Loading...
HomeMy WebLinkAboutJamboree Road (Easterly) from Camelback Avenue to Eastbluff DriveW, o994:rovel .CONSTRUCTION OF 16-INCH WATER MAIN �� NE ��, 4 ?rr ALONG THE EASTERLY SIDE OF JAMBOREE ROAD FROM CAMELBACK AVENUE TO EASTBLUFF DRIVE NEGATIVE DECLARATION BY PUBLIC WORKS DEPARTMENT CITY OF NEWPORT BEACH 1. Location: The proposed• project is located within the City limits of Newport Beach. 2. Project Description: The work consists of construction of approximately 15001.feet of 16-inch water main along the easterly side of Jamboree Road from Camelback Avenue to Eastbluff Drive (North). 3. Purpose of Project: To add operational flexibility to the City's water system by providing a secondary source of supply to Water Pressure Zone III from the Metropolitan Water District's Orange County feeder. 4. Discussion of Environmental Impacts a) Land Resources The proposed, water main will be located within the existing Jamboree Road right-of-way. b) Geologic Hazards There are no known geologic hazards within the project area. c) Secondary Consequences The project will not affect the amount of water used within the City. The project Will -not encourage development. 5. Basis for Negative Declaration: The proposed project has been reviewed in conjunction with Sections 15081, 15082, and 15083, Chapter 3 - Guidelines for Implementation of the California Environmental Quality Act of 1970, Division 6; Title 14, California Administrative Code. The project is not in conflict with the environmental plans and goals of the community; it does not have any aesthetic effect; it does not affect animal or plant life;'and it does not affect the air quality, water quality, and the ambient noise levels of the adjoining areas. Review of the criteria set forth in the above noted Sections indicate that the proposed project will not have a significant environmental impact. A copy of the informational fact sheet is attached for reference. CONSTRUCTION OF 16-INCH WATER MAIN ALONG THE EASTERLY SIDE OF JAMBOREE ROAD FROM CAMELBACK AVENUE TO EASTBLUFF DRIVE FACT SHEET TO DETERMINE IF PROJECT HAS SIGNIFICANT ENVIRONMENTAL EFFECT A. Conformance with the City General Plan The proposed Water main will add operational flexibility,to the City's water system by providing a secondary source of supply to water pressure Zone III from the Metropolitan Water District's Orange County Feeder. This project is in conformance with the City's General Plan. B. Land Use This project will not require any additional right-of-way. The water main will be located within the existing right-of-way for Jamboree Road. The land use along the westerly side of Jamboree Road is residential. The frontage along the easterly side is undeveloped and the present zoning is industrial and commercial. C. Human Resources The project will not require the relocation of any people. D. Geologic Hazards Extensive grading will not be required. There are no known unique geologic hazards within the project area. E. Flooding, Erosion, or Siltation The only excavation for this project will be a trench for installation of the water main. The trench will be backfilled to the existing ground elevation. The surplus excavated material will be removed from the job site. Therefore, this item will not be of significance. F. Ground Water There are no known aquifers in the immediate vicinity of the project. G. Noise Level This proposed project will not affect the ambient noise levels of the adjacent areas. H. Air Resources This proposed project will not affect the air quality of the surrounding areas. Construction of 16-i• Water Main along the Easterly de of Jamboree Road from Camelback Avenue to Eastbluff Drive Fact Sheet to Determine if Project has Significant Environmental Effect Page 2. I. 'Water Resources The proposed project will not affect the water resources in the area. J. Secondary Consequences The proposed project will not cause an increase or decrease in the amount of water used within the City. In addition, construction of the proposed water main will not increase or decrease the potential for development of the undeveloped land adjacent to the easterly side of the water main as the connections already exist via the existing 12-inch main stubbed out across Jamboree Road at Eastbluff Drive (North) and the existing main in Camelback Avenue. The proposed main will increase the reliability of water service for certain portions of the City's Water Pressure Zones II and III and would be a factor included in the insurance services office's analysis of the City to establish fire insurance rates. K. Short -Term Impacts The only short term impacts anticipated for this project are a slight amount of motorist inconvenience and some construction noise. These impacts are not considered to.be significant. L. Summary The project does not appear to have a significant adverse effect onthe en- vironment. \- \ 470 / X ` /' g TR6t c F -\ r. ,ie1l i;.• �I y�grA ® <.,loEa .c.•.. t.?? (e \ - L7 L_ SGl. 40 �.-: - . __ . ; ►.,,- \ •• • ;fir-_��c1H�\ - \FS... -`\ • APED,_, s, ' Ln ��'� IRSlq &9 X ZONE d\ 7x,k7"\ ' \''' -.6\ ,,, ,\) il , ON SE G 077E E7 .Q • nits•