Loading...
HomeMy WebLinkAboutRS071452 - PERMITCounty of Orange OC Public Works FOR INSPECTIONS CALL (714) 667-8899 RESIDENTIAL BUILDING PERMIT SUMMARY (RS071452) Legal Desc.: 16482 10 TR Permit Sub Type:1 Address: 9 Currents , Newport Coast Census Class: 434 Cross Street: reef pointe Thomas Guide: APN: 489-101-10 Addl Address: Description: addition on one level Rev. Desc.: Framing Change Present Use: sfd Work Authorized: PB:Y ME:Y EL:Y MT:N Fire Final Insp Required: Y Related Permits: Status: Closed -Complete Issued Date: 04/02/2008 Revision:1 Revision Date: 1/1/00 Meters: 0 Bldg Code Year2001 Elec Code Year:2001 Grading Permit Required?:N CONTACTS Contact Contact Person Role(s) Address Phone/E-Mail Address Ardeshir Bahar [Payer, Contractor] 2253 Martin #419 949-955-3434 Irvine CA 92612 Arthur Bahar, Aia [Agent, Architect] 118 Martin (949) 955-3434 Irvine CA 92612 Bestech Construction [Contractor, Payer] Inc 28 New Jersey 949-735-0597 Irvine CA 92606 Alex Tu [Signatory, Agent] Ardeshir Bahar [Signatory, Agent] Hung Chou 4502 Robinwood Circle 949-929-0901 Irvine CA 92505 Navid Zamani [Permittee, Owner, Applicant] 15 Shadow Cast 480-205-2683 Newport Coast CA 92657 License #:771810 Exp. Date:11/30/2013 Carrier:STATE COMPENSATION INSURANCE FUND WC Exp.Date:04/15/2013 ZONING & GEO DISTRICT INFORMATION Zoning Text: PC:NPTC/IRVC/ Coastal Zone: PC/SP: NPTC/IRVC Flood Plan: Land Use Element: Elem. School District: CAA: Supervisory District: Census Tract: STRUCTURE INFORMATION Eave Setback Projection Center Line Street: # of Units: 1 # of Stories: 1 Height(Ft/In): Front Property Line: Covered Parking: 0 Uncovered Parking: 0 Side Yard Right: Setback Comments: f/p is 3 feet from left side Side Yard Left: 6' 10" - see comments Rear Yard to PL: VALUATION Occupancy UBC Fire Construction Type Sa.Feet A/G/O Factor Valuation Room Additions/Remodels Room Additions (Major) 350.00 92.40 32,340.00 Roof Sunshade & Patio Structures Residential: Wood 375.00 6.63 2,486.25 AC & Fire Sprinkler System Fire Sprinkler System 350.00 2.60 910.00 Occupancy Group: R-3,R-3 Subtotal:35736.25 Multiplier:1.0 Adjustment Amount:0.0 Total Valuation:35736.25 APPROVALS/CLEARANCES Clearance Required For Approved By Clearance Date Issuance Approval Maher AI-Masri 04/02/2008 Current Planning/Zoning Revision 1 Martin Angel 05/06/2008 Architectural & Structural Plan Check Maher AI-Masri 07/15/2008 , &Dce/ 0 County of Orange Resources & Development Management Department Building Permits Division Residential Plan Check Corrections Main Office 300 N. Flower Street Santa Ana, CA 92702-4048 It is the responsibility of the applicant to satisfy the requirements (clearances) of each of the departments listed in this document. Normally, each section will stamp your plans indicating their approval. To view your plan check status and the latest correction list on the Internet, please visit: http://www.ocplanning.net and click on 'Plan Check Status' Link. Please note that Planning and Development Services (PDS) Public Counter Hours are open 7:30am to 4pm, Monday thru Thursday and Friday by appointment only. (Please call 714 834-5180 to schedule an appointment). Project Number: RS071452 Submittal Date: Oct 05, 2007 CBC Edition: 2001 Plan Check Date: 10/17/2007 2:13 PM Description: addition on one level Current - 1st Plan Check Job Address 9 CURRENTS NEWPORT COAST, CA Owner Address Navid Zamani 9 Currents Irvine Coast CA92657 Architect of Record Ardeshir "Arthur" Bahar 118 Martin Irvine CA92612 (949) 955-3434 Plan Checked By Maher AI-Masri Maher.AI-Masripdsd.ocgov.com 714-834-2624 714-796-8252 FAX Double Click to Sign Name: Maher Al-Masri Reason: Plan Checked By Location: 300 North Flower, Santa Ana, Ca Page 1 of 6 RS071452 OBTAIN CLEARANCES (approvals) from: • Current Planning/Zoning (714) 834-2626 DPC Station 3 • Fire Authority (714) 573-6100 (714)368-8843 1 Fire Authority Rd., Bldg. A, Irvine California 92606 (Jamboree@Tustin Ranch Rd.) GENERAL INFORMATION • This correction list covers plan check of residential occupancies (R-1, R-3) and garage/carports only. Recreational buildings, sales offices, retaining walls, etc. will require separate plan submittals to Commercial/Industrial Plan Check Section for approval. • Application for which no permit is issued within 180 days following the date of application shall expire by limitation. An extension of 180 days may be granted upon written request showing circumstances beyond the control of the applicant have prevented action being taken. In order to renew action for an application after expiration, the applicant shall resubmit plans and pay a new plan check fee. Sec. 107.4. • Plans, engineering calculations, diagrams and other data shall be submitted in two sets with each application for a permit. The building official may require plans, computations and specifications to be prepared and designed by an engineer or architect licensed by the State to practice as such. Sec. 106.3.2. • At building permit issuance, one (1) additional set of plans consisting of summary or title sheet, plot plan, floor plans and elevations shall be required for the Assessor's Office. INFORMATION • Valid Worker's Compensation Certificate or Owner -Builder Verification is required prior to issuance of building permits. • The Structural or Civil Engineer or Architect responsible for this project shall sign three final sets of plans, The third set is for the Assessor's Office. • Plans cannot be rechecked at the counter. Resubmit and allow additional time for recheck. • The applicant must submit three sets of plans to the Orange County Fire Authority directly. OCFA approval is required on 3 sets of plans before any building permits can be issued. Page 2 of 6 10/17/2007 2:13 PM RS071452 • NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) NOTES Notes must be shown as worded, on the title sheet of the plan 1. In the case of emergency, call at Work Phone # or Home Phone # 2. Sediment from areas disturbed by construction shall be retained on site using structural controls to the maximum extent practicable. 3. Stockpiles of soil shall be properly contained to minimize sediment transport from the site to streets, drainage facilities or adjacent properties via runoff, vehicle tacking, or wind. 4. Appropriate BMP's for construction -related materials, wastes, spills shall be implemented to minimize transport from the site to streets, drainage facilities, or adjoining properties by wind or runoff. 5. Runoff from equipment and vehicle washing shall be contained at construction sites unless treated to reduce or remove sediment and other pollutants. 6. All construction contractor and subcontractor personnel are to be made aware or the required best management practices and good housekeeping measures for the project site and any associated construction staging areas. 7. At the end of each day of construction activity all construction debris and waste materials shall be collected and properly disposed in trash or recycle bins. 8. Construction sites shall be maintained in such a condition that an anticipated storm does not carry wastes or pollutants off the site. Discharges of material other than stormwater only when necessary for performance and completion of construction practices and where they do not: cause or contribute to a violation of any water quality standard; cause or threaten to cause pollution, contamination, or nuisance; or contain a hazardous substance in a quantity reportable under Federal Regulations 40 CFR Parts 117 and 302. 9. Potential pollutants include but are not limited to: solid or liquid chemical spills; wastes from paints, stains, sealants, glues, limes, pesticides, herbicides, wood preservatives and solvents; asbestos fibers, paint flakes or stuccofragments; fuels, oils, lubricants, and hydraulic, radiator or battery fluids; fertilizers, vehicle/equipment wash water and concrete wash water; concrete, detergent or floatable wastes; wastes from any engine/equipment steam cleaning or chemical degreasing and superchlorinated potable water line flushing. During construction, permittee shall dispose of such materials in a specified and controlled temporary area on -site, physically separated from potential stormwater runoff, with ultimate disposal in accordance with local, state and federal requirements. 10. Dewatering of contaminated groundwater, or discharging contaminated soils via surface erosion is prohibited. Dewatering of non -contaminated groundwater requires a National Pollutant Discharge Elimination System Permit from the respective State Regional Water Quality Control Board. 11. Graded areas on the permitted area perimeter must drain away from the face of slopes at the conclusion of each working day. Drainage is to be directed toward desilting facilities. 12. The permittee and contractor shall be responsible and shall take necessary precautions to prevent public trespass onto areas where impounded water creates a hazardous condition. 13. The permittee and contractor shall inspect the erosion control work and insure that the work is in accordance with the approved plans. 14. The permittee shall notify all general contractors, subcontractors, material suppliers, lessees, and property owners: that dumping of chemicals into the storm drain system or the watershed is prohibited. 15. Equipment and workers for emergency work shall be made available at all times during the rainy season. Necessary materials shall be available on site and stockpiled at convenient locations to facilitate rapid construction of temporary devices when rain is imminent. 16. All removable erosion protective devices shall be in place at the end of each working day when the 5-Day Rain Probability Forecast exceeds 40%. Page 3 of 6 10/17/2007 2:13 PM RS071452 17. Sediments from areas disturbed by construction shall be retained on site using an effective combination of erosion and sediment controls to the maximum extent practicable, and stockpiles of soil shall be properly containted to minimize sediment transport from the site to streets, drainage facilities of adjacent properties via runoff, vehicle tracking, or wind. 18. Appropriate BMPs for construction -related materials, wastes, spills or residues shall be implemented and retained on site to minimize transport from the site to streets, drainage facilities, or adjoining property by wind or runoff. Page 4 of 6 10/17/2007 2:13 PM RS071452 Residential Plan Check Corrections Sheet Comments By General c0.1 In your responses, please refer to the alpha -numeric reference numbers that are shown at the start of each of the following correction items. c5.2 Plans for single-family dwellings and duplexes are not checked for plumbing, mechanical and electrical code compliance. These disciplines are subject to field inspection. M. AI-Masri M. AI-Masri c6.3 See red notes on your plans for clarification of corrections or comments, and M. AI-Masri for additional corrections. c7.4 Major corrections shall be made on the original tracings and new prints submitted. M. AI-Masri Return the original plan check set of plans. c8.5 Note on this correction sheet or on a separate sheet the location of the completed M. AI-Masri correction on your plams..(i.e. Sheet No., detail, etc.) c29.6 Omit all details not applicable to this project. M. AI-Masri NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM c1.0.7 Include "National Pollutant Discharge Elimination System Notes" on first sheet of plans. (This information is provided in the beginning of this document) M. AI-Masri c11.8 Provide Erosion and Sediment Control(ESCP) plan. Show sand bags and concrete M. AI-Masri wash area. Plot Plan c31.9 Show drainage of the site and disposal point on your site plan. c32.10 Note on plans: Property markers must be visible at the time of inspection or a survey will be required. Architectural Floor Plans M. AI-Masri M. AI-Masri c28.11 Provide landing on each side of an exit door. Sec. 1003.3.1.6. M. AI-Masri Roof c24.12 Roof/deck drainage: M. AI-Masri Page 5 of 6 10/17/2007 2:13 PM = Indicates line item not Cleared. RS071452 Residential Plan Check Corrections c25.12.1 Show slope of roof (min. 1/4" per ft.) to assure drainage. Sec. 1506.1. c26.13 Exterior decks, balconies, and stairways sealed underneath shall be waterproofed. Specify materials. Clarify. Sec. 1402.3. General Framing 141 c33.14 Make sue that 6x12 beam does not interfere with fire place c17.15 Design and show construction details of guardrails to resist 20-50 pound -per -foot horizontal force. Table No. 16-B. c18.16 Show true cross section of masonry fireplace and chimney. Table Nos. 31-A and 31-B. Provide the following: c19.16.1 Vertical reinforcement and additional reinforcing when chimney exceeds 40" wide. Sec. 3102.4.3. c20.16.2 Seismic anchorage to floor and roof, with two 3/16" x 1" steel straps with 2-1/2" bolts per strap to building framing. Sec. 3102.4.3 c21.16.3 Clearance of fireplace, smoke chamber or chimney walls to combustible material shall be 2" clear min. Sec. 3102.7.8. c22.16.4 Combustible material shall not be placed within 6 inches of the fireplace opening. Sec. 3102.7.8. c13.17 Where top plates or sole plates are cut for pipes, a metal tie minimum 0.058" thick and 1 "1/2" wide shall be fastened to each plate across and to each side of the opening with not less than 6-16d nails. Clarify. Sec. 2320.11.7. c16.18 Provide building section showing connection of new addition to existing construction. c14.19 There are two different second floor framing. Calrify Is this first and send floor framing . Differentiate between the two. c15.20 There is no moment frame design in structural calcs. Clarify. c38.21 All beams to have full width post bearing. Clarify. Foundation M. AI-Masri M. AI-Masri M. AI-Masri M. AI-Masri M. AI-Masri M. AI-Masri M. AI-Masri M. AI-Masri M. AI-Masri M. AI-Masri M. AI-Masri M. AI-Masri M. AI-Masri M. AI-Masri c37.22 Provide stucco base weep screed. Sec. 2506.5. M. AI-Masri Page 6 of 6 10/17/2007 2:13 PM = Indicates line item not Cleared. Payer: Address: Phone #: 949-955-3434 Notation: County Of Orange Development Processing Center 300 N. Flower Street Resources & Development Management Department P.O. Box 4048 Santa Ana, CA 92702-4048 Receipt #: R0716418 Posted: 10/4/2007 1:26 PM Ardeshir Bahar 2253 Martin #419 , CA 92612 Operator: Norbert Ponce Permit Number: RS071452 Job Address: 9 CURRENTS NEWPORT COAST Legal: 16482 10 TR Applicant: Address: Phone #: Navid Zamani 9 Currents Irvine Coast, CA 92657 480-205-2683 Fee Item Description 4505 Residential Permit Deposit Fee Item Description Accumulative Permit Charges Charges Payment Balance Coding $1,500.00 Charges $1,500.00 Payment $1,500.00 Balance Due $0.00 4505 Residential Permit Deposit Total Permit Charges Type Amount Account Credit $1,500.00 Cardholder: ARDESHIR BAHAR Acct#: XXXXXXXXXXXX5535 Exp Date: 07/10 Auth#: 086544 $1,500.00 $0.00 11311391200005 Charges Coding $1,500.00 11311391200005 $1,500.00 `.CT1 Notation Total Paid $1,500.00 Printed: 10/4/2007 1:26 PM The fees, deposits, dedications, reservations or other exactions imposed by this development approval must be protested, if at all, within the 90 day -approval period imposed by Government Code section 66020.