Loading...
HomeMy WebLinkAbout1522 Placentia AvenueJib 41, NEGATIVE DECLARATION • ITO: Secretary for Resources 1400 Tenth Street Sacramento, CA 95814 Clerk of the Board of Supervisors P. 0. Box 687 Santa Ana. CA 92707 FROM: 'Planning Department City of Newport Beach 3300 Newport Boulevard Newport Beach, CA 92663 NAME OF PROJECT: Heritage Bank PROJECT LOCATION: 1522 Placentia Avenue, Newport Beach, CA 92663 PROJECT DESCRIPTION: The proposed project consists of the construction of a ±37,588 sq.ft. office building with assoicated landscaping and parking. FINDING: Pursuant to the provisions of City Council Policy K-3 pertaining to procedures and guidelines to implement the California Environmental Quality Act, the Environmental Affairs Committee has evaluated the proposed project and determined that the proposed project will not have a significant effect on the environment. MITIGATION MEASURES: SSEE ATTACHED 0 INITIAL STUDY PREPARED BY: City of Newport Beach INITIAL STUDY AVAILABLE FOR REVIEW AT: 3300 Newport Boulevard, Newport Beach, CA 1 DATE RECEIVED FOR FILING: 1 Fre• Talarico, Envirgmental Coordi ator Date: w • • MITIGATION MEASURES 1. Should any resources be uncovered during construction, a qualified archaeologist or paleontologist shall evaluate the site prior to completion of construction activities, and in accordance with City Policies K-6 and K-7. 2. Final design of the project shall provide for the incorporation of water -saving devices for project lavatories and other water -using facilities. 3. The final design of the project shall provide for the sorting of recyclable material from other solid waste. 4. The applicant shall provide for weekly vacuum sweeping of all paved parking areas and drives. 5. A landscape and irrigation plan for the project shall be prepared by a licensed landscape architect. 6. A landscape plan shall be subject to the review of the Parks, Beaches, and Recreation Department and approval of the Planning Department. 7. The landscape plan shall include a maintenance program which controls the use of fertilizers and pesticides. 1 • 8. The landscape plan shall place heavy emphasis on the use of drought-resistent native vegetation and be irrigated via a system designed to avoid surface runoff and over -watering. 9. That a grading plan if required, shall include a complete plan for temporary and permanent drainage facilities, to minimize any potential impacts from silt, debris, and other water pollutants. 10. The grading permit shall include, if required, a description of haul routes, access points to the site and a watering and sweeping program designed to minimize impact of haul operations. 11. An erosion and dust control plan, if required, should be submitted and be subject to the approval of the Building Department. 12. That an erosion and siltation control, if required, be approved by the California Regional Water Quality Control Board - Santa Ana Region, and the plan be submitted to said Board ten days prior to any construction activities. 13. The project shall be so designed to eliminate light and glare spillage on adjacent residential uses. 14. The following disclosure statement of the City of Newport Beach's policy regarding the John Wayne Airport shall be included in 'all leases or ; sub -leases for space in the project and shall be 1 included in any Covenants, Conditions, and Restrictions which may be recorded against the property. r DISCLOSURE STATEMENT The lessee herein, his heirs, successors and assigns, acknowledge that: a.) The John Wayne Airport may not be able to provide adequate air service for business establishments which rely on such service; b.) When an alternate air facility is available, a complete phase out of jet service may occur at the John Wayne Airport; c.) The City of Newport Beach may continue to oppose additional commercial area service expansions at the John Wayne Airport; d.) Lessee, his heirs, successors and assigns, will not actively oppose any action taken by the City of Newport Beach to phase out or limit jet air service at the John Wayne Airport.