HomeMy WebLinkAboutS2021-0197 - MiscCity of Newport Beach Special Inspector Manual CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658 www.newoortbeachca.00v 1 (949) 644-3200 SPECIAL INSPECTION REPORT Project Address: 2720 Pebble Drive. Newport Beach, CA Permit Number: 52020-0126 Inspection Type (s): Shotcrete Inspection Inspection Date (s): 10/23/2021 ( ) Periodic (X) Continuous Describe Inspection, Includmg Locition(sy Provided continuous inspection in the placement of approximately 45 cubic yards of shotcrete 4500 psi for pool & spa Work performed took place in the back of the residence. Shotcrete temperature during placement was 820F and ambient temperature Was 670f. Work performed was in compliance with (ASTM C143 & ACI 506R-05). Slump temperature and water levels were within tolerance. A blow pipe was utilized to control and remove rebound; all bars had 3" minimum clearance from soils. Reinforcing steel Was tied in place; size location and clearance was inconformity with the approved and signed structural plans. List Tests Made: Temperature , and specimens were cast Total Inspection Time Each Day: Date: 10/23/2020 Hours. 6 hours Ust All items Requiring Correction (Include Previously Usted Uncorrected Items): To the best of my knowledge, the work inspected was in accordance with the Building Division approved design drawings, specifications and applicable workmanship provisions of the U.B.C. except as noted above. Special) rSignature: iDate: 10/23/2021 Print Full Na j Newport Beach Registration No.: Edwin Jimenez Inspection No. NB-0731 5p ciallmpeWnnPepoa 00/25/2U15 (efl ®UNIVERSAL ENGINEERING SCIENCES 16 Technology Drive Suite 139 Irvine CA (949)-266-5008 Contractor: Intex Pool Design Superintendent: Saied Soils Inspection Daily Report Client: Project: Intex Design and Construction 15915 Ventura Blvd Encino CA Permit Number: N/A Jurisdiction: Newport Beach 4210.2100058.0000 2720 Pebble Dr 2720 Pebble Dr Newport Beach CA Report Number: 3 Inspection Date: 10/05/2021 Approved Plan Date: N/A Delta Revision: 0 Plans Prepared By: N/A Area Inspected: Deep end of pool bottom Ref. Civil/Grading Sheet(s): N/A Ref. Detail(s): N/A Inspection(s) Performed: 0 Grading Report Observations: Arrived on site to find pool sides had been excavated and dimensions widened and the deep end of the pool filled in with native materiel. The contractor informed the inspector that they had not covered the fill placed the previous day from rain, and that the materiel had turned to mud due to after hours rain. They stated that they had removed the mud and replaced and backfilled the deep end using native cuttings from their excavation activities, then compacted the materiel using a tracked front end loader with a full bucket. Probing of this placed filled using a steel soil probe indicated that this fill had not been adequately compacted, and in the deepest part penetrated over a foot, with water and mud visible on the bottom few inches of the probe. Contractor was advised and elected to remove this wet materiel and replace it with dryer native materiel. This was done in a single lift and compacted using the same method. Testing with the nuclear gauge produced consistently low values for both dry density and moisture. This materiel was then re -worked using a jumping jack, and while numbers were improved, still returned consistently low. Contractor elected to scarify the top 6" of the lift, mixing and wetting this material, while wetting and recompacting the lower 6" using the frontend loader. This mixed materiel was then replaced and compacted using both the loader and the jumping jack. This 12" of materiel was then tested using the nuclear gauge, and while slight improvement was measured, the density was likely still short of 95%. The top 6" was then tested, and found to have improved dry densities that would likely meet compaction requirements. The contractor then once again removed the upper 6", and compacted the lower 6 inches with the jumping jack. This materiel was then tested, and found to have likely adequate compaction values. This test result has been attached, and at the time of issue of this report, proctor results show this test as passing. The contractor was within 1' of FSG for the remaining of the pool, and was advised that they could continue placing the remaining fill and that it could be tested upon completion, but to keep lifts no greater than 6" in order to achieve adequate compaction levels. Type of Material: Test Performed For: ❑� Native ❑� Grading Geotech Report By: Project Number: Geotech Report Date: Moisture Optimum: UES 4210.2100058.0000 9/17/2012 Optimum +/- 3% Daily Std. Count (MC): 711 Daily Std. Count (DC): 2443 Gauge Serial #: 79780 Gauge Calib. Date: 10105/2021 No. Loc. Elev. Fill Probe DD % Req. % % Meets Spec? Lab ID Max Opt. Dep. Dep. (pcf) MC Comp. Comp. DD MC (in) (pcf) 1 Deep end of pool bottom -1' FSG 6" 6.0 110A 8.3 95 97 Yes 4210.210 114.2 10.5 0058.000 0 The work WAS inspected/Tested in accordance with Approved Documents. The work MET the requirements of Approved Plans and Specifications. Material Sampling WAS performed in accordance with approved documents. Inspection Certified By ��"/ Jacob Kays 10/06/2021 Trip Charge (Hours): 1.00 Temperature (°F): 75 Technician:Jacob Kays Page 1 of 1 Time: 11:37 - 15:50 Cloud Conditions: Clear Wind Conditions: Calm Person Notified:Saied ®UNIVERSAL ENGINEERING SCIENCES 16 Technology Drive Suite 139 Irvine CA (949)-266-5008 Soils Inspection Daily Report Client: Project: Intex Design and Construction 15915 Ventura Blvd Encino CA Contractor: Intex Design and Construction Permit Number: N/A Superintendent: Saied Jurisdiction: Newport Beach 4210.2100058.0000 2720 Pebble Dr 2720 Pebble Dr Newport Beach CA Report Number: 4 Inspection Date: 10/06/2021 Approved Plan Date: N/A Delta Revision: 0 Plans Prepared By: N/A Area Inspected: Pool Bottom Ref. Civil/Grading Sheet(s): WA Ref. Detail(s): WA Performed: 7 Grading Report Observations: Arrived on site to find the pool bottom completed to the final graded. The area appeared to have been compacted with a jumping jack, and all slough from the previous day either compacted or removed. The area probed reasonably firm, and nuclear gauge readings came back as passing. fvoe of Material: Test Performed For: n Native n Grading Geotech Report By: Project Number: Geotech Report Date: Moisture Optimum: UES 4210.2100058.0000 9/18/2021 Optimum +/- 3% Daily Std. Count (MC): 705 Daily Std. Count (DC): 2429 Gauge Serial #: 79780 Gauge Calib. Date: 10/06/2021 No. Loc, Elev. Fill Probe DD % Req. % % Meets Spec? Lab ID Max Opt Dep. Dep. (pcf) MC Comp. Comp. DD MC (in) (pcf) 2 Pool Bottom FSG 1.5' 12.0 113.4 8.2 95 99 Yes 4210.210 114.2 9.3 0058.000 0 3 Pool Bottom FSG 1' 12.0 108.0 7.2 95 95 Yes 4210.210 114.2 9.3 0058.000 0 4 Pool Bottom FSG 1' 12.0 108.1 6.8 95 95 Yes 4210.210 114.2 9.3 0058.000 0 5 Pool Bottom FSG 1' 12.0 108.6 9.3 95 95 Yes 4210.210 114.2 9.3 0055.000 0 6 Pool Bottom FSG 1 12.0 108.2 7.0 95 95 Yes 4210.210 114.2 9.3 0058.000 0 The work WAS inspected/Tested in accordance with Approved Documents. The work MET the requirements of Approved Plans and Specifications. Material Sampling WAS performed in accordance with approved documents. Inspection Certified By Jacob Kays 10/07/2021 Trip Charge (Hours): 1.00 Temperature (On: 74 Technician:Jacob Kays Time: 10:55 - 11:55 Cloud Conditions: Overcast Wind Conditions: Calm Person Notified:Saied Page 1 of 1 ACOUSTICAL ENGINEERING ANALYSIS 3720 Pebble Dr. Newport Beach, CA 92625 July 14, 2022 YANCHAR DESIGN & CONSULTING GROUP 26741 Portola Parkway, Suite 1 E, Foothill Ranch, CA 92610 Tel: 949.770.6601 Fax: 949.770.6575 E-mail: info@yanchardesign.com 2720 Pebble Dr. July 14, 2022 1.0 Introduction At the request of Intex Design & Construction, Yanchar Design & Consulting Group has completed field measurements and an acoustical analysis of the pool equipment located at 2720 Pebble Dr., Newport Beach, CA. 2.0 Project Description The property is a single-family residence. The pool equipment is located approximately 18 inches from the nearest property line to the north. The property to the north is also a single-family residence. The properties are separated by a 7-foot concrete masonry wall and a 22-foot open space. The City of Newport Beach requires a sound test by an acoustical engineer is required to demonstrate that the noise level from the pool or spa pump is less than 55 dBA at the property line. NBMC10.26. 025. YANCHAR DESIGN & CONSULTING GROUP 2 2720 Pebble Dr. July 14, 2022 2.0 Field Measurements Measurements were made at the site on July 14, 2022 to determine the sound level of the pool equipment. The ambient noise level at the property was dominated by aircraft overflights and local traffic. The sound level measured at the CMU wall was 54.8 dBA. Inverse square law attenuation would decrease the sound level by 13 dBA at the property line. Therefore the equipment is in compliance with the requirements of the City of Newport Beach Municipal Code. A Soft dB Piccolo -II Integrating Sound Level Meter, Serial Number P0219050803 and CEL Instruments Model CEL-284/2 Calibrator, Serial Number 4/09023134, were used for the measurements. Respectfully submitted, Yanchar Design & Consulting Group Carl J. Yanchar President YANCHAR DESIGN & CONSULTING GROUP 3 2720 Pebble Dr. July 74 2022 c' p, NexgaR C¢ncet s 6 ci cPfo M ,9p¢l p( D San - m Q r 6 0 ? ervk Center Dr n s 5 COd San ka4ui goat Sr o` o o ? Hihs Park 7 uvme y ppt ,rr., Park ¢3 a C.na Eel 3 O¢ Cteu Or $apilh Co O N.az pi. Y Or 4'� ♦p MaraPa 0 od - 3 Poo or�� vi J. a pebd/ To Sao tv lip f Y aV e 0 o�tl fl _JP dO �u o.' �s pS4 A01 eP l .Y Ai fP �ap pye sfn dfx Jd Immin¢C pop do ay y P �` Pe c e Marguee, PROJECT SITE YANCHAR DESIGN & CONSULTING GROUP 4