HomeMy WebLinkAbout02_Uptown Newport-TowerJazz Tentative Parcel Map_PA2025-0110CITY OF NEWPORT BEACH
ZONING ADMINISTRATOR STAFF REPORT
July 10, 2025
Agenda Item No. 2
SUBJECT: Uptown Newport-TowerJazz Parcel Map (PA2025-0110)
▪County Tentative Parcel Map No. 2025-139
SITE LOCATION: 4321 Jamboree Road
APPLICANT: William A. Shopoff
OWNER: Uptown Newport Jamboree LLC
PLANNER: Rosalinh Ung, Principal Planner
(949) 644-3208, rung@newportbeachca.gov
LAND USE AND ZONING
•General Plan Land Use Plan Category: Mixed Use District Horizontal 2 (MU-H2)
•Zoning District: Uptown Newport Planned Community (PC-58)
PROJECT SUMMARY
A request for Tentative Parcel Map (TPM) to combine the remnants of Parcel Nos. 1 & 4
of Parcel Map No. 2013-108 into one parcel and subdivide the consolidated parcel into
two parcels for conveyance purposes only for Phase 2 future development in Uptown
Newport Planned Community (PC-58). No development or improvements are proposed,
and no waivers of Title 19 (Subdivisions) are requested as part of this application.
RECOMMENDATION
1)Conduct a public hearing;
2)Find that all significant environmental concerns for the proposed project have been
adequately addressed in the previously certified Environmental Impact Report No.
ER2012-001 (SCH No. 2010051094), First Addendum No. ER2012-001, and Second
Addendum No. ER2020-001; and
3)Adopt Draft Zoning Administrator Resolution No. _ (Attachment No. ZA 1), approving
Tentative Parcel Map filed as PA2025-0110 (County Tentative Parcel Map No. TPM
No. 2025-139).
1
Uptown Newport-TowerJazz Parcel Map (PA2025-0110)
Zoning Administrator, July 10, 2025
Page 2
Tmplt: 01/18/23
BACKGROUND
Uptown Newport Planned Community (PC-58) Adoption & Tract Map Approvals
On March 12, 2013, City Council adopted Ordinance No. 2013-5 for the adoption of
Uptown Newport Planned Community (PC-58) consisting of removing existing office and
industrial uses in two primary phases and constructing a mixed-use planned community
consisting of 1,244 residential units, 11,500 square feet of neighborhood-serving retail
space, and approximately two acres of public park.
In addition to the PC-58 approval, the City Council adopted Ordinance No. 2013-6 to
approve Development Agreement No. DA2012-003 (DA) and vesting development
approvals to allow build-out of the project site under development standards and
requirements in place at the time of project approval. The term of the DA is 15 years, with
two five-year extensions. The DA became effective on April 11, 2013, and the earliest
expiration could be in 2028 (2013+15).
Lastly, the City Council adopted Resolution 2013-24 approving Tentative Tract Map No.
17438 for future development of PC-58. Subsequently, Tract Map No. 17763 for Phase 1
(Phase 1 Tract Map) was recorded on June 19, 2015, as illustrated below.
Exhibit 1 – Phase 1 Tract Map
Uptown Phasing Plan
Phase 1 of PC-58 is generally located on the westerly side of the property and includes
680 residential units and a one-acre neighborhood park. This phase is nearly completed
2
Uptown Newport-TowerJazz Parcel Map (PA2025-0110)
Zoning Administrator, July 10, 2025
Page 3
Tmplt: 01/18/23
with a total of 548 residential units allotted to three residential projects in various
improvement stages and completion of Phase 1 one-acre public park as shown in Exhibit
2 below.
Exhibit 2 – Phase Plan
Phase 2 is generally located on the easterly side of the property and currently occupied
by Tower Semiconductor (TowerJazz). Timing for Phase 2 construction is contingent on
the existing lease with the TowerJazz facility, which currently extends to March 12, 2027.
At the conclusion of the lease term, the TowerJazz facility is intended to be demolished
and redeveloped with a total of 619 residential units (564 originally planned + 55 un-built
units transferred from Phase 1), 11,500 square feet of retail space transferred from Phase
1, and a remaining one-acre public park. Exhibit 3 below illustrates the existing location
of TowerJazz facility with its ancillary uses and surface parking.
3
Uptown Newport-TowerJazz Parcel Map (PA2025-0110)
Zoning Administrator, July 10, 2025
Page 4
Tmplt: 01/18/23
Exhibit 3 – TowerJazz Facility Location in Phase 2
Uptown Parcel Map for Conveyance - 2013 Approval
On June 27, 2013, Zoning Administrator adopted Resolution No. ZA2013-033, approving
Tentative Parcel Map No. 2013-010 filed as PA2013-085 to allow a four-lot subdivision
for conveyance purposes to accommodate PC-58 future development. The tentative
parcel map also included a declaration of easements for various ingress, egress,
reciprocal parking and traffic circulation, and utilities. Tentative Parcel Map No. 2013-010
was recorded as County Parcel Map No. 2013-108 (2013 Parcel Map) on December 20,
2013. Exhibit 4 below illustrates locations of four parcels: Parcels 1 and 3 are located
within the boundaries of Phase 1 development; and Parcels 2 and 4 are located within
the boundaries of Phase 2 development.
4
Uptown Newport-TowerJazz Parcel Map (PA2025-0110)
Zoning Administrator, July 10, 2025
Page 5
Tmplt: 01/18/23
Exhibit 4 – 2013 Parcel Map
TENTATIVE PARCEL MAP REQUEST
The proposed TPM includes a consolidation of the remnants of Parcels 1 and 4 of 2013
Parcel Map into one parcel. These existing remnant parcels total 12.57 acres in size,
resulted when Phase 1 Tract Map recorded over the 2013 Parcel Map. In this process,
the remainder Parcel No. 1, which is a small gap of land between the boundaries of Tract
Map No. 17763 and the Parcel No. 1 boundary lines, was inadvertently created.The
remnant of Parcel No. 4 is the remaining Parcel No. 4 of 2013 Parcel Map after Phase 1
Tract Map was recorded.
The proposed TPM also includes a two-lot subdivision to subdivide the newly combined
parcel into two parcels for conveyance purposes only for future Phase 2 development.
No development or improvements are proposed or authorized as part of this application.
Parcel 1 of the proposed TPM is approximately 4.69 acres in size and is currently
improved with a parking lot associated with TowerJazz facility. Parcel 2 of the proposed
TPM is approximately 7.87 acres size and currently improved with TowerJazz facility and
its ancillary uses. Below, Exhibit 5 illustrates the location of existing remnant parcels and
Exhibit 6 illustrates the proposed TPM.
5
Uptown Newport-TowerJazz Parcel Map (PA2025-0110)
Zoning Administrator, July 10, 2025
Page 6
Tmplt: 01/18/23
Exhibit 5 - Location of Existing Remnant Parcels
Exhibit 6 – Proposed Tentative Parcel Map No. 2025-139
The TPM also includes several proposed easements in favor of newly created parcels
for future Phase 2 development. Exhibit 7 below illustrates the proposed easements.
6
Uptown Newport-TowerJazz Parcel Map (PA2025-0110)
Zoning Administrator, July 10, 2025
Page 7
Tmplt: 01/18/23
Exhibit 7 – Proposed Easements
DISCUSSION
The proposed TPM is for financing and conveyance purposes only. No development or
improvements will be allowed. Any improvements within Phase 2 development will
require future application submittals and approvals including recordation of subdivision
map(s) as required per PC-58.
The design of the TPM will not conflict with easements acquired by the public at large, for
access through, or use of property within the proposed TPM as there are no public
easements located on the subject property. The easements are in favor of proposed
parcels for on-site access and utility purposes. The proposed 46-foot-wide access
easement to Birch Street is to be in favor of Parcel 1 of TPM, will be maintained until a
final map for Phase 2 development is recorded with a private roadway, and consistent in
size, design and location to accommodate the proposed future private roadway for Phase
2 development, or as otherwise approved by the City. Lastly, a reciprocal access and
parking agreement shall be recorded prior to the recordation of TPM, to ensure access
and parking will be provided for the duration of existing industrial development until its
lease expires and the facility is demolished, unless other arrangements can be provided
to the satisfaction of Community Development.
Lastly, the existing industrial facility which is currently located on the subject property is
a permitted interim use until the existing TowerJazz lease expires. An amendment to the
DA is being considered to extend its allowable lease term for an additional 3.5 years, from
March 12, 2027, to September 12, 2030. The existing light industrial use will continue
operating as a legal, nonconforming use pursuant to the Newport Beach Municipal Code.
(for future private roadway to Birch St)
7
Uptown Newport-TowerJazz Parcel Map (PA2025-0110)
Zoning Administrator, July 10, 2025
Page 8
Tmplt: 01/18/23
A request to exercise the DA’s first of two 5-year time extensions, pursuant to Section 5.1
(Extension) of the DA has been submitted by the applicant to extend the term of the DA
to 2033. The proposed TPM is therefore consistent with phasing development allowed
by PC-58 and required findings of Section 19.12.070 (Required Findings for Action on
Tentative Map) Title 19 (Subdivisions).
ENVIRONMENTAL REVIEW
All significant environmental concerns for the proposed project have been addressed in
the previously certified Environmental Impact Report No. ER2012-001 (SCH No.
2010051094), First Addendum No. ER2012-001, and Second Addendum No. ER2020-
001, and the City of Newport Beach intends to use said documents for the above noted
project, and further that there are no additional reasonable alternative or mitigation
measures that should be considered in conjunction with said project. The previously
prepared environmental documents for the Uptown Newport project are available for
public review at www.newportbeachca.gov/CEQA.
PUBLIC NOTICE
Notice of this application was published in the Daily Pilot, mailed to all owners of property
within 300 feet of the boundaries of the site (excluding intervening rights-of-way and
waterways), including the applicant, and posted on the subject property at least 10 days
before the scheduled hearing, consistent with the provisions of the Municipal Code.
Additionally, the item appeared on the agenda for this meeting, which was posted at City
Hall and on the City website.
APPEAL PERIOD:
An appeal may be filed with the Director of Community Development within 10 days
following the date of the action. For additional information on filing an appeal, contact the
Planning Division at (949) 644-3200.
Prepared by:
JM/ru
Attachments: ZA 1 Draft Resolution
ZA 2 Vicinity Map
ZA 3 County Tentative Parcel Map No. 2025-139
ZA 4 The Applicant’s Letter of Request
8
Attachment No. ZA 1
Draft Resolution
9
RESOLUTION NO. ZA2025-###
A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE
CITY OF NEWPORT BEACH, CALIFORNIA APPROVING A
TENTATIVE PARCEL MAP (COUNTY TENTATIVE PARCEL MAP
NO. 2025-139) FOR CONVEYANCE PURPOSES ONLY FOR
PHASE 2 UPTOWN NEWPORT PLANNED COMMUNITY
LOCATED AT 4321 JAMBOREE ROAD (PA2025-0110)
THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS
FOLLOWS:
SECTION 1. STATEMENT OF FACTS.
1. An application was filed by William A. Shopoff on behalf of Uptown Newport Jamboree
LLC, property owner (Applicant), with respect to property located at 4321 Jamboree Road,
and legally described as remainder portions of Parcel 1 and Parcel 4 of Parcel Map No.
2013-108 (Property), requesting approval of a tentative parcel map (TPM).
2. The Applicant proposes combining the remnants of Parcel Nos. 1 & 4 of Parcel Map No.
2013-108 into one parcel and subdivide the consolidated parcel into two parcels for
conveyance purposes only for Phase 2 future development in Uptown Newport Planned
Community (PC-58). No exceptions to Title 19 (Subdivisions) are requested as part of this
application (Project).
3. The Property is currently occupied by Tower Semiconductor (TowerJazz) facility and is
currently improved with an existing industrial building, a surface parking lot, driveways,
and ancillary improvements. No development or improvements are proposed as part of
this application.
4. The Property is designated Mixed-Use Horizontal 2 (MU-H2) by the General Plan Land
Use Element and located within the Uptown Newport Planned Community Zoning District
(PC-58).
5. The subject property is not located within the coastal zone; therefore, a coastal
development permit is not required.
6. A public hearing was held on July 10, 2025, online via Zoom. A notice of the time, place,
and purpose of the hearing was given in accordance with the Newport Beach Municipal
Code (NBMC). Evidence, both written and oral, was presented to and considered by the
Zoning Administrator at this hearing.
SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION.
1. All significant environmental concerns for the proposed Project have been addressed in
the previously certified Environmental Impact Report No. ER2012-001 (SCH No.
2010051094), First Addendum No. ER2012-001, and Second Addendum No. ER2020-
001, and the City of Newport Beach intends to use said documents for the above noted
10
Zoning Administrator Resolution No. ZA2025-###
Page 2 of 9
07-29-24
project, and further that there are no additional reasonable alternative or mitigation
measures that should be considered in conjunction with said project. Copies of the
previously prepared environmental document are available for public review and
inspection at the Planning Division or at the City of Newport Beach website at
www.newportbeachca.gov/ceqadocuments.
SECTION 3. REQUIRED FINDINGS.
The Zoning Administrator determined in this case that the TPM is consistent with the legislative
intent of Title 19 (Subdivisions) of the NBMC and is approved based on the following findings
per Section 19.12.070 (Required Findings for Action on Tentative Maps) of Title 19:
Finding:
A. That the proposed map and the design or improvements of the subdivision are consistent
with the General Plan and any applicable specific plan, and with applicable provisions of
the Subdivision Map Act and this Subdivision Code.
Facts in Support of Finding:
1. The Property has a General Plan designation of Mixed-Use District Horizontal-2 (MU-
H2) which provides for a horizontal intermixing of uses that may include regional
commercial office, multifamily residential, vertical mixed-use buildings, industrial, hotel
rooms, and ancillary neighborhood commercial uses. Uptown Newport Planned
Community (PC-58), Development Agreement No. DA2012-003 (DA), Tentative Tract
Map No. 17438 and other land use entitlements were approved on March 12, 2013, for
the development of a mixed-use planned community consisting of 1,244 residential
units, 11,500 square feet of neighborhood-serving retail space, and approximately two
acres of public park, consistent with the uses permitted by the MU-H2 designation. The
term of the DA is 15 years, with two five-year extensions. The DA became effective on
April 11, 2013, and the earliest expiration could be in 2028 (2013+15). Consequently,
Phase 1 Tract Map No. 17763 was recorded on June 19, 2015, for Phase 1
development.
2. On June 27, 2013, Zoning Administrator adopted Resolution ZA2013-033, approving
Tentative Parcel Map No. 2013-010 filed as PA2013-085 and recorded as County Parcel
Map No. 2013-108 on December 20, 2013, to allow a four-lot subdivision for conveyance
purposes to accommodate PC-58 future development. The tentative parcel map also
included a declaration of easements for various ingress, egress, reciprocal parking and
traffic circulation, and utilities.
3. The proposed TPM will consolidate the remnants of Parcel Nos. 1 & 4 of Parcel Map
No. 2013-108 into one parcel and subdivide the consolidated parcel into two parcels for
conveyance purposes only for Phase 2 future development in PC-58. These underlying
remnant parcels were created when Phase 1 Tract Map No. 17763 was recorded over
the parcel boundaries of Parcel Map No. 2013-108. In this process, the remainder Parcel
No. 1, which is a small gap of land between the boundaries of Tract Map No. 17763 and
11
Zoning Administrator Resolution No. ZA2025-###
Page 3 of 9
07-29-24
the Parcel No. 1 boundary lines, was inadvertently created. The remnant of Parcel No.
4 is the remaining Parcel No. 4 of 2013 Parcel Map after Phase 1 Tract Map was
recorded.
4. No development or improvements are requested with the proposed TPM. Any
improvements within Phase 2 development will require future application submittals and
approvals including recordation of subdivision map(s), prior to development of the
Property pursuant to PC-58.
5. PC-58 permits the existing industrial development currently located on the subject
property as an allowed interim use until the existing TowerJazz lease expires. An
amendment to DA is being considered to extend its allowable term for an additional 3.5
years, from March 12, 2027, to September 12, 2030. Also, a request to exercise the
DA’s first of two 5-year time extensions, pursuant to Section 5.1 (Extension) of the DA
has been submitted by the applicant to extend the term of the DA to 2033. The existing
light industrial use, therefore, will continue operating as a legal, nonconforming use
pursuant to the Newport Beach Municipal Code.
6. The proposed TPM is for conveyance purposes in preparation for Phase 2 development
and is therefore consistent with the intent of MU-H2 and phasing development allowed
by PC-58.
Finding:
B. That the site is physically suitable for the type and density of development.
Facts in Support of Finding:
1. No development or improvements are requested with the proposed TPM. The proposed
TPM is for conveyance purposes only for the future development in Phase 2 of PC-58.
Any improvements within Phase 2 development will require future application submittals
and approvals including recordation of subdivision map(s), as required per PC-58.
Finding:
C. That the design of the subdivision or the proposed improvements are not likely to cause
substantial environmental damage nor substantially and avoidably injure fish or wildlife
or their habitat. However, notwithstanding the foregoing, the decision-making body may
nevertheless approve such a subdivision if an environmental impact report was
prepared for the project and a finding was made pursuant to Section 21081 of the
California Environmental Quality Act that specific economic, social, or other
considerations make infeasible the mitigation measures or project alternatives identified
in the environmental impact report.
12
Zoning Administrator Resolution No. ZA2025-###
Page 4 of 9
07-29-24
Facts in Support of Finding:
1. The Project has been reviewed and is deemed consistent with the previously certified
Environmental Impact Report No. ER2012-001 (SCH No. 2010051094), First Addendum
No. ER2012-001 and Second Addendum No. ER2020-001 for PC-58.
Finding:
D. That the design of the subdivision or the type of improvements is not likely to cause
serious public health problems.
Facts in Support of Finding:
1. No development or improvements are requested with the proposed TPM. Any
improvements within Phase 2 development will require future application submittals and
approvals, including recordation of subdivision map(s), as required by PC-58 and will
comply with all Building, Public Works, and Fire Codes, which are in place to prevent
serious public health problems. All ordinances of the City and all Conditions of Approval
will be complied with.
Finding:
E. That the design of the subdivision or the type of improvements will not conflict with
easements, acquired by the public at large, for access through or use of property within
the proposed subdivision. In this connection, the decision-making body may approve a
map if it finds that alternate easements, for access or for use, will be provided and that
these easements will be substantially equivalent to ones previously acquired by the
public. This finding shall apply only to easements of record or to easements established
by judgment of a court of competent jurisdiction and no authority is hereby granted to
the City Council to determine that the public at large has acquired easements for access
through or use of property within a subdivision.
Facts in Support of Finding:
1. The design of the TPM will not conflict with easements acquired by the public at large,
for access through, or use of property within the proposed TPM as there are no public
easements located on the Property.
2. The proposed easements are in favor of the proposed parcels for on-site access and
utility purposes to accommodate future Phase 2 development and to be incompliance
with Condition Nos. 2 and 3.
Finding:
F. That, subject to the detailed provisions of Section 66474.4 of the Subdivision Map Act,
if the land is subject to a contract entered into pursuant to the California Land
Conservation Act of 1965 (Williamson Act), the resulting parcels following a subdivision
13
Zoning Administrator Resolution No. ZA2025-###
Page 5 of 9
07-29-24
of the land would not be too small to sustain their agricultural use or the subdivision will
result in residential development incidental to the commercial agricultural use of the
land.
Facts in Support of Finding:
1. The Property is not subject to the Williamson Act because the subject property is not
designated as an agricultural preserve and is less than 100 acres in area.
Finding:
G. That, in the case of a “land project” as defined in Section 11000.5 of the California
Business and Professions Code: (1) There is an adopted specific plan for the area to be
included within the land project; and (2) the decision-making body finds that the
proposed land project is consistent with the specific plan for the area.
Facts in Support of Finding:
1. The Property is not a “land project” as defined in Section 11000.5 of the California
Business and Professions Code because the proposed subdivision does not contain 50
or more parcels.
2. The Project is located within PC-58 and is currently improved with the existing light
industrial development. TowerJazz is a permitted interim use until its existing lease
expires. The Project is for conveyance purposes only to accommodate future Phase 2
development and therefore consistent with PC-58.
Finding:
H. That solar access and passive heating and cooling design requirements have been
satisfied in accordance with Sections 66473.1 and 66475.3 of the Subdivision Map Act.
Facts in Support of Finding:
1. The proposed TPM does not include development or improvements. Any future
improvements within Phase 2 development, under separate entitlement application(s),
will be subject to Title 24 of the California Building Code that requires new construction
to meet minimum heating and cooling efficiency standards depending on location and
climate. The Newport Beach Building Division enforces Title 24 compliance through the
plan check and inspection process.
Finding:
I. That the subdivision is consistent with Section 66412.3 of the Subdivision Map Act and
Section 65584 of the California Government Code regarding the City’s share of the
regional housing needs and that it balances the housing needs of the region against the
14
Zoning Administrator Resolution No. ZA2025-###
Page 6 of 9
07-29-24
public service needs of the City’s residents and available fiscal and environmental
resources.
Facts in Support of Finding:
1. The TPM proposes the consolation of remnants Parcel Nos. 1 & 4 of Parcel Map No.
2013-108 into one parcel and subdivide the consolidated parcel into two parcels for
conveyance purposes. Although no development or improvements are requested, and
any improvements will require future application submittals and approvals including
recordation of subdivision map(s), the proposed TPM will accommodate the conveyance
of parcels intended for the future residential development of Phase 2. Therefore, the
proposed TPM will not affect the City in meeting its share of the regional housing needs.
Finding:
J. That the discharge of waste from the proposed subdivision into the existing sewer
system will not result in a violation of existing requirements prescribed by the Regional
Water Quality Control Board.
Facts in Support of Finding:
1. No development or improvements are proposed. Existing wastewater discharge into
the existing sewer system are designed to comply with the Regional Water Quality
Control Board (RWQCB) requirements.
Finding:
K. For subdivisions lying partly or wholly within the Coastal Zone, that the subdivision
conforms with the certified Local Coastal Program and, where applicable, with public
access and recreation policies of Chapter Three of the Coastal Act.
Facts in Support of Finding:
1. The Project is not located within the Coastal Zone and therefore is not applicable in
regard to conformance with the certified Local Coastal Program and public access and
recreation policies of Chapter Three of the Coastal Act.
SECTION 4. DECISION.
NOW, THEREFORE, BE IT RESOLVED:
1. The Statement of Facts, CEQA Determination and Required Findings set forth above are
true and correct and incorporated herein by reference.
2. The Zoning Administrator of the City of Newport Beach hereby approves Tentative Parcel
Map filed as PA2025-0110 (County Tentative Parcel Map No. 2025-139), subject to the
conditions outlined in Exhibit A, which is attached hereto and incorporated by reference.
15
Zoning Administrator Resolution No. ZA2025-###
Page 7 of 9
07-29-24
3. This action shall become final and effective 10 days after the adoption of this Resolution
unless within such time an appeal is filed with the Director of Community Development
by the provisions of Title 19 Subdivisions, of the Newport Beach Municipal Code.
PASSED, APPROVED, AND ADOPTED THIS 10th DAY OF JULY 2025.
_____________________________________
Benjamin M. Zdeba, AICP, Zoning Administrator
16
Zoning Administrator Resolution No. ZA2025-###
Page 8 of 9
07-29-24
EXHIBIT “A”
CONDITIONS OF APPROVAL
(Project-specific conditions are in italics)
Planning Division
1. The approval of Tentative Parcel Map (TPM) filed as PA2025-0110 (County Tentative
Parcel Map No. 2025-139) shall be for financing and conveyance purposes only. Any
improvements shall require future application submittals and approvals and recordation
of subdivision map(s), as required per PC-58.
2. A reciprocal access and parking agreement, subject to the review and approval of the
Community Development Department and City Attorney’s Office, shall be recorded prior
to the recordation of TPM, to ensure access and parking will be continually provided for
the existing industrial development until its lease expires and the facility is demolished,
unless other arrangements can be provided to the satisfaction of Community
Development.
3. The proposed 46-foot-wide access easement to Birch Street shall be maintained until a
final map for Phase 2 development is recorded with a private roadway and consistent in
size, design and location to accommodate the proposed future private roadway for
Phase 2 development or as otherwise approved by the Community Development and
Public Works Departments.
4. This TPM shall expire if the map has not been recorded within 24 months of the date of
approval, unless an extension is granted by the Director of Community Development in
accordance with the provisions of Section 19.16 of the Newport Beach Municipal Code.
5. To the fullest extent permitted by law, applicant shall indemnify, defend and hold
harmless City, its City Council, its boards and commissions, officials, officers,
employees, and agents from and against any and all claims, demands, obligations,
damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities,
costs and expenses (including without limitation, attorney’s fees, disbursements and
court costs) of every kind and nature whatsoever which may arise from or in any manner
relate (directly or indirectly) to City’s approval of the Uptown Newport-TowerJazz
Parcel Map including, but not limited to, the TPM filed as PA2025-0110 (County
Tentative Parcel Map No. 2025-139). This indemnification shall include, but not be
limited to, damages awarded against the City, if any, costs of suit, attorneys' fees, and
other expenses incurred in connection with such claim, action, causes of action, suit or
proceeding whether incurred by applicant, City, and/or the parties initiating or bringing
such proceeding. The applicant shall indemnify the City for all of City's costs, attorneys'
fees, and damages which City incurs in enforcing the indemnification provisions set forth
in this condition. The applicant shall pay to the City upon demand any amount owed to
the City pursuant to the indemnification requirements prescribed in this condition.
17
Zoning Administrator Resolution No. ZA2025-###
Page 9 of 9
07-29-24
Public Works Department
6. A parcel map shall be recorded. The Map shall be prepared on the California coordinate
system (NAD83). Prior to recordation of the Map, the surveyor/engineer preparing the
Map shall submit to the County Surveyor and the City of Newport Beach a digital-graphic
file of said map in a manner described in Section 7-9-330 and 7-9-337 of the Orange
County Subdivision Code and Orange County Subdivision Manual, Subarticle 18. The
Map to be submitted to the City of Newport Beach shall comply with the City’s
CADD Standards. Scanned images will not be accepted.
7. Prior to recordation of the parcel map, the surveyor/engineer preparing the map shall tie
the boundary of the map into the Horizontal Control System established by the County
Surveyor in a manner described in Section s 7-9-330 and 7-9-337 of the Orange County
Subdivision Code and Orange County Subdivision Manual, Subarticle 18. Monuments
(one inch iron pipe with tag) shall be set On Each Lot Corner unless otherwise approved
by the Subdivision Engineer. Monuments shall be protected in place if installed prior to
completion of construction project.
18
Attachment No. ZA 2
Vicinity Map
19
VICINITY MAP
Tentative Parcel Map No. PA2025-0110
4321 Jamboree Road
Subject Property
20
Attachment No. ZA 3
County Tentative Parcel Map
No. 2025-139
21
33' ACCESSEASEMENT TOBIRCH STREETEEETTRESTCCHBBIRBTETETE
33' ACCESSEASEMENT TOBIRCH STREET PARCEL A:
REMAINDER PORTION OF PARCEL 4 OF PARCEL MAP NO. 2013-108, INTHE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OFCALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 378, PAGES 10THROUGH 12 INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OFTHE COUNTY RECORDER OF SAID COUNTY.
APN: 445-133-07
PARCEL B:
REMAINDER PORTION OF PARCEL 1 OF PARCEL MAP NO. 2013-108, INTHE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OFCALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 378, PAGES 10THROUGH 12 INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OFTHE COUNTY RECORDER OF SAID COUNTY.
APN: 445-133-08
Sa
v
e
D
a
t
e
:
Plo
t
D
a
t
e
:
6/1
9
/
2
0
2
5
1
1
:
0
1
A
M
6/1
9
/
2
0
2
5
2
:
0
8
P
M
By
:
SE
R
P:\S
\
S
H
O
P
T
S
G
P
3
0
0
6
\
0
4
0
0
C
A
D
\
S
H
E
E
T
S
\
E
C
\
P
r
e
l
i
m
i
n
a
r
y
E
n
g
i
n
e
e
r
i
n
g
\
T
P
M
\
E
C
-
C
V
-
T
M
-
0
0
1
-
S
H
O
P
T
S
G
P
3
0
0
6
.
d
w
g
Ste
v
i
e
R
o
j
a
s
By
:
File
:
PROJECT NO.
DRAWN BY:DESIGNED BY:
DA
T
E
:
RE
V
I
E
W
E
D
B
Y
:
DA
T
E
NO
.
R
E
V
I
S
I
O
N
CK
BY
SHEET NO.
CHECKED BY:
®
17542 E. 17th StreetSuite 150Tustin, CA 92780714.665.4500
TE
N
T
A
T
I
V
E
P
A
R
C
E
L
M
A
P
N
O
2
0
2
5
-
X
X
X
TH
E
S
H
O
P
O
F
F
G
R
O
U
P
CO
V
E
R
P
A
G
E
JBJB
JB
JB
ENTITLEMENTS
PA
2
0
2
5
-
0
1
1
0
TO
W
E
R
J
A
Z
Z
T
P
M
CI
T
Y
O
F
N
E
W
P
O
R
T
B
E
A
C
H
CA
06/20/25
SHOPTSGP3006
1 OF2
----
VICINITY MAP
SCALE: N.T.S.
IN THE CITY OF NEWPORT BEACH, CA
UPTOWN NEWPORTTENTATIVE PARCEL MAP 2025-139
OWNER / APPLICANT ENGINEER / SURVEYOR
FOR CONVEYANCE PURPOSES ONLY
LEGAL DESCRIPTION
DATUM
HORIZONTAL:THE BEARINGS SHOWN HEREON ARE BASED ON THE LINE BETWEENO.C.S. HORIZONTAL CONTROL STATION GPS NO. 6175R1 AND STATIONGPS NO. 6168R1 BEING N06°59'37"W PER RECORDS ON FILE IN THEOFFICE OF THE ORANGE COUNTY SURVEYOR.
VERTICAL:BM NO. 3J-13-70 ELEVATION: 54.540 (NAVD88) 1989
DESCRIBED BY OCS 2001 - FOUND 3 3/4" OCS ALUMINUM BENCHMARKDISK STAMPED "3J-13-70", SET IN THE TOP OF A 4 IN. BY 4 IN. CONCRETEPOST. MONUMENT IS LOCATED IN THE SOUTHERLY CORNER OF THEINTERSECTION OF JAMBOREE ROAD AND FAIRCHILD, 72.3 FT.SOUTHERLY OF THE CENTER OF THE CENTER MEDIAN ALONGMACARTHUR, 2.8 FT. WESTERLY OF THE WEST END OF THESOUTHWEST CURB RETURN. MONUMENT IS DOWN 0.1 FT. FROM THETOP OF CURB.
4321 JAMBOREE ROADNEWPORT BEACH, CA 92660
SITE ADDRESS
SITE PROJECT INFORMATION
SITE AREA = 12.57 ACRES
EXISTING USE: INDUSTRIALPROPOSED USE: NO CHANGE
EXISTING ZONING: PC-58PROPOSED ZONING: NO CHANGE
UTILITY PURVEYOR / SERVICES
SEWER PURVEYOR: CITY OF NEWPORT BEACHWATER PURVEYOR: IRVINE RANCH WATER DISTRICTSCHOOL DISTRICT: SANTA ANA UNIFIED SCHOOL DISTRICTFIRE DISTRICT: NEWPORT BEACH FIRE DEPARTMENTELECTRICITY: SOUTHERN CALIFORNIA EDISONSHEET INDEX
1 - COVER SHEET2 - DETAILED MAP SHEET
DEVELOPMENT CONTACTS
UPTOWN NEWPORT JAMBOREE, LLC18565 JAMBOREE RD, SUITE 200IRVINE, CA 92612CONTACT: TOM BITNEYPH: (949) 417-1396EMAIL: TBITNEY@SHOPOFF.COM
DAVID EVANS AND ASSOICATES17542 E. 17TH STREETTUSTIN, CA 92780CONTACT: LINDA SANDUSKYPH: 714.665.4549 EMAIL: LSANDUSKY@DEAINC.COM
SAN
SAN DIEGO FWY
COST
A
M
E
S
A
F
W
Y
JAM
B
O
R
E
E
R
D
CAMP
U
S
D
R
Ma
c
A
R
T
H
U
R
BLV
D
JOHN WAYNEAIRPORT
UPPER NEWPORTBAY
IRV
I
N
E
CA
M
P
U
S
DRUNIVERSITYDR
VON
KAR
M
A
N
AVE
BIR
C
H
STCO
R
O
N
A
D
E
L
M
A
R
F
W
Y
405
55
73
DIEGO
F
W
Y
PROJECTLOCATION
AVE
ALL BEARINGS AND DISTANCES SHOWN ARE MEASURED,UNLESS OTHERWISE NOTED.
INDICATES MEASURED AND RECORD DATA PER( )TRACT NO. 17763 M.B. 937/17-23.
INDICATES RECORD DATA PER PARCEL MAP NO. 2013-108,(R1)P.M.B. 378/10-12.
RECORD REFERENCES
1. THE PURPOSE OF THIS TPM IS TO PROPOSED LOT MERGER OFEXISTING PARCELS AND SUBDIVISION FOR CONVEYANCEPURPOSES ONLY.2. NO GRADING OR CIVIL IMPROVEMENTS ARE PROPOSED AS PARTOF THIS PROJECT.3. THE PROJECT IS WITHIN THE FEDERAL EMERGENCY MANAGEMENTAGENCY'S CLEAR ZONE Z, AREA OF 500-YEAR FLOOD ON THEFLOOD INSURANCE RATE MAP (FIRM), COMMUNITY PANEL MAP NO.0286, EFFECTIVE DATE: FEBRUARY 18, 2004.4. THOSE EXISTING EASEMENTS OR PORTIONS OF EXISTINGEASEMENTS AFFECTING THE PROPERTY WITHIN THE BOUNDARYOF THIS MAP WILL BE QUITCLAIMED TO THE EXTENT NECESSARYTO ACCOMMODATE THE FUTURE LAND USE.5. ON SITE SEWER AND STORM DRAIN WILL BE PRIVATELY OWNEDAND MAINTAINED.6. ALL EXISTING EASEMENTS GRANTING INGRESS AND EGRESSSHALL BE MAINTAINED.
GENERAL NOTES
PA2025-0110
22
(SD)
(W)
(W)
(W)
(W)
(W)
(W)(W)(W)(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W
(W)(W)(W)(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W)
(W
)
(W)
(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)(W)(W)
(W
)
(W
)
(W
)
(W
)
(W)
(W
)
(W)
(W
)
(W
)
(W)
(W
)
(W)
(W
)
(W)(W)
(W
)
(W
)
(W
)
(W
)
(W)(W)
(W)
(W)(W)(W)(W)(W)(W)
(W
)
(W)(W)(W)(W)(W)(W)(W)(W)
(W)(W)(W)(W)
(G)(G)(G)(G)(G)(G)(G)(G)(G)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)
(W
)
(W
)
(W)(W)(W)
(W)
(SS)(SS)
(SS)
(SS)(SS)(SS)
(W
)
(W
)
(W
)
(W)
(W
)
(SS
)
(SS
)
(S
S
)
(W
)
(W
)
(W
)
(W
)
(W
)
(W
)
(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(W)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)
(G)(W)(W)(W)
(W
)
(W
)
(W
)
(W)
(W)
(W)
(W
)
(SS)
(W)
(W
)
(W)
(W)
(W
)
(W
)
(W)(W)
(W
)
(W)
(W
)
(W)
(G)
(G
)
(G
)
(G
)
(G
)
(SS)
(W)
(SS)(SS)(SS)
(SS
)
(G
)
(G
)
(G)
(G
)
(G)
(G
)
(G
)
(G)(G)(G)
(G
)
(G
)
(G
)
(G
)
(W
)
(W
)
(W
)
(W)(W)(W)(W)(W)(W)(W)
(W
)
(W
)
(W
)
(W)
(W)
(W)
(SS)(SS)(SS)(SS)(SS)(SS)(SS)
(S
D
)
(SD
)
(SD
)
(SD)(SD)(SD)(SD)(SD)
(SD)(SD)
(SD)
(S
D
)
(SD
)
(SD)(SD)(SD)
(W
)
SS
12'
12'PUBLIC PEDESTRIANWALKWAY EASEMENT PERINST. NO. 2015000292781 O.R.
PUBLIC PEDESTRIANWALKWAY EASEMENT PERINST. NO. 2015000292781 O.R.
15'
PUBLIC PEDESTRIANWALKWAY EASEMENT PERINST. NO. 2015000292781 O.R.
46
'
PROPOSED ACCESSEASEMENT IN FAVOR OFPARCEL 1
ACCESS EASEMENTRECORDED MAY 26 1978 INBOOK 12690 PAGE 854 OFOFFICIAL RECORDS.
(33
'
)
36'FUTURE PRIVATE ROADWAYPARCEL LINES PERSEPARATE INSTRUMENT.
A GRANT OF EASEMENT BETWEEN COLLINSRADIO COMPANY, DON KOLL COMPANYNEWPORT RECORDED AS BOOK 10413, PAGE573 O.R.
10'
AN EASEMENT FOR STORM DRAIN AND INCIDENTALPURPOSES IN FAVOR OF KOLL CENTER NEWPORT, A LIMITEDPARTNERSHIP, RECORDED AS BOOK 11137, PAGE 1020 O.R.
10'
10'
PARCEL 27.87 AC.
PARCEL 14.69 AC.
N40°38'21"E
417.743
L=93.13',R=768.00
EX. 60" SD
EX
.
1
8
"
S
D
EX
.
P
V
T
F
I
R
E
A
N
D
DO
M
E
S
T
I
C
W
A
T
E
R
EX
.
B
U
I
L
D
I
N
G
(
T
O
R
E
M
A
I
N
)
EX
.
2
1
"
S
D
EX
.
1
8
"
S
D
EX. 48" SD
PUBLIC PEDESTRIANWALKWAY EASEMENT PERINST. NO. 2015000292781 O.R.
PROPOSEDEASEMENT INFAVOR OF PARCEL2 FOR UTILITYPURPOSES.
10
'
10'
10'
PROPOSED EASEMENTIN FAVOR OF PARCEL 2FOR UTILITY PURPOSES.
A GRANT OF EASEMENTS (WATER, FIRE, GAS,SEWER, AND STORM DRAIN) BETWEEN UPTOWNNEWPORT JAMBOREE LCC, TSG - PARCEL 1 LLC,AND TPG/TSG VENTURE 1 ACQUISITION LLC,RECORDED AS INST. NO. 2014000060495
N49
°
2
1
'
3
9
"
W
3
8
5
.
2
6
'
S40°38'21"W 510.65'S40°38'21"W68.35'
N4
9
°
2
1
'
3
9
"
W
1
8
4
.
7
9
'
S40°38'21"W 1032.49'S49°21'39"E 40.00'
S49°21'39"E 58.91'L=37.14'R=42.00'Δ=50.67
L=11.25'R=100.00'Δ=6.44 N40°38'21"E 430.81'
S49°21'39"E18.00'
N40°38'21"E45.00'
S49°21'39"E18.81'N40°38'21"E70.92'
S49
°
2
1
'
3
9
"
E
2
3
5
.
8
5
'
N8
5
°
3
8
'
2
1
"
E
72.
9
6
'
N40°38'21"E 161.24'L=57.34'R=168.00'Δ=19.56 N60°11'4
6
"
E
1
1
3
.
5
6
'
L=45.05'R=132.00'Δ=19.55
N40°38'21"E30.00'
S49°21'39"E78.14'
S4
9
°
2
1
'
3
9
"
E
3
0
7
.
1
2
'
S40°38'21"W97.63'
N40°38'21"E30.95'N40°38'21"E 577.33'
S40°38'21"W 5.18'
S4
9
°
2
1
'
3
9
"
E
78.
1
4
'
PROPOSED EASEMENT INFAVOR OF PARCEL 1 FORUTILITY PURPOSES.
65.4'
13
.
6
'
ACCESS TO BIRCH
Sa
v
e
D
a
t
e
:
Plo
t
D
a
t
e
:
6/2
0
/
2
0
2
5
1
0
:
1
0
A
M
6/2
4
/
2
0
2
5
1
0
:
5
4
A
M
By
:
J
u
a
b
P
:
\
S
\
S
H
O
P
T
S
G
P
3
0
0
6
\
0
4
0
0
C
A
D
\
S
H
E
E
T
S
\
E
C
\
P
r
e
l
i
m
i
n
a
r
y
E
n
g
i
n
e
e
r
i
n
g
\
T
P
M
\
E
C
-
P
L
-
T
M
-
0
0
1
-
S
H
O
P
T
S
G
P
3
0
0
6
.
d
w
g
Ju
s
t
i
n
B
r
o
w
n
By
:
File
:
PROJECT NO.
DRAWN BY:DESIGNED BY:
DA
T
E
:
RE
V
I
E
W
E
D
B
Y
:
DA
T
E
NO
.
R
E
V
I
S
I
O
N
CK
BY
SHEET NO.
CHECKED BY:
®
17542 E. 17th StreetSuite 150Tustin, CA 92780714.665.4500
TE
N
T
A
T
I
V
E
P
A
R
C
E
L
M
A
P
N
O
2
0
2
5
-
X
X
X
TH
E
S
H
O
P
O
F
F
G
R
O
U
P
DE
T
A
I
L
E
D
M
A
P
JBJB
JB
JB
ENTITLEMENTS
TO
W
E
R
J
A
Z
Z
T
P
M
CI
T
Y
O
F
N
E
W
P
O
R
T
B
E
A
C
H
CA
SHOPTSGP3006
2 OF 2
----
PA
2
0
2
5
-
0
1
1
0
06/20/25
23
Attachment No. ZA 4
The Applicant’s Letter of Request
24
17542 E 17th Street Suite 150 Tustin California 92780 Telephone: 714.665.4500 Facsimile: 714.665.4501
June 24, 2025
TPM 2025-139 – Subdivision for Conveyance Purposes
4321 Jamboree Road, Newport Beach, CA 92660
Project Description
The proposed Tentative Parcel Map 2025-139 proposes to merge the remnant parcels 1 and 4 of
PM2013-108 and then subdivide the site into two parcels for conveyance purposes only with no
improvements proposed. These underlying remnant parcels were created when the Phase 1 Tract Map
17763 recorded over the parcel boundaries of said underlying parcel map, PM 2013-108. In this process,
the remainder of Parcel 1 was inadvertently created in a gap between the boundaries of TR17763 and the
Parcel 1 boundary lines. The majority of the site consists of the remainder of Parcel 4.
See the attached Exhibit “Mapping Boundaries Exhibit” for reference showing the overlay of TR17763
over PM 2013-108.
As part of the process to create conveyable parcels, TPM2025-139 proposes two (2) easements to
maintain existing usage and maintenance of the site. These easements include:
• Cross lot easement for vehicular access
• Cross lot easement for utility purposes
See the attached Exhibit “Proposed Easement Exhibit” for reference showing the locations of said
proposed easements.
25
Sav
e
D
a
t
e
:
Plo
t
D
a
t
e
:
6/5
/
2
0
2
5
3
:
5
7
P
M
6/1
9
/
2
0
2
5
1
1
:
2
8
P
M
By:
J
u
a
b
S
:
\
1
0
0
2
8
8
\
S
u
r
v
e
y
\
B
o
u
n
d
a
r
y
\
T
E
M
P
\
M
1
0
0
2
8
8
B
1
P
h
a
s
e
1
B
n
d
y
V
s
P
a
r
c
e
l
M
a
p
E
x
h
i
b
i
t
.
d
w
g
Ju
s
t
i
n
B
r
o
w
n
By:
File
:
®
17542 E. 17th StreetSuite 150Tustin, CA 92780714.665.4500
TP
M
2
0
2
5
-
1
3
9
MA
P
P
I
N
G
B
O
U
N
D
A
R
I
E
S
E
X
H
I
B
I
T
TO
W
E
R
J
A
Z
Z
S
U
B
D
I
V
I
S
I
O
N
LIMITS OF PHASE 1 /
TR 17763
OVERALL UPTOWN
NEWPORT PROPERTY LINELOT 2
PM 20
1
3
-
1
0
8
LO
T
2
PM
2
0
1
3
-
1
0
8
LOT 1
PM 20
1
3
-
1
0
8
LOT 4
PM 20
1
3
-
1
0
8
UNINTENTIONALLY GREATED
REMAINDER PARCEL BETWEEN
BOUNDARIES OF PARCEL 1, PM
2013-108 AND TR 17763
PM 2025-139 PROPOSES TO
MERGE REMAINDER
PORTIONS OF PARCELS 1
AND 4 OF UNDERLYING
PARCEL MAP 2013-108 AND
SUBDIVIDE.
26
Sav
e
D
a
t
e
:
Plo
t
D
a
t
e
:
6/2
4
/
2
0
2
5
1
1
:
0
8
A
M
6/2
4
/
2
0
2
5
1
1
:
0
8
A
M
By:
J
u
a
b
S
:
\
1
0
0
2
8
8
\
S
u
r
v
e
y
\
B
o
u
n
d
a
r
y
\
T
E
M
P
\
M
1
0
0
2
8
8
B
1
P
h
a
s
e
1
T
o
w
e
r
J
a
z
z
T
P
M
E
x
h
i
b
i
t
.
d
w
g
Ju
s
t
i
n
B
r
o
w
n
By:
File
:
®
17542 E. 17th StreetSuite 150Tustin, CA 92780714.665.4500
TP
M
2
0
2
5
-
1
3
9
PR
O
P
O
S
E
D
E
A
S
E
M
E
N
T
S
E
X
H
I
B
I
T
TO
W
E
R
J
A
Z
Z
S
U
B
D
I
V
I
S
I
O
N
PROPOSED
LOT LINE PROP. CROSS LOT
ACCESS EASEMENT
FUTURE ALIGNMENT OF
ROADWAY PER AMENDED
PHASE 2 TTM.
PROP. CROSS LOT UTILITY
EASEMENT TO PRESERVE
SERVICE.
PARCEL 2
PER TPM
2025-139
PARCEL 1
PER TPM 2025-139
LIMITS OF PHASE 1 / TR17763
LIMIT OF PROPOSED TPM
2025-139
PHASE 1 / TR17763
TPM 2025-139
PHASE 1 / TR17763
TPM 2025-139
PH
A
S
E
1
/
T
R
1
7
7
6
3
TP
M
2
0
2
5
-
1
3
9
27
From: Jim Mosher <jimmosher@yahoo.com>
Sent: July 08, 2025 11:04 AM
To: CDD
Subject: Comment on ZA Item 2 (July 10, 2025, meeting)
Regarding Item 2 (Uptown Newport-TowerJazz Tentative Parcel Map, PA2025-0110) on
the July 10, 2025, Zoning Administrator agenda:
The staff report is a little difficult to follow. Particularly disorienting are the references to
Phase 1 as being "generally located on the westerly side of the property" (bottom of
handwritten page 2) and Phase 2 as being "generally located on the easterly side of the
property" (bottom of handwritten page 3).
This is confusing because Exhibit 3 on page 4 and the Vicinity Map on handwritten page
20 suggest that Phase 1 is generally on the southeasterly side and Phase 2 on the
northwesterly side.
Adding to the confusing, and introducing what would seem to be a more serious error,
the first page of Attachment ZA 3, the Tentative Parcel Map that is being proposed for
approval and recording, found on handwritten page 22, contains a compass direction
icon in the lower left corner, showing "N" pointing straight up, which is inconsistent with
the Vicinity Map inset in the upper right corner of the same sheet, which (like the other
two images just referenced) suggests the directions are quite different. If one believed
the compass direction shown on the larger map, it would mean Jamboree Road (at the
bottom of the map) runs due east and west, which I do not believe to be true.
If one zooms in on the map, one finds bearing notations for various lines that suggest
the compass icon must be mis-drawn, but should the City really be approving maps with
such obvious errors?
-- Jim
Zoning Administrator - July 10, 2025 Item No. 2a - Additional Materials Received Uptown Newport-TowerJazz Tentative Parcel Map (PA2025-0110)