Loading...
HomeMy WebLinkAboutXC2025-5101 - Accessibility Hardship RequestRECEIVED BY COMMUNITY DEVELOPMENT t>�WPOR� MAY 14 2025 o�� .I CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT CtF1 OF BUILDING DIVYSION NEWPORT BEACH cy�/ FORN P 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658 www.newportbeachca.gov 1 (949) 644-3200 �.o 2 DOCUMENTATION OF UNREASONABLE HARDSHIP - $W.00 x❑ FINDING OF UNREASONABLE HARDSHIP FOR PROJECTS UNDER CASE NO.: ,,.�_ 3 6 CBC 116-202.4 - EXCEPTION: 8 (FILL OUT PAGES 1 & 2) 1' ❑ FNDING OF UNREASONABLE HARDSHIP FOR PROJECTS OVER $186,172* CBC 11B-202.4 -EXCEPTION: 8 (FILL OUT PAGES 1 & 2) PROJECT INFORMATION: MUST BE ACCOMPANIED WITH RATIFICATION APPLICATION" — ❑ FINDING OF TECHNICAL INFEASIBILITY FOR PROJECTS PER CBC 11B-202.3 • EXCEPTION: 2 (FILL OUT PAGES1, 2 & 3) ,A. JOBADDRESS: 4400 MACARTHUR BLVD. SUITE NO. 900 B. PROPERTY OWNER: GREENLAW PARTNERS Address: 2211 MICHELSON, SUITE 220 City state: CA Zip: 92614 Phone No. 949-331-1300 C. APPLICANT: O ARCH, INC. Position/Relationship: ARCHITECT Address: 19900 MACARTHUR BLVD. City IRVINE state: CA Zip 92612 Phone No.: 949-656-2882 Email. dickson@oarchinc.com P/C. #: Permit#: KC?-vkF-! 10 Use: om C(�'- Stories: / Verified by: -z-7- c _ Receipt #: \Z(C - OC) DISTRIBUTION: ❑ Owner Petitioner P/C Eng ❑ Inspector ❑ Other An unreasonable hardship exists where the cost of providing an accessible entrance, path of travel, sanitary facilities, public phones, drinking fountains, etc. exceeds 20% of the cost of project without these features. The actual work of the project must comply with current code and an additional amount equal to at least 20% of the cost of the project must be spent to improve required accessibility features that are not in compliance with current code. In choosing which accessible elements to provide, priority should be given to those elements that will provide the greatest access, in the following order: 1) An accessible primary entrance; 2) An accessible route to the altered area; 3) At least one accessible restroom for each sex; 4) Accessible public telephones (when provided); 5) Accessible drinking fountains (when provided); 6) When possible, additional accessible elements such as additional parking, storage and alarms. To request an unreasonable hardship, complete the attached worksheet, and prepare a site and floor plan of the existing and proposed accessibility improvements. This information must be submitted to the Building Division in duplicate, prior to processing a permit application. One copy of the approval or denial will be returned to the applicant. For projects exceeding the valuation threshold of $186,172, a hardship approval can only be obtained through a ratification application and hardship application. * The $186,172 is based on $50, 000 in 1981 dollars as of January 1, 2022. *'Ratification form can be obtained at: https://www.newportbeachca.govlratificationform Fo"slHardship 06/08/2022 Address: 4400 MACARTHUR BLVD., SUITE 900 Plc #: XC2025-5101 1. Total Cost of Construction contemplated (not including disabled access work) $ 3,250 Identify the accessibility features, which will NOT be brought into compliance if the request is granted. Provide an estimate of the cost of compliance for each item. ❑ Path of travel to entrance (ramps, walks) ............................................ $ ❑ Path of travel to altered area(s)............................................................... $ 0 Sanitary facilities (restrooms) .................. $ 80,000 ❑ Parking.................................................................................................... $ ( To A&W&✓4Aoz4z 7Hr; ts) ❑ Drinking fountain(s)................................................................................ $ WTP40M To AOP A W) AVW ❑ Accessible phone(s)............................................................................... $ „1 ❑ Accessible signage................................................................................. $ ❑ Other....................................................................................................... $ Total cost of providing compliance:..... $ 80,000 Identify the accessibility features and equivalent facilities, which will be provided or brought into compliance as required by Code. Provide an estimate of the cost of each item. a. TACTILE EGRESS SIGNAGE AT EXITS (2 Qa SUITE 900) $ 375 b. TACTILE EGRESS SIGNAGE AT STAIRS (2) $ 375 C. $ d. $ e. $ f. $ Total: $ 750 2. Technically infeasibility — if applicable complete Page 3 of this application 3. Fill out this section if the path of travel from the disabled parking spaces to the tenant space is not accessible. List projects (tenant improvements, additions, remodels, etc.) performed within previous three years where no disabled access improvement was performed in conjunction with the project. State description, date, and cost. n!Ih The applicant understands that although the City may approve this request of unreasonable hardship and the proposed equivalent access, the City reserves the right to require additional access compliance upon receiving a complaint of inadequate access at this location. E 5. or iatu*)" FOR CITY USE ONLY Approved ❑Denied B , 1a 5/14/2025 (Date) FomMardshlp 06/0812022 2 Address: P/C #: TECHNICALLY INFEASIBLE. An alteration of a building or a facility that has little likelihood of being accomplished because the existing structural conditions require the removal or alteration of a load -bearing member that is an essential part of the structural frame, or because other existing physical or site constraints prohibit modification or addition of elements, spaces or features which are in full and strict compliance with the minimum requirements for new construction and which are necessary to provide accessibility. Describe why the nature of accessibility is technically infeasible: Describe how equivalent facilitation will be provided: FormslHardship 06/08/2022 3