Loading...
HomeMy WebLinkAbout09 - Tidegate Retrofits and Upgrades NOCSEW PORT �, C I I ! OF NEWPORT BEACH �Ja�P Cody C®UIB' cH Staff Depot g Agenda Item No. February 12, 2013 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department David A. Webb, Public Works Director 949 -644 -3311, dawebb @newportbeachca.gov PREPARED BY: Peter Tauscher, Associate Civil Engineer 949 -644 -3316, ptauscher @newportbeachca.gov APPROVED: "1 TITLE: Tidegate Retrofits and Upgrades — Notice of Completion and Acceptance of Contract No.5116 ABSTRACT: On July 10, 2012, City Council awarded the Tidegate Retrofits and Upgrades project to Bali Construction, Inc., for the total bid price of $126,620.00 plus 15 percent for construction contingency allowance. The required work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATIONS: 1. Accept the completed work and authorize the City Clerk to file a Notice of Completion. 2. Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with the applicable portions of the Civil Code. 3. Release the Faithful Performance Bond one year after Council acceptance. FUNDING REQUIREMENTS: Funds for the construction contract were expended from the following accounts: Account Description Account Number Amount Tide and Submerged Lands 7231- C2502009 $138,135.00 Total Construction Cost: $138,135.00 DISCUSSION: Tidegate Retrofits and Upgrades — Notice of Completion and Acceptance of Contract No.5116 February 12, 2013 Page 2 Overall Contract CosVTime Summary Contract Award Final Cost at Benchmark Actual Contract Time Amount Completion Target Contract Time Under ( -) (days) or Over ( +) $126,620.00 $138,135.00 15% or less +9.1% 54* -5 The work necessary for the completion of this contract consisted of replacing deteriorated manually operated tidegates with new self - operating tidegates and hardware units at 11 locations throughout the Balboa Peninsula and Balboa Island. By design, the new self- operating tidegates operate by opening and closing as a result of pressure changes due to tidal fluctuation, thus reducing operation costs associated with a manual tidegate system. The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: $ 126,620.00 Actual cost of bid items constructed: $129,960.00 Contract change orders: $ 8,175.00 Final contract cost: $ 138,135.00 The final overall construction cost, including one change order, was approximately 9.1% above the original bid amount. The change order was for replacing two deteriorated concrete storm drain collars, building a concrete stem wall, and installing a new storm drain outlet. A summary of the project schedule is as follows: Estimated Completion Date per July 2012 Baseline Schedule: November 21, 2012 Project Awarded for Construction: July 10, 2012 Completion Date from Award with Approved Extensions: February 8, 2013 Actual Substantial Construction Completion Date: January 31, 2013 ENVIRONMENTAL REVIEW: City Council found this project exempt from the California Environmental Quality Act ( "CEQX) pursuant to Section 15301 (c) (minor alterations of existing public facilities with negligible expansion of the facilities) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment . Tidegate Retrofits and Upgrades -- Notice of Completion and Acceptance of Contract No.5116 February 12, 2013 Page 3 NOTICING: This agenda item has been noticed according to the Brown Act. In addition, the City Clerk will be filing a Notice of Completion for the project as a result of this action. The Notice Inviting Bids was advertised in the City's official publication and in construction industry publications. Public Works Director Attachment: A. Location Maps 3 LOCATION MAP TIDEGATE RETROFITS AND UPGRADES CONTRACT NO. 5116 PROJECT LOCATIONS PROJECT LOCATIONS PROJECT LOCATIONS BALBOA ISLAND LOCATIONS 0 4 LOCATION MAP TIDEGATE RETROFITS AND UPGRADES CONTRACT NO. 5116 - PROJECT LOCATIONS onLeon BLVD BAY AVENUE LOCATIONS 0 PROJECT LOCATION LOCATION MAP TIDEGATE RETROFITS AND UPGRADES CONTRACT NO. 5116 PROJECT LOCATION ti0 c RryO 00 / 80A 0 0 2m� O�� �g11p PROJECT LOCATIONS RIVO ALTO LOCATIONS 11