantage of ocean breezes.  Unit entries are oriented to the street. 403 E. MONTECITO STREET, #2A SANTA BARBARA, CA 93101 T. 805.966.2802 • F. 805.966.3002 ii. Building Form and Massing.  The buildings feature articulation in form to create visual interest and reduce the overall mass.  The buildings have a human scaled base per the Lido Village Design Guidelines.  There is a prominent landscaping element planned for the intersection of Via Lido and Via Malaga to engage corridor views.  The units feature a variation in wall planes. This layering of wall planes and volumes provides rhythm, dynamic building forms and shadows.  The buildings articulate the line between the ground and upper levels by overhanging the upper levels. The recessed ground floor provides a base for the buildings. iii. Façade Treatments.  The buildings use projections, overhangs and recesses to bring scale to the building facades and enhance shadow articulation.  Openable walls and balconies create interest to the facades both font and rear.  The buildings feature a horizontal definition that results in an identifiable roof, body and base. iv. Street Interface.  Large transparent windows, recessed openings and entryways, planter walls and sensitive accent lighting activate and articulate the street frontages.  Articulated well scaled buildings create visual interest for both motorists and pedestrians. v. Roof Considerations.  The buildings feature vertical roof plane breaks, changes in building height and roof accents as encouraged by the guidelines.  Roof forms are integral to the design vocabulary of the building  Fascia elements are consistent with the primary design element and are in fact a feature of the design.  All units feature rooftop terraces.  Solar water heating will be incorporated into the project. vi. Materials and Applications.  The project features authentic materials such as Western Cedar, glass, steel, high quality aluminum doors / windows and high quality cement composite panel systems.  Low VOC Paints sealants and adhesives will be used. 403 E. MONTECITO STREET, #2A SANTA BARBARA, CA 93101 T. 805.966.2802 • F. 805.966.3002 vii. Materials Wrapping.  Material and horizontal elements wrap around building corners.  There are no false fronts proposed in the development. viii. Door Treatments.  All entrances address the primary street.  Entrance doors will reflect a sense of privacy with opaque glass or solid door treatments. ix. Windows and Glazing.  All unit types will feature large expanses of transparent openable walls which will animate the buildings, encourage natural ventilation and result in a coastal design expression in keeping with its location.  Daylighting is provided by clerestory windows which bring light into the interior of the units. x. Back of House Treatments.  Material and horizontal elements wrap around building corners.  Roof mounted equipment will be screened. 4. Coastal Commission. We request a Local Coastal Program, Coastal Land Use Plan (CLUP) Amendment to change to land use designation of the property at 3303 and 3315 Via Lido to an RM (Multiple Unit Residential) land use designation and density as part of this application. This request is also part of our submission letter. 5. Parcel Map. The application to combine lots will be submitted with the tentative tract map. 6. WQMP. The WQMP is included in the application. 7. CEQA. The completed environmental information form is included in the application and a fee of $750 has been paid. 8. Electronic Copy. All of the submittal items are available electronically and were transmitted on January 4th, 2013 by email. 9. Fees. Noted. Please do not hesitate to call if you have any questions or if you require any additional information. 403 E. MONTECITO STREET, #2A SANTA BARBARA, CA 93101 T. 805.966.2802 • F. 805.966.3002 Best regards, Sieglinde Pukke, AIA Attachments: - Authorization to sign for New Port Townhouse LLLC - Revised application letter - Environmental response letter