HomeMy WebLinkAboutX2021-3447 - Misc (3)Irrigation Inspection Affidavit
Plan No: Rucker Residence Project Name: 1700 Port Monleigh Pl. Newport Beach
Irrigation Plan Designer: Ryan Burress Landscape Design & Build 714.975.1434
Field Inspector: Michael McMillen BPL Irrigation Auditor 714.394.6126
This project was inspected within the limits of customary access for compliance with the approved
irrigation plans on file in City Planning. At least two (2) inspections were conducted. The findings are as
follows.
Date Inspection:0810212024
A. Inspections during construction to check mainline in open trench:
1. Location of mainline conforms to as -built plan
2. Size of mainline conforms to plan
3. Depth of mainline conforms to plan
4. Main line conditions is undamaged
5. Mainline pressure tested with water and meter to check for visible leaks
6. Specific observations attached if needed
Date Inspection: 0811212024
B. Inspections after completion of system installation prior to sodding:
1. Irrigation POC has isolation valve
2. System components (i.e., controller, backflow, rain sensor, etc.)
3. Drip line GPH and spacing as specified
4. System activated for observation of compliance
5. Each station complies installed per plan
6. Matched precipitation rates provided by zone
7. As -built plan provided to owner
8. Specific observations attached as needed
No
No
Summary of irrigation review:
THE IRRIGATION SYSTEM IS IN COMPLIANCE. SEETHE ATFACTED PUNCH LIST ITEMS REQUIRED FOR A
CERTIFICATION OF COMPLETION. THESE ITEMS MAYBE COMPLETED DURING THE 90 DAY MAINTENACE
PERIOD. THE OWNER / DEVELOPER WILL DETERMINE WHEN THE MAINTENACE PERIOD WILL BEGIN.
I hereby certify that I am qualified to submit this irrigation inspection affidavit based on the qualification
indicated below: Certified Landscape Irrigation Auditor Certified by The Irrigation Association.
Respectfully,
Michael McMillen CLIA
Certified Irrigation Auditor #014256
Big Picture Landscapes 1"1•■ ASS,`
8/12/2024
LANDSCAPE IRRIGATION AUDIT REPORT
PROJECT: Rucker Residence 1700 Port Manleigh PI. Newport Beach, CA 92660
LANDSCAPE DESIGNER / BUILDER:
RYAN BURRESS INC. Landscape Design & Build POBox 7326 Newport Beach CA 92663
RYAN(o)RYANBURRESS.COM Ryan Burress 714.975.1434
CERTIFIED LANDSCAPE IRRIGATION AUDITOR (CLIA)
BIG PICTURE LANDSCAPE
Michael McMillen / 714.394.6126 / Bigpicturelandscape(cDgmail.com Certified Irrigation Auditor #014256
All of the hydrozones on the irrigation systems were evaluated with a visual inspection. As per your request,
we evaluated the irrigation systems in accordance with the California Model Water Efficient Landscape
Ordinance (MWELO).
SUMMARY
This audit was conducted to inspect the overall site irrigation systems within the limits of construction. The
irrigation systems are new systems utilizing POTABLE water.
IRRIGATION PLANS:
Each hydrozone identified on the plans were executed in the field, (Total valve qty. 6). Each system layout,
components and functionality have met all the requirements of the Irrigation Plans.
MWELO:
The California Model Water Efficient Landscape Ordinance has been adopted by the City as the standard for
new construction and irrigation installations based on AB1881.
UNIFORMITY:
The existing parkways on this street are overhead spray lawn areas. It was verified that the 6" POP-UP / SAM-
PRS bodies were also using new MPR VAN nozzles. The systems were operational with the controller. low
efficiency nozzles installed and a 24" drip line buffer edge adjacent to paving.
There are (2) overhead spray systems in the rear yard to operate manually. These systems are for cooling
down on the synthetic lawn surface.
Shrub ZONES / STATION 1-6
• Irrigated Area: Zones separated based on Full sun South/ West side of project.
• Plant Material: Shrubs - Low water
• Plant Condition: Traditional
• Microclimate: Full Sun
• Soil Category: Silty Clay Loam
• Root Depth: Approximately 6-10"
• Slope: Overall site 1%
• Compaction: yes
• Runoff: No runoff observed
• Standing Water: None observed
• Hydrozone Separation: Yes
• Mulch in Beds: Yes
• Pressure Regulation: Req, on drip zone kips / Isolation valve installed per plan
• Controller: Rainbird TRU controller and rain shutoff
• Valves: RB XACZ Installed on S,W side rear corner.
• Emitter Type: Pt / Pt w/ adj 360 on stake
• Max Flow: +11 GPM (Turf)
• Distribution Uniformity:.90 /.77
• Precipitation Rate: 0.6 / 1.58
Punch list Items: 08/02/2024
• Complete installation of Rain Sensor Devices 08/12/2024
• Contractor to provide owner with controller charts / As -Built. 08/12/2024
Zone Audit Conclusion: PASS, project IS within compliance to begin maintenance.
The irrigation systems were evaluated and based on the Irrigation Association Audit rules/guidelines and
MWELO requirements.
Respectfully,
Michael McMillen .. Cliff,
Certified Irrigation Auditor #014256
Big Picture Landscapes Its •W°�
Appendix E
LANDSi
I hereby certify that
(1) 1 am a professional appropriately licensed in the State of California to provide
professional landscape design services.
(2) The landscape project for the property located at 1700 PORT MANLEIGH PL
(provide street
address or parcel number(s)) was installed by me or under my supervision.
(3) The landscaping for the identified property has been installed in substantial
conformance with the approved Landscape Documentation Package and complies with
the requirements of the City of Newport Beach Water Efficient Landscape Ordinance
(Municipal Code Section 14.17) and the City of Newport Beach Standards for
Implementation of the City of Newport Beach Water Efficient Landscape Ordinance for
the efficient use of water in the landscape.
(4) The following elements are attached hereto
a. Irrigation scheduling parameters used to set the controller;
b. Landscape and irrigation maintenance schedule;
c. Irrigation audit report; and
d. Soil analysis report, if not submitted with Landscape Documentation Package,
and documentation verifying implementation of the soil report recommendations.
(5) The site installation complies with the following:
a. The required irrigation system has been installed according to approved plans
and specifications and if applicable, any prior approved irrigation system
alternatives.
X Yes No
b. Sprinklers comply with ASABE/ICC 802-2014 Landscape Irrigation Sprinkler &
Emitter Standard.
X Yes No
(6) The information I have provided in this Landscape Installation Certificate of
Completion is true and correct and is hereby submitted in compliance with the City of
Newport Beach Design Standards for Implementation of the City of Newport Beach Water
Efficient Landscape Ordinance.
33
RYAN BURRESS
PriqtName
Signature
934 CONGRESS ST, COSTA MESA, CA 92627
Address
714-975-1434
Telephone
Landscape Design Professional's Stamp
(If Appropriate)
B-8-24
Date
946479
License Number
RYAN @ RYAN D B U RRES S. COM