SPECIAL INSPECTION REPORT
Project Address: 2720 Pebble Drive. Newport Beach, CA
Permit Number: 52020-0126
Inspection Type (s): Shotcrete Inspection
Inspection Date (s): 10/23/2021 ( ) Periodic (X) Continuous
Describe Inspection, Includmg Locition(sy
Provided continuous inspection in the placement of approximately 45 cubic yards of shotcrete 4500 psi for pool & spa
Work performed took place in the back of the residence. Shotcrete temperature during placement was 820F and ambient temperature
Was 670f. Work performed was in compliance with (ASTM C143 & ACI 506R-05). Slump temperature and water levels were within
tolerance. A blow pipe was utilized to control and remove rebound; all bars had 3" minimum clearance from soils. Reinforcing steel
Was tied in place; size location and clearance was inconformity with the approved and signed structural plans.
List Tests Made:
Temperature , and specimens were cast
Total Inspection Time Each Day:
Date: 10/23/2020
Hours. 6 hours
Ust All items Requiring Correction (Include Previously Usted Uncorrected Items):
To the best of my knowledge, the work inspected was in accordance with the Building Division approved design drawings,
specifications and applicable workmanship provisions of the U.B.C. except as noted above.
Special) rSignature: iDate:
10/23/2021
Print Full Na j
Newport Beach Registration No.:
Edwin Jimenez
Inspection No. NB-0731
5p ciallmpeWnnPepoa 00/25/2U15
(efl
®UNIVERSAL
ENGINEERING SCIENCES
16 Technology Drive
Suite 139
Irvine CA
(949)-266-5008
Contractor: Intex Pool Design
Superintendent: Saied
Soils Inspection Daily Report
Client: Project:
Intex Design and Construction
15915 Ventura Blvd
Encino CA
Permit Number: N/A
Jurisdiction: Newport Beach
4210.2100058.0000
2720 Pebble Dr
2720 Pebble Dr
Newport Beach CA
Report Number: 3
Inspection Date: 10/05/2021
Approved Plan Date: N/A Delta Revision: 0 Plans Prepared By: N/A
Area Inspected: Deep end of pool bottom Ref. Civil/Grading Sheet(s): N/A Ref. Detail(s): N/A
Inspection(s) Performed:
0 Grading
Report Observations:
Arrived on site to find pool sides had been excavated and dimensions widened and the deep end of the pool filled in with native materiel.
The contractor informed the inspector that they had not covered the fill placed the previous day from rain, and that the materiel had turned
to mud due to after hours rain. They stated that they had removed the mud and replaced and backfilled the deep end using native
cuttings from their excavation activities, then compacted the materiel using a tracked front end loader with a full bucket. Probing of this
placed filled using a steel soil probe indicated that this fill had not been adequately compacted, and in the deepest part penetrated over
a foot, with water and mud visible on the bottom few inches of the probe. Contractor was advised and elected to remove this wet materiel
and replace it with dryer native materiel. This was done in a single lift and compacted using the same method. Testing with the nuclear
gauge produced consistently low values for both dry density and moisture. This materiel was then re -worked using a jumping jack, and
while numbers were improved, still returned consistently low. Contractor elected to scarify the top 6" of the lift, mixing and wetting this
material, while wetting and recompacting the lower 6" using the frontend loader. This mixed materiel was then replaced and compacted
using both the loader and the jumping jack. This 12" of materiel was then tested using the nuclear gauge, and while slight improvement
was measured, the density was likely still short of 95%. The top 6" was then tested, and found to have improved dry densities that would
likely meet compaction requirements. The contractor then once again removed the upper 6", and compacted the lower 6 inches with the
jumping jack. This materiel was then tested, and found to have likely adequate compaction values. This test result has been attached,
and at the time of issue of this report, proctor results show this test as passing. The contractor was within 1' of FSG for the remaining of
the pool, and was advised that they could continue placing the remaining fill and that it could be tested upon completion, but to keep lifts
no greater than 6" in order to achieve adequate compaction levels.
Type of Material: Test Performed For:
❑� Native ❑� Grading
Geotech Report By: Project Number: Geotech Report Date: Moisture Optimum:
UES 4210.2100058.0000 9/17/2012 Optimum +/- 3%
Daily Std. Count (MC): 711 Daily Std. Count (DC): 2443 Gauge Serial #: 79780 Gauge Calib. Date: 10105/2021
No.
Loc.
Elev.
Fill
Probe
DD
%
Req. %
%
Meets Spec?
Lab ID
Max
Opt.
Dep.
Dep.
(pcf)
MC
Comp.
Comp.
DD
MC
(in)
(pcf)
1
Deep end of pool bottom
-1' FSG
6"
6.0
110A
8.3
95
97
Yes
4210.210
114.2
10.5
0058.000
0
The work WAS inspected/Tested in accordance with Approved Documents.
The work MET the requirements of Approved Plans and Specifications.
Material Sampling WAS performed in accordance with approved documents.
Inspection Certified By
��"/
Jacob Kays
10/06/2021
Trip Charge (Hours): 1.00 Temperature (°F): 75 Technician:Jacob Kays Page 1 of 1
Time: 11:37 - 15:50 Cloud Conditions: Clear
Wind Conditions: Calm
Person Notified:Saied
®UNIVERSAL
ENGINEERING SCIENCES
16 Technology Drive
Suite 139
Irvine CA
(949)-266-5008
Soils Inspection Daily Report
Client: Project:
Intex Design and Construction
15915 Ventura Blvd
Encino CA
Contractor: Intex Design and Construction Permit Number: N/A
Superintendent: Saied Jurisdiction: Newport Beach
4210.2100058.0000
2720 Pebble Dr
2720 Pebble Dr
Newport Beach CA
Report Number: 4
Inspection Date: 10/06/2021
Approved Plan Date: N/A Delta Revision: 0 Plans Prepared By: N/A
Area Inspected: Pool Bottom Ref. Civil/Grading Sheet(s): WA Ref. Detail(s): WA
Performed:
7 Grading
Report Observations:
Arrived on site to find the pool bottom completed to the final graded. The area appeared to have been compacted with a jumping jack,
and all slough from the previous day either compacted or removed. The area probed reasonably firm, and nuclear gauge readings came
back as passing.
fvoe of Material:
Test Performed For:
n Native n Grading
Geotech Report By: Project Number: Geotech Report Date: Moisture Optimum:
UES 4210.2100058.0000 9/18/2021 Optimum +/- 3%
Daily Std. Count (MC): 705 Daily Std. Count (DC): 2429 Gauge Serial #: 79780 Gauge Calib. Date: 10/06/2021
No.
Loc,
Elev.
Fill
Probe
DD
%
Req. %
%
Meets Spec?
Lab ID
Max
Opt
Dep.
Dep.
(pcf)
MC
Comp.
Comp.
DD
MC
(in)
(pcf)
2
Pool Bottom
FSG
1.5'
12.0
113.4
8.2
95
99
Yes
4210.210
114.2
9.3
0058.000
0
3
Pool Bottom
FSG
1'
12.0
108.0
7.2
95
95
Yes
4210.210
114.2
9.3
0058.000
0
4
Pool Bottom
FSG
1'
12.0
108.1
6.8
95
95
Yes
4210.210
114.2
9.3
0058.000
0
5
Pool Bottom
FSG
1'
12.0
108.6
9.3
95
95
Yes
4210.210
114.2
9.3
0055.000
0
6
Pool Bottom
FSG
1
12.0
108.2
7.0
95
95
Yes
4210.210
114.2
9.3
0058.000
0
The work WAS inspected/Tested in accordance with Approved Documents.
The work MET the requirements of Approved Plans and Specifications.
Material Sampling WAS performed in accordance with approved documents.
Inspection Certified By
Jacob Kays
10/07/2021
Trip Charge (Hours): 1.00 Temperature (On: 74 Technician:Jacob Kays
Time: 10:55 - 11:55 Cloud Conditions: Overcast
Wind Conditions: Calm
Person Notified:Saied
Page 1 of 1
ACOUSTICAL ENGINEERING ANALYSIS
3720 Pebble Dr.
Newport Beach, CA 92625
July 14, 2022
YANCHAR DESIGN & CONSULTING GROUP
26741 Portola Parkway, Suite 1 E, Foothill Ranch, CA 92610
Tel: 949.770.6601 Fax: 949.770.6575 E-mail: info@yanchardesign.com
2720 Pebble Dr. July 14, 2022
1.0 Introduction
At the request of Intex Design & Construction, Yanchar Design & Consulting
Group has completed field measurements and an acoustical analysis of the pool
equipment located at 2720 Pebble Dr., Newport Beach, CA.
2.0 Project Description
The property is a single-family residence. The pool equipment is located
approximately 18 inches from the nearest property line to the north.
The property to the north is also a single-family residence. The properties are
separated by a 7-foot concrete masonry wall and a 22-foot open space.
The City of Newport Beach requires a sound test by an acoustical engineer is
required to demonstrate that the noise level from the pool or spa pump is less
than 55 dBA at the property line. NBMC10.26. 025.
YANCHAR DESIGN & CONSULTING GROUP 2
2720 Pebble Dr. July 14, 2022
2.0 Field Measurements
Measurements were made at the site on July 14, 2022 to determine the sound
level of the pool equipment.
The ambient noise level at the property was dominated by aircraft overflights
and local traffic.
The sound level measured at the CMU wall was 54.8 dBA. Inverse square law
attenuation would decrease the sound level by 13 dBA at the property line.
Therefore the equipment is in compliance with the requirements of the City of
Newport Beach Municipal Code.
A Soft dB Piccolo -II Integrating Sound Level Meter, Serial Number
P0219050803 and CEL Instruments Model CEL-284/2 Calibrator, Serial Number
4/09023134, were used for the measurements.
Respectfully submitted,
Yanchar Design & Consulting Group
Carl J. Yanchar
President
YANCHAR DESIGN & CONSULTING GROUP 3
2720 Pebble Dr.
July 74 2022
c'
p,
NexgaR C¢ncet
s
6
ci
cPfo
M ,9p¢l p(
D
San -
m
Q
r
6 0
?
ervk Center Dr
n
s
5
COd
San ka4ui
goat
Sr
o`
o
o
? Hihs Park
7
uvme y
ppt
,rr.,
Park
¢3
a C.na Eel
3
O¢ Cteu Or
$apilh
Co O N.az pi.
Y
Or
4'�
♦p
MaraPa
0 od -
3
Poo or��
vi J.
a
pebd/ To
Sao tv
lip f Y
aV
e 0
o�tl
fl _JP dO
�u
o.'
�s pS4
A01
eP
l
.Y
Ai
fP
�ap pye
sfn
dfx
Jd
Immin¢C
pop do
ay
y
P
�`
Pe
c
e Marguee,
PROJECT SITE
YANCHAR DESIGN & CONSULTING GROUP 4