Loading...
HomeMy WebLinkAbout15 MOON SHELL - CALCS:)! . . --r V C 1 57 Kingswood, Irvine, CA 92620 Tel: 949-400-9608 Structural Calculation and Detailing Report PROJECT: Enclosure of Existing Loggia For Mr. Herbert Lee ADDRESS: 15 Moonshell Newport Beach, CA9265 7 CLIENT: KK Chang Architect, AIA. FILE No.: 1423-0907 DATE: 712/2009 THESE CALCULATIONS ARE THE SOLE PROPERTY OF YATAI CONSULTANTS, AND MAY NOT BE USED WITHOUT WRITTEN CONSENT. THE BUILDING OFFICIALS SHALL NOT ACCEPT THESE CALCULATIONS UNLESS WET STAMPED AND SIGNED BY THE ENGINEER OF RECORD. f 1 /5 Description of the project: I . Enclosure of existing loggia. Design Codes: 2007 California Building Code with local amendment. Design Criteria: Seismic: Category ll, Site D SMs= 1.769, SM 1= 0.978, SDs= 1,179, SDI=0.652. Wind: Exposure C, 85 mph. Roof DL: 22 psf LL: 16 psf Soil report per CBC minimum. Soil Bearing Pressure = 1,500 psf V. = 2,500 psi fy = 60 ksi (Grade 60'reinforcing bars) Disclosure: Please be advised that the evaluation and recommendations made were based on minimum design loads per current building codes without on -site intrusive investigation and verifications. With this inherent limitation, the design and evaluation was done in accordance with generally accepted engineering principles and practice. The engineer of record shall be notified immediately when discrepancy occurs between the actual on -site condition and this report and/or drawings for remedial solutions. STUD OR COLUMN DESIGN: DESCRIPTION: 9'-0" stud height LOADING: DL(psf) LL(psf) W OR H/2 DL(plf) LL(plf) ROOF: 22.00 16.00 5.00 110 80 WALL: 14.00 10.00 140 FLOOR: 0.00 0.00 0.00 0 0 WIND LOAD: P= 16.00 psf TL(plf): Fp= 42 Hx= 9.00 ft . psf Hy= 0.00 ft SPACING: 16.00 in SELECT A TRIAL SIZE: z x 4 v NUMBER: SIZE dy(in) dx(in) A(inA2) S(inA3) 1 I(in"4) 2 X 4 1.5 3.5 5.25 3.0625 5.359 CM= 1.00 Ct= 1 00 PAGE: DATE: JOB No: AXIAL LOAD: DEAD: 0.00 LIVE: 0.00 CL= 1.A0 Kf= 1 Cr = 1.15 CT= 1.00 K= 1 PIN:PIN DOUGLAS FIR GRADE # 1 Fb Fv E Fe Fcn 875.00 95.00 1600000 1300 625 (le/d)y= 0 in Cb=(Lb+0.375)/Lb= 1.25 (le/d)x= 30.86 in FOR VISUALLY GRADED SAWN LUMBER: Kce= 0.3 c= 0.8 CHECK STUD FOR VERTICAL LO ADS ONLY: F b El CD= 1.25 F'c F'cn 1383.59 1600000 470.49818 781.25 Fce= 504.12 psi F*c= 1787.5 psi PDL= 333.33333 PLL= 106.66667 Ptotal= 440 fc=P/A= 83.81 OKAY CHECK STUDS FOR VERTICAL AND LATERAL LOADS: F' b E F c F'cn CD= 1.33 Fce= 504.12 psi 2007.47 1600000 472.82705 781.25 F*c= 1901.9 psi w= 21.33 plf M=wh^2/8 fc=P/A= 2592.00 in -lb 83.81 OKAY fb=M/S= 846.37 OKAY CHECK COMBINED STRESSES: check (fc/F'c)^2+(1/(1-fc/Fce))*fb/F'b <=1.0 (fc/F'c)^2+(1/(1-fc/Fce))*fb/F'b = 0.54 OKAY CHECK DEFLECTION: DEFLECTION CRITERIA: 240 MAXIMUM ALLOWED DEFLECTION: ACTUAL DEFLECTION DUE TO LATERAL LOADS: 0.45 in ADDITIONAL DEFLECTION DUE TO P-DELTA; 0.37 in TOTAL ACTUAL DEFLECTION: 0.02 in 0.38 in USE 1 2 X 4 DF# 2 OKAY AT 16 CF= 1.1 Fce/F*c= 0.282 Cp= 0.263 CF= 1.5 Fce/F*c= 0.265 Cp= 0.249 psi INCHES c/o 2/5 Conterminous 48 States 2005 ASCE 7 Standard Zip Code = 92657 Spectral Response Accelerations Ss and S 1 Ss and Sl = Mapped Spectral Acceleration Values Data are based on a 0.01 deg grid spacing Period Centroid So (sec) (g) 0.2 1.623 (Ss) 110 0.579 (S 1) Period Maximum So (sec) (g) 0.2 1,769 (Ss) 1.0 0.652 (S 1) Period Minimum So (sec) (g) 0.2 1.554 (Ss) 1.0 0.551 (Si) Conterminous 48 States 2005 ASCE 7 Standard Zip Code = 92657 Spectral Response Accelerations SMs and SM1 SMs = Fa x Ss and SMI = Fv x S1 Site Class D Period Centroid So (sec) (g) 0.2 1.623 (SMs, Fa = 1.000) 1.0 0.869 (SMI, Fv = 1,500) Period Maximum So (sec) (g) 0.2 1.769 (SMs, Fa = 1.000) 1.0 0.978 (SM1, Fv = 1,500) Period Minimum So '(sec) (g) 0.2 1.554 (SMs, Fa = 1.000) 1.0 0.826 (SMI, Fv = 1.500) 2005 ASCE 7 Standard Zip Code = 92657 Spectral Response Accelerations SDs and SDI SDs = 2/3 x SMs and SDI = 2/3 x SMI Site Class D Period Centroid So (sec) (g) 0.2 1.082 (SDs) 1.0 0.579 (SDI) Period Maximum So (sec) (g) 0.2 1.179 (SDs) 1.0 0.652 (SDI) Period Minimum So (sec) (g) 0.2 1.036 (SDs) 1.0 0.551 (SDI) 3/5 t 2007 CBC RAGE: LATERAL FORCES GENERATION AND DISTRIBUTION: JOI3' No: 4/ LATERAL FORCES GENERATION AM6ISTR113UTION: WINS: Pnet - qs Kz Cnet [I Kzt] EXPOSURE: SPEED $ OCCUPANCY CATEGORY; 1T .. ._....�. ............. H qs Itz R rtt I Kzt Pnet 15 18.6 0.85 1,00 1,00 1.00 15.72 20 18:5 0.90 1,00 1.00 1,00 16.65' 25 18:5 0.94 1.00 1.00 1.00 17,30 30 18.5 0.98 1.00 1.00 1.00 18.13 40:......._ IM 1,04 r 1.00 1.00 1.00 19.24 SEISMIC: _ ZIP CODS✓= 92667 Soil Site Class = D Seismic Design Category: D 81= 0.65 SDS= 1.18 SD1= 0.65 R= 6 i= 1.00 T= CT x h x = 0.11 CT =0:02, x =0.75 Cs = $Ds/(RII) = 0.20 CS -5 SD,/[T(PJI)i 0,97 Cs 0.581/(Rll)'- 0.06 Use CS = 0.20 x 0.7 = 0.1$8 Overall Bulding " hn" w 10.00 Hr= 4.00 1st STORY STRIP: T1 1st STORY STRIP: L1 W D/2 OR H/2x# W D/2 OR H/2x# ROOF: 26,00 10.00 260 ROOF: 26.00 22.00 572 I,WALLS: 10,00 0 LWALLS, 10,00 0 E,WALLS: 14.00 5.00 70 E,WALLS: 14.00 6.00 70 FLOOR: 0 FLOOR, 0 DECK: 0 DECK: 0 Wtotal: 330 Wtotal; 642 V= Coeff,xwfotal 46.39 V= Coeff.xWtotai $8.31 WIND: ; , 110,05 WIND: 110,45 It IV) mat t.It a 'r- f MAI r P Vras G Cam) xi o ) 5M `r"O PZMAIA fJ GAMtt_ � Ncc, , 301L ENGINEER: 2007CBC REPORT: DATED: wt. psf with ft. p/ft. AT EXTERIOR BEARING WALL ROOF 22.00 0.00 0.00 ROOF 16.00 0.00 0.00 WALL 14.00 10.00 140.00 WALL 0.00 0.00 0.00 FLOOR 0.00 0.00 0.00 DECK 0.00 TOTAL 140.00 WIDTH= 1.12 AT ROOF 0.00 ROOF 0.00 WALL 0.00 WALL 0.00 FLOOR 0.00 DECK 0.00 TOTAL 0.00 WIDTH= 0.00 AT ROOF 0.00 ROOF 0.00 WALL 0.00 WALL 0.00 FLOOR 0.00 DECK 0.00 TOTAL 0.00 WIDTH= 0.00 PAGE: DATE: JOB No: bp= 1,5 wt. psf with ft. p/ft. AT ROOF 0,00 ROOF 0.00 WALL 0.00 WALL 0.00 FLOOR 0.00 DECK 0.00 TOTAL 0.00 WIDTH= 0.00 AT ROOF 0.00 ROOF 0.00 WALL 0.00 WALL 0.00 FLOOR 0.00 DECK 0.00 TOTAL 0.00 WIDTH= 0.00 AT ROOF 0.00 ROOF 0.00 WALL 0.00 WALL 0.00 FLOOR 0.00 DECK 0.00 TOTAL 0.00 WIDTH= 0.00 USE 16" WIDE BY 18" DEEP STRIP FTG @ NEW EXTERIOR WALL 245 TYP. REINF. T&B CAPACITY OF CONTINUOUS FOOTING: B= 15.00 D= 18.00 L= ((D+6in)*2)+4in= UNREINFORCED FOOTING: P= L*B*Sbp/144= 8125 LBS REINFORCED FOOTING: USING (1) REBAR As= 0.30 M= As*1.48*(B+6in-3,5in)= 9.10 P= L*(B/12)*Sbp= 11686 LBS USING MULTIPLE REBARS As= 0.90 M= As*1.48*(B+6in-3.5in)=27.31 P= L*(B/12)*Sbp= 20238 LBS 52.00 L= 2*SQRT((2*M)/(B*Sbp/12000))= 6.23 L= 2*SQRT((2*M)/(B*Sbp/12000))= 10.79