Loading...
HomeMy WebLinkAboutX2021-3447 - Misc (3)Irrigation Inspection Affidavit Plan No: Rucker Residence Project Name: 1700 Port Monleigh Pl. Newport Beach Irrigation Plan Designer: Ryan Burress Landscape Design & Build 714.975.1434 Field Inspector: Michael McMillen BPL Irrigation Auditor 714.394.6126 This project was inspected within the limits of customary access for compliance with the approved irrigation plans on file in City Planning. At least two (2) inspections were conducted. The findings are as follows. Date Inspection:0810212024 A. Inspections during construction to check mainline in open trench: 1. Location of mainline conforms to as -built plan 2. Size of mainline conforms to plan 3. Depth of mainline conforms to plan 4. Main line conditions is undamaged 5. Mainline pressure tested with water and meter to check for visible leaks 6. Specific observations attached if needed Date Inspection: 0811212024 B. Inspections after completion of system installation prior to sodding: 1. Irrigation POC has isolation valve 2. System components (i.e., controller, backflow, rain sensor, etc.) 3. Drip line GPH and spacing as specified 4. System activated for observation of compliance 5. Each station complies installed per plan 6. Matched precipitation rates provided by zone 7. As -built plan provided to owner 8. Specific observations attached as needed No No Summary of irrigation review: THE IRRIGATION SYSTEM IS IN COMPLIANCE. SEETHE ATFACTED PUNCH LIST ITEMS REQUIRED FOR A CERTIFICATION OF COMPLETION. THESE ITEMS MAYBE COMPLETED DURING THE 90 DAY MAINTENACE PERIOD. THE OWNER / DEVELOPER WILL DETERMINE WHEN THE MAINTENACE PERIOD WILL BEGIN. I hereby certify that I am qualified to submit this irrigation inspection affidavit based on the qualification indicated below: Certified Landscape Irrigation Auditor Certified by The Irrigation Association. Respectfully, Michael McMillen CLIA Certified Irrigation Auditor #014256 Big Picture Landscapes 1"1•■ ASS,` 8/12/2024 LANDSCAPE IRRIGATION AUDIT REPORT PROJECT: Rucker Residence 1700 Port Manleigh PI. Newport Beach, CA 92660 LANDSCAPE DESIGNER / BUILDER: RYAN BURRESS INC. Landscape Design & Build POBox 7326 Newport Beach CA 92663 RYAN(o)RYANBURRESS.COM Ryan Burress 714.975.1434 CERTIFIED LANDSCAPE IRRIGATION AUDITOR (CLIA) BIG PICTURE LANDSCAPE Michael McMillen / 714.394.6126 / Bigpicturelandscape(cDgmail.com Certified Irrigation Auditor #014256 All of the hydrozones on the irrigation systems were evaluated with a visual inspection. As per your request, we evaluated the irrigation systems in accordance with the California Model Water Efficient Landscape Ordinance (MWELO). SUMMARY This audit was conducted to inspect the overall site irrigation systems within the limits of construction. The irrigation systems are new systems utilizing POTABLE water. IRRIGATION PLANS: Each hydrozone identified on the plans were executed in the field, (Total valve qty. 6). Each system layout, components and functionality have met all the requirements of the Irrigation Plans. MWELO: The California Model Water Efficient Landscape Ordinance has been adopted by the City as the standard for new construction and irrigation installations based on AB1881. UNIFORMITY: The existing parkways on this street are overhead spray lawn areas. It was verified that the 6" POP-UP / SAM- PRS bodies were also using new MPR VAN nozzles. The systems were operational with the controller. low efficiency nozzles installed and a 24" drip line buffer edge adjacent to paving. There are (2) overhead spray systems in the rear yard to operate manually. These systems are for cooling down on the synthetic lawn surface. Shrub ZONES / STATION 1-6 • Irrigated Area: Zones separated based on Full sun South/ West side of project. • Plant Material: Shrubs - Low water • Plant Condition: Traditional • Microclimate: Full Sun • Soil Category: Silty Clay Loam • Root Depth: Approximately 6-10" • Slope: Overall site 1% • Compaction: yes • Runoff: No runoff observed • Standing Water: None observed • Hydrozone Separation: Yes • Mulch in Beds: Yes • Pressure Regulation: Req, on drip zone kips / Isolation valve installed per plan • Controller: Rainbird TRU controller and rain shutoff • Valves: RB XACZ Installed on S,W side rear corner. • Emitter Type: Pt / Pt w/ adj 360 on stake • Max Flow: +11 GPM (Turf) • Distribution Uniformity:.90 /.77 • Precipitation Rate: 0.6 / 1.58 Punch list Items: 08/02/2024 • Complete installation of Rain Sensor Devices 08/12/2024 • Contractor to provide owner with controller charts / As -Built. 08/12/2024 Zone Audit Conclusion: PASS, project IS within compliance to begin maintenance. The irrigation systems were evaluated and based on the Irrigation Association Audit rules/guidelines and MWELO requirements. Respectfully, Michael McMillen .. Cliff, Certified Irrigation Auditor #014256 Big Picture Landscapes Its •W°� Appendix E LANDSi I hereby certify that (1) 1 am a professional appropriately licensed in the State of California to provide professional landscape design services. (2) The landscape project for the property located at 1700 PORT MANLEIGH PL (provide street address or parcel number(s)) was installed by me or under my supervision. (3) The landscaping for the identified property has been installed in substantial conformance with the approved Landscape Documentation Package and complies with the requirements of the City of Newport Beach Water Efficient Landscape Ordinance (Municipal Code Section 14.17) and the City of Newport Beach Standards for Implementation of the City of Newport Beach Water Efficient Landscape Ordinance for the efficient use of water in the landscape. (4) The following elements are attached hereto a. Irrigation scheduling parameters used to set the controller; b. Landscape and irrigation maintenance schedule; c. Irrigation audit report; and d. Soil analysis report, if not submitted with Landscape Documentation Package, and documentation verifying implementation of the soil report recommendations. (5) The site installation complies with the following: a. The required irrigation system has been installed according to approved plans and specifications and if applicable, any prior approved irrigation system alternatives. X Yes No b. Sprinklers comply with ASABE/ICC 802-2014 Landscape Irrigation Sprinkler & Emitter Standard. X Yes No (6) The information I have provided in this Landscape Installation Certificate of Completion is true and correct and is hereby submitted in compliance with the City of Newport Beach Design Standards for Implementation of the City of Newport Beach Water Efficient Landscape Ordinance. 33 RYAN BURRESS PriqtName Signature 934 CONGRESS ST, COSTA MESA, CA 92627 Address 714-975-1434 Telephone Landscape Design Professional's Stamp (If Appropriate) B-8-24 Date 946479 License Number RYAN @ RYAN D B U RRES S. COM E-mail Address 34