Loading...
HomeMy WebLinkAboutF2018-0546 - Misc3-:' CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newoortheachca.gov 1 (949) 644-3200 FIRE SPRINKLER NFPA 13D SYSTEM ROUGH INSPECTION CHECKLIST YES NO 1. Riser Construction and Location Approval a. Drain valve ❑ b. Backttow device (single check) ❑ c. Bell activation device ❑ d. Inspectors test valve ❑ e. Riser sized per approved plans 2. Pressure Test a. System tested at operating pressure for 2 hours ❑ b. Pressure gauge installed ❑ 3. Sprinkler Heads shall not be installed in the fittings prior to the fittings being cemented in place (temporary test plugs) a. Installation and spacing of temporary test plugs ❑ ❑ 4. Piping a. Material installed per plan ❑ ❑ b. Hangers per codes/prevent upward movement ❑ ❑ c. All CPVC piping shall be installed by persons who have been ❑ ❑ certified by the manufacturer for installation of CPVC piping d. Piping protected from damage ❑ 5. Bell a. Wiring installed per code ❑ b. Boxes installed at proper locations ❑ NOTE: CPVC plastic pipe in the garage shall not be exposed. Sprinklers that are listed as "Quick Response" or "Residential" must be used. CORRECTIONS AND NOTES: FIRE SPRINKLER NFPA 13D SYSTEM ROUGH INSPECTION APPROVED: PERMIT # r2O/2 �T%jey6 BY: DATE: farms\Fire Sprinkler NFPA 13D System - Rough loupe on Checkliun 08/11/2016