Loading...
HomeMy WebLinkAbout35 - Ford Road Townhomes Appeal (PA2025-0049) - PowerPoint (Applicant)FORD ROAD TOWNHOMES City Council Appeal Hearing August 26, 2025 Ford Road Ventures LLC Site Plan & Design Summary • Four detached, four-story buildings with 27 units • Unit mix 2-4 bedrooms (1,916 - 2,989 gross sq ft) including ground floor bedroom options, bonus rooms, balconies and generous outdoor terraces • Community amenities include picnic area and fire pit lounge area, bike parking • Exceeds City's parking requirement • Complies with all traditional zoning code standards including building height, setbacks and density • Meets 49 of S2 objective design standards - SDR allows deviations based on high -quality architecture of II WN ,�► ,�._ JV- Altar ®� COLOR SCHEME A L_ A. STUCCO 1 16/20 D. $W 7594 "CARRIAGE DOOR" c SW 7005 "PURE WHITE" 1. ROOF 2. ALUMINUM STOREFRONT 3. BRICK .-L 4. OUTDOOR FAN 5. OUTDOOR LIGHTING CAPISTRANO ASH SINGLE HUNG - BLACK TUNDRABRICK HAIKU COASTAL 52" RAWLEY LED SCONCE GRAY" MILGARD "LATIGO" BLACK OIL RUBBED BRONZE MCELROY METAL EL DORADO STONE BIG ASS FANS REJUVENATION B. SW 9139 "DUBONAIR" E. SW 7674 "PEPPERCORN" C. SW 6236 "GRAYS HARBOR" Architectural 'Coastal Contemporary Design featuring high quality building materials Character • Articulated facades -varied rooflines, balconies and terraces, glazing • Color schemes for coastal and earthy palettes 0 Aesthetic improvements to AT&T facility Dbiective Des -Ion Standards (OE ODS Deviations Justified and Minor • City allows for deviations to ODS through approval of SDP • Complies with 49 of 52 ODS • Deviations minor, requested to make the buildings more aesthetically pleasing - may be more "cookie cutter" without • Two required findings to support deviation provided in Exhibit B Environmental Review Summary Covered under City's Certified Program EIR • Site specific technical studies prepared consistent with City's certified Program EIR requirements include: • Air Quality and Greenhouse Gas Emissions 2025 • Biological Resources Assessment 2025 • Phase I Site Assessment 2025 • Preliminary Hydrology Plan 2025 • Preliminary Water Quality Management Plan 2025 • Trip Generation and VMT Analysis 2025 • Water and Sewer Demand Analysis 2025 • Detailed CEQA Section 15183 Analysis to confirm no new impacts beyond those identified in certified Program EIR from 2024 Response • Deviations allowed through SDP, two required findings met • For -sale product at low end of City density requirement • Architecture inspired by Port Streets, high -quality building materials • Subdivision Map Act issues moot due to timing of appeal, Vesting Tentative Tract Map is Final and not subject to appeal • AT&T has consented to the VTTM and will be signatory to the Final Map • The 2024 Housing Implementation Program EIP is current and was intended for projects like this one that are consistent with the Housing Element IWI Response • El Project will generation 186 ADT with 11 AM and 14 Congestion PM trips. Height ]Complies with City height limit. Necessary to meet 2 t City's minimum density requirement and provide a product responsive to the market. Top floor setback, reduced area coverage. SchoolUse El Site zoned for Lincoln Elementary. • �. • El Exceeds City Parking Requirement. Exceeds City setback standards. 230' from nearest Minimal Setba 5 SFR,185' from Multifamily, 185'from nearest park use. Proposal in context of State Housing Laws • For -sale product • Proposes 27 units where 58 units allowed • High -quality building materials and intended to compliment Port Streets • Height appropriate given substantial setbacks from nearby residential, and demand for high -quality product • Helps City meet goals for market -rate housing Conclusion Consistent with General Plan and Housing Element Meets minimum density standards, not overbuilt Meets 49 out of 52 ODS ODS deviations minor and well justified in findings 0 =0 Project meets all zoning requirements and CEQA review thorough and legally sufficient Neighborhood Concerns Sensitive design in context of what could be built on the site State Housing Laws Project represents responsible, high -quality housing that supports City's goals and addresses market demand Approval Request Request adoption of Resolution No. 2025-55 affirming the Planning Commission's approval, consistent with Staff Recommendation FORD ROAD TOWNHOMES City Council Appeal Hearing August 26, 2025 Ford Road Ventures LLC v Est �' � � i � �;� �- �� I- i ;:�,, � _ � },, a �. If ,I ;, �� �t�` tl � _ '� j .. �'a � 1 rl;� i� � ,Iv - z� n � �: � ii PLAN 03 FIRST FLOOR 371 SF Net SF Bed/Bath Garage Stories #units 2,399 4/3.5+loft 2-Ad 4 5 SECOND FLOOR 772 SF THIRD FLOOR 868 SF FORD ROAD TOWNHOMES 1 19 % of total Buildable SF 19% 11,995 FOURTH FLOOR 387 SF PLAN 0� PLAN 4 n :r S_ FNm' J FI PST FLOOR 401 SF Net SF Bed/Bath Garage Stories # units 2,480 4/3.5+loft 2-std 4 6 �YCNEN ..j PLAN-4 ICI I uwvc er f I SECOND FLOOR 827 SF TH I RD FLOOR 850 SF FORD ROAD TOWNHOMES 1 20 %of total Buildable SF 22% 14,880 FOURTH FLOOR 402 SF