HomeMy WebLinkAboutBayside Drive (Southerly) from Carnation Avenue to Poppy Avenue•
xxxxxxx
64D-2281
December 9, 1976
Clerk of the Board of Supervisors
P.O. Box 687
Santa Ana, California 92702
Subject: Notice of Determination»»Water Clain Construction and
Replacement, Corona del' Mar Southerly of Bayside Drive
from Carnation Avenue to Poppy Avenue
To whom it may concerns
Enclosed is a Notice of Determination for the subject project.
A Negative Declaration has been prepared and is on file in our
Community Development Department.
If you have any questions, please call meat (7
Very truly yours,.
lnlatrativ
Irwin Miller
Public Works
Adm
e Assistant
Department
4) 640-2128.
IM:jd
Enclosure'
cc: Community Development Department, Bill Foley
• •
June 15, 1976
TO: ENVIRONMENTAL AFFAIRS COMMITTEE
FROM: Public Works Department
SUBJECT: WATER MAIN CONSTRUCTION AND REPLACEMENT
CORONA DEL MAR, SOUTHERLY OF BAYSIDE DRIVE
FROM CARNATION TO POPPY
Attached for the Committee's review and comment are drafts
of the Notice of Determination, the E.I.S. Negative Declaration, and
the Environmental Fact Sheet for the subject improvements.
This package replaces and supersedes the one previously
submitted on May 7, 1976, and approved, entitled "Water Main Replace-
ment, Corona del Mar, Phase I, 1975-76."
The Public Works Department will supply the Committee with
any additional information which may be required to make findings
and recommendations in this matter.
The tentative project schedule calls for construction to
start in October, 1976.
6e Sr -en
Al Beingessner
Project Engineer
AB:jd
Att.
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
WATER MAIN CONSTRUCTION AND REPLACEMENT
CORONA DEL MAR
SOUTHERLY OF BAYSIDE DRIVE FROM CARNATION TO POPPY
ENVIRONMENTAL REVIEW --NOTICE OF DETERMINATION
A preliminary environmental review of the proposed project for water
main improvements in the Corona del Mar area of Newport Beach has
been performed. The review was conducted in accordance with the re-
quirements of the California Environmental Quality Act of 1970, the
State "Guidelines for Implementation of the California Environmental
Quality Act of 1970", and the City's "Policies and Procedures for
Implementing the California Environmental Quality Act".
The environmental statement has been reviewed and was approved by
the City's Environmental Affairs Committee.
As a result of the preliminary review, it has been determined that:
1. The project is approved.
2. The project will not have a significant effect on the
environment.
3. An environmental impact report has not been prepared. A
Negative Declaration has been prepared and is attached
hereto.
Joseph 'T. Devlin
Public Works Director
AB:jd
Att.
r
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
ENVIRONMENTAL IMPACT STATEMENT
NEGATIVE DECLARATION
WATER MAIN CONSTRUCTION AND REPLACEMENT
CORONA DEL MAR
SOUTHERLY OF BAYSIDE DRIVE FROM CARNATION TO POPPY
1. Location: The proposed project is located in the City of Newport Beach, as
shown on the attached exhibit.
2. Project Description: The work consists of constructing approximately 7,600
feet of 6-, 8-, and 12-inch water main in Fernleaf, Seaview, Carnation,
Marguerite, and Ocean Boulevard, replacing in part existing 2-inch and 6-inch
mains.
3. Purpose of Project: To increase the reliability of water service, provide
adequate capacity for fire flows, and add operational flexibility tothe exist-
ing water system in this portion of Corona del Mar.
4. Discussion of Environmental Impacts: The proposed improvements are consistent
with City's General Plan policies, require no additional right-of-way, and
will not cause the relocation of any people or the disturbance of any buildings.
Existing topography will not be altered, and there should be no additional
noise or pollution as a result of this project. The project will not affect
the amount of water used within the City, and will not encourage development.
There will be no long-term, irreversible or irretrievable effects on the en-
vironment, and no significant short-term effects.
5. Basis for Negative Declaration: The proposed project has been reviewed in
conjunction with Sections 15081, 15082, and 15083 of the "Guidelines for
Implementation of the California Environmental Quality Act of 1970." Review
of the criteria set forth in these sections indicates that the project will
not have a significant environmental impact.
June 15, 1976
• CITY OF NEWPORT BEACH •
PUBLIC WORKS DEPARTMENT
'FACT SHEET
TO DETERMINE IF PROJECT HAS SIGNIFICANT ENVIRONMENTAL EFFECT
WATER MAIN CONSTRUCTION AND REPLACEMENT
CORONA DEL MAR
SOUTHERLY OF BAYSIDE DRIVE FROM CARNATION TO POPPY
A. Conformance with City Goals
This project conforms to the City's General Plan Policies of maintaining
appropriate levels of health and safety facilities to adequately serve the
current and future needs of the community, including public utility services.
B. Land Use
Existing land use in the project area is nearly fully -developed single- and
multiple -family residential. This project will not require any additional right-
of-way. The water main will be located within the existing street right-of-way.
C. Human Resources
The project will not affect any existing building or require the relocation of
any people.
D. Geologic Hazards
Extensive grading will not be required. There are no known unique geologic
hazards within the project area.
E. Flooding, Erosion, or Siltation
The only excavation for this project will be a trench for installation of the
water main. The trench will be backfil'led to the existing ground elevation.
The surplus excavated material will be removed from the job site. Therefore,
this item will not be of significance.
F. Ground Water
There are no known aquifers in the immediate vicinity of the project.
G. Noise Level
This proposed project will not affect the ambient noise levels of the adjacent
areas. H. Air Resources
This proposed project will not affect the air quality of the surrounding areas.
I. Vegetation and Animal Life
This project will not affect any plant or animal life in the area.
Water Main Construction Ilk Replacement, Corona.del Mar,1106therly of Bayside Drive
Fact Sheet
Page 2
J. Water Resources
The proposed project will not affect the water resources in the area.
K. Secondary Consequences
The proposed project will not cause an increase or decrease in the amount of
water used within the City. In addition, construction of the proposed water
main will not increase or decrease the potential for development since, the area
is nearly fully developed.
•
The proposed main will increase the reliability of water service and will en-
hance the fire -fighting capability in the area.
L. Short -Term Impacts
The only short-term impacts anticipated for this project are a slight amount of
motorist inconvenience and noise during construction. These impacts are not
considered to be significant.
M. Summary
The project does not appear to have any significant adverse effects on the
environment.
dune 15, 1976 .
yam
• /J
/I
0
i
• r` del iyr / C
tn
GROWN _
G - N.
Y. fr.> it
/NC47' /5/d
r
a
41
V
c,
y^y \'J Ili
„hefts
c7
4- Att ` - ' 4r *I C. C.2
& C
C20c20 JCS .
p 8
..? 9 — -\\
s....... \
-—N
Z glgetZLERIL7/
I
, L c/
.3/4... ?N.,
‘,\
c .„
��\\
,%� tea. �.�.�.� .. ••:.• Calla 11(914 rwir
1
C-%-j" %5
I
5gACN f % \ I sLOCAr,o#J A44b°
>—
!♦�JAT /'9Aiir/ Coy5>a2UsrTso.d
"�-- '•.. �-,� �AMD , sptAcuMasvr
4CF(AAIZK
PleOPOSE0 WATER MAINS
self Ps•
/ ST4T� Bg
1
le= zee
CogoflA ant. A.9aa
�e'n LIG.yr Souyi*ss2Ly OP DAlys/tg PAW'
F,noM CAOWA /DW Th PoRPY