HomeMy WebLinkAbout05 - Annual Measure M2 Eligibility SubmittalQ �EwPpRT
CITY OF
s NEWPORT BEACH
`q44:09 City Council Staff Report
June 10, 2025
Agenda Item No. 5
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: David A. Webb, Public Works Director - 949-644-3311,
dawebb@newportbeachca.gov
PREPARED BY: Trevor Smouse, (Acting) Public Works Finance/Administrative
Manager - 949-644-3325, tsmouse@newportbeachca.gov
TITLE: Resolution No. 2025-26: Annual Measure M2 Eligibility Submittal
ABSTRACT:
The City of Newport Beach must annually submit certain required documents to maintain
eligibility to receive Measure M2 Fair Share and Competitive funding from the Orange
County Transportation Authority (OCTA). The submittal documentation this year requires
approval of an updated Measure M2 Seven -Year Capital Improvement Program (CIP)
and a City Council resolution regarding the status and update of the Circulation Element/
Master Plan of Arterial Highways (MPAH) Consistency, Mitigation Fee Program (MFP),
and a Pavement Management Plan (PMP).
RECOMMENDATIONS:
a) Determine this action is exempt from the California Environmental Quality Act (CEQA)
pursuant to Sections 15060(c)(2) and 15060(c)(3) of the CEQA Guidelines because
this action will not result in a physical change to the environment, directly or indirectly;
b) Adopt the Measure M2 Seven -Year Capital Improvement Program;
c) Adopt Resolution No. 2025-26, A Resolution of the City Council of the City of Newport
Beach, California, Concerning the Status and Update of the Circulation Element,
Mitigation Fee Program and Pavement Management Plan for the Measure M2
Program; and
d) Direct staff to submit all necessary materials to the Orange County Transportation
Authority to satisfy the FY 2025-26 Measure M2 annual eligibility requirements.
DISCUSSION:
On November 7, 2006, Orange County voters approved Ordinance No. 3, the Renewed
Measure M (M2) multi -billion -dollar program extension of the original Measure M.
M2 authorized the imposition of a one-half cent retail transaction and use tax for a period
of 30 years, starting in 2011.
Current M2 legislation provides local agencies with 18% of the sales tax revenue collected
under a program called " Fair Share." The distribution to each local agency is based on a
formula using population, miles of existing arterial highways located within each
jurisdiction, and taxable sales. A forecast of Local Fair Share Funds was released by
OCTA in March 2025 and the City' s apportionment is approximately $2.6 million in
FY 2025-26 for local street projects under the Fair Share Program.
5-1
Resolution No. 2025-26: Annual Measure M2 Eligibility Submittal
June 10, 2025
Page 2
To maintain eligibility for Measure M2 funds, the City must satisfy the following
requirements by June 30, 2025:
1. Adopt a Measure M2 Seven -Year CIP that includes all projects to be funded partially
or fully by Measure M2 dollars (Attachment A);
2. Adopt a resolution concerning the status and update of the Circulation Element/ MPAH
Consistency, MFP, and PMP for the Measure M2 Program (Attachment B); and
3. Submit all other required documentation required by OCTA Fiscal Year 2025-26
Measure M2 Eligibility Guidelines.
The budgets shown on the Measure M2 Seven -Year CIP for Fiscal Years 2025-2026 to
2031-2032 are estimated based on anticipated spending and historic needs. The budget
for Fiscal Year 2025-2026 is included in the proposed Capital Improvement Program
budget for City Council adoption on June 10, 2025. Actual budgets for future years have
not yet been established.
The City's Circulation Element is considered consistent with the County MPAH with the
OCTA staff's understanding that the City is currently in the process of updating its Master
Plan of Streets and Highways (NBMPSH) within its Circulation Element. The updating of
the NBMPSH has been taking longer than anticipated as the City first needed to update
the Housing Element to incorporate recent State -mandated housing requirements, which
has been a challenging and lengthy process. Additionally, staff is currently working with
OCTA to review and process a request by the City of Costa Mesa to downgrade
19t" Street and remove planned arterials within the Randall Reserve (former Banning
Ranch). OCTA and City staff have agreed the City's effort to update the NBMPSH should
run in parallel with the Randall Preserve MPAH Network Study that OCTA is currently
leading.
The MFP assesses traffic impacts of new development and requires new development to
pay a fair share of the related, necessary transportation improvements. These Fair Share
Fees are adjusted annually based on the Consumer Price Index (Attachment C). The
PMP outlines the processes in place for the planning, preventative maintenance, and
repair of the City's roadways. An updated PMP report (Attachment D) must be submitted
to OCTA on a biennial basis. This updated pavement system assessment was completed
in March 2025 and the results show that the City's overall weighted Pavement Condition
Index (PCI) for the pavement network is 82, which is in the " Good" category. This report
also verified that the City' s overall pavement condition meets or exceeds the City
Council's goal of maintaining a citywide PCI of 80 or higher. Additionally, as a result of
maintaining a network PCI of 80 or higher, the City remains eligible for a local agency
match reduction of 10%.
A standard item included in the City's annual eligibility documentation is a Maintenance
of Effort (MOE) Certification. This required certification is meant to ensure that the local
jurisdiction maintains a minimum level of local street and road expenditures and that the
M2 funds are used to supplement, rather than replace, local funds. The City has complied
with this and all other eligibility requirements since the inception of the Measure M2
program.
5-2
Resolution No. 2025-26: Annual Measure M2 Eligibility Submittal
June 10, 2025
Page 3
The FY 2025-26 MOE benchmark for the City of Newport Beach was established at
$14,292,404. The MOE benchmark was most recently adjusted in 2023 and is adjusted
every three years. Historically, the City exceeds the benchmark by a considerable
amount. Last year's MOE expenditure totaled $22.4 million.
Upon the City Council' s approval of the recommended actions, a complete submittal of
the City' s eligibility packet will be transmitted to OCTA by the June 30, 2025, submission
deadline.
FISCAL IMPACT:
Submittal of the eligibility documentation ensures that the City will continue to receive its
Fair Share portion of the Measure M2 funds, as well as allow the City to participate in
receiving additional funds through the Measure M2 Competitive Grant funding programs.
This amounts to several million dollars in roadway -related funding each year and is a key
part of the City's roadway maintenance program. Annually, OCTA prepares a 7-year
funding estimate (see table below). Year -over -year increases are projected around 3%.
Estimated Measure M2 Local Fair Share Program Funding
FY2025-26
FY2026-27
FY2027-28
FY2028-29
FY2029-30
FY2030-31
FY2031-32
7 Year
Estimate
$2,633,331
$2,701,329
$2,743,146
$2,785,720
$2,859,412
$2,975,770
$3,093,549
$19,792,257
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this action is not subject to the California
Environmental Quality Act (CEQA) pursuant to Sections 15060(c)(2) (the activity will not
result in a direct or reasonably foreseeable indirect physical change in the environment)
and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the CEQA
Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no
potential for resulting in physical change to the environment, directly or indirectly.
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
ATTACHMENTS:
Attachment A — Measure M2 Seven -Year Capital Improvement Program
Attachment B — Resolution No. 2025-26
Attachment C — Mitigation Fee Program - Fair Share Fee Schedule
Attachment D — Pavement Management Plan
5-3
Orange County Transportation Authority ATTACHMENT A
FY 2025/26 - FY 2031/32 Capital Improvement Program
TIP ID CP--3570 IMPLEMENTING AGENCY Newport Beach, City of
Local Project Number: 20-NBCH-CBT-3956 Project Title
Additional Project IDs: 20-NBCH-CBT-3956 Balboa Island/Corona del Mar Microtransit Feasibility Study
Type of Work: Transportation Planning Project Description
Type of Work Description: Transportation Planning - The City of Newport Beach is proposing to complete a planning study to determine if microtransit service
Studies concepts are potentially feasible on Balboa Island, Corona del Mar, and potentially in the Newport Center and
Irvine Terrace areas. Planning
Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED
Balboa Island, Corona del Mar, and potentially in the
Newport Center and Irvine Terrace areas
Project Notes Totals: $0 $0 $0 $0 $0 $0
Last Revised: 25-00 - In P
Total Programmed: $0 1
TIP ID CP-1?FFQ
IMPLEMENTING AGENCY
Newport Beach, City of
Local Project Number:
Project Title
Additional Project IDs: 25F13
Balboa Peninsula
Trolley Service Continuation
Type of Work: Transit
Project Description
Type of Work Description: Transit- Operations and
Extending the existing trolley service for seven
years and
purchase four new trolley vehicles and one spare.
Maintenance
Limits
FISCAL
YEAR
FUND TYPE
ENG ROW CON/IMP O&M
TOTAL
TOTAL
ESCALATED
Hoag Hospital Lower Parking Lot and Balboa Pier on
the Balboa Peninsula via Pacific Coast Highway,
2026
General Fund
$0
$0
$0
$641,027
$641,027
$641,027
Newport Boulevard, and Balboa Boulevard
2026
Other
$0
$0
$0
$121,500
$121,500
$121,500
Project Notes
2026
PROJECT V - Community
$0
$0
$0
$465,246
$465,246
$465,246
Since the project's application is pending, the annual
Circulators
program information could be subject to change. The
City has budgeted the entire local match requirement in
2027
PROJECT V - Community
$0
$0
$0
$483,246
$483,246
$483,246
the first year on programing.
Circulators
2028
PROJECT V - Community
$0
$0
$0
$465,246
$465,246
$465,246
Circulators
2029
PROJECT V - Community
$0
$0
$0
$465,246
$465,246
$465,246
Circulators
2030
PROJECT V - Community
$0
$0
$0
$465,246
$465,246
$465,246
Circulators
2031
PROJECT V - Community
$0
$0
$0
$465,246
$465,246
$465,246
Circulators
2032
PROJECT V - Community
$0
$0
$0
$465,244
$465,244
$465,244
Circulators
Last Revised: 25-00 - In Progress
Totals: $0 $0 $0 $4,037,247 $4,037,247 $4,037,247
Total Programmed: $4,037,2471
TiD in ro_11 aI? IMPLEMENTING AGENCY
Local Project Number: 20-NBCH-ECP-3986 Project Title
Additional Project IDs: Newport Bay Trash Wheel
Type of Work: Environmental Cleanup Project Description
Type of Work Description: Environmental Cleanup - Trash interceptor collection vessel that captures trash floating in San Diego Creek from inland Orange County
Marina Trash Skimmer into Newport Bay.
Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED
San Diego Creek Upstream of Jamboree Road Bridge
Project Notes
Totals: $0 $0 $0 $0 $0 $0
Other - Upper Newport Bay Restoration fund,
Contributions, and Environmental Liability fund.
Last Revised: 25-00 - In P
Total Programmed: $0 1
5-4
Local Project Number: 24-NBCH-ECP-4096
Additional Project IDs: 26X11
Type of Work: Environmental Cleanup
Type of Work Description: Environmental Cleanup -
Catchment Retrofit
Limits
Newport Dunes
Project Notes
Project Manager John Kappeler Award deadline is
December 31. 2025
Last Revised: 25-00 - In P
Project Title
Newport Dunes Infiltration Basin
Project Description
Install one 2,000 square foot infiltration gallery and five 200 square foot infiltration galleries. • Construct a 2,000
square -foot infiltration gallery within the beach, east of the lagoon. • Construct five 200 square -foot infiltration
galleries
FISCAL TOTAL
YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL ESCALATED
2026 Environmental Cleanup Program $0 $0 $467,238 $0 $467,238 $478,919
(ECP) - Tier 2
2026 Other $0 $0 $467,238 $0 $467,238 $478,919
Totals: $0 $0 $934,476 $0 $934,476 $957,838
Total Programmed: $934,476 1
TIP ID CP-12668 IMPLEMENTING AGENCY Newport Beach, City of
Local Project Number: Project Title
Additional Project IDs: 26X11 Newport Harbor Trash Rover 2.0
Type of Work: Environmental Cleanup Project Description
Type of Work Description: Environmental Cleanup - The City of Newport Beach proposes an expansion to our current (and successful) Newport Harbor Trash Rover
Marina Trash Skimmer Project as a continued effort to improve water quality and reduce trash and debris in Newport Harbor. With this
grant, the City will add to ou
Limits FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
Newport Harbor YEAR ESCALATED
Project Notes 2026 General Fund $0 $0 $13,600 $0 $13,600 $13,940
2026 Environmental Cleanup Program $0 $0 $54,400 $0 $54,400 $55,760
(ECP) - Tier 1
Last Revised: 25-00 - In Progress
Totals: $0 $0 $68,000 $0 $68,000 $69,700
Total Programmed: $68,0001
5-5
Local Project Number:
Project Title
Additional Project IDs:
Various Pavement Rehabilitation Projects
Type of Work: Road Maintenance
Project Description
Type of Work Description: Road Maintenance -
Various pavement
rehabilitation projects as determined by
the Pavement
Management Program
and field reviews
Rehabilitation of roadway
for FY25/26
through FY31/32.
Limits
FISCAL
YEAR
FUND TYPE
ENG
ROW CON/IMP
O&M TOTAL
TOTAL
ESCALATED
Citywide
Project Notes
2026
Measure M2 Local
Fairshare
$394,649
$0
$3,551,837
$0
$3,946,486
$4,035,282
General Fund: 36.3% Measure M Fair Share: 20.4%
Other: 11.5 /o Local Street and Road
2026
Other
$863,281
$0
$7,769,533
$0
$8,632,814
$8,827,052
apportion ments(SB1 - RMRA): 15.8% Gas Tax: 15.9%
2026
Local Streets and Roads
$320,072
$0
$2,880,646
$0
$3,200,718
$3,272,734
apportionments
2026
General Fund
$1,122,490
$0
$10,102,410 $0
$11,224,900
$11,477,460
2026
Gas Tax
$328,466
$0
$2,956,191
$0
$3,284,657
$3,358,562
2027
Other
$40,000
$0
$360,000
$0
$400,000
$418,225
2027
General Fund
$492,500
$0
$4,432,500
$0
$4,925,000
$5,149,395
2027
Measure M2 Local
Fairshare
$300,000
$0
$2,700,000
$0
$3,000,000
$3,136,687
2027
Local Streets and Roads
$156,200
$0
$1,405,800
$0
$1,562,000
$1,633,169
apportionments
2027
Gas Tax
$230,000
$0
$2,070,000
$0
$2,300,000
$2,404,794
2028
Local Streets and Roads
apportionments
$283,000
$0
$2,547,000
$0
$2,830,000
$3,025,840
2028
General Fund
$445,000
$0
$4,005,000
$0
$4,450,000
$4,757,947
2028
Gas Tax
$142,000
$0
$1,278,000
$0
$1,420,000
$1,518,266
2028
Measure M2 Local Fairshare
$300,000
$0
$2,700,000
$0
$3,000,000
$3,207,605
2028
Other
$40,000
$0
$360,000
$0
$400,000
$427,681
2029
Other
$174,370
$0
$1,569,330
$0
$1,743,700
$1,906,617
2029
General Fund
$487,500
$0
$4,387,500
$0
$4,875,000
$5,330,479
2029
Gas Tax
$318,000
$0
$2,862,000
$0
$3,180,000
$3,477,112
2029
Local Streets and Roads
$250,800
$0
$2,257,200
$0
$2,508,000
$2,742,326
apportionments
2029
Measure M2 Local Fairshare
$300,000
$0
$2,700,000
$0
$3,000,000
$3,280,295
2030
General Fund
$414,100
$0
$3,726,900
$0
$4,141,000
$4,630,745
2030
Other
$40,000
$0
$360,000
$0
$400,000
$447,307
2030
Measure M2 Local Fairshare
$300,000
$0
$2,700,000
$0
$3,000,000
$3,354,802
2030
Local Streets and Roads
$213,100
$0
$1,917,900
$0
$2,131,000
$2,383,028
apportionments
2030
Gas Tax
$221,500
$0
$1,993,500
$0
$2,215,000
$2,476,962
2031
General Fund
$477,800
$0
$4,300,200
$0
$4,778,000
$5,464,714
2031
Other
$40,000
$0
$360,000
$0
$400,000
$457,490
2031
Gas Tax
$236,200
$0
$2,125,800
$0
$2,362,000
$2,701,476
2031
Local Streets and Roads
apportionments
$246,900
$0
$2,222,100
$0
$2,469,000
$2,823,855
2031
Measure M2 Local Fairshare
$300,000
$0
$2,700,000
$0
$3,000,000
$3,431,172
2032
Gas Tax
$229,540
$0
$2,065,860
$0
$2,295,400
$2,685,198
2032
Measure M2 Local
Fairshare
$300,000
$0
$2,700,000
$0
$3,000,000
$3,509,452
2032
Local Streets and Roads
$230,000
$0
$2,070,000
$0
$2,300,000
$2,690,580
apportionments
2032
General Fund
$463,380
$0
$4,170,420
$0
$4,633,800
$5,420,699
2032
Other
$40,000
$0
$360,000
$0
$400,000
$467,927
Last Revised: 25-00 - In P
Totals: $10,740,848 $0 $96,667,627 $0 $107,408,475 $116,332,935
Total Programmed: $107,408,475�
5-6
Local Project Number: N/A
Additional Project IDs:
Type of Work: Traffic Signals
Type of Work Description: Traffic Signals - Replace
and upgrade traffic signals and equipment
Limits
Citywide
Project Notes
Gas Tax - 2% General Fund - 98% OCTA Note: Projects
selected on an annual basis
Last Revised: 25-00 - In Progress
Local Project Number: 25-NBCH-ACE-5004
Additional Project IDs: 25-NBCH-ACE-5004
Type of Work: Road Widening
Type of Work Description: Road Widening -Add 1
lane to existing roadway in project limits
Limits
The intersection of West Coast Highway and Old
Newport Boulevard
Project Notes
The listed Developer fund is the Circulation and
Transportation Fund which is used to account for fair
share revenues collected from developers and restricted
for capital improvement projects meeting the circulation
element of the City's General Plan.
Last Revised: 25-00 - In P
Project Title
Various Transportation Projects
Project Description
Various Transportation Projects regarding signage,
striping, marking,
and
signal rehabilitation.
FISCAL YEAR
FUND TYPE
ENG
ROW
CON/IMP
O&M
TOTAL
TOTAL ESCALATED
2026
General Fund
$198,900
$0
$1,790,100
$0
$1,989,000
$2,033,752
2026
Gas Tax
$17,200
$0
$154,800
$0
$172,000
$175,870
2027
General Fund
$107,500
$0
$967,500
$0
$1,075,000
$1,123,980
2028
General Fund
$105,000
$0
$945,000
$0
$1,050,000
$1,122,662
2029
General Fund
$107,500
$0
$967,500
$0
$1,075,000
$1,175,439
2030
General Fund
$107,000
$0
$963,000
$0
$1,070,000
$1,196,546
2031
General Fund
$107,500
$0
$967,500
$0
$1,075,000
$1,229,503
2032
General Fund
$107,500
$0
$967,500
$0
$1,075,000
$1,257,553
Totals: $858,100 $0 $7,722,900 $0 $8,581,000 $9,315,305
Total Programmed: $8,581,0001
Project Title
West Coast Highway Widening at Old Newport Boulevard
Project Description
The City of Newport Beach requests funding for right-of-way
(ROW) acquisitions and construction funding for
improvements to the intersection of West Coast Highway and Old Newport Boulevard (see Vicinity and Project
Location Maps on the following page
FISCAL
YEAR FUND TYPE ENG ROW
TOTAL
CON/IMP O&M TOTAL ESCALATED
2026 General Fund $0 $95,000
$0 $0 $95,000 $97,375
2026 Gas Tax $0 $771,254
$0 $1,373 $772,627 $791,908
2026 Developer $0 $0
$750,000 $0 $750,000 $768,750
2026 Arterial Capacity $0 $2,598,759 $0 $0 $2,598,759 $2,663,728
Enhancements (ACE)
2027 Arterial Capacity $0 $0 $1,761,975 $0 $1,761,975 $1,851,175
Enhancements (ACE)
Totals: $0 $3,465,013 $2,511,975 $1,373 $5,978,361 $6,172,936
Total Programmed: $5,978,361 1
TIP ID CP--3550
IMPLEMENTING AGENCY Newport Beach, City of
Local Project Number: 20-NBCH-ICE-3966
Project Title
Additional Project IDs: 21 R16
West Coast Highway and Superior Avenue/Balboa Boulevard Intersection Improvements
Type of Work: Road Widening
Project Description
Type of Work Description: Road Widening -Add 1
The City proposes to improve the intersection of West Coast Highway (SR 1) and Superior Avenue/Balboa
lane to existing roadway in project limits
Boulevard to improve circulation and relieve traffic congestion. The City requests funding for the planning phase
of the project which includes plan
Limits
FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
YEAR ESCALATED
West Coast Highway (SR 1) and Superior
Avenue/Balboa Boulevard
2029 General Fund $0 $0 $7,420,500 $0 $7,420,500 $8,190,844
Project Notes
2029 Developer $0 $0 $500,000 $0 $500,000 $551,906
The General Fund will be contributing to Facility
2029 Intersection Capacity $0 $0 $14,710,900 $0 $14,710,900 $16,238,081
Financing Plan for this project. The listed Developer
Enhancements (ICE)
fund is the Circulation and Transportation Fund which is
used to account for fair share revenues collected from
developers and restricted for capital improvement
Totals: $0 $0 $22,631,400 $0 $22,631,400 $24,980,831
projects meeting the circulation element of the City's
General Plan.
Last Revised: 25-00 - In Progress
Total Programmed: $22,631,400�
5-7
Measure M Seven Year Capital Improvement Program For Fiscal Years 2025-2026 through 2031-2032
City of Newport Beach
Year 1
Year 2
Year 3
Year 4
Year 5
Year 6
Year 7
Estimated
Project Name 25/26
26/27
27/28
28/29
29/30
30/31
31/32
Cost
Fund Source
%
Various Pavement 3,284,657
2,300,000
1,420,000
3,180,000
2,215,000
2,362,000
2,295,400
17,057,057
Gas Tax
15.9%
Rehabilitation Projects 11,224,900
4,925,000
4,450,000
4,875,000
4,141,000
4,778,000
4,633,800
39,027,700
General Fund
36.3%
3,946,485
3,000,000
3,000,000
3,000,000
3,000,000
3,000,000
3,000,000
21,946,485
Measure M Fair Share
20.4%
5,980,815
0
0
0
0
0
0
5,980,815
Neighborhood Enhancement
5.6%
1,152,000
0
0
0
0
0
0
1,152,000
Oceanfront
1.1%
400,000
400,000
400,000
400,000
400,000
400,000
400,000
2,800,000
Parks Maintenance Master Plan
2.6%
3,200,718
1,562,000
2,830,000
2,508,000
2,131,000
2,469,000
2,300,000
17,000,718
SB1 - RMRA
15.8%
0
0
0
1,343,700
0
0
0
1,343,700
TBD
1.3%
1,100,000
0
0
0
0
0
0
1,100,000
Tide and Submerged Lands - Capita
1.0%
Subtotal 30,289,575
12,187,000
12,100,000
15,306,700
11,887,000
13,009,000
12,629,200
107,408,475
Total
100.0%
Various Transportation
Projects
Balboa Peninsula
Trolley Service Continuation (25T13)
E
C/I
Subtotal
Subtotal
Balboa Island/Corona del Mar
Microtransit Feasibility Study (21T13)
Subtotal
Newport Harbor Trash Rover 2.0 (24X02)
Subtotal
3,028,957
1,218,700
1,210,000
1,530,670
1,188,700
1,300,900
1,262,920
27,260,617
10,968,300
10,890,000
13,776,030
10,698,300
11,708,100
11,366,280
172,000
172,000
Gas Tax
1,989,000
1,075,000
1,050,000
1,075,000
1,070,000
1,075,000
1,075,000
8,409,000
General Fund
2,161,000
1,075,000
1,050,000
1,075,000
1,070,000
1,075,000
1,075,000
8,581,000
Total
$641,027
$641,027
General Fund
$465,246
$483,246
$465,246
$465,246
$465,246
$465,246
$465,246
$3,274,720
M Comp
$121,500
$121,500
Balboa Village Pkg Mgmt District
$1,227,773
$4,037,247
Total
38,789
38,789
General Fund
21,082
21,082
M Comp
59,871
59,871
Total
54,400
54,400
M Comp
13,600
13,600
Tidelands
68,000
68,000
Total
2%
98%
16%
81%
3%
100%
65%
35%
100%
80%
20%
100%
I:\Users\PBW\Shared\OCTA\_Measure M Eligibility\Annual Submittals\2025 Submittal\M2_FY 25-26 7-yr CIP_TGS 06/02/2025
5-8
Measure M Seven Year Capital Improvement Program For Fiscal Years 2025-2026 through 2031-2032
City of Newport Beach
Newport Dunes Infiltration Basin 155,751
(26X11) 467,254
311,502
155,751 Contributions
467,254 M Comp
311,502 Tidelands
Subtotal
934,507
934,507
Total
Newport Bay Water Wheel
153,796
153,796
Contributions
(17X12)
25,000
25,000
M Comp
10
10
Tidelands
Subtotal
178,806
178,806
Total
West Coast Hwy Intersection
1,400
14,709,500
14,710,900
M Comp.
Improvements and Pedestrian
0
7,420,500
7,420,500
FFP: Parks
Bridge (21 R16)
500,000
500,000
Transportation & Circulation
Subtotal
1,400
22,630,000
22,631,400
Total
West Coast Highway Widening at
95,000
95,000
General Fund
Old Newport Boulevard (15R19)
772,627
772,627
Gas Tax
2,598,759 1,761,975
4,360,734
M Comp
750,000
750,000
Transportation and Circulation
Subtotal
4,216,386 1,761,975
5,978,361
Total
TOTAL PROJECTED BUDGET
39,137,317 15,023,975
13,150,000 39,011,700 12,957,000 14,084,000 13,704,200
149,877,667
17%
50%
33%
100%
86%
14%
0%
100%
65%
33%
2%
100%
2%
13%
73%
13%
100%
I:\Users\PBW\Shared\OCTA\_Measure M Eligibility\Annual Submittals\2025 Submittal\M2_FY 25-26 7-yr CIP_TGS
06/02/2025
5-9
CAPITAL
"T.
nm, ment Program
Landscape En cement Program
MacA hur Blvd Pavement Rehabilitation
Newport Blvd and Via Lido Pavement Rehabilitation
FZM�
Old Newport Boulevard Curb and Gutter and Sidewalk Improvements
guel Drive - San Joaquin Hills Road to Old Ford Road
FIR
--®-®-®--®--®
®
.:- :.
---®--------®
it
it
ii
FT�
Newport Dunes Infiltration Basin
Newport Bay Water Wheel
5-10
ATTACHMENT B
RESOLUTION NO. 2025- 26
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF NEWPORT BEACH, CALIFORNIA, CONCERNING
THE STATUS AND UPDATE OF THE CIRCULATION
ELEMENT, MITIGATION FEE PROGRAM, AND
PAVEMENT MANAGEMENT PLAN FOR THE MEASURE
M2 PROGRAM
WHEREAS, the City of Newport Beach desires to maintain and improve the
streets within its jurisdiction, including those arterials contained in the Master Plan of
Arterial Highways ("MPAH") administered by the Orange County Transportation Authority
("OCTA");
WHEREAS, the City of Newport Beach has endorsed a definition of and process
for determining consistency of the City's Traffic Circulation Plan ("Circulation Element")
with the MPAH;
WHEREAS, the City's Circulation Element, which is incorporated into the City's
General Plan, does not preclude implementation of the MPAH within its jurisdiction;
WHEREAS, the City is required to adopt a resolution biennially informing OCTA
that the City's Circulation Element is in conformance with the MPAH and whether any
changes to any arterial highways of said Circulation Element have been adopted by the
City during Fiscal Years ("FY") 2023-24 and FY 2024-25;
WHEREAS, the City is required to send biennially to the OCTA all recommended
changes to the City Circulation Element and the MPAH for the purposes of re -qualifying
for participation in the Comprehensive Transportation Funding Programs, which are a
collection of competitive grant programs comprised primarily of Measure M2 funds (an
Orange County transportation sales tax) offered to local agencies to assist in funding
street improvements, transit expansion and even environmental mitigation projects;
WHEREAS, the City is required to adopt a resolution biennially certifying that the
City has an existing Mitigation Fee Program that assesses traffic impacts of new
development and requires new development to pay a fair share of necessary
transportation improvements attributable to the new development;
WHEREAS, the City is required to meet eligibility requirements and submit
eligibility verification packages to OCTA in order to remain eligible to receive M2 funds;
5-11
Resolution No. 2025-
Page 2 of 3
WHEREAS, the City is required to adopt and update a Pavement Management
Plan ("PMP"), using the required format, regarding the status of road pavement conditions
and implementation of the PMP on a biennial basis; and
WHEREAS, the City is required to provide a plan that manages the preservation,
rehabilitation, and maintenance of paved roads by analyzing pavement life cycles,
assessing overall system performance costs, and determining alternative strategies and
costs necessary to improve paved roads.
NOW, THEREFORE, the City Council of the City of Newport Beach resolves as
follows:
Section 1: The City Council does hereby inform OCTA that:
a) The arterial highway portion of the City's Circulation Element
is in conformance with the MPAH.
b) The City attests that no unilateral reduction in through lanes
has been made on any MPAH arterials during FY 2023-24 and
FY 2024-25.
c) The City affirms that it is currently in the process of reviewing
and updating the City's Circulation Element primarily due to
recent State mandates to increase housing, and is working
with OCTA staff to identify and then bring forward any
requests to amend either the City's Circulation Element or the
MPAH, when necessary, in order to ensure that the MPAH
and the General Plan Circulation Element remain consistent..
d) The City reaffirms that the existing Mitigation Fee Program is
in effect.
e) The PMP is in conformance with the PMP Submittal Template
provided in the Countywide Pavement Management Plan
Guidelines.
f) The City hereby adopts and will maintain the PMP and has
provided an updated PMP report, using the required format,
to OCTA.
g) The Public Works Director, City Engineer or designee is
authorized to sign the PMP certification form.
5-12
Resolution No. 2025-
Page 3 of 3
Section 2: The recitals provided in this resolution are true and correct and are
incorporated into the operative part of this resolution.
Section 3: If any section, subsection, sentence, clause or phrase of this
resolution is, for any reason, held to be invalid or unconstitutional, such decision shall not
affect the validity or constitutionality of the remaining portions of this resolution. The City
Council hereby declares that it would have passed this resolution, and each section,
subsection, sentence, clause or phrase hereof, irrespective of the fact that any one or
more sections, subsections, sentences, clauses or phrases be declared invalid or
unconstitutional.
Section 4: The City Council finds the adoption of this resolution is not subject to
the California Environmental Quality Act ("CEQA") pursuant to Sections 15060(c)(2) (the
activity will not result in a direct or reasonably foreseeable indirect physical change in the
environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378)
of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3,
because it has no potential for resulting in physical change to the environment, directly or
indirectly.
Section 5: This resolution shall take effect immediately upon its adoption by the
City Council, and the City Clerk shall certify the vote adopting the resolution.
ADOPTED this loth day of June, 2025.
Joe Stapleton
Mayor
ATTEST:
Leilani I. Brown
City Clerk
APPROVED AS TO FORM:
CITY TTORNEY'S OFFICE
7C-
ar n C. Harp
City Attorney
5-13
ATTACHMENT C
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
1 CIVIC CENTER DRIVE
P.O. BOX 1768, NEWPORT BEACH, CA 92659-1768
(949) 644-3311
MEMORANDUM
TO: PLANNING DEPARTMENT
FROM: TRAFFIC ENGINEER
DATE: June 13, 2024
SUBJECT: REVISED FAIR SHARE FEES -- UPDATE 2024
Per City Ordinance 94-19, the Fair Share Fees are to be adjusted effective July 1 of each year
based on the Consumer Price Index (the Los Angeles -- Long Beach — Anaheim, All Urban
Consumer Index). For 2024, the fee will be revised 3.9%, from $261.30/trip to $271.49/trip.
A revised Fair Share Fee Summary Table of various land uses as defined by the 1996 NBTAM
is attached for your use.
If you have any questions regarding the new fee or help with fee calculations, please contact me
at ext. 3326.
Brad Sommers
City Traffic Engineer
Attachment
:1Users\PBMShared\TRAFFICIFair Share FeeVairsharememo2024.doe
5-14
FAIR SHARE FEE SUMMARY TABLE 06.13.24
FAIR SHARE FEE SUMMARY TABLE
Fair Share Fee Per Trip $271.49
USE
GEN RATE
UNIT
FEE/UNIT
1
Res-Low(SFD)
11.00
DU
$2,986
1
2
Res -Medium (SFA)
8.60
DU
$2,335
3
Apartment
6.50
DU
1,765
4
Elderly Residential
4.00
DU
$1,086
5
Mobile Home
6.00
DU
$1,629
6
Motel
10.10
ROOM
$2,742
7
Hotel
10.50
ROOM
$2,851
8
Resort Hotel
6.00
ROOM
$1,629
9
Regional Commercial
22.00
TSF
$5,973
10
General Commercial
40.00
TSF
$10,860
11
Comm.IRecreatlon
40.00
ACRE
$10,860
12
Resort Commercial
35.00
TSF
$9,502
13
Restaurant
66.90
TSF
$18,163
14
Family Restaurant
177.87
TSF
$48,290
15
Fast Food Restaurant
142.00
TSF
$38,552
16
Auto Dealer/Sales
47.91
TSF
$13,007
17
Yacht Club
50.00
TSF
$13,575
18
Health Club
40.00
TSF
$10,860
19
Tennis Club
44.30
CRT
$12,027
20
Marina
0.50
SLIP
$136
21
Theater
1.50
SEAT
$407
22
Newport Dunes
5.70
ACRE
$1,647
23
General Office
13.00
TSF
$3,529
24
Medical Office
45.00
TSF
$12,217
25
R & D
9.50
TSF
$2,579
26Industrial
5.00
TSF
$1,357
27
Mini-Storage/Warehouse
2.61
TSF
$709
28
Pre-School/Day Care
67.00
TSF
$18,190
29
Elementary/Private School
1.00
STU
$271
30
JuniorlHigh School
1.40
STU
$380
31
Civic Center/Museum
32.00
TSF
$8,688
32
Library
41.80
TSF
$11,348
33
Post Office
86.80
TSF
$23,565
34
Hospital
11.40
BED
$3,095
35
Nursing/Cony. Home
2.70
PAT
$733
36
Church
7.70
TSF
$2,090
37
Youth Ctrlservice
4.00
TSF
38
Park
6.00
ACRE
39
Regional Park
5.00
ACRE
J$1,629
40
Golf Course
6.00
ACRE
41
Resort Golf Course
3.00
ACRE
I:\Users\PBWIShared\TRAFFICIFair Share Fee1FSHARE2024UPDATE.xls 5-15
ATTACHMENT D
OCTA
City of Newport Beach
Pavement
Management Plan
Prepared by: GMU
Submitted to OCTA: 4-25-2025
5-16
OCTA &GO
Local Tax Dollars at Work
Agency Submittal Table of Contents
Pavement Management Plan Agency Submittal
I.
Pavement Management Plan Certification..................................................................................................... 2
II.
Executive Summary.........................................................................................................................................
3
III.
Background (Optional)....................................................................................................................................
5
IV.
Current Pavement Conditions (PCI)................................................................................................................ 7
V.
Projected Pavement Conditions(PCI)............................................................................................................. 7
VI.
Alternative Funding Levels..............................................................................................................................
8
Maintain Existing Average Network PCI.......................................................................................................... 8
Improve Average Network PCI......................................................................................................................... 8
VI I.
Current and Projected Backlog by Year of Pavement Maintenance Needs ...................................................
9
VIII.
Centerline Mileage..........................................................................................................................................
9
IX.
Percentage of Network in Each of Five Condition Categories Based on Centerline Miles ...........................
10
X.
Reduction in Local Match..............................................................................................................................
11
XI.
Appendix A — Seven -Year Road Maintenance and Rehabilitation Plan Based on Current or Expected
Funding Level and Maintenance of Current System PCIs.............................................................................
12
XII.
Appendix B — Complete Listing of Current Street Conditions.......................................................................
13
XIII.
Appendix C — GIS Digital Data.......................................................................................................................
14
Introduction...................................................................................................................................................
14
Structureof GIS Data.....................................................................................................................................
14
XIV.
Appendix D — Quality Assurance/Quality Control Plan.................................................................................
16
Introduction...................................................................................................................................................
16
Objectives......................................................................................................................................................
16
Structureof QA/QC Plan................................................................................................................................
16
ConditionSurvey Procedures.........................................................................................................................
17
Accuracy Required for Data Collection..........................................................................................................
18
Random and Systematic Re-Inspections........................................................................................................
18
PCI Comparison with Past Surveys.................................................................................................................
19
Inspector's Qualifications and Experience.....................................................................................................
20
SafetyProcedures..........................................................................................................................................
20
XV.
Appendix E — Pavement Management Data Files.........................................................................................
21
XVI.
Appendix F — GIS Maps — Current Conditions (Optional)..............................................................................
21
Page 1 1 5-17
MOCTA &GO Pavement Management Plan Agency Submittal
Local Tax Dollars at Work
I. Pavement Management Plan Certification
The City of Newport Beach certifies that it has a Pavement Management Plan in conformance with the criteria
stated in the Orange County Transportation Authority Ordinance No. 3. This ordinance requires that a Pavement
Management Plan be in place and maintained to qualify for allocation of revenues generated from renewed
Measure M2.
The plan was developed by GMU Pavement Engineering* using PAVER, a pavement management system,
confirming to American Society of Testing and Materials (ASTM) Standard D6433, and contains, at a minimum,
the following elements:
• Inventory of MPAH and local routes reviewed and updated biennially. The last update of the inventory
was completed on March, 2025 for Arterial (MPAH) streets and March, 2025 for local streets.
• Assessment of pavement condition for all routes in the system, updated biennially. The last field review
of pavement condition was completed on March, 2025.
• Percentage of all sections of pavement needing:
o Preventative Maintenance:25%
o Rehabilitation:25%
o Reconstruction:1
• Budget needs for Preventative Maintenance, Rehabilitation, and/or Reconstruction of deficient sections
of pavement for:
o Current biennial period $58.6 million
o Following biennial period $11.8 million
• Funds budgeted or available for Preventative Maintenance, Rehabilitation, and/or Reconstruction:
o Current biennial period $16.0 million
o Following biennial period $16.0 million
• Backlog by year of unfunded pavement rehabilitation, restoration, and reconstruction needs.
• The Pavement Management Plan is consistent with countywide pavement condition assessment
standards as described in the OCTA Countywide Pavement Management Plan Guidelines adopted by the
OCTA Board of Directors.
*An electronic copy of the Pavement Management Plan (with Paver or StreetSaver compatible files) has been,
or will be, submitted with the certification statement.
A copy of this certification is being provided to the Orange County Transportation Authority.
Submitted by:
James Houlihan
Name (Print)
Zop
ed
uty Public Works Director/City Engineer
Title (Public Works Director and/or City Engineer)
City of Newport Beach
Jurisdiction
5l51 rZ467,5
Date
Page 1 2
5-18
OCTA &GO
Local Tax Dollars at Work
II. Executive Summary
Pavement Management Plan Agency Submittal
Maintaining a roadway network constitutes one of the most significant expenses for any city. To strategically
and methodically maintain its roadway network, the city of Newport Beach conducts routine and biennial
pavement management plan updates. Beyond monitoring its roadway network condition, this type of study is
used to assist policy makers in making decisions on its pavement maintenance funding levels, as well as to
comply with the Orange County Transportation Authority (OCTA) Measure M2 Program. This report summarizes
the findings and conclusions from the city's 2025 PMP Update.
The City is responsible for maintaining a total of approximately 204.8 centerline miles of streets, comprising of
approximately 156.6 centerline miles of local streets and approximately 48.2 miles of Master Plan of Arterial
Highways (MPAH). To monitor and analyze this vast network of streets and pertinent information, the City
utilizes PAVER pavement management software. Pavement distress surveys are performed in compliance with
the American Society of Testing and Materials standard ASTM D6433, as required by the Orange County
Transportation Authority.
The condition of Master Plan of Arterial Highway (MPAH) streets is surveyed and updated on annual basis,
whereas the condition of local streets located in Zones 1-3 are surveyed every odd year, and condition of local
streets in Zones 4-7 are surveyed in even years. The current year marks the time to update the PMP with the
condition of MPAH streets and local streets located in Zones 1-3. This report represents the findings of the 2025
PMP update for the City of Newport Beach.
Table 1 below summarizes the current City of Newport Beach network's Pavement Condition Index (PCI)
breakdown by functional classification.
Table 1. Network PCI Breakdown by Functional Classification
The current citywide weighted average Pavement Condition Index (PCI) of the City of Newport Beach is 82.
Overall, approximately 75% (by area) of the City's road network is in the "Very Good" and "Good" condition,
approximately 24% of the roads are in the "Fair" and "Poor" condition categories, and the remaining 1% are in
the "Very Poor" Category
The following three budget scenarios were evaluated as part of this study.
Scenario 1: Current Funding Level ($ 8 million / Year)
The current allocated budget for City of Newport Beach roadway rehabilitation projects is $8.0 million per year,
equating to a total of $56.0 million over the next 7 years.
With this funding level, the network PCI is expected to decrease from its current 82 to a PCI of 80 by fiscal year
2031/32. Approximately 80% of the network will be in the "Very Good" and "Good" condition categories, 16%
will be in the "Fair" and "Poor" condition categories, and 3% of the sections will be in the "Very Poor" Category.
The deferred maintenance will increase to $75.0 million by year fiscal year 2031/32.
Page 13
5-19
OCTA &GO
Local Tax Dollars at Work
Pavement Management Plan Agency Submittal
Scenario 2: Maintain Current Network PCI at 82 ($11.1 million per year)
To maintain the current network PCI at 82, the city would need to spend $11.5 million annually over the next
seven years. The total required budget over the next 7 years for this scenario is $77.7 million.
In this scenario, the street network will consist of approximately 85% of streets with "Very Good" and "Good"
condition categories, 14% will be in the "Fair" and "Poor" condition categories, and the remaining 2% will be in
the "Very Poor" Category. The deferred maintenance will decrease to $45.9 million by fiscal year 2031/32.
Scenario 3: Increase Network PCI by One Point ($13.9 million per year)
To increase the current network PCI by one point (i.e., PCI of 83), the City would need to fund $13.9 million
annually over the next seven years.. In this scenario, the street network will consist of approximately 89% of
streets in the "Very Good" and "Good" condition categories, 9% will be in the "Fair" and "Poor" condition
categories, and the remaining 1% will be in the "Very Poor" Category. The deferred maintenance will decrease
to $16.1 million by fiscal year 2031/32.
Based on the analysis and results of study, GMU recommends the following:
• At minimum, maintain the current funding level of $8.0 million annually (Scenario 1). Although the
network PCI score will degrade by 2 point and the amount of "deferred maintenance" increases, this
funding level is predicted to result in a PCI score that will maintain eligibility for the Measure M CTFP
10% local match reduction.
• Preferably, increase the funding level to $11.1 million annually (Scenario 2). This funding level is
predicted to allow the network PCI score to remain the same and not degrade, as well as reduce the
amount of deferred maintenance. As evident by comparing the funding level of Scenario 2 against
Scenario 3, each 1 point of PCI degradation requires an additional annual funding level of $2.8M to
recover from.
• Preserve streets at higher PCI levels as much as possible, which helps with reducing life cycle costs due
to factors such as:
o Regular maintenance and timely repairs help prevent minor issues from escalating into more
severe distresses and more expensive repairs.
o Roads maintained at higher PCI levels tend to offer longer life, reducing the need for more
frequent rehabilitation or reconstruction.
• Continuously monitor construction costs for implementation into future pavement management plan
updates.
• Continuously update the Maintenance and Rehabilitation (M&R) history of all the streets in the network.
• When specific streets are identified to be improved, perform project -level studies (coring, lab testing,
etc.) to develop site -specific pavement recommendations, in lieu of directly implementing the
conceptual treatments identified in this report. This pavement management plan report is developed
for planning and funding -level determination purposes. It does not contain or directly consider detailed
information such as subgrade condition, in -place pavement layer thicknesses, laboratory test results,
etc. when the conceptual treatments are identified.
• Consider incorporating additional pavement maintenance and rehabilitation strategies that reuse in -
place materials, such as Full Depth Reclamation (FDR) or Cold Recycled AC, which can help reduce
pavement maintenance/repair costs.
Page 14
5-20
OCTA &GO
Local Tax Dollars at Work
Pavement Management Plan Agency Submittal
• Update the pavement management plan as required by OCTA to help ensure that Measure M2 funds
are not jeopardized.
III. Background (Optional)
Maintaining a citywide street network is a complex undertaking. It involves many layers of information that can
have significant impacts on pavement performance and maintenance costs. Some of these layers of information
include:
• Funding: The funding level impacts the type of repair strategies that can be carried out, the design life
of the selected strategy, and the amount of streets that can be improved.
• Pavement age and work history: The city's streets were constructed at different times and received
various maintenance and rehabilitation activities over time. These differences will impact the
pavement's current and future condition.
• Pavement inventory: An inventory of streets defines the limits of the study and the City's responsibility.
Working with a current pavement inventory allows for a more accurate budget scenario analysis to be
conducted.
• Historical costs for various types of repairs: Recent pavement maintenance / rehabilitation costs are
reviewed and updated to more accurately budget for future pavement maintenance/rehabilitation
costs.
• Current pavement condition: To objectively rate the pavement's condition, the roadway is surveyed by
pavement inspectors in accordance with ASTM D 6433 Standard Practice for Roads and Parking Lots
Pavement Condition Index Surveys.
• Predicted pavement condition: Depending on the available budget, the projected future pavement
condition has been analyzed and presented under various scenarios.
The above information was identified, analyzed, and summarized into this 2025 Pavement Management Plan
Update report. This report should be considered a tool for decision makers to use when deciding the amount of
funding to allocate towards pavement maintenance and rehabilitation.
The most cost-effective method for roadway maintenance is to keep them in "good" or better condition. Just
like doing oil changes for vehicles, proactive pavement maintenance (i.e., slurry sealing) will help keep future
repair costs down. Eventually, after so many oil changes, more costly but still relatively inexpensive repairs, will
be due (i.e., rehabilitation or mill -and -overlays). The most expensive approach is to "do-nothing" or defer
maintenance substantially such that complete replacement will be the only option left to restore the pavement
condition. The following is a general description of the conceptual pavement repair strategies.
• For optimal performance, slurry seals are applied on streets in "good" or "very good" condition to help
preserve the condition of the roadway. These treatments help seal minor surface cracks as well as serve
as a protective surface membrane, acting as "sunblock" for the roadway surface. When properly applied
and on a suitable -condition pavement surface, slurry seals typically last approximately 5 to 7 years.
Pavement maintenance treatments applied on streets that are in unsuitable condition (worse than
"good") will result in reduced performance of the treatment and protection of the underlying structural
pavement section.
• Streets that deteriorate to "fair" condition are typically identified for rehabilitation, consisting of
performing a 2-inch or 3-inch thick mill -and -overlay, often times with a pavement reflective cracking
limiting system to reduce pavement reflective cracking propagation potential. Localized areas of repair
5-21
OCTA &GO
Local Tax Dollars at Work
Pavement Management Plan Agency Submittal
(i.e., patches) may also be required to address localized areas of load -related (i.e., alligator cracked)
distresses. Mill -and -overlays are typically performed once every 15 to 20 years.
• If streets deteriorate more rapidly than expected or maintenance/rehabilitation is neglected, they can
deteriorate to a "poor" or worse condition category. Streets that deteriorate to this condition are
typically identified for reconstruction, which generally includes performing full -depth reclamation or
remove -and -replace reconstruction.
The following graph illustrates this concept further.
VeryGood
..............................
~ $0.30 ! SF
I TIMELY PAVEMENT
Good-
PRESERVATION
■
0
Fair
- -$4.50
I - $6.30 f sF I
O
Poor
PAVEMENT I I
U
REHABILITATION I
C
E
Very Poor
�
- $16 - $22 ! SF
'
AC RECONSTRUCTION
IL
- $36 ! SF
PCC RECONSTRUCTION
0
5 10 15 20 25 30 35
Aae of Pavement
The x-axis represents the age of roadway and y-axis represents pavement condition (Pavement Condition Index).
Following a proactive maintenance schedule ("timely pavement maintenance curve") will help reduce pavement
costs by several folds relative to the "reactive maintenance" or "pavement reconstruction" curves.
Page 16
5-22
OCTA &GO
Local Tax Dollars at Work
V.
V.
Pavement Management Plan Agency Submittal
Current Pavement Conditions (PCI)
F Current Network PCI -=W Current MPAH PCI Current Local PCI
Projected Pavement Conditions (PCI)
Should be by projected PCI by year under existing or expected funding levels for next seven fiscal years ("Today"
is before June 30, 2025).
Miscal Year
W
Today
Current Funding
$8.0 million
Entire Network
PCI
82
IVIPAH
83
Local
81
2025-26
$8.0 million
83
85
83
2026-27
$8.0 million
83
83
83
2027-28
$8.0 million
82
83
82
2028-29
$8.0 million
82
82
81
2029-30
$8.0 million
82
81
82
2030-31
$8.0 million
81
79
83
2031-32
$8.0 million
80
78
81
Page 17
5-23
OCTA &GO
Local Tax Dollars at Work
VI. Alternative Funding Levels
Maintain Existing Average Network PCI
Pavement Management Plan Agency Submittal
Fiscal Year
Today
Maintain
Funding
$8.0 million
Entire Network
PCI
82
MPAH
83
Local
81
2025-26
$11.1 million
84
85
83
2026-27
$11.1 million
84
85
83
2027-28
$11.1 million
84
85
82
2028-29
$11.1 million
83
85
82
2029-30
$11.1 million
83
84
82
2030-31
$11.1 million
83
83
83
2031-32
$11.1 million
82
82
82
Improve Average Network PCI
Fiscal Year
Today
Current Funding
$8.0 million
Entire Network
PCI
82
MPAH
83
Local
81
2025-26
$13.9 million
84
85
84
2026-27
$13.9 million
84
87
83
2027-28
$13.9 million
84
87
82
2028-29
$13.9 million
84
87
82
2029-30
$13.9 million
84
87
83
2030-31
$13.9 million
84
84
84
2031-32
$13.9 million
83
83
83
Page 18
5-24
om &GO
Local Tax Dollars at Work
VII
Vill.
Pavement Management Plan Agency Submittal
Current and Projected Backlog by Year of Pavement Maintenance
Needs
Current
urrent Funding
Backlog
54.7
Maintain PCI
Backlogff
54.7
Increase PCI Backlog
54.7
2025-26
46.7
43.6
40.8
2026-27
48.3
42.2
35.5
2027-28
49.9
40.1
29.7
2028-29
54.6
40.4
26.5
2029-30
62.0
42.7
23.8
2030-31
70.9
46.8
23.0
2031-32
75.0
45.9
16.1
Centerline Mileage
Entire Pavement Network
MPAH
I Roads
Page 19
5-25
OCTA &GO
Local Tax Dollars at Work
Pavement Management Plan Agency Submittal
IX. Percentage of Network in Each of Five Condition Categories Based on
Centerline Miles
ir
I
PCIRange
W
Network
Percent
Area of
Pavement
P
t rr
Centerline
Mileage
Categor
Totj
All
(sf)
Mileage
A3
E of
a ork
IL
MPAH
23.6%
10,971,008
29.0
Very Goo d
86-100
46.9%
I
Local
25.4%
11,792,086
67.1
IMPAH
5.1%
2,402,247
6.0
Good
75-85
27.4%
I
Local
20.4%
9,476,694
50.2
I
MPAH
6.2%
2,868,890
8.0
Fair
60-74
18.0%
I
Local
11.3%
5,256,480
28.9
I
MPAH
3.8%
1,752,604
4.8
Poor
41-59
7.1%
I
Local
3.5%
1,633,750
9.6
MPAH
0.4%
180,790
0.4
Very Poor
0-40
0.6%
Local
0.3%
124,930
0.8
Page I10
5-26
om &GO
Local Tax Dollars at Work
X. Reduction in Local Match
Pavement Management Plan Agency Submittal
A local agency match reduction of 10% of the eligible cost for Project 0 submitted for consideration of funding
through the Comprehensive Transportation Funding Programs (CTFP) call for projects is available if the local
agency either:
a. Shows measurable improvement of paved road conditions during the previous reporting period defined
as an overall weighted (by area) average system improvement of one Pavement Condition Index (PCI)
point with no reduction in the overall weighted (by area) average PCI in the Master Plan of Arterial
Highways (MPAH) or local street categories;
or
b. Have road pavement conditions during the previous reporting period, within the highest 20% of the
scale for road pavement conditions in conformance with OCTA Ordinance No. 3, defined as a PCI of 75
or higher, otherwise defined as in "good condition".
If applicable, please use the space below to justify the local agency's eligibility for a reduction in Local Match
based on the statement above.
The City of Newport Beach has met criteria (b) above by having an average weighted PCI of 82. This means the
City continues to remain eligible for the CTFP 10% local match reduction.
Page 1 11
5-27
OCTA &GO
Local Tax Dollars at Work
Pavement Management Plan Agency Submittal
XI. Appendix A — Seven -Year Road Maintenance and Rehabilitation Plan
Based on Current or Expected Funding Level and Maintenance of
Current System PCIs
The seven-year plan for road maintenance and rehabilitation should be based on current and projected budget.
Street sections selected for treatment should be identified here. Specific data to be submitted should follow the
format below:
M PAH
Limits of Work
Street Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of
Treatment
Cost of
Treatment
Year of
Treatment
LOCAL
Limits of Work
Street Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of
Treatment
Cost of
Treatment
Year of
Treatment
Please attach the seven-year road maintenance and rehabilitation plan, following the above template, after this
sheet. The plan should be labeled Appendix A.
Page 112
5-28
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
V 1�1 V
PAVEMENT
E N G I N E E R I N G
M PAH
Street Name From Limits of WorkTo Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
Birch St Quail St Bristol St North 865 61 67,885 Mill and Overlay $374,990 2025
Ford Rd WB San Miguel Dr Newport Hills Dr 2,420 30 72,600 Mill and Overlay $402,215 2025
Jamboree Rd NB Bristol St North MacArthur Blvd 780 46 39,380 Mill and Overlay $86,634 2025
Jamboree Rd SB
Bristol St South
Bayview Way
938
53
51,214
Mill and Overlay
$286,329
2025
Jamboree Rd SB
Birch St
Fairchild Rd
1,820
48
106,560
Mill and Overlay
$591,605
2025
Jamboree Rd SB
Ba view Way
University Dr/Eastbluff Dr
1,788
46
87,498
Mill and Overlay
$484,070
2025
MacArthur Blvd NB
Birch St
Campus Dr
918
60
55,080
Mill and Overlay
$307,192
2025
MacArthur Blvd NB
Jamboree Rd
Von Karman Ave
1,763
39
99,757
Mill and Overlay
$49,378
2025
MacArthur Blvd SB
Birch St
Newport Place Dr
2,454
60
147,240
Mill and Overlay
$857,546
2025
Newport Blvd NB
Via Lido
Newport Channel Bridge
618
42
25,956
Mill and Overlay
$148,540
2025
Newport Center Dr SB
Farallon Dr/Granville Dr
Coast Highway East
1,106
36
40,816
Mill and Overlay
$235,012
2025
Newport Coast Dr SB
Sage Hill
San Joaquin Hills Rd
3,044
41
129,054
Mill and Overlay
$721,520
2025
San Joaquin Hills Rd WB
Crown Dr
San Miguel Dr
932
41
40,212
Mill and Overlay
$228,503
2025
San Joaquin Hills Rd WB
Marguerite Ave
Crown Dr
1,573
41
65,993
Mill and Overlay
$39,925
2025
San Miguel Dr SB
Pacific View Dr
San Joaquin Hills Rd
635
29
22,915
Mill and Overlay
$131,346
2025
Ford Rd EB
Newport Hills Dr
San Miguel Dr
2,443
29
79,047
Mill and Overlay
$188,072
2026
Newport Center Dr E SB
San Miguel Dr
Anacapa Dr
830
36
31,380
Mill and Overlay
$179,801
2026
San Miguel Dr NB
Harbor Woods PI
Port Sutton Dr
1,761
29
53,319
Mill and Overlay
$303,722
2026
Via Lido
Bridge (West End)
Newport Blvd
1,550
26
40,300
Mill and Overlay
$228,483
2026
32nd St WB
Newport Blvd
Marcus Ave
195
32
6,240
Reconstruction
$42,802
2027
Bristol St North
Dove St
Spruce St
1,261
46
58,006
Reconstruction
$384,324
2027
Jamboree Rd SB
Koll Center
MacArthur Blvd
525
58
35,450
Reconstruction
$230,551
2027
MacArthur Blvd NB
Von Karman Ave
Birch St
2,449
60
146,940
Reconstruction
$987,949
2027
MacArthur Blvd SB
Campus Dr
Birch St
860
61
81,960
Reconstruction
$530,149
2027
Newport Center Dr E NB
Newport Center Dr
Anacapa Dr
754
36
28,644
Reconstruction
$185,636
2027
Newport Center Dr E NB
Santa Rosa Dr
Santa Cruz Dr
1,536
36
57,296
Mill and Overlay
$335,772
2027
Newport Center Dr NB
Farallon Dr/Granville Dr
Newport Center Dr West
868
36
32,748
Reconstruction
$214,039
2027
Newport Center Dr W NB
Santa Barbara Dr
Santa Cruz Dr
1,087
36
41,632
Reconstruction
$274,401
2027
Newport Center Dr W SB
Santa Barbara Dr
Newport Center Dr
1,484
36
55,924
Reconstruction
$362,818
2027
Newport Coast Dr NB
Sage Hill
73 Freeway Bride
2,235
42
93,870
Mill and Overlay
$273,856
2027
San Joaquin Hills Rd EB
Crown Dr
Marguerite Ave
1,573
41
65,993
Reconstruction
$444,249
2027
San Joaquin Hills Rd WB
Newport Coast Dr
Newport Ridge Dr East
1,030
33
42,890
Reconstruction
$278,375
2027
San Miguel Dr NB
Port Sutton Dr
Yacht Coquette (North End)
1,110
29
32,190
Mill and Overlay
$189,309
2027
Via Lido
Newport Blvd
Bridge (West End)
1,550
26
40,300
Mill and Overlay
$204,574
2027
Bristol St North
Birch St
Campus Dr
617
51
36,967
Reconstruction
$266,189
2028
Bristol St North
Jamboree Rd
Dove St
566
46
26,036
Reconstruction
$186,368
2028
Jamboree Rd NB
Ba view Way
Bristol St South
955
57
58,935
Mill and Overlay
$358,417
2028
Jamboree Rd SB
Campus Dr
Birch St
840
49
43,740
Reconstruction
$312,567
2028
MacArthur Blvd SB
Newport Place Dr
Jamboree Rd
1,844
61
104,984
Reconstruction
$769,528
2028
Newport Center Dr W NB
Newport Center Dr
Santa Barbara Dr
1,418
36
53,548
Reconstruction
$392,428
2028
San Joaquin Hills Rd EB
San Miguel Dr
Crown Dr
932
41
39,212
Reconstruction
$290,541
2028
San Miguel Dr NB
Pacific View Dr
Harbor Woods PI
505
777
29
76
14,645
Mill and Overlay
$88,919
2028
Von Karman Ave
Campus Dr
Birch St
56,952
Reconstruction
$416,768
2028
Appendix A - MPAH
1of2
5-29
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
V 1�1 V
PAVEMENT
E N G I N E E R I N G
M PAH
Limits of Work
Street Name From To Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
Von Karman Ave Birch St MacArthur Blvd 2,180 76 163,580 Reconstruction $1,186,604 2028
32nd St Villa Way Newport Blvd 530 62 29,150 Mill and Overlay $10,827 2029
Newport Center Dr E SB
Santa Rosa Dr
San Miguel Dr
1,135
36
43,360
Mill and Overlay
$152,991
2029
Superior Av SB
Ticonderga St
Coast Highway West
1,552
38
58,976
Reconstruction
$391,901
2029
Newport Center Dr E NB
San Miguel Dr
Santa Rosa Dr
1,199
36
44,664
Mill and Overlay
$285,006
2030
Newport Center Dr E NB
Anacapa Dr
San Miguel Dr
830
36
31,630
Mill and Overlay
$94,784
2030
Newport Center Dr E SB
Santa Cruz Dr
Santa Rosa Dr
1,403
36
53,008
Mill and Overlay
$339,049
2030
San Joaquin Hills Rd EB
Newport Ridge Dr West
Newport Ridge Dr East
2,240
33
77,670
Reconstruction
$542,725
2030
San Joaquin Hills Rd WB
Newport Ridge Dr East
Newport Ridge Dr West
2,240
33
77,920
Reconstruction
$544,472
2030
San Miguel Dr SB
Port Sutton Dr
Harbor Woods PI
1,761
29
51,069
Mill and Overlay
$327,801
2030
Campus Dr EB
MacArthur Blvd
MacArthur Ct
510
40
20,400
Reconstruction
$143,720
2031
Hospital Rd
Placentia Ave
Newport Blvd
700
57
39,900
Reconstruction
$315,683
2031
Newport Blvd SB
Newport Channel Bridge
Via Lido
546
42
22,932
Reconstruction
$478,795
2031
Newport Center Dr E SB
Anacapa Dr
Newport Center Dr
754
36
29,144
Reconstruction
$605,320
2031
Newport Center Dr NB
Coast Highway East
Farallon Dr/Granville Dr
1,189
36
46,304
Reconstruction
$818,857
2031
Newport Center Dr SB
Newport Center Dr West
Farallon Dr/Granville Dr
945
36
37,020
Reconstruction
$789,062
2031
Newport Coast Dr NB
San Joaquin Hills Rd
Sage Hill
3,044
41
124,804
Reconstruction
$881,583
2031
San Miguel Dr NB
San Joaquin Hills Rd
Pacific View Dr
635
29
19,665
Reconstruction
$516,592
2031
Superior Av NB
Ticonderga St
Placentia Ave
1,493
38
56,734
Reconstruction
$1,255,595
2031
Appendix A - MPAH
2of2
5-30
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name From Limits of WorkTo Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
26th St East End Newport Blvd 140 29 4,060 Slurry Seal $1,218 2025
26th St Newport Blvd Balboa Blvd 125 22 2,750 Slurry Seal $825 2025
28th St Newport Blvd West SB Balboa Blvd 220 60 13,200 Slurry Seal $3,960 2025
54th St Neptune Ave Seashore Dr 75 27 2,025 Slurry Seal $608 2025
60th St
North End
Coast Highway West
155
28
4,340
Slurry Seal
$1,302
2025
Alder PI
Alta Vista Dr
End
305
32
9,760
Slurry Seal
$2,928
2025
Aleppo St
Alta Vista Dr
End
385
32
12,320
Slurry Seal
$3,696
2025
Almond PI
Alta Vista Dr
End
245
32
7,840
Slurry Seal
$2,352
2025
Alta Vista Dr
Carob St
Bison Ave
2,220
36
79,920
Slurry Seal
$23,976
2025
Anniversary Ln
Irvine Ave
End
2,209
28
61,852
Slurry Seal
$18,556
2025
Aralia St
Aleppo St
End
1,775
35
62,125
Slurry Seal
$18,638
2025
Arbutus St
Aleppo St
Alta Vista Dr
1,140
36
41,040
Slurry Seal
$12,312
2025
Arbutus St
Alta Vista Dr
End
225
32
7,200
Slurry Seal
$2,160
2025
Avocado Ave
Pacific Dr
160' N of Pacific Dr
160
16
2,560
Slurry Seal
$768
2025
Avocado Ave SB
167' S/0 San Joaquin Hills
Bus Station
107
22
3,674
Slurry Seal
$1,102
2025
Azure Ave
Orchid St
Bay View Ave
630
35
22,050
Slurry Seal
$6,615
2025
Back Bay Dr
Jamboree Rd
Entrance to Newport Dunes
1,110
61
67,710
Slurry Seal
$20,313
2025
Back Bay Dr
Entrance to Newport Dunes
Shellmaker Rd
1,225
48
58,800
Slurry Seal
$17,640
2025
Back Bay Dr
Shellmaker Rd
Beginning of PCC Section
800
22
17,600
Slurry Seal
$5,280
2025
Back Bay Dr
End of PCC Section
San Joaquin Hills Rd
1,649
22
36,278
Slurry Seal
$10,883
2025
Back Bay Dr
San Jao uin Hills Rd
Beginning of PCC Section
2,710
22
59,620
Slurry Seal
$17,886
2025
Back Bay Dr
End of PCC Section
Backbay sewer pump station
3,106
22
68,332
Slurry Seal
$20,500
2025
Back Bay Dr
Access Rd
Staired Path to Landmark
2,394
22
52,668
Slurry Seal
$15,801
2025
Basswood St
Alta Vista Dr
Alta Vista Dr
1,090
33
35,425
Slurry Seal
$10,628
2025
Bay Farm PI
Upper Bay Dr
End
425
34
14,450
Slurry Seal
$4,335
2025
Ba crest Rd
Irvine Ave
Tradewinds Ln
238
38
9,044
Slurry Seal
$2,713
2025
Ba side Dr
Coast Highway East
End
1,187
38
45,106
Slurry Seal
$13,532
2025
Ba view Way
Shearwater PI
Ba view PI
575
37
32,838
Slurry Seal
$9,851
2025
Ba view Way EB
Ba view PI
Jamboree Rd
587
33
21,371
Mill and Overlay
$99,762
2025
Beacon Bay
Harbor Island Rd
End
1,170
24
28,080
Slurry Seal
$8,424
2025
Beacon St
La Jolla Dr
Santa Ana Ave
105
33
3,465
Slurry Seal
$1,040
2025
Bellis St
Alta Vista Dr
End
475
32
15,200
Slurry Seal
$4,560
2025
Birch St
Mesa Dr
End
232
36
9,552
Slurry Seal
$2,866
2025
Bixia St
Eastbluff Dr
Bamboo St
150
35
5,250
Slurry Seal
$1,575
2025
Blackthorn St
Bellis St
Bison Ave
1,385
34
47,090
Slurry Seal
$14,127
2025
Blue Key
Sandcastle Dr
End
750
32
26,700
Slurry Seal
$8,010
2025
Blue Water Dr
Salt Air Dr
Crown Dr North
1,100
32
35,028
Slurry Seal
$10,508
2025
Bowsprit Dr
MacArthur Blvd
Dove St
306
44
13,464
Slurry Seal
$4,039
2025
Buck Gully Dr
Sandcastle Dr
End
126
36
5,786
Slurry Seal
$1,736
2025
Buckeye St
Bellis St
Bison Ave
1,190
32
38,080
Slurry Seal
$11,424
2025
Cabrillo Ter
Serra Dr
De Anza Dr
869
23
19,787
Slurry Seal
$5,936
2025
Camelback St
Jamboree Rd
La Felicidad
1,505
40
60,825
Slurry Seal
$18,248
2025
Cameo Highlands Dr
Coast Highway East
Garrett Dr
1,420
37
49,321
Slurry Seal
$14,796
2025
Carmel Bay Dr
Point Loma Dr
Spyglass Hill Rd
1,635
36
58,860
Mill and Overlay
$277,097
2025
Carob St
Camphor St
End
2,360 34
80,240
Slurry Seal
$24,072
2025
Appendix A - Local Streets
1 of 29
5-31
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name
Catamaran Dr
From Limits of WorkTo
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
975 36 _ 37,350 _ Slurry Seal $11,205 2025
195 54 11,780 Slurry Seal $3,534 2025
190 54 10,260 Slurry Seal $3,078 2025
Keel Dr
End
Ceiba PI
Carob St
End
Celtis PI
Alta Vista Dr
End
Cercis PI
Alta Vista Dr
End
220
32
7,040
Slurry Seal
$2,112
2025
Chestnut PI
Alta Vista Dr
End
220
32
7,040
Slurry Seal
$2,112
2025
Citrus PI
Alta Vista Dr
End
285
32
9,120
Slurry Seal
$2,736
2025
Civic Center Dr
Avocado Ave
Newport Center Dr
1,559
48
74,832
Slurry Seal
$22,450
2025
Columbus Cir
Serra Dr
End
112
22
3,464
Slurry Seal
$1,039
2025
Corinthian Way
MacArthur Blvd
Birch St
876
44
38,544
Slurry Seal
$11,563
2025
Cortes Cir
Serra Dr
End
90
22
2,980
Slurry Seal
$894
2025
Cortland Dr
Rockford PI
Cameo Highlands Dr
702
37
25,974
Slurry Seal
$7,792
2025
Cortland Dr
Cameo Highlands Dr
Garrett Dr
989
37
36,593
Slurry Seal
$10,978
2025
Court Ave
20th St
McFadden PI
85
28
2,380
Slurry Seal
$714
2025
Crown Dr
Sea Ln
Crown Dr North
1,152
37
42,624
Slurry Seal
$12,787
2025
Crown Dr North
Crown Dr
San Joaquin Hills Rd
1,370
36
49,320
Slurry Seal
$14,796
2025
Cutter Rd
Beacon Bay
End
380
24
9,120
Slurry Seal
$2,736
2025
Cypress St (S/A Heights)
Mesa Dr
Orchard Dr
1,320
36
47,520
Slurry Seal
$14,256
2025
Cypress St (S/A Heights)
Orchard Dr
Cul De Sac
980
36
35,280
Slurry Seal
$10,584
2025
Cypress St (S/A Heights)
Cul De Sac
Bristol St South
260
36
9,360
Slurry Seal
$2,808
2025
De Anza Dr
Seaward Rd
De Sola Ter
750
35
26,250
Slurry Seal
$7,875
2025
Dolphin -Striker Way
Dove St
End
335
44
16,740
Slurry Seal
$5,022
2025
Dorchester Rd
Rockford Rd
Cameo Highland Rd
825
33
27,225
Slurry Seal
$8,168
2025
Dorchester Rd
Cameo Highland Rd
Garrett Rd
910
33
30,030
Slurry Seal
$9,009
2025
Dove St
Campus Dr
Birch St
585
37
21,645
Slurry Seal
$6,494
2025
Dover Dr
End
Leila Ln
492
29
15,768
Slurry Seal
$4,730
2025
Dover Dr
Leila Ln
Mariners Dr
500
29
14,500
Slurry Seal
$4,350
2025
Dover Dr
Mariners Dr
Doris Ln
510
29
14,790
Slurry Seal
$4,437
2025
Dover Dr
Doris Ln
Nottingham Rd
590
29
17,110
Slurry Seal
$5,133
2025
Dover Dr
Nottingham Rd
Norfolk Ln
665
29
19,285
Slurry Seal
$5,786
2025
Dover Dr
Norfolk Ln
Westcliff Dr
490
29
14,210
Slurry Seal
$4,263
2025
Dover Dr
Westcliff Dr
Dover Dr (Arterial)
170
36
5,460
Slurry Seal
$1,638
2025
East Coastal Peak
Ridge Park Rd
1195' S of Ridge Park Rd
1,195
37
44,215
Slurry Seal
$13,265
2025
Ebbtide Rd
Crown Dr
Sandpiper Dr
1,317
33
43,461
Slurry Seal
$13,038
2025
El Ca itan Dr
Spyglass Hill Rd
Point Arguello Way
1,236
44
54,384
Slurry Seal
$16,315
2025
El Capitan Dr
Point Arguella Way
Point Conception Way
1,603
44
71,282
Slurry Seal
$21,385
2025
Fernleaf Ave
Coast Highway East
Fifth Ave
370
27
9,990
Slurry Seal
$2,997
2025
Fifth Avenue
Marguerite Ave
Marigold Ave
320
36
11,520
Slurry Seal
$3,456
2025
Fifth Avenue
Marigold Ave
Poppy Ave
1,175
36
42,300
Slurry Seal
$12,690
2025
Ford Rd
Hillside Dr
East End
590
32
22,320
Slurry Seal
$6,696
2025
Ford Rd EB
West End
San Miguel Dr
840
30
26,900
Slurry Seal
$8,070
2025
Ford Rd WB
Newport Hills Dr
West End
877
29
25,433
Slurry Seal
$7,630
2025
Fourth Ave
Larkspur Ave
Marguerite Ave
280
27
7,560
Slurry Seal
$2,268
2025
Fourth Ave
Poinsettia Ave
Poppy Ave
269
27
7,263
Slurry Seal
$2,179
2025
Francisco Dr
Irvine Ave
Tradewinds Ln
236
36
8,496
Slurry Seal
$2,549
2025
Garrett Dr
Cortland Dr
Cameo Highlands Dr
840
37
31,080
Slurry Seal
$9,324
2025
Appendix A - Local Streets
2 of 29
5-32
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name
Goldenrod Ave
From Limits of WorkTo
Fourth Ave Fifth Ave
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
350 27 _ 9,450 _ Slurry Seal $2,835 2025
1,165 33 38,445 Slurry Seal $11,534 2025
635 35 22,225 Slurry Seal $6,668 2025
Goldenrod Ave
Harbor View Dr
Crown Dr
Goldenrod Ave
Crown Dr
Wavecrest Dr
Granville Dr
Newport Center Dr
Gate
388
26
10,088
Slurry Seal
$3,026
2025
Harbor View Dr
MacArthur Blvd
Goldenrod Ave
685
38
26,030
Slurry Seal
$7,809
2025
Harbor View Dr
Goldenrod Ave
Marguerite Ave
1,945
38
73,910
Slurry Seal
$22,173
2025
Hazel Dr
Coast Highway East
577' N of Coast Highway East
577
30
17,310
Slurry Seal
$5,193
2025
Hazel Dr
577' N of Coast Highway East
Poppy Ave (north side)
393
29
11,397
Slurry Seal
$3,419
2025
Heliotrope Ave
Coast Highway East
Fifth Ave
785
27
21,195
Slurry Seal
$6,359
2025
Holiday Rd
Irvine Ave
Tustin Ave
1,290
38
49,020
Slurry Seal
$14,706
2025
Hospital Rd
Superior Ave
Placentia Ave
976
44
42,944
Slurry Seal
$12,883
2025
Indus St
Kline Dr
West End
800
33
28,400
Slurry Seal
$8,520
2025
Inlet Dr
Marguerite Ave
Keel Dr
150
36
5,400
Slurry Seal
$1,620
2025
Inlet Isle Dr
Topside Ln
Sandcastle Dr
1,088
32
37,066
Slurry Seal
$11,120
2025
Island Ave
Bay Ave East
Balboa Blvd West
164
33
5,412
Slurry Seal
$1,624
2025
Island View Dr
Salt Air Dr
Lighthouse Ln
815
32
26,080
Slurry Seal
$7,824
2025
Jade Cove
San Martin Way
End
275
32
10,300
Slurry Seal
$3,090
2025
Jasmine Ave
Third Ave
Fifth Ave
760
27
20,520
Slurry Seal
$6,156
2025
Keel Dr
Catamaran Dr
Outrigger Dr
583
32
21,014
Slurry Seal
$6,304
2025
Ketch Rd
Beacon Bay
End
310
24
7,440
Slurry Seal
$2,232
2025
Key Bay
Park Green Dr
End
80
64
5,120
Slurry Seal
$1,536
2025
Key View
Sandcastle Dr
End
115
34
5,410
Slurry Seal
$1,623
2025
Key West
Park Green Dr
End
230
32
8,860
Slurry Seal
$2,658
2025
Kline Dr
South End
Orchard Dr
625
28
19,000
Slurry Seal
$5,700
2025
Kline Dr
Pegasus St
North End
570
33
21,060
Slurry Seal
$6,318
2025
La Felicidad
Camelback St
La Salud
300
44
13,200
Slurry Seal
$3,960
2025
La Salud
North End
La Vida
499
44
23,956
Slurry Seal
$7,187
2025
La Salud
La Vida
Corsica Dr N
1,335
44
58,740
Slurry Seal
$17,622
2025
La Salud
Corsica Dr N
La Felicidad
1,005
44
44,220
Slurry Seal
$13,266
2025
La Salud
La Felicidad
South End
431
44
20,964
Slurry Seal
$6,289
2025
La Vida
University Dr
La Salud
843
44
40,092
Slurry Seal
$12,028
2025
Lighthouse Ln
Salt Air Dr
Blue Water Dr
1,065
32
35,580
Slurry Seal
$10,674
2025
Marguerite Ave
San Joaquin Hills Rd
Pacific View Dr
721
36
26,406
Slurry Seal
$7,922
2025
Marigold Ave
Third Ave
Fourth Ave
345
27
9,315
Slurry Seal
$2,795
2025
Marine Ave
South Bridge End
North Bridge End
400
20
8,000
Slurry Seal
$2,400
2025
Marine Ave
North Bridge End
Ba side Dr
300
20
10,800
Slurry Seal
$3,240
2025
Martingale Way
Corinthian Way
End
562
44
26,228
Slurry Seal
$7,868
2025
Mesa Dr
Mesa Dr/Birch St
Cypress St
1,140
37
42,180
Slurry Seal
$12,654
2025
Mesa Dr
Cypress St
End
1,345
37
49,765
Slurry Seal
$14,930
2025
Mesa View North
Ford Rd
Bonita Canyon Dr
400
43
17,200
Slurry Seal
$5,160
2025
Mesa View South
Bonita Canyon Dr
Ford Rd
400
43
17,200
Slurry Seal
$5,160
2025
Morning Canyon Rd
Serra Dr
Seaward Rd
920
35
32,200
Slurry Seal
$9,660
2025
Morning Canyon Rd
Seaward Rd
Coast Highway East
350
35
12,250
Slurry Seal
$3,675
2025
Narcissus Ave
Fifth Ave
Geranium
344
36
12,384
Mill and Overlay
$58,278
2025
Newport Hills Dr W
Port Seabourne Wy
Ford Rd
2,346
38
89,148
Mill and Overlay
1 $4,012
2025
Appendix A - Local Streets
3 of 29
5-33
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name From Limits of WorkTo
Newport Ridge Dr East San Joaquin Hills Rd Park Crest
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
1,520 40 _ 59,300 _ Slurry Seal $17,790 2025
2,215 40 88,600 Slurry Seal $26,580 2025
800 40 32,000 Slurry Seal $9,600 2025
Newport Ridge Dr East
Park Crest
St Michael
Orchard Dr
Irvine Ave
Birch St
Orchard Dr
Birch St
Cypress St
630
36
22,680
Slurry Seal
$6,804
2025
Orchard Dr
Cypress St
Orchid St
465
35
16,275
Slurry Seal
$4,883
2025
Orchard Dr
Bay View Ave
End
148
35
5,180
Slurry Seal
$1,554
2025
Orchard Dr
Santa Ana Ave
End
1,374
33
47,142
Slurry Seal
$14,143
2025
Orchid Hill PI
Upper Bay Dr
End
425
34
14,450
Slurry Seal
$4,335
2025
Orchid St
Orchard Dr
Azure Ave
500
35
17,500
Slurry Seal
$5,250
2025
Outrigger Dr
Keel Dr
Sandcastle Dr
1,454
33
47,255
Slurry Seal
$14,177
2025
Park Green Dr
Sausalito Dr
Sandcastle Dr
1,110
40
44,400
Slurry Seal
$13,320
2025
Pebble Dr
Goldenrod Ave
Sandpiper Dr
1,247
34
42,398
Slurry Seal
$12,720
2025
Pegasus St
Santa Ana Ave
Kline Dr
1,177
33
38,841
Slurry Seal
$11,652
2025
Pelican Hill Rd N
Pelican Hill Cir (North Side)
Pelicans Dr
2,684
19
50,996
Slurry Seal
$15,299
2025
Pelican Hill Rd N
Newport Coast Dr North
Pelicans Dr
1,258
19
23,902
Slurry Seal
$7,171
2025
Pelican Hill Rd N
Pelicans Dr
Newport Coast Dr
1,258
19
23,902
Slurry Seal
$7,171
2025
Pelican Hill Rd N
Pelicans Dr
Pelican Hill Cir (North Side)
2,684
19
50,996
Slurry Seal
$15,299
2025
Pelican Hill Rd S
Newport Coast Dr
Pelican Hill Cir S
5,650
24
142,100
Slurry Seal
$42,630
2025
Pelican Hill Rd S
Pelican Hill Cir (North Side)
Pelican Hill Cir (South Side)
1,352
24
31,798
Slurry Seal
$9,539
2025
Pelican Hill Rd S
Pelican Hill Cir (South Side)
Pelican Hill Cir (North Side)
1,352
24
32,448
Slurry Seal
$9,734
2025
Pelican Hill Rd S
Pelican Hill Cir (South Side)
Newport Coast Dr
5,650
24
142,600
Slurry Seal
$42,780
2025
Pescador Dr
Nottingham Rd
Santiago Dr
1,487
33
50,271
Slurry Seal
$15,081
2025
Piazza Genoa
Via Lido Soud
Via Genoa
192
45
8,640
Slurry Seal
$2,592
2025
Piazza Lido
Via Florence
Via Havre
510
58
29,580
Slurry Seal
$8,874
2025
Point Conception Way
El Capitan Dr
Drakes Bay Dr
168
36
6,798
Slurry Seal
$2,039
2025
Poppy Ave
Second Ave
Fifth Ave
1,150
27
31,050
Mill and Overlay
$146,301
2025
Pork Barrel Way (35th 1/2 St)
FinleyAve
S End
80
16
1,280
Slurry Seal
$384
2025
Port Abbey PI
Port Sheffield PI (West End)
Newport Hills Drive West
772
32
24,704
Slurry Seal
$7,411
2025
Port Aberdeen PI
Port Whitby PI
Port Durness PI
1,379
32
44,628
Slurry Seal
$13,389
2025
Port Ashley PI
Newport Hills Drive West
Port Stirling PI (East End)
620
32
19,840
Slurry Seal
$5,952
2025
Port Bishop PI
Newport Hills Dr East
Port Carney PI
998
33
32,435
Slurry Seal
$9,731
2025
Port Cardiff PI
Port Bristol Cir (West End)
Newport Hills Drive East
958
32
30,656
Slurry Seal
$9,197
2025
Port Carlisle PI
Port Whitby PI
Port Lerwick PI
1,461
32
47,252
Slurry Seal
$14,176
2025
Port Carlow Cir
Newport Hills Dr West
End
115
54
6,210
Slurry Seal
$1,863
2025
Port Carney PI
Newport Hills Dr East
Port Bishop PI
523
33
16,998
Slurry Seal
$5,099
2025
Port Dunbar Dr
Spyglass Hill Rd
Port Harwick PI
172
36
6,942
Slurry Seal
$2,083
2025
Port Durness PI
Port Harwick PI
Port Whitby PI
708
36
26,238
Slurry Seal
$7,871
2025
Port Durness PI
Port Whitby PI
Port Aberdeen PI
1,274
36
46,364
Slurry Seal
$13,909
2025
Port Harwick PI
Port Dunbar Dr
Port Durness PI
353
36
14,208
Slurry Seal
$4,262
2025
Port Hemley Cir
Newport Hills Dr West
End
110
54
5,940
Slurry Seal
$1,782
2025
Port Kimberly PI
Newport Hills Dr West
Port Manlei h PI
858
32
27,456
Slurry Seal
$8,237
2025
Port Margate PI
Port Charles PI (East Side)
Newport Hills Drive West
840
32
26,880
Mill and Overlay
$126,665
2025
Port Ramsey PI
San Miguel Dr
Port Whitby PI
153
36
6,008
Slurry Seal
$1,802
2025
Port Sheffield PI
Newport Hills Drive West
Port Abbey PI (East Side)
650
32
20,800
Slurry Seal
$6,240
2025
Port Stanhope Cir
Newport Hills Dr West
End
115
38
5,330
Slurry Seal
$1,599
2025
Appendix A - Local Streets
4of29
5-34
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name From Limits of WorkTo
Port Stanhope PI Newport Hills Dr West Port Tiffin PI
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
725 32 _ 23,200 _ Slurry Seal $6,960 2025
615 32 19,680 Slurry Seal $5,904 2025
995 32 31,840 Slurry Seal $9,552 2025
Port Stirling PI
Port Ashley PI (West Side)
Newport Hills Drive West
Port Taggart PI
Newport Hills Dr West
Port Wheeler PI
Port Tiffin Cir
Newport Hills Dr West
End
115
54
6,210
Slurry Seal
$1,863
2025
Port Tiffin PI
Newport Hills Dr West
Port Stanhope PI
730
32
23,360
Slurry Seal
$7,008
2025
Port Townsend Cir
Port Bishop PI
End
295
33
9,735
Slurry Seal
$2,921
2025
Port Trinity Cir
Newport Hills Dr East
End
345
33
11,213
Slurry Seal
$3,364
2025
Port Trinity PI
Newport Hills Dr East
Port Laurent PI
758
33
24,635
Slurry Seal
$7,391
2025
Port Westbourne PI
Port Barmouth PI (West Side)
Newport Hills Drive West
390
32
12,480
Slurry Seal
$3,744
2025
Port Westbourne PI
Newport Hills Drive West
Port Barmouth PI (East Side)
680
32
21,760
Mill and Overlay
$101,852
2025
Port Wheeler PI
Newport Hills Dr West
Port Taggart PI
1,057
32
33,824
Slurry Seal
$10,147
2025
Port Whitby PI
Port Ramsey PI
Port Durness PI
1,020
36
37,220
Slurry Seal
$11,166
2025
Portside Way
Windover Dr
Wavecrest Dr
576
32
18,432
Slurry Seal
$5,530
2025
Prairie Road SIB
Bonita Canyon Dr
Ford Rd
350
35
12,250
Slurry Seal
$3,675
2025
Prairie Road NB
Ford Rd
Bonita Canyon Dr
350
46
16,100
Slurry Seal
$4,830
2025
Quiet Cove
Tiller Way
End
470
32
16,540
Slurry Seal
$4,962
2025
Ramona Dr
Dolphin Ter
Santanella Ter
511
33
16,863
Mill and Overlay
$78,665
2025
Redlands Dr
Orchard Dr
Indus St
565
33
18,645
Slurry Seal
$5,594
2025
Ridge Park Rd
Newport Coast Dr
Tesoro
1,813
37
67,081
Slurry Seal
$20,124
2025
Ridge Park Rd
Tesoro
Campo Bello
1,283
37
47,471
Slurry Seal
$14,241
2025
Ridge Park Rd
Campo Bello
Vista Ridge Rd
1,491
37
55,167
Slurry Seal
$16,550
2025
Ridge Park Rd
Vista Ridge Rd
West Coast Peak
1,378
37
50,986
Slurry Seal
$15,296
2025
Ridge Park Rd
West Coast Peak
Talmont
1,216
37
44,992
Slurry Seal
$13,498
2025
Ridge Park Rd
Talmont
East End
1,055
37
40,835
Slurry Seal
$12,251
2025
Ridge Park Rd
San Joaquin Hills Rd
Newport Coast Dr
1,449
37
53,613
Slurry Seal
$16,084
2025
Riverside Dr
Indus St
End
210
33
8,430
Slurry Seal
$2,529
2025
Riverside Dr
Orchard Dr
End
520
33
18,960
Slurry Seal
$5,688
2025
Rockford PI
Rockford Rd
End
250
37
11,050
Slurry Seal
$3,315
2025
Rockford Rd
Surrey Dr
Cortland Dr
671
37
24,827
Slurry Seal
$7,448
2025
Salt Air Cir
Salt Air Dr
End
335
32
13,520
Slurry Seal
$4,056
2025
Salt Air Dr
Salt Air Cir
Lighthouse Ln
560
32
18,420
Slurry Seal
$5,526
2025
San Joaquin Hills Rd WB
Jamboree Rd
800' E of Backbay Dr
832
47
44,498
Slurry Seal
$13,350
2025
San Nicolas Dr
Newport Center Dr East
Avocado Ave
1,080
78
84,240
Slurry Seal
$25,272
2025
Sand Key
Park Green Dr
End
501
33
17,783
Slurry Seal
$5,335
2025
Sand Point Way
Windover Dr
Wavecrest Dr
280
36
11,580
Slurry Seal
$3,474
2025
Sandcastle Dr
Marguerite Ave
Tiller Way
193
36
6,948
Slurry Seal
$2,084
2025
Sandcastle Dr
Inlet Isle Dr
Park Green Dr
654
36
23,544
Slurry Seal
$7,063
2025
Sandcastle Dr
Park Green Dr
Seacrest Dr
975
36
35,100
Slurry Seal
$10,530
2025
Sandcastle Dr
Seacrest Dr
Catamaran Dr
1,465
36
52,740
Slurry Seal
$15,822
2025
Sandpiper Dr
Ebbtide Rd
Setting Sun Dr
435
33
14,855
Slurry Seal
$4,457
2025
Sandune Ln
Inlet Isle Dr
End
670
32
23,240
Slurry Seal
$6,972
2025
Sausalito Dr
Marguerite Ave
End
600
36
23,100
Slurry Seal
$6,930
2025
Schooner Rd
Beacon Bay
End
290
24
6,960
Slurry Seal
$2,088
2025
Scott Dr
Corinthian Way
Dove St
513
44
22,572
Slurry Seal
$6,772
2025
Sea Ln
Harbor View Dr
Goldenrod Ave
1,340
37
49,580
Slurry Seal
$14,874
2025
Appendix A - Local Streets
5 of 29
5-35
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name
Seabreeze Ln
Limits of Work
From To Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
Tiller Way Surfview Ln 1,110 32 _ 36,520 _ Slurry Seal $10,956 2025
Catamaran Dr Sandcastle Dr 1,475 32 47,200 Slurry Seal $14,160 2025
Jasmine Ave Marguerite Ave 536 27 14,472 Slurry Seal $4,342 2025
Seacrest Dr
Second Ave
Second Ave
Narcissus Ave
Orchid Ave
269
27
7,263
Slurry Seal
$2,179
2025
Serra Dr
Seaward Rd
De Anza Dr
1,305
35
45,675
Slurry Seal
$13,703
2025
Setting Sun Dr
Pebble Dr
Sandpiper Dr
972
33
32,576
Slurry Seal
$9,773
2025
Spruce Ave
Bristol St South
Azure Ave
1,824
35
63,840
Slurry Seal
$19,152
2025
Spruce St
Bristol St North
Quail St
600
60
36,000
Slurry Seal
$10,800
2025
Starboard Way
Windover Dr
Wavecrest Dr
357
32
11,424
Slurry Seal
$3,427
2025
Surfline Way
Windover Dr
Wavecrest Dr
658
32
22,556
Slurry Seal
$6,767
2025
Surfview Ln
Tiller Wy
Seabreeze Lane
720
32
24,040
Slurry Seal
$7,212
2025
Surrey Dr
Rockford Rd
Cameo Highland Dr
1,103
33
36,399
Slurry Seal
$10,920
2025
Surrey Dr
Cameo Highland Dr
Garret Dr
640
33
21,120
Slurry Seal
$6,336
2025
Terrace Ridge
Newport Ridge Dr West
End
550
38
23,000
Slurry Seal
$6,900
2025
Third Ave
Heliotrope Ave
Iris Ave
263
27
7,101
Slurry Seal
$2,130
2025
Third Ave
Larkspur Ave
Marguerite Ave
276
27
7,452
Slurry Seal
$2,236
2025
Third Ave
Poinsettia Ave
Poppy Ave
270
28
7,560
Slurry Seal
$2,268
2025
Tiller Way
Sandcastle Dr
Sausalito Dr
1,475
36
53,100
Slurry Seal
$15,930
2025
Topside Ln
Sandcastle Dr
Inlet Isle Dr
626
32
20,782
Slurry Seal
$6,235
2025
Upper Bay Dr
Mesa Dr
Orchid Hill PI
527
36
18,972
Slurry Seal
$5,692
2025
Via Oporto
Via Lido
Central Ave
600
29
17,400
Slurry Seal
$5,220
2025
Vista Del Sol
Vista Del Oro
Eastbluff Dr
470
60
28,200
Slurry Seal
$8,460
2025
Vista Ridge Rd
Newport Coast Dr
Altezza Dr
1,493
37
55,241
Slurry Seal
$16,572
2025
Vista Ridge Rd
Altezza Dr
Ocean Heights Dr
1,857
37
68,709
Slurry Seal
$20,613
2025
Vista Ridge Rd
Ocean Heights Dr
Coastal Canyon Dr
2,067
37
76,479
Slurry Seal
$22,944
2025
Vista Ridge Rd
Coastal Canyon Dr
Ocean Heights Dr
1,695
37
62,715
Slurry Seal
$18,815
2025
Vista Ridge Rd
Ocean Heights Dr
Ridge Park Rd
619
37
22,903
Slurry Seal
$6,871
2025
Vivian Ln
Beryl Ln
Diana Ln
794
34
28,196
Slurry Seal
$8,459
2025
Wavecrest Dr
Surfline Wy
Sand Point Wy
1,060
36
41,660
Slurry Seal
$12,498
2025
Wayne Rd
Rockford Rd
Cameo Highlands Dr
695
33
22,935
Slurry Seal
$6,881
2025
Westcliff Dr
Dover Dr
Santiago Dr
1,531
32
48,992
Slurry Seal
$14,698
2025
Westerly PI
Dove St
Quail St
1,406
44
61,864
Slurry Seal
$18,559
2025
White Cliffs Dr
Polaris Dr
North Star Ln
224
38
8,400
Slurry Seal
$2,520
2025
White Sails Way
Crown Dr
Harbor View Dr
1,045
33
34,485
Slurry Seal
$10,346
2025
Windover Dr
Surfline Way
Sand Point Way
1,023
36
38,328
Slurry Seal
$11,498
2025
Yawl Rd
Beacon Bay
End
250
24
6,000
Slurry Seal
$1,800
2025
Zenith Ave
Bayview Ave
Spruce Ave
283
35
9,905
Slurry Seal
$2,972
2025
15th St
Bolsa Ave
Santa Ana Ave
960
18
17,280
Mill and Overlay
$82,789
2026
31st St
Lafayette Ave
Villa Way
351
24
8,424
Mill and Overlay
$39,813
2026
35th St
Lake Ave
Balboa Blvd
283
20
5,660
Mill and Overlay
$27,353
2026
Acacia St
Orchard Dr
Mesa Dr
1,122
50
56,100
Mill and Overlay
$269,764
2026
Alta Vista Dr
Bellis St
Aralia St
1,880
36
67,680
Mill and Overlay
$318,827
2026
Back Bay Dr
Backbay Sewer Pump Station
Access Rd
607
22
13,354
Mill and Overlay
$63,286
2026
Bayview PI
Bristol St South
Bayview Way
1,355
54
75,170
Mill and Overlay
$364,949
2026
Bayview Way
Jamboree Rd
End
202
72
14,544
Mill and Overlay
$69,127
2026
Appendix A - Local Streets
6of29
5-36
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name
Bellis St
From Limits of WorkTo
Bamboo St Alta Vista
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
730 37 _ 27,010 Mill and Overlay $91,394 2026
1,481 37 54,797 Mill and Overlay $259,484 2026
1,067 37 39,479 Mill and Overlay $185,117 2026
Bonnie Doon Ter
Patolita Dr
Ramona Dr
Bonnie Doon Ter
Dolphin Ter
Patolita Dr
Bonnie Doon Ter
Ramona Dr
Malabar Dr
350
37
12,950
Mill and Overlay
$45,620
2026
Bunya St
Bellis St
Bison Ave
1,555
32
49,760
Mill and Overlay
$241,561
2026
Camelback St
La Felicidad
Bison Ave
760
78
55,821
Mill and Overlay
$260,400
2026
Camphor St
Catalpa St
Alta Vista Dr
847
37
31,339
Mill and Overlay
$149,361
2026
Carnation Ave
First Ave
Coast Highway East
1,425
27
38,475
Mill and Overlay
$119,488
2026
Cassia St
Camphor St
Carob St
1,245
32
39,840
Mill and Overlay
$132,961
2026
Clay St
Westminster Ave
Orange Ave
800
32
25,600
Mill and Overlay
$120,988
2026
Cliff Dr
Kings PI
Signal Rd
426
55
23,430
Mill and Overlay
$110,732
2026
Dahlia Ave
South End
Way Ln
145
27
3,915
Mill and Overlay
$18,933
2026
Dahlia Ave
Coast Highway East
Fifth Ave
165
27
4,455
Mill and Overlay
$20,918
2026
Dana Rd
Superior Ave
Flagship Rd
600
36
21,600
Mill and Overlay
$101,152
2026
Evita Dr
Seadrift Dr
Chubasco Dr
220
58
12,760
Mill and Overlay
$59,181
2026
Golden Cir
Anniversary Ln
Anniversary Ln
1,217
33
40,161
Mill and Overlay
$191,276
2026
Half Moon Bay Dr
Point Loma Dr
Point Arena Way
1,080
32
32,904
Mill and Overlay
$159,550
2026
Iris Ave
Bayside Dr
Coast Highway East
722
27
19,494
Mill and Overlay
$92,953
2026
Jasmine Ave
Coast Highway East
Third Ave
508
27
13,716
Mill and Overlay
$4,450
2026
Larkspur Ave
Coast Highway East
Fifth Ave
1,406
27
37,962
Mill and Overlay
$182,950
2026
Marapata Dr
Sabrina Ter
Kewamee Dr
690
37
25,530
Mill and Overlay
$123,380
2026
Monrovia Ave
City Limit
15th St West
1,655
39
64,545
Mill and Overlay
$313,604
2026
Narcissus Ave
Seaview Ave
Coast Hi hway East
553
27
14,931
Mill and Overlay
$71,237
2026
Poinsettia Ave
Ocean Blvd
Seaview Ave
547
28
15,316
Mill and Overlay
$73,855
2026
Point Arguello Way
El Capitan Dr
Drakes Bay Dr
170
36
6,120
Mill and Overlay
$28,541
2026
Port Albans PI
Newport Hills Dr East
Port Cardigon PI
695
32
22,240
Mill and Overlay
$103,820
2026
Port Barmouth PI
Newport Hills Drive West
Port Westbourne PI (East End)
850
32
27,200
Mill and Overlay
$128,235
2026
Port Barmouth PI
Port Westbourne PI (West End)
Newport Hills Drive West
600
32
19,200
Mill and Overlay
$89,361
2026
Port Carlow PI
Newport Hills Dr West
Port Renwick PI
959
32
30,688
Mill and Overlay
$144,963
2026
Port Charles PI
Newport Hills Drive West
Port Margate PI (East End)
1,000
36
36,000
Mill and Overlay
$171,892
2026
Port Chelsea PI
Port Ramsgate PI (West End)
Newport Hills Drive East
987
32
31,584
Mill and Overlay
$118,583
2026
Port Claridge PI
Newport Hills Dr East
Port Nelson PI
906
33
29,445
Mill and Overlay
$139,774
2026
Port Edward Cir
Newport Hills Dr East
End
325
32
10,400
Mill and Overlay
$39,047
2026
Port Edward PI
Newport Hills Dr East
Port Lockslei h PI
888
33
28,860
Mill and Overlay
$138,469
2026
Port Locksleigh PI
Newport Hills Dr East
Port Edward PI
1,000
33
32,500
Mill and Overlay
$152,167
2026
Port Margate PI
Port Charles PI (West Side)
Newport Hills Drive West
378
32
12,096
Mill and Overlay
$39,808
2026
Port Provence PI
Port Weybridge PI (West End)
Newport Hills Dr East
1,160
32
37,120
Mill and Overlay
$177,584
2026
Port Ramsgate PI
Port Chelsea PI (West End)
Newport Hills Drive East
633
32
20,256
Mill and Overlay
$97,093
2026
Port Sheffield PI
Port Abbey PI (West Side)
Newport Hills Drive West
507
32
16,224
Mill and Overlay
$38,353
2026
Port Stirling PI
Newport Hills Drive West
Port Ashley PI (East Side)
780
32
24,960
Mill and Overlay
$47,435
2026
Port We brid a PI
Newport Hills Drive East
Port Provence PI (East Side)
618
33
20,394
Mill and Overlay
$97,850
2026
Quail St
Campus Dr
Birch St
585
36
21,060
Mill and Overlay
$100,391
2026
Ramona Dr
Santanella Ter
Bonnie Doone Ter
280
33
9,240
Mill and Overlay
$43,626
2026
San Mateo Way
Bodega Bay Dr
San Martin Way
640
32
21,980
Mill and Overlay
$102,5014
2026
Santa Barbara Dr
Jamboree Rd
Newport Center Dr West
2,525
73
184,325
Mill and Overlay
1 $136,702
2026
Appendix A - Local Streets
7of29
5-37
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name
Sea Gull Ln
Limits of Work
From To
Sherin ton PI 16th St
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
900 37 _ 33,300 Mill and Overlay $155,496 2026
125 27 3,375 Mill and Overlay $16,249 2026
272 28 7,616 Mill and Overlay $36,739 2026
Second Ave
Poppy Ave
Hazel Ave
Third Ave
Marguerite Ave
Marigold Ave
Third Ave
Narcissus Ave
Orchid Ave
264
28
7,392
Mill and Overlay
$35,658
2026
Vista Del Oro
Vista Del Sol
Vista Nobleza
2,140
35
74,900
Mill and Overlay
$352,457
2026
07th St
Bay Ave West
Balboa Blvd West
167
30
5,010
Reconstruction
$25,223
2027
10th St
North End
Bay Ave West
36
26
936
Slurry Seal
$298
2027
10th St
Bay Ave West
Balboa Blvd West
216
28
5,180
Slurry Seal
$1,649
2027
11th St
Bay Ave West
Balboa Blvd West
215
28
5,208
Slurry Seal
$1,658
2027
13th St
Bay Ave West
Balboa Blvd West
216
28
6,048
Slurry Seal
$1,925
2027
15th St
Tustin Ave
Aliso Ave
660
36
23,760
Slurry Seal
$7,562
2027
15th St
Aliso Ave
Irvine Ave
660
36
23,760
Slurry Seal
$7,562
2027
15th St
Irvine Ave
St Andrew Rd
560
62
33,720
Slurry Seal
$10,732
2027
15th St
St Andrew Rd
Kings PI
1,180
35
41,300
Slurry Seal
$13,145
2027
15th St
Kings PI
St James PI
210
35
7,350
Slurry Seal
$2,339
2027
15th St
Redlands Ave
Tustin Ave
670
18
12,060
Mill and Overlay
$9,212
2027
18th St
North End
Balboa Blvd West
300
28
8,400
Slurry Seal
$2,673
2027
19th St
North End
Balboa Blvd West
430
28
12,040
Slurry Seal
$3,832
2027
20th St
North End
91' S of North End
91
34
3,094
Slurry Seal
$985
2027
21st St
North End
Balboa Blvd West
442
24
10,608
Slurry Seal
$3,376
2027
21st St
Balboa Blvd West N/s
South End
442
24
10,608
Slurry Seal
$3,376
2027
22nd St
North End
Balboa Blvd West
130
40
5,200
Slurry Seal
$1,655
2027
23rd St
Balboa Blvd West
Ocean Front West
360
30
10,800
Slurry Seal
$3,437
2027
28th St
East End
Villa Way
75
14
1,050
Slurry Seal
$334
2027
28th St
Newport Blvd East NB
Newport Blvd West SIB
135
37
4,995
Slurry Seal
$1,590
2027
29th St
Lafayette Ave
Newport Blvd NB
535
24
12,840
Slurry Seal
$4,087
2027
30th St
Villa Way
Newport Blvd
450
25
11,250
Slurry Seal
$3,581
2027
31st St
Villa Way
Newport Blvd
493
24
11,832
Slurry Seal
$3,766
2027
32nd St
Seashore Dr
Ocean Front West
190
16
3,040
Slurry Seal
$968
2027
33rd St
East End
Marcus Ave
75
18
1,350
Slurry Seal
$430
2027
33rd St
Marcus Ave
Lake Ave
220
18
3,960
Slurry Seal
$1,260
2027
33rd St
Lake Ave
Balboa Blvd
275
18
4,950
Slurry Seal
$1,575
2027
33rd St
Balboa Blvd
Seashore Dr
248
20
4,960
Slurry Seal
$1,579
2027
33rd St
Seashore Dr
Ocean Front West
135
16
2,160
Slurry Seal
$687
2027
34th St
Clubhouse Ave
Rivo Alto
165
16
2,640
Slurry Seal
$840
2027
34th St
Rivo Alto
Marcus Ave
66
16
1,056
Slurry Seal
$336
2027
34th St
Marcus Ave
Lake Ave
216
18
3,888
Slurry Seal
$1,237
2027
34th St
Lake Ave
Balboa Blvd
280
18
5,040
Slurry Seal
$1,604
2027
34th St
Balboa Blvd
Seashore Dr
257
18
4,756
Slurry Seal
$1,514
2027
34th St
Seashore Dr
Ocean Front West
100
17
1,700
Slurry Seal
$541
2027
35th St
Short St
FinleyAve
305
16
4,880
Slurry Seal
$1,553
2027
35th St
Finley Ave
Rivo Alto
70
16
1,120
Slurry Seal
$356
2027
35th St
Rivo Alto
Marcus Ave
85
16
1,360
Slurry Seal
$433
2027
35th St
Marcus Ave
Lake Ave
215
20
4,300
Slurry Seal
$1,369
2027
35th St
Balboa Blvd
Seashore Dr
280
20
5,264
Slurry Seal
$1,675
2027
Appendix A - Local Streets
8of29
5-38
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name
35th St
36th St
From Limits of WorkTo
Seashore Dr Ocean Front West
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
90 20 _ 1,800 _ Slurry Seal $573 2027
340 16 5,440 Slurry Seal $1,731 2027
305 16 4,880 Slurry Seal $1,553 2027
Short St
Clubhouse Ave
36th St
FinleyAve
Short St
36th St
Finley Ave
End
70
16
1,120
Slurry Seal
$356
2027
36th St
Marcus Ave
Balboa Blvd
500
20
10,000
Slurry Seal
$3,183
2027
36th St
Balboa Blvd
Seashore Dr
195
20
3,124
Slurry Seal
$994
2027
37th St
48' E of Park Ln
Park Ln
48
20
960
Slurry Seal
$306
2027
37th St
Balboa Blvd
Seashore Dr
284
20
5,340
Slurry Seal
$1,700
2027
38th St
North End
Channel PI
34
16
544
Slurry Seal
$173
2027
38th St
Channel PI
FinleyAve
226
16
3,616
Slurry Seal
$1,151
2027
38th St
Finley Ave
Marcus Ave
275
16
4,400
Slurry Seal
$1,400
2027
38th St
Marcus Ave
East End of Bridge
83
16
1,328
Slurry Seal
$423
2027
38th St
Balboa Blvd
Seashore Dr
296
18
5,448
Slurry Seal
$1,734
2027
39th St
Channel PI
Marcus Ave
275
16
4,400
Slurry Seal
$1,400
2027
39th St
River Ave
Balboa Blvd
165
17
2,805
Slurry Seal
$893
2027
40th St
North End
Channel PI
35
16
560
Slurry Seal
$178
2027
40th St
Channel PI
Marcus Ave
130
16
2,080
Slurry Seal
$662
2027
40th St
Marcus Ave
Rivo Alto
35
16
560
Slurry Seal
$178
2027
40th St
Balboa Blvd
Seashore Dr
318
18
5,844
Slurry Seal
$1,860
2027
41st St
Balboa Blvd
Seashore Dr
330
18
6,060
Slurry Seal
$1,929
2027
42nd St
Balboa Blvd
Seashore Dr
345
18
6,350
Slurry Seal
$2,021
2027
43rd St
River Ave
Balboa Blvd
155
21
3,255
Slurry Seal
$1,036
2027
44th St
Channel PI
Balboa Blvd
100
21
2,100
Slurry Seal
$668
2027
44th St
Balboa Blvd
Seashore Dr
370
21
7,770
Slurry Seal
$2,473
2027
45th St
Balboa Blvd
Seashore Dr
395
21
8,295
Slurry Seal
$2,640
2027
46th St
Balboa Blvd
Seashore Dr
438
21
9,198
Slurry Seal
$2,927
2027
47th St
River Ave
Neptune Ave
315
21
6,615
Slurry Seal
$2,105
2027
47th St
Neptune Ave
Seashore Dr
84
20
1,680
Slurry Seal
$535
2027
48th St
River Ave
Neptune Ave
260
20
5,200
Slurry Seal
$1,655
2027
49th St
River Dr
Neptune Ave
245
20
4,900
Slurry Seal
$1,560
2027
50th St
River Ave
Neptune Ave
230
20
4,600
Slurry Seal
$1,464
2027
51st St
River Ave
Seashore Dr
330
20
6,600
Slurry Seal
$2,101
2027
52nd St
River Ave
Neptune Ave
215
20
4,300
Slurry Seal
$1,369
2027
53rd St
River Ave
Neptune Ave
181
20
3,620
Slurry Seal
$1,152
2027
54th St
River Ave
Neptune Ave
140
38
5,320
Slurry Seal
$1,693
2027
61st St
Lancaster St
Coast Highway West
645
20
12,900
Slurry Seal
$4,106
2027
61st St
Seashore Dr
Ocean Front West
85
19
1,615
Slurry Seal
$514
2027
62nd St
Canal St
Cedar St
860
29
24,940
Slurry Seal
$7,938
2027
62nd St
Cedar St
Lancaster St
480
29
13,920
Slurry Seal
$4,430
2027
62nd St
Lancaster St
Newport Shores Dr
405
29
11,745
Slurry Seal
$3,738
2027
62nd St
Newport Shores Dr
Coast Highway West
165
18
2,970
Slurry Seal
$945
2027
62nd St
Seashore Dr
Ocean Front Alley West
55
18
990
Slurry Seal
$315
2027
Aliso Ave
15th St
Clay St
643
35
22,505
Slurry Seal
$7,163
2027
Aliso Ave
Clay St
Beacon St
667
35
35
23,345
14,700
Slurry Seal
Slurry Seal
$7,430
$4,679
2027
2027
Aliso Ave
Beacon St
Cliff Dr
420
Appendix A - Local Streets
9 of 29
5-39
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name
Avon St
Avon St
From Limits of WorkTo
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
835 21 _ 18,747 _ Slurry Seal $5,967 2027
458 34 15,572 Slurry Seal $4,956 2027
320 60 19,200 Slurry Seal $6,111 2027
West End
Riverside Ave
Riverside Ave
Tustin Ave
B St
Ocean Front East
South End
Babcock St SB
City Limit
16th St West
306
33
10,098
Mill and Overlay
$48,302
2027
Back Bay Dr
Staired Path to Landmark
Eastbluff Dr
3,482
22
79,004
Mill and Overlay
$378,470
2027
Bay Ave E
6th St
Island Ave
370
28
10,360
Slurry Seal
$3,297
2027
Bay Ave W
19th St
18th St
425
42
24,350
Slurry Seal
$7,750
2027
Bay Ave W
10th St
9th St
470
33
15,510
Slurry Seal
$4,936
2027
Bay Ave W
7th St
6th St
450
28
12,600
Slurry Seal
$4,010
2027
Bay View Ave
Orchard Dr
Zenith Ave
1,200
35
42,000
Mill and Overlay
$88,229
2027
Bay View Ave
Mesa Dr
Orchard Dr
1,200
35
42,000
Mill and Overlay
$8,021
2027
Beacon St
Santa Ana Ave
Cliff Dr
210
34
7,140
Slurry Seal
$2,272
2027
Beacon St
Tustin Ave
Aliso Ave
600
35
21,000
Slurry Seal
$6,684
2027
Beacon St
Aliso Ave
Irvine Ave
638
35
22,330
Slurry Seal
$7,107
2027
Bolsa Ave
Clay St
15th St
406
36
14,616
Slurry Seal
$4,652
2027
Broad St
Bolsa Ave
Westminster Ave
628
36
22,608
Slurry Seal
$7,196
2027
Broad St
Santa Ana Ave
San Bernardino Ave
280
16
4,480
Slurry Seal
$1,426
2027
Broad St
San Bernardino Ave
Redlands Ave
285
35
9,975
Slurry Seal
$3,175
2027
Canal Cir
Canal St
Canal St
265
29
7,685
Slurry Seal
$2,446
2027
Canal St
62nd St
Canal Cir (West End)
270
30
8,100
Slurry Seal
$2,578
2027
Canal St
Canal Cir (West End)
Sunset Dr
420
30
12,600
Slurry Seal
$4,010
2027
Canal St
Sunset Dr
Grant St
969
30
29,070
Slurry Seal
$9,252
2027
Catalina Dr
Broad St
Clay St
323
34
10,982
Slurry Seal
$3,495
2027
Catalina Dr
Clay St
15th St
677
34
23,018
Slurry Seal
$7,326
2027
Cedar St
East End
Prospect St
300
29
8,700
Slurry Seal
$2,769
2027
Cedar St
Prospect St
Newport Shores Dr
670
29
19,430
Slurry Seal
$6,184
2027
Cedar St
Newport Shores Dr
Coast Highway West
185
19
3,515
Slurry Seal
$1,119
2027
Cedar St
Seashore Dr
Ocean Front Alley West
57
19
1,083
Slurry Seal
$345
2027
Channel PI
Balboa Blvd
Rivo Alto (River)
295
21
6,195
Slurry Seal
$1,972
2027
Channel PI
Rivo Alto
39th St
743
16
11,888
Slurry Seal
$3,784
2027
Channel PI
39th St
Rialto
440
16
7,040
Slurry Seal
$2,241
2027
Clay St
15th St
St Andrews Rd
760
34
25,840
Slurry Seal
$8,224
2027
Clay St
St Andrews Rd
Irvine Ave
658
34
22,372
Slurry Seal
$7,120
2027
Clay St
Irvine Ave
Tustin Ave
1,339
34
46,126
Slurry Seal
$14,681
2027
Clay St
Tustin Ave
Westminster Ave
1,961
34
66,674
Slurry Seal
$21,221
2027
Cliff Dr
St Andrews Place
Irvine Ave
1,210
55
64,519
Slurry Seal
$20,535
2027
Cliff Dr
Irvine Ave
Riverside Ave
1,684
56
92,820
Slurry Seal
$29,542
2027
Cliff Dr
Riverside Ave
Beacon St
1,062
33
35,046
Slurry Seal
$11,154
2027
Cliff Dr
Beacon St
Santa Ana Ave
740
34
25,160
Slurry Seal
$8,008
2027
Cliff Dr
Santa Ana Ave
La Jolla Dr
300
52
15,600
Slurry Seal
$4,965
2027
Clubhouse Ave
Newport Island Channel
Rivo Alto
1,057
17
17,441
Slurry Seal
$5,551
2027
Coast Blvd
61st St
End
133
30
3,990
Slurry Seal
$1,270
2027
Colton St
Sunset Dr
Prospect St
398
29
11,792
Slurry Seal
$3,753
2027
Colton St
Sunset Dr
Newport Shores Dr
760
29
22,040
Slurry Seal
$7,015
2027
Colton St
Newport Shores Dr
End
170
18
3,060
Slurry Seal
$974
2027
Appendix A - Local Streets
10 of 29
5-40
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name
Colton St
From Limits of WorkTo
Seashore Dr Ocean Front Alley West
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
60 18 _ 1,080 _ Slurry Seal $344 2027
802 35 28,070 Slurry Seal $8,934 2027
1,381 32 44,192 Mill and Overlay $213,116 2027
Coral PI
Irvine Ave
St Andrews Ave
Drakes Bay Dr
Point A uello Way
Point Conception Way
Drakes Bay Dr
Goleta Point Dr
Point Aguello Way
269
32
9,358
Mill and Overlay
$44,991
2027
El Modena Ave
Beacon St
Clay St
667
35
23,345
Slurry Seal
$7,430
2027
El Modena Ave
Clay St
15th St
655
35
22,925
Slurry Seal
$7,296
2027
Evening Canyon Rd
Shorecliff Rd
Morning Canyon Rd
1,995
28
63,360
Mill and Overlay
$302,711
2027
F St
Balboa Blvd East
Ocean Front East
225
26
5,850
Slurry Seal
$1,862
2027
Fern St
Canal St
Coast Highway West
273
30
8,190
Slurry Seal
$2,607
2027
Fern St
Seashore Dr
Ocean Front Alley West
62
17
1,054
Slurry Seal
$335
2027
Fernando Street
Edgewater Ave East
Bay Ave East
367
30
10,680
Slurry Seal
$3,399
2027
Fifth Avenue
Dahlia Ave
Heliotrope Ave
895
33
29,535
Slurry Seal
$9,400
2027
Fifth Avenue
Heliotrope Ave
Iris Ave
290
32
9,280
Slurry Seal
$2,954
2027
Finley Ave
Newport Blvd
Clubhouse Ave
190
16
3,040
Slurry Seal
$968
2027
FinleyAve
Clubhouse Ave
End
665
16
10,640
Slurry Seal
$3,386
2027
Finley Ave
Rialto
38th St
35
16
560
Slurry Seal
$178
2027
FinleyAve
38th St
Channel PI
220
16
3,520
Slurry Seal
$1,120
2027
Fourth Ave
Goldenrod Ave
Heliotrope Ave
260
27
7,020
Mill and Overlay
$30,164
2027
Fullerton Ave
Cliff Dr
Beacon St
423
35
14,805
Slurry Seal
$4,712
2027
Fullerton Ave
Beacon St
Clay St
667
35
23,345
Slurry Seal
$7,430
2027
Fullerton Ave
Clay St
15th St
643
35
22,505
Slurry Seal
$7,163
2027
Gary PI
15th St
End
260
33
8,580
Slurry Seal
$2,731
2027
Goldenrod Ave
Fifth Ave
Sea Ln
282
36
10,152
Slurry Seal
$3,231
2027
Grant St
North End
Coast Highway West
325
29
9,425
Slurry Seal
$3,000
2027
Grant St
Seashore Dr
Ocean Front Alley West
65
17
1,105
Slurry Seal
$352
2027
Highland St
North End
Coast Highway West
260
30
7,800
Slurry Seal
$2,483
2027
Highland St
Seashore Dr
Ocean Front Alley West
72
17
1,224
Slurry Seal
$390
2027
Hilaria Way
North End
Flagship Dr
230
38
8,740
Slurry Seal
$2,782
2027
Holly Ln
Tustin Ave
Irvine Ave
1,286
34
43,724
Slurry Seal
$13,916
2027
Holmwood Dr
Catalina Dr
Broad St
1,380
34
46,920
Slurry Seal
$14,933
2027
Hospital Rd
Newport Blvd
Old Newport Blvd
160
70
11,200
Slurry Seal
$3,565
2027
Irvine Ave
Clay St
15th St
630
38
23,940
Slurry Seal
$7,619
2027
Irvine Ave
15th St
16th St
1,267
62
78,554
Slurry Seal
$25,002
2027
Kings PI
St James Rd
Kings Rd
1,888
35
66,080
Slurry Seal
$21,031
2027
Kings Rd
Cliff Rd
St Andrews Rd
1,510
35
52,850
Slurry Seal
$16,821
2027
Kings Rd
St Andrews Rd
Kings PI
1,915
35
67,025
Slurry Seal
$21,332
2027
K-Thanga Dr
Dolphin Ter
Bonnie Doone Ter
275
33
9,075
Mill and Overlay
$43,743
2027
La Jolla Dr
Santa Ana Ave
End
175
16
2,800
Slurry Seal
$891
2027
La Jolla Dr
End
Cliff Dr
227
20
4,540
Slurry Seal
$1,445
2027
La Jolla Dr
Cliff Dr
Beacon St
715
20
14,300
Slurry Seal
$4,551
2027
Lafayette Ave
28th St
31st St
860
24
21,140
Slurry Seal
$6,728
2027
Lake Ave
50' S of 38th St
36th St
320
25
8,000
Slurry Seal
$2,546
2027
Lake Ave
36th St
35th St
205
26
5,330
Slurry Seal
$1,696
2027
Lake Ave
35th St
34th St
205
26
26
5,330
5,330
Slurry Seal
Slurry Seal
$1,696
$1,696
2027
2027
Lake Ave
34th St
33rd St
205
Appendix A - Local Streets
11 of 29
5-41
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name
Lake Ave
From Limits of WorkTo
33rd St 32nd St
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
205 26 _ 5,330 _ Slurry Seal $1,696 2027
79 30 2,370 Slurry Seal $754 2027
60 29 1,740 Slurry Seal $554 2027
Lancaster St
62nd St
61st St
Lancaster St
Canal St
30' S of End
Laurel PI
Irvine Ave
End
510
36
18,360
Slurry Seal
$5,843
2027
Lindo Ave
Bay Ave West
Alley N of Bay Ave West
553
23
12,719
Slurry Seal
$4,048
2027
Lugonia St
Newport Shores Dr
Coast Highway West
167
19
3,173
Slurry Seal
$1,010
2027
Lugonia St
Seashore Dr
Ocean Front Alley West
59
19
1,121
Slurry Seal
$357
2027
Malibu Cir
Mission Bay Dr
End
205
32
7,560
Slurry Seal
$2,406
2027
Marcus Ave
32nd St
33rd St
213
26
5,538
Slurry Seal
$1,763
2027
Marcus Ave
33rd St
34th St
229
26
5,954
Slurry Seal
$1,895
2027
Marcus Ave
34th St
35th St
209
26
5,434
Slurry Seal
$1,729
2027
Marcus Ave
35th St
36th St
220
26
5,720
Slurry Seal
$1,821
2027
Marcus Ave
36th St
Rialto
164
26
4,264
Slurry Seal
$1,357
2027
Marcus Ave
Rialto
Channel PI
735
16
11,760
Slurry Seal
$3,743
2027
Marguerite Ave
195' S of Coast Highway East
Coast Highway East
195
38
7,410
Slurry Seal
$2,358
2027
Mc Fadden PI
Balboa Blvd West
End
600
22
13,200
Slurry Seal
$4,201
2027
Michael PI
15th St
End
260
34
8,840
Slurry Seal
$2,814
2027
Mission Bay Dr
Point Loma Dr
Spyglass Hill Rd
1,818
36
65,448
Slurry Seal
$20,830
2027
Neptune Ave
46th St
51st St
1,075
24
25,800
Slurry Seal
$8,211
2027
Neptune Ave
51st St
End
750
25
18,750
Slurry Seal
$5,968
2027
Newport Shores Dr
Orange St
Walnut St
632
20
12,640
Slurry Seal
$4,023
2027
Newport Shores Dr
Walnut St
61st St
827
20
16,540
Slurry Seal
$5,264
2027
Nordina St
Seashore Dr
Ocean Front Alley West
85
17
1,445
Slurry Seal
$460
2027
Ocean View Ave
Tustin Ave
Cliff Dr
922
24
22,128
Slurry Seal
$7,043
2027
Old Newport BI
Coast Highway
270' N of Coast Highway
270
46
12,420
Slurry Seal
$3,953
2027
Old Newport BI
475' N of Coast Highway
595' N of Coast Highway
120
30
3,600
Slurry Seal
$1,146
2027
Olive St
Seashore Dr
Ocean Front West
172
17
2,924
Slurry Seal
$931
2027
Orange St
Canal St
Coast Highway West
468
35
16,380
Slurry Seal
$5,213
2027
Orange St
Coast Highway West
Ocean Front Alley West
166
32
5,312
Slurry Seal
$1,691
2027
Palm St
Bay AveEast
Balboa Blvd East
193
34
6,562
Slurry Seal
$2,089
2027
Palm St
Balboa Blvd East
Ocean Front Alley East
75
31
2,325
Slurry Seal
$740
2027
Palm St
Ocean Front Alley East
Ocean Front East
135
31
4,185
Slurry Seal
$1,332
2027
Park Ln
38th St
36th St
442
24
10,608
Slurry Seal
$3,376
2027
Patrice Rd
Bolero Way
Flagship Rd
500
37
18,500
Mill and Overlay
$72,426
2027
Pirate Rd
Cliff Dr
Clay St
821
35
28,735
Slurry Seal
$9,146
2027
Port Abbey PI
Newport Hills Drive West
Port Sheffield PI (East End)
940
32
30,080
Mill and Overlay
$143,625
2027
Powell PI
15th St
End
220
34
7,480
Slurry Seal
$2,381
2027
Prospect St
Canal St
Cedar St
856
29
24,824
Slurry Seal
$7,901
2027
Prospect St
Cedar St
Newport Shores Dr
785
29
22,765
Slurry Seal
$7,245
2027
Prospect St
Newport Shores Dr
Coast Highway West
180
24
4,320
Slurry Seal
$1,375
2027
Prospect St
Coast Highway West
Seashore Dr
75
46
3,450
Slurry Seal
$1,098
2027
Prospect St
Seashore Dr
Ocean Front Alley West
54
18
972
Slurry Seal
$309
2027
Redlands Ave
15th St
Clay St
680
34
23,120
Slurry Seal
$7,358
2027
Redlands Ave
Clay St
Cliff Dr
730
34
24,820
Slurry Seal
$7,900
2027
River Ave
42nd St
Channel PI
340
28
9,520
Slurry Seal
$3,030
2027
Appendix A - Local Streets
12 of 29
5-42
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name
River Ave
Limits of WorkTo
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
1,100 38 _ 41,800 _ Slurry Seal $13,304 2027
1,250 38 47,500 Slurry Seal $15,118 2027
750 24 18,000 Slurry Seal $5,729 2027
From
Balboa Blvd
51st St
River Ave
51st St
End
Santa Ana Ave
Old Newport Blvd
Cliff Dr
Santa Ana Ave
Cliff Dr
Clay St
1,655
34
56,270
Slurry Seal
$17,909
2027
Santa Ana Ave
Clay St
15th St
627
36
22,572
Slurry Seal
$7,184
2027
Santa Ana Ave
15th St
City Limit
640
19
12,160
Mill and Overlay
$32,511
2027
Seashore Dr
36th St
33rd St
690
28
19,320
Slurry Seal
$6,149
2027
Seashore Dr
39th St
36th St
690
28
19,320
Slurry Seal
$6,149
2027
Seashore Dr
42nd St
39th St
650
28
18,200
Slurry Seal
$5,793
2027
Seashore Dr
42nd St
45th St
630
28
17,640
Slurry Seal
$5,614
2027
Seashore Dr
46tth St
45th St
205
28
5,740
Slurry Seal
$1,827
2027
Seashore Dr
46th St
53rd St
1,500
28
42,000
Slurry Seal
$13,367
2027
Seashore Dr
53rd St
60th St
1,500
28
42,000
Slurry Seal
$13,367
2027
Seashore Dr
60th St
Prospect St
630
28
17,640
Slurry Seal
$5,614
2027
Seashore Dr
Orange St
End
1,475
27
41,625
Slurry Seal
$13,248
2027
Seaward Rd
De Anza Dr
Serra Dr
914
35
31,990
Mill and Overlay
$153,906
2027
Seaward Rd
Coast Highway East
Evening Canyon Rd
235
37
9,195
Mill and Overlay
$44,150
2027
Shell St
Way Ln
End
145
32
3,770
Mill and Overlay
$18,040
2027
Sherington PI
Irvine Ave
Sea Gull Ln
1,432
37
52,984
Slurry Seal
$16,863
2027
Short St
Newport Blvd
Clubhouse Ave
135
32
4,320
Slurry Seal
$1,375
2027
Short St
Clubhouse Ave
End
315
16
5,040
Slurry Seal
$1,604
2027
Signal Rd
Kings Rd
15th St
1,190
35
41,650
Slurry Seal
$13,256
2027
Snug Harbor Rd
Cliff Dr
Clay St
936
35
32,760
Slurry Seal
$10,427
2027
Sonora St
Seashore Dr
Ocean Front Alley West
95
16
1,520
Slurry Seal
$484
2027
St Andrews Rd
Kings Rd
Clay St
1,045
34
35,530
Slurry Seal
$11,308
2027
St Andrews Rd
Clay St
15th St
600
34
20,400
Slurry Seal
$6,493
2027
St James PI
15th St
St James Rd
641
35
24,635
Slurry Seal
$7,841
2027
St James Rd
15th St
St James PI
945
35
35,275
Slurry Seal
$11,227
2027
Summit St
Seashore Dr
End
175
18
3,150
Slurry Seal
$1,003
2027
Sundance Dr
19th St
End
600
29
17,400
Slurry Seal
$5,538
2027
Sunset Dr
Lugonia St
End
363
29
10,527
Slurry Seal
$3,350
2027
The Arcade
22nd St
21st St
167
10
1,670
Slurry Seal
$532
2027
Tustin Ave
Coast Highway West
Ocean View Ave (S))
400
34
13,600
Slurry Seal
$4,329
2027
Tustin Ave
Ocean View Ave
Cliff Dr
480
26
12,480
Slurry Seal
$3,972
2027
Tustin Ave
Cliff Dr
Clay St
807
35
28,245
Slurry Seal
$8,990
2027
Via Antibes
Via Lido Soud
Via Lido Nord
248
36
8,928
Slurry Seal
$2,842
2027
Via Antibes
Via Lido Nord
Via Lido Soud
248
36
8,928
Slurry Seal
$2,842
2027
Via Barcelona
Via Lido Soud
Via Lido Nord
327
20
6,540
Slurry Seal
$2,082
2027
Via Cordova
Via Lido Soud
Via Lido Nord
450
20
9,000
Slurry Seal
$2,864
2027
Via Dijon
Via Lido Soud
Via Lido Nord
570
20
11,400
Slurry Seal
$3,628
2027
Via Eboli
Via Lido Soud
Via Lido Nord
702
20
14,040
Slurry Seal
$4,469
2027
Via Fermo
Via Lido Soud
Via Firenze
256
16
4,096
Slurry Seal
$1,304
2027
Via Firenze
Via Lido Nord
Piazza Lido
447
16
7,152
Slurry Seal
$2,276
2027
Via Firenze
Piazza Lido
Via Lido Soud
356
16
1 5,696
Slurry Seal
$1,813
1 2027
Via Florence
Via Lido Soud
Piazza Lido
270
24
1 6,480
Slurry Seal
$2,062
1 2027
Appendix A - Local Streets
13 of 29
5-43
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name From Limits of WorkTo
Via Genoa Via Lido Soud Piazza Lido
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
440 43 _ 18,920 _ Slurry Seal $6,022 2027
446 43 19,178 Slurry Seal $6,104 2027
490 18 8,820 Slurry Seal $2,807 2027
Via Genoa
Piazza Lido
Via Lido Nord
Via Graziana
Via Havre
Piazza Lido
Via Graziana
Piazza Lido
Via Lido Nord
470
16
7,520
Slurry Seal
$2,393
2027
Via Havre
Via Lido Soud
Piazza Lido
475
23
10,925
Slurry Seal
$3,477
2027
Via Ithaca
Via Lido Soud
Via Lido Nord
970
20
19,400
Slurry Seal
$6,174
2027
Via Jucar
Via Lido Soud
Via Lido Nord
925
23
21,275
Slurry Seal
$6,771
2027
Via Koron
Via Lido Soud
Via Lido Nord
910
23
20,930
Slurry Seal
$6,661
2027
Via Lido
Bridge (West End)
Via Lido Soud
760
22
28,420
Slurry Seal
$9,045
2027
Via Lido Nord
Via Lido Soud (East Side)
Via Zurich
459
33
18,647
Slurry Seal
$5,935
2027
Via Lido Nord
Via Zurich
Via Waziers
540
33
17,820
Slurry Seal
$5,672
2027
Via Lido Nord
Via Waziers
Via San Remo
661
33
21,813
Slurry Seal
$6,942
2027
Via Lido Nord
Via San Remo
Via Palermo
541
33
17,853
Slurry Seal
$5,682
2027
Via Lido Nord
Via Palermo
Via Lorca
646
33
21,318
Slurry Seal
$6,785
2027
Via Lido Nord
Via Lorca
Via Genoa
769
33
25,377
Slurry Seal
$8,077
2027
Via Lido Nord
Via Genoa
Via Dijon
571
33
18,843
Slurry Seal
$5,997
2027
Via Lido Nord
Via Dion
Via Antibes
530
33
17,490
Slurry Seal
$5,567
2027
Via Lido Nord
Via Antibes
Via Lido Soud (West Side)
400
20
9,200
Slurry Seal
$2,928
2027
Via Lido Soud
Via Lido Nord (West Side)
Via Antibes
280
20
6,800
Slurry Seal
$2,164
2027
Via Lido Soud
Via Antibes
Via Dion
625
33
20,625
Slurry Seal
$6,564
2027
Via Lido Soud
Via Dijon
Via Genoa
820
33
27,060
Slurry Seal
$8,612
2027
Via Lido Soud
Via Genoa
Via Koron
850
33
28,050
Slurry Seal
$8,928
2027
Via Lido Soud
Via Koron
Via Orvieto
660
33
21,780
Slurry Seal
$6,932
2027
Via Lido Soud
Via Orvieto
Via San Remo
670
33
22,110
Slurry Seal
$7,037
2027
Via Lido Soud
Via San Remo
Via Venezia
520
33
17,160
Slurry Seal
$5,462
2027
Via Lido Soud
Via Venezia
Via Zurich
660
33
21,780
Slurry Seal
$6,932
2027
Via Lido Soud
Via Zurich
Via Lido Nord (East Side)
405
53
24,965
Slurry Seal
$7,946
2027
Via Lorca
Via Lido Soud
Via Lido Nord
875
20
17,500
Slurry Seal
$5,570
2027
Via Malaga
Via Oporto
Via Lido
295
22
6,490
Slurry Seal
$2,066
2027
Via Mentone
Vai Lido Soud
Via Lido Nord
850
20
17,000
Slurry Seal
$5,411
2027
Via Nice
Via Lido Soud
Via Lido Nord
810
20
16,200
Slurry Seal
$5,156
2027
Via Oporto
32nd St
Via Lido
575
23
13,225
Slurry Seal
$4,209
2027
Via Orvieto
Via Lido Soud
Via Lido Nord
785
23
18,055
Slurry Seal
$5,746
2027
Via Palermo
Via Lido Soud
Via Lido Nord
762
22
16,764
Slurry Seal
$5,336
2027
Via Quito
Vai Lido Soud
Via Lido Nord
710
20
14,200
Slurry Seal
$4,519
2027
Via Ravenna
Via Lido Soud
Via Lido Nord
660
20
13,200
Slurry Seal
$4,201
2027
Via San Remo
Via Lido Soud
Via Lido Nord
630
23
15,240
Slurry Seal
$4,850
2027
Via Trieste
Via Lido Soud
Via Lido Nord
600
20
12,000
Slurry Seal
$3,819
2027
Via Undine
Via Lido Soud
Via Lido Nord
570
20
11,400
Slurry Seal
$3,628
2027
Via Venezia
Via Lido Soud
Via Lido Nord
535
20
10,700
Slurry Seal
$3,406
2027
Via Waziers
Via Lido Soud
Via Lido Nord
515
23
11,845
Slurry Seal
$3,770
2027
Via Xanthe
Via Lido Soud
Via Lido Nord
490
20
9,800
Slurry Seal
$3,119
2027
Via Yella
Via Lido Soud
Via Lido Nord
465
20
9,300
Slurry Seal
$2,960
2027
Via Zurich
Via Lido Soud
Via Lido Nord
430
21
1 9,030
Slurry Seal
$2,874
1 2027
Villa Way
28th St
29th St
320
25
1 8,000
Slurry Seal
$2,546
1 2027
Appendix A - Local Streets
14 of 29
5-44
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name
Villa Way
From Limits of WorkTo
29th St 32nd St
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
780 22 _ 17,160 _ Slurry Seal $5,462 2027
165 19 3,135 Slurry Seal $998 2027
55 18 990 Slurry Seal $315 2027
Walnut St
Newport Shores Dr
Coast Highway West
Walnut St
Seashore Dr
Ocean Front Alley West
Washington St
Bay Ave East
Balboa Blvd East
140
20
2,800
Slurry Seal
$891
2027
Washington St
Balboa Blvd East
Ocean Front Alley East
85
14
1,190
Slurry Seal
$379
2027
Washington St
Ocean Front East
Ocean Front Alley East
135
14
1,890
Slurry Seal
$602
2027
Way Ln
Fernleaf Ave
Shell St
419
15
6,285
Mill and Overlay
$27,906
2027
Way Ln
Dahlia Ave
Fernleaf Ave
314
15
4,710
Mill and Overlay
$2,923
2027
Westminster Ave
Old Newport Blvd
15th St
1,720
36
61,920
Slurry Seal
$19,707
2027
Zurich Cir
Via Zurich
Via Zurich
450
16
7,200
Slurry Seal
$2,292
2027
15th St
Old Newport Ave
Bolsa Ave
690
18
12,420
Mill and Overlay
$46,417
2028
Aleppo St
Aralia St
Alta Vista Dr
675
37
24,975
Mill and Overlay
$66,320
2028
Ami os Way
Domingo Dr
Domingo Dr
1,055
36
37,980
Mill and Overlay
$187,925
2028
Balboa Blvd E EB
Main St
B St
695
27
18,765
Slurry Seal
$6,152
2028
Balboa Blvd E EB
B St
D St
991
22
21,802
Slurry Seal
$7,147
2028
Balboa Blvd E EB
D St
G St
1,066
22
23,452
Slurry Seal
$7,688
2028
Balboa Blvd E WB
G St
D St
1,066
22
23,452
Slurry Seal
$7,688
2028
Balboa Blvd E WB
D St
B St
991
22
21,802
Slurry Seal
$7,147
2028
Balboa Blvd E WB
B St
Main St
695
27
18,765
Slurry Seal
$6,152
2028
Ba view Way EB
Ba view PI
Jamboree Rd
587
33
21,371
Slurry Seal
$7,006
2028
Bolsa Ave
Broad St
Clay St
203
38
7,714
Mill and Overlay
$2,276
2028
Cambria Dr
El Ca itan Dr
Drakes Bay Dr
2,510
32
80,320
Mill and Overlay
$122,442
2028
Carmel Bay Dr
Point Loma Dr
Spyglass Hill Rd
1,635
36
58,860
Slurry Seal
$19,296
2028
Chubasco Dr
Evita Dr
Zahma Dr
690
37
25,530
Mill and Overlay
$125,871
2028
Cove St
Fernleaf Ave
End
165
24
3,960
Reconstruction
$21,466
2028
De Sola Ter
Seaward Rd
End
1,005
24
28,015
Mill and Overlay
$37,196
2028
Fifth Avenue
Jasmine Ave
Marguerite Ave
630
28
18,390
Mill and Overlay
$90,976
2028
Fourth Ave
Orchid Ave
Poinsettia Ave
270
27
7,290
Mill and Overlay
$36,171
2028
G St
Balboa Blvd East
Ocean Blvd
204
36
6,344
Slurry Seal
$2,080
2028
Goleta Point Dr
Drakes Bay Dr
Morro Bay Dr
1,635
32
53,820
Mill and Overlay
$134,977
2028
Isabella Ter
Seaward Rd
End
325
24
8,800
Mill and Overlay
$43,434
2028
Montecito Dr
Cambria Dr
Dana Point Way
1,052
32
33,664
Mill and Overlay
$150,644
2028
Narcissus Ave
Fifth Ave
Geranium
344
36
12,384
Slurry Seal
$4,060
2028
Newport Coast Dr SB
73 Freeway Bride
Sage Hill
2,235
44
98,340
Mill and Overlay
$484,701
2028
Newport Hills Dr W
Port Seabourne Wy
Ford Rd
2,346
38
89,148
Slurry Seal
$29,225
2028
Newport Hills Dr W
Port Carlow PI
Port Seabourne Wy
1,295
38
49,210
Mill and Overlay
$123,415
2028
Newport Place Dr
MacArthur Blvd
Dove St
565
62
36,530
Mill and Overlay
$97,004
2028
Pacific View Dr
San Miguel Dr
End
2,675
36
97,800
Mill and Overlay
$483,963
2028
Point Mendocino Way
Spyglass Hill Rd
Bodega Bay Dr
170
36
6,120
Mill and Overlay
$30,098
2028
Poppy Ave
Second Ave
Fifth Ave
1,150
27
31,050
Slurry Seal
$10,179
2028
Port Ashley PI
Port Stirling PI (West End)
Newport Hills Drive West
350
32
11,200
Mill and Overlay
$17,074
2028
Port Charles PI
Port Margate PI (West End)
Newport Hills Drive West
665
32
21,280
Mill and Overlay
$95,227
2028
Port Chelsea PI
Newport Hills Drive East
Port Rams ate PI (East End)
549
32
17,568
Mill and Overlay
$87,091
2028
Port Laurent PI
Newport Hills Dr East
Port Trinity PI
878
33
28,535
Mill and Overlay
$140,897
2028
Port Manleigh Cir
Newport Hills Dr West
Newport Hills Dr West
750
32
24,000
Mill and Overlay
$118,622
2028
Appendix A - Local Streets
15 of 29
5-45
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name
Port Margate PI
Limits of WorkTo
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
840 32 _ 26,880 _ Slurry Seal $8,812 2028
1,600 40 63,760 Mill and Overlay $253,968 2028
680 32 21,760 Slurry Seal $7,133 2028
From
Port Charles PI (East Side)
Newport Hills Drive West
Port Seabourne Way
Newport Hills Dr West
Newport Hills Dr East
Port Westbourne PI
Newport Hills Drive West
Port Barmouth PI (East Side)
Ramona Dr
Dolphin Ter
Santanella Ter
511
33
16,863
Slurry Seal
$5,528
2028
Riverside Ave
Coast Highway West
Avon St (West Side)
475
52
24,700
Mill and Overlay
$10,932
2028
Rocky Point Rd
Goleta Point Dr
End
465
32
16,380
Slurry Seal
$5,370
2028
San Joaquin Hills Rd
Backbay Dr
800' E of Backbay Dr
786
31
29,386
Mill and Overlay
$95,374
2028
Santiago Dr
Irvine Ave
Galaxy Dr
874
36
31,464
Mill and Overlay
$6,189
2028
Santiago Dr
Mariners Dr
Nottingham Rd
2,360
36
84,960
Mill and Overlay
$16,712
2028
Sea Ln
Crown Dr
Harbor View Dr
1,078
38
40,964
Mill and Overlay
$203,255
2028
Second Ave
Orchid Ave
Poinsettia Ave
268
27
7,236
Mill and Overlay
$30,957
2028
Second Ave
Poinsettia Ave
Poppy Ave
270
27
7,290
Mill and Overlay
$24,019
2028
Second Ave
Marguerite Ave
Narcissus Ave
574
27
15,498
Mill and Overlay
$5,335
2028
Third Ave
Jasmine Ave
Larkspur Ave
270
27
7,290
Mill and Overlay
$31,188
2028
Vista Del Oro
Vista Nobleza
Vista Umbrosa
1,880
35
65,800
Mill and Overlay
$168,258
2028
15th St
Bolsa Ave
Santa Ana Ave
960
18
17,280
Slurry Seal
$5,835
2029
23rd St
City Limits
Tustin Ave
943
35
33,005
Slurry Seal
$11,144
2029
23rd St
Tustin Ave
Irvine Ave
778
35
27,230
Slurry Seal
$9,194
2029
31st St
Lafayette Ave
Villa Way
351
24
8,424
Slurry Seal
$2,844
2029
35th St
Lake Ave
Balboa Blvd
283
20
5,660
Slurry Seal
$1,911
2029
39th St
Balboa Blvd
Seashore Dr
305
18
5,610
Reconstruction
$30,450
2029
A St
Ocean Front East
South End
535
60
32,100
Slurry Seal
$10,839
2029
Acacia Ave
Coast Highway East
Second Ave
1,075
27
29,025
Slurry Seal
$9,800
2029
Acacia Ave
Second Ave
Pacific Dr
717
27
19,359
Slurry Seal
$6,537
2029
Acacia St
Orchard Dr
Mesa Dr
1,122
50
56,100
Slurry Seal
$18,942
2029
Aldebaran Cir
Galaxy Dr
End
135
55
9,925
Slurry Seal
$3,351
2029
Alta Vista Dr
Bellis St
Aralia St
1,880
36
67,680
Slurry Seal
$22,853
2029
Anita Ln
Estelle Ln
Marian Ln
1,102
33
36,366
Slurry Seal
$12,279
2029
Antigua Cir
Santiago Dr
End
165
33
7,945
Slurry Seal
$2,683
2029
Antigua Way
Santiago Dr (North End)
Mariners Dr
1,980
37
74,460
Slurry Seal
$25,142
2029
Antigua Way
Mariners Dr
Santiago Dr (South End)
1,006
35
35,210
Slurry Seal
$11,889
2029
Ashford Ln
Glenwood Ln
Santiago Dr
315
33
10,995
Slurry Seal
$3,713
2029
Avocado Ave
Waterfront Dr
Coast Highway East
1,460
86
99,420
Mill and Overlay
$506,941
2029
Avocado Ave
San Miguel Dr
Bus Station
1,389
36
56,210
Mill and Overlay
$285,930
2029
Back Bay Dr
Backbay Sewer Pump Station
Access Rd
607
22
13,354
Slurry Seal
$4,509
2029
Bayport Way
Holiday Rd
South End
232
33
7,656
Slurry Seal
$2,585
2029
Bayport Way
Francisco Dr
North End
213
34
9,742
Slurry Seal
$3,289
2029
Bayside Dr
Marguerite Ave
Carnation Ave
2,415
37
74,855
Slurry Seal
$25,275
2029
Bayview Dr
Ocean Blvd
Goldenrod Ave
157
28
4,396
Slurry Seal
$1,484
2029
Bayview Dr
Goldenrod Ave
Heliotrope Ave
251
28
7,028
Slurry Seal
$2,373
2029
Bayview Dr
Heliotrope Ave
Iris Ave
260
28
7,280
Slurry Seal
$2,458
2029
Bayview PI
Bristol St South
Bayview Way
1,355
54
75,170
Slurry Seal
$25,382
2029
Bayview Way
Jamboree Rd
End
202
72
14,544
Slurry Seal
$4,911
2029
Beacon St
Westminster Ave
Holmwood Dr
240
34
36
8,160
23,076
Mill and Overlay
Slurry Seal
$41,451
$7,792
2029
2029
Bedford Ln
Rutland Rd
Buckingham Ln
641
Appendix A - Local Streets
16 of 29
5-46
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V1lv1V
PAVEMENT
ENGINEERING
LOCAL
Street Name
Begonia Ave
From Limits of WorkTo
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
1,885 28 _ 52,780 _ Slurry Seal $17,821 2029
730 37 27,010 Slurry Seal $9,120 2029
947 34 32,198 Slurry Seal $10,872 2029
Pacific Dr
Coast Highway East
Bellis St
Bamboo St
Alta Vista
Berkshire Ln
Oxford Ln
Cambridge Ln
Beryl Ln
Priscilla Ln
Vivian Ln
1,196
34
41,864
Slurry Seal
$14,136
2029
Bison Ave
Bamboo St
Jamboree Rd
1,105
36
41,780
Mill and Overlay
$212,316
2029
Blue Gum Ln
Westcliff Dr
End
700
32
25,500
Slurry Seal
$8,610
2029
Bonaire Way
Holiday Rd
South End
235
33
10,255
Slurry Seal
$3,463
2029
Bonaire Way
Francisco Dr
North End
225
33
7,425
Slurry Seal
$2,507
2029
Bonnie Doon Ter
Dolphin Ter
Patolita Dr
1,067
37
39,479
Slurry Seal
$13,330
2029
Bonnie Doon Ter
Patolita Dr
Ramona Dr
1,481
37
54,797
Slurry Seal
$18,503
2029
Bonnie Doon Ter
Ramona Dr
Malabar Dr
350
37
12,950
Slurry Seal
$4,373
2029
Braemar Way
Francisco Dr
End
215
34
9,810
Slurry Seal
$3,312
2029
Breakers Dr
Breakers Dr
End
1,035
25
25,875
Slurry Seal
$8,737
2029
Brighton Rd
Cameo Shores Rd
Camden Dr
1,390
33
48,370
Slurry Seal
$16,332
2029
Buckingham Ln
Westcliff Dr
Cornwall Ln
620
36
22,320
Slurry Seal
$7,536
2029
Bunya St
Bellis St
Bison Ave
1,555
32
49,760
Slurry Seal
$16,802
2029
Buttonshell Ln
Holiday Rd
Nautilus Ln
410
33
14,130
Slurry Seal
$4,771
2029
Cacao St
Eastbluff Dr
Catalpa St
150
36
5,400
Mill and Overlay
$27,493
2029
Cambridge Ln
Devon Ln
Highland Dr
803
34
27,902
Slurry Seal
$9,421
2029
Camden Dr
Cameo Shores Rd
Milford Dr
1,345
33
44,385
Slurry Seal
$14,987
2029
Camelback St
La Felicidad
Bison Ave
760
78
55,821
Slurry Seal
$18,848
2029
Cameo Shores Rd
Coast Highway East
Orrin ton Rd
1,088
37
37,777
Slurry Seal
$12,756
2029
Cameo Shores Rd
Orrin ton Rd
Brighton Rd
956
37
35,372
Slurry Seal
$11,944
2029
Camphor St
Catalpa St
Alta Vista Dr
847
37
31,339
Slurry Seal
$10,582
2029
Candlestick Ln
Glenwood Ln
Sandalwood Ln
630
35
23,250
Slurry Seal
$7,850
2029
Carnation Ave
First Ave
Coast Highway East
1,425
27
38,475
Slurry Seal
$12,991
2029
Cassia St
Camphor St
Carob St
1,245
32
39,840
Slurry Seal
$13,452
2029
Castaways Ln
Dover Dr
Castaways (private) North
462
54
24,948
Slurry Seal
$8,424
2029
Catalina Dr
Old Newport Blvd
Broad St
1,700
34
57,800
Mill and Overlay
$295,659
2029
Catalpa St
Camphor St
Carob St
1,500
35
52,500
Mill and Overlay
$268,361
2029
Centella PI
Holiday Rd
South End
369
33
12,177
Slurry Seal
$4,112
2029
Centella PI
Santiago Dr
North End
265
37
12,305
Slurry Seal
$4,155
2029
Cherry Tree Ln
Redland Dr
End
200
34
6,800
Slurry Seal
$2,296
2029
Clay St
Westminster Ave
Orange Ave
800
32
25,600
Slurry Seal
$8,644
2029
Cliff Dr
Kings PI
Signal Rd
426
55
23,430
Slurry Seal
$7,911
2029
Cliff Dr
Signal Rd
St Andrews Rd
1,010
55
55,550
Mill and Overlay
$283,221
2029
Cliff Dr
Dover Dr
Kings PI
756
55
41,580
Mill and Overlay
$181,120
2029
Commodore Rd
Tradewinds Ln
Mariners Dr
1,950
38
75,300
Slurry Seal
$25,425
2029
Constellation Dr
Santiago Dr
End
135
38
5,130
Slurry Seal
$1,732
2029
Cornwall Ln
Pembroke Ln
Dover Dr
712
34
24,808
Slurry Seal
$8,377
2029
Cumberland Ln
Sussex Ln
Dover Dr
435
34
15,390
Slurry Seal
$5,197
2029
Dahlia Ave
South End
Way Ln
145
27
3,915
Slurry Seal
$1,322
2029
Dahlia Ave
Ocean Blvd
Seaview Ave
275
27
7,425
Slurry Seal
$2,507
2029
Dahlia Ave
200' S of First St
Coast Highway East
1,490
27
40,230
Slurry Seal
$13,584
2029
Dahlia Ave
Coast Highway East
Fifth Ave
165
27
4,455
Slurry Seal
$1,504
2029
Appendix A - Local Streets
17 of 29
5-4 7
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name
Dana Rd
From Limits of WorkTo
Superior Ave Flagship Rd
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
600 36 _ 21,600 _ Slurry Seal $7,293 2029
160 33 5,280 Slurry Seal $1,783 2029
243 34 8,262 Slurry Seal $2,790 2029
Dawnview Ln
Redland Dr
Redland Dr
Deborah Ln
Mariners Dr
Vivian Ln
Deborah Ln
Vivian Ln
Sylvia Ln
633
34
22,122
Slurry Seal
$7,470
2029
Devon Ln
Oxford Ln
Cambridge Ln
730
33
25,290
Slurry Seal
$8,539
2029
Diana Ln
Priscilla Ln
Vivian Ln
762
34
27,108
Slurry Seal
$9,153
2029
Dolphin Ter
Patolita Dr
Ramona Dr
1,306
33
43,098
Mill and Overlay
$219,516
2029
Dolphin Ter
Bonnie Doone Ter
Patolita Dr
1,266
33
41,778
Mill and Overlay
$118,500
2029
Donnie Rd
22nd St
End
540
33
20,320
Slurry Seal
$6,861
2029
Doris Ln
Dover Dr
Ruth Ln
241
36
8,676
Slurry Seal
$2,929
2029
Dorothy Ln
Mariners Dr
Estelle Ln
238
33
7,854
Slurry Seal
$2,652
2029
Dorothy Ln
Estelle Ln
Marian Ln
920
34
31,280
Slurry Seal
$10,562
2029
Dove St
Birch St
Bristol St North
3,930
44
176,670
Mill and Overlay
$902,359
2029
Essex Ln
Cambridge Ln
Oxford Ln
836
34
28,424
Slurry Seal
$9,598
2029
Estelle Ln
Ruth Ln
Highland Dr
1,368
33
45,744
Slurry Seal
$15,446
2029
Estelle Ln
Highland Dr
Santiago Dr
362
33
11,946
Slurry Seal
$4,034
2029
Eton PI
Dover Dr
End
163
33
7,879
Slurry Seal
$2,660
2029
Evening Star Ln
Polaris Dr
End
980
33
34,840
Slurry Seal
$11,764
2029
Evita Dr
Seadrift Dr
Chubasco Dr
220
58
12,760
Slurry Seal
$4,308
2029
Fairfield Dr
Cameo Shores Rd
Milford Dr
1,355
33
44,715
Slurry Seal
$15,098
2029
Fairhill Dr
23rd St
End
543
34
18,462
Slurry Seal
$6,234
2029
Fernleaf Ave
Seaview Ave
150' N Seaview Ave
150
27
4,050
Slurry Seal
$1,368
2029
Fernleaf Ave
250' S of First St
Coast Highway East
1,260
27
34,020
Slurry Seal
$11,487
2029
First Ave
Acacia Ave
Begonia Ave
272
27
7,344
Slurry Seal
$2,480
2029
First Ave
Begonia Ave
Carnation Ave
270
27
7,290
Slurry Seal
$2,462
2029
First Ave
Carnation Ave
Dahlia Ave
271
27
7,317
Slurry Seal
$2,471
2029
First Ave
Dahlia Ave
Fernleaf Ave
270
27
7,290
Slurry Seal
$2,462
2029
First Ave
Fernleaf Ave
Goldenrod Ave
270
27
7,290
Slurry Seal
$2,462
2029
First Ave
Goldenrod Ave
Heliotrope Ave
270
27
7,290
Slurry Seal
$2,462
2029
Fourth Ave
Avocado Ave
Acacia Ave
265
27
7,155
Slurry Seal
$2,416
2029
Fourth Ave
Acacia Ave
Begonia Ave
267
27
7,209
Slurry Seal
$2,434
2029
Fourth Ave
Begonia Ave
Carnation Ave
265
27
7,155
Slurry Seal
$2,416
2029
Fourth Ave
Carnation Ave
Dahlia Ave
265
27
7,155
Slurry Seal
$2,416
2029
Fourth Ave
Heliotrope Ave
Iris Ave
268
27
7,236
Mill and Overlay
$36,687
2029
Francisco Dr
Tustin Ave
Irvine Ave
1,290
37
47,730
Slurry Seal
$16,116
2029
Galaxy Dr
Santiago Dr (South End)
Rigel Cir
1,459
37
53,983
Slurry Seal
$18,228
2029
Galaxy Dr
Rigel Cir
Mariners Dr
1,956
37
72,372
Slurry Seal
$24,437
2029
Galaxy Dr
Mariners Dr
Holiday Dr
1,452
34
49,368
Slurry Seal
$16,669
2029
Galaxy Dr
Hoilday Dr
Santiago Dr (North End)
2,202
34
74,868
Slurry Seal
$25,280
2029
Glenwood Ln
Candlestick Ln
Ashford Ln
640
33
22,320
Slurry Seal
$7,536
2029
Golden Cir
Anniversary Ln
Anniversary Ln
1,217
33
40,161
Slurry Seal
$13,561
2029
Goldenrod Ave
150' S of Seaview Ave
Seaview Ave
150
28
4,200
Slurry Seal
$1,418
2029
Goldenrod Ave
End
Coast Highway East
1,124
28
31,472
Slurry Seal
$10,627
2029
Gorham Dr
Cameo Shores Rd
Milford Dr
1,400
33
46,200
Slurry Seal
$15,600
2029
Grove Ln
Westcliff Dr
End
622
32
23,004
Slurry Seal
$7,767
2029
Appendix A - Local Streets
18 of 29
5-48
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name
Half Moon Bay Dr
From Limits of WorkTo
Point Loma Dr Point Arena Way
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
1,080 32 _ 32,904 _ Slurry Seal $11,110 2029
930 37 34,410 Slurry Seal $11,619 2029
213 37 8,131 Slurry Seal $2,745 2029
Hampden Rd
Milford Dr
Cameo Shores Rd
Hampden Rd
Cameo Shores Rd
End
Hampshire Cir
Antigua Way
Antigua Way
751
34
25,534
Slurry Seal
$8,622
2029
Hampshire Ct
Hampshire Cir
End
134
50
9,200
Slurry Seal
$3,106
2029
Hampshire Ln
Lincoln Ln
Santiago Dr
250
34
8,500
Slurry Seal
$2,870
2029
Hampshire Ln
Santiago Dr
Antigua Way
250
34
8,500
Slurry Seal
$2,870
2029
Harbor Island Dr
Bayside Dr
Harbor Island Rd
750
43
34,250
Slurry Seal
$11,565
2029
Harbor Island Dr
Harbor Island Rd
E End
1,862
37
68,894
Slurry Seal
$23,262
2029
Harbor Island Dr
Harbor Island Dr
N End
190
36
6,840
Slurry Seal
$2,310
2029
Harrow PI
Dover Dr
End
155
33
7,615
Slurry Seal
$2,571
2029
Hazel Dr
Poppy Ave (south side)
Coast Highway East
1,375
21
29,875
Slurry Seal
$10,087
2029
Heather Ln
Irvine Ave
End
955
34
36,390
Slurry Seal
$12,287
2029
Heliotrope Ave
Ocean Blvd
Bayview Dr
400
27
10,800
Slurry Seal
$3,647
2029
Heliotrope Ave
Seaview Ave
End
314
27
8,478
Slurry Seal
$2,863
2029
Heliotrope Ave
Bayside Dr
Coast Highway East
1,015
28
28,420
Slurry Seal
$9,596
2029
Highland Dr
Westcliff Dr
Nottingham Rd
1,592
38
60,496
Slurry Seal
$20,427
2029
Highland Dr
Nottingham Rd
Mariners Dr
1,858
38
70,604
Slurry Seal
$23,840
2029
Highland Dr
Mariners Dr
Irvine Ave
1,945
37
71,965
Slurry Seal
$24,299
2029
Holiday Rd
Galaxy Dr
Santiago Dr
165
38
6,270
Slurry Seal
$2,117
2029
Holiday Rd
Santiago Dr
Tradewinds Ln
1,485
38
56,430
Slurry Seal
$19,054
2029
Indian Spring Ln
Irvine Ave
End
78
52
6,556
Slurry Seal
$2,214
2029
Iris Ave
Ocean Blvd
Seaview Ave
625
28
17,500
Slurry Seal
$5,909
2029
Iris Ave
Seaview Ave
North End
320
28
8,960
Slurry Seal
$3,025
2029
Iris Ave
Bayside Dr
Coast Highway East
722
27
19,494
Slurry Seal
$6,582
2029
Irvine Ave
Cliff Dr
Clay St
1,093
38
41,534
Mill and Overlay
$151,467
2029
Jasmine Ave
88' N of Ocean Blvd
Seaview Ave
432
28
12,096
Slurry Seal
$4,084
2029
Jasmine Ave
Seaview Ave
North End
283
27
7,641
Slurry Seal
$2,580
2029
Jasmine Ave
Coast Highway East
Third Ave
508
27
13,716
Slurry Seal
$4,631
2029
Kathleen Ln
Teresita Ln
Beryl Ln
255
34
9,270
Slurry Seal
$3,130
2029
Kathleen Ln
Beryl Ln
Highland Dr
260
34
8,840
Slurry Seal
$2,985
2029
Kent Ln
Pembroke Ln
Sussex Ln
250
34
8,500
Slurry Seal
$2,870
2029
Kent Ln
Sussex Ln
Dover Dr
415
34
14,110
Slurry Seal
$4,764
2029
La Linda Ct
23rd St
End
199
32
6,368
Slurry Seal
$2,150
2029
La Linda PI
23rd St
End
548
37
22,076
Slurry Seal
$7,454
2029
Lake Park Ln
23rd St
Tustin Ave
430
25
10,750
Slurry Seal
$3,630
2029
Larkspur Ave
Ocean Blvd
Seaview Ave
470
28
13,160
Slurry Seal
$4,444
2029
Larkspur Ave
Seaview Ave
North End
360
28
10,080
Slurry Seal
$3,404
2029
Larkspur Ave
Bayside Dr
Coast Highway East
247
28
6,916
Slurry Seal
$2,335
2029
Larkspur Ave
Coast Highway East
Fifth Ave
1,406
27
37,962
Slurry Seal
$12,818
2029
Leeward Ln
Tradewinds Ln
Holiday Rd
1,865
33
61,545
Slurry Seal
$20,781
2029
Leila Lane
Dover Dr (Cul-de-Sac)
Diana Ln
240
33
7,920
Slurry Seal
$2,674
2029
Lincoln Ln
Estelle Ln
Marian Ln
1,563
34
53,742
Slurry Seal
$18,146
2029
Linda Ln
Irvine Ave
Priscilla Ave
234
34
7,956
Slurry Seal
$2,686
2029
Malabar Dr
Seadrift Dr/El Paseo Dr
Bonnie Doone Ter
688
37
25,456
Slurry Seal
$8,595
2029
Appendix A - Local Streets
19 of 29
5-49
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name
Mara ata Dr
Limits of WorkTo
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
690 37 _ 25,530 _ Slurry Seal $8,620 2029
279 38 11,202 Slurry Seal $3,782 2029
1,048 38 39,824 Slurry Seal $13,447 2029
From
Sabrina Ter
Kewamee Dr
Marian Ln
Lincoln Ln
Highland Dr
Marian Ln
Highland Dr
Ruth Ln
Mariners Dr
Irvine Ave
Dover Dr
1,450
38
55,100
Slurry Seal
$18,605
2029
Mariners Dr
Dover Dr
Santiago Dr
2,212
38
84,056
Slurry Seal
$28,382
2029
Mariners Dr
Santiago Dr
East End
1,232
37
48,084
Slurry Seal
$16,236
2029
Marlin Way
Shipway Ln
Terrapin Way
725
33
25,725
Slurry Seal
$8,686
2029
Meadow Ln
Tustin Ave
End
195
35
9,325
Slurry Seal
$3,149
2029
Milford Dr
Hampden Rd
Orrington Rd
875
37
32,375
Slurry Seal
$10,932
2029
Milford Dr
Orrington Rd
Camden Dr
801
37
32,137
Slurry Seal
$10,851
2029
Monrovia Ave
City Limit
15th St West
1,655
39
64,545
Slurry Seal
$21,794
2029
Morning Canyon Rd
Coast Highway East
Shorecliff Rd
1,462
27
41,964
Slurry Seal
$14,169
2029
Morning Star Ln
Polaris Dr
End
675
33
24,775
Slurry Seal
$8,365
2029
Narcissus Ave
Seaview Ave
Coast Highway East
553
27
14,931
Slurry Seal
$5,042
2029
Nautilus Lane
To on Ln
Buttonshell Ln
320
33
11,760
Slurry Seal
$3,971
2029
Newport Hills Dr E
Port Sutton Dr
Newport Hills Dr West
1,985
38
75,430
Mill and Overlay
$383,241
2029
Norfolk Ln
Dover Dr
Devon Ln
220
33
7,260
Slurry Seal
$2,451
2029
North Star Ln
White Cliffs Dr
End
850
33
30,550
Slurry Seal
$10,315
2029
Nottingham Rd
Dover Dr
Santiago Dr
1,758
38
66,804
Slurry Seal
$22,557
2029
Orange Ave
Old Newport Blvd
15th St
436
36
15,696
Mill and Overlay
$4,770
2029
Orrington Rd
Cameo Shores Rd
Milford Dr
1,425
33
47,025
Slurry Seal
$15,878
2029
Oxford Ln
Devon Ln
Highland Dr
760
34
26,440
Slurry Seal
$8,928
2029
Pacific Dr
Begonia Ave
Acacia Ave
330
27
8,910
Slurry Seal
$3,009
2029
Pacific Dr
Acacia Ave
Avocado Ave
305
27
8,235
Slurry Seal
$2,781
2029
Paloma Dr
Holiday Rd
City Limit
650
35
22,750
Slurry Seal
$7,682
2029
Patolita Dr
Dolphin Ter
Bonnie Doone Ter
490
33
16,170
Slurry Seal
$5,460
2029
Peach Tree Ln
Redland Dr
End
202
34
6,868
Slurry Seal
$2,319
2029
Pembroke Ln
Mariners Dr
Cornwall Ln
930
34
32,220
Slurry Seal
$10,879
2029
Perham Rd
Cameo Shores Rd
Milford Dr
1,380
33
45,540
Slurry Seal
$15,377
2029
Poinsettia Ave
Ocean Blvd
Seaview Ave
547
28
15,316
Slurry Seal
$5,172
2029
Point Arguello Way
El Capitan Dr
Drakes Bay Dr
170
36
6,120
Slurry Seal
$2,066
2029
Polaris Dr
Galaxy Dr
Evening Star Ln
1,232
36
44,352
Slurry Seal
$14,976
2029
Polaris Dr
Evening Star Ln
Santiago Dr
1,718
36
62,148
Slurry Seal
$20,985
2029
Poppy Ave
190'S Coast Highway East
Coast Highway East
190
21
3,990
Slurry Seal
$1,347
2029
Port Albans Cir
Newport Hills Dr East
End
175
54
9,450
Mill and Overlay
$48,252
2029
Port Albans PI
Newport Hills Dr East
Port Cardi on PI
695
32
22,240
Slurry Seal
$7,509
2029
Port Barmouth PI
Port Westbourne PI (West End)
Newport Hills Drive West
600
32
19,200
Slurry Seal
$6,483
2029
Port Barmouth PI
Newport Hills Drive West
Port Westbourne PI (East End)
850
32
27,200
Slurry Seal
$9,184
2029
Port Cardigan PI
Newport Hills Dr East
Port Albans PI
840
32
26,880
Mill and Overlay
$55,821
2029
Port Carlow PI
Newport Hills Dr West
Port Renwick PI
959
32
30,688
Slurry Seal
$10,362
2029
Port Charles PI
Newport Hills Drive West
Port Margate PI (East End)
1,000
36
36,000
Slurry Seal
$12,156
2029
Port Chelsea PI
Port Ramsgate PI (West End)
Newport Hills Drive East
987
32
31,584
Slurry Seal
$10,665
2029
Port Claridge PI
Newport Hills Dr East
Port Nelson PI
906
33
29,445
Slurry Seal
$9,942
2029
Port Dunleigh Cir
Newport Hills Dr East
End
678
32
21,696
Mill and Overlay
$110,781
2029
Port Edward Cir
Newport Hills Dr East
End
325
32
10,400
Slurry Seal
$3,512
2029
Appendix A - Local Streets
20 of 29
5-50
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V1lv1V
PAVEMENT
ENGINEERING
LOCAL
Street Name
Port Edward PI
From Limits of WorkTo
Newport Hills Dr East Port Locksleigh PI
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
888 33 _ 28,860 _ Slurry Seal $9,745 2029
992 32 31,744 Mill and Overlay $161,782 2029
1,000 33 32,500 Slurry Seal $10,974 2029
Port Lerwick PI
Port Whitby PI
Port Carlisle PI
Port Lockslei h PI
Newport Hills Dr East
Port Edward PI
Port Margate PI
Port Charles PI (West Side)
Newport Hills Drive West
378
32
12,096
Slurry Seal
$4,084
2029
Port Provence PI
Port Weybridge PI (West End)
Newport Hills Dr East
1,160
32
37,120
Slurry Seal
$12,534
2029
Port Ramsgate PI
Port Chelsea PI (West End)
Newport Hills Drive East
633
32
20,256
Slurry Seal
$6,840
2029
Port Ramsgate PI
Newport Hills Drive East
Port Chelsea PI (East End)
430
32
13,760
Mill and Overlay
$697
2029
Port Sheffield PI
Port Abbe PI (West Side)
Newport Hills Drive West
507
32
16,224
Slurry Seal
$5,478
2029
Port Stirling PI
Newport Hills Drive West
Port Ashley PI (East Side)
780
32
24,960
Slurry Seal
$8,428
2029
Port We brid a PI
Newport Hills Drive East
Port Provence PI (East Side)
618
33
20,394
Slurry Seal
$6,886
2029
Priscilla Ln
Beryl Ln
Diana Ln
658
34
23,572
Slurry Seal
$7,959
2029
Private Rd
Irvine Ave
Irvine Ave
870
33
31,110
Slurry Seal
$10,504
2029
Quail St
Campus Dr
Birch St
585
36
21,060
Slurry Seal
$7,111
2029
Quail St
Westerly PI
Spruce St
912
44
40,128
Mill and Overlay
$150,405
2029
Ramona Dr
Santanella Ter
Bonnie Doone Ter
280
33
9,240
Slurry Seal
$3,120
2029
Redlands Dr
South End
23rd St
203
33
6,699
Slurry Seal
$2,262
2029
Redlands Dr
23rd St
Dawnview Ln
550
33
18,150
Slurry Seal
$6,128
2029
Redlands Dr
Dawnview Ln
Santa Isabel Ave
768
33
25,344
Slurry Seal
$8,558
2029
Rigel Cir
Galaxy Dr
End
170
56
12,020
Slurry Seal
$4,059
2029
Roxbury Rd
Cameo Shores Rd
Milford Dr
1,197
33
39,501
Slurry Seal
$13,338
2029
Ruth Ln
Estelle Ln
Marian Ln
631
34
22,654
Slurry Seal
$7,649
2029
Rutland Rd
Mariners Dr
Westcliff Dr
1,350
36
48,600
Slurry Seal
$16,410
2029
San Bernardino Ave
15th St
Clay Ave
630
34
21,420
Mill and Overlay
$108,916
2029
San Clemente Dr
Santa Barbara Dr
Santa Cruz Dr
1,140
48
54,720
Mill and Overlay
$277,880
2029
San Mateo Way
Bodega Bay Dr
San Martin Way
640
32
21,980
Slurry Seal
$7,422
2029
Sandalwood Ln
Santiago Dr
Candlestick Ln
402
35
14,670
Slurry Seal
$4,953
2029
Santa Barbara Dr
Jamboree Rd
Newport Center Dr West
2,525
73
184,325
Slurry Seal
$62,238
2029
Santa Isabel Ave
Irvine Ave
Tustin Ave
290
56
16,240
Slurry Seal
$5,484
2029
Santana Dr
Dolphin Ter
Bonnie Doone Ter
375
33
12,375
Slurry Seal
$4,178
2029
Santanella Ter
Patolita Dr
Malabar Dr
1,605
33
52,965
Mill and Overlay
$203,885
2029
Santiago Dr
Tustin Ave
Irvine Ave
1,275
37
48,375
Slurry Seal
$16,334
2029
Santiago Dr
Galaxy Dr
Antigua Way
2,347
36
84,492
Slurry Seal
$28,529
2029
Santiago Dr
Antigua Way
Mariners Dr
953
36
34,308
Slurry Seal
$11,584
2029
Sea Gull Ln
Sherin ton PI
16th St
900
37
33,300
Slurry Seal
$11,244
2029
Second Ave
Carnation Ave
Heliotrope Ave
1,200
28
33,600
Slurry Seal
$11,345
2029
Second Ave
Poppy Ave
Hazel Ave
125
27
3,375
Slurry Seal
$1,140
2029
Shipway Ln
Tradewinds Ln
Skylark Ln
782
38
29,716
Slurry Seal
$10,034
2029
Sierra Vista
Tustin Ave
End
551
32
20,132
Slurry Seal
$6,798
2029
Skylark Ln
Highland Dr
Commodore Rd
245
37
9,065
Slurry Seal
$3,061
2029
Skylark Ln
Commodore Rd
Holiday Rd
1,088
38
41,344
Slurry Seal
$13,960
2029
Somerset Ln
Highland Dr
Highland Dr
1,445
34
50,330
Slurry Seal
$16,994
2029
Starlight Cir
Commodore Rd
Glenwood Ln
233
35
8,155
Slurry Seal
$2,754
2029
Starlight Cir
Glenwood Ln
End
195
33
8,935
Slurry Seal
$3,017
2029
Sussex Ln
Dover Dr
Cumberland Ln
1205,
34
41,570
Slurry Seal
$14,036
2029
Sylvia Ln
Beryl Ln
Deborah Ln
462
34
16,308
Slurry Seal
$5,506
2029
Appendix A - Local Streets
21 of 29
5-51
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name
Teresita Ln
Limits o Work
From To
Kathleen Ln Vivian Ln
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
530 35 _ 19,150 _ Slurry Seal $6,466 2029
450 33 15,450 Slurry Seal $5,217 2029
270 27 7,290 Slurry Seal $2,462 2029
Terrapin Way
Shipway Ln
Marlin Way
Third Ave
Avocado Ave
Acacia Ave
Third Ave
Acacia Ave
Begonia Ave
265
27
7,155
Slurry Seal
$2,416
2029
Third Ave
Begonia Ave
Carnation Ave
265
27
7,155
Slurry Seal
$2,416
2029
Third Ave
Dahlia Ave
Fernleaf Ave
265
27
7,155
Slurry Seal
$2,416
2029
Third Ave
Marguerite Ave
Marigold Ave
272
28
7,616
Slurry Seal
$2,572
2029
Third Ave
Narcissus Ave
Orchid Ave
264
28
7,392
Slurry Seal
$2,496
2029
Toyon Ln
Holiday Rd
Nautilus Ln
445
33
15,285
Slurry Seal
$5,161
2029
Tradewinds Ln
Santiago Dr
Commodore Rd
2,275
38
86,450
Slurry Seal
$29,190
2029
Tremont Ln
Cameo Shores Rd
Milford Dr
1,420
33
46,860
Slurry Seal
$15,823
2029
Tustin Ave
Emerson St
Francisco Dr
809
37
31,503
Slurry Seal
$10,637
2029
Tustin Ave
150' South of Windward Ln
Santiago Dr
640
18
11,900
Slurry Seal
$4,018
2029
Tustin Ave
South End
Santa Isabel Ave
330
37
12,700
Slurry Seal
$4,288
2029
Tustin Ave
Santa Isabel Ave
North End
580
37
25,400
Slurry Seal
$8,576
2029
Tustin Ave
Clay St
15th St
633
35
22,155
Mill and Overlay
$112,541
2029
Via Marina
Tustin Ave
End
486
33
18,538
Slurry Seal
$6,259
2029
Vista Baya
West End
Tustin Ave
527
33
19,891
Slurry Seal
$6,716
2029
Vista Baya
Tustin Ave
East End
430
24
13,305
Slurry Seal
$4,493
2029
Vista Del Oro
Vista Del Sol
Vista Nobleza
2,140
35
74,900
Slurry Seal
$25,290
2029
Warwick Ln
Estelle Ln
Marian Ln
742
33
24,486
Slurry Seal
$8,268
2029
Warwick Ln
Marian Ln
Nottingham Rd
244
33
8,052
Slurry Seal
$2,719
2029
West Wind Way
Polaris Dr
End
822
34
29,448
Slurry Seal
$9,943
2029
Windward Ln
Tustin Ave
Irvine Ave
1,290
33
42,570
Slurry Seal
$14,374
2029
Windward Ln
Tradewinds Ln
Leeward Ln
1,420
33
48,060
Slurry Seal
$16,228
2029
07th St
Bay Ave West
Balboa Blvd West
167
30
5,010
Slurry Seal
$1,742
2030
15th St
Redlands Ave
Tustin Ave
670
18
12,060
Slurry Seal
$4,194
2030
26th St
East End
Newport Blvd
140
29
4,060
Slurry Seal
$1,412
2030
26th St
Newport Blvd
Balboa Blvd
125
22
2,750
Slurry Seal
$956
2030
28th St
Newport Blvd West SIB
Balboa Blvd
220
60
13,200
Slurry Seal
$4,591
2030
54th St
Neptune Ave
Seashore Dr
75
27
2,025
Slurry Seal
$704
2030
60th St
North End
Coast Highway West
155
28
4,340
Slurry Seal
$1,509
2030
Alder PI
Alta Vista Dr
End
305
32
9,760
Slurry Seal
$3,394
2030
Aleppo St
Alta Vista Dr
End
385
32
12,320
Slurry Seal
$4,285
2030
Almond PI
Alta Vista Dr
End
245
32
7,840
Slurry Seal
$2,727
2030
Alta Vista Dr
Carob St
Bison Ave
2,220
36
79,920
Slurry Seal
$27,795
2030
Aralia St
Aleppo St
End
1,775
35
62,125
Slurry Seal
$21,606
2030
Arbutus St
Aleppo St
Alta Vista Dr
1,140
36
41,040
Slurry Seal
$14,273
2030
Arbutus St
Alta Vista Dr
End
225
32
7,200
Slurry Seal
$2,504
2030
Avocado Ave
Pacific Dr
160' N of Pacific Dr
160
16
2,560
Slurry Seal
$890
2030
Avocado Ave SIB
167' S/O San Joaquin Hills
Bus Station
107
22
3,674
Slurry Seal
$1,278
2030
Azure Ave
Orchid St
Bay View Ave
630
35
22,050
Slurry Seal
$7,669
2030
Babcock St SB
City Limit
16th St West
306
33
10,098
Slurry Seal
$3,512
2030
Back Bay Dr
Jamboree Rd
Entrance to Newport Dunes
1,110
61
67,710
Slurry Seal
$23,549
2030
Back Bay Dr
Entrance to Newport Dunes
Shellmaker Rd
11225
48
58,800
Slurry Seal
1 $20,450
1 2030
Appendix A - Local Streets
22 of 29
5-52
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name
Back Bay Dr
From Limits of WorkTo
Shellmaker Rd Beginning of PCC Section
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
800 22 _ 17,600 _ Slurry Seal $6,121 2030
1,649 22 36,278 Slurry Seal $12,617 2030
2,710 22 59,620 Slurry Seal $20,735 2030
Back Bay Dr
End of PCC Section
San Joaquin Hills Rd
Back Bay Dr
San Jao uin Hills Rd
Beginning of PCC Section
Back Bay Dr
End of PCC Section
Backbay sewer pump station
3,106
22
68,332
Slurry Seal
$23,765
2030
Back Bay Dr
Access Rd
Staired Path to Landmark
2,394
22
52,668
Slurry Seal
$18,317
2030
Back Bay Dr
Staired Path to Landmark
Eastbluff Dr
3,482
22
79,004
Slurry Seal
$27,476
2030
Basswood St
Alta Vista Dr
Alta Vista Dr
1,090
33
35,425
Slurry Seal
$12,320
2030
Bay Farm PI
Upper Bay Dr
End
425
34
14,450
Slurry Seal
$5,025
2030
Bay View Ave
Mesa Dr
Orchard Dr
1,200
35
42,000
Slurry Seal
$14,607
2030
Bay View Ave
Orchard Dr
Zenith Ave
1,200
35
42,000
Slurry Seal
$14,607
2030
Bayadere Ter
Sabrina Ter
Angelita Dr
2,310
33
76,230
Mill and Overlay
$23,861
2030
Baycrest Rd
Irvine Ave
Tradewinds Ln
238
38
9,044
Slurry Seal
$3,145
2030
Ba side Dr
Coast Highway East
End
1,187
38
45,106
Slurry Seal
$15,687
2030
Bayside Dr
Carnation Ave
EI Paseo Dr
3,600
37
126,200
Mill and Overlay
$506,956
2030
Beacon Bay
Harbor Island Rd
End
1,170
24
28,080
Slurry Seal
$9,766
2030
Beacon St
La Jolla Dr
Santa Ana Ave
105
33
3,465
Slurry Seal
$1,205
2030
Bellis St
Alta Vista Dr
End
475
32
15,200
Slurry Seal
$5,286
2030
Birch St
Mesa Dr
End
232
36
9,552
Slurry Seal
$3,322
2030
Bixia St
Eastbluff Dr
Bamboo St
150
35
5,250
Slurry Seal
$1,826
2030
Blackthorn St
Bellis St
Bison Ave
1,385
34
47,090
Slurry Seal
$16,377
2030
Blue Key
Sandcastle Dr
End
750
32
26,700
Slurry Seal
$9,286
2030
Blue Water Dr
Salt Air Dr
Crown Dr North
1,100
32
35,028
Slurry Seal
$12,182
2030
Bowsprit Dr
MacArthur Blvd
Dove St
306
44
13,464
Slurry Seal
$4,683
2030
Broad St
Westminster Ave
Santa Ana Ave
725
35
25,375
Mill and Overlay
$87,372
2030
Buck Gully Dr
Sandcastle Dr
End
126
36
5,786
Slurry Seal
$2,012
2030
Buckeye St
Bellis St
Bison Ave
1,190
32
38,080
Slurry Seal
$13,244
2030
Cabrillo Ter
Serra Dr
De Anza Dr
869
23
19,787
Slurry Seal
$6,882
2030
Camelback St
Jamboree Rd
La Felicidad
1,505
40
60,825
Slurry Seal
$21,154
2030
Cameo Highlands Dr
Coast Highway East
Garrett Dr
1,420
37
49,321
Slurry Seal
$17,153
2030
Carob St
Camphor St
End
2,360
34
80,240
Slurry Seal
$27,906
2030
Catamaran Dr
Keel Dr
End
975
36
37,350
Slurry Seal
$12,990
2030
Ceiba PI
Carob St
End
195
54
11,780
Slurry Seal
$4,097
2030
Celtis PI
Alta Vista Dr
End
190
54
10,260
Slurry Seal
$3,568
2030
Cercis PI
Alta Vista Dr
End
220
32
7,040
Slurry Seal
$2,448
2030
Chestnut PI
Alta Vista Dr
End
220
32
7,040
Slurry Seal
$2,448
2030
Citrus PI
Alta Vista Dr
End
285
32
9,120
Slurry Seal
$3,172
2030
Civic Center Dr
Avocado Ave
Newport Center Dr
1,559
48
74,832
Slurry Seal
$26,025
2030
Columbus Cir
Serra Dr
End
112
22
3,464
Slurry Seal
$1,205
2030
Corinthian Way
MacArthur Blvd
Birch St
876
44
38,544
Slurry Seal
$13,405
2030
Cortes Cir
Serra Dr
End
90
22
2,980
Slurry Seal
$1,036
2030
Cortland Dr
Rockford PI
Cameo Highlands Dr
702
37
25,974
Slurry Seal
$9,033
2030
Cortland Dr
Cameo Highlands Dr
Garrett Dr
989
37
36,593
Slurry Seal
$12,727
2030
Court Ave
20th St
McFadden PI
85
28
2,380
Slurry Seal
$828
2030
Crown Dr
Sea Ln
Crown Dr North
1,152
37
42,624
Slurry Seal
$14,824
2030
Crown Dr North
Crown Dr
San Joaquin Hills Rd
1,370
36
49,320
Slurry Seal
$17,153
2030
Appendix A - Local Streets
23 of 29
5-53
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name
Cutter Rd
From Limits of WorkTo
Beacon Bay End
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
380 24 _ 9,120 _ Slurry Seal $3,172 2030
1,320 36 47,520 Slurry Seal $16,527 2030
980 36 35,280 Slurry Seal $12,270 2030
Cypress St (S/A Heights)
Mesa Dr
Orchard Dr
Cypress St (S/A Heights)
Orchard Dr
Cul De Sac
Cypress St (S/A Heights)
Cul De Sac
Bristol St South
260
36
9,360
Slurry Seal
$3,255
2030
Dana Point Way
San Martin Way
Montecito Dr
169
36
6,084
Mill and Overlay
$13,013
2030
De Anza Dr
Seaward Rd
De Sola Ter
750
35
26,250
Slurry Seal
$9,129
2030
Dolphin -Striker Way
Dove St
End
335
44
16,740
Slurry Seal
$5,822
2030
Dorchester Rd
Rockford Rd
Cameo Highland Rd
825
33
27,225
Slurry Seal
$9,468
2030
Dorchester Rd
Cameo Highland Rd
Garrett Rd
910
33
30,030
Slurry Seal
$10,444
2030
Dove St
Campus Dr
Birch St
585
37
21,645
Slurry Seal
$7,528
2030
Dover Dr
End
Leila Ln
492
29
15,768
Slurry Seal
$5,484
2030
Dover Dr
Leila Ln
Mariners Dr
500
29
14,500
Slurry Seal
$5,043
2030
Dover Dr
Mariners Dr
Doris Ln
510
29
14,790
Slurry Seal
$5,144
2030
Dover Dr
Doris Ln
Nottingham Rd
590
29
17,110
Slurry Seal
$5,951
2030
Dover Dr
Nottingham Rd
Norfolk Ln
665
29
19,285
Slurry Seal
$6,707
2030
Dover Dr
Norfolk Ln
Westcliff Dr
490
29
14,210
Slurry Seal
$4,942
2030
Dover Dr
Westcliff Dr
Dover Dr (Arterial)
170
36
5,460
Slurry Seal
$1,899
2030
Drakes Bay Dr
Goleta Point Dr
Point Aguello Way
269
32
9,358
Slurry Seal
$3,255
2030
Drakes Bay Dr
Point Aguello Way
Point Conception Way
1,381
32
44,192
Slurry Seal
$15,369
2030
East Coastal Peak
Ridge Park Rd
1195' S of Ridge Park Rd
1,195
37
44,215
Slurry Seal
$15,377
2030
Ebbtide Rd
Crown Dr
Sandpiper Dr
1,317
33
43,461
Slurry Seal
$15,115
2030
Evening Canyon Rd
Shorecliff Rd
Morning Canyon Rd
1,995
28
63,360
Slurry Seal
$22,036
2030
Fernleaf Ave
Coast Highway East
Fifth Ave
370
27
9,990
Slurry Seal
$3,474
2030
Fifth Avenue
Marguerite Ave
Marigold Ave
320
36
11,520
Slurry Seal
$4,006
2030
Fifth Avenue
Marigold Ave
Poppy Ave
1,175
36
42,300
Slurry Seal
$14,711
2030
Ford Rd
Hillside Dr
East End
590
32
22,320
Slurry Seal
$7,763
2030
Ford Rd EB
West End
San Miguel Dr
840
30
26,900
Slurry Seal
$9,355
2030
Ford Rd WB
Newport Hills Dr
West End
877
29
25,433
Slurry Seal
$8,845
2030
Fourth Ave
Goldenrod Ave
Heliotrope Ave
260
27
7,020
Slurry Seal
$2,441
2030
Fourth Ave
Larkspur Ave
Marguerite Ave
280
27
7,560
Slurry Seal
$2,629
2030
Fourth Ave
Poinsettia Ave
Poppy Ave
269
27
7,263
Slurry Seal
$2,526
2030
Francisco Dr
Irvine Ave
Tradewinds Ln
236
36
8,496
Slurry Seal
$2,955
2030
Garrett Dr
Cortland Dr
Cameo Highlands Dr
840
37
31,080
Slurry Seal
$10,809
2030
Goldenrod Ave
Fourth Ave
Fifth Ave
350
27
9,450
Slurry Seal
$3,287
2030
Goldenrod Ave
Harbor View Dr
Crown Dr
1,165
33
38,445
Slurry Seal
$13,371
2030
Goldenrod Ave
Crown Dr
Wavecrest Dr
635
35
22,225
Slurry Seal
$7,730
2030
Granville Dr
Newport Center Dr
Gate
388
26
10,088
Slurry Seal
$3,508
2030
Harbor View Dr
MacArthur Blvd
Goldenrod Ave
685
38
26,030
Slurry Seal
$9,053
2030
Harbor View Dr
Goldenrod Ave
Marguerite Ave
1,945
38
73,910
Slurry Seal
$25,705
2030
Hazel Dr
Coast Highway East
577' N of Coast Highway East
577
30
17,310
Slurry Seal
$6,020
2030
Hazel Dr
577' N of Coast Highway East
Poppy Ave (north side)
393
29
11,397
Slurry Seal
$3,964
2030
Heliotrope Ave
Coast Highway East
Fifth Ave
785
27
21,195
Slurry Seal
$7,371
2030
Holiday Rd
Irvine Ave
Tustin Ave
1,290
38
49,020
Slurry Seal
$17,048
2030
Hospital Rd
Superior Ave
Placentia Ave
976
44
42,944
Slurry Seal
$14,935
2030
Indus St
Kline Dr
West End
800
33
28,400
Slurry Seal
$9,877
2030
Appendix A - Local Streets
24 of 29
5-54
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name
Inlet Dr
From Limits of WorkTo
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
150 36 _ 5,400 _ Slurry Seal $1,878 2030
1,088 32 37,066 Slurry Seal $12,891 2030
164 33 5,412 Slurry Seal $1,882 2030
Marguerite Ave
Keel Dr
Inlet Isle Dr
Topside Ln
Sandcastle Dr
Island Ave
Bay Ave East
Balboa Blvd West
Island View Dr
Salt Air Dr
Lighthouse Ln
815
32
26,080
Slurry Seal
$9,070
2030
Jade Cove
San Martin Way
End
275
32
10,300
Slurry Seal
$3,582
2030
Jasmine Ave
Third Ave
Fifth Ave
760
27
20,520
Slurry Seal
$7,137
2030
Keel Dr
Catamaran Dr
Outrigger Dr
583
32
21,014
Slurry Seal
$7,308
2030
Ketch Rd
Beacon Bay
End
310
24
7,440
Slurry Seal
$2,588
2030
Key Bay
Park Green Dr
End
80
64
5,120
Slurry Seal
$1,781
2030
Key View
Sandcastle Dr
End
115
34
5,410
Slurry Seal
$1,882
2030
Key West
Park Green Dr
End
230
32
8,860
Slurry Seal
$3,081
2030
Kline Dr
South End
Orchard Dr
625
28
19,000
Slurry Seal
$6,608
2030
Kline Dr
Pegasus St
North End
570
33
21,060
Slurry Seal
$7,324
2030
K-Thanga Dr
Dolphin Ter
Bonnie Doone Ter
275
33
9,075
Slurry Seal
$3,156
2030
La Felicidad
Camelback St
La Salud
300
44
13,200
Slurry Seal
$4,591
2030
La Salud
North End
La Vida
499
44
23,956
Slurry Seal
$8,332
2030
La Salud
La Vida
Corsica Dr N
1,335
44
58,740
Slurry Seal
$20,429
2030
La Salud
Corsica Dr N
La Felicidad
1,005
44
44,220
Slurry Seal
$15,379
2030
La Vida
University Dr
La Salud
843
44
40,092
Slurry Seal
$13,943
2030
Lighthouse Ln
Salt Air Dr
Blue Water Dr
1,065
32
35,580
Slurry Seal
$12,374
2030
Marguerite Ave
San Joaquin Hills Rd
Pacific View Dr
721
36
26,406
Slurry Seal
$9,184
2030
Marigold Ave
Third Ave
Fourth Ave
345
27
9,315
Slurry Seal
$3,240
2030
Marine Ave
South Bridge End
North Bridge End
400
20
8,000
Slurry Seal
$2,782
2030
Marine Ave
North Bridge End
Bayside Dr
300
20
10,800
Slurry Seal
$3,756
2030
Martingale Way
Corinthian Way
End
562
44
26,228
Slurry Seal
$9,122
2030
Mesa Dr
Mesa Dr/Birch St
Cypress St
1,140
37
42,180
Slurry Seal
$14,670
2030
Mesa Dr
Cypress St
End
1,345
37
49,765
Slurry Seal
$17,308
2030
Mesa View North
Ford Rd
Bonita Canyon Dr
400
43
17,200
Slurry Seal
$5,982
2030
Mesa View South
Bonita Canyon Dr
Ford Rd
400
43
17,200
Slurry Seal
$5,982
2030
Morning Canyon Rd
Serra Dr
Seaward Rd
920
35
32,200
Slurry Seal
$11,199
2030
Morning Canyon Rd
Seaward Rd
Coast Highway East
350
35
12,250
Slurry Seal
$4,260
2030
Newport Hills Dr E
Ford Rd
Port Ramsgate PI
1,280
36
51,100
Mill and Overlay
$268,215
2030
Newport Hills Dr E
Port Ramsgate PI
Port Seabourne Way
1,550
37
57,350
Mill and Overlay
$300,421
2030
Newport Ridge Dr East
San Joaquin Hills Rd
Park Crest
1,520
40
59,300
Slurry Seal
$20,624
2030
Newport Ridge Dr East
Park Crest
St Michael
2,215
40
88,600
Slurry Seal
$30,814
2030
Orchard Dr
Irvine Ave
Birch St
800
40
32,000
Slurry Seal
$11,129
2030
Orchard Dr
Birch St
Cypress St
630
36
22,680
Slurry Seal
$7,888
2030
Orchard Dr
Cypress St
Orchid St
465
35
16,275
Slurry Seal
$5,660
2030
Orchard Dr
Bay View Ave
End
148
35
5,180
Slurry Seal
$1,802
2030
Orchard Dr
Santa Ana Ave
End
1,374
33
47,142
Slurry Seal
$16,395
2030
Orchid Hill PI
Upper Bay Dr
End
425
34
14,450
Slurry Seal
$5,025
2030
Orchid St
Orchard Dr
Azure Ave
500
35
17,500
Slurry Seal
$6,086
2030
Outrigger Dr
Keel Dr
Sandcastle Dr
1,454
33
47,255
Slurry Seal
$16,435
2030
Park Green Dr
Sausalito Dr
Sandcastle Dr
1,110
40
44,400
Slurry Seal
$15,442
2030
Patrice Rd
Bolero Way
Flagship Rd
500
37
18,500
Slurry Seal
$6,434
2030
Appendix A - Local Streets
25 of 29
5-55
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V1lv1V
PAVEMENT
ENGINEERING
LOCAL
Street Name From Limits of WorkTo
Pebble Dr Goldenrod Ave Sandpiper Dr
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
1,247 34 _ 42,398 _ Slurry Seal $14,745 2030
1,177 33 38,841 Slurry Seal $13,508 2030
2,684 19 50,996 Slurry Seal $17,736 2030
Pegasus St
Santa Ana Ave
Kline Dr
Pelican Hill Rd N
Pelican Hill Cir (North Side)
Pelicans Dr
Pelican Hill Rd N
Newport Coast Dr North
Pelicans Dr
1,258
19
23,902
Slurry Seal
$8,313
2030
Pelican Hill Rd N
Pelicans Dr
Newport Coast Dr
1,258
19
23,902
Slurry Seal
$8,313
2030
Pelican Hill Rd N
Pelicans Dr
Pelican Hill Cir (North Side)
2,684
19
50,996
Slurry Seal
$17,736
2030
Pelican Hill Rd S
Newport Coast Dr
Pelican Hill Cir S
5,650
24
142,100
Slurry Seal
$49,420
2030
Pelican Hill Rd S
Pelican Hill Cir (North Side)
Pelican Hill Cir (South Side)
1,352
24
31,798
Slurry Seal
$11,059
2030
Pelican Hill Rd S
Pelican Hill Cir (South Side)
Pelican Hill Cir (North Side)
1,352
24
32,448
Slurry Seal
$11,285
2030
Pelican Hill Rd S
Pelican Hill Cir (South Side)
Newport Coast Dr
5,650
24
142,600
Slurry Seal
$49,594
2030
Pescador Dr
Nottingham Rd
Santiago Dr
1,487
33
50,271
Slurry Seal
$17,484
2030
Piazza Genoa
Via Lido Soud
Via Genoa
192
45
8,640
Slurry Seal
$3,005
2030
Piazza Lido
Via Florence
Via Havre
510
58
29,580
Slurry Seal
$10,287
2030
Point Conception Way
El Capitan Dr
Drakes Bay Dr
168
36
6,798
Slurry Seal
$2,364
2030
Pork Barrel Way (35th 1/2 St)
FinleyAve
S End
80
16
1,280
Slurry Seal
$445
2030
Port Abbey PI
Port Sheffield PI (West End)
Newport Hills Drive West
772
32
24,704
Slurry Seal
$8,592
2030
Port Abbey PI
Newport Hills Drive West
Port Sheffield PI (East End)
940
32
30,080
Slurry Seal
$10,461
2030
Port Aberdeen PI
Port Whitby PI
Port Durness PI
1,379
32
44,628
Slurry Seal
$15,521
2030
Port Ashley PI
Newport Hills Drive West
Port Stirling PI (East End)
620
32
19,840
Slurry Seal
$6,900
2030
Port Bishop PI
Newport Hills Dr East
Port Carney PI
998
33
32,435
Slurry Seal
$11,280
2030
Port Bristol Cir
Newport Hills Drive East
End
1,095
32
35,040
Mill and Overlay
$166,351
2030
Port Cardiff PI
Port Bristol Cir (West End)
Newport Hills Drive East
958
32
30,656
Slurry Seal
$10,662
2030
Port Carlisle PI
Port Whitby PI
Port Lerwick PI
1,461
32
47,252
Slurry Seal
$16,434
2030
Port Carlow Cir
Newport Hills Dr West
End
115
54
6,210
Slurry Seal
$2,160
2030
Port Dunbar Dr
Spyglass Hill Rd
Port Harwick PI
172
36
6,942
Slurry Seal
$2,414
2030
Port Durness PI
Port Harwick PI
Port Whitby PI
708
36
26,238
Slurry Seal
$9,125
2030
Port Durness PI
Port Whitby PI
Port Aberdeen PI
1,274
36
46,364
Slurry Seal
$16,125
2030
Port Harwick PI
Port Dunbar Dr
Port Durness PI
353
36
14,208
Slurry Seal
$4,941
2030
Port Kimberly PI
Newport Hills Dr West
Port Manlei h PI
858
32
27,456
Slurry Seal
$9,549
2030
Port Ramsey PI
San Miguel Dr
Port Whitby PI
153
36
6,008
Slurry Seal
$2,089
2030
Port Stanhope Cir
Newport Hills Dr West
End
115
38
5,330
Slurry Seal
$1,854
2030
Port Stirling PI
Port Ashley PI (West Side)
Newport Hills Drive West
615
32
19,680
Slurry Seal
$6,844
2030
Port Tiffin Cir
Newport Hills Dr West
End
115
54
6,210
Slurry Seal
$2,160
2030
Port Townsend Cir
Port Bishop PI
End
295
33
9,735
Slurry Seal
$3,386
2030
Port Trinity Cir
Newport Hills Dr East
End
345
33
11,213
Slurry Seal
$3,900
2030
Port Westbourne PI
Port Barmouth PI (West Side)
Newport Hills Drive West
390
32
12,480
Slurry Seal
$4,340
2030
Port Whitby PI
Port Ramsey PI
Port Durness PI
1,020
36
37,220
Slurry Seal
$12,945
2030
Portside Way
Windover Dr
Wavecrest Dr
576
32
18,432
Slurry Seal
$6,410
2030
Prairie Road SB
Bonita Canyon Dr
Ford Rd
350
35
12,250
Slurry Seal
$4,260
2030
Prairie Road NB
Ford Rd
Bonita Canyon Dr
350
46
16,100
Slurry Seal
$5,599
2030
Quail St
Birch St
Westerly PI
617
60
37,020
Mill and Overlay
$193,403
2030
Quail St
Spruce St
Dove St
1,276
44
56,144
Mill and Overlay
$128,877
2030
Quiet Cove
Tiller Way
End
470
32
16,540
Slurry Seal
$5,752
2030
Redlands Dr
Orchard Dr
Indus St
565
33
37
18,645
67,081
Slurry Seal
Slurry Seal
$6,484
$23,330
2030
1 2030
Ridge Park Rd
Newport Coast Dr
Tesoro
1,813
Appendix A - Local Streets
26 of 29
5-56
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name From Limits of WorkTo
Ridge Park Rd Tesoro Campo Bello
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
1,283 37 _ 47,471 _ Slurry Seal $16,510 2030
1,491 37 55,167 Slurry Seal $19,186 2030
1,378 37 50,986 Slurry Seal $17,732 2030
Ridge Park Rd
Campo Bello
Vista Ridge Rd
Ridge Park Rd
Vista Ridge Rd
West Coast Peak
Ridge Park Rd
West Coast Peak
Talmont
1,216
37
44,992
Slurry Seal
$15,648
2030
Ridge Park Rd
Talmont
East End
1,055
37
40,835
Slurry Seal
$14,202
2030
Ridge Park Rd
San Joaquin Hills Rd
Newport Coast Dr
1,449
37
53,613
Slurry Seal
$18,646
2030
Rivera Ter
Seaward Rd
End
328
23
8,544
Mill and Overlay
$38,779
2030
Riverside Ave
Avon St
Cliff Dr
943
52
49,036
Mill and Overlay
$257,586
2030
Riverside Dr
Indus St
End
210
33
8,430
Slurry Seal
$2,932
2030
Riverside Dr
Orchard Dr
End
520
33
18,960
Slurry Seal
$6,594
2030
Rockford PI
Rockford Rd
End
250
37
11,050
Slurry Seal
$3,843
2030
Rockford Rd
Surrey Dr
Cortland Dr
671
37
24,827
Slurry Seal
$8,634
2030
Salt Air Cir
Salt Air Dr
End
335
32
13,520
Slurry Seal
$4,702
2030
Salt Air Dr
Salt Air Cir
Lighthouse Ln
560
32
18,420
Slurry Seal
$6,406
2030
San Martin Way
Bode a Bay Dr
San Mateo Way
825
36
30,450
Mill and Overlay
$160,144
2030
San Nicolas Dr
Newport Center Dr East
Avocado Ave
1,080
78
84,240
Slurry Seal
$29,297
2030
Sand Key
Park Green Dr
End
501
33
17,783
Slurry Seal
$6,184
2030
Sand Point Way
Windover Dr
Wavecrest Dr
280
36
11,580
Slurry Seal
$4,027
2030
Sandcastle Dr
Marguerite Ave
Tiller Way
193
36
6,948
Slurry Seal
$2,416
2030
Sandcastle Dr
Inlet Isle Dr
Park Green Dr
654
36
23,544
Slurry Seal
$8,188
2030
Sandcastle Dr
Park Green Dr
Seacrest Dr
975
36
35,100
Slurry Seal
$12,207
2030
Sandcastle Dr
Seacrest Dr
Catamaran Dr
1,465
36
52,740
Slurry Seal
$18,342
2030
Sandcastle Dr
Tiller Way
Inlet Isle Dr
2,588
36
93,168
Mill and Overlay
$490,918
2030
Sandpiper Dr
Ebbtide Rd
Setting Sun Dr
435
33
14,855
Slurry Seal
$5,166
2030
Sandune Ln
Inlet Isle Dr
End
670
32
23,240
Slurry Seal
$8,083
2030
Santa Ana Ave
15th St
City Limit
640
19
12,160
Slurry Seal
$4,229
2030
Santiago Dr
Nottingham Rd
Pescador Dr
1,445
36
52,020
Mill and Overlay
$272,854
2030
Sausalito Dr
Marguerite Ave
End
600
36
23,100
Slurry Seal
$8,034
2030
Schooner Rd
Beacon Bay
End
290
24
6,960
Slurry Seal
$2,421
2030
Scott Dr
Corinthian Way
Dove St
513
44
22,572
Slurry Seal
$7,850
2030
Sea Ln
Harbor View Dr
Goldenrod Ave
1,340
37
49,580
Slurry Seal
$17,243
2030
Seabreeze Ln
Tiller Way
Surfview Ln
1,110
32
36,520
Slurry Seal
$12,701
2030
Seacrest Dr
Catamaran Dr
Sandcastle Dr
1,475
32
47,200
Slurry Seal
$16,415
2030
Seaview Ave
Poinsettia Ave
Poppy Ave
270
28
7,560
Mill and Overlay
$36,680
2030
Seaward Rd
De Anza Dr
Serra Dr
914
35
31,990
Slurry Seal
$11,126
2030
Seaward Rd
Coast Highway East
Evening Canyon Rd
235
37
9,195
Slurry Seal
$3,198
2030
Seaward Rd
Isabella Ter
De Anza Dr
1,544
35
54,040
Mill and Overlay
$245,276
2030
Second Ave
Jasmine Ave
Marguerite Ave
536
27
14,472
Slurry Seal
$5,033
2030
Second Ave
Narcissus Ave
Orchid Ave
269
27
7,263
Slurry Seal
$2,526
2030
Second Ave
Avocado Ave
Carnation Ave
898
28
25,144
Mill and Overlay
$9,182
2030
Serra Dr
Seaward Rd
De Anza Dr
1,305
35
45,675
Slurry Seal
$15,885
2030
Setting Sun Dr
Pebble Dr
Sandpiper Dr
972
33
32,576
Slurry Seal
$11,329
2030
Shell St
Way Ln
End
145
32
3,770
Slurry Seal
$1,311
2030
Spruce Ave
Bristol St South
Azure Ave
11824
35
60
63,840
36,000
Slurry Seal
Slurry Seal
$22,203
$12,520
2030
2030
Spruce St
Bristol St North
Quail St
600
Appendix A - Local Streets
27 of 29
5-57
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V1lv1V
PAVEMENT
ENGINEERING
LOCAL
Street Name
Starboard Way
From Limits of WorkTo
Windover Dr Wavecrest Dr
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
357 32 _ 11,424 _ Slurry Seal $3,973 2030
658 32 22,556 Slurry Seal $7,845 2030
720 32 24,040 Slurry Seal $8,361 2030
Surfline Way
Windover Dr
Wavecrest Dr
Surfview Ln
Tiller Wy
Seabreeze Lane
Surrey Dr
Rockford Rd
Cameo Highland Dr
1,103
33
36,399
Slurry Seal
$12,659
2030
Surrey Dr
Cameo Highland Dr
Garret Dr
640
33
21,120
Slurry Seal
$7,345
2030
Terrace Ridge
Newport Ridge Dr West
End
550
38
23,000
Slurry Seal
$7,999
2030
Third Ave
Heliotrope Ave
Iris Ave
263
27
7,101
Slurry Seal
$2,470
2030
Third Ave
Larkspur Ave
Marguerite Ave
276
27
7,452
Slurry Seal
$2,592
2030
Third Ave
Poinsettia Ave
Poppy Ave
270
28
7,560
Slurry Seal
$2,629
2030
Tiller Way
Sandcastle Dr
Sausalito Dr
1,475
36
53,100
Slurry Seal
$18,467
2030
Topside Ln
Sandcastle Dr
Inlet Isle Dr
626
32
20,782
Slurry Seal
$7,228
2030
Tustin Ave
Santiago Dr
23rd St
1,305
34
44,370
Mill and Overlay
$166,664
2030
Upper Bay Dr
Mesa Dr
Orchid Hill PI
527
36
18,972
Slurry Seal
$6,598
2030
Via Oporto
Via Lido
Central Ave
600
29
17,400
Slurry Seal
$6,051
2030
Vista Del Sol
Vista Del Oro
Eastbluff Dr
470
60
28,200
Slurry Seal
$9,808
2030
Vista Ridge Rd
Newport Coast Dr
Altezza Dr
1,493
37
55,241
Slurry Seal
$19,212
2030
Vista Ridge Rd
Altezza Dr
Ocean Heights Dr
1,857
37
68,709
Slurry Seal
$23,896
2030
Vista Ridge Rd
Ocean Heights Dr
Coastal Canyon Dr
2,067
37
76,479
Slurry Seal
$26,598
2030
Vista Ridge Rd
Coastal Canyon Dr
Ocean Heights Dr
1,695
37
62,715
Slurry Seal
$21,811
2030
Vista Ridge Rd
Ocean Heights Dr
Ridge Park Rd
619
37
22,903
Slurry Seal
$7,965
2030
Vivian Ln
Beryl Ln
Diana Ln
794
34
28,196
Slurry Seal
$9,806
2030
Wavecrest Dr
Surfline Wy
Sand Point Wy
1,060
36
41,660
Slurry Seal
$14,489
2030
Way Ln
Dahlia Ave
Fernleaf Ave
314
15
4,710
Slurry Seal
$1,638
2030
Way Ln
Fernleaf Ave
Shell St
419
15
6,285
Slurry Seal
$2,186
2030
Wayne Rd
Rockford Rd
Cameo Highlands Dr
695
33
22,935
Slurry Seal
$7,976
2030
Westcliff Dr
Dover Dr
Santiago Dr
1,531
32
48,992
Slurry Seal
$17,039
2030
Westerly PI
Dove St
Quail St
1,406
44
61,864
Slurry Seal
$21,515
2030
White Cliffs Dr
Polaris Dr
North Star Ln
224
38
8,400
Slurry Seal
$2,921
2030
White Sails Way
Crown Dr
Harbor View Dr
1,045
33
34,485
Slurry Seal
$11,993
2030
Windover Dr
Surfline Way
Sand Point Way
1,023
36
38,328
Slurry Seal
$13,330
2030
Yawl Rd
Beacon Bay
End
250
24
6,000
Slurry Seal
$2,087
2030
Zenith Ave
Bayview Ave
Spruce Ave
283
35
9,905
Slurry Seal
$3,445
2030
15th St
Old Newport Ave
Bolsa Ave
690
18
12,420
Slurry Seal
$4,449
2031
Aleppo St
Aralia St
Alta Vista Dr
675
37
24,975
Slurry Seal
$8,947
2031
Amigos Way
Domingo Dr
Domingo Dr
1,055
36
37,980
Slurry Seal
$13,605
2031
Bolsa Ave
Broad St
Clay St
203
38
7,714
Slurry Seal
$2,763
2031
Cambria Dr
El Capitan Dr
Drakes Bay Dr
2,510
32
80,320
Slurry Seal
$28,772
2031
Chubasco Dr
Evita Dr
Zahma Dr
690
37
25,530
Slurry Seal
$9,145
2031
Cove St
Fernleaf Ave
End
165
24
3,960
Slurry Seal
$1,419
2031
Cove St
Way Ln
End
110
24
2,200
Mill and Overlay
$5,083
2031
De Sola Ter
Seaward Rd
End
1,005
24
28,015
Slurry Seal
$10,035
2031
Drakes Bay Dr
Point Conception Way
Montecito Dr
471
32
15,822
Mill and Overlay
$42,510
2031
Driftwood Rd
Shorecliff Rd
Morning Canyon Rd
1,100
27
29,700
Mill and Overlay
$160,008
2031
Fifth Avenue
Jasmine Ave
Marguerite Ave
630
28
18,390
Slurry Seal
$6,588
2031
Fourth Ave
Orchid Ave
Poinsettia Ave
270
27
7,290
Slurry Seal
$2,611
2031
Appendix A - Local Streets
28 of 29
5-58
Appendix A
Seven -Year Road Maintenance and Rehabilitation Plan Based on Expected Funding Level
AOMuI
V 1V1 V
PAVEMENT
ENGINEERING
LOCAL
Street Name
Fourth Ave
Limits of WorkTo
Length of Segment Width of Segment Pavement Area Type of Treatment Cost of Treatment Year of Treatment
266 27 _ 7,182 Mill and Overlay $38,708 2031
1,635 32 53,820 Slurry Seal $19,279 2031
325 24 8,800 Slurry Seal $3,152 2031
From
Jasmine Ave
Larkspur Ave
Goleta Point Dr
Drakes Bay Dr
Morro Bay Dr
Isabella Ter
Seaward Rd
End
Mendoza Ter
Seaward Rd
End
715
23
17,445
Mill and Overlay
$25,310
2031
Montecito Dr
Cambria Dr
Dana Point Way
1,052
32
33,664
Slurry Seal
$12,059
2031
Newport Coast Dr SB
73 Freeway Bridge
Sage Hill
2,235
44
98,340
Slurry Seal
$35,227
2031
Newport Hills Dr E
Port Seaborne Way
Port Sutton Dr
1,809
36
65,124
Mill and Overlay
$353,129
2031
Newport Hills Dr W
Port Carlow PI
Port Seabourne Wy
1,295
38
49,210
Slurry Seal
$17,628
2031
Newport Hills Dr W
Newport Hills Dr East
Port Carlow PI
1,550
36
55,800
Mill and Overlay
$302,270
2031
Newport Place Dr
MacArthur Blvd
Dove St
565
62
36,530
Slurry Seal
$13,086
2031
Newport Ridge Dr West
St Michael
Whitesands
1,420
40
56,800
Mill and Overlay
$305,978
2031
Orchid St
Zenith Ave
Orchard Dr
957
35
33,495
Mill and Overlay
$180,957
2031
Pacific View Dr
San Miguel Dr
End
2,675
36
97,800
Slurry Seal
$35,034
2031
Poinsettia Ave
Seaview Ave
Coast Highway East
638
28
17,864
Mill and Overlay
$96,501
2031
Point Mendocino Way
Spyglass Hill Rd
Bode a Bay Dr
170
36
6,120
Slurry Seal
$2,192
2031
Port Ashley PI
Port Stirling PI (West End)
Newport Hills Drive West
350
32
11,200
Slurry Seal
$4,012
2031
Port Cardiff PI
Newport Hills Drive East
Port Bristol Cir (East End)
525
32
16,800
Mill and Overlay
$46,040
2031
Port Charles PI
Port Margate PI (West End)
Newport Hills Drive West
665
32
21,280
Slurry Seal
$7,623
2031
Port Chelsea PI
Newport Hills Drive East
Port Ramsgate PI (East End)
549
32
17,568
Slurry Seal
$6,293
2031
Port Hemley Cir
Newport Hills Dr West
End
110
54
5,940
Reconstruction
$33,582
2031
Port Laurent PI
Newport Hills Dr East
Port Trinity PI
878
33
28,535
Slurry Seal
$10,222
2031
Port Manlei h Cir
Newport Hills Dr West
Newport Hills Dr West
750
32
24,000
Slurry Seal
$8,597
2031
Port Seabourne Way
Newport Hills Dr West
Newport Hills Dr East
1,600
40
63,760
Slurry Seal
$22,840
2031
Port Weybrid a PI
Port Provence PI (West End)
Newport Hills Drive East
830
32
26,560
Mill and Overlay
$58,515
2031
Riverside Ave
Coast Highway West
Avon St (West Side)
475
52
24,700
Slurry Seal
$8,848
2031
San Joaquin Hills Rd
Backbay Dr
800' E of Backbay Dr
786
31
29,386
Slurry Seal
$10,527
2031
Santiago Dr
Irvine Ave
Galaxy Dr
874
36
31,464
Slurry Seal
$11,271
2031
Santiago Dr
Mariners Dr
Nottingham Rd
2,360
36
84,960
Slurry Seal
$30,434
2031
Santiago Dr
Pescador Dr
Polaris Dr
394
37
15,178
Mill and Overlay
$81,918
2031
Sea Ln
Crown Dr
Harbor View Dr
1,078
38
40,964
Slurry Seal
$14,674
2031
Seaview Ave
Orchid Ave
Poinsettia Ave
270
28
7,425
Mill and Overlay
$9,177
2031
Second Ave
Marguerite Ave
Narcissus Ave
574
27
15,498
Slurry Seal
$5,552
2031
Second Ave
Orchid Ave
Poinsettia Ave
268
27
7,236
Slurry Seal
$2,592
2031
Second Ave
Poinsettia Ave
Poppy Ave
270
27
7,290
Slurry Seal
$2,611
2031
Serenade Ter
Dolphin Ter
Ramona Dr
1,000
33
33,000
Mill and Overlay
$46,105
2031
Third Ave
Jasmine Ave
Larkspur Ave
270
27
7,290
Slurry Seal
$2,611
2031
Vista Del Oro
Vista Nobleza
Vista Umbrosa
1,880
35
65,800
Slurry Seal
$23,571
2031
Appendix A - Local Streets
29 of 29
5-59
om &GO
Local Tax Dollars at Work
Pavement Management Plan Agency Submittal
XII. Appendix B — Complete Listing of Current Street Conditions
A complete listing of current pavement conditions should be included in this report. Specific data to be submitted
should follow the format below:
MPAH
Most Recent
Street Name
From
To
Width of Segment
Area
Current PCI
Inspection Date
LOCAL
Street Name
From
To
Width of Segment
Area
Current PCI
Most Recent
Inspection Date
Please attach the complete street listing, following the above template, after this sheet. The pages should be
labeled Appendix B.
Page 113
5-60
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
M PAH
Street Name
To
Width of Segment
38
Area (SF) Current PCI Most Recent Inspection Date
17,100 89 2/7/2025
89,380 53 11/25/2024
24,564 94 11/25/2024
From
16th St
Sea Gull Ln
Dover Dr
16th St
City Limit
Sea Gull Ln
60
32nd St
Lafayette Ave
Villa Way
48
32nd St
Villa Way
Newport Blvd
62
29,150
79
11/25/2024
32nd St EB
Balboa Blvd
Marcus Ave
32
15,840
100
12/31/2024
32nd St EB
Marcus Ave
Newport Blvd
32
6,240
51
10/30/2024
32nd St WB
Marcus Ave
Balboa Blvd
32
15,840
100
12/31/2024
32nd St WB
Newport Blvd
Marcus Ave
32
6,240
59
11/25/2024
Adams St
Ocean Front Alley East
Ocean Front East
15
1,395
87
11/27/2024
Avocado Ave
Coast Highway East
Farralon Dr
64
120,360
92
10/31/2024
Avocado Ave
Farralon Dr
San Miguel Dr
66
57,552
84
10/31/2024
Balboa Blvd E EB
Medina Way
Adams St
28
26,696
94
10/24/2024
Balboa Blvd E EB
Adams St
Main St
22
17,006
94
10/24/2024
Balboa Blvd E EB
Island Ave
Medina Way
44
21,910
92
10/24/2024
Balboa Blvd E WB
Main St
Washington St
22
5,610
94
10/24/2024
Balboa Blvd E WB
Washington St
Palm St
30
7,920
94
10/24/2024
Balboa Blvd E WB
Palm St
Adams St
22
5,500
94
10/24/2024
Balboa Blvd E WB
Adams St
Coronado Ave
28
17,640
94
10/24/2024
Balboa Blvd E WB
Coronado St
Medina Way
28
9,240
94
10/24/2024
Balboa Blvd E WB
Medina Way
Island Ave
40
20,800
85
10/24/2024
Balboa Blvd NB
23rd St
25th St
35
11,600
100
12/31/2024
Balboa Blvd NB
25th St
27th St
35
12,600
100
12/31/2024
Balboa Blvd NB
27th St
29th St
35
17,850
100
12/31/2024
Balboa Blvd NB
29th St
32nd St
35
25,875
100
12/31/2024
Balboa Blvd NB
32nd St
34th St
34
16,592
100
12/31/2024
Balboa Blvd NB
34th St
36th St
34
15,640
100
12/31/2024
Balboa Blvd NB
36th St
110' N of 39th St
34
28,200
100
12/31/2024
Balboa Blvd NB
110' N of 39th St
42nd St
40
22,100
100
12/31/2024
Balboa Blvd NB
42nd St
44th St
40
16,800
100
12/31/2024
Balboa Blvd NB
44th St
Coast Highway
35
28,700
100
12/31/2024
Balboa Blvd SB
Coast Highway
46th St
35
14,595
100
12/31/2024
Balboa Blvd SB
46th St
44th St
35
16,205
100
12/31/2024
Balboa Blvd SB
44th St
41st St
24
15,870
100
12/31/2024
Balboa Blvd SB
41st St
38th St
24
17,330
100
12/31/2024
Balboa Blvd SB
38th St
36th St
24
11,040
100
12/31/2024
Balboa Blvd SB
36th St
34th St
24
11,982
100
12/31/2024
Balboa Blvd SB
34th St
32nd St
24
12,712
100
12/31/2024
Balboa Blvd SB
32nd St
29th St
35
24,675
100
12/31/2024
Balboa Blvd SB
29th St
27th St
35
17,850
100
12/31/2024
Balboa Blvd SB
27th St
25th St
35
12,600
100
12/31/2024
Balboa Blvd SB
25th St
23rd St
35
14,000
100
12/31/2024
Appendix B - MPAH
1of8
5-61
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
M PAH
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
Balboa Blvd W EB 23rd St 22nd St 29 8,700 100 12/31/2024
Balboa Blvd W EB 22nd St McFadden PI 48 21,360 100 12/31/2024
Balboa Blvd W EB McFadden PI 16th St 39 73,320 100 12/31/2024
Balboa Blvd W EB
16th St
14th St
24
22,824
100
12/31/2024
Balboa Blvd W EB
14th St
12th St
24
21,120
100
12/31/2024
Balboa Blvd W EB
12th St
8th St
50
89,000
93
10/24/2024
Balboa Blvd W EB
6th St
Island Ave
42
18,400
90
10/24/2024
Balboa Blvd W EB
16th St
14th St
18
17,100
90
11/27/2024
Balboa Blvd W EB
14th St
12th St
18
15,840
90
11/27/2024
Balboa Blvd W EB
8th St
6th St
42
36,506
85
10/24/2024
Balboa Blvd W WB
12th St
14th St
24
21,120
100
12/31/2024
Balboa Blvd W WB
14th St
16th St
24
22,824
100
12/31/2024
Balboa Blvd W WB
16th St
21st St
38
69,940
100
12/31/2024
Balboa Blvd W WB
21st St
23rd St
42
21,000
100
12/31/2024
Balboa Blvd W WB
12th St
14th St
18
15,840
89
11/27/2024
Balboa Blvd W WB
14th St
16th St
18
17,100
88
11/27/2024
Balboa Blvd W WB
8th St
12th St
40
70,600
88
10/24/2024
Balboa Blvd W WB
Island Ave
6th St
40
15,100
85
10/24/2024
Balboa Blvd W WB
6th St
8th St
40
34,800
85
10/24/2024
Ba side Dr
Jamboree Rd
Coast Highway East
60
247,800
92
11/1/2024
Birch St
Bristol St South
Orchard St
64
90,130
75
11/5/2024
Birch St
Dove St
Quail St
61
81,130
75
11/5/2024
Birch St
Quail St
Bristol St North
61
67,885
70
11/5/2024
Birch St
Orchard St
Mesa Dr
64
79,744
69
11/5/2024
Birch St
MacArthur Blvd
Dove St
61
91,195
67
11/5/2024
Birch St
Jamboree Rd
Von Karman Ave
60
114,000
64
11/5/2024
Birch St
Von Karman Ave
MacArthur Blvd
56
74,960
53
11/5/2024
Bison Ave EB
Jamboree Rd
MacArthur Blvd
34
93,040
94
11/5/2024
Bison Ave EB
MacArthur Blvd
City limit
42
46,940
92
11/5/2024
Bison Ave WB
City Limit
MacArthur Blvd
42
48,340
94
11/5/2024
Bison Ave WB
MacArthur Blvd
Jamboree Rd
41
104,210
94
11/5/2024
Bonita Canyon Dr EB
MacArthur Blvd
Bride
41
32,431
94
11/6/2024
Bonita Canyon Dr EB
Bride
Mesa View Dr
30
35,000
94
11/6/2024
Bonita Canyon Dr EB
Mesa View Dr
Prarie Rd
30
49,950
94
11/6/2024
Bonita Canyon Dr EB
Prarie Rd
Bride
42
34,440
94
11/6/2024
Bonita Canyon Dr EB
Bride
Chambord
42
19,140
94
11/6/2024
Bonita Canyon Dr EB
Chambord
SR-73
42
44,310
94
11/6/2024
Bonita Canyon Dr WB
SR-73
Chambord
44
33
46,420
13,200
94
94
11/6/2024
11/6/2024
Bonita Canyon Dr WB
Chambord
Bride
Mesa View Dr
Bride
Bonita Canyon Dr WB
Prarie Rd
30
52,950
94
1 11/6/2024
Bonita Canyon Dr WB
Mesa View Dr
30
30,000---+
94
1 11/6/2024
Appendix B - MPAH
2of8
5-62
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
M PAH
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
Bonita Canyon Dr WB Bride MacArthur Blvd 38 39,758 94 11/6/2024
Bonita Canyon Dr WB Bride Prarie Rd 33 32,555 91 11/6/2024
Bristol St North Dove St Spruce St 46 58,006 63 11/6/2024
Bristol St North
Jamboree Rd
Dove St
46
26,036
60
11/6/2024
Bristol St North
Birch St
Campus Dr
51
36,967
59
11/6/2024
Bristol St North
Spruce St
Birch St
46
72,856
47
11/6/2024
Bristol St South
Birch St
Cypress St
50
31,550
94
11/6/2024
Bristol St South
Cypress St
Spruce Ave
34
31,350
94
11/6/2024
Bristol St South
Spruce Ave
Ba view PI
50
42,750
94
11/6/2024
Bristol St South
Ba view PI
Jamboree Rd
50
52,000
94
11/6/2024
Bristol St South
Irvine Ave
Birch St
58
33,900
92
11/6/2024
Campus Dr EB
MacArthur Ct
Von Karman Ave
36
37,044
92
11/7/2024
Campus Dr EB
Quail St
Dove St
42
58,150
92
11/7/2024
Campus Dr EB
Dove St
Airport
42
81,300
91
11/7/2024
Campus Dr EB
Airport
MacArthur Blvd
62
26,040
91
11/7/2024
Campus Dr EB
Bristol St North
Quail St
41
40,450
91
11/7/2024
Campus Dr EB
Teller Ave
Jamboree Rd
33
26,600
83
11/7/2024
Campus Dr EB
MacArthur Blvd
MacArthur Ct
40
20,400
76
11/7/2024
Campus Dr EB
Von Karman Ave
Teller Ave
36
47,340
54
11/7/2024
Coast Highway E NB
Newport Coast Dr
Cameo Highlands Dr
50
176,750
94
10/28/2024
Coast Highway E NB
Cameo Highlands Dr
Morning Canyon Rd
28
38,900
94
10/28/2024
Coast Highway E NB
Morning Canyon Rd
Poppy Ave
28
48,220
94
10/28/2024
Coast Highway E NB
Poppy Ave
Marguerite Ave
28
46,940
94
10/28/2024
Coast Highway E NB
Marguerite Ave
Goldenrod Ave
28
54,370
94
10/28/2024
Coast Highway E NB
Goldenrod Ave
MacArthur Blvd
28
35,057
94
10/28/2024
Coast Highway E NB
MacArthur Blvd
Avocado Ave
50
39,500
94
10/28/2024
Coast Highway E NB
Avocado Ave
Newport Center Dr
50
54,500
94
10/28/2024
Coast Highway E NB
Newport Center Dr
Irvine Ter
50
56,250
94
10/28/2024
Coast Highway E NB
Irvine Ter
Jamboree Rd
46
154,350
94
10/28/2024
Coast Highway E SB
Jamboree Rd
Irvine Ter
46
139,150
94
10/28/2024
Coast Highway E SB
Irvine Ter
Newport Center Dr
46
55,600
94
10/28/2024
Coast Highway E SB
Newport Center Dr
Avocado Ave
44
55,830
94
10/28/2024
Coast Highway E SB
Avocado Ave
MacArthur Blvd
50
41,250
94
10/28/2024
Coast Highway E SB
MacArthur Blvd
Goldenrod Ave
28
35,442
94
10/28/2024
Coast Highway E SB
Goldenrod Ave
Marguerite Ave
28
58,170
94
10/28/2024
Coast Highway E SB
Marguerite Ave
Poppy Ave
28
47,190
94
10/28/2024
Coast Highway E SB
Poppy Ave
Morning Canyon Rd
28
49,220
94
10/28/2024
Coast Highway E SB
Morning Canyon Rd
Cameo Highlands Dr
30
41,750
94
10/28/2024
Coast Highway E SB
Cameo Highlands Dr
Newport Coast Dr
50
176,850
94
10/28/2024
Dover Dr NB
Mariners Dr
Irvine Ave
37
34,854
94
11/8/2024
Dover Dr NB
Cliff Dr
Castaways Ln
30
39,080
92
11/8/2024
Appendix B - MPAH
3of8
5-63
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
M PAH
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
Dover Dr NB Castaways Ln Westcliff Dr 30 44,100 92 11/8/2024
Dover Dr NB Westcliff Dr Mariners Dr 37 96,795 92 11/8/2024
Dover Dr NB Coast Highway Cliff Dr 39 40,823 89 11/8/2024
Dover Dr SB
Westcliff Dr
16th St
33
44,070
94
11/8/2024
Dover Dr SB
16th St
Cliff Dr
30
37,500
94
11/8/2024
Dover Dr SB
Cliff Dr
Coast Highway
41
52,549
94
11/8/2024
Eastbluff Dr NB
Jamboree Rd
Vista Del Sol
30
119,250
70
11/15/2024
Eastbluff Dr NB
Vista Del Sol
Jamboree Rd/University Dr
30
120,000
53
11/15/2024
Eastbluff Dr SB
Jamboree Rd/University Dr
Vista Del Sol
30
120,000
51
11/15/2024
Eastbluff Dr SB
Vista Del Sol
Jamboree Rd
30
119,250
42
11/15/2024
Ford Rd EB
Jamboree Rd
MacArthur Blvd
34
129,320
94
11/15/2024
Ford Rd EB
San Miguel Dr
Hillside Dr
36
14,760
80
11/15/2024
Ford Rd EB
Newport Hills Dr
San Miguel Dr
29
79,047
73
11/15/2024
Ford Rd WB
MacArthur Blvd
Jamboree Rd
34
127,840
94
11/15/2024
Ford Rd WB
Hillside Dr
San Miguel Dr
32
12,960
85
11/15/2024
Ford Rd WB
San Miguel Dr
Newport Hills Dr
30
72,600
70
11/15/2024
Hospital Rd
Placentia Ave
Newport Blvd
57
39,900
65
11/13/2024
Irvine Ave
Linda Ln
Ba crest Rd
34
36,890
94
9/26/2024
Irvine Ave
16th St
Mariners Dr
34
88,400
93
9/26/2024
Irvine Ave
Mariners Dr
Dover Dr
32
38,816
93
9/26/2024
Irvine Ave
Santiago Dr
23rd St
77
103,606
93
9/26/2024
Irvine Ave
Francisco Dr
Ba crest Rd
38
46,474
93
9/26/2024
Irvine Ave
23rd St
Santa Isabel Ave
76
114,000
93
9/26/2024
Irvine Ave
Ba crest Rd
Francisco Dr
38
46,626
93
9/26/2024
Irvine Ave
Francisco Dr
Santiago Dr
38
37,658
93
9/26/2024
Irvine Ave
Dover Dr
Linda Ln
34
21,930
93
9/26/2024
Irvine Ave
Santiago Dr
Francisco Dr
38
37,848
92
9/26/2024
Irvine Ave
300' S of Monte Vista Ave
Santa Isabel Ave
28
29,372
89
9/26/2024
Irvine Ave
Santa Isabel Ave
University Dr
28
96,800
86
9/26/2024
Irvine Ave
BRISTOL ST
MESA DR
42
131,880
82
9/27/2024
Irvine Ave
Mesa Dr
Bristol St South
42
129,900
82
9/27/2024
Jamboree Rd
Ba side Dr
Coast Highway East
60
48,000
94
11/15/2024
Jamboree Rd NB
Coast Highway East
Back Bay Dr
53
37,014
94
10/30/2024
Jamboree Rd NB
Back Bay Dr
Island Lagoon Dr/Hyatt Newporter
61
42,175
94
10/30/2024
Jamboree Rd NB
Island Lagoon Dr/Hyatt Newporter
Santa Barbara Dr
46
155,600
94
10/30/2024
Jamboree Rd NB
Santa Barbara Dr
San Joaquin Hills Rd
47
46,415
94
10/30/2024
Jamboree Rd NB
San Joaquin Hills Rd
Ford Rd
46
127,968
94
10/30/2024
Jamboree Rd NB
Bison Ave
University Dr/Eastbluff Dr
46
144,680
93
10/30/2024
Jamboree Rd NB
Ford Rd
Bison Ave
46
152,424
88
10/30/2024
Jamboree Rd NB
University Dr/Eastbluff Dr
Ba view Way
57
83,439
84
10/30/2024
Jamboree Rd NB
Ba view Way
Bristol St South
57
58,935
75
10/30/2024
Appendix B - MPAH
4of8
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
M PAH
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
Jamboree Rd NB Bristol St North MacArthur Blvd 46 39,380 71 10/30/2024
Jamboree Rd SB Bison Ave Ford Rd/Eastbluff Dr 46 154,430 94 10/30/2024
Jamboree Rd SB Ford Rd/Eastbluff Dr San Joaquin Hills Rd 46 128,450 94 10/30/2024
Jamboree Rd SB
San Joaquin Hills Rd
Santa Barbara Dr
46
51,920
94
10/30/2024
Jamboree Rd SB
Santa Barbara Dr
Island Lagoon Dr/Hyatt Newporter
46
146,710
94
10/30/2024
Jamboree Rd SB
Island Lagoon Dr/Hyatt Newporter
Back Bay Dr
46
31,460
94
10/30/2024
Jamboree Rd SB
Back Bay Dr
Coast Highway East
45
53,350
94
10/30/2024
Jamboree Rd SB
University Dr/Eastbluff Dr
Bison Ave
46
151,880
88
10/30/2024
Jamboree Rd SB
MacArthur Blvd
Bristol St North
46
38,824
79
10/30/2024
Jamboree Rd SB
Fairchild Rd
Koll Center
58
42,542
78
10/30/2024
Jamboree Rd SB
Ba view Way
University Dr/Eastbluff Dr
46
87,498
70
10/30/2024
Jamboree Rd SB
Birch St
Fairchild Rd
48
106,560
69
10/30/2024
Jamboree Rd SB
Bristol St South
Ba view Way
53
51,214
69
10/30/2024
Jamboree Rd SB
Koll Center
MacArthur Blvd
58
35,450
64
10/30/2024
Jamboree Rd SB
Campus Dr
Birch St
49
43,740
60
10/30/2024
MacArthur Blvd NB
Coast Highway East
San Miguel Dr
34
105,712
94
9/27/2024
MacArthur Blvd NB
San Miguel Dr
San Joaquin Hills Rd
46
74,798
94
9/27/2024
MacArthur Blvd NB
San Joa in Hills Rd
3400' N of San Joa in Hills Rd
44
151,350
94
9/27/2024
MacArthur Blvd NB
3400' N of San Joa in Hills Rd
Bonita Canyon Dr/Ford Rd
44
140,900
94
9/27/2024
MacArthur Blvd NB
Villaggio
Bison Ave
55
84,560
94
9/27/2024
MacArthur Blvd NB
Bison Ave
City Limit
46
54,470
94
9/27/2024
MacArthur Blvd NB
Bonita Canyon Dr/Ford Rd
Villaggio
59
97,144
93
9/27/2024
MacArthur Blvd NB
Jamboree Rd
Von Karman Ave
39
99,757
71
9/27/2024
MacArthur Blvd NB
Birch St
Campus Dr
60
55,080
69
9/27/2024
MacArthur Blvd NB
Von Karman Ave
Birch St
60
146,940
61
9/27/2024
MacArthur Blvd SB
Bonita Canyon Dr
2600' S Bonita Canyon Dr
46
125,600
94
9/27/2024
MacArthur Blvd SB
2600' S Bonita Canyon Dr
San Joa in Hills Rd
46
171,400
94
9/27/2024
MacArthur Blvd SB
San Joaquin Hills Rd
San Miguel Dr
44
74,952
94
9/27/2024
MacArthur Blvd SB
San Miguel Dr
Coast Highway East
34
125,006
94
9/27/2024
MacArthur Blvd SB
Villaggio
Bonita Canyon Dr
55
101,380
93
9/27/2024
MacArthur Blvd SB
City Limit
Bison Ave
60
75,450
93
9/27/2024
MacArthur Blvd SB
Bison Ave
Vilaggio
55
74,060
92
9/27/2024
MacArthur Blvd SB
Birch St
Newport Place Dr
60
147,240
65
9/27/2024
MacArthur Blvd SB
Campus Dr
Birch St
61
81,960
65
9/27/2024
MacArthur Blvd SB
Newport Place Dr
Jamboree Rd
61
104,984
58
9/27/2024
Marguerite Ave
Harbor View Dr
Fifth Ave
55
84,810
94
11/15/2024
Marguerite Ave
Fifth Ave
Coast Hwy East
36
64,920
94
11/15/2024
Marguerite Ave
Harbor View Dr
Sausalito Dr
60
62,820
94
11/15/2024
Marguerite Ave
Sausalito Dr
San Joaquin Hills Rd
60
66
66
110,700
13,200
90,090
94
83
81
11/15/2024
11/15/2024
11/15/2024
Mesa Dr
Acacia St
Mesa Dr/ Birch St
Mesa Dr
Irvine Ave
Acacia St
Appendix B - MPAH
5of8
5-65
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
M PAH
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
Newport Blvd NB 21st St/Balboa Blvd West 23rd St 36 20,844 100 12/31/2024
Newport Blvd NB 23rd St 26th St 32 17,120 100 12/31/2024
Newport Blvd NB FinleyAve Via Lido 42 21,084 93 11/13/2024
Newport Blvd NB
30th St
32nd St
35
17,780
91
11/13/2024
Newport Blvd NB
32nd St
FinleyAve
52
20,880
89
11/13/2024
Newport Blvd NB
26th St
28th St
38
15,770
79
12/4/2024
Newport Blvd NB
28th St
30th St
38
25,460
70
12/4/2024
Newport Blvd NB
Via Lido
Newport Channel Bride
42
25,956
67
11/13/2024
Newport Blvd SB
30th St
28th St
41
26,568
100
12/31/2024
Newport Blvd SB
28th St
26th St
41
16,810
100
12/31/2024
Newport Blvd SB
26th St
23rd St
32
17,280
100
12/31/2024
Newport Blvd SB
23rd St
21st St/Balboa Blvd West
32
20,192
100
12/31/2024
Newport Blvd SB
FinleyAve
32nd St
42
21,820
89
11/13/2024
Newport Blvd SB
32nd St
30th St
35
17,640
89
11/13/2024
Newport Blvd SB
Via Lido
FinleyAve
42
21,546
87
11/13/2024
Newport Blvd SB
Newport Channel Bride
Via Lido
42
22,932
55
11/13/2024
Newport Center Dr E NB
Anaca a Dr
San Miguel Dr
36
31,630
81
9/11/2024
Newport Center Dr E NB
San Miguel Dr
Santa Rosa Dr
36
44,664
80
9/11/2024
Newport Center Dr E NB
Santa Rosa Dr
Santa Cruz Dr
36
57,296
74
9/11/2024
Newport Center Dr E NB
Newport Center Dr
Anaca a Dr
36
28,644
65
9/11/2024
Newport Center Dr E SB
Santa Cruz Dr
Santa Rosa Dr
36
53,008
80
9/11/2024
Newport Center Dr E SB
Santa Rosa Dr
San Miguel Dr
36
43,360
79
9/11/2024
Newport Center Dr E SB
San Miguel Dr
Anaca a Dr
36
31,380
71
9/11/2024
Newport Center Dr E SB
Anaca a Dr
Newport Center Dr
36
29,144
55
9/11/2024
Newport Center Dr NB
Farallon Dr/Granville Dr
Newport Center Dr West
36
32,748
64
9/11/2024
Newport Center Dr NB
Coast Highway East
Farallon Dr/Granville Dr
36
46,304
57
9/11/2024
Newport Center Dr SB
Farallon Dr/Granville Dr
Coast Highway East
36
40,816
66
9/11/2024
Newport Center Dr SB
Newport Center Dr West
Farallon Dr/Granville Dr
36
37,020
55
9/11/2024
Newport Center Dr W NB
Santa Barbara Dr
Santa Cruz Dr
36
41,632
63
9/11/2024
Newport Center Dr W NB
Newport Center Dr
Santa Barbara Dr
36
53,548
58
9/11/2024
Newport Center Dr W SB
Santa Barbara Dr
Newport Center Dr
36
55,924
65
9/11/2024
Newport Center Dr W SB
Santa Cruz Dr
Santa Barbara Dr
36
40,018
53
9/11/2024
Newport Coast Dr NB
Coast Highway East
Pelican Hill Rd South
41
80,809
94
10/30/2024
Newport Coast Dr NB
Pelican Hill Rd South
Provence
41
66,321
94
10/30/2024
Newport Coast Dr NB
Provence
Pelican Hill Rd N/Ocean Ridge Dr
41
200,473
94
10/30/2024
Newport Coast Dr NB
Pelican Hill Rd N/Ocean Ridge Dr
Vista Ridge Rd/Pacific Pine Dr
41
140,908
94
10/30/2024
Newport Coast Dr NB
Vista Ridge Rd/Pacific Pine Dr
Ridge Park Rd
41
46,932
94
10/30/2024
Newport Coast Dr NB
Ridge Park Rd
San Joa uins Hills Rd
41
59,965
81
10/30/2024
Newport Coast Dr NB
San Joaquin Hills Rd
Sage Hill
41
124,804
76
10/30/2024
Newport Coast Dr NB
Sage Hill
73 Freeway Bride
42
93,870
75
10/30/2024
Newport Coast Dr SB
Ridge Park Rd
Vista Ridge Rd/Pacific Pine Dr
41
47,182
94
10/30/2024
Appendix B - MPAH
6of8
9 • •
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
M PAH
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
Newport Coast Dr SB Vista Ridge Rd/Pacific Pine Dr Pelican Hill Rd N/Ocean Ridge Dr 41 143,408 94 10/30/2024
Newport Coast Dr SB Pelican Hill Rd N/Ocean Ridge Dr Provence 41 200,973 94 10/30/2024
Newport Coast Dr SB Provence Pelican Hill Rd South 41 70,821 94 10/30/2024
Newport Coast Dr SB
Pelican Hill Rd South
Coast Highway East
41
83,809
94
10/30/2024
Newport Coast Dr SB
San Joaquin Hills Rd
Ridge Park Road
41
45,715
77
10/30/2024
Newport Coast Dr SB
Sage Hill
San Joaquin Hills Rd
41
129,054
69
10/30/2024
Placentia Ave
Superior Ave
City Limits
62
79,050
78
11/14/2024
Placentia Ave
Hospital Rd
Superior Ave
40
32,400
77
11/14/2024
San Joaquin Hills Rd EB
Santa Rosa Dr
MacArthur Blvd
40
68,200
94
10/10/2024
San Joaquin Hills Rd EB
Jamboree Rd
Santa Cruz Dr
40
61,900
93
10/10/2024
San Joaquin Hills Rd EB
Santa Cruz Dr
Santa Rosa Dr
40
88,650
93
10/10/2024
San Joaquin Hills Rd EB
Marguerite Ave
Spyglass Hill Rd
41
116,841
92
10/10/2024
San Joaquin Hills Rd EB
Newport Ridge Dr East
Newport Coast Dr
33
41,125
87
10/10/2024
San Joaquin Hills Rd EB
Spyglass Hill Rd
Newport Ridge Dr West
33
152,385
81
10/10/2024
San Joaquin Hills Rd EB
MacArthur Blvd
San Miguel Dr
40
44,320
80
10/10/2024
San Joaquin Hills Rd EB
Newport Ridge Dr West
Newport Ridge Dr East
33
77,670
72
10/10/2024
San Joaquin Hills Rd EB
Crown Dr
Marguerite Ave
41
65,993
61
10/10/2024
San Joaquin Hills Rd EB
San Miguel Dr
Crown Dr
41
39,212
56
10/10/2024
San Joaquin Hills Rd WB
MacArthur Blvd
Santa Rosa Dr
40
70,360
94
10/10/2024
San Joaquin Hills Rd WB
Santa Rosa Dr
Santa Cruz Dr
40
92,200
94
10/10/2024
San Joaquin Hills Rd WB
Santa Cruz Dr
Jamboree Rd
40
63,240
94
10/10/2024
San Joa uin Hills Rd WB
S lass Hill Rd
Marguerite Ave
41
115,619
85
10 10 2024
San Joaquin Hills Rd WB
San Miguel Dr
MacArthur Blvd
41
41,565
81
10/10/2024
San Joaquin Hills Rd WB
Newport Ridge Rd West
Spyglass Hill Rd
33
144,885
78
10/10/2024
San Joaquin Hills Rd WB
Newport Ridge Dr East
Newport Ridge Dr West
33
77,920
72
10/10/2024
San Joaquin Hills Rd WB
Marguerite Ave
Crown Dr
41
65,993
71
10/10/2024
San Joaquin Hills Rd WB
Crown Dr
San Miguel Dr
41
40,212
67
10/10/2024
San Joaquin Hills Rd WB
Newport Coast Dr
Newport Ridge Dr East
33
42,890
65
10/10/2024
San Miguel Dr
Avocado Ave
MacArthur Blvd
92
28,520
94
9/11/2024
San Miguel Dr
Newport Center Dr East
Avocado Ave
72
68,216
94
9/11/2024
San Miguel Dr NB
MacArthur Blvd
San Joaquin Hills Rd
31
45,335
87
9/11/2024
San Miguel Dr NB
Pacific View Dr
Harbor Woods PI
29
14,645
75
9/11/2024
San Miguel Dr NB
Port Sutton Dr
Yacht Coquette (North End)
29
32,190
73
9/11/2024
San Miguel Dr NB
Harbor Woods PI
Port Sutton Dr
29
53,319
72
9/11/2024
San Miguel Dr NB
Yacht Coquette (North End)
Spyglass Hill Rd/East ate Dr
29
45,326
47
9/11/2024
San Miguel Dr NB
San Joaquin Hills Rd
Pacific View Dr
29
19,665
47
9/11/2024
San Miguel Dr NB
Spyglass Hill Rd/East ate Dr
Ford Rd
29
70,294
36
9/11/2024
San Miguel Dr SB
San Joaquin Hills Rd
MacArthur Blvd
30
41,200
91
9/11/2024
San Miguel Dr SB
Harbor Woods PI
Pacific View Dr
29
15,645
82
9/11/2024
San Miguel Dr SB
Port Sutton Dr
Harbor Woods PI
29
51,069
80
9/11/2024
San Miguel Dr SB
Pacific View Dr
San Joaquin Hills Rd
29
22,915
67
9/11/2024
Appendix B - MPAH
7of8
5-67
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
M PAH
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
San Miguel Dr SB Yacht Coquette (North Side) Port Sutton Dr/Yacht Coquette (S) 29 33,940 44 9/11/2024
San Miguel Dr SB Spyglass Hill Rd/East ate Dr Yacht Coquette (North Side) 29 43,326 39 9/11/2024
San Miguel Dr SB Ford Rd Spyglass Hill Rd/East ate Dr 29 67,170 38 9/11/2024
Santa Cruz Dr
San Joaquin Hills Rd
Newport Center Dr West
72
82,656
46
11/15/2024
Santa Rosa Dr
Newport Center Dr East
San Joaquin Hills Rd
72
39,600
83
11/15/2024
Spyglass Hill Rd
El Ca itan Dr
San Joaquin Hills Rd
44
84,480
67
11/15/2024
Spyglass Hill Rd
San Miguel Dr
Harbor Ridge Dr
44
54,340
65
11/15/2024
Spyglass Hill Rd
Harbor Ridge Dr
Rid eline Dr
44
56,452
48
11/15/2024
Spyglass Hill Rd
Rid eline Dr
El Ca itan Dr
44
56,144
46
11/15/2024
Superior Av NB
Placentia Ave
City Limit
38
66,500
84
11/14/2024
Superior Av NB
Ticonder a St
Placentia Ave
38
56,734
54
11/14/2024
Superior Av NB
Coast Highway West
Ticonder a St
38
55,784
49
11/14/2024
Superior Av SB
City Limit
Placentia Av
38
63,080
80
11/14/2024
Superior Av SB
Ticonder a St
Coast Highway West
38
58,976
72
11/14/2024
Superior Av SB
Placentia Av
Ticonder a St
38
58,976
45
11/14/2024
University Dr EB
Jamboree Rd
La Vida/Baypointe Dr
32
21,730
94
11/15/2024
University Dr EB
La Vida/Baypointe Dr
Bonita Creek Bride
32
21,280
94
11/15/2024
University Dr EB
Bonita Creek Bride
City Limit
44
34,320
94
11/15/2024
University Dr WB
City Limit
Bonita Creek Bride
44
36,320
94
11/15/2024
University Dr WB
Bonita Creek Bride
La Vida/Baypointe Dr
42
29,600
94
11/15/2024
University Dr WB
La Vida/Baypointe Dr
Jamboree Rd
42
30,130
94
11/15/2024
Via Lido
Newport Blvd
Bridge (West End)
26
40,300
74
9/12/2024
Via Lido
Bridge (West End)
Newport Blvd
26
40,300
72
9/12/2024
Von Karman Ave
Birch St
MacArthur Blvd
76
163,580
59
11/15/2024
Von Karman Ave
Campus Dr
Birch St
76
56,952
58
11/15/2024
Westcliff Dr EB
Irvine Ave
Dover Dr
25
42,575
89
11/12/2024
Westcliff Dr WB
Dover Dr
Irvine Ave
25
42,375
89
11/12/2024
Appendix B - MPAH
8of8
9 .:
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
I
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
06th St Balboa Blvd West Ocean Front West 34 5,168 96 11/14/2024
06th St Bay Ave West Balboa Blvd West 34 4,896 95 10/30/2024
07th St
Balboa Blvd West
Ocean Front West
34
5,100
94
11/14/2024
07th St
Bay Ave West
Balboa Blvd West
30
5,010
69
2/7/2025
08th St
Balboa Blvd West
Ocean Front West
33
5,280
91
11/14/2024
08th St
Bay Ave West
Balboa Blvd West
33
5,280
76
2/7/2025
09th St
North End
Bay Ave West
30
3,300
92
11/22/2024
09th St
Balboa Blvd West
Ocean Front West
28
5,740
88
11/14/2024
09th St
Bay Ave West
Balboa Blvd West
27
4,995
70
11/25/2024
10th St
Bay Ave West
Balboa Blvd West
28
5,180
94
11/25/2024
10th St
Balboa Blvd West
Ocean Front West
27
6,129
93
11/14/2024
10th St
North End
Bay Ave West
26
936
93
2/7/2025
11th St
North End
Bay Ave West
30
900
94
11/22/2024
11th St
Balboa Blvd West
Ocean Front West
28
6,440
84
11/14/2024
11th St
Bay Ave West
Balboa Blvd West
28
5,208
83
2/7/2025
12th St
North End
Bay Ave West
29
870
88
11/22/2024
12th St
Balboa Blvd West
Ocean Front West
28
6,440
86
11/14/2024
12th St
Bay Ave West
Balboa Blvd West
28
5,180
72
11/25/2024
13th St
North End
Bay Ave West
30
900
86
11/22/2024
13th St
Balboa Blvd West
Ocean Front West
28
6,720
85
11/14/2024
13th St
Bay Ave West
Balboa Blvd West
28
6,048
84
11/25/2024
14th St
Balboa Blvd West
Ocean Front West
27
6,210
91
11/14/2024
14th St
North End
Bay Ave West
30
900
89
11/22/2024
14th St
Bay Ave West
Balboa Blvd West
30
6,450
84
11/22/2024
15th St
Kings PI
St James PI
35
7,350
89
8/26/2024
15th St
North End
Balboa Blvd West
73
21,900
88
11/22/2024
15th St
Balboa Blvd West
Ocean Front West
77
17,941
87
11/14/2024
15th St
Irvine Ave
St Andrew Rd
62
33,720
86
8/26/2024
15th St
St Andrew Rd
Kings PI
35
41,300
83
8/26/2024
15th St
Aliso Ave
Irvine Ave
36
23,760
82
8/26/2024
15th St
Tustin Ave
Aliso Ave
36
23,760
80
8/26/2024
15th St
Old Newport Ave
Bolsa Ave
18
12,420
76
8/26/2024
15th St
Redlands Ave
Tustin Ave
18
12,060
75
8/26/2024
15th St
Bolsa Ave
Santa Ana Ave
18
17,280
69
8/26/2024
15th St
Santa Ana Ave
Redlands Ave
36
24,120
67
8/26/2024
15th St W
Monrovia Ave
Placentia Ave
36
46,224
65
11/25/2024
15th St W
Placentia Ave
Superior Ave
60
12,900
42
2/7/2025
16th St
Balboa Blvd West
Ocean Front West
27
6,075
85
11/14/2024
16th St W
West End
Placentia Ave
36
86,400
42
2/7/2025
17th St
Balboa Blvd West
Ocean Front West
28
6,300
79
11/14/2024
18th St
North End
Balboa Blvd West 28
8,400
91
11/25/2024
Appendix B - Local Streets
1 of 33
4 . •'
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment
18th St Balboa Blvd West Ocean Front West 28
19th St North End Balboa Blvd West 28
Area (SF) Current PCI
6,356 78
Most Recent Inspection Date
11/14/2024
11/25/2024
11/14/2024
12,040
8,100
88
74
19th St
Balboa Blvd West
Ocean Front West
30
19th St
Balboa Blvd
Sundance Dr
30
27,900
65
10/30/2024
20th St
Balboa Blvd West
Ocean Front West
33
11,418
90
11/14/2024
20th St
North End
91' S of North End
34
3,094
83
11/25/2024
20th St
91' S of North End
Balboa Blvd West
34
11,050
52
11/14/2024
21st St
Balboa Blvd West N/s
South End
24
10,608
87
11/25/2024
21st St
North End
Balboa Blvd West
24
10,608
84
11/25/2024
22nd St
North End
Balboa Blvd West
40
5,200
88
11/25/2024
22nd St
Balboa Blvd West
Ocean Front West
30
9,450
74
11/25/2024
23rd St
City Limits
Tustin Ave
35
33,005
100
11/25/2024
23rd St
Tustin Ave
Irvine Ave
35
27,230
98
10/30/2024
23rd St
Balboa Blvd West
Ocean Front West
30
10,800
85
11/25/2024
24th St
Balboa Blvd
Ocean Front West
16
6,240
55
11/22/2024
25th St
Balboa Blvd
Ocean Front West
16
6,320
86
11/22/2024
26th St
Newport Blvd
Balboa Blvd
22
2,750
83
11/25/2024
26th St
East End
Newport Blvd
29
4,060
83
11/25/2024
26th St
Balboa Blvd
Ocean Front West
21
8,295
72
11/22/2024
27th St
Balboa Blvd
Ocean Front West
20
7,800
69
11/22/2024
28th St
Newport Blvd West SB
Balboa Blvd
60
13,200
91
11/25/2024
28th St
Newport Blvd East NB
Newport Blvd West SIB
37
4,995
84
11/25/2024
28th St
East End
Villa Way
14
1,050
81
11/25/2024
28th St
Villa Way
Newport Blvd East NB
54
11,750
74
11/25/2024
28th St
Balboa Blvd West
Ocean Front West
34
13,090
73
11/22/2024
29th St
Lafayette Ave
Newport Blvd NB
24
12,840
92
11/25/2024
29th St
Balboa Blvd
Ocean Front West
33
12,705
60
11/22/2024
29th St
Newport Blvd SIB
Balboa Blvd
33
10,725
57
11/26/2024
29th St
East End
Lafayette Ave
24
1,800
49
11/25/2024
30th St
180' E of Balboa Blvd
Balboa Blvd
34
6,120
98
11/22/2024
30th St
Lafayette Ave
Villa Way
29
7,965
88
11/26/2024
30th St
Villa Way
Newport Blvd
25
11,250
87
11/25/2024
30th St
Balboa Blvd
Ocean Front West
32
12,000
65
11/22/2024
30th St
Newport Blvd
180' E of Balboa Blvd
34
7,480
62
11/25/2024
31st St
Villa Way
Newport Blvd
24
11,832
88
11/25/2024
31st St
Balboa Blvd
Ocean Front West
32
12,032
84
2/7/2025
31st St
Lafayette Ave
Villa Way
24
8,424
70
11/25/2024
32nd St
Balboa Blvd
Seashore Dr
36
6,264
98
11/22/2024
32nd St
Seashore Dr
Ocean Front West
16
3,040
92
11/25/2024
33rd St
East End
Marcus Ave
18
1,350
93
11/25/2024
33rd St
Marcus Ave
Lake Ave 18
3,960
91
11/25/2024
Appendix B - Local Streets
2 of 33
5-70
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment
33rd St Balboa Blvd Seashore Dr 20
33rd St Seashore Dr Ocean Front West 16
Area (SF) Current PCI
4,960 91
Most Recent Inspection Date
11/25/2024
11/25/2024
11/25/2024
2,160
4,950
89
86
33rd St
Lake Ave
Balboa Blvd
18
16
18
16
34th St
Rivo Alto
Marcus Ave
1,056
93
11/25/2024
34th St
Lake Ave
Balboa Blvd
5,040
92
11/25/2024
34th St
Clubhouse Ave
Rivo Alto
2,640
1,700
92
88
11/25/2024
11/25/2024
34th St
Seashore Dr
Ocean Front West
17
34th St
Balboa Blvd
Seashore Dr
18
4,756
87
11/25/2024
34th St
Marcus Ave
Lake Ave
18
3,888
86
11/25/2024
35th St
Seashore Dr
Ocean Front West
20
1,800
94
11/25/2024
35th St
FinleyAve
Rivo Alto
16
1,120
93
11/25/2024
35th St
Rivo Alto
Marcus Ave
16
1,360
92
10/25/2024
35th St
Short St
FinleyAve
16
4,880
92
11/25/2024
35th St
Balboa Blvd
Seashore Dr
20
5,264
83
11/25/2024
35th St
Marcus Ave
Lake Ave
20
4,300
81
11/25/2024
35th St
Lake Ave
Balboa Blvd
20
5,660
68
11/25/2024
36th St
FinleyAve
End
16
1,120
91
11/25/2024
36th St
FinleyAve
Short St
16
4,880
91
11/25/2024
36th St
Short St
Clubhouse Ave
16
5,440
89
11/25/2024
36th St
Balboa Blvd
Seashore Dr
20
540
88
11/26/2024
36th St
Balboa Blvd
Seashore Dr
20
3,124
83
11/25/2024
36th St
Seashore Dr
Ocean Front West
20
1,780
82
11/22/2024
36th St
Marcus Ave
Balboa Blvd
20
10,000
79
11/25/2024
36th St
Rivo Alto
Marcus Ave
20
2,000
64
11/22/2024
37th St
48' E of Park Ln
Park Ln
20
960
92
11/25/2024
37th St
Seashore Dr
Ocean Front West
20
1,400
90
11/26/2024
37th St
Balboa Blvd
Seashore Dr
20
5,340
88
11/25/2024
37th St
Lake Ave
48' E of Park Ln
20
2,300
76
11/26/2024
38th St
Seashore Dr
Ocean Front West
20
1,440
94
11/26/2024
38th St
Marcus Ave
East End of Bride
16
1,328
92
11/25/2024
38th St
Channel PI
FinleyAve
16
3,616
91
11/25/2024
38th St
FinleyAve
Marcus Ave
16
4,400
86
11/25/2024
38th St
Lake Ave
Balboa Blvd
22
5,984
84
11/26/2024
38th St
Balboa Blvd
Seashore Dr
18
5,448
83
11/25/2024
38th St
North End
Channel PI
16
544
81
11/25/2024
38th St
East End of Bride
Lake Ave
19
2,147
53
11/26/2024
39th St
Rivo Alto
River Ave
20
720
95
11/26/2024
39th St
Channel PI
Marcus Ave
16
4,400
92
11/25/2024
39th St
Seashore Dr
Ocean Front West
20
1,500
87
11/26/2024
39th St
North End
Channel PI
16
560
2,805
84
75
11/25/2024
11/25/2024
39th St
River Ave
Balboa Blvd 17
Appendix B - Local Streets
3 of 33
5-71
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment
39th St Balboa Blvd Seashore Dr 18
39th St Marcus Ave Rivo Alto 19
Area (SF) Current PCI
5,610 71
Most Recent Inspection Date
11/25/2024
11/26/2024
11/26/2024
703
62
40th St
Rivo Alto
River Ave
20
700
94
40th St
North End
Channel PI
16
560
93
11/25/2024
40th St
Marcus Ave
Rivo Alto
16
560
92
11/25/2024
40th St
Seashore Dr
Ocean Front West
20
1,320
92
11/26/2024
40th St
Channel PI
Marcus Ave
16
2,080
89
11/25/2024
40th St
Balboa Blvd
Seashore Dr
18
5,844
82
11/25/2024
40th St
River Ave
Balboa Blvd
20
3,140
65
11/26/2024
41st St
Seashore Dr
Ocean Front West
20
1,480
92
11/26/2024
41st St
Balboa Blvd
Seashore Dr
18
6,060
87
11/25/2024
41st St
Rivo Alto
River Ave
20
720
85
11/26/2024
41st St
River Ave
Balboa Blvd
20
3,080
56
11/26/2024
42nd St
Seashore Dr
Ocean Front West
19
1,406
90
11/26/2024
42nd St
Balboa Blvd
Seashore Dr
18
6,350
85
11/25/2024
42nd St
Rivo Alto
River Ave
20
700
73
11/26/2024
42nd St
River Ave
Balboa Blvd
20
3,160
50
11/26/2024
43rd St
Seashore Dr
Ocean Front West
20
1,540
94
11/26/2024
43rd St
River Ave
Balboa Blvd
21
3,255
82
11/25/2024
43rd St
Balboa Blvd
Seashore Dr
18
6,210
74
11/25/2024
43rd St
Rivo Alto
River Ave
21
1,806
57
11/26/2024
44th St
Seashore Dr
Ocean Front West
20
1,560
90
11/26/2024
44th St
Channel PI
Balboa Blvd
21
2,100
84
10/25/2024
44th St
Balboa Blvd
Seashore Dr
21
7,770
79
11/25/2024
45th St
Seashore Dr
Ocean Front West
20
1,500
90
11/26/2024
45th St
Balboa Blvd
Seashore Dr
21
8,295
78
11/25/2024
46th St
Seashore Dr
Ocean Front West
20
1,500
90
11/26/2024
46th St
Balboa Blvd
Seashore Dr
21
9,198
86
10/30/2024
47th St
Neptune Ave
Seashore Dr
20
1,680
90
2/7/2025
47th St
Seashore Dr
Ocean Front West
20
1,460
88
11/26/2024
47th St
River Ave
Neptune Ave
21
6,615
86
2/7/2025
48th St
Seashore Dr
Ocean Front West
20
1,440
94
11/26/2024
48th St
River Ave
Neptune Ave
20
5,200
85
11/25/2024
49th St
River Dr
Neptune Ave
20
4,900
94
11/25/2024
49th St
Seashore Dr
Ocean Front West
20
1,260
90
11/19/2024
50th St
River Ave
Neptune Ave
20
4,600
94
11/25/2024
50th St
Seashore Dr
Ocean Front West
20
1,240
91
11/19/2024
51st St
River Ave
Seashore Dr
20
6,600
91
11/25/2024
51st St
Seashore Dr
Ocean Front West
20
1,060
87
11/19/2024
52nd St
River Ave
Neptune Ave
20
4,300
94
11/25/2024
52nd St
Seashore Dr
Ocean Front West 20
1,060
1 86
11/19/2024
Appendix B - Local Streets
4 of 33
5-72
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
53rd St River Ave Neptune Ave 20 3,620 94 10/31/2024
53rd St Seashore Dr Ocean Front West 20 1,300 88 11/19/2024
54th St
Neptune Ave
Seashore Dr
27
2,025
92
10/31/2024
54th St
River Ave
Neptune Ave
38
5,320
92
10/31/2024
54th St
Seashore Dr
Ocean Front West
20
1,400
92
11/19/2024
55th St
Seashore Dr
Ocean Front West
18
1,260
88
11/19/2024
56th St
Seashore Dr
Ocean Front West
20
1,640
92
11/19/2024
57th St
Seashore Dr
Ocean Front West
19
1,615
87
11/19/2024
58th St
Seashore Dr
Ocean Front West
19
1,691
88
11/19/2024
59th St
Seashore Dr
Ocean Front West
20
1,720
93
11/19/2024
60th St
Seashore Dr
Ocean Front West
19
1,691
84
11/19/2024
60th St
North End
Coast Highway West
28
4,340
75
10/31/2024
61st St
Seashore Dr
Ocean Front West
19
1,615
90
10/31/2024
61st St
Lancaster St
Coast Highway West
20
12,900
82
10/31/2024
62nd St
Canal St
Cedar St
29
24,940
93
10/31/2024
62nd St
Cedar St
Lancaster St
29
13,920
92
10/31/2024
62nd St
Seashore Dr
Ocean Front Alley West
18
990
90
10/31/2024
62nd St
Ocean Front Alley West
Ocean Front West
18
1,260
84
11/19/2024
62nd St
Newport Shores Dr
Coast Highway West
18
2,970
81
10/31/2024
62nd St
Lancaster St
Newport Shores Dr
29
11,745
80
10/31/2024
A St
Ocean Front East
South End
60
32,100
94
10/31/2024
A St
Bay Ave East
Balboa Blvd East
20
2,700
89
11/27/2024
A St
Balboa Blvd East
Ocean Front East
20
4,200
88
11/27/2024
Abalone Ave
Balboa Ave
Park Ave
28
11,760
88
12/21/2023
Abalone Ave
Abalone PI
Balboa Ave
28
3,920
80
12/21/2023
Abalone Ave
Park Ave
Bay Front South
28
11,620
69
12/21/2023
Abalone Dr
Crystal Ave
Abalone PI
28
6,160
91
12/21/2023
Abalone PI
Abalone Dr
Crystal Ave
24
4,440
91
12/21/2023
Acacia Ave
Second Ave
Pacific Dr
27
19,359
96
12/13/2023
Acacia Ave
Coast Highway East
Second Ave
27
29,025
95
12/13/2023
Acacia St
Orchard Dr
Mesa Dr
50
56,100
68
11/30/2023
Adams St
North End
Bay Ave East
21
3,255
81
11/27/2024
Adams St
Balboa Blvd East
Ocean Front Alley East
19
2,185
75
11/27/2024
Adams St
Bay Ave East
Balboa Blvd East
19
4,750
44
11/27/2024
Agate Ave
Park Ave
Bay Front South
30
15,150
51
12/22/2023
Agate Ave
Bay Front North
Park Ave
23
15,318
44
12/22/2023
Alba St
Eastbluff Dr
Aralia St
36
4,932
56
12/1/2023
Aldean PI
15th St
End
35
9,100
72
10/31/2024
Aldebaran Cir
Galaxy Dr
End
55
9,925
9,760
12,320
95
86
83
10/31/2024
12/1/2023
12/1/2023
Alder PI
Alta Vista Dr
End
32
Aleppo St
Alta Vista Dr
End 32
Appendix B - Local Streets
5 of 33
5-73
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment
Aleppo St Aralia St Alta Vista Dr 37
Aliso Ave Clay St Beacon St 35
Area (SF) Current PCI
24,975 77
Most Recent Inspection Date
12/1/2023
9/26/2024
9/26/2024
23,345
91
Aliso Ave
15th St
Clay St
35
22,505
89
Aliso Ave
Beacon St
Cliff Dr
35
14,700
87
9/26/2024
Almond PI
Alta Vista Dr
End
32
7,840
82
12/1/2023
Alta Vista Dr
Carob St
Bison Ave
36
79,920
80
12/1/2023
Alta Vista Dr
Bellis St
Aralia St
36
67,680
71
12/1/2023
Alta Vista Dr
Bison Ave
Bellis St
36
37,620
39
12/1/2023
Altura Dr
Mara ata Dr
An elita Dr
34
31,450
67
12/14/2023
Alvarado PI
Bay Front North
Bay Ave East
34
17,000
98
11/27/2024
Amethyst Ave
Park Ave
Bay Front South
27
11,070
67
12/21/2023
Amethyst Ave
Bay Front North
Balboa Ave
27
15,525
62
12/21/2023
Amethyst Ave
Balboa Ave
Park Ave
27
11,475
62
12/21/2023
Amigos Way
Domingo Dr
Domingo Dr
36
37,980
76
12/4/2023
Anaca a Dr
Newport Center Dr East
Farallon Dr
48
36,384
61
12/20/2023
Anade Ave
Bay Ave East
Edgewater Ave East
34
17,340
93
11/27/2024
An elita Dr
Kewamee Dr
Ba adere Ter
38
40,280
53
12/14/2023
Anita Ln
Estelle Ln
Marian Ln
33
36,366
91
10/31/2024
Anniversary Ln
Irvine Ave
End
28
61,852
72
10/31/2024
Antigua Cir
Santiago Dr
End
33
7,945
100
10/31/2024
Antigua Way
Mariners Dr
Santiago Dr South End)
35
35,210
99
10/31/2024
Antigua Way
Santiago Dr North End
Mariners Dr
37
74,460
95
10/31/2024
A olena Ave
Park Ave
Bay Ave South
27
11,178
77
12/21/2023
A olena Ave
Bay Front North
Balboa Ave
27
15,471
69
12/21/2023
A olena Ave
Balboa Ave
Park Ave
27
11,502
69
12/21/2023
Aralia St
Aleppo St
End
35
62,125
78
12/1/2023
Arbutus St
Alta Vista Dr
End
32
7,200
82
12/1/2023
Arbutus St
Aleppo St
Alta Vista Dr
36
41,040
78
12/1/2023
Ashford Ln
Glenwood Ln
Santiago Dr
33
10,995
90
10/31/2024
Avocado Ave
Pacific Dr
160' N of Pacific Dr
16
2,560
85
12/21/2023
Avocado Ave
San Miguel Dr
Bus Station
36
56,210
78
12/20/2023
Avocado Ave
Waterfront Dr
Coast Highway East
86
99,420
77
12/13/2023
Avocado Ave
160' N of Pacific Dr
Waterfront Dr
16
1,472
63
1/16/2024
Avocado Ave NB
Bus Station
San Joaquin Hills Rd
23
2,093
79
1/16/2024
Avocado Ave SIB
167' S/0 San Joaquin Hills
Bus Station
22
3,674
92
12/20/2023
Avocado Ave SIB
San Joaquin Hills Rd
16T S/0 San Joaquin Hills
22
3,674
72
1/16/2024
Avon St
West End
Riverside Ave
21
18,747
87
9/26/2024
Avon St
Riverside Ave
Tustin Ave
34
15,572
86
9/26/2024
Azure Ave
Orchid St
Bay View Ave
35
22,050
88
11/30/2023
B St
Balboa Blvd East
Ocean Front East
20
2,700
19,200
95
84
11/27/2024
11/1/2024
B St
Ocean Front East
South End 60
Appendix B - Local Streets
6 of 33
5-74
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
B St North End Balboa Blvd East 20 1,800 62 11/27/2024
Babcock St SB City Limit 16th St West 33 10,098 74 11/1/2024
Back Bay Dr
Shellmaker Rd
Beginning of PCC Section
22
17,600
86
12/18/2023
Back Bay Dr
End of PCC Section
San Joaquin Hills Rd
22
36,278
85
12/18/2023
Back Bay Dr
End of PCC Section
Backbay sewer pump station
22
68,332
84
12/18/2023
Back Bay Dr
Jamboree Rd
Entrance to Newport Dunes
61
67,710
84
12/18/2023
Back Bay Dr
San Jao uin Hills Rd
Beginning of PCC Section
22
59,620
80
12/18/2023
Back Bay Dr
Access Rd
Staired Path to Landmark
22
52,668
79
12/18/2023
Back Bay Dr
Entrance to Newport Dunes
Shellmaker Rd
48
58,800
79
12/18/2023
Back Bay Dr
Staired Path to Landmark
Eastbluff Dr
22
79,004
74
12/18/2023
Back Bay Dr
Beginning of PCC Section
End of PCC Section
22
6,600
71
1/16/2024
Back Bay Dr
Backbay Sewer Pump Station
Access Rd
22
13,354
70
12/18/2023
Back Bay Dr
Beginning of PCC Section
End of PCC Section
22
1,980
8
1/16/2024
Balboa Ave
Grand Canal
Bay Front East
28
13,440
80
12/22/2023
Balboa Ave
Marine Ave
Grand Canal
28
5,040
74
12/22/2023
Balboa Ave
Collins Ave
Marine Ave
28
48,300
35
12/22/2023
Balboa Blvd
19th St
End North City Limit
30
22,500
66
11/6/2024
Balboa Blvd E EB
L St
M St
22
15,092
94
11/27/2024
Balboa Blvd E EB
Main St
B St
27
18,765
94
10/24/2024
Balboa Blvd E EB
B St
D St
22
21,802
94
10/24/2024
Balboa Blvd E EB
D St
G St
22
23,452
94
10/24/2024
Balboa Blvd E EB
J St
L St
22
8,470
91
11/27/2024
Balboa Blvd E EB
M St
Channel Dr
18
7,074
91
11/27/2024
Balboa Blvd E EB
G St
J St
22
21,670
89
11/27/2024
Balboa Blvd E WB
G St
D St
22
23,452
94
10 24 2024
Balboa Blvd E WB
D St
B St
22
21,802
94
10/24/2024
Balboa Blvd E WB
B St
Main St
27
18,765
94
10/24/2024
Balboa Blvd E WB
L St
J St
22
8,470
93
11/27/2024
Balboa Blvd E WB
Channel Rd
M St
22
8,646
92
11/27/2024
Balboa Blvd E WB
M St
L St
22
15,092
92
11/27/2024
Balboa Blvd E WB
J St
G St
22
21,670
90
11/27/2024
Bamboo St
Bison Ave
Bellis St
36
64,980
66
12/1/2023
Basswood St
Alta Vista Dr
Alta Vista Dr
33
35,425
75
12/1/2023
Bay Ave E
Adams St
Palm St
29
7,975
95
11/27/2024
Bay Ave E
Fernando St
Adams St
30
17,250
94
11/27/2024
Bay Ave E
Medina Way
Fernando St
28
14,420
93
11/27/2024
Bay Ave E
Island Ave
Medina Way
28
15,008
87
11/27/2024
Bay Ave E
Main St
A St
21
5,670
86
11/27/2024
Bay Ave E
6th St
Island Ave
28
10,360
81
11/1/2024
Bay Ave E
Palm St
Main St
26
10,850
31,280
74
94
11/1/2024
11/27/2024
Bay Ave W
15th St
13th St 34
Appendix B - Local Streets
7 of 33
5-75
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
Bay Ave W 13th St 10th St 34 44,880 92 11/27/2024
Bay Ave W 9th St 7th St 30 26,100 90 11/27/2024
Bay Ave W
10th St
9th St
33
15,510
86
11/1/2024
Bay Ave W
19th St
18th St
42
24,350
84
11/1/2024
Bay Ave W
7th St
6th St
28
12,600
82
11/1/2024
Bay Farm PI
Upper Bay Dr
End
34
14,450
85
11/30/2023
Bay View Ave
Mesa Dr
Orchard Dr
35
42,000
75
11/30/2023
Bay View Ave
Orchard Dr
Zenith Ave
35
42,000
75
11/30/2023
Ba adere Ter
Sabrina Ter
An elita Dr
33
76,230
81
12/14/2023
Ba crest Rd
Irvine Ave
Tradewinds Ln
38
9,044
94
11/1/2024
Bayport Way
Holiday Rd
South End
33
7,656
100
11/1/2024
Bayport Way
Francisco Dr
North End
34
9,742
100
11/1/2024
Ba side Dr
Marguerite Ave
Carnation Ave
37
74,855
96
12/13/2023
Ba side Dr
Coast Highway East
End
38
45,106
90
12/20/2023
Ba side Dr
Carnation Ave
El Paseo Dr
37
126,200
80
12/13/2023
Ba side Dr
EI Paseo Dr
Jamboree Rd
37
85,420
60
12/20/2023
Ba view Dr
Ocean Blvd
Goldenrod Ave
28
4,396
96
12/19/2023
Ba view Dr
Goldenrod Ave
Heliotrope Ave
28
7,028
96
12/19/2023
Ba view Dr
Heliotrope Ave
Iris Ave
28
7,280
95
12/19/2023
Ba view PI
Bristol St South
Ba view Way
54
75,170
67
12/18/2023
Ba view Way
Shearwater PI
Ba view PI
37
32,838
74
12/18/2023
Ba view Way
Jamboree Rd
End
72
14,544
70
12/18/2023
Ba view Way EB
Ba view PI
Jamboree Rd
33
21,371
66
12/20/2023
Ba view Way WB
Jamboree Rd
Ba view PI
32
19,744
60
12/20/2023
Beacon Bay
Harbor Island Rd
End
24
28,080
84
12/19/2023
Beacon St
La Jolla Dr
Santa Ana Ave
33
3,465
90
11/1/2024
Beacon St
Tustin Ave
Aliso Ave
35
21,000
85
11/5/2024
Beacon St
Aliso Ave
Irvine Ave
35
22,330
83
11/5/2024
Beacon St
Westminster Ave
Holmwood Dr
34
8,160
78
11/1/2024
Beacon St
Santa Ana Ave
Cliff Dr
34
7,140
76
11/5/2024
Bedford Ln
Rutland Rd
Buckingham Ln
36
23,076
97
11/5/2024
Begonia Ave
Pacific Dr
Coast Highway East
28
52,780
97
12/13/2023
Bellis St
Alta Vista Dr
End
32
15,200
78
12/1/2023
Bellis St
Bamboo St
Alta Vista
37
27,010
72
12/1/2023
Berkshire Ln
Oxford Ln
Cambridge Ln
34
32,198
97
11/5/2024
Beryl Ln
Priscilla Ln
Vivian Ln
34
41,864
97
11/5/2024
Birch St
Mesa Dr
End
36
9,552
85
11/30/2023
Bison Ave
Bamboo St
Jamboree Rd
36
41,780
78
12/1/2023
Bixia St
Eastbluff Dr
Bamboo St
35
5,250
47,090
25,500
83
81
92
12/1/2023
12/4/2023
11/6/2024
Blackthorn St
Bellis St
Bison Ave
34
Blue Gum Ln
Westcliff Dr
End 32
Appendix B - Local Streets
8 of 33
5-76
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
Blue Key Sandcastle Dr End 32 26,700 92 12/6/2023
Blue Water Dr Salt Air Dr Crown Dr North 32 35,028 90 12/7/2023
Bode a Bay Dr
San Mateo Way
End
36
48,780
59
12/6/2023
Bolsa Ave
Clay St
15th St
36
14,616
92
8/26/2024
Bolsa Ave
Broad St
Clay St
38
7,714
77
8/26/2024
Bonaire Way
Holiday Rd
South End
33
10,255
96
11/6/2024
Bonaire Way
Francisco Dr
North End
33
7,425
91
11/6/2024
Bonnie Doon Ter
Ramona Dr
Malabar Dr
37
12,950
72
12/14/2023
Bonnie Doon Ter
Dolphin Ter
Patolita Dr
37
39,479
71
12/14/2023
Bonnie Doon Ter
Patolita Dr
Ramona Dr
37
54,797
70
12/14/2023
Bowsprit Dr
MacArthur Blvd
Dove St
44
13,464
90
11/30/2023
Braemar Way
Francisco Dr
End
34
9,810
96
11/6/2024
Breakers Dr
Breakers Dr
End
25
25,875
88
1/16/2024
Breakers Dr
Ocean Blvd
Breakers Dr
20
18,000
85
12/19/2023
Brighton Rd
Cameo Shores Rd
Camden Dr
33
48,370
96
12/12/2023
Broad St
Santa Ana Ave
San Bernardino Ave
16
4,480
92
8/26/2024
Broad St
Bolsa Ave
Westminster Ave
36
22,608
90
8/26/2024
Broad St
San Bernardino Ave
Redlands Ave
35
9,975
85
8/26/2024
Broad St
Westminster Ave
Santa Ana Ave
35
25,375
81
8/26/2024
Broad St
Santa Ana Ave
San Bernardino Ave
20
5,600
58
8/26/2024
Buck Gully Dr
Sandcastle Dr
End
36
5,786
82
12/7/2023
Buckeye St
Bellis St
Bison Ave
32
38,080
79
12/1/2023
Buckingham Ln
Westcliff Dr
Cornwall Ln
36
22,320
94
11/7/2024
Bun a St
Bellis St
Bison Ave
32
49,760
67
12/1/2023
Buttonshell Ln
Holiday Rd
Nautilus Ln
33
14,130
95
11/7/2024
C St
North End
Balboa Blvd East
15
1,170
52
12/2/2024
C St
Balboa Blvd East
Ocean Front East
20
1,600
43
12/2/2024
Cabrillo Ter
Serra Dr
De Anza Dr
23
19,787
88
12/13/2023
Cacao St
Eastbluff Dr
Catalpa St
36
5,400
78
12/4/2023
Cambria Dr
El Ca itan Dr
Drakes Bay Dr
32
80,320
77
12/6/2023
Cambridge Ln
Devon Ln
Highland Dr
34
27,902
94
11/7/2024
Camden Dr
Cameo Shores Rd
Milford Dr
33
44,385
95
12/12/2023
Camelback St
Jamboree Rd
La Felicidad
40
60,825
82
12/18/2023
Camelback St
La Felicidad
Bison Ave
78
55,821
72
12/18/2023
Cameo Highlands Dr
Coast Highway East
Garrett Dr
37
49,321
89
12/12/2023
Cameo Shores Rd
Coast Highway East
Orrin ton Rd
37
37,777
97
12/12/2023
Cameo Shores Rd
Orrin ton Rd
Brighton Rd
37
35,372
97
12/12/2023
Camphor St
Catalpa St
Alta Vista Dr
37
31,339
69
12/4/2023
Canal Cir
Canal St
Canal St
29
7,685
88
11/7/2024
Canal St
Canal Cir West End
Sunset Dr
30
12,600
92
11/7/2024
Canal St
62nd St
Canal Cir West End 30
8,100
91
11/7/2024
Appendix B - Local Streets
9 of 33
5-77
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment
Canal St Sunset Dr Grant St 30
Candlestick Ln Glenwood Ln Sandalwood Ln 35
Area (SF) Current PCI
29,070 90
Most Recent Inspection Date
11/7/2024
11/7/2024
23,250
98
Carmel Bay Dr
Point Loma Dr
Spyglass Hill Rd
36
58,860
66
12/6/2023
Carnation Ave
Ba side Dr
First Ave
37
12,366
73
12/13/2023
Carnation Ave
First Ave
Coast Highway East
27
38,475
72
12/13/2023
Carnation Ave
Ocean Blvd
Seaview Ave
30
8,910
66
12/22/2023
Carob St
Camphor St
End
34
80,240
76
12/4/2023
Cassia St
Camphor St
Carob St
32
39,840
72
12/4/2023
Castaways Ln
Dover Dr
Castaways(private) North
54
24,948
100
11/7/2024
Catalina Dr
Clay St
15th St
34
23,018
81
9/26/2024
Catalina Dr
Broad St
Clay St
34
10,982
78
9/26/2024
Catalina Dr
Old Newport Blvd
Broad St
34
57,800
77
9/26/2024
Catalpa St
Camphor St
Carob St
35
52,500
77
12/4/2023
Catamaran Dr
Keel Dr
End
36
37,350
90
12/7/2023
Cedar St
East End
Prospect St
29
8,700
94
11/7/2024
Cedar St
Seashore Dr
Ocean Front Alley West
19
1,083
94
11/7/2024
Cedar St
Newport Shores Dr
Coast Highway West
19
3,515
92
11/7/2024
Cedar St
Ocean Front Alley West
Ocean Front West
19
1,349
88
11/20/2024
Cedar St
Prospect St
Newport Shores Dr
29
19,430
87
11/7/2024
Ceiba PI
Carob St
End
54
11,780
75
12/4/2023
Celtis PI
Alta Vista Dr
End
54
10,260
82
12/4/2023
Centella PI
Santiago Dr
North End
37
12,305
100
11/7/2024
Centella PI
Holiday Rd
South End
33
12,177
94
11/7/2024
Central Ave
Via Lido
End
40
12,600
87
9/12/2024
Cercis PI
Alta Vista Dr
End
32
7,040
85
12/4/2023
Channel PI
39th St
Rialto
16
7,040
92
11/7/2024
Channel PI
Rivo Alto
39th St
16
11,888
90
11/7/2024
Channel PI
Balboa Blvd
Rivo Alto River
21
6,195
89
11/7/2024
Channel Rd
Balboa Blvd
Granada Dr
36
5,976
93
11/27/2024
Channel Rd
Granada Dr
End
38
55,670
87
11/27/2024
Cherry Tree Ln
Redland Dr
End
34
6,800
98
11/7/2024
Chestnut PI
Alta Vista Dr
End
32
7,040
84
12/4/2023
China Cove Ramp
Ocean Blvd
Fernleaf Ave
19
5,320
54
1/16/2024
Chubasco Dr
Evita Dr
Zahma Dr
37
25,530
76
12/14/2023
Citrus PI
Alta Vista Dr
End
32
9,120
82
12/4/2023
Civic Center Dr
Avocado Ave
Newport Center Dr
48
74,832
77
12/20/2023
Clay St
St Andrews Rd
Irvine Ave
34
22,372
93
8/26/2024
Clay St
15th St
St Andrews Rd
34
25,840
92
8/26/2024
Clay St
Irvine Ave
Tustin Ave
34
46,126
84
8/26/2024
Clay St
Tustin Ave
Westminster Ave
34
66,674
82
8/26/2024
Clay St
Westminster Ave
Orange Ave 32
25,600
70
8/26/2024
Appendix B - Local Streets
10of33
5-78
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment
Cliff Dr Santa Ana Ave La Jolla Dr 52
Cliff Dr Irvine Ave Riverside Ave 56
Area (SF) Current PCI
15,600 92
Most Recent Inspection Date
8/26/2024
8/26/2024
8/26/2024
92,820
35,046
91
85
Cliff Dr
Riverside Ave
Beacon St
33
Cliff Dr
St Andrews Place
Irvine Ave
55
64,519
84
8/26/2024
Cliff Dr
Beacon St
Santa Ana Ave
34
25,160
81
8/26/2024
Cliff Dr
Dover Dr
Kings PI
55
41,580
78
8/26/2024
Cliff Dr
Signal Rd
St Andrews Rd
55
55,550
78
8/26/2024
Cliff Dr
Kings PI
Signal Rd
55
23,430
70
8/26/2024
Clubhouse Ave
Newport Island Channel
Rivo Alto
17
17,441
94
11/7/2024
Coast Blvd
61st St
End
30
3,990
92
11/7/2024
Collins Ave
Park Ave
Bay Front South
27
11,313
63
12/22/2023
Collins Ave
Balboa Ave
Park Ave
28
12,012
60
12/22/2023
Collins Ave
Bay Front North
Balboa Ave
28
12,320
45
12/22/2023
Colton St
Seashore Dr
Ocean Front Alley West
18
1,080
88
11/7/2024
Colton St
Newport Shores Dr
End
18
3,060
86
11/7/2024
Colton St
Sunset Dr
Prospect St
29
11,792
79
11/7/2024
Colton St
Sunset Dr
Newport Shores Dr
29
22,040
77
11/7/2024
Colton St
Ocean Front Alley West
Ocean Front West
21
924
64
11/20/2024
Columbus Cir
Serra Dr
End
22
3,464
87
12/13/2023
Commodore Rd
Tradewinds Ln
Mariners Dr
38
75,300
95
11/7/2024
Constellation Dr
Santiago Dr
End
38
5,130
100
11/7/2024
Coral Ave
Bay Front South
Park Ave
27
11,070
63
12/22/2023
Coral Ave
Bay Front North
Balboa Ave
27
15,525
60
12/22/2023
Coral Ave
Balboa Ave
Park Ave
27
11,259
58
12/22/2023
Coral PI
Irvine Ave
St Andrews Ave
35
28,070
94
11/7/2024
Corinthian Way
MacArthur Blvd
Birch St
44
38,544
84
11/30/2023
Cornwall Ln
Pembroke Ln
Dover Dr
34
24,808
87
11/7/2024
Coronado St
Balboa Blvd East
Ocean Front East
27
4,752
94
11/14/2024
Coronado St
Bay Ave East
Balboa Blvd East
28
5,180
72
12/3/2024
Coronado St
Edgewater Ave East
Bay Ave East
34
14,960
70
12/3/2024
Cortes Cir
Serra Dr
End
22
2,980
86
12/13/2023
Cortland Dr
Cameo Highlands Dr
Garrett Dr
37
36,593
92
12/12/2023
Cortland Dr
Rockford PI
Cameo Highlands Dr
37
25,974
88
12/12/2023
Court Ave
20th St
McFadden PI
28
5,600
87
11/14/2024
Court Ave
20th St
McFadden PI
28
2,380
83
11/12/2024
Court Ave
19th St
20th St
28
8,540
62
11/14/2024
Cove St
Way Ln
End
24
2,200
83
12/19/2023
Cove St
Fernleaf Ave
End
24
3,960
66
12/19/2023
Crown Dr
Sea Ln
Crown Dr North
37
42,624
81
12/7/2023
Crown Dr North
Crown Dr
San Joaquin Hills Rd
36
49,320
82
12/7/2023
Cr staI Ave
Balboa Ave
Park Ave 28
12,040
87
12/21/2023
Appendix B - Local Streets
11 of 33
5-79
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment
Cr staI Ave Abalone Dr Balboa Ave 24
Cr staI Ave Park Ave Bay Front South 28
Area (SF) Current PCI
11,520 87
Most Recent Inspection Date
12/21/2023
12/21/2023
11/8/2024
11,480
15,390
71
89
Cumberland Ln
Sussex Ln
Dover Dr
34
Cutter Rd
Beacon Bay
End
24
9,120
86
12/19/2023
Cypress St
Bay Ave East
Balboa Blvd East
20
5,800
86
12/4/2024
Cypress St
Edgewater PI
Bay Ave East
20
5,460
84
12/4/2024
Cypress St S/A Heights)
Orchard Dr
Cul De Sac
36
35,280
92
12/20/2023
Cypress St S/A Heights)
Cul De Sac
Bristol St South
36
9,360
90
12/20/2023
Cypress St S/A Heights)
Mesa Dr
Orchard Dr
36
47,520
89
12/20/2023
D St
North End
Balboa Blvd East
20
1,500
39
12/4/2024
D St
Balboa Blvd East
Ocean Front East
19
1,520
37
12/4/2024
Dahlia Ave
Ocean Blvd
Seaview Ave
27
7,425
98
12/19/2023
Dahlia Ave
200' S of First St
Coast Highway East
27
40,230
98
12/13/2023
Dahlia Ave
Coast Highway East
Fifth Ave
27
4,455
71
12/7/2023
Dahlia Ave
South End
Way Ln
27
3,915
68
12/19/2023
Dana Point Way
San Martin Way
Montecito Dr
36
6,084
81
12/6/2023
Dana Rd
Superior Ave
Flagship Rd
36
21,600
71
11/12/2024
Dawnview Ln
Redland Dr
Redland Dr
33
5,280
93
11/8/2024
De Anza Dr
Seaward Rd
De Sola Ter
35
26,250
88
12/13/2023
De Sola Ter
Seaward Rd
End
24
28,015
77
12/13/2023
Deborah Ln
Mariners Dr
Vivian Ln
34
8,262
92
11/8/2024
Deborah Ln
Vivian Ln
Sylvia Ln
34
22,122
92
11/8/2024
Devon Ln
Oxford Ln
Cambridge Ln
33
25,290
98
11/8/2024
Diamond Ave
Park Ave
Bay Front South
27
11,286
66
12/22/2023
Diamond Ave
Balboa Ave
Park Ave
28
12,040
62
12/22/2023
Diamond Ave
Bay Front North
Balboa Ave
28
13,888
54
12/22/2023
Diana Ln
Priscilla Ln
Vivian Ln
34
27,108
98
11/8/2024
Dolphin Ter
Bonnie Doone Ter
Patolita Dr
33
41,778
79
12/14/2023
Dolphin Ter
Patolita Dr
Ramona Dr
33
43,098
78
12/14/2023
Dolphin -Striker Way
Dove St
End
44
16,740
80
11/30/2023
Domingo Dr
Mar Vista Dr
Mar Vista Dr
36
60,300
64
12/4/2023
Donnie Rd
22nd St
End
33
20,320
89
11/8/2024
Dorchester Rd
Cameo Highland Rd
Garrett Rd
33
30,030
92
12/12/2023
Dorchester Rd
Rockford Rd
Cameo Highland Rd
33
27,225
88
12/12/2023
Doris Ln
Dover Dr
Ruth Ln
36
8,676
89
11/8/2024
Dorothy Ln
Mariners Dr
Estelle Ln
33
7,854
88
11/8/2024
Dorothy Ln
Estelle Ln
Marian Ln
34
31,280
87
11/8/2024
Dove St
Campus Dr
Birch St
37
21,645
90
11/30/2023
Dove St
Birch St
Bristol St North
44
176,670
14,790
17,110
77
94
94
11/30/2023
11/8/2024
11/8/2024
Dover Dr
Mariners Dr
Doris Ln
29
Dover Dr
Doris Ln
Nottingham Rd 29
Appendix B - Local Streets
12 of 33
9 :I
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment
Dover Dr Nottingham Rd Norfolk Ln 29
Dover Dr Norfolk Ln Westcliff Dr 29
Area (SF) Current PCI
19,285 94
Most Recent Inspection Date
11/8/2024
11/8/2024
11/8/2024
14,210
94
Dover Dr
Westcliff Dr
Dover Dr Arterial
36
5,460
94
Dover Dr
Leila Ln
Mariners Dr
29
14,500
93
11/8/2024
Dover Dr
End
Leila Ln
29
15,768
91
11/8/2024
Drakes Bay Dr
Point Conception Way
Montecito Dr
32
15,822
83
12/6/2023
Drakes Bay Dr
Goleta Point Dr
Point A uello Way
32
9,358
73
12/6/2023
Drakes Bay Dr
Point A uello Way
Point Conception Way
32
44,192
73
12/6/2023
Driftwood Rd
Shorecliff Rd
Morning Canyon Rd
27
29,700
82
12/13/2023
E St
Balboa Blvd East
North End
20
1,560
39
12/4/2024
E St
Balboa Blvd East
Ocean Front East
20
1,660
39
12/4/2024
East Coastal Peak
Ridge Park Rd
1195' S of Ridge Park Rd
37
44,215
92
12/15/2023
East ate Dr
Newport Hills Dr East
San Miguel Dr
56
11,110
57
12/5/2023
Ebbtide Rd
Crown Dr
Sandier Dr
33
43,461
80
12/7/2023
El Ca itan Dr
Spyglass Hill Rd
Point Arguello Way
44
54,384
74
12/6/2023
El Ca itan Dr
Point Ar uella Way
Point Conception Way
44
71,282
72
12/6/2023
El Modena Ave
Clay St
15th St
35
22,925
91
9/26/2024
El Modena Ave
Beacon St
Clay St
35
23,345
84
9/26/2024
El Modena Ave
Cliff Dr
Beacon St
35
14,350
63
9/26/2024
El Paseo Dr
Ba side Dr
Malabar Dr
34
18,700
58
12/14/2023
Emerald Ave
Park Ave
Bay Front South
27
9,153
55
12/22/2023
Emerald Ave
Bay Front North
Park Ave
27
8,640
53
12/22/2023
Emerson St
Tustin Ave
City Limits
30
10,200
70
11/12/2024
Essex Ln
Cambridge Ln
Oxford Ln
34
28,424
88
11/8/2024
Estelle Ln
Highland Dr
Santiago Dr
33
11,946
87
11/8/2024
Estelle Ln
Ruth Ln
Highland Dr
33
45,744
87
11/8/2024
Eton PI
Dover Dr
End
33
7,879
92
11/8/2024
Evening Canyon Rd
Shorecliff Rd
Morning Canyon Rd
28
63,360
74
12/13/2023
Evening Star Ln
Polaris Dr
End
33
34,840
89
11/8/2024
Evita Dr
Seadrift Dr
Chubasco Dr
58
12,760
72
12/14/2023
F St
Balboa Blvd East
Ocean Front East
26
5,850
94
11/12/2024
F St
North End
Balboa Blvd East
20
2,900
53
12/4/2024
Fairfield Dr
Cameo Shores Rd
Milford Dr
33
44,715
96
12/12/2023
Fairhill Dr
23rd St
End
34
18,462
88
11/8/2024
Fern St
Seashore Dr
Ocean Front Alley West
17
1,054
89
11/13/2024
Fern St
Canal St
Coast Highway West
30
8,190
81
11/13/2024
Fern St
Ocean Front Alley West
Ocean Front West
20
1,400
76
11/20/2024
Fernando Street
Edgewater Ave East
Bay Ave East
30
10,680
78
11/12/2024
Fernleaf Ave
Coast Highway East
Fifth Ave
27
9,990
92
12/7/2023
Fernleaf Ave
Cove St
China Cove Ramp
21
6,510
91
1/16/2024
Fernleaf Ave
250' S of First St
Coast Highway East 27
34,020
90
12/13/2023
Appendix B - Local Streets
13 of 33
5-81
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
Fernleaf Ave Seaview Ave 150' N Seaview Ave 27 4,050 89 12/19/2023
Fernleaf Ave 150' N Seaview Ave Ba side Dr 28 9,520 85 1/16/2024
Fernleaf Ave
Ocean Blvd
Seaview Ave
30
8,850
41
1/16/2024
Fifth Avenue
Heliotrope Ave
Iris Ave
32
9,280
90
12/7/2023
Fifth Avenue
Marguerite Ave
Marigold Ave
36
11,520
88
12/7/2023
Fifth Avenue
Dahlia Ave
Heliotrope Ave
33
29,535
84
12/7/2023
Fifth Avenue
Marigold Ave
Poppy Ave
36
42,300
82
12/7/2023
Fifth Avenue
Jasmine Ave
Marguerite Ave
28
18,390
76
12/7/2023
FinleyAve
Rialto
38th St
16
560
94
11/12/2024
FinleyAve
38th St
Channel PI
16
3,520
92
11/12/2024
FinleyAve
Newport Blvd
Clubhouse Ave
16
3,040
90
11/12/2024
FinleyAve
Clubhouse Ave
End
16
10,640
90
11/12/2024
First Ave
Acacia Ave
Begonia Ave
27
7,344
97
12/13/2023
First Ave
Carnation Ave
Dahlia Ave
27
7,317
96
12/13/2023
First Ave
Begonia Ave
Carnation Ave
27
7,290
95
12/13/2023
First Ave
Dahlia Ave
Fernleaf Ave
27
7,290
88
12/13/2023
First Ave
Fernleaf Ave
Goldenrod Ave
27
7,290
87
12/13/2023
First Ave
Goldenrod Ave
Heliotrope Ave
27
7,290
87
12/13/2023
First Ave
Iris Ave
Jasmine Ave
27
7,290
86
12/13/2023
First Ave
Heliotrope Ave
Iris Ave
27
7,290
60
12/13/2023
Flagship Rd
Dana Rd
Placentia Ave
37
39,220
58
11/13/2024
Ford Rd
Hillside Dr
East End
32
22,320
80
12/5/2023
Ford Rd EB
West End
San Miguel Dr
30
26,900
84
12/21/2023
Ford Rd WB
Newport Hills Dr
West End
29
25,433
83
12/21/2023
Fourth Ave
Avocado Ave
Acacia Ave
27
7,155
96
12/13/2023
Fourth Ave
Carnation Ave
Dahlia Ave
27
7,155
95
12/13/2023
Fourth Ave
Begonia Ave
Carnation Ave
27
7,155
95
12/13/2023
Fourth Ave
Larkspur Ave
Marguerite Ave
27
7,560
92
12/7/2023
Fourth Ave
Acacia Ave
Begonia Ave
27
7,209
92
12/13/2023
Fourth Ave
Jasmine Ave
Larkspur Ave
27
7,182
82
12/7/2023
Fourth Ave
Poinsettia Ave
Poppy Ave
27
7,263
82
12/7/2023
Fourth Ave
Heliotrope Ave
Iris Ave
27
7,236
78
12/7/2023
Fourth Ave
Orchid Ave
Poinsettia Ave
27
7,290
75
12/7/2023
Fourth Ave
Goldenrod Ave
Heliotrope Ave
27
7,020
74
12/7/2023
Fourth Ave
Marigold Ave
Narcissus Ave
27
7,209
67
12/7/2023
Fourth Ave
Narcissus Ave
Orchid Ave
27
7,371
65
12/7/2023
Fourth Ave
Marguerite Ave
Marigold Ave
27
7,290
60
12/7/2023
Fourth Ave
Iris Ave
Jasmine Ave
27
7,425
51
12/7/2023
Francisco Dr
Tustin Ave
Irvine Ave
37
47,730
8,496
22,505
95
91
91
11/8/2024
11/8/2024
9/26/2024
Francisco Dr
Irvine Ave
Tradewinds Ln
36
Fullerton Ave
Clay St
15th St 35
Appendix B - Local Streets
14of33
5-82
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
Fullerton Ave Beacon St Clay St 35 23,345 89 9/26/2024
Fullerton Ave Cliff Dr Beacon St 35 14,805 86 9/26/2024
G St
Balboa Blvd East
Ocean Blvd
36
6,344
94
11/12/2024
G St
North End
Balboa Blvd East
20
3,620
61
12/4/2024
G St
Ocean Blvd
Ocean Front East
30
6,000
56
12/4/2024
Galatea Ter
Ba adere Ter
An elita Dr
33
57,750
85
12/14/2023
Galaxy Dr
Santiago Dr South End
Rigel Cir
37
53,983
100
12/31/2024
Galaxy Dr
Mariners Dr
Holiday Dr
34
49,368
100
11/8/2024
Galaxy Dr
Hoilday Dr
Santiago Dr North End)
34
74,868
97
11/8/2024
Galaxy Dr
Rigel Cir
Mariners Dr
37
72,372
97
11/8/2024
Garnet Ave
Bay Front North
Park Ave
27
12,987
60
12/22/2023
Garnet Ave
Park Ave
Bay Front South
25
9,800
47
12/22/2023
Garrett Dr
Cortland Dr
Cameo Highlands Dr
37
31,080
91
12/12/2023
Gary PI
15th St
End
33
8,580
78
11/13/2024
Glenwood Ln
Candlestick Ln
Ashford Ln
33
22,320
95
11/8/2024
Golden Cir
Anniversary Ln
Anniversary Ln
33
40,161
69
11/8/2024
Goldenrod Ave
End
Coast Highway East
28
31,472
98
12/13/2023
Goldenrod Ave
150' S of Seaview Ave
Seaview Ave
28
4,200
96
12/19/2023
Goldenrod Ave
Fourth Ave
Fifth Ave
27
9,450
92
12/7/2023
Goldenrod Ave
Crown Dr
Wavecrest Dr
35
22,225
89
12/7/2023
Goldenrod Ave
Fifth Ave
Sea Ln
36
10,152
86
12/7/2023
Goldenrod Ave
Harbor View Dr
Crown Dr
33
38,445
82
12/7/2023
Goldenrod Ave
Sea Ln
Harbor View Dr
33
33,264
60
12/7/2023
Goldenrod Ave
Coast Highway East
Fourth Ave
27
5,130
57
12/7/2023
Goldenrod Ave
Ocean Blvd
150' S of Seaview Ave
27
10,125
56
1/16/2024
Goldenrod Ave
Seaview Ave
End
30
6,900
55
1/16/2024
Goleta Point Dr
Drakes Bay Dr
Morro Bay Dr
32
53,820
77
12/6/2023
Gorham Dr
Cameo Shores Rd
Milford Dr
33
46,200
94
12/12/2023
Granada Ave
M St
Channel Rd
30
10,800
86
12/4/2024
Grant St
Ocean Front Alley West
Ocean Front West
21
1,470
91
11/20/2024
Grant St
North End
Coast Highway West
29
9,425
90
11/13/2024
Grant St
Seashore Dr
Ocean Front Alley West
17
1,105
82
11/13/2024
Granville Dr
Newport Center Dr
Gate
26
10,088
89
12/20/2023
Grove Ln
Westcliff Dr
End
32
23,004
89
11/8/2024
H St
North End
Balboa Blvd East
20
3,640
88
12/4/2024
Half Moon Bay Dr
Point Loma Dr
Point Arena Way
32
32,904
68
12/6/2023
Hampden Rd
Cameo Shores Rd
End
37
8,131
98
12/12/2023
Hampden Rd
Milford Dr
Cameo Shores Rd
37
34,410
97
12/12/2023
Hampshire Cir
Antigua Way
Antigua Way
34
25,534
98
11/8/2024
Hampshire Ct
Hampshire Cir
End
50
9,200
8,500
96
98
11/8/2024
11/8/2024
Hampshire Ln
Santiago Dr
Antigua Way 34
Appendix B - Local Streets
15 of 33
5-83
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
Hampshire Ln Lincoln Ln Santiago Dr 34 8,500 97 11/8/2024
Harbor Island Dr Harbor Island Dr N End 36 6,840 93 12/19/2023
Harbor Island Dr
Harbor Island Rd
E End
37
68,894
92
12/19/2023
Harbor Island Dr
Ba side Dr
Harbor Island Rd
43
34,250
88
12/19/2023
Harbor Island Rd
Harbor Island Dr
S End
30
17,550
86
12/20/2023
Harbor View Dr
MacArthur Blvd
Goldenrod Ave
38
26,030
83
12/7/2023
Harbor View Dr
Goldenrod Ave
Marguerite Ave
38
73,910
83
12/7/2023
Harding St
Adams St
Cypress St
20
4,800
91
12/4/2024
Harrow PI
Dover Dr
End
33
7,615
95
11/8/2024
Haven PI
Irvine Ave
St Andrews Rd
35
19,005
73
11/13/2024
Hazel Dr
Poppy Ave south side
Coast Highway East
21
29,875
91
12/19/2023
Hazel Dr
Coast Highway East
577' N of Coast Highway East
30
17,310
90
12/12/2023
Hazel Dr
577' N of Coast Highway East
Poppy Ave north side
29
11,397
87
12/12/2023
Heather Ln
Irvine Ave
End
34
36,390
92
11/8/2024
Heliotrope Ave
Seaview Ave
End
27
8,478
98
12/19/2023
Heliotrope Ave
Coast Highway East
Fifth Ave
27
21,195
90
12/12/2023
Heliotrope Ave
Ocean Blvd
Ba view Dr
27
10,800
89
12/19/2023
Heliotrope Ave
Ba side Dr
Coast Highway East
28
28,420
88
12/13/2023
Heliotrope Ave
Ba view Dr
Seaview Ave
27
9,450
85
12/19/2023
Heron Way
Keel Dr
Outrigger Dr
32
8,480
84
12/7/2023
Highland Dr
Nottingham Rd
Mariners Dr
38
70,604
98
11/8/2024
Highland Dr
Westcliff Dr
Nottingham Rd
38
60,496
97
11/8/2024
Highland Dr
Mariners Dr
Irvine Ave
37
71,965
92
11/8/2024
Highland St
North End
Coast Highway West
30
7,800
92
11/13/2024
Highland St
Seashore Dr
Ocean Front Alley West
17
1,224
88
11/13/2024
Highland St
Ocean Front Alley West
Ocean Front West
19
1,330
83
11/20/2024
Hilaria Way
North End
Flagship Dr
38
8,740
80
11/13/2024
Hilaria Way
Flagship Dr
South End
36
14,632
58
11/13/2024
Holiday Rd
Galaxy Dr
Santiago Dr
38
6,270
98
11/8/2024
Holiday Rd
Santiago Dr
Tradewinds Ln
38
56,430
94
11/8/2024
Holiday Rd
Irvine Ave
Tustin Ave
38
49,020
91
11/8/2024
Holly Ln
Tustin Ave
Irvine Ave
34
43,724
78
11/13/2024
Holmwood Dr
Catalina Dr
Broad St
34
46,920
79
11/13/2024
Hospital Rd
Superior Ave
Placentia Ave
44
42,944
94
11/13/2024
Hospital Rd
Newport Blvd
Old Newport Blvd
70
11,200
89
11/13/2024
1 St
North End
Balboa Blvd East
20
4,560
90
12/4/2024
1 St
Miramar Dr
Ocean Blvd
36
6,120
87
12/4/2024
1 St
Balboa Blvd East
Miramar Dr
37
14,060
86
12/4/2024
I St
Ocean Blvd
Ocean Front East
30
3,540
84
12/4/2024
Indian Spring Ln
Irvine Ave
End
52
6,556
28,400
93
84
11/11/2024
11/30/2023
Indus St
Kline Dr
West End 33
Appendix B - Local Streets
16of33
a I'
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
Inlet Dr Marguerite Ave Keel Dr 36 5,400 88 12/6/2023
Inlet Isle Dr Topside Ln Sandcastle Dr 32 37,066 91 12/7/2023
Iris Ave
Ocean Blvd
Seaview Ave
28
17,500
98
12/12/2023
Iris Ave
Seaview Ave
North End
28
8,960
95
12/19/2023
Iris Ave
Ba side Dr
Coast Highway East
27
19,494
69
12/13/2023
Iris Ave
Coast Highway East
Fifth Ave
27
25,515
59
12/12/2023
Irvine Ave
Clay St
15th St
38
23,940
91
9/26/2024
Irvine Ave
15th St
16th St
62
78,554
84
9/26/2024
Irvine Ave
Cliff Dr
Clay St
38
41,534
78
12/21/2023
Irvine Ter
Coast Highway East
Bonnie Doone Ter
64
7,360
28
12/14/2023
Isabella Ter
Seaward Rd
End
24
8,800
76
12/13/2023
Island Ave
Balboa Blvd West
Ocean Front West
34
5,270
88
11/14/2024
Island Ave
Edgewater Ave East
Bay Ave East
34
18,258
87
12/4/2024
Island Ave
Bay Ave East
Balboa Blvd West
33
5,412
83
11/12/2024
Island View Dr
Salt Air Dr
Lighthouse Ln
32
26,080
87
12/7/2023
J St
North End
Balboa Blvd East
20
4,800
86
12/4/2024
Jade Ave
Park Ave
Bay Front South
28
11,620
89
12/22/2023
Jade Cove
San Martin Way
End
32
10,300
85
12/6/2023
Jasmine Ave
88' N of Ocean Blvd
Seaview Ave
28
12,096
96
12/19/2023
Jasmine Ave
Seaview Ave
North End
27
7,641
94
12/19/2023
Jasmine Ave
Third Ave
Fifth Ave
27
20,520
92
12/12/2023
Jasmine Ave
Ba side Dr
Coast Highway East
28
13,440
88
12/13/2023
Jasmine Ave
Coast Highway East
Third Ave
27
13,716
73
12/12/2023
Jasmine Ave
Ocean Blvd
88' N of Ocean Blvd
28
2,464
58
1/16/2024
K St
Balboa Blvd East
North End
19
4,085
74
12/4/2024
Kathleen Ln
Teresita Ln
Beryl Ln
34
9,270
98
11/11/2024
Kathleen Ln
Beryl Ln
Highland Dr
34
8,840
97
11/11/2024
Keel Dr
Catamaran Dr
Outrigger Dr
32
21,014
90
12/6/2023
Keel Dr
Outrigger Dr
End
32
46,108
84
12/6/2023
Kent Ln
Sussex Ln
Dover Dr
34
14,110
90
11/11/2024
Kent Ln
Pembroke Ln
Sussex Ln
34
8,500
87
11/11/2024
Ketch Rd
Beacon Bay
End
24
7,440
88
12/19/2023
Kewamee Dr
Seadrift Dr
Avocado Ave
37
42,550
45
12/14/2023
Key Bay
Park Green Dr
End
64
5,120
92
12/7/2023
Key View
Sandcastle Dr
End
34
5,410
92
12/6/2023
Key West
Park Green Dr
End
32
8,860
92
12/7/2023
Kings PI
St James Rd
Kings Rd
35
66,080
92
8/26/2024
Kings Rd
St Andrews Rd
Kings PI
35
67,025
89
8/26/2024
Kings Rd
Cliff Rd
St Andrews Rd
35
52,850
21,060
19,000
85
87
86
8/26/2024
11/30/2023
11/30/2023
Kline Dr
Pegasus St
North End
33
Kline Dr
South End
Orchard Dr 28
Appendix B - Local Streets
17 of 33
5-85
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
K-Than a Dr Dolphin Ter Bonnie Doone Ter 33 9,075 73 12/14/2023
L St Ocean Blvd Ocean Front East 30 2,760 87 12/4/2024
L St
Plaza Del Norte
Ocean Blvd
36
21,132
81
12/4/2024
L St
Balboa Blvd East
Plaza Del Norte
44
9,504
72
12/4/2024
La Felicidad
Camelback St
La Salud
44
13,200
85
12/4/2023
La Jolla Dr
End
Cliff Dr
20
4,540
94
11/14/2024
La Jolla Dr
Cliff Dr
Beacon St
20
14,300
94
11/14/2024
La Jolla Dr
Santa Ana Ave
End
16
2,800
81
11/14/2024
La Linda Ct
23rd St
End
32
6,368
91
11/11/2024
La Linda PI
23rd St
End
37
22,076
92
11/11/2024
La Salud
Corsica Dr N
La Felicidad
44
44,220
84
12/4/2023
La Salud
La Vida
Corsica Dr N
44
58,740
83
12/4/2023
La Salud
North End
La Vida
44
23,956
77
12/4/2023
La Salud
La Felicidad
South End
44
20,964
72
12/4/2023
La Vida
University Dr
La Salud
44
40,092
81
12/4/2023
Lafayette Ave
28th St
31st St
24
21,140
87
11/12/2024
Lafayette Ave
31st St
Via Lido
60
23,100
57
11/12/2024
Lake Ave
50' S of 38th St
36th St
25
8,000
92
11/12/2024
Lake Ave
36th St
35th St
26
5,330
92
11/12/2024
Lake Ave
35th St
34th St
26
5,330
92
11/12/2024
Lake Ave
34th St
33rd St
26
5,330
92
11/12/2024
Lake Ave
33rd St
32nd St
26
5,330
89
11/12/2024
Lake Ave
38th St
50' S of 38th St
25
1,250
76
12/4/2024
Lake Park Ln
23rd St
Tustin Ave
25
10,750
80
11/11/2024
Lancaster St
Canal St
30' S of End
29
1,740
93
11/14/2024
Lancaster St
62nd St
61st St
30
2,370
92
11/14/2024
Lancaster St
30' S of End
End
30
900
88
11/20/2024
Larkspur Ave
Ocean Blvd
Seaview Ave
28
13,160
96
12/19/2023
Larkspur Ave
Seaview Ave
North End
28
10,080
96
12/19/2023
Larkspur Ave
Ba side Dr
Coast Highway East
28
6,916
85
12/13/2023
Larkspur Ave
Coast Highway East
Fifth Ave
27
37,962
68
12/12/2023
Laurel PI
Irvine Ave
End
36
18,360
81
11/13/2024
Leeward Ln
Tradewinds Ln
Holiday Rd
33
61,545
90
11/11/2024
Leila Lane
Dover Dr Cul-de-Sac
Diana Ln
33
7,920
95
11/11/2024
Lido Park Dr
Lafayette Ave
28th St
54
38,662
60
11/12/2024
Lighthouse Ln
Salt Air Dr
Blue Water Dr
32
35,580
88
12/7/2023
Lincoln Ln
Estelle Ln
Marian Ln
34
53,742
90
11/11/2024
Linda Ln
Irvine Ave
Priscilla Ave
34
7,956
97
11/11/2024
Lindo Ave
Bay Ave West
Alley N of Bay Ave West
23
12,719
88
11/12/2024
Lindo Ave
Alley N of Bay Ave West
North End
23
1,587
5,180
57
58
12/4/2024
12/6/2023
Little River Cir
Carmel Bay Dr
End 32
Appendix B - Local Streets
18 of 33
9 :.
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment
Lu onia St Seashore Dr Ocean Front Alley West 19
Lu onia St Newport Shores Dr Coast Highway West 19
Area (SF) Current PCI
1,121 92
Most Recent Inspection Date
11/14/2024
11/14/2024
3,173
83
Lu onia St
Ocean Front Alley West
Ocean Front West
19
1,349
82
3/10/2025
Lu onia St
Prospect St
Newport Shores Dr
29
29,725
73
11/14/2024
M St
Balboa Blvd East
Seville Ave
30
16,500
95
12/4/2024
M St
Seville Ave
Ocean Blvd
30
13,200
94
12/4/2024
M St
Ocean Blvd
Ocean Front East
30
2,700
88
12/4/2024
Main St
Bay Ave East
Balboa Blvd East
20
3,700
91
12/4/2024
Main St
Balboa Blvd East
Ocean Front East
26
5,460
86
12/4/2024
Malabar Dr
Seadrift Dr/El Paseo Dr
Bonnie Doone Ter
37
25,456
90
12/14/2023
Malibu Cir
Mission Bay Dr
End
32
7,560
92
12/6/2023
Mar Vista Dr
Vista Del Oro
Eastbluff Dr
36
81,648
59
12/4/2023
Mara ata Dr
Sabrina Ter
Kewamee Dr
37
25,530
68
12/14/2023
Marcus Ave
33rd St
34th St
26
5,954
91
11/12/2024
Marcus Ave
35th St
36th St
26
5,720
91
11/12/2024
Marcus Ave
32nd St
33rd St
26
5,538
89
11/12/2024
Marcus Ave
34th St
35th St
26
5,434
87
11/12/2024
Marcus Ave
36th St
Rialto
26
4,264
86
11/12/2024
Marcus Ave
Rialto
Channel PI
16
11,760
85
11/12/2024
Margaret Dr
Tustin Ave
Irvine Ave
34
43,306
69
11/14/2024
Marguerite Ave
195' S of Coast Highway East
Coast Highway East
38
7,410
92
12/19/2023
Marguerite Ave
Ocean Blvd
Seaview Ave
40
17,120
91
1/16/2024
Marguerite Ave
San Joaquin Hills Rd
Pacific View Dr
36
26,406
90
12/20/2023
Marguerite Ave
Seaview Ave
195' S of Coast Highway East
40
16,200
89
1/16/2024
Marian Ln
Lincoln Ln
Highland Dr
38
11,202
95
11/11/2024
Marian Ln
Highland Dr
Ruth Ln
38
39,824
93
11/11/2024
Marigold Ave
Third Ave
Fourth Ave
27
9,315
92
12/12/2023
Marigold Ave
Coast Highway East
Third Ave
27
22,275
86
12/12/2023
Marigold Ave
Seaview Ave
Coast Highway East
28
16,380
65
12/19/2023
Marigold Ave
Fourth Ave
Fifth Ave
27
8,910
59
12/12/2023
Marigold Ave
Ocean Blvd
Seaview Ave
27
9,990
51
1/16/2024
Marine Ave
North Bridge End
Ba side Dr
20
10,800
92
12/20/2023
Marine Ave
South Bridge End
North Bridge End
20
8,000
90
12/20/2023
Marine Ave
Balboa Ave
South Bridge End
37
21,867
53
12/22/2023
Marine Ave
Bay Front South
Park Ave
27
12,880
52
12/22/2023
Marine Ave
Park Ave
Balboa Ave
37
17,390
45
12/22/2023
Mariners Dr
Santiago Dr
East End
37
48,084
90
11/11/2024
Mariners Dr
Irvine Ave
Dover Dr
38
55,100
90
11/11/2024
Mariners Dr
Dover Dr
Santiago Dr
38
84,056
88
11/11/2024
Marlin Way
Shipway Ln
Terrapin Way
33
25,725
94
11/11/2024
Martingale Way
Corinthian Way
End 44
26,228
87
11/30/2023
Appendix B - Local Streets
19 of 33
5-87
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment
Mc Fadden PI Balboa Blvd West End 22
Meadow Ln Tustin Ave End 35
Area (SF) Current PCI
13,200 79
Most Recent Inspection Date
11/13/2024
11/11/2024
11/14/2024
9,325
3,040
88
94
Medina Way
Balboa Blvd East
End
19
Medina Way
Edgewater Ave East
Bay Ave East
20
10,400
88
12/4/2024
Medina Way
Bay Ave East
Balboa Blvd East
20
3,600
88
12/4/2024
Mendoza Ter
Seaward Rd
End
23
17,445
83
12/13/2023
Mesa Dr
Mesa Dr/Birch St
Cypress St
37
42,180
90
11/30/2023
Mesa Dr
Cypress St
End
37
49,765
89
11/30/2023
Mesa View North
Ford Rd
Bonita Canyon Dr
43
17,200
87
12/21/2023
Mesa View South
Bonita Canyon Dr
Ford Rd
43
17,200
87
12/21/2023
Michael PI
15th St
End
34
8,840
79
11/14/2024
Milford Dr
Hampden Rd
Orrin ton Rd
37
32,375
97
12/12/2023
Milford Dr
Orrin ton Rd
Camden Dr
37
32,137
97
12/12/2023
Miramar Dr
Balboa Blvd East
L St
30
41,610
74
12/4/2024
Miramar Dr
M St
Channel Rd
30
17,700
70
12/4/2024
Miramar Dr
L St
M St
29
16,965
69
12/4/2024
Mission Bay Dr
Point Loma Dr
Spyglass Hill Rd
36
65,448
92
12/6/2023
Monrovia Ave
15th St West
End
39
20,865
69
11/14/2024
Monrovia Ave
City Limit
15th St West
39
64,545
67
11/14/2024
Montecito Dr
Cambria Dr
Dana Point Way
32
33,664
76
12/6/2023
Montecito Dr
Dana Point Way
Drakes Bay Dr
32
57,518
47
12/6/2023
Monterey Cir
Carmel Bay Dr
End
32
18,696
67
12/6/2023
Montero Ave
Bay Ave East
Edgewater Ave East
33
16,500
98
12/4/2024
Morning Canyon Rd
Seaward Rd
Coast Highway East
35
12,250
90
12/13/2023
Morning Canyon Rd
Serra Dr
Seaward Rd
35
32,200
87
12/13/2023
Morning Canyon Rd
Coast Highway East
Shorecliff Rd
27
41,964
84
12/13/2023
Morning Star Ln
Polaris Dr
End
33
24,775
90
11/11/2024
Morro Bay Dr
Goleta Point Dr South End
Goleta Point Dr North End
32
42,894
56
12/6/2023
Muir Beach Cir
Goleta Point Dr
End
32
19,740
61
12/6/2023
Narcissus Ave
Seaview Ave
Coast Highway East
27
14,931
69
12/19/2023
Narcissus Ave
Fifth Ave
Geranium
36
12,384
66
12/12/2023
Narcissus Ave
Coast Highway East
175' S of Fifth Ave
27
38,610
59
12/12/2023
Narcissus Ave
Ocean Blvd
Seaview Ave
27
9,882
57
12/19/2023
Narcissus Ave
175' S of Fifth Ave
Fifth Ave
30
4,890
35
1/16/2024
Nautilus Lane
To on Ln
Buttonshell Ln
33
11,760
92
11/11/2024
Neptune Ave
51st St
End
25
18,750
84
11/14/2024
Neptune Ave
46th St
51st St
24
25,800
84
11/14/2024
Newport Coast Dr SIB
73 Freeway Bride
Sage Hill
44
98,340
76
12/21/2023
Newport Hills Dr E
Port Seaborne Way
Port Sutton Dr
36
65,124
81
12/5/2023
Newport Hills Dr E
Port Rams ate PI
Port Seabourne Way
37
57,350
80
12/5/2023
Newport Hills Dr E
Ford Rd
Port Rams ate PI 36
51,100
80
12/5/2023
Appendix B - Local Streets
20 of 33
9 -w
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
Newport Hills Dr E Port Sutton Dr Newport Hills Dr West 38 75,430 78 12/5/2023
Newport Hills Dr W Newport Hills Dr East Port Carlow PI 36 55,800 81 12/5/2023
Newport Hills Dr W
Port Carlow PI
Port Seabourne Wy
38
49,210
77
12/5/2023
Newport Hills Dr W
Port Seabourne Wy
Ford Rd
38
89,148
71
12/5/2023
Newport Place Dr
MacArthur Blvd
Dove St
62
36,530
77
11/30/2023
Newport Ridge Dr East
San Joaquin Hills Rd
Park Crest
40
59,300
85
12/15/2023
Newport Ridge Dr East
Park Crest
St Michael
40
88,600
83
12/15/2023
Newport Ridge Dr West
Whitesands
San Joaquin Hills Rd
40
47,700
84
12/15/2023
Newport Ridge Dr West
St Michael
Whitesands
40
56,800
82
12/15/2023
Newport Shores Dr
Orange St
Walnut St
20
12,640
88
11/14/2024
Newport Shores Dr
Walnut St
61st St
20
16,540
87
11/14/2024
Nordina St
Seashore Dr
Ocean Front Alley West
17
1,445
90
11/14/2024
Nordina St
Ocean Front Alley West
Ocean Front West
19
1,235
85
2/7/2025
Norfolk Ln
Dover Dr
Devon Ln
33
7,260
91
11/11/2024
North Star Ln
White Cliffs Dr
End
33
30,550
86
11/11/2024
Nottingham Rd
Dover Dr
Santiago Dr
38
66,804
89
11/11/2024
Ocean Blvd
Goldenrod Ave
Iris Ave
41
32,062
95
12/22/2023
Ocean Blvd
Iris Ave
Marguerite Ave
48
44,640
95
12/22/2023
Ocean Blvd
Marguerite Ave
Poppy Ave
41
64,985
95
12/22/2023
Ocean Blvd
L St
Channel Rd
36
48,060
60
12/4/2024
Ocean Blvd
G St
L St
36
54,900
55
12/4/2024
Ocean Blvd
Carnation Ave
Goldenrod Ave
41
45,920
45
12/22/2023
Ocean View Ave
Tustin Ave
Cliff Dr
24
22,128
90
9/26/2024
Old Newport BI
Coast Highway
270' N of Coast Highway
46
12,420
85
11/14/2024
Old Newport BI
475' N of Coast Highway
595' N of Coast Highway
30
3,600
85
11/14/2024
Old Newport BI
270' N of Coast Highway
475' N of Cosast Highway
32
6,560
75
11/20/2024
Old Newport BI
Hospital Rd
City Limit
32
58,560
70
11/20/2024
Old Newport BI
595' N of Coast Highway
Hospital Rd
30
28,500
69
11/20/2024
Old Newport BI
1530' N Hospital Rd
City Limit
15
4,500
61
11/14/2024
Old Newport BI
Hospital Rd
City Limit
26
39,375
58
11/14/2024
Olive St
Seashore Dr
Ocean Front West
17
2,924
86
11/14/2024
Onyx Ave
Park Ave
Bay Front South
27
11,070
75
12/22/2023
Onyx Ave
Balboa Blvd
Park Ave
27
11,340
68
12/22/2023
Onyx Ave
Bay Front North
Balboa Ave
27
15,525
65
12/22/2023
O al Ave
Park Ave
Bay Front South
24
13,200
60
12/22/2023
Opal Ave
Collins Ave
Park Ave
23
12,627
58
12/22/2023
Orange Ave
Old Newport Blvd
15th St
36
15,696
79
8/26/2024
Orange St
Canal St
Coast Highway West
35
16,380
93
11/14/2024
Orange St
Coast Highway West
Ocean Front Alley West
32
5,312
92
11/14/2024
Orange St
Ocean Front Alley West
Ocean Front West
33
1,716
85
11/20/2024
Orchard Dr
Birch St
Cypress St 36
22,680
89
11/30/2023
Appendix B - Local Streets
21 of 33
4 : •'
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment
Orchard Dr Cypress St Orchid St 35
Orchard Dr Irvine Ave Birch St 40
Area (SF) Current PCI
16,275 89
Most Recent Inspection Date
11/30/2023
11/30/2023
11/30/2023
32,000
5,180
87
82
Orchard Dr
Bay View Ave
End
35
Orchard Dr
Santa Ana Ave
End
33
47,142
79
11/30/2023
Orchid Ave
Ocean Blvd
Coast Highway East
27
29,862
63
12/19/2023
Orchid Ave
Coast Highway East
Third Ave
28
23,800
59
12/12/2023
Orchid Ave
Third Ave
Fifth Ave
28
21,448
49
12/12/2023
Orchid Hill PI
Upper Bay Dr
End
34
14,450
84
11/30/2023
Orchid St
Orchard Dr
Azure Ave
35
17,500
85
11/30/2023
Orchid St
Zenith Ave
Orchard Dr
35
33,495
82
11/30/2023
Orrin ton Rd
Cameo Shores Rd
Milford Dr
33
47,025
90
12/12/2023
Outrigger Dr
Keel Dr
Sandcastle Dr
33
47,255
91
12/7/2023
Oxford Ln
Devon Ln
Highland Dr
34
26,440
88
11/11/2024
Pacific Dr
Begonia Ave
Acacia Ave
27
8,910
98
12/21/2023
Pacific Dr
Acacia Ave
Avocado Ave
27
8,235
98
12/21/2023
Pacific View Dr
San Miguel Dr
End
36
97,800
76
12/20/2023
Palm St
Ocean Front Alley East
Ocean Front East
31
4,185
94
11/13/2024
Palm St
Bay AveEast
Balboa Blvd East
34
6,562
93
11/13/2024
Palm St
Balboa Blvd East
Ocean Front Alley East
31
2,325
92
11/13/2024
Palm St
Ferry Entrance
Bay Ave East
34
4,080
89
12/4/2024
Palma Dr
Holiday Rd
City Limit
35
22,750
86
11/11/2024
Pa er Ln
Anniversary Ln
End
33
13,365
52
11/11/2024
Park Ave
West Side of Bride
East Side of Bride
20
5,600
87
12/21/2023
Park Ave
East Side of Bride
Bay Front East
40
22,820
87
12/21/2023
Park Ave
Amethyst Ave
West Side of Bride
46
23,060
69
12/21/2023
Park Ave
West End
Pearl Ave
48
28,560
63
12/21/2023
Park Ave
Sapphire Ave
Amethyst Ave
48
26,304
54
12/21/2023
Park Ave
Collins Ave
Sapphire Ave
48
25,920
54
12/21/2023
Park Ave
Pearl Ave
Collins Ave
48
35,460
54
12/21/2023
Park Green Dr
Sausalito Dr
Sandcastle Dr
40
44,400
92
12/7/2023
Park Ln
38th St
36th St
24
10,608
87
11/13/2024
Patolita Dr
Dolphin Ter
Bonnie Doone Ter
33
16,170
83
12/14/2023
Patrice Rd
Bolero Way
Flagship Rd
37
18,500
74
11/14/2024
Patrice Rd
Flagship Rd
South End
37
11,655
60
11/14/2024
Peach Tree Ln
Redland Dr
End
34
6,868
88
11/11/2024
Pearl Ave
Park Ave
Bay Front South
23
10,695
89
12/22/2023
Pearl Ave
Bay Front North
Park Ave
23
13,386
52
12/22/2023
Pebble Dr
Goldenrod Ave
Sandier Dr
34
42,398
81
12/7/2023
Pegasus St
Santa Ana Ave
Kline Dr
33
38,841
81
11/30/2023
Pelican Hill Rd N
Pelicans Dr
Pelican Hill Cir North Side
19
50,996
88
12/8/2023
Pelican Hill Rd N
Pelicans Dr
Newport Coast Dr 19
23,902
88
12/8/2023
Appendix B - Local Streets
22 of 33
9 U00
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment
Pelican Hill Rd N Pelican Hill Or North Side Pelicans Dr 19
Pelican Hill Rd N Newport Coast Dr North Pelicans Dr 19
Area (SF) Current PCI
50,996 88
Most Recent Inspection Date
12/8/2023
12/8/2023
12/8/2023
23,902
85
Pelican Hill Rd S
Newport Coast Dr
Pelican Hill Cir S
24
142,100
84
Pelican Hill Rd S
Pelican Hill Cir South Side
Newport Coast Dr
24
142,600
84
12/8/2023
Pelican Hill Rd S
Pelican Hill Cir South Side
Pelican Hill Cir North Side
24
32,448
80
12/8/2023
Pelican Hill Rd S
Pelican Hill Cir North Side
Pelican Hill Cir South Side
24
31,798
80
12/8/2023
Pembroke Ln
Mariners Dr
Cornwall Ln
34
32,220
84
11/11/2024
Perham Rd
Cameo Shores Rd
Milford Dr
33
45,540
93
12/12/2023
Pescador Dr
Nottingham Rd
Santiago Dr
33
50,271
83
11/11/2024
Piazza Genoa
Via Lido Soud
Via Genoa
45
8,640
81
9/12/2024
Piazza Lido
Via Florence
Via Havre
58
29,580
83
9/12/2024
Piazza Lido
Via Havre
Via Koron
24
10,272
70
9/12/2024
Pirate Rd
Cliff Dr
Clay St
35
28,735
92
8/26/2024
Plaza Del Norte
L St
I St
30
11,250
73
12/4/2024
Plaza Del Sur
I St
L St
30
16,050
73
12/4/2024
Poinsettia Ave
Seaview Ave
Coast Highway East
28
17,864
82
12/19/2023
Poinsettia Ave
Ocean Blvd
Seaview Ave
28
15,316
68
12/19/2023
Poinsettia Ave
Coast Highway East
Fourth Ave
28
33,936
63
12/12/2023
Poinsettia Ave
Fourth Ave
Fifth Ave
30
9,540
24
1/16/2024
Point Arena Way
Point Loma Dr
Point Sur Dr
32
22,140
60
12/6/2023
Point Arguello Way
El Ca itan Dr
Drakes Bay Dr
36
6,120
72
12/6/2023
Point Conception Way
El Ca itan Dr
Drakes Bay Dr
36
6,798
87
12/6/2023
Point Loma Dr
Mission Bay Dr
Point Arena Way
32
43,950
48
12/6/2023
Point Mendocino Way
Spyglass Hill Rd
Bode a Bay Dr
36
6,120
76
12/6/2023
Point Sur Dr
Carmel Bay Dr
Point Arena Wy
32
21,390
64
12/6/2023
Polaris Dr
Evening Star Ln
Santiago Dr
36
62,148
86
11/11/2024
Polaris Dr
Galaxy Dr
Evening Star Ln
36
44,352
85
11/11/2024
Poppy Ave
190'S Coast Highway East
Coast Highway East
21
3,990
92
12/7/2023
Poppy Ave
Ocean Blvd
190' S Coast Highway East
24
27,840
89
1/16/2024
Poppy Ave
Second Ave
Fifth Ave
27
31,050
65
12/7/2023
Poppy Ave
Coast Highway East
Second Ave
30
9,000
27
1/16/2024
Pork Barrel Way 35th 1/2 St)
FinleyAve
S End
16
1,280
93
11/13/2024
Port Abbey PI
Port Sheffield PI West End
Newport Hills Drive West
32
24,704
79
12/5/2023
Port Abbey PI
Newport Hills Drive West
Port Sheffield PI East End)
32
30,080
74
12/5/2023
Port Aberdeen PI
Port Whitby PI
Port Durness PI
32
44,628
90
12/4/2023
Port Albans Cir
Newport Hills Dr East
End
54
9,450
77
12/5/2023
Port Albans PI
Newport Hills Dr East
Port Cardi on PI
32
22,240
71
12/5/2023
Port Ashley PI
Newport Hills Drive West
Port Stirling PI East End
32
19,840
85
12/5/2023
Port Ashley PI
Port Stirling PI West End
Newport Hills Drive West
32
11,200
77
12/5/2023
Port Barmouth PI
Port Westbourne PI West End
Newport Hills Drive West
32
19,200
72
12/5/2023
Port Barmouth PI
Newport Hills Drive West
Port Westbourne PI East End) 32
27,200
70
12/5/2023
Appendix B - Local Streets
23 of 33
5-91
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
Port Bishop PI Newport Hills Dr East Port Carney PI 33 32,435 75 12/5/2023
Port Bristol Cir Newport Hills Drive East End 32 35,040 80 12/5/2023
Port Bristol Cir
Port Cardiff PI West Side
Newport Hills Drive East
32
37,120
67
12/5/2023
Port Cardiff PI
Newport Hills Drive East
Port Bristol Cir East End)
32
16,800
83
12/5/2023
Port Cardiff PI
Port Bristol Cir West End
Newport Hills Drive East
32
30,656
79
12/5/2023
Port Cardigan PI
Newport Hills Dr East
Port Albans PI
32
26,880
79
12/5/2023
Port Carlisle PI
Port Whitby PI
Port Lerwick PI
32
47,252
82
12/4/2023
Port Carlow Cir
Newport Hills Dr West
End
54
6,210
77
12/5/2023
Port Carlow PI
Newport Hills Dr West
Port Renwick PI
32
30,688
70
12/5/2023
Port Carney PI
Newport Hills Dr East
Port Bishop PI
33
16,998
71
12/5/2023
Port Charles PI
Port Margate PI West End
Newport Hills Drive West
32
21,280
76
12/5/2023
Port Charles PI
Newport Hills Drive West
Port Margate PI East End
36
36,000
69
12/5/2023
Port Chelsea PI
Newport Hills Drive East
Port Rams ate PI East End
32
17,568
75
12/5/2023
Port Chelsea PI
Port Rams ate PI West End
Newport Hills Drive East
32
31,584
72
12/5/2023
Port Claridge PI
Newport Hills Dr East
Port Nelson PI
33
29,445
70
12/5/2023
Port Dunbar Dr
Spyglass Hill Rd
Port Harwick PI
36
6,942
83
12/4/2023
Port Dunlei h Cir
Newport Hills Dr East
End
32
21,696
77
12/5/2023
Port Durness PI
Port Whitby PI
Port Aberdeen PI
36
46,364
89
12/4/2023
Port Durness PI
Port Harwick PI
Port Whitby PI
36
26,238
85
12/4/2023
Port Edward Cir
Newport Hills Dr East
End
32
10,400
72
12/5/2023
Port Edward PI
Newport Hills Dr East
Port Lockslei h PI
33
28,860
69
12/5/2023
Port Harwick PI
Port Dunbar Dr
Port Durness PI
36
14,208
79
12/4/2023
Port Hemley Cir
Newport Hills Dr West
End
54
5,940
71
12/5/2023
Port Kimberly PI
Newport Hills Dr West
Port Manlei h PI
32
27,456
76
12/5/2023
Port Laurent PI
Newport Hills Dr East
Port Trinity PI
33
28,535
76
12/5/2023
Port Lerwick PI
Port Whitby PI
Port Carlisle PI
32
31,744
78
12/4/2023
Port Lockslei h PI
Newport Hills Dr East
Port Edward PI
33
32,500
71
12/5/2023
Port Manlei h Cir
Newport Hills Dr West
Newport Hills Dr West
32
24,000
76
12/5/2023
Port Manlei h PI
Newport Hills Dr West
Port Kimberly PI
32
25,024
70
12/5/2023
Port Margate PI
Port Charles PI West Side
Newport Hills Drive West
32
12,096
72
12/5/2023
Port Margate PI
Port Charles PI East Side
Newport Hills Drive West
32
26,880
65
12/5/2023
Port Nelson PI
Newport Hills Dr West
Port Charles PI East Side
33
30,713
67
12/5/2023
Port Provence PI
Port We brid a PI West End
Newport Hills Dr East
32
37,120
69
12/5/2023
Port Provence PI
Newport Hills Dr East
Port We brid a PI East Side)
32
27,784
64
12/5/2023
Port Ramsey PI
San Miguel Dr
Port Whitby PI
36
6,008
92
12/4/2023
Port Rams ate PI
Newport Hills Drive East
Port Chelsea PI East End)
32
13,760
79
12/5/2023
Port Rams ate PI
Port Chelsea PI West End
Newport Hills Drive East
32
20,256
69
12/5/2023
Port Renwick PI
Newport Hills Dr West
Port Carlow PI
32
27,264
70
12/5/2023
Port Seabourne Way
Newport Hills Dr West
Newport Hills Dr East
40
63,760
76
12/5/2023
Port Sheffield PI
Newport Hills Drive West
Port Abbe PI East Side)
32
20,800
74
12/5/2023
Port Sheffield PI
Port Abbe PI West Side
Newport Hills Drive West 32
16,224
73
12/5/2023
Appendix B - Local Streets
24 of 33
5-92
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment
Port Stanhope Or Newport Hills Dr West End 38
Port Stanhope PI Newport Hills Dr West Port Tiffin PI 32
Area (SF) Current PCI
5,330 85
Most Recent Inspection Date
12/5/2023
12/5/2023
12/5/2023
23,200
71
Port Stirling PI
Port Ashley PI West Side
Newport Hills Drive West
32
19,680
80
Port Stirling PI
Newport Hills Drive West
Port Ashley PI East Side
32
24,960
73
12/5/2023
Port Sutton Dr
San Miguel Dr
Newport Hills Dr East
49
15,756
63
12/5/2023
Port Taggart PI
Newport Hills Dr West
Port Wheeler PI
32
31,840
71
12/5/2023
Port Tiffin Cir
Newport Hills Dr West
End
54
6,210
89
12/5/2023
Port Tiffin PI
Newport Hills Dr West
Port Stanhope PI
32
23,360
72
12/5/2023
Port Townsend Cir
Port Bishop PI
End
33
9,735
74
12/5/2023
Port Trinity Cir
Newport Hills Dr East
End
33
11,213
79
12/5/2023
Port Trinity PI
Newport Hills Dr East
Port Laurent PI
33
24,635
73
12/5/2023
Port Westbourne PI
Port Barmouth PI West Side
Newport Hills Drive West
32
12,480
81
12/5/2023
Port Westbourne PI
Newport Hills Drive West
Port Barmouth PI East Side
32
21,760
66
12/5/2023
Port We brid a PI
Port Provence PI West End
Newport Hills Drive East
32
26,560
83
12/5/2023
Port We brid a PI
Newport Hills Drive East
Port Provence PI East Side
33
20,394
69
12/5/2023
Port Wheeler PI
Newport Hills Dr West
Port Taggart PI
32
33,824
70
12/5/2023
Port Whitby PI
Port Ramsey PI
Port Durness PI
36
37,220
90
12/4/2023
Portside Way
Windover Dr
Wavecrest Dr
32
18,432
90
12/7/2023
Powell PI
15th St
End
34
7,480
78
11/14/2024
Prairie Road SIB
Bonita Canyon Dr
Ford Rd
35
12,250
91
12/21/2023
Prairie Road NB
Ford Rd
Bonita Canyon Dr
46
16,100
83
12/21/2023
Priscilla Ln
Beryl Ln
Diana Ln
34
23,572
95
11/11/2024
Private Rd
Irvine Ave
Irvine Ave
33
31,110
84
11/11/2024
Production PI
Monrovia Ave
Placentia Ave
38
48,070
65
11/14/2024
Prospect St
Coast Highway West
Seashore Dr
46
3,450
94
11/14/2024
Prospect St
Seashore Dr
Ocean Front Alley West
18
972
94
11/14/2024
Prospect St
Canal St
Cedar St
29
24,824
94
11/14/2024
Prospect St
Cedar St
Newport Shores Dr
29
22,765
94
11/14/2024
Prospect St
Newport Shores Dr
Coast Highway West
24
4,320
93
11/14/2024
Prospect St
Ocean Front Alley West
Ocean Front West
18
576
80
11/20/2024
Quail St
Spruce St
Dove St
44
56,144
81
11/30/2023
Quail St
Birch St
Westerly PI
60
37,020
80
11/30/2023
Quail St
Westerly PI
Spruce St
44
40,128
78
11/30/2023
Quail St
Campus Dr
Birch St
36
21,060
69
11/30/2023
Quiet Cove
Tiller Way
End
32
16,540
91
12/7/2023
Ramona Dr
Santanella Ter
Bonnie Doone Ter
33
9,240
70
12/14/2023
Ramona Dr
Dolphin Ter
Santanella Ter
33
16,863
67
12/14/2023
Redlands Ave
15th St
Clay St
34
23,120
90
9/26/2024
Redlands Ave
Clay St
Cliff Dr
34
24,820
18,150
25,344
84
89
88
9/26/2024
11/11/2024
11/11/2024
Redlands Dr
23rd St
Dawnview Ln
33
Redlands Dr
Dawnview Ln
Santa Isabel Ave 33
Appendix B - Local Streets
25 of 33
5-93
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
Redlands Dr South End 23rd St 33 6,699 86 11/11/2024
Redlands Dr Orchard Dr Indus St 33 18,645 81 11/30/2023
Ridge Park Rd
San Joaquin Hills Rd
Newport Coast Dr
37
53,613
87
12/15/2023
Ridge Park Rd
Talmont
East End
37
40,835
86
12/15/2023
Ridge Park Rd
Campo Bello
Vista Ridge Rd
37
55,167
84
12/15/2023
Ridge Park Rd
Vista Ridge Rd
West Coast Peak
37
50,986
84
12/15/2023
Ridge Park Rd
Tesoro
Campo Bello
37
47,471
82
12/15/2023
Ridge Park Rd
West Coast Peak
Talmont
37
44,992
82
12/15/2023
Ridge Park Rd
Newport Coast Dr
Tesoro
37
67,081
81
12/15/2023
Rigel Cir
Galaxy Dr
End
56
12,020
87
11/11/2024
River Ave
42nd St
Channel PI
28
9,520
89
11/13/2024
River Ave
51st St
End
38
47,500
89
11/14/2024
River Ave
Balboa Blvd
51st St
38
41,800
88
11/14/2024
River Ave
Alley #325
Balboa Blvd
25
8,250
84
11/13/2024
River Ave
40th St
42nd St
28
12,600
77
12/4/2024
River Ave
38th St
40th St
28
12,040
76
12/4/2024
Rivera Ter
Seaward Rd
End
23
8,544
80
12/13/2023
Riverside Ave
Avon St
Cliff Dr
52
49,036
79
9/26/2024
Riverside Ave
Coast Highway West
Avon St West Side
52
24,700
77
9/26/2024
Riverside Ave
Cliff Dr
15th St
34
47,600
60
9/26/2024
Riverside Dr
Indus St
End
33
8,430
91
11/30/2023
Riverside Dr
Orchard Dr
End
33
18,960
83
11/30/2023
Rockford PI
Rockford Rd
End
37
11,050
89
12/12/2023
Rockford Rd
Surrey Dr
Cortland Dr
37
24,827
88
12/12/2023
Rocky Point Rd
Goleta Point Dr
End
32
16,380
92
12/6/2023
Roxbury Rd
Cameo Shores Rd
Milford Dr
33
39,501
95
12/12/2023
Ruby Ave
Park Ave
Bay Front South
27
11,286
74
12/22/2023
Ruby Ave
Bay Front North
Balboa Ave
28
12,768
72
12/22/2023
Ruby Ave
Balboa Ave
Park Ave
28
12,180
72
12/22/2023
Ruth Ln
Estelle Ln
Marian Ln
34
22,654
88
11/11/2024
Rutland Rd
Mariners Dr
Westcliff Dr
36
48,600
91
11/11/2024
Sabrina Ter
Seadrift Dr
An elita Dr
33
56,826
61
12/14/2023
Salt Air Cir
Salt Air Dr
End
32
13,520
90
12/7/2023
Salt Air Dr
Salt Air Cir
Lighthouse Ln
32
18,420
90
12/7/2023
San Bernardino Ave
Clay Ave
Cliff Dr
14
12,040
85
9/26/2024
San Bernardino Ave
15th St
Clay Ave
34
21,420
78
9/26/2024
San Bernardino Ave
Clay Ave
Cliff Dr
20
17,200
62
9/26/2024
San Clemente Dr
Santa Barbara Dr
Santa Cruz Dr
48
54,720
78
12/15/2023
San Joaquin Hills Rd
Backbay Dr
800' E of Backbay Dr
31
29,386
32,960
44,498
77
69
73
12/15/2023
12/15/2023
12/15/2023
San Joaquin Hills Rd EB
800' E of Backbay Dr
Jamboree Rd
30
San Joaquin Hills Rd WB
Jamboree Rd
800' E of Backbay Dr 47
Appendix B - Local Streets
26 of 33
M.i
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
San Martin Way Bode a Bay Dr San Mateo Way 36 30,450 1 79 12/6/2023
San Mateo Way Bode a Bay Dr San Martin Way 32 21,980 72 12/6/2023
San Nicolas Dr
Newport Center Dr East
Avocado Ave
78
84,240
86
12/15/2023
Sand Key
Park Green Dr
End
33
17,783
90
12/7/2023
Sand Point Way
Windover Dr
Wavecrest Dr
36
11,580
88
12/7/2023
Sandalwood Ln
Santiago Dr
Candlestick Ln
35
14,670
98
11/11/2024
Sandcastle Dr
Marguerite Ave
Tiller Way
36
6,948
87
12/7/2023
Sandcastle Dr
Park Green Dr
Seacrest Dr
36
35,100
86
12/7/2023
Sandcastle Dr
Inlet Isle Dr
Park Green Dr
36
23,544
85
12/7/2023
Sandcastle Dr
Seacrest Dr
Catamaran Dr
36
52,740
85
12/7/2023
Sandcastle Dr
Tiller Way
Inlet Isle Dr
36
93,168
79
12/7/2023
Sandier Dr
Ebbtide Rd
Setting Sun Dr
33
14,855
82
12/7/2023
Sandune Ln
Inlet Isle Dr
End
32
23,240
91
12/7/2023
Santa Ana Ave
Cliff Dr
Clay St
34
56,270
89
8/26/2024
Santa Ana Ave
Clay St
15th St
36
22,572
85
8/26/2024
Santa Ana Ave
Old Newport Blvd
Cliff Dr
24
18,000
76
8/26/2024
Santa Ana Ave
15th St
City Limit
19
12,160
75
8/26/2024
Santa Ana Ave
Cliff Dr
Clay St
20
33,100
53
8/26/2024
Santa Ana Ave
Clay St
15th St
20
12,540
52
8/26/2024
Santa Barbara Dr
Jamboree Rd
Newport Center Dr West
73
184,325
73
12/15/2023
Santa Isabel Ave
Irvine Ave
Tustin Ave
56
16,240
100
11/11/2024
Santana Dr
Dolphin Ter
Bonnie Doone Ter
33
12,375
83
12/14/2023
Santanella Ter
Patolita Dr
Malabar Dr
33
52,965
78
12/14/2023
Santiago Dr
Antigua Way
Mariners Dr
36
34,308
92
11/11/2024
Santiago Dr
Galaxy Dr
Antigua Way
36
84,492
89
11/11/2024
Santiago Dr
Tustin Ave
Irvine Ave
37
48,375
89
11/11/2024
Santiago Dr
Pescador Dr
Polaris Dr
37
15,178
82
11/11/2024
Santiago Dr
Nottingham Rd
Pescador Dr
36
52,020
80
11/11/2024
Santiago Dr
Irvine Ave
Galaxy Dr
36
31,464
77
11/11/2024
Santiago Dr
Mariners Dr
Nottingham Rd
36
84,960
77
11/11/2024
Sapphire Ave
Park Ave
Bay Front South
28
12,180
65
12/22/2023
Sapphire Ave
Balboa Ave
Park Ave
27
11,313
64
12/22/2023
Sapphire Ave
Bay Front North
Balboa Ave
27
14,580
64
12/22/2023
Sausalito Dr
Marguerite Ave
End
36
23,100
90
12/7/2023
Schooner Rd
Beacon Bay
End
24
6,960
88
12/19/2023
Scott Dr
Corinthian Way
Dove St
44
22,572
87
11/30/2023
Sea Gull Ln
Sherin ton PI
16th St
37
33,300
71
11/11/2024
Sea Ln
Harbor View Dr
Goldenrod Ave
37
49,580
89
12/7/2023
Sea Ln
Crown Dr
Harbor View Dr
38
40,964
75
12/7/2023
Seabreeze Ln
Tiller Way
Surfview Ln
32
36,520
91
12/7/2023
Seacrest Dr
Catamaran Dr
Sandcastle Dr 32
47,200
91
12/7/2023
Appendix B - Local Streets
27 of 33
5-95
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
Seadrift Dr Malabar Dr Zahma Dr 37 61,420 46 12/14/2023
Seashore Dr 36th St 33rd St 28 19,320 93 11/13/2024
Seashore Dr
46tth St
45th St
28
5,740
92
11/13/2024
Seashore Dr
42nd St
39th St
28
18,200
91
11/13/2024
Seashore Dr
42nd St
45th St
28
17,640
91
11/13/2024
Seashore Dr
39th St
36th St
28
19,320
89
11/13/2024
Seashore Dr
60th St
Prospect St
28
17,640
89
11/13/2024
Seashore Dr
46th St
53rd St
28
42,000
88
11/13/2024
Seashore Dr
Orange St
End
27
41,625
83
11/13/2024
Seashore Dr
53rd St
60th St
28
42,000
82
11/13/2024
Seashore Dr
Prospect St
Orange St
28
29,820
73
11/13/2024
Seashore Dr
32nd St
33rd St
33
7,425
65
12/4/2024
Seaview Ave
Narcissus Ave
Orchid Ave
28
7,040
86
12/19/2023
Seaview Ave
Orchid Ave
Poinsettia Ave
28
7,425
83
12/19/2023
Seaview Ave
Poinsettia Ave
Poppy Ave
28
7,560
80
12/19/2023
Seaview Ave
Goldenrod Ave
Jasmine Ave
30
27,270
63
12/22/2023
Seaview Ave
Jasmine Ave
Marguerite Ave
30
16,890
61
12/22/2023
Seaview Ave
Marguerite Ave
Narcissus Ave
30
18,450
52
12/22/2023
Seaview Ave
Carnation Ave
Goldenrod Ave
30
25,710
51
12/22/2023
Seaward Rd
Evening Canyon Rd
Driftwood Rd
27
7,749
87
12/13/2023
Seaward Rd
Isabella Ter
De Anza Dr
35
54,040
80
12/13/2023
Seaward Rd
Coast Highway East
Evening Canyon Rd
37
9,195
74
12/13/2023
Seaward Rd
De Anza Dr
Serra Dr
35
31,990
73
12/13/2023
Seaward Rd
Serra Dr
Coast Highway East
35
12,215
59
12/13/2023
Second Ave
Carnation Ave
Heliotrope Ave
28
33,600
90
12/13/2023
Second Ave
Narcissus Ave
Orchid Ave
27
7,263
83
12/12/2023
Second Ave
Avocado Ave
Carnation Ave
28
25,144
81
12/13/2023
Second Ave
Jasmine Ave
Marguerite Ave
27
14,472
77
12/12/2023
Second Ave
Marguerite Ave
Narcissus Ave
27
15,498
77
12/12/2023
Second Ave
Poinsettia Ave
Poppy Ave
27
7,290
76
12/12/2023
Second Ave
Orchid Ave
Poinsettia Ave
27
7,236
76
12/12/2023
Second Ave
Poppy Ave
Hazel Ave
27
3,375
68
12/12/2023
Serenade Ter
Dolphin Ter
Ramona Dr
33
33,000
83
12/14/2023
Serra Dr
Seaward Rd
De Anza Dr
35
45,675
85
12/13/2023
Serrano Ave
M St
Granada Ave
30
5,550
91
12/4/2024
Setting Sun Dr
Pebble Dr
Sandier Dr
33
32,576
79
12/7/2023
Seville Ave
Balboa Blvd East
M St
30
20,250
81
12/4/2024
Seville Ave
M St
Channel Rd
30
14,550
3,770
52,984
29,716
63
74
78
94
12/4/2024
12/19/2023
11/11/2024
11/12/2024
Shell St
Way Ln
End
32
Sherin ton PI
Irvine Ave
Sea Gull Ln
37
Shipway Ln
Tradewinds Ln
Skylark Ln 38
Appendix B - Local Streets
28 of 33
9•.
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
Shorecliff Rd Evening Canyon Rd End 27 26,559 59 12/13/2023
Short St Clubhouse Ave End 16 5,040 92 11/13/2024
Short St
Newport Blvd
Clubhouse Ave
32
4,320
90
11/13/2024
Sierra Vista
Tustin Ave
End
32
20,132
91
11/12/2024
Signal Rd
Kings Rd
15th St
35
41,650
88
8/26/2024
Silver Ln
Anniversary Ln
End
33
11,220
49
11/12/2024
Skylark Ln
Highland Dr
Commodore Rd
37
9,065
93
11/12/2024
Skylark Ln
Commodore Rd
Holiday Rd
38
41,344
91
11/12/2024
Snug Harbor Rd
Cliff Dr
Clay St
35
32,760
88
8/26/2024
Somerset Ln
Highland Dr
Highland Dr
34
50,330
87
11/12/2024
Sonora St
Seashore Dr
Ocean Front Alley West
16
1,520
90
11/14/2024
Sonora St
Ocean Front Alley West
Ocean Front West
19
1,330
84
11/20/2024
Spruce Ave
Bristol St South
Azure Ave
35
63,840
80
11/30/2023
Spruce St
Bristol St North
Quail St
60
36,000
85
11/30/2023
St Andrews Rd
Kings Rd
Clay St
34
35,530
86
8/26/2024
St Andrews Rd
Clay St
15th St
34
20,400
85
8/26/2024
St James PI
15th St
St James Rd
35
24,635
87
8/26/2024
St James Rd
15th St
St James PI
35
35,275
88
8/26/2024
Starboard Way
Windover Dr
Wavecrest Dr
32
11,424
89
12/7/2023
Starlight Cir
Glenwood Ln
End
33
8,935
99
11/12/2024
Starlight Cir
Commodore Rd
Glenwood Ln
35
8,155
98
11/12/2024
Summit St
Seashore Dr
End
18
3,150
91
11/14/2024
Sundance Dr
19th St
End
29
17,400
81
11/14/2024
Sunset Dr
Lu onia St
End
29
10,527
90
11/14/2024
Surfline Way
Windover Dr
Wavecrest Dr
32
22,556
85
12/7/2023
Surfview Ln
Tiller Wy
Seabreeze Lane
32
24,040
91
12/7/2023
Surrey Dr
Rockford Rd
Cameo Highland Dr
33
36,399
88
12/12/2023
Surrey Dr
Cameo Highland Dr
Garret Dr
33
21,120
82
12/12/2023
Sussex Ln
Dover Dr
Cumberland Ln
34
41,570
87
11/12/2024
Sylvia Ln
Beryl Ln
Deborah Ln
34
16,308
94
11/12/2024
Tahuna Ter
Mara ata Dr
An elita Dr
33
40,755
60
12/14/2023
Teller Ave
Campus Dr
Birch St
44
39,100
55
12/20/2023
Teresita Ln
Kathleen Ln
Vivian Ln
35
19,150
87
11/12/2024
Terrace Ride
Newport Ridge Dr West
End
38
23,000
86
12/21/2023
Terrapin Way
Shipway Ln
Marlin Way
33
15,450
89
11/12/2024
The Arcade
22nd St
21st St
10
1,670
92
11/13/2024
Third Ave
Avocado Ave
Acacia Ave
27
7,290
98
12/13/2023
Third Ave
Acacia Ave
Begonia Ave
27
7,155
95
12/13/2023
Third Ave
Begonia Ave
Carnation Ave
27
7,155
95
12/13/2023
Third Ave
Heliotrope Ave
Iris Ave
27
7,101
7,452
91
89
12/12/2023
12/12/2023
Third Ave
Larkspur Ave
Marguerite Ave 27
Appendix B - Local Streets
29 of 33
5-97
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
Third Ave Dahlia Ave Fernleaf Ave 27 7,155 84 12/13/2023
Third Ave Poinsettia Ave Poppy Ave 28 7,560 77 12/12/2023
Third Ave
Jasmine Ave
Larkspur Ave
27
7,290
76
12/12/2023
Third Ave
Marguerite Ave
Marigold Ave
28
7,616
68
12/12/2023
Third Ave
Narcissus Ave
Orchid Ave
28
7,392
68
12/12/2023
Third Ave
Orchid Ave
Poinsettia Ave
28
7,420
64
12/12/2023
Third Ave
Marigold Ave
Narcissus Ave
28
7,420
63
12/12/2023
Third Ave
Iris Ave
Jasmine Ave
27
7,290
47
12/12/2023
Tiburon Bay Dr
Carmel Bay Dr
Point Arena Way
32
31,104
60
12/6/2023
Tiller Way
Sandcastle Dr
Sausalito Dr
36
53,100
90
12/7/2023
Topaz Ave
Collins Ave
Park Ave
23
5,474
66
12/22/2023
Topaz Ave
Park Ave
Bay Front South
24
13,920
60
12/22/2023
Topside Ln
Sandcastle Dr
Inlet Isle Dr
32
20,782
92
12/7/2023
To on Ln
Holiday Rd
Nautilus Ln
33
15,285
89
11/12/2024
Tradewinds Ln
Santiago Dr
Commodore Rd
38
86,450
93
11/12/2024
Tremont Ln
Cameo Shores Rd
Milford Dr
33
46,860
92
12/12/2023
Turquoise Ave
Bay Front South
Park Ave
28
14,000
58
12/22/2023
Tustin Ave
Emerson St
Francisco Dr
37
31,503
89
11/12/2024
Tustin Ave
Ocean View Ave
Cliff Dr
26
12,480
89
9/26/2024
Tustin Ave
150' South of Windward Ln
Santiago Dr
18
11,900
89
11/12/2024
Tustin Ave
Santa Isabel Ave
North End
37
25,400
87
11/12/2024
Tustin Ave
Coast Highway West
Ocean View Ave S
34
13,600
87
9/26/2024
Tustin Ave
South End
Santa Isabel Ave
37
12,700
82
11/12/2024
Tustin Ave
Cliff Dr
Clay St
35
28,245
82
9/26/2024
Tustin Ave
Santiago Dr
23rd St
34
44,370
80
12/21/2023
Tustin Ave
Clay St
15th St
35
22,155
78
9/26/2024
Twin Lakes Cir
Carmel Bay Dr
End
32
6,684
57
12/6/2023
University Dr
Irvine Ave
South End
40
50,400
62
11/12/2024
Upper Bay Dr
Mesa Dr
Orchid Hill PI
36
18,972
85
11/30/2023
Via Antibes
Via Lido Soud
Via Lido Nord
36
8,928
94
9/12/2024
Via Antibes
Via Lido Nord
Via Lido Soud
36
8,928
94
9/12/2024
Via Barcelona
Via Lido Soud
Via Lido Nord
20
6,540
87
9/12/2024
Via Cordova
Via Lido Soud
Via Lido Nord
20
9,000
86
9/12/2024
Via Dion
Via Lido Soud
Via Lido Nord
20
11,400
87
9/12/2024
Via Eboli
Via Lido Soud
Via Lido Nord
20
14,040
85
9/12/2024
Via Fermo
Via Lido Soud
Via Firenze
16
4,096
92
9/12/2024
Via Firenze
Piazza Lido
Via Lido Soud
16
5,696
92
9/12/2024
Via Firenze
Via Lido Nord
Piazza Lido
16
7,152
88
9/12/2024
Via Florence
Via Lido Soud
Piazza Lido
24
6,480
19,178
18,920
94
77
75
9/12/2024
9/12/2024
9/12/2024
Via Genoa
Piazza Lido
Via Lido Nord
43
Via Genoa
Via Lido Soud
Piazza Lido 43
Appendix B - Local Streets
30 of 33
4 •:
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
Via Graziana Piazza Lido Via Lido Nord 16 7,520 91 9/12/2024
Via Graziana Via Havre Piazza Lido 18 8,820 91 9/12/2024
Via Havre
Via Lido Soud
Piazza Lido
23
10,925
78
9/12/2024
Via Ithaca
Via Lido Soud
Via Lido Nord
20
19,400
86
9/12/2024
Via Jucar
Via Lido Soud
Via Lido Nord
23
21,275
90
9/12/2024
Via Koron
Via Lido Soud
Via Lido Nord
23
20,930
92
9/12/2024
Via Lido
Bride West End
Via Lido Soud
22
28,420
86
9/12/2024
Via Lido Nord
Via Genoa
Via Dion
33
18,843
92
9/12/2024
Via Lido Nord
Via Waziers
Via San Remo
33
21,813
92
9/12/2024
Via Lido Nord
Via Dion
Via Antibes
33
17,490
92
9/12/2024
Via Lido Nord
Via Antibes
Via Lido Soud West Side
20
9,200
92
9/12/2024
Via Lido Nord
Via Zurich
Via Waziers
33
17,820
91
9/12/2024
Via Lido Nord
Via Lorca
Via Genoa
33
25,377
90
9/12/2024
Via Lido Nord
Via Lido Soud East Side
Via Zurich
33
18,647
89
9/12/2024
Via Lido Nord
Via San Remo
Via Palermo
33
17,853
87
9/12/2024
Via Lido Nord
Via Palermo
Via Lorca
33
21,318
87
9/12/2024
Via Lido Soud
Via Genoa
Via Koron
33
28,050
92
9/12/2024
Via Lido Soud
Via Antibes
Via Dion
33
20,625
92
9/12/2024
Via Lido Soud
Via Dion
Via Genoa
33
27,060
92
9/12/2024
Via Lido Soud
Via Koron
Via Orvieto
33
21,780
92
9/12/2024
Via Lido Soud
Via Orvieto
Via San Remo
33
22,110
91
9/12/2024
Via Lido Soud
Via Lido Nord West Side
Via Antibes
20
6,800
91
9/12/2024
Via Lido Soud
Via Venezia
Via Zurich
33
21,780
89
9/12/2024
Via Lido Soud
Via San Remo
Via Venezia
33
17,160
89
9/12/2024
Via Lido Soud
Via Zurich
Via Lido Nord East Side
53
24,965
87
9/12/2024
Via Lorca
Via Lido Soud
Via Lido Nord
20
17,500
90
9/12/2024
Via Malaga
Via Oporto
Via Lido
22
6,490
92
9/12/2024
Via Marina
Tustin Ave
End
33
18,538
96
11/12/2024
Via Mentone
Vai Lido Soud
Via Lido Nord
20
17,000
91
9/12/2024
Via Nice
Via Lido Soud
Via Lido Nord
20
16,200
91
9/12/2024
Via Oporto
32nd St
Via Lido
23
13,225
88
9/12/2024
Via Oporto
Via Lido
Central Ave
29
17,400
85
9/12/2024
Via Orvieto
Via Lido Soud
Via Lido Nord
23
18,055
91
9/12/2024
Via Palermo
Via Lido Soud
Via Lido Nord
22
16,764
86
9/12/2024
Via Quito
Vai Lido Soud
Via Lido Nord
20
14,200
89
9/12/2024
Via Ravenna
Via Lido Soud
Via Lido Nord
20
13,200
86
9/12/2024
Via San Remo
Via Lido Soud
Via Lido Nord
23
15,240
94
9/12/2024
Via Trieste
Via Lido Soud
Via Lido Nord
20
12,000
91
9/12/2024
Via Undine
Via Lido Soud
Via Lido Nord
20
11,400
10,700
89
90
9/12/2024
9/12/2024
Via Venezia
Via Lido Soud
Via Lido Nord 20
Via Lido Nord 23
Via Waziers
Via Lido Soud
11,845
1 94
9/12/2024
Appendix B - Local Streets
31 of 33
Appendix B
Complete Street Listing Current Conditions
PAVEMENT
E NGIN EERIN G
Local Streets
i
Street Name From To Width of Segment Area (SF) Current PCI Most Recent Inspection Date
Via Xanthe Via Lido Soud Via Lido Nord 20 9,800 90 9/12/2024
Via Yella Via Lido Soud Via Lido Nord 20 9,300 88 9/12/2024
Via Zurich
Via Lido Soud
Via Lido Nord
21
9,030
90
9/12/2024
Villa Way
28th St
29th St
25
8,000
92
11/13/2024
Villa Way
29th St
32nd St
22
17,160
86
11/13/2024
Vista Ba a
Tustin Ave
East End
24
13,305
90
11/12/2024
Vista Ba a
West End
Tustin Ave
33
19,891
88
11/12/2024
Vista Del Oro
Vista Nobleza
Vista Umbrosa
35
65,800
77
12/4/2023
Vista Del Oro
Vista Del Sol
Vista Nobleza
35
74,900
71
12/4/2023
Vista Del Oro
Vista Umbrosa
Eastbluff Dr North End)
35
26,425
63
12/4/2023
Vista Del Oro
Vista Caudal
Vista Entrada
35
36,400
61
12/4/2023
Vista Del Oro
Vista Entrada
Vista Del Sol
35
76,475
61
12/4/2023
Vista Del Oro
Eastbluff Dr South End
Vista Caudal
36
103,068
46
12/4/2023
Vista Del Sol
Vista Del Oro
Eastbluff Dr
60
28,200
90
12/4/2023
Vista Ridge Rd
Ocean Heights Dr
Ridge Park Rd
37
22,903
89
12/15/2023
Vista Ridge Rd
Newport Coast Dr
Altezza Dr
37
55,241
87
12/15/2023
Vista Ridge Rd
Altezza Dr
Ocean Heights Dr
37
68,709
84
12/15/2023
Vista Ridge Rd
Ocean Heights Dr
Coastal Canyon Dr
37
76,479
83
12/15/2023
Vista Ridge Rd
Coastal Canyon Dr
Ocean Heights Dr
37
62,715
81
12/15/2023
Vivian Ln
Beryl Ln
Diana Ln
34
28,196
86
11/12/2024
Walnut St
Seashore Dr
Ocean Front Alley West
18
990
94
11/14/2024
Walnut St
Newport Shores Dr
Coast Highway West
19
3,135
80
11/14/2024
Walnut St
Ocean Front Alley West
Ocean Front West
19
1,330
77
11/20/2024
Walnut St
Prospect St
Newport Shores Dr
29
25,694
53
2/7/2025
Warwick Ln
Estelle Ln
Marian Ln
33
24,486
89
11/12/2024
Warwick Ln
Marian Ln
Nottingham Rd
33
8,052
88
11/12/2024
Washington St
Ocean Front East
Ocean Front Alley East
14
1,890
92
11/13/2024
Washington St
Balboa Blvd East
Ocean Front Alley East
14
1,190
92
11/13/2024
Washington St
Bay Ave East
Balboa Blvd East
20
2,800
87
11/13/2024
Washington St
Edgewater PI
Bay Ave East
18
1,800
86
12/4/2024
Waterfront Dr
Avocado Ave
Acacia Ave
30
8,430
91
1/16/2024
Wavecrest Dr
Surfline Wy
Sand Point Wy
36
41,660
83
12/7/2023
Way Ln
Dahlia Ave
Fernleaf Ave
15
4,710
75
12/19/2023
Way Ln
Fernleaf Ave
Shell St
15
6,285
74
12/19/2023
Wayne Rd
Rockford Rd
Cameo Highlands Dr
33
22,935
90
12/12/2023
West Wind Way
Polaris Dr
End
34
29,448
98
11/12/2024
Westcliff Dr
Dover Dr
Santiago Dr
32
48,992
89
11/12/2024
Westerly PI
Dove St
Quail St
44
61,864
84
11/30/2023
Westminster Ave
Old Newport Blvd
15th St
36
61,920
8,400
34,485
88
84
79
9/26/2024
11/12/2024
12/7/2023
White Cliffs Dr
Polaris Dr
North Star Ln
38
White Sails Way
Crown Dr
Harbor View Dr 33
Appendix B - Local Streets
32 of 33
5-100
V 1�1 V
Appendix B
PAVEMENT
Complete Street
Listing Current Conditions
EIN G I N EERIN G
Local Streets
Street Name
From
To
i
Width of Segment
I Area (SF)
Current PCI
Most Recent Inspection Date
Windover Dr
Surfline Way
Sand Point Way
36
38,328
87
12/7/2023
Windward Ln
Tradewinds Ln
Leeward Ln
33
48,060
89
11/12/2024
Windward Ln
Tustin Ave
Irvine Ave
33
42,570
88
11/12/2024
Yawl Rd
Beacon Bay
End
24
6,000
88
12/19/2023
Zahma Dr
Kewamee Dr
Chubasco Dr
37
19,610
67
12/14/2023
Zenith Ave
Bayview Ave
Spruce Ave
35
9,905
75
11/30/2023
Zenith Ave
Spruce Ave
Orchid St
35
9,940
63
1 11/30/2023
Zurich Cir
Via Zurich
Via Zurich
16
7,200
92
1 9/12/2024
Appendix B - Local Streets
33 of 33
5-101
OCTA &GO
Local Tax Dollars at Work
Pavement Management Plan Agency Submittal
XIII. Appendix C — GIS Digital Data
Introduction
The OCTA GIS Section maintains a spatial inventory of transportation infrastructure which mostly consists of
major arterial streets, roads, and highways. A key component of road information is pavement condition.
Maintaining an inventory of pavement condition will enhance OCTA's GIS visualization and analysis capabilities
and assist in understanding the transportation investment needs throughout the region. Therefore, a GIS dataset
in digital format should be included in this report.
If the agency is unable to provide pavement data in the requested GIS format, a request for exception must be
submitted by the agency. When requesting an exception, the agency must provide a letter signed by the Public
Works Director with an explanation and a timeline of when the agency will have the capabilities of providing
pavement data in the required GIS digital format.
Structure of GIS Data
The GIS dataset must consist of linear or polygon geographic features that represent road/street segments. All
segments that are part of the report should be included in the GIS dataset. The attribute information of each
segment should generally follow the format of the Complete Listing of Current Street Conditions in Appendix B
above.
The GIS data requirements are discussed below. Most commercial and open -source GIS software provide
industry -standard tools to manage GIS data to meet these requirements.
GIS Digital Data Format
The GIS data must be submitted in either one of the following formats:
• Esri Shapefile, or
• Esri File Geodatabase
Metadata
The GIS data are required to have associated metadata. The minimum metadata items required are:
• Title of Dataset
• Tags (A set of words that can be used by GIS to search for the resource.
"transportation", "roads")
• Summary (A brief purpose statement of the dataset)
• Description (A brief narrative of the dataset's content)
• Credits (A recognition of those who created or contributed to the resource)
Spatial Geometry Type
For example: "pavement",
Page 1 14
5-102
OCTA &GO
Local Tax Dollars at Work
Pavement Management Plan Agency Submittal
The spatial geometry of the segment features should be lines that represent the roadway centerline as
accurately as possible. Polygon features may be provided if they are the only spatial features available. If
polygons are provided, they must spatially represent the paved surface of roadway segments.
Proiection
The GIS data must have spatial reference information and have its coordinate system identified and embedded
in or associated with the data file(s). All GIS data submitted to OCTA should be in the following projected
coordinate system:
• NAD 1983 State Plane California VI FIPS O406 (US Feet) - More information about this system can be
found at: https://spatialreference.org/ref/epsg/nad83-california-zone-6-ftus/
GIS Feature Attributes
The required segment attributes are:
• Street name
• Unique segment identifier (Segment ID from original source if available)
• Name of intersecting road at the beginning of a segment
• Name of intersecting road at the end of the segment
• Current pavement condition index (PCI)
• Current PCI inspection date
• Length of road segment in feet
• Width of road segment in feet
• Paved area of road segment in square feet or square yards
• Projected PCI at end of Seven -Year Road Maintenance and Rehabilitation Plan
Additional attributes such as number of through travel lanes, direction of travel and pavement surface type may
be provided. An example of a GIS attribute table for road segments is shown below (Note that there are
additional attributes such as surface, functional class, and number of travel lanes).
OBIECTIDSec 16 Street Name
Fr..
1 I 43
4022 ARBORWOOD
HEDGE LN
_ 44
4025
ARBORWOOD
EETHESDA
45
4031
ARBORWOOD
WINTHROP
— 46
4187 ARBORWOOD
YALE CT
47
4195 ARBORWOOD
CITRl1SGLEN
1:18
1362 CAMPUSDR
CARLSDNAVE
71119
2057 CAMPl1SDR
MAC ARTHUR BLVD
E 111
2053 CAMPUS DR
VON KARMAN AVE
_ 112
2060 CAMPUS DR
TELLER AVE
10 116
9961 CAMPl1SDR
JAMBOREE RD
r11� 117
4186 CANYONWOOD
WOO
MEADCD
12 118
1409 CARLSON AVE
MICHELSON DR
Tv
-ANYONWOOD
(ALE CT
3ETHESDA
PCI
Ins, Date
Length
Width
Area
Surface Fu Class �
Lanes
39
1/11/2013
254
43
12192
AC SECONDARY
2
92
1111/Z013
374
48
1795Z
AC SECONDARY
AC SECONDARY
2
39
1/11/2013
366
48
41563
2
SEDGE LN
89
111U2013
1691
48
31163
AC
SECONDARY
2
NINTHROP
90
1/11/2013
434
48
20332
AC
SECONDARY
2
JNIVERSITY DR
99
12/19/2012
3963
58
200334
AC
SECONDARY
4
/ON KARMAN AVE
FELLER AVE
AM BOREE RD
-ARLSON AVE
7RBCRWOOD
'ALATINE
93
12/19/2012
1609
30 64570 AC SECONDARY 4
30 39300 AC SECONDARY 4
24 13300 AC SECONDARY 4
631 83752 AC SECONDARY 2
47 49472 AC SECONDARY 2
65 744W AC SECONDARY 4
93
12/19/2012
1310
96
12/19/2012
700
98
12/19/2012
1164
39
1/11/2013
1026
100
12119/2012
1146
Page 1 15
5-103
om &GO
Local Tax Dollars at Work
Pavement Management Plan Agency Submittal
XIV. Appendix D — Quality Assurance/Quality Control Plan
Introduction
When performing data collection in any field, the need for quality control is paramount as it is essential for
accurate planning, analysis and design. This is particularly true for collecting pavement distress data for a
pavement management system.
The Quality Assurance/Quality Control (QA/QC) Plan establishes minimum quality standards for performance
and procedures for updates of the pavement management system.
Objectives
This document constitutes a formal QA/QC Plan for the City of Newport Beach. It was prepared on 1/11/2025
and last revised on 4/25/2025.
Specifically, it is intended for the 2025 Pavement Management Plan Update. The focus is on the collection of
network -level pavement distress data (defined by National Cooperative Highway Research Program (NCHRP)
Synthesis 401 Quality Management of Pavement Data Collection, as "Network -level data collection involves
collection of large quantities of pavement condition data, which is often converted to individual condition indices
or aggregated into composite condition indices.")
This document also addresses the QA/QC plan requirements of the Orange County Transportation Authority
(OCTA)'s "Countywide Pavement Management Plan Guidelines" (section 2.4), adopted in May 2010.
Structure of QA/QC Plan
The following components are addressed in this QA/QC Plan:
• Condition survey procedures used
• Accuracy required for data collection
• Inspector qualifications and experience
• Safety
Page 1 16
5-104
oCTA &GO
Local Tax Dollars at Work
Condition Survey Procedures
Pavement Management Plan Agency Submittal
The governing document in performing condition surveys for the City of Newport Beach is ASTM D6433
"Standard Practice for Roads and Parking Lots Pavement Condition Index (PCI) Surveys." Both asphalt concrete
(AC) and Portland cement concrete (PCC) pavements are included in this protocol. The following distresses are
collected for each pavement type.
Asphalt Concrete AC Pavements
1. Alligator (fatigue) cracking
2. Bleeding
3. Block cracking
4. Bumps and sags
5. Corrugation
6. Depression
7. Edge cracking
8. Joint reflection cracking
9. Lane/Shoulder drop off
10. Longitudinal & Transverse cracking
11. Patching and utility cut patching
12. Polished aggregate
13. Potholes
14. Railroad crossing
15. Rutting
16. Shoving
17. Slippage cracking
18. Swell
19. Weathering
20. Raveling
Portland Cement Concrete (Jointed)
1. Blowup/buckling
2. Corner breaks
3. Divided slab
4. Durability ("D") cracking
5. Faulting
6. Joint seal damage
7. Lane/shoulder drop off
8. Linear cracking
9. Patching (large) and utility cuts
10. Patching (small)
11. Polished aggregate
12. Popouts
13. Pumping
14. Punchout
15. Railroad crossing
16. Scaling, map cracking and crazing
17. Shrinkage cracks
18. Spalling (corner)
19. Spalling (joint)
Any exceptions to the above procedures are discussed before any surveys are performed. They are documented
in the paragraphs below.
[Note to agency: these are usually related to distresses or situations that are not covered in the manuals.
Examples include roller check marks or edge cracking on streets with no curbs and gutters. Others include the
raveling of surface seals or the use of open -graded asphalt concrete mixes where the surface appears to have
large voids present. Any modifications must be documented and included in this document. Photos are extremely
helpful.]
All surveys are performed as walking surveys on MPAH, and a combination of walking and windshield on local
streets, and a minimum 10% sampling rate is utilized. Field crews are typically composed of one -person crew
and sometimes more when a street with high traffic volume was surveyed. The safety of field personnel is
paramount in all instances.
Page 1 17
5-105
OCTA &GO
Local Tax Dollars at Work
Pavement Management Plan Agency Submittal
The sample unit selected must be representative of the entire pavement section. This assumes that the section
is homogenous; if it is not homogeneous, then the section must be split according to the criteria agreed upon
by the agency. Typically, the criteria used are:
• Pavement condition
• Construction age, if known
• Maintenance history, if known
• Traffic volumes (or functional classification as a surrogate)
• Surface types (e.g. asphalt concrete or Portland cement concrete)
• Geometric elements (e.g. widths)
Any modifications to the section inventory data are documented in the pavement management report.
A sample unit must be between 2,500 ± 1,000 square feet in conformance with ASTM D6433 protocols. Typical
sample unit dimensions are 100 feet long by the width of the street. Streets that are wider than 40 feet wide
will have shorter lengths (generally 50 feet) or if they are divided by a raised median, separate sample units will
be taken in each direction.
Any pavement areas that are not representative of the section will be noted and surveyed as an additional
sample unit.
Accuracy Required for Data Collection
The accuracy required for data collection has two components, both of which are further described in the
following paragraphs.
• Re -inspections
• PCI comparisons with past surveys
Random and Systematic Re -Inspections
Random Re -inspections
Random re -inspections will include a representative selection across the following categories:
• Functional classes (i.e. MPAH, locals);
• Surface types (e.g. asphalt concrete or Portland cement concrete);
• Pavement conditions (e.g. good, fair, poor);
• Inspectors;
• Geographical areas, if applicable.
Systematic Re -inspections
For systematic re -inspections, this could be due to noticed trends such as specific treatment types (e.g. open -
graded mixes), a specific inspector or geographical area. In such cases, more than 5% will be re -inspected.
Page 1 18
5-106
OCTA &GO
Local Tax Dollars at Work
Acceptability Criteria
Pavement Management Plan Agency Submittal
At the time of re -inspection, the actual distresses will be re -inspected and verified, and any corrections made,
if necessary. Distress types and severities must be the same and re -measured quantities within ±10% of the
original measured quantity.
If corrections are required on more than 10% of the re -inspected sample unit, then an additional 5% will be re-
inspected. This will continue until more than 95% of the re -inspected sections meet the acceptability criteria.
PCI Comparison with Past Surveys
As another level of quality control, the new PCIs are compared with the previous PCIs. If they differ by more than
±10 PCI points, these sections are automatically flagged for further investigation.
If PCI Increases 10 points
The section is investigated to see if a maintenance and rehabilitation event has occurred since the last survey,
but has not been recorded. Typically, it may include activities such as:
• Crack sealing activities— changes medium or high severity cracking to low severity
• Patching activities — alligator cracking that has been removed and patched, so that the resultant PCI is
increased.
• Surface seals
• Overlay
• Others
Therefore, an up to date maintenance and rehabilitation history file in the pavement management database is
desirable, both for historical accuracy as well as to provide additional quality control.
If PCI decreases 10 points
The section is checked to see if the average deterioration rate (usually 3 to 4 points per year) is exceeded. If the
drop in PCI is within range of what is acceptable, no further action is required. If the drop is more than the
acceptable range, a re -inspection will be performed. The default performance curves in the pavement
management software form the basis for what is acceptable.
Page 1 19
5-107
OCTA &GO
Local Tax Dollars at Work
Inspector's Qualifications and Experience
Pavement Management Plan Agency Submittal
The GMU inspectors have attended formal training on pavement condition distress surveys. This training was
conducted prior to performing any work using the ASTM D6433 protocols, consistent with OCTA's requirements.
Inspector Name
Date of ASTM D6433 Training
Training Conducted By:
Amina Mannan
July 2024
GMU and OCTA
Mahmoud Khadem
July 2024
GMU and OCTA
Joseph Huynh
August 2024
GMU
Resumes of the technicians utilized on this project are included as an attachment.
Safety Procedures
The GMU administers a health and safety program in compliance with the Cal Occupational Safety and Health
Administration (OSHA) Title Vlll, Section 3203. The program is documented in GMU'S Workplace Safety Manual.
Generally, the safety procedures include (Edit as applicable to agency):
• Inspectors to wear Class 2 or 3 safety vest at all times;
• Flashing beacon on all vehicles utilized for surveys; and
• Stopped vehicles to be parked at locations away from moving traffic (e.g. nearby parking, shoulders,
etc.).
• Inspectors to survey the street from the curb or shoulder, especially when Arterials are being surveyed.
On streets where there is a high volume of traffic or high speeds, additional measures may be necessary, such
as:
• Surveys to occur during off-peak periods or on weekends;
• Additional inspector to watch out for traffic; and
• Traffic flaggers in extreme cases.
All GMU employees are required to acknowledge that they have read the GMU Safety Manual carefully. This
manual is updated annually, and all employees receive an updated copy
Attachment — Appendix C: Resumes of Field Inspectors
---End of QA/QC Plan ---
Page 120
5-108
Amina Mannan, Ph.D., P.E.
Senior Engineer, Pavement & Geotechnical Engineering
PROFESSION
Civil Engineer
REGISTRATION
Registered Civil Engineer, State of Texas
EDUCATION
Ph.D. Civil Engineering
(Pavement/Materials Engineering),
University of New Mexico, Albuquerque
M.S. Civil Engineering
(Pavement/Materials Engineering),
University of Akron, Akron, OH
B.S. Civil Engineering
Bangladesh University of Engineering and
Technology, Dhaka Bangladesh
PROFESSIONAL EXPERIENCE
GMU Geotechnical, Inc.
(2023 — Present)
Senior Engineer
Rancho Santa Margarita, California
Arias & Associates, Inc.
(2018 — 2023)
Senior Pavement & Geotechnical Engineer
San Antonio, Texas
Applied Research Associates Inc.
(Feb 2018 — Sept 2018)
Pavement Condition Consultant for FDOT
Gainesville, Florida
University of New Mexico
(2012 — 2017)
Graduate Researcher, Pavement / Materials
Albuquerque, New Mexico
University of Akron
(2010 — 2012)
Graduate Researcher, Pavement / Materials
Akron, Ohio
PUBLICATIONS
Author of over 40 journal and conference
publications in pavement materials and
engineering
r►/1 1
V 1"W1 V
PAVEMENT
ENCINEEPING
Amnia is a highly experienced senior pavement and
geotechnical engineer with 14 years of experience in
pavement engineering and 5 years of experience in
geotechnical engineering projects. Her expertise includes
pavement condition assessment, material testing,
pavement evaluation/design, pavement condition index,
specification development, and mix design development
projects. In addition, she has experience in geotechnical
engineering, such as site investigation, geotechnical
analysis and design, foundation design, slope stability
analysis, construction monitoring, and risk assessment.
Amina has had the privilege of collaborating with state
and local agencies, private sector clients, and civil
engineering firms, and has previously worked with several
state agencies (e.g., NMDOT, FDOT, and TxDOT) on
pavement and geotechnical projects. Her unique
proficiency in both pavement and geotechnical
engineering enables her to provide her clients with high -
quality, cost-effective, and reliable solutions.
• Advanced Non -Destructive Testing: Proficiency in
utilizing non-destructive testing methodologies such as
Falling Weight Deflectometer (FWD), Ground Penetrating
Radar (GPR), Laser Crack Measurement System (LCMS),
and Profiler, for comprehensive pavement condition
assessments.
• Pavement Evaluation and Design: Demonstrated
expertise in employing various design methos, including
Caltrans, Greenbook, AASHTO'93, FAA, AASHTOWare
Pavement ME for the evaluation and design of pavements.
• Pavement Management Plans (PMP): Experience in
formulating PMP using the Pavement Condition Index
(PCI), budget analysis and Maintenance and Rehabilitation
(M&R) planning using PAVER.
• Asphalt Mix Designs: Proficiency in designing asphalt
mixes, encompassing hot -mix asphalt (HMA) and warm -
mix asphalt (WMA) with and without RAP, in accordance
with Superpave mix design method.
• Geotechnical Data and Design Recommendations:
Expertise in providing geotechnical data and design
recommendations for utilities, retaining walls, and bridges
based on the in -situ lab testing of soil and rock.
• AC Laboratory Testing: Experience in laboratory testing,
including Dynamic Modulus Test, Low -Temperature
Cracking Test, Beam Fatigue Test, Hamburg Wheel
Tracking (HWT) Test, Moisture Induced Sensitivity Test
(MIST), and more.
• Asphalt Binder Testing: Experience in binder testing,
including Dynamic Shear Rheometer (DSR), Dynamic
Mechanical Analyzer (DMA), Bending Beam Rheometers
(BBR), Rotational Viscometer (RV), and more.
30336 Esperanza, Rancho Santa Margarita, CA 92688 1 ph: 330.622.0916 1 fax: 949.888.1380 1 web: www.gmugeo.com
5-109
Select Pavement Management Plan (PMP) Projects
City of Newport Beach, Citywide Pavement Management Plan Updates for 2023, 2025, 2027:
Managed the on -going, citywide pavement management plan study consisting of 205 centerline miles of
streets to comply with OCTA Measure M2 funding requirements.
City of Laguna Niguel, CA, 2024 Citywide Pavement Management Plan Updates, 2020 to 2024:
Pavement condition index (PCI) assessment of all city -maintained streets consisting of a total of
approximately 141.5 centerline miles of streets and budget scenario analysis to help optimize the City's
pavement maintenance and rehabilitation schedule and budget (approximately $2M per year typically).
City of San Fernando, 2024 Citywide Pavement Management Plan Update: Managed the City's
pavement management plan study consisting of 50 centerline miles of streets to comply with Los Angeles
County Transportation Authority (METRO) pavement management requirements.
City of Hermosa Beach, 2024 Citywide Pavement Management Plan Update: Managed the City's
pavement management plan study consisting of 48 centerline miles of streets to comply with Los Angeles
County Transportation Authority (METRO) pavement management requirements.
Groves at Orchard Hills Homeowners Association, Pavement Management Plan Update 2024,
Irvine, CA: Updated the pavement management inventory and performed pavement management plan
updates in 2024.
Casta Del Sol Community Association, Pavement Management Plan Update 2024, Mission Viejo,
CA: Updated the pavement management system for approximately 22 centerline miles of streets managed
by the HOA with a yearly street improvement budget of approximately $1.2M to $2.2M per year.
Performing periodic reviews and updates to the community's pavement management plan each year.
Canyon Lake Property Owners Association, Pavement Management Plan Update 2024, Canyon
Lake, CA: Updated the pavement management system for approximately 37 centerline miles of streets
managed by the HOA with a yearly street improvement budget of approximately $3M per year.
Oasis Palm Desert Homeowners Association Pavement Management Plan, 2023, Palm Desert, CA:
Creating the HOA's street network inventory, performing walking pavement condition assessment of the
HOA streets, reviewing previous Maintenance and Rehabilitation (M&R) activities, performing various
budget scenarios analysis, and recommending Maintenance and Rehabilitation (M&R) treatments for the
next 5 years.
Select Pavement Evaluation and Design Projects — Local Municipalities and Agencies
Harbor Boulevard from Lincoln Avenue to North Street, Pavement Evaluation Project, City of
Anaheim, CA, July 2024: Pavement design engineer overseeing the evaluation of the segments located
in the City of Anaheim, including pavement surface condition assessment, corings, laboratory testing,
analysis, and development of pavement rehabilitation recommendations.
Brookhurst Street from Ball Road to La Palma Avenue, Pavement Evaluation Project, City of
Anaheim, CA, September 2024: Pavement design engineer overseeing the evaluation of the segments
located in the City of Anaheim, including pavement surface condition assessment, corings, laboratory
testing, analysis, and development of pavement rehabilitation recommendations.
2020 "Phase II" Citywide Pavement Evaluation Project, City of Aliso Viejo, CA, ongoing: Pavement
design engineer overseeing pavement condition assessments, corings, laboratory testing, analysis, and
Amina Mannan
2
5-110
pavement repair recommendations of arterial and residential street segments.
Annual Residential Slurry Seal FY 2024-25 Project, City of Dana Point, CA, ongoing: Pavement
design engineer performing and overseeing the pavement evaluation of various residential streets,
including corings, ground -penetrating radar (GPR) testing, Falling Weight Deflectometer (FWD) testing,
laboratory testing, and analysis.
Crenshaw Boulevard Rehabilitation Project, City of Torrance, CA, April 2019: Performed pavement
evaluation to develop pavement rehabilitation repair recommendations.
Crenshaw Boulevard Between 79th Street and I-105 Freeway, City of Inglewood, CA, January 2024:
Performing and analyzing ground -penetrating radar (GPR) testing to identify approximate limits of buried
underlying PCC.
Seal Beach Boulevard from Westminster Boulevard to N Gate Road, City of Seal Beach, CA, March
2024: Performed pavement evaluation to develop rehabilitation repair recommendations for Seal Beach
Boulevard.
Access Trail Evaluation and Pavement Design, City of Anaheim, CA, April 2024: Pavement design
engineer overseeing the field exploration, laboratory testing, analysis, and development of pavement
design recommendations.
Select Quality Assurance Testing and Observation Projects
Phase 3 Annual Street Resurfacing Project, City of San Fernando, CA, Ongoing: Construction
management (CM) and quality assurance (QA) testing services.
2024 Asphalt Repairs and Asphalt Overlays of Various Streets, City of Mission Viejo, CA, Ongoing:
Quality control and asphalt concrete observation and testing.
Cityside Fiber Micro -Trench Asphalt Restoration, City of Mission Viejo, CA, Ongoing: Quality
control, field density testing, and asphalt concrete observation and testing.
Canyon Lake Property Owners Association, 2023-24 Pavement Improvement Project, Canyon Lake,
CA: Construction Management Advisory and Materials Observation/Testing Services.
Select Homeowner Association Pavement Projects
Oasis Palm Desert Homeowners Association Pavement Evaluation Project, March -June 2024
Pavement design engineer performing and overseeing the pavement evaluation including corings, Falling
Weight Deflectometer (FWD) testing, laboratory testing, and analysis.
Caritas Corp. Pavement Evaluation Project, May -July 2024
Pavement design engineer performing and overseeing the pavement evaluation of three sites located in
Brea and Vista, SC, including pavement condition index (PCI) surveys, corings, laboratory testing, and
analysis. Provided 15-year plan of the recommended future pavement maintenance/rehabilitation for
each site.
Connemara by the Sea Homeowners Association, San Juan Capistrano, CA, Pavement Evaluation
Project, June -August 2024: performed pavement condition index (PCI) surveys, corings, laboratory
testing, and analysis. Provided 5-year plan of the recommended future pavement
maintenance/rehabilitation.
Amina Mannan
3
5-111
Ocean Ranch Homeowners Association 2024 Pavement Improvement, Laguna Niguel, CA: Providing
pavement maintenance/repair budget advisory, maintenance/repair design, and Prepared plan/specs for
2024 pavement project.
Shady Canyon Homeowners Association 2024 Pavement Improvement, Irvine, CA: Providing
pavement maintenance/repair budget advisory, maintenance/repair design, and construction support
services for 2024 pavement project.
Casta Del Sol Community Association, 2024 Pavement Improvement, Mission Viejo, CA: Providing
pavement maintenance/repair budget advisory, maintenance/repair design, and Prepared plan/specs for
2024 pavement project.
Lake Forest II Master Homeowners Association, 2024 Pavement Improvement, Lake Forest, CA:
Providing pavement maintenance/repair budget advisory, maintenance/repair design, and and Prepared
plan/specs for 2024 pavement project.
Amina Mannan
4
5-112
CERTIFICATE
Of Prequalification
This certificate has been
presented to
Amino Mannan
for successfully meeting the requirements of the
OCTA 2024 Pavement Inspector Prequalification Program
using MANUAL survey techniques
EXPIRATION:
7.30.2026
G
-WestCoastEC.com/OCiA
-1
MAHMOUD KHADEM, M.Sc , E.I.T
Staff Pavement Engineer
V 1"Wr1 V
PAVEMENT
ENGINEERING
PROFESSION
Mahmoud has been involved in a wide variety of projects
Civil Engineer
that are related to pavement designs, laboratory testing,
data analysis, pavement rehabilitation and preservation.
EDUCATION
Mahmoud's current work includes supporting a wide-
M.S. Civil Engineering
range of pavement construction projects for multiple
(Pavement/Materials Engineering)
Cities and private communities, and pavement
University of Nevada, Reno
engineering projects, including pavement evaluations,
pavement field explorations, proposals and cost
M.S. Civil Engineering
estimates preparation, and network -level pavement
(Structural Engineering)
management plans. His work also extends to developing
University of Balamand,
different project maps using AutoCAD and ESRI
Koura, Lebanon
ArcGIS.
B.Sc. Civil Engineering
Mahmoud's experience in pavement management,
University of Balamand,
evaluation, design, and construction includes:
Koura, Lebanon
• Pavement Management Plans (PMP) for local
Cities and HOAs
CERTIFICATIONS
. Budget analysis and Maintenance and
Engineer In Training (E.I.T)
Rehabilitation (M&R) planning using PAVER
OCTA Pavement Inspector
. Developing Plans, Specifications, and
Engineering Estimates (PS&E) for pavement
PROFESSIONAL
related projects
AFFILIATIONS
• Pavement Condition Index (PCI) calculations
American Concrete Institute (ACI)
and analysis
American Society of Civil
• Non-destructive testing, including deflection
Engineers (ASCE)
testing & ground -penetrating radar (GPR)
testing
• SuperPave and Hveem Asphalt Mix designs.
• Pavement Design using Caltrans, AASHTO
1993 and Pavement ME methods
• Construction inspection, observation, and
testing
• SuperPave Asphalt Binder Testing and
Asphalt Mixture Performance Testing
• Pavement related softwares: 3D-Move,
WESLEA, PAVEXpress, ILLI-PAVE,
AASHTOware Pavement ME Design,
MODULUS
30336 Esperanza, Rancho Santa Margarita, CA 92688 1 ph: 949.888.6513 1 fax: 949.888.1380 1 web: www.gmugeo.com
5-114
CERTIFICATE
Of Prequalification
This certificate has been
presented to
Mahmoud Khadem
for successfully meeting the requirements of the
OCTA 2024 Pavement Inspector Prequalification Program
using MANUAL survey techniques
EXPIRATION:
7.30.2026
G
-WestCoastEC.com/OCiA
-1
om &GO
Local Tax Dollars at Work
Pavement Management Plan Agency Submittal
XV. Appendix E — Pavement Management Data Files
The Pavement Management data files shall be submitted to OCTA in spreadsheet format. This must include the
following information:
• Street name and limits for all public streets
• Street identifiers (Branch ID, Section ID)
• Direction (if applicable)
• Beginning and ending of each section
• Length, widths, and true areas
• Functional Classification (MPAH, Local)
• Number of travel lanes
• PCI and date of inspection
• Type of recommended treatment
• Cost of recommended treatment
• Street geometry as linear or polygon features
The Pavement Management data files are submitted here as an electronic copy sent via email as an attachment,
via a link to an online storage device site, such as DropBox and/or OneDrive, or USB drive , and/or included as
Appendix E.
XVI. Appendix F — GIS Maps — Current Conditions (Optional)
If included, attach and label Appendix F.
Page 121
5-116
W
CALIFORNIA
N
0 4,000
Feet
^ Y
.' fie�fPOlt
"enie�porr QO �
Concordia
lJnr. Ir�u•z-
Xl •`+". LV Place ra,F��.
,, •,r tti
J
USGS The National Map: National Boundaries Data set, 3DEP Elevation Program, Geographic
Land Cover Database, National Structures Dataset, and National Transportation Dataset;
Road data; Natural Earth Data; U.S. Department of State HIU; NOAA National 0
PCI RANGE LEGEND
■ PCI RANGE 85 - ] 04
PCI RANGE 75 - 85
FAIR PC I RANGE 60 - 74
'►�' PCI RANGE 41-59
•��• PCI RANGE 0-40
CC,