May 27, 2025
Agenda Item No. 5
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: David A. Webb, Public Works Director - 949-644-3311,
dawebb@newportbeachca.gov
PREPARED BY: Tom Sandefur, Assistant City Engineer - 949-644-3321,
tandefur@newportbeachca.gov
TITLE: San Miguel Park Accessibility Playground Improvements - Notice of
Completion for Contract No. 9371-1 (24P01)
ABSTRACT -
On October 8, 2024, the City Council awarded Contract No. 9371-1 for the San Miguel
Park Accessible Playground Improvements to R.E. Schultz Construction, Inc.
(R.E. Schultz). The project involved replacing the existing playground equipment with
new, accessible features, removing physical barriers and accommodating disability
access. The work is now complete and staff requests City Council acceptance and close
out of the contract.
RECOMMENDATION:
a) Accept the completed work and authorize the City Clerk to file a Notice of Completion
for the project.
DISCUSSION:
Overall Contract Cost/Time Summary
Awarded Contract
Final Total Contract
Total Contract
Percent Contract
Amount
Amount
Change Amount
Cost Change
$819,475
$804,778.50
- $14,696.50
- 1.8%
Allowed Contract Time +
Approved Extensions (Days) -
54
Actual Time Used (Days)
54
This project involved replacing the existing play equipment with accessible play
equipment, installing new rubber surfacing, and replacing the adjacent sidewalk to meet
current ADA guidelines.
The design of the new play equipment incorporated feedback received from public
outreach meetings and includes over 20 ground accessible components for all ability
levels along with additional elevated components accessible by transfer platforms.
5-1
San Miguel Park Accessible Playground Improvements —
Notice of Completion for Contract No. 9371-1
May 27, 2025
Page 2
The contracted work has been completed to the satisfaction of the Public Works
Department. A summary of the construction cost is as follows:
Original bid amount:
$
819,475.00
Actual Cost of Bid Items Constructed:
$
786,137.50
Total Change Orders:
$
18,641.00
Final contract cost:
$
804,778.50
The final total contract amount was $804,778.50, which is approximately 1.8% less than
the original bid amount. Two contract change orders were provided to replace additional
grass areas, re -paint the existing shade structure, replace a belt swing with an
ADA bucket swing, and replace the existing deteriorated bike rack.
A summary of the project schedule milestones is as follows:
Estimated Start of Construction per Annual Baseline Schedule
January 20, 2025
Actual Start of Construction Per Notice to Proceed
January 13, 2025
Estimated Completion per Annual Baseline Schedule
March 21, 2025
Substantial Completion Date Inclusive of Extra Work
April 1, 2025
Due to unforeseen weather delays and contract change orders for requested additional
playground improvements, the contractor was granted nine additional workdays to
complete the project.
FISCAL IMPACT:
The San Miguel Park Accessible Playground Improvements were funded from the Fiscal
Year 2024-25 Capital Improvement Program Budget. Funds for the construction contract
were expended from the Community Development Block Grant (CDBG) and Building
Excise Tax (BET) in the following accounts:
Account Description Account Number Amount
CDBG 12001-980000-24P01 $ 607,680.00
BET Fund 14101-980000-24P01 $ 197,098.50
Total: $ 804,778.50
The City Council approved the CBDG federal grant funding for this project with Resolution
Nos. 2023-23 and 2024-30 in the CDBG Annual Action Plans for the 2023-2024 and
2024-2025 fiscal years.
The BET fund is used to account for property development taxes imposed on construction
and occupancy of all residential, commercial, industrial units, and mobile home parks for
which a building or construction permit is issued. BET funds can be used for acquiring,
improving, expanding and equipping City fire stations, libraries and parks as provided by
Chapter 3.12 of Newport Beach Municipal Code.
5-2
San Miguel Park Accessible Playground Improvements —
Notice of Completion for Contract No. 9371-1
May 27, 2025
Page 3
ENVIRONMENTAL REVIEW:
On October 8, 2024, the City Council found this project exempt from the California
Environmental Quality Act (CEQA) pursuant to Class 1 Section 15301 Class 1
(rehabilitation of deteriorated facilities) of the CEQA Guidelines, California Code of
Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect
on the environment.
NOTICING -
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
ATTACHMENT:
Attachment A — Location Map
5-3
ATTACHMENT A
Q
0
17TH ST
16TH S
CITY OF
COSTA MESA
BALB
PACIFIC
JOHN WAYNE
AIRPORT
FF J
�P
P
P UPPE a
NEWPORT o¢
�P BAY_ C�--
E
OCEAN
0 PROJECT LOCATION
SAN MIGUEL PARK (2200 SAN MIGUEL DR)
F
NEW�POR
CE TEF
sod
CITY OF
IRVINE
P�
um/ERs�
0N—
HI
�ST
M'
CITY OF NEWPORT BEACH
SAN MIGUEL PARK ACCESSIBLE PLAYGROUND IMPROVEMENTS PUBLIC WORKS DEPARTMENT
LOCATION MAP �
C-9371-1 24F02 05/27/25
5