CITY OF NEWPORT BEACH
0 0
r COMMUNITY DEVELOPMENT DEPARTMENT
u yb i BUILDING DIVISION
c ea r 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
q�rF00.N� www.newportbeachca.aov 1 (949) 644-3200
/r�\������,/ CASE NO.: /
I UEST FOR MODIFICATION TO PROVISIONS
F TITLE 9 (FIRE CODE) OR TITLE 15 (BUILDING CODE)
OF THE NEWPORT BEACH MUNICIPAL CODE
(See Reverse for Basis for Approval) (Fee $316)
rr )
REQUEST FOR ALTERNATE MATERIAL
OR METHOD OF CONSTRUCTION
(See Reverse for Basis for Approval) (Fee$316)
For above requests, complete Sections 1, 2 & 3
below by printing in ink or typing.
7I JOB ADDRESS:
SITE ADDRESS- 657 BAYSIDE DRIVE
Owner RENEE WEST
Address 657 BAYSIDE DRIVE
NEWPORT BEACH, CA Zip 92660
Daytime Phone ( )
�L1A
0 Sy n
O N
y c10,o
�KA ��� h2oas
0
III FOR STAFF USE ONLY III
Plan Check # �— # of Stories
Occupancy Cie sification l)
Use of Building X7 sd # of Units
Project Status J.�D�R (�7���0.✓'
Construction Type ✓�
Verified by i� O
No. of Items I
Fee due
DISTRIBUTION:
Owner PCheck lan ��.
Petitioner Inspector
❑ Fire ❑ Other
PETITIONER:
Petitioner PLAMEN PETROV, P.E.
(POiti—, to be architect or engineer)
Address 28161 CASITAS CT.
LAGUNA NIGUEL, CA Zip
Daytime Phone ( 714) 717-7542
Email: CONSULTING@PMA-BG.COM
3 USTIFICATION/FINDINGS OF EQUIVALENCY: CODE SECTIONS:
HARBOR DESIGN CRITERIA
DUE TO THE ENCOUNTERED HARD LAYER OF STRATA, THE PILE COULDN'T BE SECTION A.2(k)3c
II EMBEDMENT LISTED IN SECTION 2 ABOVE SUFFICIENT FOR A PROPER FUNCTIONING OF THE FLOATING DOCK. II
/ Position PRINCIPAL AT PMA CONSULTING, INC.
Petitioner's "i— 05/07/25
Signature CA Professional Lic. # C66947 Date:
FOR STAFF USE ONLY
DEPARTMENT ACTION:
In accordance with: ❑ CBC 104.11/CFC 1049
�CBC 104.10/CFC 104.8
(Alternate materials & methods)
rr (rCBC Modification)
❑ Concurrence from Fire Code
Official is required. ❑ Approved ❑ Disapproved
❑ Written Comments Attached
By: Date
Request (DOES sen any fire protection requirements.
equest (DOE OES
NO essen the structural integrity
The Request is:
Granted ❑ Denied (See reverse for appeal information)
❑ Granted (Ratification required)
Conditions of Approval:
Signature--�,�-i
Posiho HEF pIJILCI^JG OFFICIAL
Date 5—(
bL Y'
Print Name I E-hlT
\ �
APPEAL OF DIVISION ACTION TO THE BUILDING BOARD OF APPEALS (See Reverse)
(Signature, statement of owner or applicant, statement of reasons for appeal and filing fees are required.)
CASHIER RECEIPT NUMBER: `�l� n 0 5544 - zzr" Frnms\madif 07f29/24
.wmxw�m
y, ®W�^•rear-a
�+ - J>•aa
' Fu..nn*v•nn uiu
j .'..b ,•^, ¢r^w•s M•
��19999
05926 tl0'H'Jtl301SOVZ99
3AN03015Atl8
[59
NaLLtlA3l3 9 s OAN moa
A0tl13 an..,.
o I
oe
�i
_
O�ZB tl0'AM RGISAWM.�OW]G.
3AIN030131VB01
Q
SZ<Z9
�� ��w� d
�"^a•'°
1S3M 33N38
A031tl001
1N3W30Vld3il Slid l331S
Pp
szoz/zo/gyp
§
Y
O
>
`G
3 tl
6I!
---------------- ==1
----------- ----
0
p
.a
I - 3
e
z
�
—�-------- 4 -- -
z
ca
e
c�
z
UY
O
O
U'
N
Y
h.
—
]
u
7
II
I
/I
L.1
<
m
i
a
<
j
o
y
o
O
3 ei
O
e
?
w
:'' II
.-.
Y
F
V
W
_ _________
O
a
m
5
s
m
5
S
N i
_
NEq
Y
Y
O
00
-H
Na S`eO
00
O
O
y
�
O
¢O
w
x
w
¢
Delta 1-1
STRUCTURAL CALCULATIONS
for
REPLACEMENT OF STEEL PILE AT AN EXISTING
FLOATING DOCK — REQUEST FOR MODIFICATION
Located at:
657 BAYSIDE DRIVE
NEWPORT BEACH, CA 92660
Prepared for:
RENEE WEST
657 BAYSIDE DRIVE
NEWPORT BEACH, CA 92660
Prepared by:
PMA CONSULTING, INC.
28161 CASITAS CT.
LAGUNA NIGUEL, CA 92677
JOB #62725
MAY 79 2025
5/7/25
Delta 1-2
PMA Consulting, Inc. Project: Pile Replacement Job: 62725
CONSULTING STRUCTURAL ENGINEERS 657 Bayside Drive Sheet:
26161 CASITAS cr. P (714) M - 7542 Newport Beach, CA 92660 Design: PBP
LAGUNA NIGUEL, CA 92677 Steel Pile at Floating Dock Date: 05/07/25
Pile P1
Design of Guide Piles at Floating Dock
The pile design below is based on the requirements of:
1) "Layout & Design guidelines for Marina Berthing Facilities - Section D" - Department of Boating
and Waterways of the State of California - July 2005 edition
2) "Design Criteria & Standard drawings for Harbor Construction'- City of Newport Beach - 2021 edition
hp min = 8.50 ft (applied load location above MLLW)
Dmin = min [ 15' or (dreq'd embedment + T) 1
hcutoff = 12 it (pile cutoff height above MLLW)
Lpile = hcutoff + D min + hmudline
Pile Design
M = Pmax * h <= Mall
hmudline= 10.5 ft
hs = 24.0 ft <<< Arm for Pile Strength Calculation
Find (Mall) maximum Moment capacity of the pile
Try, d = 16 in m Steel Pipe wl Fels: 42 ksi
Wall (t) = 0.375 in nominal thickness E = 29000 ksi
Wall (t) = 0.349 in design thickness
If Do / t = 42.7 < 3300 / Fy »» Fb = 0.66 * Fy
3300 / Fy = 78.6 »» Flo = 27.72 ksi
A = (r / 4)*(Do-2 - D02) & »» A = 17.2 inA2
S = (7 / 32Do)*(DoA4 -DiA4) & »» S = 65.7 inA3
I = (r / 64)*(DoA4 - DIM) & »» I = 526 inA4
Find Pall=?
Mall = Flo * S
= 151792 ft-Ibs
h = (h)mudline + hp + 5' <<< Point of fixity 5' below mudline
24.0 ft <<< Arm for flexural capacity calculations
Pall = Mall i h
6325 be > Pmax o.k. <<< By the Flexural capacity of the steel pipe!
Find Pile embedment d =?
Pmax = 2812 Ibs Lboat = 35 ft << Length of Boat
h = 19.0 ft Ld= 44 ft << Length of Dock
Try, to = 16.00 in TEL 149 pit << Total Env. Load
DL Freeboard: 1.9 ft << Freeboard
Fcurrent= 5 plf << Current Load
Fdr- 12 plf << Wave Drift Force
Pw= 15 psf << Wind Pessure
Pmax = (Lboat-TEL)12+(Ld-Lboat)•(Fcurrent+Fdr)/2+(Ld-Lboat)*(Pw-DL)/2
Delta 1-3
PMA Consulting, Inc. Project: Pile Replacement Job: 62725
CONSULTING STRUCTURAL ENGINEERS 657 Bayside Drive Sheet:
28161 CAsITAS CT. P (714) 717 -7M2 Newport Beach, CA 92660 Design: PBP
LAGUNA NIGUEL, CA 92677 Steel Pile at Floating Dock Date: 05/07/25
=ind Pile embedment (d) = 7
Mall = 2812 Ibs <<< Maximum lateral force induced on the pile by the boat
h= 19.0 ft
b = 1.33 ft
'or section 1807.3.2.1 of CBC
d=A/2*{1+sgrt[l+(4.36*h/A)I}
A=2.34`P/(S1*b)
& S1=Fp*d/3
Try, d = 8 ft
Fp = 400 psf <<< 200 pcf, min for bedrock, increased twice per CBC
3er section 1807.3.2.1 for (d) not over 12' deep,
& S1 <= 1600 psf
Per footnote note d of table 1804.2, increase Fla by 33% for transient forces.
S1 = 1458 psf
A = 3.39 ft
1/8" thickness added for
corrosion protection
Pmax =
2812 Ibs & Fy = 42 ksi
Pile :
16.00 in x 0.500 in thick
(L)pile =
31 ft
Embed =
8 ft Pile P1
STRUCTURAL CALCULATIONS
for
REPLACEMENT OF STEEL PILE AT AN EXISTING
FLOATING DOCK — REQUEST FOR MODIFICATION
Located at:
657 BAYSIDE DRIVE
NEWPORT BEACH, CA 92660
YY:: '.•:YY'Y. >:XX
Prepared for:
RENEE WEST
657 BAYSIDE DRIVE
NEWPORT BEACH, CA 92660
Prepared by:
PMA CONSULTING, INC..
28161 CASITAS CT. F tJt,^<a G J y
LAGUNA NIGUEL, CA 92677
JOB #62725
gY: Z•z•
MAY 75 2025
5/7/25
PMA Consulting, Inc. Project: Pile Replacement Job: 62725
CONSULTING STRUCTURAL ENGINEERS 657 Bayside Drive Sheet:
28161 cASITAs CT. P (714) 717 - 7542 Newport Beach, CA 92660 Design: PBP
LAGUNA NIGUEL, CA 92677 Steel Pile at Floating Dock Date: 05/07/25
1
The pile design below is based on the requirements of:
"Layout & Design guidelines for Marina Berthing Facilities - Section D" - Department of Boating
and Waterways of the State of California - July 2005 edition
"Design Criteria & Standard drawings for Harbor Construction"- City of Newport Beach - 2021 edition
hp min = 8.50 ft (applied load location above MLLW)
Dmin = min [ 15' or (dreq'd embedment + 3') )
hcutoff = 12 ft (pile cutoff height above MLLW)
Lpile = hcutoff + D min + hmudline
M= Pmax *h<=Mail
hmudline= 10.5 ft
hs = 24.0 ft <<< Arm for Pile Strength Calculation
=ind (Mall) maximum Moment capacity of the pile
Try, d = 16 in m Steel Pipe w/ Fq= 42
ksi
Wall (t) = 0.375 in nominal thickness E = 29000
ksi
Wall (t) = 0.349 in design thickness
If Do / t = 42.7 < 3300 / Fy »» Flo = 0.66
* Fy
3300 / Fy = 78.6 »» Fb = 27.72
ksi
A = (T / 4)*(DoA2 - DiA2) & »» A = 17.2
inA2
S = (T / 32Do)*(DoA4 -DiA4) & »» S = 65.7
inA3
1 = (T / 64)*(DoA4 - DiA4) & »» I = 526
inA4
Find Pall=?
Mall = Flo
= 151792 ft-Ibs
in = (h)mudline + hp + 5' <<< Point of fixity 5' below mudline
= 24.0 ft <<<Arm for flexural capacity calculations
Pall = Mall / In
= 6325 Ibs > Pmax o.k.
«< By the flexural capacity of the steel pipe!
Find Pile embedment (d) = ?
Pmax = 2812 Ibs
Lboat =
35
ft
<< Length of Boat
h = 19.0 ft
Ld=
44
ft
« Length of Dock
Try, b = 16.00 in
TEL
149
plf
<< Total Env. Load
DL Freeboards
1.9
ft
<< Freeboard
Fcurrent=
5
pit
<< Current Load
Fdr=
12
plf
<< Wave Drift Force
Pw=
15
psf
« Wind Pessure
Pmax = (Lboat*TEL)/2 + (Ld-Lboat)*(Fcurrent+Fdr)/2 + (Ld-Lboat)*(Pw*OL)/2
PKA Consulting, Inc. Project Pile Replacement Job: 62725
CONSULTING STRUCTURAL ENGINEERS 657 Bayside Drive Sheet:
26161 cAsiTAS CT. ❑ (714) 717-7542 Newport Beach, CA 92660 Design: PBP
LAGUNA NIGUEL, CA 92677 Steel Pile at Floatino Dock Date: 05/07/25
FIna vile embedment (a) = 9
Mall = 2812 Ibs <<< Maximum lateral force induced on the pile by the boat
h= 19.0 ft
b= 1.33 ft
Per section 1807.3.2.1 of CBC
d=A/2*{1+sgrt[l+(4.36*h/A)]}
A=2.34*P/(S1*b)
& S1=Fp*d/3
Try, d = 8 ft
Fp = 400 psf <<< 200 pcf, min for bedrock, increased twice per CBC
Per section 1807.3.2.1 for (d) not over 12' deep,
& S1 — 1600 psf
Per footnote note d of table 1804.2, increase Fp by 33% for transient forces.
S1 = 1458 psf
A = 3.39 ft
1/8" thickness added for
corrosion protection
Pmax =
2812 Ibs & Fy = 42 ks(
Pile :
16.00 in x 0.500 in thick
(L)pile =
31 ft
Embed =
8 ft Pile P1