HomeMy WebLinkAboutCITYWIDECITY OF NEWPORT BEACH.
CALIFORNIA
XXXXXX 640-2221
March 6,: 197E
Clerk of the Board-.. ef,.;Super»isors
P.:0:`Box 687
Santa -Ana, California '72702.
Subject: Water Plain Construction and Replacement, Corona del Mar (t-1957)
To whom it; may concern.
Enclosed is a notice of determination for the subject project.
A negative declaration has been prepared and is on file in our
Community Development Department.,
If you have,any questions, please call ne at (714) 640-2128.,
Very truly yours,.
Irwin Miller
Administrative Assistant
Public Works Department
IM:jd
Enclosure
cc: Community Development Department, Beverly Wood
.9
Ro ery
eo
DevenQat
MARE 197.80,,
NoF,
CM iF tom•
• •
February 24, 1978
TO: ENVIRONMENTAL AFFAIRS COMMITTEE
FROM: Public Works Department
SUBJECT: WATER MAIN CONSTRUCTION AND REPLACEMENT, CORONA DEL MAR
(C-1957)
Attached for the Committee's review and comment are drafts
of the notice of determination and the EIR negative declaration for
the subject improvements.
The Public Works Department will supply the Committee with
any additional information which may be required to make findings
and recommendations in this matter.
The tentative project schedule calls for construction to
start in summer of 1978. Final design is nearing completion.
oseph
blic
:jd
Att.
Devlin
rks Director
ti
RCoC E!VED �j
Thmunity
veieprn
DQpt "t
FE82 719781.
NEvwoRrgFcAucult
CITY OF NEWPORT BEACH 1
I
PUBLIC WORKS DEPARTMENT
WATER MAIN CONSTRUCTION AND REPLACEMENT, CORONA DEL MAR
(C-1957)
ENVIRONMENTAL REVIEW - NOTICE OF DETERMINATION
NOTICE:
A preliminary environmental review of the proposed project for water
main construction and replacement in various streets in Corona del Mar
has been completed. The review was conducted in compliance with the re-
quirements of the California Environmental Quality Act of 1970, the State
"Guidelines for Implementation of the California Environmental Quality
Act of 1970," and the City's "Policies and Procedures for Implementing
the California Environmental Quality Act."
As a result of the preliminary review, it has been determined that:
1. The project is approved.
2. The project will not have a significant effect on the
environment.
3. An environmental impact report has not been prepared. A
negative declaration has been prepared and is attached
hereto.
Devlin
ks Department
• •
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
ENVIRONMENTAL IMPACT STATEMENT
NEGATIVE DECLARATION
WATER MAIN CONSTRUCTION AND REPLACEMENT
CORONA DEL MAR
1977-78
1. Location: The proposed project is located in the City of Newport
Beach, as shown on the attached exhibit.
2. Project Description: The work consists of constructing approxi-
mately 4,300 feet of 4-thru 12-inch water mains in various streets
of Corona del Mar, replacing in part existing 6-inch mains.
3. Purpose of Project: To permit the abandonment of an existing
deteriorated 8-inch water main in East Coast Highway from Goldenrod
Avenue to Larkspur Avenue. The new water mains will increase the
reliability of water service, add operational flexibility to the
existing water system and improve fire protection to the community
in this section of Corona del Mar.
4. Discussion of Environmental Impacts: The proposed improvements are
consistent with City's General Plan Policies, require no additional
right-of-way, and will not cause the relocation of any people or the
disturbance of any buildings. Existing topography will not be altered
and there should be no additional noise or pollution as a result of
this project. The project will not affect the amount of water used
within the City, and will not encourage development.
There will be no long-term, irreversible or irretrievable effects on
the environment, and no significant short-term effects.
5. Basis for Negative Declaration: The proposed project has been reviewed
in conjunction with Sections 15081, 15082, and 15083 of the "Guidelines
for Implementation of the California Environmental Quality Act of 1970."
Review of the criteria set forth in these sections indicates that the
project will not have a significant environmental impact.
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
FACT SHEET
TO DETERMINE IF PROJECT HAS SIGNIFICANT ENVIRONMENTAL EFFECT
WATER MAIN CONSTRUCTION AND REPLACEMENT
CORONA DEL MAR
1977-78
A. Conformance with City Goals
This project conforms to the City's General Plan Policies of maintaining appro-
priate levels of health and safety facilities to adequately serve the current
and future needs of the community, including public utility services.
B. Land Use
Existing land use in the project area is nearly fully developed two-family
residential with fully developed commercial district along both sides of East
Coast Highway. This project will not require any additional right-of-way. The
water mains will be located within the existing street right-of-way.
C. Human Resources.
The project will not affect any existing building or require the relocation
of any people.
D. Geologic Hazards
Extensive grading will not be required. There are no known unique geologic
hazards within the project area.
E. Flooding, Erosion, or Siltation
The only excavation for this project will be a trench for installation of the
water, mains. The trench will be backfilled to the existing ground elevation.
The surplus excavated material will be removed from the job site. Therefore,
this item will not be of significance.
F. Ground Water
There are no known aquifers in the immediate vicinity of the project.
G. Noise Level
This proposed project will not affect the ambient noise levels of the adjacent
areas.
Fact Sheet, Water Main Construction and Replacement Corona del Mar, 1977-78
Page 2
H. Air Resources
This proposed project will not affect the air quality of the surrounding areas.
I. Vegetation and Animal Life
This project will not affect any plant or animal life in the area.
J. Water Resources
The proposed project will not affect the water resources in the area.
K. Secondary Consequences
The proposed project will not cause an increase or decrease in the amount of
water used within the City. In addition, construction of the proposed water
mains will not increase or decrease the potential for development since the
area is nearly fully developed.
The proposed mains will increase the reliability of water service, add
operational flexibility to the existing water system, and enhance the fire
fighting capability in the area.
L. Short -Term Impacts
The only short-term impacts anticipated for this project are a slight amount
of motorist inconvenience and noise during construction. These impacts are
not considered to be significant.
M. Summary
The project does not appear to have any significant adverse effects on the
environment.
14
I
t
CITY OF' 'N.EWPORT BEACH
CALIFORNIA
' PUBLIC WORKS DEPARTMENT
• (714) 640-2281•
March 5, 1919
Clerk of the Board of Supervisors
P. O. Box 687
Santa Ana, CA 92702 , '
Subject: Water Main Replacement Corona del Mar, Phase'I.I, 1978,79
C-2054
To whom it may concern:
Enclosed is a notice of'determinatiohjor the subject project.
A negative declaration has been prepared and is on file in our
Community Development Department.
If you have any questions, please call, at (714)640-2128:'
Very truly yours,
Irw1n Miller /
Administrative Assistant
Public Works Department
IM:jd
Enclosure
cc: Community Development Department, Pat Temple
r-.
1i
��r
Ste
•
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
ENVIRONMENTAL IMPACT STATEMENT
NEGATIVE DECLARATION
WATER MAIN REPLACEMENT
CORONA DEL MAR
PHASE II, 1978-79
1. Location: The proposed project is located in. the City of Newport Beach,
as shown on the attached exhibit.
2. Project Description: The work consists of constructing approximately
3,700 feet of 4" - 12" water main with appurtenances in various streets
of Corona del Mar. This project will allow the City to abandon an ex-
isting deteriorated 4" cast iron water main in Fernleaf Avenue from
Ocean Boulevard to Way Lane and a deteriorated 2" galvanized water main
at the State Beach Park at Iris Avenue.
3. Purpose of Project: To increase the reliability of water service, pro-
vide adequate capacity for fire flows, and add operational flexibility to
the existing water system in this portion of Corona del Mar.
4. Discussion of Environmental Impacts: The proposed improvements are con-
sistent with City's General Plan Policies, require no additional right-
of-way, and will not cause the relocation of any people or the disturbance
of any buildings. Existing topography will not be altered, and there
should be no additional noise or pollution as a result of this project.
The project will not affect the amount of water used within the City, and
will not encourage development.
There will be no long-term, irreversible or irretrievable effects on the
environment, and no significant short-term effects.
5. Basis for Negative Declaration: The proposed project has been reviewed in
conjunction with Sections 15081, 15082, and 15083 of the "Guidelines for
Implementation of the California Environmental Quality Act of 1970." Re-
view of the criteria set forth in these sections indicates that the proj-
ect will not have a significant environmental impact.
1/12/79
C
C
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
WATER MAIN CONSTRUCTION AND REPLACEMENT, CORONA DEL MAR
(C-2054)
ENVIRONMENTAL REVIEW - NOTICE OF DETERMINATION
NOTICE:
A preliminary environmental review of the proposed project for water
main construction and replacement in various streets in Corona del Mar
has been completed. The review was conducted in compliance with the re-
quirements of the California Environmental Quality Act of 1970, the State
"Guidelines for Implementation of the California Environmental Quality
Act of 1970," and the City's "Policies and Procedures for Implementing
the California Environmental Quality Act."
As a result of the preliminary review, it has been determined that:
1. The project is approved.
2. The project will not have a significant effect on the
environment.
3. An environmental impact report has not been prepared. A
negative declaration has been prepared and is attached
hereto.
Benjamin B. Nolan
Public Works Director
IM:em
Att.
• •
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
FACT SHEET
TO DETERMINE IF PROJECT HAS SIGNIFICANT ENVIRONMENTAL EFFECT
WATER MAIN REPLACEMENT
CORONA DEL MAR
PHASE II, 1978-79
A. Conformance with City Goals
•
This project conforms to the City's General Plan Policies of maintaining appro-
priate levels of health and safety facilities to adequately serve the current
and future needs of the community, including public utility services.
B. Land Use
Existing land use in the project area is nearly fully developed single- and
multiple -family residential. This project will not require any additional right-
of-way. The water main will be located within the existing street right-of-way.
C. Human Resources
The project will not affect any existing building or require the relocation of
any people.
D. Geologic Hazards
Extensive grading will not be required. There are no known unique geologic
hazards within the project area.
E. Flooding, Erosion, or Siltation
The only excavation for this project will be a trench for installation of the
water main. The trench will be backfilled to the existing ground elevation.
The surplu's excavated material. will be removed from the job site. Therefore,
this item will not be of significance.
F. Ground Water
There are no known aquifers in the immediate vicinity of the project.
G. Noise Level
This proposed project will not affect the ambient noise levels of the adjacent
areas.
r
Fact Sheet --Water Main Replacement, Corona del Mar
Page 2
H. Air Resources
This proposed project will not affect the air quality of the surrounding areas.
I. Vegetation and Animal Life
This project will not affect any plant or animal life in the area.
J. Water Resources
The proposed project will not affect the water resources in the area.
K. Secondary Consequences
The proposed project will not cause an increase or decrease in the amount of
water used within the City. In addition, construction of the proposed water
main will not increase or decrease the potential for development since the
area is nearly fully developed.
The proposed main will increase the reliability of water service and will en-
hance the fire -fighting capability in the area.
L. Short -Term Impacts
The only short-term impacts anticipated for this project are a slight amount
of motorist inconvenience and noise during construction. These impacts are
not considered to be significant.
M. Summary
The project does not appear to have any significant adverse effects on the
environment.
1/12/79