HomeMy WebLinkAbout7 COTTONWOOD - MISCment WM__?
concrete waste Ma!�
I() m1L____/
PLASTIC
(2 FIR E7AI-E)
NATIVI-' MATERIAL.
(OPTIONAL)
3anuary mw;z
NO 11) F
1-0-1 CIRAD
W111111?AW BAIP
LIN111(l
ME -JAL ' 'T A 1< I--
BAIJ
T YIJ
2"
WIRL
STAPLE DE -TAIL.
'RAW .:-Al.
P)
PX!
C N
i-A(
.-
WOU, Pr
y x
EO(ji LNT)
1\1 G WIRE
-d RAW RALE
MOTE
I. A C'] *IJ A [ I A YO
IN FIEO). )F. I.E.RMINFI)
HIF
1.N
, ;HAI.I. Iff, I -f-A I I- E [) WI f I I I N
HE II.-M,f)jAIDy-
CONCIRF FI_ WA` I.-, Ot i T ( AC'I I I I
Calffornia Stormwat. f3MP Handbook
ConSt-LIC0011 7 of 7
www.cabmPhancIbooI(s.Coj,n
Notes must be shown
In the cas
0 Of emorgenqV, on the title shoot of the Plan
practicable struction
a tont'men"�Om areas disturbed by con,
x shall be retained on Home Phone
3. Stockpiles site Using
facilities Or ad�ftent properties , structural controls to the maximum
Of $011 shall be Properly contained to mininlize sediment transport from the $lie to Streets,, dra.
4 Via runoff, vehicle tacking, or wind.
Appropriate BMP's for construction -related materials, wastes
from the site to streets, drainage facilities, I Inage
equipment and vehicle washIn rOPertles by wind or runoM minimize transport
g shall be containe(I at construction
or remove sediment and other pollutants,
6. All construction contractor and subcont 'Ito$
unless treat,, to reduce
Practices and good housekeeping M(),)s ractOr Personnel are to be
7At the end Of each day Of construction ur"11 'Or the Made aware or the required best Management
an associated cOnstruction staging aroas
"Y all construction debris
8. Construction site$ trash or recycle bins.
shall be and Waste materials shall be collected
POliutants off th maintained in such a condition that an anticipato storm does not carry
o site, Discharges Of Material other than d
an( Wastes or
Completion Otconstruction practice,, stormwater only when necOs ry for P rtaim
standard; cause or threaten t I I where they do not: caus 0
I quantity reportable under 0 cause Pollution, cOnt8M 0 r contribute to a sa e ance a
1:odoral Regulations 40 CF Illation, or nuisance; 01 Violation of an nd
R Parts 117 and 302. substance In
9- Potential Pollutants Include but are not limited to: Solid or liquid chemic,11 spills; W,
o"reastauncct'so' fg#,alljoems "Me-S, Pesticides, herbicides wood preservatives and solvents;
wash water - fuels,
steam Wash Water;
lubricants, a�d hydraulic, radiator or battOr Paints, stain,,
asbestos fibers, Paint
~ cleaning _ _~~.,^= concrete,ncrete
detergent or 1`108table wastes,.
and SuPerchlorinated Pat, flakes
Y fluids; fertilizers, VONGIO/equipment
Is' shl
-$Ito, physically separated %M Potentl pose Ofsuch m1teria in a specified nd , ntrolled temporary area on
st4te and federal requirement,% 91 8tOrmwater runoff, th Ultimate disposal
Of contaminated groundwater or discharging contaminated a,,
D"Watering of, non -contaminated 91`Oundwate� requires a National Pollutant Discharg led.
the re$P(�ctive State Regional Water Quality Control Board. soil's via surface erosion is prohlbi
11- Graded areas Or, the Permitted area Perimeter must drain away from , e Elimination System permit from
working day, Drainage is to be directed toward desilting fa(,,Ilitjes. the face Of Slopes at the conclusior of e
I be responsible and shall take necessary
onto areas where Impounded water IrrOWer, a ha,'�ardous condition. Precautions to PrevOnt Public trespass
13. The Permitt0eand contractor shall inspect
With the approved
14`The ' -- Insure
accordance
shall notify all general con
rkors for emergency work shall be Made available at all times during the rainy season, Noce rary
owners,, that dumping of chemicals into theStOrm drain system or the watershed is Prohibited.
I S. Equipment and wo tractors, subcontractors, material suppliers, I's"lles, and Property
materials shall be available on site and stockpiled at convenient locations to facilitate
temporary devices When rain is imminent. 'a s
Probability erosion Protective devices shall be In
F-OrO
cast exceeds Place a^"°.end cfeach �
, ""nn/Romythe 5~Da» /
17, Sediments from areas d1slurbed by
erosion and sediment controls construction shall be retained On
to minimise spdIr/jent transporttforom the site to streets,
site using an effective
vehicle trac, . cing. or wind. the maximum GXtent Practicable, and stockpiles of 8 it shall 8
16, 'appropriate drainage 0 h b
on BMPS for construction -related Materials, waste., facilitie's Of adjacent properties
site to minimize transport from the site to
runoff.
streets, drainage 11�, SPIIIS Or residues shall t,
combination or
properly containted
via runoff,
ki "ties, or adjoining pro pe" Implemented
rty by wind or
and retained
4� ltxlr,t�
County of Orange
Resources &Development Management Department
Building Permits Division
Resid
Main office
300 N. Flower Street
Santa Ana, CA 92702-404F
ential Plan Check Corrections
It is the responsibility of the applicant to satisfy the requirements (clearances) of each of the departments Normally, each section will stamp your plans indicating their approval, p ents listed in this document.
To view your plan check status and the latest correction list on the Internet, please visit: httpa/www.ocp lanni
Plan Check Status' Link.
Please note that Planning and Development Services (PDS) Public Counter Hours are open 7:30am to 4prn,
ng net and click on
Monday thru Thursday and Friday by appointment only. (Please call 714 834-5180 to schedule an an"„i"4w _._., Prniari AI.. .� _-_ r)n
Submittal Date: Mar 10, 2008
CBC Edition: 2007
Plan Check Date: 3/11/2008 2:55 PM
Description: Det Solid Roof Gazebo
to existing SFD
(12ft)
1st Plan Check 2122/08 1st Recheck 3/10/08
Pia" r l,..
William Chem vy
William. Chern rdmd �
714-834-2633
Page 1 of 6
Job Address
7 COTTONWOOD Owner Address
NEWPORT COAST, CA John 7 Cottonwood
Newport Beach CA
Current - 2nd Recheck 3/10/08
Contact Address
Jaime Hernandez
1321 Cottonwood Ct
Corona CA92879
951-347-843n
Double Click to Sign
Name: William Chern
Reason: Plan Checked By
Location: 300 North Flower, Santa Ana, Ca
RS080149
OBTAIN CLEARANCES (approvals) from:
Fire Authority (714) 573-6100 FAX (714)368-8843
1 Fire Authority Rd., Bldg. A, Irvine California 92606 (Jamboree@Tustin Ranch Rd.)
GENERAL INFORMATION
• Application for which no permit is issued within 180 days following the date of application shall expire by limitation.
An extension of 180 days may be granted upon written request showing circumstances beyond the control of the a
have prevented action being taken. In order to renew action for an application after expiration, the applicant
shall resubmit plans and pay a new plan check fee. Sec. 107.4. applicant
• At building permit issuance, one (1) additional set of plans consisting of summary or title sheet, plot plan, floor
plans and elevations shall be required for the Assessor's Office.
INFORMATION
• Valid Worker's Compensation Certificate or Owner -Builder Verification is required prior to issuance of buildin
permits.
g
The Structural or Civil Engineer or Architect responsible for this project shall sign three final sets of plans.
The third set is for the Assessor's Office.
• Plans cannot be rechecked at the counter. Resubmit and allow additional time for recheck.
• The applicant must submit three sets of plans to the Orange County Fire Authority directly. OCFA approval is required
on 3 sets of plans before any building permits can be issued.
The section Nos. and table Nos. called out in this correction list are from the 2007 California Building Code unless
noted otherwised.
Page 2 of 6 3/11/2008 2:55 PM
RS080149
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM NPDES NOTES
Notes must be shown as worded, on the title sheet of the plan
1. In the case of emergency, call
at Work Phone # or Home Phone #
2. Sediment from areas disturbed by construction shall be retained on site using structural controls to the maximum
extent practicable.
3. Stockpiles of soil shall be properly contained to minimize sediment transport from the site to streets, drainage
facilities or adjacent properties via runoff, vehicle tacking, or wind.
4. Appropriate BMP's for construction -related materials, wastes, spills shall be implemented to minimize transport
from the site to streets, drainage facilities, or adjoining properties by wind or runoff.
5. Runoff from equipment and vehicle washing shall be contained at construction sites unless treated to reduce
or remove sediment and other pollutants.
6. All construction contractor and subcontractor personnel are to be made aware or the required best management
practices and good housekeeping measures for the project site and any associated construction staging areas.
7. At the end of each day of construction activity all construction debris and waste materials shall be collected
and properly disposed in trash or recycle bins.
8. Construction sites shall be maintained in such a condition that an anticipated storm does not carry wastes or
Pollutants off the site. Discharges of material other than stormwater only when necessary for performance and
completion of construction practices and where they do not: cause or contribute to a violation of any water quality
standard; cause or threaten to cause pollution, contamination, or nuisance; or contain a hazardous substance in
a quantity reportable under Federal Regulations 40 CFR Parts 117 and 302.
9. Potential pollutants include but are not limited to: solid or liquid chemical spills; wastes from paints, stains,
sealants, glues, limes, pesticides, herbicides, wood preservatives and solvents; asbestos fibers, paint flakes
or stucco fragments; fuels, oils, lubricants, and hydraulic, radiator or battery fluids; fertilizers, vehicle/equipment
wash water and concrete wash water; concrete, detergent or floatable wastes; wastes from any engine/equipment
steam cleaning or chemical degreasing and superchlorinated potable water line flushing.
During construction, permittee shall dispose of such materials in a specified and controlled temporary area on
-site, physically separated from potential stormwater runoff, with ultimate disposal in accordance with local,
state and federal requirements.
10. Dewatering of contaminated groundwater, or discharging contaminated soils via surface erosion is prohibited.
Dewatering of non -contaminated groundwater requires a National Pollutant Discharge Eliminatio
the respective State Regional Water Quality Control Board. n System Permit from
11. Graded areas on the permitted area perimeter must drain away from the face of slopes at the conclusion of each
working day. Drainage is to be directed toward desilting facilities.
12. The permittee and contractor shall be responsible and shall take necessary precautions to prevent public trespass
onto areas where impounded water creates a hazardous condition.
13. The permittee and contractor shall inspect the erosion control work and insure that the work is in accordance
with the approved plans.
14. The permittee shall notify all general contractors, subcontractors, material suppliers, lessees, and property
owners: that dumping of chemicals into the storm drain system or the watershed is prohibited.
15. Equipment and workers for emergency work shall be made available at all times during the rainy season. Necessary
materials shall be available on site and stockpiled at convenient locations to facilitate rapid construction of
temporary devices when rain is imminent,
16. All removable erosion protective devices shall be in place at the end of each working day when the 5-Day Rain
Probability Forecast exceeds 40%.
Page 3 of 6 3/11/2008 2:55 PM
RS080149 ,
17. Sediments from areas disturbed by construction shall be retained on site using an effective combination of
erosion and sediment controls to the maximum extent practicable, and stockpiles of soil shall be properly containted
to minimize sediment transport from the site to streets, drainage facilities of adjacent properties via runoff,
vehicle tracking, or wind.
18. Appropriate BMPs for construction -related materialswastes, spills or residues shall be implemented and retained
on site to minimize transport from the site to streets, drainage facilities, or adjoining property by wind or
runoff.
Page 4 of 6 3/11/2008 2:55 PM
RS080149 ,
Residential Plan Check Corrections
RS CBC 2007
c0.1 In your responses, please refer to the alpha -numeric reference numbers that
are shown at the start of each of the following correction items. W. Chern
c5.2 General
W. Chern
c7.2.1 Note on Plans:
W. Chern
c9.2.1.1 Assessor's parcel number.
W. Chern
c10.2.2 See red notes on your plans for clarification of corrections or comments,
and for additional corrections. W. Chern
c11.2.3 Major corrections shall be made on the original tracings and new prints
submitted. Return the original plan check set of plans. W. Chern
c12.3 Plot Plan
W. Chern
c14.3.1 Show on plan all easements of record.
W. Chern
07.4 Roof Framing
W. Chern
98.5 Chapter 7A.,-Nildland - Urband Interface Fire Area
W. Chern
c19.5.1 Roofing:
W. Chern
,/'c20,5.1.1 Provide class A roof with firestop to prevent entrussion of flames
and embers or 1 layer of No.72 ASTM cap sheet. W. Chern
v`621.5.1.2 Valley flashings not less than 26 galvanized -sheet -gage metal
over No.72 ASTM cap sheet. W. Chern
P)tN c22.5.1.3 Note on plans: Roof gutters shall be provided with the means
to prevent accumulation of leaves and debris. W. Chern
I'JVI� c23.5.2 Attic Ventilation:
W. Chern
'Jilt,
c24.5.2.1 Eaves and cornice vents are not allowed.
A W. Chern
3 c25.5.2.2 Provide roof vents with minimum of corrosion -resistant, noncombustible
c lt-, wire mesh with 1/4-inch openings. W. Chern
Page 5 of 6 3/11/2008 2:55 PM
= Indicates line item not Cleared.
RS080149
kesidential Plan Check Corrections
---r c26.5.2.3 Eaves and soffits shall be protected by ignition -resistant materials W. Chern
or noncombustible construction on the exposed underside.
(144 c27.5.3 Exterior Walls:
1 W. Chern
c28.5.3.1 Exterior walls shall be of approved non-combustible or ignition W. Chern
-resistant material or heavy timber.
c29.5.3.2 Vents in exterior walls shall be screened with a corrosion -resistant, W. Chern
noncombusitible wire mesh with 1/4 inch openings.
c30.5.3.3 Windows shall be multi -glazed with mimimum one tempered pane, W. Chern
or 20 minute rated.
c31.5.3.4 Exterior doors shall be approved non-combustible or 1 3/8 inch W. Chern
solid core or 20 minute rated.
c32.5.4 Decking, floors and Underfloor Protection:
W. Chern
`J c33.5.4.1 Decking, stairs, porches, balconies shall be ignition resistant
materials meeting SFM12-7A-4, parts A and B, or heavy timber, exterior W. Chern
fire -retardant -treated wood or approved noncombustible materials.
c34.5.4.2 Underside of floor projections shall have ignition -resistant W. Chern
integrity of exterior walls.
c35.5.4.3 Under floor areas shall be enclosed to grade with approved exterior
walls. W. Chern
Page 6 of 6 3/11/2008 2:55 PM
= Indicates line item not Cleared.