COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newporlbeachca.pov 1 (949) 644-3200
CASE NO.:
❑ REQUEST FOR MODIFICATION TO PROVISIONS
OF TITLE 9 (FIRE CODE) OR TITLE 15 (BUILDING CODE)
OF THE NEWPORT BEACH MUNICIPAL CODE
(See Reverse for Basis for Approval) (Fee $326)
F-KREQUEST FOR ALTERNATE MATERIAL
OR METHOD OF CONSTRUCTION
(See Reverse for Basis for Approval) (Fee $326)
For above requests, complete Sections 1, 2 & 3
below by printing in ink or typing.
JOB ADDRESS:
xei.,JORRSTe1FF USE ONLY
Plan Check# XA2Da S— R #of Stories I I
Occupancy Classification R3 / L)
Use of Building F. rR + Apt) # of Units '7
Project Status uxioEA FL*,j 6NEcL.
Construction Type V NI
Verified by
No. of Items i
Fee due 3i6
DISTRIBUTION: ,,��//,,
El owner tyy Plan Check
K Petitioner ❑ Inspector
Fire I IOther
PETITIONER:
SITE ADDRESS: 3601 Seabreeze Petitioner Jeffrey Van Voorhis
Owner Gena Reed (Petitioner to be architect or engineer)
Address 27231 Nubles
Address 3601 Seabreeze Mission Viejo, CA zip 92692
Corona Del Mar, CA zip 92625 Daytime Phone (949) 436 8415
Daytime Phone( ) (949)351-5390
Email: Jeff@VanVoorhisArchitects.com
11 IREQUEST: Submit plans if necessary to illustrate reauest. Additional sheets or data may be attached. II
We are proposing an alternative weep screed and waterproofing approach per detail 5/AD1.0, using a continuous band of waterproofing membrane installed 6
inches above the sill plate and extending 6 inches below the adjacent finished grade. This assembly also includes a protective stainless -steel layer to ensure
long-term durability and moisture management. 11
L3JJUSTIFICATIONIFINDINGS OF EQUIVALENCY: CODE SECTIONS:
GRG R317.1 rR�-03.}?�
The code -minimum weep screed height creates an atypical condition at exterior door openings, where maintaining the required clearance would force landings
and finished surfaces to sit lower than is typical. Our proposed detail uses a well -established, above -standard waterproofing approach that exceeds the code's
intent by providing significantly greater protection against water intrusion and safeguarding the structural framing.
Petitioner's /� �� Position Principal Architect
Signature( /d✓!� CA Professional Lic. # C-37065 Date: 1 1 /14/2025
FOR STAFF USE ONLY
DEPARTMENT ACTION: In accordance with: C 104.11/CFC 104.9
(Alternate materials & methods)
❑ Concurrence from Fire Code Official is required. ❑ Approved ❑ Disapproved
^^ By: Date
equest (DOES),��''Iessen any fire protection requirements.
,,,,,,{{�—essen the structural integrity
equest (DOES)( p ) l
❑ CBC 104.10/CFC 104.8
(CBC Modification)
❑ Written Comments Attached
The Request is:
, C-Granted ❑ Denied (See reverse for appeal information)
❑ Granted (Ratification required)
Conditions of Approval:
Signa
Print Name
uIFF RIJiCnin. �' �I .14
Positio - F L
Date
APPEAL OF DIVISION ACTION TO THE BUILDING BOARD OF APPEALS (See Reverse)
(Signature, statement of owner or applicant, statement of reasons for appeal and filing fees are required.)
CASHIER RECEIPT NUMBER: P EC — D0°135' 4 m.� 8- Foons\modif 09/23/25
Guidelines for Approval of Alternate Materials, Design and Methods of Construction
Basis For Approval
For the Chief Building Official and Fire Code Official or their designated agent to approve a request for modification or a request for
alternate material or method of construction, he/she must determine that special, individual reasons exist that make compliance with the
strict letter of the Code impractical and that equivalency is provided. The resulting condition must be in conformance with the spirit and
purpose of the Code provisions involved and that such modification does not lessen fire protection, structural integrity or occupant
safety. The applicant must provide sufficient information with this application to allow the above evaluation to be made.
Requirements for Submittals
The applicant design professional shall prepare a Written Report that describes the alternate proposal along with the applicable data
listed below:
• State specific code provisions for which alternative is requested and why request is being submitted.
• Describe by code section those provisions for which alternative is desired.
• Compare the proposed alternative versus the code requirements in terms of structural strength, suitability, effectiveness, fire
resistance, safety and health impacts affecting the building or user of the building.
Demonstrate that the proposed alternative is compatible with balance of code requirements.
• When applicable, specify how authoritative consensus document(s) are used to substantiate proposal. (Reference draft ICC
Building Performance Code Commentary Section 1.4.2.3 for background information).
• Provide assumptions, references, and documentation of evaluation methods utilized. This includes intended use, input data,
anticipated outputs, and limitations of computer models and other analytical tools or methods.
• Specify when and where special inspection and testing are required and the standards of acceptance for demonstrating
compliance. Show how the proposed alternate, if accepted, will be identified on the job site.
• Where land use restrictions and building setbacks are required, deed restrictions may be an appropriate method to ensure
continued compliance.
• State how and where alternate proposal is incorporated within construction plans and prepare plan amendments as necessary.
The design professional has the responsibility to coordinate all construction documents and ensure compatibility between
documents.
• The report and design documents shall be dated, signed and stamped by the design professional according to the plan submittal
procedure.
• For alternate methods of design requests, the applicant shall set performance criteria for his design. Performance criteria shall be
reviewed, amended and approved by the Building or Fire Code Official prior to start of design.
Alternative Desian Review/Verification
The Chief Building Official or Fire Code Official has the responsibility to review design submittals for compliance to the adopted codes
and procedures. If the Building or Fire Code Official does not have the expertise on staff to make a thorough and competent review,
the Building or Fire Code Official shall select a consultant that possesses the necessary qualifications to perform a third -party or peer
review. Cost of peer review shall be paid by applicant to the Building Division prior to commencing the review.
• Verify that all applicable information and justifications listed above as requirements for submittals is received and verify that
evaluation and design methods used by designer are appropriate to the alternative proposed.
• Verify products are being used in accordance with their listing conditions as required by recognized listing agencies. If not available,
require documentation and/or testing to demonstrate compliance with intent of code and intended use.
• Evaluate performance of material and possible flaws that could affect performance of material in its installed state.
• The reviewer shall document that the submittal has been reviewed and accepted as meeting the alternative materials, design and
methods of construction provisions of the code. If the Building or Fire Code Official is not satisfied that the applicant has met the
conditions, the request should be denied in writing with the applicable reason(s).
Inspection/Field Verification
The alternate proposal as approved in the construction documents must be verified by inspection, and, where necessary, testing as
follows:
• To verify that alternate materials, systems and fabricated products comply with accepted design criteria and the manufacturer's
and engineer's installation procedures, inspectors should check product labeling, certification, quality assurance processes, and
testing, as applicable.
• When appropriate, an approved third party quality assurance inspection and testing service may be required for continuous and
complex inspection and testing activities. This is intended to verify that construction complies with the code and the approved
plans.
Appeal from the determination or action of the Chief Building Official or Fire Code Official or their designated agent may be made to the
Building and Fire Board of Appeals. To appeal, the applicant must provide special individual reasons that make compliance with the
strict letter of the Code impractical. Appeals or ratifications pertaining to State Disabled Access Standards require complete evidence
to substantiate that the proposed design is equivalent to that prescribed by that standards or that due to legal or physical constraints,
compliance with the standards or providing equivalency would create an unreasonable hardship.
Appeals must be submitted on the Appeal Form available at Permit Counter accompanied by the proper fee. You will be notified in
writing of the appeal hearing's time and date.
0
w
X
w
Q \
o �
tE
�R * o
0 1ULJ
��) —S\\ ¢¢
Q �jOO4� 2 J�
O �l co
O J
�5 ciI IL
* L r•
9
9
5 ft/ V ! i ,f}fJ 1tf`;Ij P
SO 1'A9V
•NIW.M NIW .3" . °.
'8'0'1'A8tl Z 'S'0'1MO138;
„9 a, 9
W U c o N_ O
��' om �oa� XF o>vm G
J Nc` >? ��Qa �Nm �c�� cnc;) ov'LU cn C7
d Cl) o m w N p = W OF Q N ww LL o = o Z
�� ^moo ¢o�~ z U) z 2
z z >
F- v[il ? O J •�<
= H"' OV>�g LL WQH Wes? W wwQF- v/
z_ azvi wQyiO uj wioO �' �¢ 6 �ww 0 J
�- w o-' w Ci 6 L) � w 0 C6 in U L.L.
X O
w wa ~ =a O rcF-Oar d
i N6cl� d m� W
mQ O
O WQ jLL Q
..
C.J m U cl m
n
ic
33N3alS3u a33H
----------------
- - -- - - --- --- - - -
H awn:
I