Loading...
HomeMy WebLinkAbout08 - Amendment to PSA for the Old Newport Boulevard and West Coast Highway Modifications Project (Contract No. 5244-1) (15R19)Q �EwPpRT CITY OF s NEWPORT BEACH `q44:09 City Council Staff Report September 9, 2025 Agenda Item No. 8 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Andy Tran, Principal Civil Engineer - 949-644-3315, atran@newportbeachca.gov TITLE: Approval of Amendment No. One to Professional Services Agreement with Kreuzer Consulting Group for the Old Newport Boulevard and West Coast Highway Modifications Project (Contract No. 5244-1) (15R19) ABSTRACT: On May 14, 2013, the City of Newport Beach entered into a professional services agreement (PSA) with Kreuzer Consulting Group (KCG) of Irvine, to provide professional engineering and environmental services for the Old Newport Boulevard and West Coast Highway Modifications project. This agreement expired and the City entered into a second PSA with KCG on October 22, 2024, Contract No. 5244-1, to prepare grant funding documents for the right-of-way and construction phases of this project. Staff requests City Council approval of Amendment No. One to Contract No. 5244-1 to provide for additional engineering and right-of-way services. RECOMMENDATIONS: a) Determine this action is exempt from the California Environmental Quality Act (CEQA) pursuant to Sections 15060(c)(2) and 15060(c)(3) of the CEQA Guidelines because this action will not result in a physical change to the environment, directly or indirectly; and b) Approve Amendment No. One to the professional services agreement with Kreuzer Consulting Group for Engineering and Right -of -Way Services for the Old Newport Boulevard and West Coast Highway Modifications project to increase the agreement amount by $286,059 for a total not -to -exceed amount of $306,655, and authorize the Mayor and City Clerk to execute the amendment. DISCUSSION: This project is located at the intersection of Old Newport Boulevard and West Coast Highway, an area of the highway within the jurisdiction of the California Department of Transportation (Caltrans). A location map is provided as Attachment A. Currently, there are three westbound and two eastbound lanes on West Coast Highway in the vicinity of the proposed project. The third westbound lane terminates into a right -turn lane at Old Newport Boulevard. 8-1 Approval of Amendment No. One to Professional Services Agreement with Kreuzer Consulting Group for the Old Newport Boulevard and West Coast Highway Modifications Project (Contract No. 5244-1) (15R19) September 9, 2025 Page 2 The proposed improvements include widening the north side of West Coast Highway to continue the third westbound thrudane, adding a bike lane, a right -turn pocket, and a sidewalk. Additional improvements include implementing storm drain modifications; constructing concrete curbs, gutters and sidewalks; constructing site improvements to two adjacent private properties impacted by the roadway widening; constructing a retaining wall; installing landscape and irrigation improvements; relocating and adjusting utilities; and modifying signing and striping. Partial right-of-way acquisition will be required from two adjacent parcels to facilitate the improvements. On October 17, 2024, the City entered into a new PSA (Contract No. 5244-1) with KCG to prepare grant funding documents for an Orange County Transportation Authority (OCTA) Comprehensive Transportation Funding Program grant application. In April 2025, OCTA informed the City that it will receive up to $4,327,881 in Measure M grants for the right-of-way and construction phases. With the success of the grant application, staff recommends the approval of Amendment No. One with KCG to prepare site improvement plans for the two impacted parcels, design a new retaining wall along the back of the two parcels, and provide right- of-way acquisition services. Upon further evaluation of the Old Newport Boulevard realignment option, the design team decided to revert to the existing Old Newport Boulevard alignment option due to right-of-way constraints and existing infrastructure conflicts. Amendment No. One (Attachment B) includes additional engineering services needed to finalize the construction documents for the existing alignment option. FISCAL IMPACT: The adopted budget includes sufficient funding for this service. It will be expensed to the Capital Improvement Program Project Budget Gas Tax account in the Public Works Department, 12101-980000-15R19. The consultant's proposed not -to -exceed fee for this additional service is $286,059. Gas Tax revenue is received through State -imposed taxes on fuel and motor vehicle registration dedicated to transportation purposes. ENVIRONMENTAL REVIEW: Staff recommends the City Council find this action is not subject to the California Environmental Quality Act (CEQA) pursuant to Sections 15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect physical change in the environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential for resulting in physical change to the environment, directly or indirectly. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). 8-2 Approval of Amendment No. One to Professional Services Agreement with Kreuzer Consulting Group for the Old Newport Boulevard and West Coast Highway Modifications Project (Contract No. 5244-1) (15R19) September 9, 2025 Page 3 ATTACHMENTS: Attachment A — Location Map Attachment B — Amendment No. One 8-3 a Attachment B AMENDMENT NO. ONE TO PROFESSIONAL SERVICES AGREEMENT WITH RAK DEVELOPMENT, INC. DBA KREUZER CONSULTING GROUP FOR OLD NEWPORT BOULEVARD AND WEST COAST HIGHWAY MODIFICATIONS THIS AMENDMENT NO. ONE TO PROFESSIONAL SERVICES AGREEMENT ("Amendment No. One") is made and entered into as of this 9th day of September, 2025 ("Effective Date"), by and between the CITY OF NEWPORT BEACH, a California municipal corporation and charter city ("City"), and RAK DEVELOPMENT, INC., a California corporation doing business as ("DBA") KREUZER CONSULTING GROUP ("Consultant"), whose address is 18872 MacArthur Blvd, Suite 210, Irvine, CA 92612, and is made with reference to the following: _ RECITALS A. On October 17, 2024, City and Consultant entered into a Professional Services Agreement (Contract No. C-5244-1) ("Agreement") for engineering support services for the Old Newport Boulevard and West Coast Highway Intersection Improvement ("Project"). B. The parties desire to enter into this Amendment No. One to reflect additional Services not included in the Agreement, to extend the term of the Agreement to October 16, 2029 and to increase the total compensation. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. TERM Section 1 of the Agreement is amended in its entirety and replaced with the following: "The term of this Agreement shall commence on the Effective Date, and shall terminate on October 16, 2029, unless terminated earlier as set forth herein." 2. SERVICES TO BE PERFORMED Exhibit A to the Agreement shall be supplemented to include the Scope of Services, attached hereto as Exhibit A and incorporated herein by reference ("Services" or "Work"). Exhibit A to the Agreement and Exhibit A to this Amendment No. One shall collectively be known as "Exhibit A." The City may elect to delete certain Services within the Scope of Services at its sole discretion. 3. COMPENSATION TO CONSULTANT Exhibit B to the Agreement shall be supplemented to include the Schedule of Billing Rates, attached hereto as Exhibit B and incorporated herein by reference. Exhibit B to the Agreement and Exhibit B to Amendment No. One shall collectively be known as "Exhibit B." M Section 4.1 of the Agreement is amended in its entirety and replaced with the following: "City shall pay Consultant for the Services on a time and expense not -to - exceed basis in accordance with the provisions of this Section and the Schedule of Billing Rates attached hereto as Exhibit B and incorporated herein by reference. Consultant's compensation for all Work performed in accordance with this Agreement, including all reimbursable items and subconsultant fees, shall not exceed Three Hundred Six Thousand Six Hundred Fifty Five Dollars and 001100 ($306,655.00), without prior written authorization from City. No billing rate changes shall be made during the term of this Agreement without the prior written approval of City." The total amended compensation reflects Consultant's additional compensation for additional Services to be performed in accordance with this Amendment No. One, including all reimbursable items and subconsultant fees, in an amount not to exceed Two Hundred Eighty Six Thousand Fifty Nine Dollars and 001100 ($286,059.00). 4. INTEGRATED CONTRACT Except as expressly modified herein, all other provisions, terms, and covenants set forth in the Agreement shall remain unchanged and shall be in full force and effect. [SIGNATURES ON NEXT PAGE] Rak Development, Inc. DBA Kreuzer Consulting Group Page 2 :. IN WITNESS WHEREOF, the parties have caused this Amendment No. One to be executed on the dates written below. APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Date: F, By: ( .� Aa n C. Harp City Attorney r c ATTEST: Date: Molly Perry Interim City Clerk CITY OF NEWPORT BEACH, a California municipal corporation Date: By: Joe Stapleton Mayor CONSULTANT: Rak Development, Inc., a California corporation DBA Kreuzer Consulting Group Date: By: Richard Andrew Kreuzer Chief Executive Officer, Chief Financial Officer Date: By: Kelsey A Jaap Secretary (END OF SIGNATURES] Attachments: Exhibit A — Scope of Services Exhibit B Schedule of Billing Rates Rak Development, Inc. DBA Kreuzer Consulting Group Page 3 8-7 EXHIBIT SCOPE OF SERVICES Rak Development, Inc. DBA Kreuzer Consulting Group Page A-1 8.8 Task 1.0 - Project Management, Administration and Meetings Under this task, Consultant will manage the subconsultant team and coordinate project activities and tasks with the City of Newport Beach. Consultant will attend all project related meetings for the duration of the Project. Task 2.0 - Field Reviews Under this task, Consultant will conduct field reviews, as required, to ensure base map accuracy and to evaluate and resolve design issues in the field. Task 3.0 - Utility Coordination Due to the Project being on hold for over 2 years, Consultant will need to reestablish and maintain utility coordination activities which will consist of the following efforts: • Review plans showing location and size of all utility lines and appurtenances within the Project area. • Cross check plotted locations above with detailed topographic survey information to ensure that existing lines are shown in proper location. Field checks will be performed as necessary. • Based on the proposed improvements, determine where potential utility conflicts exist and where utility relocation is warranted. • Coordinate with affected utility companies regarding conflicts, relocations and improvements. This coordination effort will require providing updated plans to the utility agencies for the proposed improvements and also meeting with the various utility service planners on the Project site, as necessary, to discuss conflicts and/or relocations. Task 4.0 -Additional Field Survey Consultant has assumed that there will likely be a need to pick up additional field survey points to support the detailed design of the wall and on -site improvements on the back side of A's as well as some points on the Pacific Imaging site. Consultant has included provisions for 3 days of additional surveying, as needed. Task 5.0 - Undated Base Plan Based on the results of tasks 2.0, 3.0 and 4.0, Consultant will modify the Project base plan. Task 6.0 - Utility Potholin As reflected on Exhibit A on the following page, Consultant has identified the need for 4 utility potholes for the Project. :•, Bess Test Labs (BST) will conduct these potholes per their proposal which is included herein as Attachment 1. Task 7.0 -Wall Geotechnical Report A geotechnical investigation and report are required to support the design of the soldier pile retaining wall along Santa Ana Avenue on the back side of the A's property. Albus Associates will complete this work in conformance with their proposal which is included herein as Attachment 2. Task 8.0 - Pacific Imaging Site Lavout and Preliminary Design City staff are currently having discussions with the Pacific Imaging property owner. Based on these discussions, the parties anticipate the need to develop some options and alternatives for this Project site to facilitate further discussion and, ultimately, the owner's approval of improvements on his property. Consultant will develop preliminary plans and/or graphics, as requested, to facilitate this process. Task 9.0 -A's Site Layout and Preliminary Design Consultant has done a fair amount of preliminary design work to date on this site. This task will include refinements to this design and preparation of graphics, as required, to facilitate the City's further discussions with the property owner. Task 10.0 - Santa Ana Wall Design Under this task Consultant will set the wall horizontal alignment and will develop a profile for the wall. Consultant's design will also include the removal of the existing structure on the slope behind the Pacific Imaging site. Cross sections will be developed to depict the wall as well as the vertical location of Santa Ana Avenue and the proposed parking lots adjacent to the wall on the A's and Pacific Imaging sites. The structural details and supporting calculations for the retaining wall will be completed by Rende Consulting Group (RCG) in conformance with their proposal which is included herein as Attachment 3. Task 11.0 - Modify/Finalize Legal Descriptions and Plats Based on the final design plans, Consultant will modify the current legal descriptions and right of way plats for the acquisitions required from the A's site (AP #049-110-01) and the Pacific Imaging Site (AP #049-110-29) for the Project. These documents will cover all necessary takes, including permanent takes/easements as well as temporary construction easements. M Task 12.0 - Right of Way Acquisition Dokken Engineering will provide right of way acquisition services for the Project in conformance with their proposal which is included herein as Attachment 4. Task 13.0 - Prepare 90% PS&P Under this task, the Consultant will prepare a 90% complete plan set consisting of the following sheets: Description Sheets Scale Title Sheet 1 NTS Typical Sections 1 NTS Construction Details 2 NTS Removal Plans 1 1 "=20' Roadway Plan & Profile 2 1 "=20' H; 1 "=2' V Off Site Plans 31 "=10' Utility Plan 1 1 "=20' Drainage Plan 1 1"=20' Storm Drain Profiles 1 1 "=20' H; 1 "=2' V Retaining Wall Plan & Profile 1 1 "=20' H; 1 "=4' V Retaining Wall Details 2 Varies Planting Plan 21 "=10' Irrigation Plan 2 1 "=10' Planting & Irrigation Details 2 NTS Signing & Striping Plans 21 "=20' Construction Staging Plans 51"=40' Cross Sections 91 "=10' H; 1 "=1' V Consultant will provide Construction Specifications for the Project as well as prepare and submit quantity calculations and a construction cost estimate. 8-11 Consultant will utilize the services of Clark and Green Associates for the preparation of planting and irrigation plans and details. Their proposal is contained in Attachment 5 herein. Task 14.0 - Update/Finalize Water Quality Document Under this task, Consultant will update and finalize the Draft WQMP that was prepared for the Project in 2022. This document will be finalized in conformance with City format and content requirements. Task 15.0 - Respond to City Comments and Submit 100% PS&E Under this task, Consultant will address all City comments on the 90% submittal and will submit revised PS&E along with a response matrix which addresses all 90% comments. Task 16.0 - Respond to City Comments and Submit Final PS&E Under this task, Consultant will address all City comments on the 100% submittal and will submit revised PS&E along with a response matrix which addresses all 100% comments. Task 17.0 - Caltrans Encroachment Permit Under this task, Consultant will package the Project plans, including traffic control plans and required supporting documentation for submittal to Caltrans for an Encroachment Permit. This permit application will be processed through the CEPS portal. Consultant will address all Caltrans comments and/or requests for additional information until the permit is obtained. 8-12 EXHIBIT B SCHEDULE OF BILLING RATES Rak Development, Inc. DBA Kreuzer Consulting Group Page B-1 8_13 City of Newport Beach Exhibit B PCH/Old Newport Intersection Improvements Fee Schedule SUB rLU z 1- I- W j LC LL vl z w WW a m x D us; o x vi a cc z Q KCG TOTAL a o Y SUBS TOTAL TOTAL n� �w w a J LL U hr. IF _ hr, S220 S140 S235 1 PM, Administration and Meetin s 50 16 $15,440 $15.440 2 Field Review 4 4 $1,440 $1,44C 3 Utilit Coordination 12 20 $5,44C $6A40 4 Additional Field Survey 1 2 24 S6,140 $6.140 5 Update Base Files 2 12 $2,120 $2,120 6 Utility Potholing 2 4 $1,000 $11,360 $11,360 $12,360 7 Wall Geotechnical Report 2 4 $1,000 $15,400 $15A00 $16.400 8 Pacific Imaging Site Layout. Preliminary Design and Final Design 3 12 $3,440 $3 440 9 A's Site Layout. Preliminary Design and Final Design 4 5 $2,000 $2,000 10 Santa Ana Ave Walk Design 24 48 $12.000 $19.600 Si9,600 S31.600 11 Modify/Finalize Legal Descriptions and Plats 8 16 $4.000 $4.000 12 Right of Way Ac uistion 12 16 $4,880 $61,575 $61,575 566.455 13 Prepare 90% PS&E 60 160 $40,000 S21 924 $21,924 $51.924 14 Update/Finalize Water Quality Document 4 10 $2,280 $2,280 15 Respond to City Comments and Submit 90% PS&E 40 80 $20,000 $20.000 16 Respond to City Comments and Submit 100% PS&E 20 40 $10,000 $10,000 17 Caltrans Encroachment Permit 24 48 S12,000 $12,000 18 Bidding and Construction Support 24 16 $7.520 $4.000 $4.000 $11,520 Rermbursables $1,500 $1,500 $1.500 Total Hours 331 516 24 Total Cost $72,820 $72,240 $5,640 $1,500 $152.200 $23,600 $15,400 $11,360 $61.575 $21.924 $133,859 $286,059 W