CITY OF NEWPORT BEACH
IMPROVEMENT OF FORD ROAD
FROM JAMBOREE ROAD'TO'570 FEET'WESTERLY OF MACARTHUR BLVD. (SH 73)
"ENVIRONMENTAL REVIEW -"NOTICE OF DETERMINATION
A preliminary environmental review of the proposed project to improve
Ford Road from Jamboree Road to 570 feet westerly of MacArthur Blvd.
(SH 73), in the City of Newport Beach, has been completed. The review
was conducted in compliance with the requirements of the California
Environmental Quality Act of 1970, the State Guidelines for implemen-
tation of same, and the City's "Policies and Procedures for Implementing
the California Environmental Quality Act".
As a result of the preliminary review it has been determined that:
1. The project is approved.
2. The project will not have a significant effect on the
environment.
3. An Environmental Impact Report has not been prepared.
A Negative Declaration has been prepared and is attached
hereto.
oseph T.
Bile W
B:hh
Att.
evlin
s Director
March 11, 1974
IMPROVEMENT OF FORD ROAD
FROM JAMBOREE ROAD TO 570 FEET WESTERLY OF MACARTHUR BLVD. (SH73)
ENVIRONMENTAL IMPACT REPORT - NEGATIVE DECLARATION
BY
CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT
I. PROJECT LOCATION: The proposed project is located on Ford Road from Jamboree Road
to a point 570 feet, more or less, westerly of MacArthur Blvd. (SH 73). Development
in the area is commercial, recreational, and portions are zoned multi -family residen-
tial.
2. PROJECT DESCRIPTION: The work consists of widening and reconstruction of Ford Road,
reconstruction of existing storm drainage systems, modification of an existing traffic
signal system, and construction of a bicycle trail adjacent to Ford Road.
3. PURPOSE: To reconstruct and upgrade Ford Road to existing standards for primary
arterial highways. The proposed construction is in accordance with the planned
development of the County of Orange - Master Plan of Arterial Highways; the City's
Master Plan of Streets and Highways; and the City's Master Plan of Bicycle Routes.
4. DISCUSSION OF ENVIRONMENTAL IMPACTS:
(a) Land Resources
This project will be constructed in street right of way and public
easement and will not affect land resources.
(b) Human Resources
There will be no effects on human resources due to this project since
the work will not require relocation of residents or businesses.
5. BASIS FOR NEGATIVE DECLARATION:
The proposed project has been reviewed in conjunction with Sections 15081 and 15082
of Article 7, Chapter 3 (Guidelines for Implementation of the California Environmental
Quality Act of 1970), Title 14, Division 6 of the California Administrative Code.
The criteria set forth in the above sections indicate that the proposed project will
not have a significant environmental impact. A copy of an informational fact sheet
is attached for reference hereto.
March 11, 1974
IMPROVEMENT OF FORD ROAD
FROM JAMBOREE ROAD TO 570 FEET WESTERLY OF MACARTHUR BLVD. (SH 73)
FACT SHEET TO DETERMINE IF PROJECT HAS SIGNIFICANT ENVIRONMENTAL EFFECT
A. Conformance with City and County General Plans
This project is in conformance with the City's Master Plan of Streets and Highways,
Orange County's Master Plan of Arterial Highways, and the City's Master Plan of
Bicycle Routes. Ford Road is classified as a primary arterial highway on both the
City and County Master Plans.
B. Land Use and Aesthetics
Construction of this project will require the acquisition of right of way at the
westerly end near Jamboree Road. An easement for bicycle trail purposes will be
dedicated along a portion of the southerly right of way line. The remainder of the
work is within established public right of way.
C Geologic Hazards and Grading
A portion of the project (approximately 1/2) lies in a zone of possible ground failure
by rupture during an earthquake of significant magnitude. The rest of the project lies
in an area of no known significant geologic hazard. Grading will be required to create
the roadbed, approximately 10,000 cubic yards of material will be moved.
D. Human Resources
There will be no effects on human resources due to this project since no relocation
of residences or alterations to private residential or commercial property will be made.
E. Flooding, Erosion, and Siltation
Project planning calls for construction of this project to occur during the summer and
early fall months prior to the normal rainy season in this region. Construction,during
that period should preclude the possibility of flooding, erosion, and any subsequent
siltation of materials. The project specifications will require the contractor to
•
•
•� �C
Improvement of Ford Road
From Jamboree Road to 570 Feet Westerly of MacArthur Blvd. (SH 73)
Fact Sheet to Determine if Project has Significant Environmental Effect
Page 2.
employ erosion control measures during construction to further reduce the possibility
of siltation.
F. Groundwater
There are no known aquifers in the project area.
G. Noise Level
During construction, noise levels may rise due to operations which are necessary to.
construct the project; however, these operations will be limited as to working hours
to ensure a minimum of disturbance to neighboring residents, and commercial establish-
ments and the operations will cease upon project completion.
H. Archeological Sites
There are no known archeological sites within the project limits. However, should
grading operations encounter significant fossils or artifacts, construction scheduling
• will be altered to allow sufficient time for investigation and recovery of finds.
I. Air Resources
This project will not affect the air quality of this region. Dust control measures
will be required during construction under the project specifications.
J. Vegetation and Animal Life
There are no known rare or endangered species or habitats of such species of animal
or plant life within or adjacent to the project area. All vegetation removed to
facilitate construction will be replaced in size and kind under the construction contract.
K. Secondary Consequences
It has been determined that no secondary consequences will arise from the minor
primary consequences related to this project.
L. Short Term Impacts
The only short term impacts anticipated are those associated with any construction.
These are specifically noise and motorist inconvenience during construction. These
•
•
Improvement of Ford Road
From Jamboree Road to 570 Feet Westerly of MacArthur Blvd. (SH 73)
Fact Sheet to Determine if Project has Significant Environmental Effect
Page 3.
impacts are not considered to have a significant effect on the environment.
K. Summary
This project does not appear to have a significant effect on the environment.
•
•
•
/\
Q'
io k0
R4v DED/CA rION
/M.PfOVEMENT XEY
—CONST. !4C PVMT.
-RECO.VST. A.C. PVMT,
-NEW CUR9 *GUTTER
—EX/Sr. CURB »#GUTTER — — — -
-NEW. S/DEWALK t t
w DED/CAT/ON
NEW CMG -SW K.
•
4Z'
89*'
to
4-
iL g__L44f48�
11
' / .
c5 PROPOSED Tf P/C4L SECT/ON
S TA. /0'40 — /g 4/O t
3/'
v
VARtEE 42' ToSo'
37'
4B'
�O'—
STQ P
/2' 2,
4'1 7 .
Ace
TQA/L
PROPOSED T YP/GAL SECT/ON
STA. /14/Ot - 124,00f
/Od'
52'
33' ± /433'
T
42'
EX/STING TYP/CRL
/.s
l2' Z'
PUBLIC WORKS DIRECTOR
RE NO. —
DATE_
FORD ROAD IMPROVEMENTS
JAMBOREE RD. TO MAC ARTHUR BLVD.
.°ROPOSED AHFP PROJECT /974-75
DATE. BY
DESCRIPTION
REVISIONS
APP'D.
DESIGNED
DRAWN
5»S. CITY OF NEWPORT BEACH EXHIBIT 'A1"
CHECKED DATE
/2-//-73
PUBLIC WORKS DEPARTMENT SHEET / OF /