Loading...
HomeMy WebLinkAbout03-Appendix A MMRPAPPENDIX A MITIGATION MONITORING AND REPORTING PLAN Old Newport Boulevard General Plan Amendment December 2009 Newport Beach Page 1 Mitigation Monitoring Plan and Reporting Plan Method of Timing Responsible Verification Verification Party Date MM KI: The site shall not be excessively illuminated based on Plan check and Prior to the issuance Planning the luminance recommendations of the Illuminating field of permits and after Dept. Engineering Society of North America, or, if in the opinion of inspection. construction. the Planning Director, the illumination creates an unacceptable negative impact on surrounding land uses or environmental resources. The Planning Director may order the dimming of light sources or other remediation upon finding that the site is excessively illuminated. MM V.2: Prior to the issuance of building permits, the Plan check. Prior to the issuance Planning applicant shall prepare a photometric study in conjunction with of permits. Dept. a final lighting lan for approval by the Planning Department. MM V.3: Lighting shall be in compliance with applicable Plan check. Prior to the issuance Planning standards of the Zoning Code. Exterior on -site lighting shall be of permits. Dept. shielded and confined within site boundaries. No direct rays or glaze are permitted to shine onto public streets or adjacent sites or create a public nuisance. "Walpak" type fixtures are not permitted. Parking area lighting shall have zero cut -off fixtures and fight standards shall not exceed 20 feet in height. MM AQ.i: The applicant shall employ the following best Field During construction. Building . available control measures (`BACMs ") to reduce construction- inspections. Dept, and related air quality impacts: Contractor to Contractor. Dust Control certify. — Water all active construction areas as needed. — Cover all haul trucks or maintain at least two feet of freeboard. — Pave or apply water four times daily to all unpaved parking or staging areas. — Sweep or wash any site access points within two hours of any visible dirt deposition on any public roadway. — Cover or water twice daily any on -site stockpiles of debris, dirt or other dusty material. — Suspend all operations on any unpaved surface if winds exceed 25 mph. Emissions — Require 90 -day low- NOxtune -ups for off road equipment. — Limit allowable idling to 5 minutes for trucks and heavy equipment. — The construction contractor shall utilize coatings and solvents with a VOC content lower than required under SCAQMD Rule 1113. — The construction contractor shall utilize materials that do not require painting, as feasible. Off -Site Impacts — Encourage car pooling for construction workers. — Limit lane closures to off -peak travel periods. — Park construction vehicles off traveled roadways. — Wet down or cover dirt hauled off -site as needed to reduce dust. — Sweep access points daily. — Encourage receipt of materials during non -peak traffic hours. — Sandbag construction sites for erasion control. Excavation — The number and type of equipment for dirt removal will be Old Newport Boulevard General Plan Amendment December 2009 Newport Beach Page 1 Mitigation Monitoring Plan and Reporting Plan Old Newport Boulevard General Plan Amendment December 2009 Newport Beach Page 2 Mitigation Monitoring Plan and Reporting Plan Method of Timing Responsible Verification Verification Party Date limited on any day to ensure that SCAQMD significance thresholds are not exceeded. — Maintain and utilize a continuous water application system during earth movement to achieve a minimum 10 percent soil moisture content in the top six -inch surface layer, subject to review /discretion of the georechnical engineer. MM AQ.2: Energy Conservation Plan check and Prior to issuance of Planning — During demolition, to the extent feasible, recyclable materials field permits and during Dept. and shall be separated from materials that cannot be recycled. inspections construction. Contractor. — Incorporate energy and water saving materials, features and (recycling). Contractor to practices as feasible; maximize use of low - energy lighting certify. (LED, fluorescent) where feasible; require acquisition of new appliances and equipment to meet Energy Star certification where appropriate. MM CRl: Prior to issuance of a grading permit, the applicant Plan check and Prior to issuance of Planning shall provide written evidence to the Planning Director that a field permits and during Dept. and qualified archaeologist (with training in the recognition of inspections. construction. Contractor. paleontological resources, or a separate paleontologist) has been Contractor to retained to observe grading activities and conduct salvage certify. excavation of archeological resources as necessary. The archeologist shall be present at the pre - grading conference, shall establish procedures for archeological resources surveillance, and shall establish, in cooperation with the City, procedures for temporarily halting or redirecting work to permit the sampling, identification and evaluation of the artifacts as appropriate. If archeological and/or paleontological features are discovered, the archeologist shall report such findings to the Planning Department. If the archeological resources are found to be significant, the archeological observer shall determine appropriate actions, in cooperation with the City, for exploration and/or salvage. These actions, as well as final mitigation and disposition of the resources, shall be subject to the approval of the Planning Director. MM CR.2: In accordance with the Public Resources Code Field During construction, Building §5097.94, if human remains are found, the Orange County inspections. Dept. and Coroner must be notified within 24 hours of the discovery. If Contractor. the Coroner determines that the remains are not recent, the Coroner will notify the Native American Heritage Commission in Sacramento to determine the most likely descendent for the area. The designated Native American representative then determines in consultation with the City the disposition of the human remains. Hazards MM HZ.1: A survey for hazardous materials /wastes shall be Plan check. Prior to issuance of Building undertaken prior to demolition activities. In the event that permits. Dept. hazardous materials are determined to be potentially present, a plan for safe storage and disposal shall be developed. The Applicant shall provide evidence that ensures that any identified hazardous materials /wastes are handled and disposed of in the manner specified by the State of California Hazardous Substances Control Law (Health and Safety Code Division 20, Chapter 6.5), standards established by the California Department of Health Services and Office of Statewide Planning and Development, and according to the requirements of the California Administrative Code, Title 30. MM HZ.2: Prior to the issuance of any building permits for Plan check Prior to issuance of Fire Dept. new construction, the Applicant shall submit documentation to permits. the City's Fire Department for review and approval to ensure that either there are no hazardous materials /wastes on the site, Old Newport Boulevard General Plan Amendment December 2009 Newport Beach Page 2 Mitigation Monitoring Plan and Reporting Plan Old Newport Boulevard General Plan Amendment December 2009 Newport Beach Page 3 Mitigation Monitoring Plan and Reporting Plan Method of Timing Responsible Verification Verification Party Date or that any identified hazardous materials /wastes are stored, handled and disposed of in compliance with state and federal guidelines, and as directed by the City's Fire Department. MM HZ.3: The Applicant shall ensure that grading and Plan check Prior to issuance of Planning building plans include the following measures and that the permits. Dept. measures shall be followed by the construction contractor and crew: 1. The storage of hazardous materials, chemicals, fuels, and oils and fueling of construction equipment shall be a minimum of 45 meters (150 feet) from any drainage, water supply, or other water feature. 2. Provide secondary containment and /or proper covers or lids for material storage, trash bins, and outdoor processing and work areas (Source NPDES Santa Ana Regional Water Quality Control Board [SARWQCB] 4th Term Permit R8- 2009- 0030). 3. Whenever possible, all of a product shall be used up before disposal of its container. 4. If surplus product must be disposed of, methods for disposal recommended by the manufacturer or the City and the state shall be followed. 5. Spills shall be contained and cleaned up immediately after discovery. Manufacturer's methods for spill cleanup of a material shall be followed as described on the Material Safety Data Sheets (MSDS) for each product. Any hazardous spills that enter the storm drains (also known as MS 4s ) shall notify the City and the SARW CB. MM HYA: Prior to grading and building permit issuance, the Plan check Prior to issuance of Building applicant shall submit a Water Quality Management Plan permits. Dept. ( "WQMP ") to satisfy the City's requirements. This plan will prescribe appropriate structural and non - structural Best Management Practices ( "BMPs ") to address pollutants generated by the project to ensure that no violations of water quality standards will occur. MM NJ: As feasible, pile driving shall utilize sonic pile driving Field During construction. Building or caisson drilling in place of impact pile driving as appropriate inspections. Dept. and for site conditions; sonic pile driving shall only be used after Contractor to Contractor. review by acoustical and structural engineers to ensure that certify. adjacent buildings would not be adversely affected by steady state excitation resulting in resonance response or other adverse geologic issues. The pile driving rig shall access the site from Old Newport and not the alley. MM N.2: All construction equipment shall be equipped with Field Prior to start of Contractor. residential -grade mufflers and other suitable noise attenuation inspections, excavation /grading. devices. Contractor to certi MM N.3: A temporary six-foot solid wall (e.g., wood or other .Field Prior to start of Building noise baffling material) shall be constructed on the project site inspections. excavation/grading. Dept. and such that the line -of -sigbt is blocked from construction activity Contractor to Contractor. to the residential uses along the alley. Additionally noise certify. shrouds and/or noise blankets shall be used to screen and reduce noise from pile driving activity at the residences along the alley- MM NA: Prior to the issuance of the demolition permit, the Field Prior to demolition Public Works project applicant shall prepare a construction staging plan that inspections permit. Dept. reflects the locations of the construction and staging areas on the subject property, which shall be located as far away from the nearby residential development as possible to reduce temporary noise impacts. MM N.S: All residential units and site occupants located Field Prior to start of Planning" Old Newport Boulevard General Plan Amendment December 2009 Newport Beach Page 3 Mitigation Monitoring Plan and Reporting Plan Old Newport Boulevard General Plan Amendment December 2009 Newport Beach Page 4 Mitigation Monitoring Plan and Reporting Plan Method of Timing Responsible Verification Verification Party Date within 300 feet of the construction site shall be sent a notice inspections. excavation /grading. Dept. and regarding the construction schedule of the proposed project. A Contractor to Contractor. sign, legible at a distance of 50 feet shall also be posted at the certify. construction site. All notices and signs shall indicate the dates and duration of construction activities, as well as provide a telephone number where residents can inquire about the construction process and register complaints. MM N.6: The construction contractor shall establish a "noise Field Prior to start of Planning disturbance coordinator ". The disturbance coordinator shall be inspections. excavation/grading. Dept. and responsible for responding to any local complaints about Contractor to Contractor. construction noise. The disturbance coordinator would certify. determine the cause of the noise complaint (e.g., starting too early, bad muffler, etc.) and would be required to implement reasonable measures such that the complaint is resolved. All notices that are sent to residential units within 300 feet of the construction site and all signs posted at the construction site shall list the telephone number for the disturbance coordinator. Public Services Fire MM F.1: The project shall provide water and access to meet fire Plan check. Issuance of building Fire Dept. department requirements; the building shall be equipped with a permit sprinkler system that complies with Fire Department specifications (if any). Traffic -- Safety MM T.1: Sight distance at the project access points shall be Plan check. Issuance of building Public Works reviewed with respect to City of Newport Beach standards in permit Dept, conjunction with the preparation of final grading, landscaping, and street improvement plans. MM T2: On -site traffic signing and striping shall be Plan check. Issuance of building Public Works implemented in conjunction with detailed construction plans for permit Dept. the project and as approved by the City of Newport Beach. Utilities— Water and Wastewater MM W.1: Prior to demolition, the applicant shall prepare a Plan check. Prior to start of Public Works water system and sanitary sewer system demand study to construction Dept. identify potential impacts to the existing City or Sanitation District's ability to provide adequate water and sewer service and sewage collection and treatment. The study will identify the need to upgrade any of the existing facilities currently serving the site. MM W1: Prior to the issuance of grading or building permits, Plan check. Prior to the issuance Public Works the Applicant shall coordinate with utility and service of permits. Dept. organizations regarding any construction activities to ensure existing facilities are protected and any necessary expansion or relocation of facilities are planned and scheduled in consultation with the appropriate ublic agencies. MM W.3: The project shall incorporate water conservation Plan check. Prior to the issuance Planning measures including low flow fixtures, water - efficient of permits. Dept. equipment, drought tolerant landscaping, rain capture and storage and other features as feasible to reduce water consumption. Old Newport Boulevard General Plan Amendment December 2009 Newport Beach Page 4 Mitigation Monitoring Plan and Reporting Plan