HomeMy WebLinkAboutB9906933 - Alternative Material & Methods0
CITY OF NEWPORT BEACH
BUILDING DEPARTMENT
3300 Newport Boulevard, P.O. Box 1768, Newport Beach, CA 92658-8915
CASE NO. /J 000 r 1
(Receipt No.) G�
REQUEST FOR MODIFICATION TO PROVISIONS
OF TITLE 15 OF THE NEWPORT BEACH
MUNICIPAL CODE
(See Reverse for Basis for Approval) (Fee $150)
REQUEST FOR ALTERNATE MATERIAL
OR METHOD OF CONSTRUCTION
(See Reverse for Basis for Approval) (Fee $150)
r] REQUEST FOR EXEMPTION FROM DISABLED
ACCESS DUE TO PHYSICAL OR LEGAL
CONSTRAINT(Fee $665)
(Ratification by the Board of Appeals will be required.)
For above requests, complete Sections 1, 2 & 3 by printing itt ink
or typing.
FOR STAFF USE ONLY
Plan
Occupancy
Use
Project
Construction
Verified.
No.
Fee
Check # G318 - 9 5 # of Stories Co
Classification 5 - 4.
of Building P1«K ru c. # of Units I
Status P i 0.h Y.
T p S
by
of Items
due /j/n
DISTRIB ION:
Owner Plan Check
Petitioner Inspector
T
� V S
'Fire Other
'
JOB ADDRESS
Site Address: 0116 is c.
Petitioner $7.1�f 4l'p'4
rr 11
Address "��� (\OV Vkj'
kr€
Owner C"�PNtancti ��
Address cPi%
C` � 1 CA Zip C ®O
14)4Zip C 1' Q 4
Daytime Phone (14, \717-
6
Daytime Phone (q*°\) r(tQO. BCj i3O -
2
REQUEST: Submit plans f necess y to illustrate re uest. Additional sheets or data may be attached.
i(rnN�
fit x car P c C�6,S 4 VWCkliA kit'' ai. QA\ grtk .
( KtG e- 1 �, 4 ctAz c i .. .. - o•1
OA
3
USTIFICATION/FINDINGS OF EQUIVALENCY:
CODE SECTIONS:
dF ro4'>rq,� t}(hl\
`CA 4
\St\ Ve
1(1i
r�
ivWO- i �i
4 rc (anO,i ou '� 1
�-w,\\ 4
\
aa�Q c -
`fit ��w.c� qR�d�. 44+41)e
elere
Petitioner's //
Signature `d Position
t _-F-
��l Date 1
DEPARTMENT ACTION: In accordance with: 0 105 UAC (Alternate materials
thod
❑ 106 UAC (UBC Modification)
oncurrence from the Fire Marshal is required.
WIZequest (DOES) a OES NOessen any fire
go Request (DOES) ' OES NOT lessen the structural
ed ❑
By:
pproved Written Comments Attached
Date 59 12,100
protection requirements.
integrity
The Request is -
required)
❑ Denied (See reverse for
iappeal information)...
JGranted
❑ Granted (Ratification
Conditions of Approval:
VW
et 4
Position r'iQ PI-.
Date ;kVA:90
Signature'
Print N v
.
GGGGG
15'.�
APPEAL OF DEPARTMENT ACTION TO THE BUILDING BOARD OF APPEALS(SeeReverse)
(Signature, statement of owner or applicant, statement of reasons for appeal and filing fees are required.)
CASHIER VALIDATION
Forms\regmodif 3/2000.doc
Guidelines for ApOoval of Alternate Materials, isign and Methods of
Construction
Basis For Approval
For the Building Official and Fire Marshal or their designated agent to approve a request for modification or a request for
alternate material or method of construction. he/she must determine that special. individual reasons exist that make
compliance with the sttict letter of the Code impractical and that equivalency is provided. The resulting condition must
be in conformance with the spirit and purpose of the Code provisions involved and that such modification does not lessen
fire protection. structural integrity or occupant safety The applicant must provide sufficient information with this
application to allow the above evaluation to be made.
Requirements for Submittals
The applicant design professional shall prepare a Wntten Report that describes the alternate proposal along with the
applicable data listed below:
• State specific code provisions for which alternative is requested and why request is being submitted
• Describe by code section those provisions for which alternative is desired
• Compare the proposed alternative versus the code requirements in tei ms of structural strength, suitability,
effectiveness, fire resistance. safety and health impacts affecting the building of user of the building.
• Demonstrate that the proposed alternative is compatible with balance of code requirements.
• When applicable, specify how authoritative consensus document(s) arc used to substantiate proposal. (Reference
draft ICC Building Performance Code Commentary Section 14.2.3 for background information).
• Provide assumptions, references, and documentation of evaluation methods utilized. This includes intended use,
input data. anticipated outputs. and limitations of computer models and other analytical tools or methods.
• Specify when and where special inspection and testing are required and the standards of acceptance for
demonstrating compliance Show how the proposed alternate, if accepted. will be idenufied on the job site.
• Where land use restrictions and budding setbacks are required, deed restrictions may be an appropriate method to
ensure continued compliance.
• State how and where alternate proposal is incorporated within construction plans and prepare plan amendments as
necessary. The design professional has the responsibility to coordinate all construction documents and ensure
compatibility between documents.
• The report and design documents shall be dated, signed and stamped by the design professional according to the plan
submittal procedure
• For alternate methods of design requests, the applicant shall set performance criteria for his design. Performance
criteria shalt be reviewed, amended and approved by the Building Official prior to start of design.
Alternative Design Review/Verification
The Building Official has the responsibility to review design submittals for compliance to the adopted codes and
procedures. If the Building Official does not have the expertise on staff to make a thorough and competent review, the
Building Official shall select a consultant that possesses the necessary qualifications to perform a third -party or peer
review. Cost of peer review shall be paid by applicant to the Building Department prior to commencing the review.
• Verify that all applicable information and justifications listed above as requirements for submittals is received and
verify that evaluation and design methods used by designer are appropriate to the alternative proposed.
• Verify products are being used in accordance with their listing conditions as required by recognized listing agencies.
If not available, require documentation and/or testing to demonstrate compliance with intent of code and intended use.
• Evaluate performance of material and possible flaws that could affect performance of material in its installed state
• The reviewer shall document that the submittal has been reviewed and accepted as meeting the alternative materials,
design and methods of construction provisions of the code. If the Building Official is not satisfied that the applicant
has met the conditions, the request should be denied in writing with the applicable reason(s).
Insnection/Field Verification
The alternate proposal as approved in the construction documents must be verified by inspection, and. where necessary,
testing as follows:
• To verify that alternate materials, systems and fabricated products comply with accepted design criteria and the
manufacturer's and engineer's installation procedures, inspectors should check product labeling, certification, quality
assurance processes, and testing, as applicable.
• When appropriate, an approved third party quality assurance inspection and testing service may be required for
continuous and complex inspection and testing activities. This is intended to verify that construction complies with
the code and the approved plans.
information on Procedure for Appeal from a Determination or Action by the Building Official or Fire Marshal
Appeal from the determination or action of the Building Official or Fire Marshal or their designated agent may be made
to the Building Board of Appeals. To appeal, the applicant must provide special individual reasons that make compliance
with the strict letter of the Code impractical. Appeals or ratifications pertaining to State Disabled Access Standards
require complete evidence to substantiate that the proposed design is equivalent to that prescribed by that standards or
that due to legal or physical constraints, compliance with the standards or providing equivalency would create an
unreasonable hardship.
Appeals must be submitted on the Appeal Form available at Permit Counter accompanied by the proper fee. You will be
notified in writing of the appeal hearing's time and date.
* i
CITY OF NEWPORT BEACH
Date '-1 2.-O0
P.O. BOX 1768, NEWPORT BEACH, CA 9265&8915
BUILDING DEPARTMENT - (949) 644-3288
FEE RECEIPT
Plan Check No. & 3 7B-(1 cj Received By:
Ncx-iifrf
Received From
o CM LA —
Job Address
Building Plan Check
Zoning Plan Check
Grading Plan Check
Fire Plan Check
2900-5002 $ i 55C) -O c
2700-5003 $
2900-5004 $
2330-5055 $
Electric Plan Check 2900-4612 $
Plumbing Plan Check 2900-4616 $
Mechanical Plan Check 2900-4618 $
Overtime Plan Check - Building 2900-5023 $
Overtime Plan Check - Grading 2900-5004 $
Overtime Plan Check - Planning 2700-5003 $
Preliminary Code Compliance Review 2900-5002 $
Reinspection B E M P/Special Inspection 2900-5008 $
Reinspection Fire 2330-5050 $
Temporary Certificate of Occupancy 2900-5008 $
Underground Utilities Waiver 010-2225. $
Energy Compliance 2900-5017 $
Planning Department Fees 2700-5000 $
Sale of Maps & Publications (Planning) 2700-5812 $
Determination of Unreasonable Hardshi # +� 2900-5018 $
Copies / Misc. y.a o, 2900-5019 $
Microfilm \kVA r 010-2263 $
Other (Specify)G6� $
TOTAL FEES $ 1 Sc -cc
Fee Receipt No.
NOTICE: PLAN CHECK EXPIRES 180 DAYS FROM DATE OF SUBMITTAL
(f\feerept.12/99)
3300 Newport Boulevard, Newport Beach