HomeMy WebLinkAboutF2018-0546 - Misc3-:'
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newoortheachca.gov 1 (949) 644-3200
FIRE SPRINKLER NFPA 13D SYSTEM
ROUGH INSPECTION CHECKLIST
YES NO
1. Riser Construction and Location Approval
a.
Drain valve
❑
b.
Backttow device (single check)
❑
c.
Bell activation device
❑
d.
Inspectors test valve
❑
e.
Riser sized per approved plans
2. Pressure Test
a. System tested at operating pressure for 2 hours ❑
b. Pressure gauge installed ❑
3. Sprinkler Heads shall not be installed in the fittings prior to the fittings
being cemented in place (temporary test plugs)
a. Installation and spacing of temporary test plugs ❑ ❑
4. Piping
a. Material installed per plan ❑
❑
b. Hangers per codes/prevent upward movement ❑
❑
c. All CPVC piping shall be installed by persons who have been ❑
❑
certified by the manufacturer for installation of CPVC piping
d. Piping protected from damage
❑
5. Bell
a. Wiring installed per code
❑
b. Boxes installed at proper locations
❑
NOTE: CPVC plastic pipe in the garage shall not be exposed. Sprinklers that are listed as
"Quick
Response" or "Residential" must be used.
CORRECTIONS AND NOTES:
FIRE SPRINKLER NFPA 13D SYSTEM ROUGH INSPECTION APPROVED:
PERMIT # r2O/2 �T%jey6
BY: DATE:
farms\Fire Sprinkler NFPA 13D System - Rough loupe on Checkliun 08/11/2016