TITLE: Balboa Boulevard and Channel Road Pavement Reconstruction —
Award of Contract No. 5152
ABSTRACT:
Staff has received favorable construction bids for the Balboa Boulevard and Channel
Road Pavement Reconstruction project and is requesting City Council's approval to
award the contract to NOBEST. Inc.
RECOMMENDATIONS:
1. Approve the project drawings and specifications.
2. Award Contract No. 5152 to NOBEST, Inc., (NOBEST) for the total bid price of
$1,175,000.00, and authorize the Mayor and the City Clerk to execute the contract.
3. Establish an amount of $176,000.00 (15 %) to cover the cost of unforeseen work
and anticipated additional concrete work not included in the original contract.
FUNDING REQUIREMENTS:
The current adopted budget includes sufficient funding for this contract. The following
funds will be expensed:
Account Description
Proposition 1 B (SLPP)
Measure M (Fair Share)
Account Number
7185- C2002058
7281- C2002058
Amount
$693,000.00
$702.000.00
Total $1,395,000.00
1 of 4
Balboa Boulevard and Channel Road Pavement Reconstruction —Award of Contract
No. 5152
February 12, 2013
Page 2
The Proposition 1B State -Local Partnership Program (SLPP) requires a minimum one -
to -one match from the local agency's Measure M Fair Share funds.
Proposed uses are as follows:
Vendor
NOBEST, Inc.
NOBEST, Inc.
GMU Geotechnical, Inc.
Various
DISCUSSION:
Purpose
Construction Contract
Construction Contingency
Geotechnical Services
Printing and Incidentals
Total:
Amount
$ 1,175,000.00
176,000.00
41,800.00
2,200.00
$ 1,395,000.00
At 10:00 AM on January 17, 2013, the City Clerk opened and read the following bids for
this project:
The total low bid amount is 26.6% below the Engineer's Estimate of $1,600,000. The
disparity between the estimate and the actual bid prices reflects a continued favorable
construction market (including lower concrete prices), and possibly some level of
discount as the low bidder in already currently mobilized and working on the Central
Balboa and Newport Heights Alley and Street Replacement project for the City. The low
bidder, NOBEST, possesses a California State Contractors License Classification "A" as
required by the project specifications. A check of NOBEST's references indicates
satisfactory completion of similar projects for other public agencies, including the
recently completed the work on the Ocean Front Alley Replacement project for the City.
Given the favorable project unit prices by NOBEST, staff recommends establishing a
fifteen percent (15 %) contract contingency to be included in the contract award, totaling
$176;000.00. These added funds will provide an opportunity for the City to take
advantage of the low unit prices to perform additional concrete work within the project
limits.
2 of
BIDDER TOTAL BID AMOUNT
Low
NOBEST, Inc.
$1,175,000.00
2
Hillcrest Contracting, Inc.
$1,264,608.05
3
PIMA Corporation
$1,272,350.00
4
Grigolla & Sons Const. Co. Inc.
$1,292,520.00
5
PALP, Inc., DBA Excel Paving Co.
$1,364,347.00
6
All American Asphalt
$1,414,414.00
The total low bid amount is 26.6% below the Engineer's Estimate of $1,600,000. The
disparity between the estimate and the actual bid prices reflects a continued favorable
construction market (including lower concrete prices), and possibly some level of
discount as the low bidder in already currently mobilized and working on the Central
Balboa and Newport Heights Alley and Street Replacement project for the City. The low
bidder, NOBEST, possesses a California State Contractors License Classification "A" as
required by the project specifications. A check of NOBEST's references indicates
satisfactory completion of similar projects for other public agencies, including the
recently completed the work on the Ocean Front Alley Replacement project for the City.
Given the favorable project unit prices by NOBEST, staff recommends establishing a
fifteen percent (15 %) contract contingency to be included in the contract award, totaling
$176;000.00. These added funds will provide an opportunity for the City to take
advantage of the low unit prices to perform additional concrete work within the project
limits.
2 of
Balboa Boulevard and Channel Road Pavement Reconstruction —Award of Contract
No. 5152
February 12, 2013
Page 3
The work necessary for the completion of this contract consists of removing the existing
concrete street, constructing new concrete street pavement, adjusting utilities to grade
and performing other appurtenant and incidental items of work as required.
Pursuant to the Contract Specifications, the Contractor will have 60 consecutive working
days to complete the work.
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this project exempt from the California
Environmental Quality Act ( "CEQA ") pursuant to Section 15301(c) (maintenance
activities with negligible expansion) of the CEQA Guidelines, California Code of
Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect
on the environment.
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
The Notice Inviting Bids was advertised in the City's official publication and in
construction industry publications. Affected residents will be notified prior to the start of
the project.
Submitted by:
e /,), 16
avid A. ebb
Public Works Director
Attachment: A. Project Location Map
3 of
BALBOA BLVD. AND CHANNEL RD. PAVEMENT RECONSTRUCTION,
C -5152
LOCATION MAP
CHANNEL RD.
G�
OP ,�
M
2g s
M
sF sT o
Vl «Fq�F.
W
Z
Z FV F �° MST
l� m
°a
4 If m
sr.
�L w
5
�v
a Q < sr
i sT U�Q'
O
sT QQ'
�o
H sT m
NT
S
® PROJECT LIMITS
0
c
Ge
ST ATTACHMENT A
m 4of4
co F:\ Users \PBw \Snared \CADD\ Engineering\ STREETS \R603DS- 8elboa- Blvtl \Balboa_LOm lion-M,A.,