Loading...
HomeMy WebLinkAboutF2018-0520 - MiscQ4��wP CITY OF NEWPORT BEACH e COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION "+crruae`' 100 Civic Center Drive j P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.gov1(949)644-3200 FUZE SPRINKLER NFPA 13D SYSTEM FINAL CHECKLIST (RESIDENTIAL) YES 1. Water meter proper size 2. Fire sprinkler system installed per the approved plans 3. All construction covers removed from sprinkler heads 4. Cover plates are NOT to be installed, but shall be available on the jobsite 5. All tape and paint removed from sprinkler heads 6. Finish trim installed around sprinkler heads 7. Proper signage posted at all required locations 8. Flow test conducted and bell tested 9. Location of inspector's testing valve in approved location SYSTEMS: 10. Clearances around sprinkler heads and riser - no obstructions 11. Operating pressure gauge installed at riser showing proper water pressure 12. Back flow preventer installed 13. System installed per manufacturers specifications FIRE S INKLE 13D SYSTEM FINAL APPROVED: PERMIT BY: DATE: Farms\ Fire Sprinkler NFPA OD System - FINAL Checkl" RESIDEN AL 05/12/20L J MUGS] SLOZ/ZL/50 15?IATa4� uoyatlsul 48notl- wapsh5 OET tlddN �a�HuudS aid\suuoj 3LV0 A8 =# lINNAd :O3AOaddV NOII03dSNl Honou VOISAS O£6 Vd-AN S315NINdS 3HI=l (INV SNOI102HIJ00 pesn aq;snw „leguapisay. jo asuodseN pino, se pa;sp aje;e43 suahluude'pasodxo aq;ou pays a6eue6 a4; ui adld Opeld 0A IZ) 7 ON ❑ El suopool jadoid;e pape4sul sexo8 q apoo jad palle;sul 6uuI 'e Ilae a6ewep woj; papa;oid 6uldld p 6uldld oAdO }o uopepe;sul jo} iam;oe;nuew a4; Aq paggiao ❑ El uaaq ane4 o4m suos/ad Aq palfgsul aq 11e4s 6uldld 0Ad0 IIV 'o ;uewanow pievdn;ueAejd/sapoo jad s/96ueH 'q ❑ ueldjad palle;sulleua;e" •e u6D Fl s6nld;sa; A ejodwa; jo 6woeds pue uopelleisul e (sonla isa; ejo wa; aoel ul pa;uawao uieq s ug4g a4; o; joua s ulgg a4; ul palle;sul eq;ou hays speaH Jal)luu S ❑ El pape4sul 96ne6 adnssa�d 'q smo4 Z jol amssaid 6ugejado;e pa;sa; wa;sAS -e ;sal amssaid sueld panojdde jad pazls jas41 -a ❑ El amen;sa; S4o;aadsul •p aolnap uogeAgoe 1196 •0 ()paLlo 916uis) aolnap nnopoeg -q amen uieiO -e Iena V uogeoo-; pue uogaru4suo0 Tasiy ON 53A _ .i.sirimoaHa uozso�as�u H�nox WHISAS Q£T vjffK 2i 7 i3i�1TNdS 3HI3 OOZ9-"g (646)IAo6,eagoeagpodMauN" S L69-MZ6 VO '43B98 3JOdMON 199L L xog 'O'd I anuO ua;u90 CIM0 00 L NOISIAIQ Dha(lr ff .IdsaL0i.iNvaaa 3.A mwaoriaAaa xiv ifmmoa IG 7 T .Z 1 -37 CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.aov 1 (949) 644-3200 FIRE SPRINKLER NFPA 13D SYSTEM ROUGH INSPECTION CHECKLIST YES NO Riser Construction and Location Approval a. Drain valve b. Backflow device (single check) c. Bell activation device El d. Inspector's test valve e. Riser sized per approved plans 2. Pressure Test a. System tested at operating pressure for 2 hours b. Pressure gauge installed 3. Sprinkler Heads shall not be installed in the fittings prior to the fittings being cemented in place (temporary test plugs) a. Installation and spacing of temporary test plugs 4. Piping a. Material installed per plan b. Hangers per codes/prevent upward movement El c. All CPVC piping shall be installed by persons who have been certified by the manufacturer for installation of CPVC piping d. Piping protected from damage 5. Bell a. Wiring installed per code b. Boxes installed at proper locations NOTE: CPVC plastic pipe in the garage shall not be exposed. Sprinklers that are listed as "Quick Response" or "Residential" must be used. CORRECTIONS AND NOTES: FIRE SPRINKLER NFPA 13D SYSTEM ROUGH INSPECTION APPROVED: PERMIT #:ppy�� BY:4 DATE: Por s\Fre Sprinkler NF A 13D System - Faueh Inspection Checklist p8/11/2016