HomeMy WebLinkAbout08 - Bulkhead Seawall Repairs NOC C-4897���WPaRT p� —B CITY OF R® /■/p'
Urjb �S
Cky Coundi Staff Report 8
Agenda Item No.
February 12, 2013
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: Public Works Department
David A. Webb, Public Works Director
949- 644 -3311, dawebb @newportbeachca.gov
PREPARED BY: Iris Lee, Senior Civil Engineer
949- 644 -3323, ilee @newportbeachca.gov
APPROVED: "AA L A �
V V"
TITLE: Bulkhead and Seawall Repairs — Notice of Completion and
Acceptance of Contract No.4897
ABSTRACT:
On March 13, 2012, City Council awarded the Bulkhead and Seawall Repairs project to
Surfside Restoration and Waterproofing, Inc., for the total bid price of $141,300.00 plus
25 percent for construction contingency allowance. The required work is now complete
and staff requests City Council acceptance and close out of the contract.
RECOMMENDATIONS:
1. Accept the completed work and authorize the City Clerk to file a Notice of
Completion.
2. Authorize the City Clerk to release the Labor and Materials Bond 65 days after
the Notice of Completion has been recorded in accordance with the applicable
portions of the Civil Code.
3. Release the Faithful Performance Bond one year after Council acceptance.
FUNDING REQUIREMENTS:
Funds for the construction contract were expended from the following accounts:
Account Description Account Number Amount
Tide and Submerged Lands 7231- C4402007 $171,861.49
Total Construction Cost: $171,861.49
1 of 6
DISCUSSION:
Bulkhead and Seawall Repairs — Notice of Completion and
Acceptance of Contract No.4897
February 12, 2013
Page 2
Overall Contract Cost/Time Summary
*Due to the nature of this project, a working day was defined as any weekday with a daytime low of
MLLW 0.0 or lower.
The work necessary for the completion of this contract consisted of:
• Repairing existing seawall expansion joints, cracks, & spalls in the Newport
Island area; and
Replacing deteriorated joint material with new joint material in the Balboa Yacht
Basin and other City Bulkhead /Seawall structures; and
• Repairing the concrete cap on an existing concrete sand groin along the Little
Balboa Island South Bay Front.
The contract has now been completed to the satisfaction of the Public Works
Department. A summary of the contract cost is as follows:
Original bid amount:
Actual cost of bid items constructed:
Contract change orders:
Final contract cost:
$ 141,300.00
$124,872.00
$ 46,989.49
$ 171,861.49
Given the favorable contract bid pricing, a construction contingency of 25 percent was
established at the time of contract award providing funds to address additional work
locations discovered during the course of work. As a result, the final contract cost was
21.6 percent above the original contract amount. These unscheduled bulkhead and
seawall repairs included:
Finley Street street -end;
29th Street at Lafayette Avenue; and
• Additional areas in the Balboa Yacht Basin.
A summary of the project schedule is as follows:
Estimated Completion Date per July 2011 Baseline Schedule: September 28, 2012
Project Awarded for Construction: March 13, 2012
Completion Date from Award with Approved Extensions: December 28, 2012
Actual Substantial Construction Completion Date: December 19, 2012
4011
Contract
Time
Contract Award
Final Cost at
Benchmark
Actual
Time
Amount
Completion
Target
Contract
(days)
or Over ( +)
$141,300.00
$171,861.49
25% or less
+21.6%
40*
5
*Due to the nature of this project, a working day was defined as any weekday with a daytime low of
MLLW 0.0 or lower.
The work necessary for the completion of this contract consisted of:
• Repairing existing seawall expansion joints, cracks, & spalls in the Newport
Island area; and
Replacing deteriorated joint material with new joint material in the Balboa Yacht
Basin and other City Bulkhead /Seawall structures; and
• Repairing the concrete cap on an existing concrete sand groin along the Little
Balboa Island South Bay Front.
The contract has now been completed to the satisfaction of the Public Works
Department. A summary of the contract cost is as follows:
Original bid amount:
Actual cost of bid items constructed:
Contract change orders:
Final contract cost:
$ 141,300.00
$124,872.00
$ 46,989.49
$ 171,861.49
Given the favorable contract bid pricing, a construction contingency of 25 percent was
established at the time of contract award providing funds to address additional work
locations discovered during the course of work. As a result, the final contract cost was
21.6 percent above the original contract amount. These unscheduled bulkhead and
seawall repairs included:
Finley Street street -end;
29th Street at Lafayette Avenue; and
• Additional areas in the Balboa Yacht Basin.
A summary of the project schedule is as follows:
Estimated Completion Date per July 2011 Baseline Schedule: September 28, 2012
Project Awarded for Construction: March 13, 2012
Completion Date from Award with Approved Extensions: December 28, 2012
Actual Substantial Construction Completion Date: December 19, 2012
4011
Bulkhead and Seawall Repairs — Notice of Completion and
Acceptance of Contract No.4897
February 12, 2013
Page 3
ENVIRONMENTAL REVIEW:
City Council found this project exempt from the California Environmental Quality Act
( "CEQX) pursuant to Section 15301(d). This exemption covers maintenance activities
with negligible expansion.
NOTICING:
This agenda item has been noticed according to the Brown Act. In addition, the City Clerk
will be filing a Notice of Completion for the project as a result of this action.
The Notice Inviting Bids was advertised in the City's official publication and in
construction industry publications.
Submitted by:
, "A0 /,), )
n • David A.'Webb
Public Works Director
Attachment: A. Location Maps
3 of
LOCATION MAP
RU1._KHEAD AND SEAWALL REPAIRS
CONTRACT NO.4897
a.K
Q
_ U �
O ..
PARK A.[
95-TEN
II 117] FID�1 I� I!TQ [1
PROJECT LOCATION
CRYSTAL AVE SAND GROIN
4of6
LOCATION MAP
BULKHEAD AND SEAWALL REPAIRS
CONTRACT NO.4897
NEWPORT
ISLAND
O i CC v lv
d1y
0
CITY HALL
REPAIR LOCATION O
RIVO ALTO BULKHEAD CRACK REPAIR
N I I /AU f IIVItIN I H Z OT 3
5of6
LOCATION MAP
BULKHEAD AND SEAWALL REPAIRS
CONTRACT N10,4897
>
A YAaT
PROJECT LOCATIDN---�
BALBOA YACHT BASIN
A I I AUHIVILIN I A 6 OT 6
6 of 6