HomeMy WebLinkAboutX2011-1838 - Misc (2)Upper Campus Heart and Vascular Institute Site Improvements Mitigation Monitoring Plan Hoag Memorial Hospital Presbyterian Volume I • March 28, 2012 • a Rosalinh Ung Associate Planner City of Newport Beach 3300 Newport Boulevard Newport Beach, CA 92658-8915 RE: Hoag Memorial Hospital Presbyterian Upper Campus Heart and Vascular Institute Project — Compliance with Applicable Mitigation Measures for Site Improvements Project (as Revised) Dear Ms. Ung: On July 21, 2011, Hoag Hospital submitted plans for the Site Improvements portion of the HVI project and for the elevator tower associated with the HVI project (under Plan Check 1459- 2011). These plans were subsequently approved by the City, and I provided you with the record copy of all of the signed mitigation measures forms, along with all supporting documentation. The permit for the HVI Site Improvements project, however, was not issued. To reduce the construction impact (including reducing the construction duration) on the site and to our patients, revisions were made to the vehicular bridge to the parking structure. Further, the paving revisions to the existing site that were initially contemplated were also scaled back. Plans for the revised HVI Site Improvements project were submitted to the City on January 23, 2012 (under Plan Check 1459-2012). Since that time, comments from that initial plan check were responded to, and the plans were resubmitted to the City on March 14, 2012. You completed your plan check for the revised HVI Site Improvements project with no comments, except that you requested that a review of mitigation measures compliance be undertaken and that, based upon that review, revised/amended documentation in support of the revised HVI Site Improvements project be submitted for approval. On February 14, Peri Muretta and I met with you to discuss the required information to be provided to document mitigation measures' compliance for the HVI Site Improvements project, as revised. The underlying plans, which include notes documenting compliance with some of the mitigation measures have not changed, nor have the plans themselves (including civil, erosion control, landscape, etc.). changed in a manner that would alter the determination of compliance that was completed for the original HVI Site Improvements project. Finally, most of the base technical studies, including traffic, hydrology, geology, soils corrosivity, etc., did not require amendment to reflect the revised HVI Site Improvements project. Therefore, the existing mitigation measures signoffs are valid. However, amendments were required to the approved Storm Water Pollution Prevention Plan and the approved Water Quality Management Plan to reflect the HIV Site Improvements project, as revised. A detailed discussion of the revisions to those documents is provided below. In addition to the information provided below, the accompanying plans/documents are also provided. HOAG MEMORIAL HOSPITAL PRESBYTERIAN One Hoag Drive, PG Br:) 6100. Newport Beach CA 92656-610C1 • www hoag.org • • • Rosalinh Ung March 28, 2012 1. MM 62: A study of the concentration of potential hazardous constituents shall be conducted prior to initiation of the project to characterize the wastewater and any risk it may pose to human health prior to development. A stormwater pollution prevention plan shall be developed to reduce the risk of the transport of hazardous constituents from the site. The Hospital shall apply for coverage under the State Water Resources Control Board's General Permit for Storm Water Discharges Associated with Construction Activity and shall comply with all the provisions of the permit, including, but not limited to, the development of the SWPPP, the development and implementation of Best Management Practices, implementation of erosion control measures, the monitoring program requirements, and post construction monitoring of the system. Compliance: Halladay & Mim Mack prepared a Storm Water Pollution Prevention Plan documenting compliance with Mitigation Measure # 62. The SWPPP was approved by the City during the initial plan check process. Based on the revised HVl Site Improvements project, the previously approved SWPPP has been amended. Minor amendments to the SWPPP were necessitated based on the revised site plan for the HVI Site Improvements project. Additionally, amendments to the SWPPP were made to respond to requirements contained in the new RWQCB's General Construction Permit. While there are several changes that have been made to the SWPPP, these amendments are technical in nature, and do not substantively affect the SWPPP. A section -by -section summary of the amendments to the SWPPP is provided below: • Section 100 - SWPPP Certification and Approval - Reassignment of QSD and LRP - Addition of Section to provide Permit Registration Documents - Addition of Section on SWPPP Availability and Implementation • Section 200 - SWPPP Amendments Update to SWPPP Amendment Certification and Approval and Amendment Log sections (with corresponding Appendices provided) Provision of new sections to several components of Section 200 (including: Retention of Records, Required Non -Compliance Reporting, Annual Report, Changes to Permit Report and Notice of Termination) • Section 300 - Introduction and Project Description - Revision to project description Update to construction site estimates Revision to project schedule/water pollution control schedule Provision of new sections to several components of Section 300 (including: Soils, Slopes, Vegetation and Current Drainage Patterns; Stormwater Run-on from Offsite Areas; and Findings of the Construction Site Risk Determination) • Section 400 - References (provision of references to new General Construction Permit) Page 2 • • • Rosalinh Ung March 28, 2012 • Section 500 - Body of SWPPP - Update of various subsections to reflect new General Construction Permit (including: Water Pollution Control Plans, Operation/Maintenance after Project Completion and Other Plans/Permits) - Addition of new component to subsection "Construction BMP Maintenance, Inspection, Repair" to add "...and Rain Event Action Plan (REAP)" • Section 600 - Monitoring Program and Reports (provision of references to new Genera Construction Permit added to Section 600) • SWPPP Appendices Revision to existing Appendices to reflect SWPPP document changes, General Construction Permit updates and HVI Site Improvements revisions (Appendices A,G,FJand K) Provision of new Appendices to reflect new General Construction Permit (including: Appendix Q [SWPPP Amendments: Amendment Descriptions Certifications and Amendment Log]; Appendix R [Site Specific Rain Event Action Plan (REAP); and, Appendix S [Annual Reports]) 2. MM 12: Upon completion of final building construction plans, and prior to the issuance of a grading permit for each phase of development, the Project Sponsor shall ensure that site hydrological analyses are conducted to verify that existing drainage facilities are adequate. The applicant shall submit a report to the City of Newport Beach Building Department for approval, verifying the adequacy of the proposed facilities and documenting measures for the control of siltation and of erosive runoff velocities. Compliance: Halladay & Mim Mack prepared a Preliminary Hydrology Study and documenting compliance with Mitigation Measure # 12. Halladay & Mim Mack also prepared a WQMP for the project. The Hydrology Study did not require amendment, as the changes to the HVI Site Improvements project did not affect the overall drainage pattern of the site and resulted in very minor changes to the project's drainage areas (0.02 acres). There are, however, several revisions that have been made to the approved WQMP. These changes are minor in nature and were necessitated by the revisions to the HVI Site Improvements project's site plan. The complete revised WQMP is enclosed for your records, and the specific revisions are identified as follows: • Addition of a paragraph to the Owner's Certification page describing the reason for the amendment • Revision to project description in Section II • Revision to construction site estimates in Section III • Addition of cut sheets and filtration media description (for Kleenspout Filtration Vault) in Section VI • Revision to Attachment A (Notice of Transfer) to be specific to project Page 3 • • Rosalinh Ung March 28, 2012 • Revision to WQMP Site Plan based on current construction layout • Revisions to page numbers and WQMP document date Please let me know if you have any comments or questions on Hoag Hospital's compliance with the documentation submitted in support of the revised HVI Site Improvements project for satisfaction of the mitigation measures identified above. I can be reached at (949) 764-4496. You can also contact Peri Muretta for assistance in answering questions. She can be reached at (949) 588-6090. Cary Brooks Senior Project Manager Enclosures: "SWPPP Certifications and Approval for Hoag Memorial Hospital Presbyterian VHI Entry Project", July 2011, Amended March 2012 "Water Quality Management Plan (WQMP) for Hoag Memorial Hospital Presbyterian Heart Vascular Institute Entry Improvements", July 2011, revised January 2012 C: Jim Budke, Halladay & Mim Mack, Inc. Peri Muretta Mike Petersen, Taylor and Associates Page 4 • • BY September 14, 2011 Rosalinh Ung Associate Planner City of Newport Beach 3300 Newport Boulevard Newport Beach, CA 92658-8915 RE: Hoag Memorial Hospital Presbyterian Upper Campus Heart and Vascular Institute Project — Compliance with Applicable Mitigation Measures for Site Improvements Dear Ms. Ung: On July 21, 2010, you approved the overall mitigation measures applicability matrix for Hoag's Heart and Vascular Institute project. Based on the permitting of separate components of the project, and its review by the Office of Statewide Health Planning and Development (OSHPD), the overall applicability matrix was amended (and subsequently approved by you on December 6, 2010) to reflect two separate OSHPD submittals for mitigation compliance review by the City of Newport Beach, as well as one submittal to the City of Newport Beach for permitting and mitigation compliance review. The first of the OHSPD submittals, OSHPD Package One, included a hybrid OR, staff area, pre-op/PACU and Cath Labs. Documentation was submitted to (and subsequently approved by) the City for compliance with OSHPD Package One, which was permitted by OSHPD on May 31, 2011. The second OSHPD submittal, OSHPD Package Two, was submitted to OSHPD for initial plan check on July 8, 2011, and is currently still under review by OSHPD. The OSHPD Package Two project includes upgrades to the One South interior. Mitigation measure compliance documentation is being submitted separately to the City for the OSHPD Package Two project. When the December 6, 2011 matrix was approved, it included minor building facade improvements, in addition to site improvements, as, part of the City submittal. However, the facade improvements are now included as part of the second OSHPD submittal. A revised applicability matrix, HOAG MEMORIAL HOSPITAL PRESBYTERIAN . , _ .. _ : i 4. • I' k' c 5 . 1 . . . . I • • ioaq which shifts those few mitigation measures directly related to the minor facade improvements from the site improvements component of the HVI project to the OSHPD Package Two component. of the HVI project, is included with the mitigation measure submittal documentation. On July 22, Hoag Hospital submitted plans for the site improvements portion of the HVI project and for the elevator tower associated with the HVI project (under Plan Check 1459-2011). Since then, Hoag has received plan check comments on that initial submittal and has subsequently responded to those plan check comments. At this time, Hoag is submitting compliance documentation for plan check and permitting by the City of Newport Beach for the site improvements component of the HVI project. This compliance documentation reflects responses to initial plan check comments, as appropriate. Each of the mitigation measures applicable to the site improvements component of the HVI project is itemized below. Hoag Hospital's compliance with each of those applicable mitigation measures is also documented. In addition to the information provided below, the relevant mitigation measures sign -off sheets and accompanying plans/documents are also provided. 1. SC 3.5-1: Lighting shall be in compliance with applicable standards of the Zoning Code. Exterior on -site lighting shall be shielded and confined within site boundaries. No direct rays or glare are permitted to shine onto public streets or adjacent sites or create a public nuisance. "Walpak" type fixtures are not permitted. Parking area lighting shall have zero cut-off fixtures and light standards shall not exceed 30 feet in height. Compliance: See Sheets # E3.01 and # E3.02 (the project Electrical Plans), which have been developed in compliance with the City's standards. Exterior lighting is shielded and no direct light/glare will shine onto public streets or adjacent sites. "Walpak" type fixtures are not included. No light standards exceed 30 feet in height. HOAG MEMORIAL HOSPITAL PRE58YTERIAW :I .ry ;., ;_. _rF... ._)5r-}il.•. . 'I; • 1103)0,1 2. SC 3.5-2: The site shall not be excessively illuminated based on the luminance recommendations of the Illuminating Engineering Society of North America, or, if in the opinion of the Planning Director, the illumination creates an unacceptable negative impact on surrounding land uses or environmental resources. The Planning Director may order the dimming of light sources or other remediation upon finding that the site is excessively illuminated. Compliance: See Sheets # E3.01 and # E3.02 (the project Electrical Plans). Exterior lighting associated with the project is shielded, and no direct light/glare will shine onto public streets or adjacent properties. Based on the recommendations of the Illuminating Engineering Society of North America, the project site will not be excessively illuminated. 3. SC 3.5-3: Prior to the issuance of a building permit, the applicant shall prepare photometric study in conjunction with a final lighting plan for approval by the Planning Department. Compliance: A photometric study was prepared for the project, as shown on Sheet # E2.02, which documents the vehicular roadway lighting associated with the HVI site improvements project. 4. SC 3.5-4: Prior to issuance of the certificate of occupancy or final building permits, the applicant shall schedule an evening inspection by the Code and Water Quality Enforcement Division to confirm control of light and glare. Compliance: Compliance with this standard condition will be addressed subsequent to installation of project lighting. 5. MM 43: Prior to issuance of grading permits, the Project Sponsor shall ensure that a landscape and irrigation plan is prepared for each building/improvement within the overall Master Plan. This plan shall be prepared by a licensed landscape architect. The landscape plan shall integrate and phase the installation of landscaping with the proposed construction schedule. The plan shall be subject to HOAG MEMORIAL HOSPITAL PRESBYTERIAN • • hocj review by the General Services Department and approval by the Planning Department and Public Works Department. Compliance: Sheets # L2.01 and # L2.02, the project's irrigation plans, and Sheets # L3.11 and # L3.12, the project's planting plans, were prepared by the Rabben/Herman Design Office, a licensed landscape architect. The installation of the planting and irrigation system will be integrated with the construction schedule. 6. MM 37: Prior to the issuance of grading and building permits for each phase of development, the project proponent shall provide evidence for verification by the Planning Department that energy efficient lighting has been incorporated into the project design. Compliance: See Sheet # E1.03 for Title 24 information associated with the site improvements portion of the HVI project. 7. MM 82: Before the issuance of building permits, the Project Sponsor shall submit plans to the Building Department, City of Newport Beach demonstrating compliance with all applicable District Rules, including Rule 401, Visible Emissions, and Rule 402, Public Nuisance. Compliance: All applicable Air Quality Management District Rules, including Rule 401, Visible Emissions, and Rule 402, Public Nuisance, shall be complied with during site preparation, grading and construction. Refer to Sheet # C1.00 (Title Sheet) Air Quality Notes #1, #2, #7, and #8 which address Rule 401 and Air Quality Notes #9 and #10 which address Rule 402. Also see enclosed information from the Supplementary Agreement between Hoag and its contractor (Exhibit "L", "Mitigation Monitoring Program') which requires this mitigation measure to be implemented by Hoag's contractor. 8. MM 88: The Project Sponsor shall submit plans to the City Building Department prior to the issuance of a building, permit for each phase of development, verifying that energy efficiency will be achieved by incorporating appropriate technologies and systems HOAG` MEMORIAL HOSPITAL PRESBI i ERIAH 1• • flodq into future structures, which may include: high efficiency cooling/absorption units; thermal storage and ceramic cooling towers; cogeneration capabilities; high efficiency water heaters; energy efficient glazing systems; appropriate off -hour heating/cooling/lighting controls; time clocks and photovoltaic cells for lighting controls; efficient insulation systems; light colored roof and building exteriors; PL lighting and fluorescent lighting systems; motion detector lighting controls; natural interior lighting —skylights, clerestories; and, solar orientation, earth berming and landscaping. Compliance: See Sheet # E1.03 for Title 24 information associated with the site improvements portion of the HVI project. Also see Sheets # L2.01 and # L2.02, the project's irrigation plans, and Sheets # L3.11 and # L3.12, the project's planting plans. 9. MM 106: Project Sponsor shall ensure that all project related grading shall be performed in accordance with the City of Newport Beach Grading Ordinance, which contains procedures and requirements relative to dust control, erosion and siltation control, noise, and other grading related activities. Compliance: All project related grading shall be performed in accordance with the City of Newport Beach Grading Ordinance; procedures and requirements relative to dust control are addressed on Sheet # C1.00 (Title Sheet), Air Quality Notes #9 and #10. Erosion and siltation control are addressed in General Note #22 (Erosion Control General Notes) and Air Quality Notes #9 and #10. Noise, and other grading related activities, is addressed in General Note #13 and Air Quality Notes # 2 and #8. Also see enclosed information from the Supplementary Agreement between Hoag and its contractor (Exhibit "L", "Mitigation Monitoring Program") which requires this mitigation measure to be implemented by Hoag's contractor. 10.MM 110: The Project Sponsor shall ensure that low emission mobile and stationary equipment is utilized during construction, and low sulfur fuel is utilized in stationary equipment, when available. Evidence of this fact shall be provided to the City of Newport Beach prior to issuance of any grading or building permit. HOAG MEMORIAL HOSPITAL PRESBYTERIAN : • Compliance: Low emission mobile and stationary equipment shall be utilized during construction, and low sulfur fuel shall be utilized in stationary equipment, when available, as addressed on Sheet # C1.00 (Title Sheet), Air Quality Notes #2, #7 and #8. Also see enclosed information from the Supplementary Agreement between Hoag and its contractor (Exhibit "L", "Mitigation Monitoring Program") which requires this mitigation measure to be implemented by Hoag's contractor. 11. MM 3.3-1 (summary only): During construction of the Project, the Applicant and its Contractors shall be required to comply with regional rules established by the South Coast Air Quality Management District (SCAQMD), which assist in reducing short- term air pollutant emissions. The SCAQMD's Rule 403 requires that fugitive dust be controlled with best available control measures so that the presence of such dust does not remain visible in the atmosphere beyond the property line of the emission source. Two options are presented in Rule 403: monitoring of particulate concentrations or active control. Monitoring involves a sampling network around the project with no additional control measures unless specified concentrations are exceeded. The active control option does not require any monitoring, but requires that a list of measures be implemented starting with the first day of construction. Compliance: See letter from Hoag Hospital documenting measures for compliance with SCAQMD Rule 403 as part of the site improvements component of the HVI project. 12.MM 3.3-2: Prior to issuance of each grading permit, the Applicant shall include the following notes on the contractor specifications submitted for review and approval by the City of Newport Beach Department of Public Works. To reduce construction equipment emissions, the following measures shall be implemented: maintain construction equipment engines by keeping them tuned; use existing power sources (i.e., power poles) when available (this measure would minimize the use of higher polluting gas or diesel generators; configure construction parking to minimize traffic interference; minimize obstruction of through -traffic lanes HOAG MEMORIAL HOSPITAL PRESBYTERIAN [11110EN • ' (construction shall be planned so that lane closures on existing streets are kept to a minimum); schedule construction operations affecting traffic for off-peak hours to the best extent when possible; and develop a traffic plan to minimize traffic flow interference from construction activities (the plan may include advance public notice of routing, use of public transportation, and satellite parking areas with a shuttle service). Compliance: Refer to enclosed information from the Supplementary Agreement between Hoag and its contractor (Exhibit "L", "Mitigation Monitoring Program") which requires this mitigation measure to be implemented by Hoag's contractor. 13. MM 3.3-3: Prior to issuance of each building permit for the proposed Master Plan Update Project, the Applicant shall include the following notes on the contractor specifications submitted for review and approval by the City of Newport 'Beach Building Department: minimize the amount of paint used by using pre - coated, pre -colored, and naturally colored building materials; and, use high transfer efficiency painting methods such as HVLP (High Volume Low Pressure) sprayers and brushes/rollers were possible. Compliance: Refer to enclosed information from the Supplementary Agreement between Hoag and its contractor (Exhibit "L", "Mitigation Monitoring Program") which requires this mitigation measure to be implemented by Hoag's contractor. 14.MM 1: Prior to issuance of a grading permit, the Project Sponsor shall document to the City of Newport Beach Building Department that grading and development of the site shall be conducted in accordance with the City of Newport Beach Grading Ordinance and with plans prepared by a registered civil engineer. These plans shall incorporate the recommendations of a soil engineer and an engineering geologist, subsequent to the completion of a comprehensive soil and geologic investigation of the site. Permanent reproducible copies of the "Approved as Built" grading plans shall be furnished to the Building Department by the Project Sponsor. HOAG MEMORIAL HOSPITAL PRESBYTERIAH •i ; if, .... �E'::,.h , ..255_• hoar)] • Compliance: Refer to Sheets # C1.00 through # C12.00, the project civil plans, which were developed by the project's civil engineer in accordance with the City's Grading Ordinance, and are based on the recommendations of the project's geotechnical consultant. 15.MM 3: Prior to the issuance of a grading permit, the Project Sponsor shall provide to the City of Newport Beach a comprehensive soil and geologic investigation and report of the site prepared by a registered grading engineer and/or engineering geologist. This report shall also identify construction excavation techniques which ensure no damage and minimize disturbance to adjacent residents. This report shall determine if there are any on - site faults which could render all or a portion of the property unsafe for construction. All recommendations contained in this investigation and report shall be incorporated into project construction and design plans. This report shall be submitted to the City for review and approval. Compliance: As part of previous Upper Campus projects, including the South Parking Structure, the Dolphin Parking Structure and the Women's Pavilion, extensive geotechnical investigations were submitted for review to and approval by the City of Newport Beach. An additional geotechnical evaluation was prepared by Geotek for the HVI site improvements, and is being provided for your review. 16. MM 6: Prior to the issuance of a grading permit, the Project Sponsor shall conduct a soil corrosivity evaluation. This evaluation shall be conducted by an expert in the field of corrosivity. This site evaluation shall be designed to address soils to at least the depth to which excavation is planned. At a minimum, at least one sample from each soil type should be evaluated. Appropriate personnel protection shall be worn by field personnel during the field evaluation. In the event soils are found to be corrosive, the source and extent of the corrosive soils shall be determined, and all buildings and infrastructure shall be designed to control the potential impact of corrosive soils over time. Compliance: GeoScience Analytical has prepared a report documenting compliance with Mitigation Measure # 6. This report HOAG MEMORIAL HOSPITAL PRESBYTERIAN A0a0,) concluded that there no limitations exist that render the site unsuitable for development (with adequate mitigation for construction materials). • 17.MM 7: Based on the corrosion assessment and source determination, a soils and construction material compatibility evaluation shall be undertaken, concluding with the appropriate mitigation measures and design criteria. Corrosion resistant construction materials are commonly available and shall be used where the evaluation/assessment concludes that corrosive soils conditions could adversely impact normal construction materials or the materials used for the mitigation of subsurface gas conditions. For example, there are many elastomers and plastics, like PVC, which are resistant to corrosion by up to 70 percent sulfuric acid at 140 degrees Fahrenheit. Compliance: GeoScience Analytical has prepared a report documenting compliance with Mitigation Measure # 7. This report concluded that there no limitations exist that render the site unsuitable for development (with adequate mitigation for construction materials). A report prepared in 1997, with laboratory results supplemented in 2005, remains applicable to the HVI site improvements project (and is included). The relevant recommendations from that report are also identified on Sheet # C5.00. 18.MM 8: Should the soil be identified as hazardous due to the severeness of their corrosivity (i.e., a pH less than 2.5), on -site remediation by neutralization shall be undertaken prior to construction. Appropriate regulatory agency approvals and permits shall also be obtained. Compliance: GeoScience Analytical has prepared a report documenting compliance with Mitigation Measure # 8. The laboratory analyses conducted in conjunction with this mitigation measure found no evidence of the presence of hazardous substances with respect to corrosive soils. HOAG MEMORIAL HOSPITAL PRESBYTERIAN • hcalj 19. MM 9: Prior to issuance of grading permits, the Project Sponsor shall ensure that a construction erosion control plan is submitted to and approved by the City of Newport Beach that is consistent with the City of Newport Beach Grading Ordinance and includes procedures to minimize potential impacts of silt, debris, dust and other water pollutants. These procedures may include: the replanting of exposed slopes within 30 days after grading or as required by the City Engineer; the use of sandbags to slow the velocity of or divert stormflows and the limiting of grading to the non -rainy season. The project Sponsor shall strictly adhere to the approved construction erosion control plan and compliance shall be monitored on an ongoing basis by the Newport Beach Building Department. Compliance: Refer to Sheet # C9.00 - # C9.02, the project's Erosion Control Plan, which was developed in compliance with Mitigation Measure 9. 20. MM 49: In the event that hazardous waste is discovered during site preparation or construction, the Project Sponsor shall ensure that the identified hazardous waste and/or hazardous materials are handled and disposed in the manner specified by the State of California Hazardous Substances Control Law (Health and Safety Code Division 20, Chapter 6.5), standards established by the California Department of Health Services, Office of Statewide Health Planning and Development, and according to the requirements of the California Administrative Code, Title 30, Chapter 22. Compliance: See Sheet # C1.00 (Title Sheet), General Note #24 which addresses this requirement; also see enclosed information from the Supplementary Agreement between Hoag and its contractor (Exhibit "L", "Mitigation Monitoring Program") which requires this mitigation measure to be implemented by Hoag's contractor. 21. MM 53: A site safety plan shall be developed that addresses the risks associated with exposures to methane and hydrogen sulfide. Each individual taking part in the sampling and monitoring program HOAG MEMORIAL HOSPITAL PRESBYTERIAN • -- S shall receive training on the potential hazards and on proper personal protective equipment. This training shall be at least at the level required by CFR 2910.120. Compliance: GeoScience Analytical has prepared a report documenting compliance with Mitigation Measure # 53. 22. MM 55: Continuous monitoring for methane and hydrogen sulfide. Compliance: See Sheet # C1.00 (Title Sheet), General Note #25 which addresses this requirement; also see enclosed information from the Supplementary Agreement between Hoag and its contractor (Exhibit "L", "Mitigation Monitoring Program") which requires this mitigation measure to be implemented by Hoag's contractor. 23. MM 56: A study of other hazardous constituents that may be present in quantities that pose a health risk to exposed individuals shall be prepared and evaluated prior to the initiation of the project. The constituents studied shall include compounds that are directly related to petroleum, such as benzene and toluene. Compliance: GeoScience Analytical has prepared a report documenting compliance with Mitigation Measure # 56. No hazardous materials or excess residual substances were identified under the scope of the investigation. 24. MM 62: A study of the concentration of potential hazardous constituents shall be conducted prior to initiation of the project to characterize the wastewater and any risk it may pose to human health prior to development. A stormwater pollution prevention plan shall be developed to reduce the risk of the transport of hazardous constituents from the site. The Hospital shall apply for coverage under the State Water Resources Control Board's General Permit for Storm Water Discharges Associated with Construction Activity and shall comply with all the provisions of the permit, including, but not limited to, the development of the SWPPP, the development and implementation of Best Management Practices, implementation HOAG MEMORIAL HOSPITAL PRESBYTERIAN .. F' r --"• —'•"I, tL':—. I' .)!SH::?i'_I• •'---:ring • 1 , .oac t.„.% of erosion control measures, the monitoring program requirements, and post construction monitoring of the system. Compliance: Halladay & Mim Mack has prepared a Storm Water Pollution Prevention Plan documenting compliance with Mitigation Measure # 62. 25. MM 63: Soil samples shall be collected from the appropriate locations at the site and analyzed for BTEX and priority pollutants; if the soils are found to contain unacceptable levels of hazardous constituents, appropriate mitigation will be required, including a complete characterization of both the vertical and horizontal extent of the contamination, and a remedial action plan shall be completed and approved by the California Regional Water Quality Control Board. The project Sponsor must demonstrate to the City of Newport Beach compliance with this measure prior to issuance of any permits for Phase I and subsequent phases of construction activities as applicable to the project activity. Compliance: GeoScience Analytical has prepared a report documenting compliance with Mitigation Measure # 63. That report documented that soils on the project site were void of concentrations of petroleum related volatile organic compounds, including benzene, toluene, xylenes and ethylbenzene over background levels. 26. MM 74: During construction, Project Sponsor shall ensure that an explosimeter is used to monitor methane levels and percentage range. Additionally, construction contractors shall be required to have a health and safety plan that includes procedures for worker/site safety for methane. If dangerous levels of methane are discovered, construction in the vicinity shall stop, the City of Newport Beach Fire Department shall be notified and appropriate procedures followed in order to contain the methane to acceptable and safe levels. Compliance: See Sheet # C1.00 (Title Sheet), General Note #26 which addresses this requirement; also see enclosed information from the Supplementary Agreement between Hoag and its HOAG MEMORIAL HOSPITAL PRESBYTERIAN • • how contractor (Exhibit "L", "Mitigation Monitoring Program") which requires this mitigation measure to be implemented by Hoag's contractor. 27. MM 10: Prior to the issuance of grading permits, the Project Sponsor shall submit a landscape plan which includes a maintenance program to control the use of fertilizers and pesticides, and an irrigation system designed to minimize surface runoff and overwatering. This plan shall be reviewed by the General Services Department and approved by the City of Newport Beach Planning Department. The Project Sponsor shall install landscaping in strict compliance with the approved plan. Compliance: Sheets # L2.01 and # L2.02, the project's irrigation plans, and Sheets # L3.11 and # L3.12, the project's planting plans, were prepared by the Rabben/Herman Design Office, a licensed landscape architect. The landscape and irrigation plans include a maintenance program to control the use of fertilizers and pesticides. Hoag Hospital maintains a full-time contractor to maintain and monitor the landscape installation on a daily basis. The irrigation system is designed to minimize surface run-off and over -watering. The irrigation system designed for the HVI project incorporates numerous water conservation features and operating functions that support the no run-off water ordinance, minimizing any over - watering. The automatic irrigation controller specified meets criteria for what is known in the industry as a "Smart Controller". Capabilities including: user -defined evapotranspiration functions, valve scheduling to operate with automatic seasonal timing adjustments, employment of multiple start times for "cycle and soak" programming and use of multiple programs to maximize schedule separation between planting types. The controller also operates a high flow shut down of the main line piping system and specific valve stations (e.g., in case a broken sprinkler is detected by high flow). HOAG MEMORIAL HOSPITAL PRESBYTERIAN if10,aigi • • 28. MM 12: Upon completion of final building construction plans, and prior to the issuance of a grading permit for each phase of development, the Project Sponsor shall ensure that site hydrological analyses are conducted to verify that existing drainage facilities are adequate. The applicant shall submit a report to the City of Newport Beach Building Department for approval, verifying the adequacy of the proposed facilities and documenting measures for the control of siltation and of erosive runoff velocities. Compliance: Halladay & Mim Mack has prepared a Preliminary Hydrology Study and documenting compliance with Mitigation Measure # 12. Halladay and Mim Mack has also prepared a WQMP for the project. 29. MM 14: Prior to the completion of final building construction plans for each phase of Lower Campus development, the Project Sponsor shall prepare and submit a construction stormwater National Pollution Discharge Elimination System (NPDES) General Permit for stormwater discharge associated with construction activity (Construction General Permit, SWRCB Order No. 99-08- DWQ or its successor) and Notice of Intent (NOI) to obtain the required coverage under the General Permit for Discharges of Storm Water Associated with Construction Activity. Construction activity subject to this permit includes clearing, grading, and disturbances to the ground such as stockpiling or excavation, but does not include regular maintenance activities performed to restore the original line, grade, or capacity of the facility. The NOI, site plan, a check in an amount specified by the most current fee schedule, and any other documentation required by the permit shall be sent to the State Water Resource Control Board (SWRCB). The SWRCB will send a Waste Discharger Identification (WDI) to the project sponsor and the Regional Water Quality Control Board Santa Ana Region for use during site inspection, if needed. Compliance: A copy of the Notice of Intent, and verification of receipt by the RWQCB, is provided for the site improvements component of the HVI project. HOAG MEMORIAL HOSPITAL PRESBYTERIAN • • I Odqj 30.MM 24: The proposed project is subject to all applicable requirements of the City of Newport Beach General Plan, Zoning Code, and Local Coastal Program (LCP). Those requirements that are superseded by the PCDP and District Regulations are not considered applicable. The following discretionary approvals are required by the City of Newport Beach: EIR certification, adoption of an amendment to the Planned Community Development Plan and District Regulations, approval of an amendment to the Development Agreement, grading permits, and building permits for some facilities. The California Coastal Commission has the discretionary responsibility to issue a Coastal Development Permit for the Lower Campus. Compliance: The project plans have been prepared in compliance with applicable requirements of the City of Newport Beach. The project is not required to obtain a Coastal Development Permit, as the Upper Campus is not located within the coastal zone. 31.SC 3.4-1: During construction, the Applicant shall ensure that all noise -generating activities be limited to the hours of 7:00 AM to 6:30 PM on weekdays and 8:00 AM to 6:00 PM on Saturdays. No noise -generating activities shall occur on Sundays or national holidays in accordance with the City of Newport Beach Noise Ordinance. Compliance: All Noise -generating construction activities shall be limited to the hours of 7:00 AM to 6:30 PM on weekdays and 8:00 AM to 6:00 PM on Saturdays. No noise -generating activities shall occur on Sundays or national holidays in accordance with the City of Newport Beach Noise Ordinance as addressed on Sheet # C1.00 (Title Sheet) General Note #3. Also see enclosed information from the Supplementary Agreement between Hoag and its contractor (Exhibit "L", "Mitigation Monitoring Program") which requires this mitigation measure to be implemented by Hoag's contractor. 32.MM 111: The Project Sponsor shall ensure that all internal combustion engines associated with construction activities shall be fitted with properly maintained mufflers and kept in proper tune. HOAG MEMORIAL HOSPITAL PRESBYTERIAH I :: • • • troai Compliance: All internal combustion engines associated with construction activities shall be fitted with properly maintained mufflers and kept in proper tune as addressed on Sheet # C1.00 (Title Sheet), Air Quality Notes # 1 and #8. Also see enclosed information from the Supplementary Agreement between Hoag and its contractor (Exhibit "L", "Mitigation Monitoring Program") which requires this mitigation measure to be implemented by Hoag's contractor. 33. MM 91: Prior to the issuance of grading permits, emergency fire access to the site shall be approved by the City Public Works and Fire Departments. Compliance: Refer to Sheet # G2.50, which documents emergency fire access to the project site. 34. MM 32: Prior to issuance of approvals for development projects, the applicant shall submit to the City Traffic Engineer for his/her review and approval, a study that identifies the appropriate parking generation rates. The findings of this study shall be based on empirical or survey data for the proposed parking rates. Compliance: Refer to "Traffic, Circulation, Parking and Construction Parking/Traffic Control Report: Heart and Vascular Institute"prepared by KOA (dated July 2011) which documents that the HVI project (including the OHSPD One Package, the OSHPD Two Package and the Site Improvements Package) does not negatively affect parking (either during construction or after project implementation) at Hoag Hospital. 35. MM 33: Prior to issuance of precise grading permits for Master Plan development that includes new, or modifications to existing, internal roadways (other than service roads), the Project Sponsor will prepare an internal circulation plan for submittal to and approval by the City Traffic Engineer that identifies all feasible measures to eliminate internal traffic congestion and facility's ingress and egress HOAG MEMORIAL HOSPITAL PRESBYTERIAIJ • • to the site. All feasible measures identified in this study shall be incorporated into the site plan. Compliance: Refer to Sheet # C2.00 (Site Plan) which shows internal circulation associated with the project. Also refer to "Traffic, Circulation, Parking and Construction Parking/Traffic Control Report: Heart and Vascular Institute" prepared by KOA (dated July 2011) which documents that the site improvements associated with the HVI project do not create internal traffic congestion or negatively affect ingress and egress to the Hospital. 36. MM 95: Prior to issuance of building permits, the Project Sponsor shall demonstrate to the City Fire Department that all existing and new access roads surrounding the project site shall be designated as fire lanes, and no parking shall be permitted unless the accessway meets minimum width requirements of the Public Works and Fire Departments. Parallel parking on one side may be permitted if the road is a minimum 32 feet in width. Compliance: Refer to Sheet # G2.50 which documents that the existing and new access roads surrounding the project site are designated as fire lanes in compliance with Mitigation Measure # 95. 37. MM 101: In conjunction with the application for a grading permit, the Project Sponsor shall submit a construction phasing and traffic control plan for each phase of development. This plan would identify the estimated number of truck trips and measures to assist truck trips and truck movement in and out of the local street system (i.e., flagmen, signage, etc.). This plan shall consider scheduling operations affecting traffic during off-peak hours, extending the construction period and reducing the number of pieces of equipment used simultaneously. The plan will be reviewed and approved by the City Traffic Engineer prior to issuance of the grading permit. HOAG MEMORIAL HOSPITAL PRESBYTERIAN • ,Odqj Compliance: Refer to "Traffic, Circulation, Parking and Construction Parking/Traffic Control Report: Heart and Vascular Institute" prepared by KOA (dated July 2011) which includes a Construction Phasing and Traffic Control Plan for the project. 38. MM 102: The Project Sponsor shall ensure that all haul routes for import or export materials shall be approved by the City Traffic Engineer and procedures shall conform with Chapter 15 of the Newport Beach Municipal Code. Compliance: All haul routes for import or export of materials shall be approved by the City Traffic Engineer and procedures shall conform with Chapter 15 of the Newport Grading Ordinance as shown on Sheet # C1.00 (Title Sheet), General Note # 21. Also see enclosed information from the Supplementary Agreement between Hoag and its contractor (Exhibit "L", "Mitigation Monitoring Program") which requires this mitigation measure to be implemented by Hoag's contractor. 39. MM 103: The Project Sponsor shall provide advance written notice of temporary traffic disruptions to affected area business and the public. This notice shall be provided at least two weeks prior to disruptions. Compliance: See enclosed information from the Supplementary Agreement between Hoag and its contractor (Exhibit "L", "Mitigation Monitoring Program") which requires this mitigation measure to be implemented by Hoag's contractor. 40. MM 104: The Project Sponsor shall ensure that construction activities requiring more than 16 truck (i.e., multiple axle vehicle) trips per hour, such as excavation and concrete pours, shall be limited between June 1 and September 1 to avoid traffic conflicts with beach and tourist traffic. At all other times, such activities shall be limited to 25 truck (i.e., multiple axle vehicle) trips per hour unless otherwise approved by the City Traffic Engineer. Haul operations will be monitored by the Public Works Department and HOAG MEMORIAL HOSPITAL PRESBYTERIAN • ir additional restrictions may be applied if traffic congestion problems arise. Compliance: See Sheet # C1.00 (Title Sheet), General Note #27 which addresses this requirement; also see enclosed information from the Supplementary Agreement between Hoag and its contractor (Exhibit "L", "Mitigation Monitoring Program") which requires this mitigation measure to be implemented by Hoag's contractor. 41. MM 92: Prior to the issuance of building permits, the Project Sponsor shall demonstrate that final design of the project shall provide for the incorporation of water -saving devices for project lavatories and other water -using facilities. The Project Sponsor will also comply with any other City adopted water conservation policies. Compliance: The Site Improvements component of the HVI project includes irrigation system which complies with the City's adopted water conservation policies. The water -saving devices are documented and the project's irrigation plans (see Sheets # L2.01 and # L2.02, the project's irrigation plans) and discussed in detail under Mitigation Measure 10, above. 42. MM 93: Prior to issuance of grading permits, the City of Newport Beach shall review individual development projects for consistency with master plan of water and sewer facilities. The Project Sponsor shall construct any modifications or facilities necessitated by the proposed project development. Compliance: The site improvements component of the HVI project does not contain any project components that could affect the Master Plan of Sewer for the City of Newport Beach. There will be no impact on the City's Master Plan of Sewer, and the impact to the City's Master Plan of Water will be insignificant, as the only relationship of the project to the City's water system is irrigation for the landscape associated with the project. The irrigation associated with the HVI site improvements project is anticipated to HOAG MEMORIAL HOSPITAL PRESBYTERIAN • • °Tx) be roughly between 25% and 40% below existing landscape water consumption. New landscape and irrigation improvements for the site improvements component of the HVI project (as shown on the Sheets # L2.01 and # L2.02, the project's irrigation plans, and Sheets # L3.11 and # L3.12, the project's planting plans) are within existing landscape areas, and also include a small percentage of new planting areas. Drought tolerant plant material and water efficient irrigation equipment provide a reduction in water consumption compared to existing landscape conditions. The new irrigation system is estimated to provide a reduction of water consumption between 10% and 25% below the City's Water Conservation Ordinance Maximum Annual Water Allowance (MAWA). 43.MM 6.13.1: During project construction, the contractor shall be required, to the extent practicable, to take concrete and asphalt from project demolition to an off -site recycling location to minimize impacts to existing landfills. The contractor shall provide the City of Newport Beach General Services Department verification of materials that have been recycled. Compliance: See Sheet # C1.00 (Title Sheet), Paving Note #3 which addresses this requirement; also see enclosed information from the Supplementary Agreement between Hoag and its contractor (Exhibit "L", "Mitigation Monitoring Program") which requires this mitigation measure to be implemented by Hoag's contractor. Please let me know if you have any comments or questions on Hoag Hospital's compliance with the mitigation measures identified above for the Upper Campus Heart and Vascular Institute project (site improvements component). I can be reached at (949) 764-4496. You can also contact Peri Muretta for assistance in answering questions. She can be reached at (949) 588-6090. HOAG MEMORIAL HOSPITAL PRESBYTERIAN how • ' • Sincerely, Cooks Senior Project Manager Enclosures: Heart and Vascular Institute Site Improvements Plans (89 sheets) C: Peri Muretta Bianca Pegues, Hoag Hospital Mike Petersen, Taylor and Associates HOAG MEMORIAL HOSPITAL PRESBYTERIAN • • • Hoag Memorial Hospital Presbyterian Heart and Vascular Institute Mitigation Measures Applicability Matrix Overall Applicability Approved by Planning Department: July 21, 2010 Project -Specific Breakdown Applicability Approved by Planning Department: December 6, 2010 (Update based on Facade Component Change to Internal OSHPD Submittal # 2) Mitigation Measure ' Overall Applicability ' Internal . OS IPD . Submittal # l : - Internal OSHHD Submittal # 2. -Site, Improvements AESTHETICS SC 3.5-1 — Lighting Plan X N/A N/A X SC 3.5-2 — Lighting Plan X N/A N/A X SC 3.5-3 — Photometric Study X N/A N/A X SC 3.5-4 — Lighting Plan Compliance X N/A N/A X MM 43 — Landscape and Irrigation Plan X N/A N/A X MM 45 — Screening of Mechanical Equip/Trash X X X N/A MM 46 — Clean Lower Campus Rooftops N/A N/A N/A N/A MM 48 — Approved LC View Impact Analysis N/A N/A N/A N/A AIR QUALITY AND HUMAN HEALTH RISK MM 36 — AQMP Permit Applications/Analysis N/A N/A N/A N/A MM 37 — Energy -Efficient Lighting X X X X MM 38 — Compliance with TDM Ordinance N/A N/A N/A N/A MM 82 — Compliance SCAQMD Rule 401 /402 X N/A N/A X MM 88 — Energy -Efficient Technology X X X X MM 89 — Minimize VOC Emissions X X X N/A MM 96 — Time Clocks/Occupant Sensors N/A N/A N/A N/A MM 97 — Energy Efficiency (Bldg Design) X X X N/A MM 98 — Efficient Appliances X X X N/A MM 99 — Solar Design/Solar Heating N/A N/A N/A N/A MM 106 — Compliance with Grading Ordinance X N/A N/A X • Hoag Presbyterian Memorial�fos ital p Heart and Vascular Institute Mitigation Measures Applicability Matrix Overall Applicability Approved by Planning Department: July 21, 2010 Project -Specific Breakdown Applicability Approved by Planning Department: December 6, 2010 (Update based on Facade Component Change to Internal OSHPD Submittal # 2), Cont. • ;'`: rX Mitigation Measure :Overall; k:, . , _ Internals Internal Site Applicability _ QSHPD OSPHI) Improvements 1-.. , ... " � . . , . 'Su ni ttal # .I :Submittal # 2 MM 110 — Low Emissions Construction Equip X X X X MM 3.3-1 — Compliance with SCAQMD Rule 403 X N/A N/A X MM 3.3-2 — Construction Equipment Emissions X N/A N/A X MM.3.3-3 — Paint Emissions X X X X CULTURAL RESOURCES MM 21— Archaeological Monitoring N/A N/A N/A N/A MM 22 — Paleontological Monitoring N/A N/A N/A N/A GEOLOGY AND SOILS MM 1— Compliance with Grading Ordinance X N/A N/A X MM 2 — Monitoring Cut Slopes N/A N/A N/A N/A MM 3 — Geotechnical Investigation X N/A N/A X MM 4 — Seismic Standards for Hospital Buildings X X X N/A MM 6 — Soils Corrosivity Report X N/A N/A X MM 7 — Construction Materials Compatibility X N/A N/A X MM 8 — Hazardous Corrosivity Determination X N/A N/A X MM 9 — Erosion Control Plan X N/A N/A X HAZARDS AND HAZARDOUS MATERIALS MM 49 — Hazardous Waste/Construction Activity X X X X MM 52 — Soil Gas Sampling/Monitoring Program N/A N/A N/A N/A MM 53 — Site Health and Safety Plan X N/A N/A X MM 54 — Additional Gas Collection Wells N/A N/A N/A N/A MM 55 — Monitoring Methane/Hydrogen Sulfide X N/A N/A X Page 2 • Hoag Memorial pital Presbyterian Heart and Vascular Institute Mitigation Measures Applicability Matrix Overall Applicability Approved by Planning Department: July 21, 2010 Project -Specific Breakdown Applicability Approved by Planning Department: December 6, 2010 (Update based on Facade Component Change to Internal OSHPD Submittal # 2), Cont. • - Mitigation,Measure ' Overall .. , Internal Internal Site Applicability OSHPD OSPHD Improvements Subniittaf # L -Submittal # 2 MM 56 — Hazardous Constituents Study X N/A N/A X MM 59 — Flare System Evaluation with New Wells N/A N/A N/A N/A MM 62 — NOI and SWPPP X N/A N/A X MM 63 — Soils Samples/Priority Pollutants X N/A N/A X MM 64 — Evaluation of Existing Vent Systems N/A N/A N/A N/A MM 66 — Hydrogen Sulfide Monitor in Buildings N/A N/A N/A N/A MM 68 — Bldg Protection from Gas Accumulation N/A N/A N/A N/A MM 69 — Gas Borings Locations Under Buildings N/A N/A N/A N/A MM 70 — Passive Gas Collection System N/A N/A N/A N/A MM 71 — Sealing Bldgs from Gas Migration N/A N/A N/A N/A MM 72 — Equip Buildings with Gas Sensors N/A N/A N/A N/A MM 73 — Gas Accumulation in Svc/Storage Rooms N/A N/A N/A N/A MM 74 — Methane Monitoring X N/A N/A X MM 83 — HazMat/Infect Control Plans Amend X X X N/A MM 84— Comply New Hazardous/Infectious Regs N/A N/A N/A N/A MM 85 — Expanded Hazardous Disposal Facilities X X X N/A MM 86 — AQMD Permits for Regulated Equip N/A N/A N/A N/A MM 100 — Disposal of Export N/A N/A N/A N/A MM 122 — Comply with Safety Regulations N/A N/A N/A N/A HYDROLOGY AND WATER QUALITY MM 9 — Construction Erosion Control Plan X N/A N/A X MM 10 — Landscape Plan/Maintenance Program X N/A N/A X Page 3 • Hoag Memorialeital Presbyterian Heart and Vascular Institute Mitigation Measures Applicability Matrix Overall Applicability Approved by Planning Department: July 21, 2010 Project -Specific Breakdown Applicability Approved by Planning Department: December 6, 2010 (Update based on Facade Component Change to Internal OSHPD Submittal # 2), Cont. • Mitigation Measure Overall .. Applicability • Internal _ OSHPD Internal OSPHD Site , Improvements Submittal # I Submittal # 2 MM 11 — Cleaning Parking Lots/Structures N/A N/A N/A N/A MM 12 — Hydrology Analysis X N/A N/A X MM 13 — Construction Dewatering/Subdrains N/A N/A N/A N/A MM 14 — Compliance with NPDES Construction X N/A N/A X MM 15 — Comply with HazMat/Infectious Control N/A N/A N/A N/A LAND USE AND PLANNING PROGRAMS MM 24 — Comply with GP, ZC, LCP, PC X X X X MM 118 — OSHPD Letter City Regs Compliance X X X N/A NOISE PDF 3.4-1 — Install VB Window Upgrades N/A N/A N/A N/A PDF 3.4-2 — Construct W Hoag Drive Sound Wall N/A N/A N/A N/A SC 3.4-1 — Comply with City Noise Ordinance X X X X MM 42 — Letter to Emergency Vehicle Companies N/A N/A N/A N/A MM 111 — Construction Equipment Noise X N/A N/A X MM 117 — Heliport/Helipad Utilization N/A N/A N/A N/A MM 119 — Non -Vehicular Noise Generation N/A N/A N/A N/A MM 3.4-1 — Vibration and Demo/Construction N/A N/A N/A N/A MM 3.4-2 — HVAC Ancillary and W Tower Equip N/A N/A N/A N/A MM 3.4-3 — HVAC Acoustical Study X X X N/A MM 3.4-4 — Loading Dock Deliveries N/A N/A N/A N/A MM 3.4-5 — Install Loading Dock Sound Panels N/A N/A N/A N/A MM 3.4-6 — Loading Dock Trash Compactor N/A N/A N/A N/A Page 4 • Hoag Memorialipital Presbyterian Heart and Vascular Institute Mitigation Measures Applicability Matrix Overall Applicability Approved by Planning Department: July 21, 2010 Project -Specific Breakdown Applicability Approved by Planning Department: December 6, 2010 (Update based on Facade Component Change to Internal OSHPD Submittal # 2), Cont. • Mitigation Measure' Overall Applicability Internal- , OSIHPD� : - Internal OSPHD: Site Improvements Submits ;# 1 Submittal # 2 MM 3.4-7 — Posting "No Idling" Signs N/A N/A N/A N/A MM 3.4-8 — Grease Trap Cleaning Hours N/A N/A N/A N/A MM 3.4-9 — Cogen Cooling Tower Noise Monitor N/A N/A N/A N/A MM 3.4-10 — Acoustical Study for Patio Use N/A N/A N/A N/A MM 3.4-11— 65 CNEL Contour Acoustical Study N/A N/A N/A N/A PUBLIC SERVICES MM 91 — Emergency Fire Access X N/A N/A X MM 94 — Fire Suppression Systems X X X N/A TRANSPORTATION AND CIRCULATION MM 25 — TPO Analysis N/A N/A N/A N/A MM 27 — Trip Generation Analysis N/A N/A N/A N/A MM 28 — AQMD Trip Reduction Measures N/A N/A N/A N/A MM 29 — TDM Ordinance Compliance N/A N/A N/A N/A MM 30 — Bus Turnouts N/A N/A N/A N/A MM 32 — Parking Generation Rates Study X N/A N/A X MM 33 — Internal Circulation Plan X N/A N/A X MM 34 — Intersection Improvements and TPO N/A N/A N/A N/A MM 35 — Rideshare Info to Employees N/A N/A N/A N/A MM 38 — TDM Ordinance Compliance N/A N/A N/A N/A MM 91 — Emergency Fire Access X N/A N/A X MM 95 — Fire Lanes and Access Roads X N/A N/A X MM 101 — Construction Phasing/Traffic Control X N/A N/A X Page 5 • Hoag Memoria ospital Presbyterian Heart and Vascular Institute Mitigation Measures Applicability Matrix Overall Applicability Approved by Planning Department: July 21, 2010 Project -Specific Breakdown Applicability Approved by Planning Department: December 6, 2010 (Update based on Facade Component Change to Internal OSHPD Submittal # 2), Cont. • Il'1Eitigatibn iV. eastirc} ' ... Q erall " .. Applicability - ;internal = = ..- `OS PD =; e ....•# I Internal Site Improvements OSPIID Submittai.# 2 MM 102 — Import/Export Haul Routes X N/A N/A X MM 103 — Notice of Temporary Traffic Disruption X N/A N/A X MM 104 — Construction Trips During Summer X N/A N/A X MM 108 — Trip Reduction Plan N/A N/A N/A N/A UTILITIES AND SERVICE SYSTEMS MM 92 — Water -saving Devices X X X X MM 93 — Master Plan of Water/Sewer Facilities X N/A N/A X MM 6.13.1— Recycle Concrete/Asphalt X N/A N/A X Page 6 • Hoag Hospital Project: Heart and Vascular Institute Projects Mitigation Measure: SC 3.5-1 Lighting shall be in compliance with applicable standards of the Zoning Code. Exterior on -site lighting shall be. shielded and confined within site boundaries. No direct rays or glare are permitted to shine onto public streets or adjacent sites or create a public nuisance. "Walpak" type fixtures are not permitted. Parking area lighting shall have zero cut-off fixtures and light standards shall not exceed 30 feet in height. Standard for Compliance: Shown on approved site lighting plan. Method of Verification: Plan check; provision of approved lighting plan. Timing of Verification: Prior to issuance of a grading or building permit; subsequent field check. Responsible Party(ies): Applicant; Planning Director or designated representative. Verification Date: City of Newport Beach Verification Approved on: Via$1 I� Approved by: F� Signature: ffAI)9)j Pc 1s.'qzO12. flf.„oost:-.0ew1 Hoag Hospital Project: Heart and Vascular Institute Projects Mitigation Measure: SC 3.5-2 The site shall not be excessively illuminated based on the luminance recommendations of the Illuminating Engineering Society of North America, or, if in the opinion of the Planning Director, the illumination creates an unacceptable negative impact on surrounding land uses or environmental resources. The Planning Director may order the dimming of light sources or other remediation upon finding that the site is excessively illuminated. Standard for Compliance: Shown on approved site lighting plan. Method of Verification: Plan check; provision of approved lighting plan; subsequent field check. Timing of Verification: Prior to issuance of a grading or building permit. Responsible Party(ies): Applicant; Planning Director or designated representative. Verification Date: City of Newport Beach Verification Approved on: Approved by: Signature: • • g12* F.. 0.5-X c� I'I aoi2, • • • Hoag Hospital Project: Heart and Vascular Institute Projects Mitigation Measure: SC 3.5-3 Prior to the issuance of a building permit, the applicant shall prepare photometric study in conjunction with a final lighting plan for approval by the Planning Department. Standard for Compliance: Approval of photometric study in conjunction with a final lighting plan. Method of Verification: Plan check; provision of approved lighting plan. Timing of Verification: Prior to issuance of a building permit. Responsible Party(ies): Applicant; Planning Director or designated representative. Verification Date: City of Newport Beach Verification Approved on: 4f23I 1 ( Approved by: Signature: F �� • • • Hoag Hospital Project: Heart and Vascular Institute Projects Mitigation Measure: SC 3.5-4 shall Prior to issuance of the certificate of occupancy or final building permits, the applicant sc hedule an evening inspection by the Code and Water Quality Enforcement Division to confirm control of light and glare. Standard for Compliance: Method of Verification: Timing of Verification: Responsible Party(ies): Compliance with lighting plan. Nighttime field inspection. Prior to issuance of the certificate of occupancy or final building permits. Applicant; Code and Water Quality Enforcement Division; Planning Director or designated representative. Verification Date: City of Newport Beach Verification Q123I11 Approved on: Approved by: Signature: • • • Hoag Hospital Project: Heart and Vascular Institute Projects Mitigation Measure: 43 Prior to issuance of grading permits, the Project Sponsor shall ensure that a landscape and irrigation plan is prepared for each building/improvement within the overall Master Plan. This plan shall be prepared by a licensed landscape architect. The landscape plan shall integrate and phase the installation of landscaping with the proposed construction schedule. The plan shall be subject to review by the General Services Department and approval by the Planning Department and Public Works Department. Standard for Compliance: Approval of landscape and irrigation plan. Method of Verification: Plan check. Timing of Verification: Prior to issuance of grading permits. Responsible Party(ies): Applicant; Licensed Landscape Architect; General Services Department; Planning Director or designated representative; Public Works Department. Verification Date: City of Newport Beach Verification Approved on: oi, do jlk Approved by: O 1e'`r I Signature: o • • Hoag Hospital Project: Heart and Vascular Institute Projects Mitigation Measure: 43 Prior to issuance of grading permits, the Project Sponsor shall ensure that a landscape and irrigation plan is prepared for each building/improvement within the overall Master Plan. This plan shall be prepared by a licensed landscape architect. The landscape plan shall integrate and phase the installation of landscaping with the proposed construction schedule. The plan shall be subject to review by the General Services Department and approval by the Planning Department and Public Works Department. Standard for Compliance: Approval of landscape and irrigation plan. Method of Verification: Plan check. Timing of Verification: Prior to issuance of grading permits. Responsible Party(ies): Applicant; Licensed Landscape Architect; General Services Department; Planning Director or designated representative; Public Works Department. Verification Date: City of Newport Beach Verification Approved on: 101lg) If Approved by: F. tit Signature: Hoag Hospital Project: Heart and Vascular Institute Projects • • • Mitigation Measure: 37 Prior to the issuance of grading and building permits for each phase of development, the project proponent shall provide evidence for verification by the Planning Department that energy efficient lighting has been incorporated into the project design. Standard for Compliance: Shown on approved building plans. Method of Verification: Plan check. Timing of Verification: Prior to issuance of grading and building permits for each phase of development or prior to City approval of a project subject to OSHPD approval. Responsible Party(ies): Applicant; Planning Director or designated representative. Verification Date: City of Newport Beach Verification Approved on: g(23111 Approved by: 7r Signature: Approved on: Approved by: Signature: • • Hoag Hospital Project: Heart and Vascular Institute Projects Mitigation Measure: 82 Before the issuance of building permits, the Project Sponsor shall submit plans to the Building Department, City of Newport Beach demonstrating compliance with all applicable District Rules, including Rule 401, Visible Emissions, and Rule 402, Public Nuisance. Standard for Compliance: Shown on approved building plans, documented in contractor/subcontractor supplemental general conditions. Method of Verification: Plan check for permits issued by the City; verification of compliance for permits issued by OSHPD. Timing of Verification: Prior to issuance of building permits. Responsible Party(ies): Verification Date: Applicant; Building Director or designated representative; Planning Director or designated representative. City of Newport Beach Verification gizIll • • HOAG MEMORIAL HOSPITAL PRESBYTERIAN SUPPLEMENTARY AGREEMENT BETWEEN OWNER AND CONTRACTOR JULY 2009 EDITION The following terms and conditions are supplementary to the Master Services Agreement Between Owner and Contractor, dated , (July 2009 Edition) (hereinafter the "Master Agreement"), the General Conditions of the Master Services Agreement (hereinafter the "General Conditions") (collectively the "Base Agreement"). Upon receipt of a written authorization, the conditions and exhibits described below will modify the Master Agreement for the scope and extent of the project identified below only. It is agreed that the terms and conditions set forth in the Master Agreement are a part of this document and are in full force and effect as if incorporated herein, except as modified. Where inconsistencies exist between the Master Agreement and the authorized Supplementary Agreement, the conditions and exhibits included in the Supplementary Agreement shall govern. Date: , 2011 Hoag Project Number: 125925 Hoag Project Name: Heart and Vascular Institute Owner: Hoag Memorial Hospital Presbyterian 500 Superior Ave., Suite 300 Newport Beach, California 92663 Mail/Federal Express Address: Hoag Memorial Hospital Presbyterian Real Estate, Facilities, Construction and Operations (REFCO) 500 Superior Avenue, Suite 300 Newport Beach, CA 92663 Contractor: Contractor Company Name Street Address And Suite City, State Zip The Architect: Architect Name Or N/A Street Address And Suite (Or N/A) City, State Zip (Or N/A) Owner's Representative: Cary Brooks, Senior Project Manager Real Estate, Facilities, Construction and Operations (REFCO) Hoag Memorial Hospital Presbyterian 500 Superior Avenue, Suite 300, Newport Beach, California 92663 Architect's Project No.: Architect project number or N/A • • Contractor Supplementary Agreement Data Entry Fields The following information is required in order to complete this form: 1. Date of Master Agreement 2. Date of This Agreement 3. Hoag Project Name 4. Hoag Project Number 5. Contractor Company Name 6. Contractor Address 7. Architect Name 8. Architect Address 9. Hoag Project Manager Name . 10. Architect Project Number 11. Short Scope of Work (text) 12. Construction Start Date 13. Date of Substantial Completion 14. Construction Duration (Days) 15. Liquidated Damages Amount / Day I have chosen a daily rate of based on the following: 16. Be prepared to choose correct statement in Section 3.2. Section 3.2 - The Contractor acknowledges that a sufficient amount OR hal provided a sufficient amount of time in the schedule OR Article 3.1 attached hereto to complete all phases of the Work, including without limitation, city building and safety inspection and all other agency inspections within the Contract Time fixed in this article and agrees to pay liquidated damages fixed in this article. • • Contractor Supplementary Agreement Data Entry Fields (cont.) 17. Contract Amount 18. Contractor Authorized Signature Name 19. Contractor Authorized Signature Title 20. Contractor License Number 21. Exhibit A — Scope of Work / Drawing Sheet and Specification Index (Optional Attachment) 22. Exhibit B — Schedule of Services / Fee Worksheet (Optional Attachment) 23. Exhibit C — Addenda (Optional Attachment) 24. Exhibit D — Schedule of Values (Optional Attachment) 25. Exhibit E — Preliminary Construction Schedule (Optional Attachment) 26. Exhibit G — Extended Field Overhead Rates (Optional Attachment 27. Exhibit H — Contractors' Assumptions, Exclusions and Clarifications (Optional Attachment) 28. Exhibit L — Mitigation Monitoring Program 29. Exhibit M — Schedule of Key Personnel (Optional Attachment) 30. Exhibit 0 — Scope of Potential Pre -Construction Phase Services (Optional Attachment) 31. Exhibit P — Statutory Waiver & Release 32. Exhibit R — List of Alternates (Optional Attachment) 33. Exhibit S — Subcontractor List / Project Team List 34. Exhibit T — Construction Schedule 35. Exhibit V — Unit Prices and Wage Rates • • • EXHIBIT L MITIGATION MONITORING PROGRAM The Final Supplemental Environmental Impact Report (FSEIR) for the Hoag Memorial Hospital Presbyterian Master Plan Update (SCH # 1991071003) was certified by the City of Newport Beach City Council on April 17, 2008 (via Resolution No. 2008-27). Included as part of that certified FSEIR were mitigation measures identified to minimize or eliminate potential environmental impacts associated with implementation of the Hoag Memorial Hospital Presbyterian Master Plan Update. The text of each of the Hoag Memorial Hospital Presbyterian Master Plan Update mitigation measures is included herein as Exhibit L. The entire FSEIR is available for review at the offices of Hoag REFCO, located at 500 Superior Avenue, Suite 300, Newport Beach. • Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report (SCH # 1991071003) Certified by City of Newport Beach City Council Resolution No. 2008-27 (Adopted April 17, 2008) MITIGATION MEASURES • • • • Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. AESTHETICS Mitigation Measure SC 3.5-1: Lighting shall be in compliance with applicable standards of the Zoning Code. Exterior on -site lighting shall be shielded and confined within site boundaries. No direct rays or glare are permitted to shine onto public streets or adjacent sites or create a public nuisance. "Walpak" type fixtures are not permitted. Parking area lighting shall have zero cut-off fixtures and light standards shall not exceed 30 feet in height. Mitigation Measure SC 3.5-2: The site shall not be excessively illuminated based on the luminance recommendations of the Illuminating Engineering Society of North America, or, if in the opinion of the Planning Director, the illumination creates an unacceptable negative impact on surrounding land uses or environmental resources. The Planning Director may order the dimming of light sources or other remediation upon finding that the site is excessively illuminated. Mitigation Measure SC 3.5-3: Prior to the issuance of a building permit, the applicant shall prepare photometric study in conjunction with a final lighting plan for approval by the Planning Department. Mitigation Measure SC 3.5-4: Prior to issuance of the certificate of occupancy or final building permits, the applicant shall schedule an evening inspection by the Code and Water Quality Enforcement Division to confirm control of light and glare. Mitigation Measure 43: Prior to issuance of grading permits, the Project Sponsor shall ensure that a landscape and irrigation plan is prepared for each building/improvement within the overall Master Plan. This plan shall be prepared by a licensed landscape architect. The landscape plan shall integrate and phase the installation of landscaping with the proposed construction schedule. The plan shall be subject to review by the General Services Department and approval by the Planning Department and Public Works Department. Mitigation Measure 45: Prior to issuance of a building permit, the Project Sponsor shall submit plans to the City Planning Department which illustrate that all mechanical equipment and trash areas will be screened from public streets, alleys and adjoining properties. Mitigation Measure 46: Prior to issuance of building permits, the Project Sponsor shall submit plans which illustrate that major mechanical equipment will not be located on the rooftop of any structure on the Lower Campus. Rather, such buildings will have clean rooftops. Minor rooftop equipment necessary for operating purposes will comply with all building height criteria, and shall be concealed and screened to blend into the building roof using materials compatible with building materials. Mitigation Measure 48: Prior to issuance of a building permit for any Lower Campus structure, the Project Sponsor shall prepare a study of each proposed building project to assure conformance with the EIR view impact analysis and the PCDP and District Regulations, to ensure that the visual impacts identified in the EIR are consistent with actual Master Plan development. This analysis shall be submitted to and approved by the City Planning Department. Page 2 • • Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. AIR QUALITY AND HUMAN HEALTH RISK Mitigation Measure 36: Prior to the issuance of grading permits for each phase of development, the Project Sponsor shall provide evidence for verification by the Planning Department that the necessary permits have been obtained from the SCAQMD for regulated commercial equipment incorporated within each phase. An air quality analysis shall be conducted prior to each phase of development for the proposed mechanical equipment contained within that phase that identifies additional criteria pollutant emissions generated by the mechanical equipment to be installed in the phase. Mitigation Measure 37: Prior to the issuance of grading and building permits for each phase of development, the project proponent shall provide evidence for verification by the Planning Department that energy efficient lighting has been incorporated into the project design. Mitigation Measure 38: Prior to the issuance of grading and building permits for each phase of Master Plan development, the Project Sponsor shall provide evidence that site plans incorporate the site development requirements of Ordinance No. 91-16, as appropriate, to the Traffic Engineering Division and Planning Department for review and Planning Commission approval. Requirements outlined in the Ordinance include: a. A minimum of five percent of the provided parking at new facilities shall be reserved for carpools. These parking spaces shall be located near the employee entrance or at other preferred locations. b. A minimum of two bicycle lockers per 100 employees shall be provided. Additional lockers shall be provided at such time as demands warrants. c. A minimum of one shower and two lockers shall be provided. d. Information of transportation alternatives shall be provided to all employees. e. A rideshare vehicle loading area shall be designated in the parking area. f. The design of all parking facilities shall incorporate provisions for access and parking of vanpool vehicles. Bus stop improvements shall be coordinated with the Orange County Transportation Authority, consistent with the requirements of Mitigation Measure 30. The exact number of each of the above facilities within each phase of the Master Plan shall be determined by the City during review of grading and building permit applications for each phase. The types and numbers of facilities required of each phase will reflect the content of the Ordinance at the time that a permit application is deemed complete by the Planning Department. Mitigation Measure 82: Before the issuance of building permits, the Project Sponsor shall submit plans to the Building Department, City of Newport Beach demonstrating compliance with all applicable District Rules, including Rule 401, Visible Emissions, and Rule 402, Public Nuisance. g• Mitigation Measure 88: The Project Sponsor shall submit plans to the City Building Department prior to the issuance of a building permit for each phase of development, verifying Page 3 • • Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. that energy efficiency will be achieved by incorporating appropriate technologies and systems into future structures, which may include: • High efficiency cooling/absorption units • Thermal storage and ceramic cooling towers • Cogeneration capabilities • High efficiency water heaters • Energy efficient glazing systems • Appropriate off -hour heating/cooling/lighting controls • Time clocks and photovoltaic cells for lighting controls • Efficient insulation systems • Light colored roof and building exteriors • PL lighting and fluorescent lighting systems • Motion detector lighting controls • Natural interior lighting —skylights, clerestories • Solar orientation, earth berming and landscaping Mitigation Measure 89: The Project Sponsor shall demonstrate to the City Building Department that methods and materials which minimize VOC emissions have been employed where practical, available and where value engineering allows it to be feasible. Mitigation Measure 96: Prior to issuance of a building permit, the Project Sponsor shall demonstrate to the City that the thermal integrity of new buildings is improved with automated time clocks or occupant sensors to reduce the thermal load. Mitigation Measure 97: Prior to issuance of a building permit, the Project Sponsor shall demonstrate to the City that window glazing, wall insulation, and efficient ventilation methods have been incorporated into building designs. Mitigation Measure 98: Prior to issuance of a building permit, the Project Sponsor shall demonstrate that building designs incorporate efficient heating units and other appliances, such as water heater, cooking equipment, refrigerators, furnaces and boiler units. Mitigation Measure 99: Prior to issuance of a building permit, the Project Sponsor shall incorporate into building designs, where feasible, passive solar designs and solar heaters. Mitigation Measure 106: Project Sponsor shall ensure that all project related grading shall be performed in accordance with the City of Newport Beach Grading Ordinance, which contains procedures and requirements relative to dust control, erosion and siltation control, noise, and other grading related activities. Page 4 • • • Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. Mitigation Measure 110: The Project Sponsor shall ensure that low emission mobile and stationary equipment is utilized during construction, and low sulfur fuel is utilized in stationary equipment, when available. Evidence of this fact shall be provided to the City of Newport Beach prior to issuance of any grading or building permit. Mitigation Measure 3.3-1: During construction of the Project, the Applicant and its Contractors shall be required to comply with regional rules established by the South Coast Air Quality Management District (SCAQMD), which assist in reducing short-term air pollutant emissions. The SCAQMD's Rule 403 requires that fugitive dust be controlled with best available control measures so that the presence of such dust does not remain visible in the atmosphere beyond the property line of the emission source. Two options are presented in Rule 403: monitoring of particulate concentrations or active control. Monitoring involves a sampling network around the project with no additional control measures unless specified concentrations are exceeded. The active control option does not require any monitoring, but requires that a list of measures be implemented starting with the first day of construction. Rule 403 requires that "No person shall conduct active operations without utilizing the best available control measures included in Table 1 of this Rule to minimize fugitive dust emissions from each fugitive dust source type within the active operation." The measures from Table 1 of Rule 403 are presented in this SEIR as Table A. It is required that all applicable and feasible measures in Table A are implemented. At this time, specific construction projects are not specified so it is unknown which measures will be applicable. All applicable and feasible control measures for each source category used during construction shall be implemented. Prior to permit issuance, the Applicant shall submit a list of applicable measures that will be implemented along with a list of inapplicable measures that will not be implemented for the specific construction project. Rule 403 requires that "Large Projects" implement additional measures. A Large Project is defined as "any active operations on property which contains 50 or more acres of disturbed surface area, or any earthmoving operation with a daily earthmoving or throughput volume of 5,000 cubic yards for more than three times during the most recent 365 day period." Grading of the project is not considered a Large Project under Rule 403. However, the project shall implement all applicable and feasible measures specified in Table 2 (presented in this SEIR as Table B) to the greatest extent possible. This results in a higher reduction of fugitive dust emissions than would be achieved through complying solely with Table A. At this time, specific construction projects are not specified so it is unknown which measures will be feasible. Prior to permit issuance, the Applicant shall submit a list of applicable measures that will be implemented for the specific construction project along with justification for the infeasibility finding. Rule 403 also requires that the construction activities "shall not cause or allow PM10 levels to exceed 50 micrograms per cubic meter when determined by simultaneous sampling, as the difference between upwind and downwind sample." Projects that cannot meet this performance standard are required to implement the applicable actions specified in Table 3 of Rule 403 (presented in this SEIR as Table C). Rule 403 requires that that the project shall not "allow track -out to extend 25 feet or more in cumulative length from the point of origin from an active operation." All track -out from an active Page 5 • • Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. operation is required to be removed at the conclusion of each workday or evening shift. Any active operation with a disturbed surface area of five or more acres or with a daily import or export of 100 cubic yards or more of bulk materials must use at least one of the measures listed in Table D at each vehicle egress from the site to a paved public road. TABLE A REQUIRED BEST AVAILABLE CONTROL MEASURES (RULE 403 TABLE 1) Source Category Control. Measure ... Guidance Backfilling 01-1 Stabilize backfill material when not actively handling; and 01-2 Stabilize backfill material during handling; and 01-3 Stabilize soil at completion of activity. • • • • Mix backfill soil with water prior to moving Dedicate water truck or high capacity hose to backfilling equipment Empty loader bucket slowly so that no dust plumes are generated Minimize drop height from loader bucket Clearing and Grubbing 02-1 Maintain stability of soil through pre -watering of site prior to clearing and grubbing; and 02-2 Stabilize soil during clearing and grubbing activities; and 02-3 Stabilize soil immediately after clearing and grubbing activities. • • Maintain live perennial vegetation where possible Apply water in sufficient quantity to prevent generation of dust plumes Clearing Forms 03-1 Use water spray to clear forms; or 03-2 Use sweeping and water spray to clear forms; or 03-3 Use vacuum system to clear forms. • Use of high pressure air to clear forms may cause exceedance of Rule requirements Crushing 04-1 Stabilize surface soils prior to operation of support equipment; and 04-2 Stabilize material after crushing. • • • • Follow permit conditions for crushing equipment Pre -water material prior to loading into crusher Monitor crusher emissions opacity Apply water to crushed material to prevent dust plumes Cut and Fill 05-1 Pre -water soils prior to cut and fill activities; and 05-2 Stabilize soil during and after cut and fill activities. • • For large sites, pre -water with sprinklers or water trucks and allow time for penetration Use water trucks/pulls to water soils to depth of cut prior to subsequent cuts Demolition — Mechanical/Manual 06-1 Stabilize wind erodible surfaces to reduce dust; and 06-2 Stabilize surface soil where support equipment and vehicles will operate; and 06-3 Stabilize loose soil and demolition debris; and 06-4 Comply with AQMD Rule 403. • Apply water in sufficient quantities to prevent the generation of visible dust plumes • Disturbed Soil Page 6 • • Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. Source Category, Control Measure Guidance 07-1 Stabilize disturbed soil throughout the construction site; and 07-2 Stabilize disturbed soil between structures • • Limit vehicular traffic and disturbances on soils where possible If interior block walls are planned, install as early as possible Apply water or a stabilizing agent in sufficient quantities to prevent the generation of visible dust plumes Earth -Moving Activities 08-1 Pre -apply water to depth of proposed cuts; and 08-2 Re -apply water as necessary to maintain soils in a damp condition and to ensure that visible emissions do not exceed 100 feet in any direction; and 08-3 Stabilize soils once earth -moving activities are complete. • • . Grade each project phase separately, timed to coincide with construction phase Upwind fencing can prevent material movement on site Apply water or a stabilizing agent in sufficient quantities to prevent the generation of visible dust plumes Importing/Exporting of Bulk Materials 09-1 Stabilize material while loading to reduce fugitive dust emissions; and 09-2 Maintain at least six inches of freeboard on haul vehicles; and 09-3 Stabilize material while transporting to reduce fugitive dust emissions; and 09-4 Stabilize material while unloading to reduce fugitive dust emissions; and 09-5 Comply with Vehicle Code Section 23114. • • • • Use tarps or other suitable enclosures on haul trucks Check belly -dump truck seals regularly and remove any trapped rocks to prevent spillage Comply with track -out prevention/mitigation requirements Provide water while loading and unloading to reduce visible dust plumes Landscaping 10-1 Stabilize soils, materials, slopes • • • • Apply water to materials to stabilize and maintain materials in a crusted condition Maintain effective cover over materials Stabilize sloping surfaces using soil binders until vegetation or ground cover can effectively stabilize the slopes Hydroseed prior to rain season Road Shoulder Maintenance 11-1 Apply water to unpaved shoulders prior to clearing; and 11-2 Apply chemical dust suppressants and/or washed gravel to maintain a stabilized surface after completing road shoulder maintenance. • • Installation of curbing and/or paving of road shoulders can reduce recurring maintenance costs Use of chemical dust suppressants can inhibit vegetation growth and reduce future road shoulder maintenance costs Screening 12-1 Pre -water material prior to screening; and 12-2 Limit fugitive dust emissions to opacity and plume length standards; and 12-3 Stabilize material immediately after screening. • • • Dedicate water truck or high capacity hose to screening operation Drop material through the screen slowly and minimize drop height Install wind barrier with a porosity of no more than 50% upwind of screen to the height of the drop point Staging Areas 13-1 Stabilize staging areas during use; and 13-2 Stabilize staging area soils at project • • Limit size of staging area Limit vehicle speeds to 15 miles per hour Page 7 • • • Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. Source'Category -, Contra! , Measure Guidance completion. • Limit number and size of staging area entrances/exists Stockpiles! Bulk Material Handling 14-1 Stabilize stockpiled materials. 14-2 Stockpiles within 100 yards of off -site occupied buildings must not be greater than eight feet in height; or must have a road bladed to the top to allow water truck access or must have an operational water irrigation system that is capable of complete stockpile coverage. • Add or remove material from the downwind portion of the storage pile • Maintain storage piles to avoid steep sides or faces Traffic Areas for Construction Activities 15-1 Stabilize all off -road traffic and parking areas; and 15-2 Stabilize all haul routes; and 15-3 Direct construction traffic over established haul routes. • Apply gravel/paving to all haul routes as soon as possible to all future roadway areas • Barriers can be used to ensure vehicles are only used on established parking areas/haul routes Trenching 16-1 Stabilize surface soils where trencher or excavator and support equipment will operate; and 16.2 Stabilize soils at the completion of trenching activities. • Pre -watering of soils prior to trenching is an effective preventive measure. • For deep trenching activities, pre -trench to 18 inches, soak soils via the pre -trench, and resume trenching • Washing mud and soils from equipment at the conclusion of trenching activities can prevent crusting and drying of soil on equipment Truck Loading 17-1 Pre -water material prior to loading; and 17.2 Ensure that freeboard exceeds six inches (CVC 23114) • Empty loader bucket such that no visible dust plumes are created • Ensure that the loader bucket is close to the truck to minimize drop height while loading Turf Overseeding 18-1 Apply sufficient water immediately prior to conducting turf vacuuming activities to meet opacity and plume length standards; and 18-2 Cover haul vehicles prior to exiting the site. • Haul waste material immediately off -site Unpaved Roads/Parking Lots 19-1 Stabilize soils to meet the applicable performance standards; and 19-2 Limit vehicular travel to established unpaved roads (haul routes) and unpaved parking lots. • Restricting vehicular access to established unpaved travel paths and parking lots can reduce stabilization requirements Vacant Land Page 8 • • Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. Source Category Control Measure Guidance 20-1 In instances where vacant lots are 0.10 acre or larger and have a cumulative area of 500 square feet or more that are driven over and/or used by motor vehicles and/or off - road vehicles, prevent motor vehicle and/or off -road vehicle trespassing, parking and/or access by installing barriers, curbs, fences, gates, posts, signs, shrubs, trees or other effective control measures. Source: SCAQMD. TABLE B . DUST CONTROL MEASURES FOR LARGE OPERATIONS (RULE 403 TABLE 2) Fugitive Dust Source Category ' . -Control Actions Earth -moving (except construction cutting and filling areas, and mining operations) (1a) Maintain soil moisture content at a minimum of 12 percent, as determined by ASTM method D2216, or other equivalent method approved by the Executive Officer, the California Air Resources Board, and the U.S. EPA. Two soil moisture evaluations must be conducted during the first three hours of active operations during a calendar day, and two such evaluations each subsequent four-hour period of active operations; OR (1a-1) For any earth -moving which is more than 100 feet from all property lines, conduct watering as necessary to prevent visible dust emissions from exceeding 100 feet in length in any direction. Earth -moving: Construction fill areas: (1b) Maintain soil moisture content at a minimum of 12 percent, as determined by ASTM method D2216, or other equivalent method approved by the Executive Officer, the California Air Resources Board, and the U.S. EPA. For areas which have an optimum moisture content for compaction of less than 12 percent, as determined by ASTM Method 1557 or other equivalent method approved by the Executive Officer and the California Air Resources Board and the U.S. EPA, complete the compaction process as expeditiously as possible after achieving at least 70 percent of the optimum soil moisture content. Two soil moisture evaluations must be conducted during the first three hours of active operations during a calendar day, and two such evaluations during each subsequent four-hour period of active operations. Earth -moving: Construction cut areas and mining operations: (1c) Conduct watering as necessary to prevent visible emissions from extending more than 100 feet beyond the active cut or mining area unless the area is inaccessible to watering vehicles due to slope conditions or other safety factors. Disturbed surface areas (except completed grading areas) (2a/b) Apply dust suppression in sufficient quantity and frequency to maintain a stabilized surface. Any areas which cannot be stabilized, as evidenced by wind driven fugitive dust must have an application of water at least twice per day to at least 80 percent of the unstabilized area. Disturbed surface areas: Completed grading areas (2c) Apply chemical stabilizers within five working days of grading completion; OR (2d) Take actions (3a) or (3c) specified for inactive disturbed surface areas. Inactive disturbed surface areas (3a) Apply water to at least 80 percent of all inactive disturbed surface areas on a daily basis when there is Page 9 Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. 'Fugitive Dust Source Category Control Actions evidence of wind driven fugitive dust, excluding any areas which are inaccessible to watering vehicles due to excessive slope or other safety conditions; OR (3b) Apply dust suppressants in sufficient quantity and frequency to maintain a stabilized surface; OR (3c) Establish a vegetative ground cover within 21 days after active operations have ceased. Ground cover must be of sufficient density to expose less than 30 percent of unstabilized ground within 90 days of planting, and at all times thereafter; OR (3d) Utilize any combination of control actions (3a), (3b), and (3c) such that, in total, these actions apply to all inactive disturbed surface areas. Unpaved Roads (4a) Water all roads used for any vehicular traffic at least once per every two hours of active operations [3 times per normal 8 hour work day]; OR (4b) Water all roads used for any vehicular traffic once daily and restrict vehicle speeds to 15 miles per hour; OR (4c) Apply a chemical stabilizer to all unpaved road surfaces in sufficient quantity and frequency to maintain a stabilized surface. Open storage piles (5a) Apply chemical stabilizers; OR (5b) Apply water to at least 80 percent of the surface area of all open storage piles on a daily basis when there is evidence of wind driven fugitive dust; OR (5c) Install temporary coverings; OR (5d) Install a three -sided enclosure with walls with no more than 50 percent porosity which extend, at a minimum, to the top of the pile. This option may only be used at aggregate -related plants or at cement manufacturing facilities. All Categories (6a) Any other control measures approved by the Executive Officer and the U.S. EPA as equivalent to the methods specified in Table 2 may be used. TABLE C CONTINGENCY CONTROL MEASURES FOR LARGE OPERATIONS (RULE 403 TABLE 3) Fugitive Dust Source Category Control Actions Earth -moving (IA) Cease all active operations; OR (2A) Apply water to soil not more than 15 minutes prior to moving such soil. Disturbed surface areas (0B) On the last day of active operations prior to a weekend, holiday, or any other period when active operations will not occur for not more than four consecutive days: apply water with a mixture of chemical stabilizer diluted to not less than 1/20 of the concentration required to maintain a stabilized surface for a period of six months; Page 10 • • • Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. Fugitive Dust Source Category Control Actions OR (1 B) Apply chemical stabilizers prior to wind event; OR (2B) Apply water to all unstabilized disturbed areas 3 times per day. If there is any evidence of wind driven fugitive dust, watering frequency is increased to a minimum of four times per day; OR (3B) Take the actions specified in Table 2, Item (3c); OR (4B) Utilize any combination of control actions (16), (2B), and (3B) such that, in total, these actions apply to all disturbed surface areas. Unpaved Roads (1C) Apply chemical stabilizers prior to wind event; OR (2C) Apply water twice per hour during active operation; OR (3C) Stop all vehicular traffic. Open Storage Piles (1 D) Apply water twice per hour; OR (2D) Install temporary coverings. Paved Road Track -Out (1 E) Cover all haul vehicles; OR (2E) Comply with the vehicle freeboard requirements of Section 23114 of the California Vehicle Code for both public and private roads. All Categories (1F) Any other control measures approved by the Executive Officer and the U.S. EPA as equivalent to the methods specified in Table 3 may be used. Source: SCAQMD. TABLE D TRACK OUT CONTROL OPTIONS (A) Install a pad consisting of washed gravel (minimum -size: one inch) maintained in a clean condition to a depth of at least six inches and extending at least 20 feet wide and 50 feet long. (B) Pave the surface extending at least 100 feet and a width of at least 20 feet wide. (C) Utilize a wheel shaker/wheel spreading device consisting of raised dividers (rails, pipe, or grates) at least 24 feet long and 10 feet wide to remove bulk material from tires and vehicle under carriages before vehicles exit the site. (D) Install and utilize a wheel washing system to remove bulk material from tires and vehicle undercarriages before vehicles exit the site. (E) Any other control measures approved by the Executive Officer and the U.S. EPA as equivalent to the methods specified items (A) through (D) above. Source: SCAQMD. Page 11 • • • Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. Mitigation Measure 3.3-2: Prior to issuance of each grading permit, the Applicant shall include the following notes on the contractor specifications submitted for review and approval by the City of Newport Beach Department of Public Works: To reduce construction equipment emissions, the following measures shall be implemented: • Maintain construction equipment engines by keeping them tuned. • Use existing power sources (i.e., power poles) when available. This measure would minimize the use of higher polluting gas or diesel generators. • Configure construction parking to minimize traffic interference. • Minimize obstruction of through -traffic lanes. Construction shall be planned so that lane closures on existing streets are kept to a minimum. • Schedule construction operations affecting traffic for off-peak hours to the best extent when possible. • Develop a traffic plan to minimize traffic flow interference from construction activities (the plan may include advance public notice of routing, use of public transportation, and satellite parking areas with a shuttle service). Mitigation Measure 3.3-3: Prior to issuance of each building permit for the proposed Master Plan Update Project, the Applicant shall include the following notes on the contractor specifications submitted for review and approval by the City of Newport Beach Building Department: • Minimize the amount of paint used by using pre -coated, pre -colored, and naturally colored building materials. • Use high transfer efficiency painting methods such as HVLP (High Volume Low Pressure) sprayers and brushes/rollers were possible. CULTURAL RESOURCES Mitigation Measure 21: Prior to the issuance of a grading permit, an Orange County certified archaeologist shall be retained to, and shall, monitor the grading across the project area. The archaeologist shall be present at the pre -grading conference, at which time monitoring procedures acceptable to and approved by the City shall be established, including procedures for halting or redirecting work to permit the assessment, and possible salvage, of unearthed cultural material. Mitigation Measure 22: Prior to the issuance of grading permits, an Orange County certified paleontologist shall be retained to, and shall, monitor the grading activities. The paleontologist shall be present at the pre -grading conference, at which time procedures acceptable to and Page 12 • • • Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. approved by the City for monitoring shall be established, including the temporary halting or redirecting of work to permit the evaluation and possible salvage, of any exposed fossils. All fossils and their contextual stratigraphic data shall go to an Orange County institution with an educational and/or research interest in the materials. GEOLOGY AND SOILS Mitigation Measure 1: Prior to the issuance of a grading permit, the Project Sponsor shall document to the City of Newport Beach Building Department that grading and development of the site shall be conducted in accordance with the City of Newport Beach Grading Ordinance and with plans prepared by a registered civil engineer. These plans shall incorporate the recommendations of a soil engineer and an engineering geologist, subsequent to the completion of a comprehensive soil and geologic investigation of the site. Permanent reproducible copies of the "Approved as Built" grading plans shall be furnished to the Building Department by the Project Sponsor. Mitigation Measure 2: Prior to the issuance of a grading permit, the Project Sponsor shall submit documentation to the City of Newport Beach Building Department confirming that all cut slopes shall be monitored for potential instabilities by the project geotechnical engineer during all site grading and construction activities and strictly monitor the slopes in accordance with the documentation. Mitigation Measure 3: Prior to the issuance of a grading permit, the Project Sponsor shall provide to the City of Newport Beach a comprehensive soil and geologic investigation and report of the site prepared by a registered grading engineer and/or engineering geologist. This report shall also identify construction excavation techniques which ensure no damage and minimize disturbance to adjacent residents. This report shall determine if there are any on -site faults which could render all or a portion of the property unsafe for construction. All recommendations contained in this investigation and report shall be incorporated into project construction and design plans. This report shall be submitted to the City for review and approval. Mitigation Measure 4: Prior to the completion of the final design phase, the Project Sponsor shall demonstrate to the City of Newport Beach Building Department that all facilities will be designed and constructed to the seismic standards applicable to hospital related structures and as specified in the then current City adopted version of the California Building Code. Mitigation Measure 6: Prior to the issuance of a grading permit, the Project Sponsor shall conduct a soil corrosivity evaluation. This evaluation shall be conducted by an expert in the field of corrosivity. This site evaluation shall be designed to address soils to at least the depth to which excavation is planned. At a minimum,. at least one sample from each soil type should be evaluated. Appropriate personnel protection shall be worn by field personnel during the field evaluation. In the event soils are found to be corrosive, the source and extent of the corrosive soils shall be determined, and all buildings and infrastructure shall be designed to control the potential impact of corrosive soils over time. Page 13 • • • Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. Mitigation Measure 7: Based on the corrosion assessment and source determination, a soils and construction material compatibility evaluation shall be undertaken, concluding with the appropriate mitigation measures and design criteria. Corrosion resistant construction materials are commonly available and shall be used where the evaluation/assessment concludes that corrosive soils conditions could adversely impact normal construction materials or the materials used for the mitigation of subsurface gas conditions. For example, there are many elastomers and plastics, like PVC, which are resistant to corrosion by up to 70 percent sulfuric acid at 140 degrees Fahrenheit. Mitigation Measure 8: Should the soil be identified as hazardous due to the severeness of their corrosivity (i.e., a pH less than 2.5), on -site remediation by neutralization shall be undertaken prior to construction. Appropriate regulatory agency approvals and permits shall also be obtained. Mitigation Measure 9: Prior to issuance of grading permits, the Project Sponsor shall ensure that a construction erosion control plan is submitted to and approved by the City of Newport Beach that is consistent with the City of Newport Beach Grading Ordinance and includes procedures to minimize potential impacts of silt, debris, dust and other water pollutants. These procedures may include: • the replanting of exposed slopes within 30 days after grading or as required by the City Engineer. • the use of sandbags to slow the velocity of or divert stormflows. • the limiting of grading to the non -rainy season. The project Sponsor shall strictly adhere to the approved construction erosion control plan and compliance shall be monitored on an ongoing basis by the Newport Beach Building Department. HAZARDS AND HAZARDOUS MATERIALS Mitigation Measure 49: In the event that hazardous waste is discovered during site preparation or construction, the Project Sponsor shall ensure that the identified hazardous waste and/or hazardous materials are handled and disposed in the manner specified by the State of California Hazardous Substances Control Law (Health and Safety Code Division 20, Chapter 6.5), standards established by the California Department of Health Services, Office of Statewide Health Planning and Development, and according to the requirements of the California Administrative Code, Title 30, Chapter 22. Mitigation Measure 52: A soil gas sampling and monitoring program shall include methane and hydrogen sulfide levels. Samples shall be taken just below the depth of actual disturbance. (The individuals(s) performing this initial study may be at risk of exposure to significant —and possibly lethal —doses of hydrogen sulfide, and shall be appropriately protected as required.) Page 14 • • Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. Mitigation Measure 53: A site safety plan shall be developed that addresses the risks associated with exposures to methane and hydrogen sulfide. Each individual taking part in the sampling and monitoring program shall receive training on the potential hazards and on proper personal protective equipment. This training shall be at least at the level required by CFR 2910.120. Mitigation Measure 54: If the analysis of the initial soil gas samples shows unacceptable levels of hazardous constituents that have the potential to pose a health risk during construction activities, additional gas collection wells shall be drilled to contain and collect the gas. Mitigation Measure 55: Continuous monitoring for methane and hydrogen sulfide. Mitigation Measure 56: A study of other hazardous constituents that may be present in quantities that pose a health risk to exposed individuals shall be prepared and evaluated prior to the initiation of the project. The constituents studied shall include compounds that are directly related to petroleum, such as benzene and toluene. Mitigation Measure 59: In the event additional gases are to be collected from newly constructed collection wells as part of a measure to reduce exposures during construction, an evaluation of the capacity and efficiency of the present flare system shall be conducted prior to connecting any new sources. Mitigation Measure 62: A study of the concentration of potential hazardous constituents shall be conducted prior to initiation of the project to characterize the wastewater and any risk it may pose to human health prior to development. A stormwater pollution prevention plan shall be developed to reduce the risk of the transport of hazardous constituents from the site. The Hospital shall apply for coverage under the State Water Resources Control Board's General Permit for Storm Water Discharges Associated with Construction Activity and shall comply with all the provisions of the permit, including, but not limited to, the development of the SWPPP, the development and implementation of Best Management Practices, implementation of erosion control measures, the monitoring program requirements, and post construction monitoring of the system. Mitigation Measure 63: Soil samples shall be collected from the appropriate locations at the site and analyzed for BTEX and priority pollutants; if the soils are found to contain unacceptable levels of hazardous constituents, appropriate mitigation will be required, including a complete characterization of both the vertical and horizontal extent of the contamination, and a remedial action plan shall be completed and approved by the California Regional Water Quality Control Board. The project Sponsor must demonstrate to the City of Newport Beach compliance with this measure prior to issuance of any permits for Phase I and subsequent phases of construction activities as applicable to the project activity. Mitigation Measure 64: Prior to the issuance of grading or building permits, the Project Sponsor shall evaluate all existing vent systems located on the lower campus and submit this data to the City Building and Fire Departments. Additionally, any proposed new passive vents shall be evaluated by the City Building and Fire Departments prior to the issuance of grading or building permits. Page 15 • • • Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. Mitigation Measure 66: Before the issuance of building permits, the Project Sponsor shall submit plans to the Building Department City of Newport Beach, demonstrating that continuous hydrogen sulfide monitoring equipment with alarms to a manned remote location have been provided in building designs. This monitoring equipment must be the best available monitoring system, and the plans must include a preventative maintenance program for the equipment and a calibration plan and schedule. Mitigation Measure 68: Prior to issuance of building permits, Project Sponsor shall submit plans to the City of Newport Beach ensuring that all structures built on the Lower Campus are designed for protection from gas accumulation and seepage based on the recommendations of a geotechnical engineer. Mitigation Measure 69: Project Sponsor shall submit plans to the City of Newport Beach indicating where gas test boring will be drilled under each proposed main building site once specific building plans are complete. Such testing shall be carried out, and test results submitted to the City's building official, prior to issuance of grading permits. If a major amount of gas is detected, a directionally drilled well will be permanently completed and put into the existing gas collection system. Mitigation Measure 70: 'Project Sponsor shall submit plans to the Grading Engineer, City of Newport Beach, indicating that all buildings and parking lots on the Lower Campus will be constructed with passive gas collection systems under the foundations. Such a system typically consists of perforated PVC pipes laid in parallel lengths below the foundation. Riser type vents will be attached to light standards and building high points. Additionally, parking lots on the Lower Campus will contain unpaved planter areas and vertical standpipes located at the end of each length of PVC pipe. The standpipes will serve to vent any collected gas to the atmosphere. A qualified geotechnical firm shall be retained to design such systems. Mitigation Measure 71: Prior to issuance of building permits, Project Sponsor shall submit plans to the Building Department, City of Newport Beach demonstrating that all buildings on the Lower Campus are sealed from gas migration. Such sealing may be installed by the use of chlorinated polyethylene sheeting or similar approved system. All material of construction including the PVC piping and the ground lining must be evaluated for compatibility with the existing environmental conditions of the soils and/or potential gases. Mitigation Measure 72: Prior to issuance of building permits, Project Sponsor shall submit plans to the City of Newport Beach Building and Fire Departments demonstrating that all buildings on the Lower Campus will be equipped with methane gas sensors. Such sensors will be installed in areas of likely accumulation, such as utility or other seldom used rooms. Sensors can monitor on a continuous basis, and can be tied into fire alarm systems for 24-hour surveillance. Mitigation Measure 73: To avoid possible accumulation of gas in utility or other seldom used service or storage rooms, Project Sponsor shall submit plans to the City of Newport Beach Building Department prior to issuance of building permits indicating that such rooms are serviced by the buildings' central air conditioning system (or an otherwise positive ventilation system that circulates and replaces the air in such rooms on a continuous basis). Page 16 • • • Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. Mitigation Measure 74: During construction, Project Sponsor shall ensure that an explosimeter is used to monitor methane levels and percentage range. Additionally, construction contractors shall be required to have a health and safety plan that includes procedures for worker/site safety for methane. If dangerous levels of methane are discovered, construction in the vicinity shall stop, the City of Newport Beach Fire Department shall be notified and appropriate procedures followed in order to contain the methane to acceptable and safe levels. Mitigation Measure 83: Before the issuance of building permits, the Project Sponsor must submit plans to the City of Newport Beach demonstrating that its Hazardous Material and Waste Management Plan and its infectious Control Manual have been modified to include procedures to minimize the potential impacts of emissions from the handling, storage, hauling and destruction of these materials, and that the Project Sponsor has submitted the modified plans to the City of Newport Beach, Fire Prevention Department, and the Orange County Health Care Agency, as required by the Infections Waste Act and AB 2185/2187. Mitigation Measure 84: Project Sponsor shall continue compliance with its Hazardous Material and Waste Management Program and its Infectious Control Manual for all new activities associated with the proposed Master Plan, as well as comply with all new regulations enacted between now and completion of the proposed Master Plan. Mitigation Measure 85: To the satisfaction of the City building official, the Project Sponsor shall expand existing hazardous, infectious, radiological disposal facilities to add additional storage areas as necessary to accommodate the additional waste to be generated by the expanded facilities. Mitigation Measure 86: The Project Sponsor shall provide evidence to the Planning Director that measures to ensure implementation and continue compliance with all applicable SCAQMD Air Toxic Rules, specifically Rules 1401, 1402, 1403, 1405 and 1415, are being carried out. Mitigation Measure 100: The Project Sponsor shall ensure that all cut material is disposed of at either an environmentally cleared development site or a certified landfill. Also, all material exported off site shall be disposed of at an environmentally certified development cleared landfill with adequate capacity. Mitigation Measure 122: The methane gas facility and all building on the lower campus shall be subject to all laws and regulations applicable, including, but not limited to, the Federal Regulation contained in 29 CFR 1910, the State Health and Safety Code, Division 20, Chapter 6.9.5, and the regulations of OSHA and the National Fire Protection Association. Prior to the issuance of building permits on the lower campus, the Project Sponsor shall submit, to the Newport Beach Fire Department a compliance review report of all the above referenced laws and regulations. HYDROLOGY AND WATER QUALITY Mitigation Measure 9: Prior to issuance of grading permits, the Project Sponsor shall ensure that a construction erosion plan is submitted to and approved by the City of Newport Beach that Page 17 • • Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. is consistent with the City of Newport Beach Grading Ordinance and includes procedures to minimize potential impacts of silt, debris, dust and other water pollutants. These procedures may include: • the replanting of exposed slopes within 30 days after grading or as required by the City Engineer. • the use of sandbags to slow the velocity of or divert stormflows. • the limiting of grading to the non -rainy season. The Project Sponsor shall strictly adhere to the approved construction erosion control plan and compliance shall be monitored on an ongoing basis by the Newport Beach Building Department. Mitigation Measure 10: Prior to the issuance of grading permits, the Project Sponsor shall submit a landscape plan which includes a maintenance program to control the use of fertilizers and pesticides, and an irrigation system designed to minimize surface runoff and overwatering. This plan shall be reviewed by the General Services Department and approved by the City of Newport Beach Planning Department. The Project Sponsor shall install landscaping in strict compliance with the approved plan. Mitigation Measure 11: The Project Sponsor shall continue the current practice of routine vacuuming of all existing parking lots and structures and shall also routinely vacuum all future parking lots and structures at current frequencies. Upon implementation of the County of Orange Drainage Area Management Plan (DAMP), routine vacuuming shall be done in accordance with the requirements specified in the plan. Mitigation Measure 12: Upon completion of final building construction plans, and prior to the issuance of a grading permit for each phase of development, the Project Sponsor shall ensure that site hydrological analyses are conducted to verify that existing drainage facilities are adequate. The applicant shall submit a report to the City of Newport Beach Building Department for approval, verifying the adequacy of the proposed facilities and documenting measures for the control of siltation and of erosive runoff velocities. Mitigation Measure 13: Prior to the completion of final construction plans for each phase of Lower Campus development, the Project Sponsor shall submit a comprehensive geotechnical/hydrologic study to the City of Newport Beach Building Department, which includes data on groundwater. This study shall also determine the necessity for a construction dewatering program and subdrain system. Mitigation Measure 14: Prior to the completion of final building construction plans for each phase of Lower Campus development, the Project Sponsor shall prepare and submit a construction stormwater National Pollution Discharge Elimination System (NPDES) General Permit for stormwater discharge associated with construction activity (Construction General Permit, SWRCB Order No. 99-08-DWQ or its successor) and Notice of Intent (NOI) to obtain the required coverage under the General Permit for Discharges of Storm Water Associated with Construction Activity. Construction activity subject to this permit includes clearing, grading, and disturbances to the ground such as stockpiling or excavation, but does not include regular Page 18 • • • Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. maintenance activities performed to restore the original line, grade, or capacity of the facility. The NOI, site plan, a check in an amount specified by the most current fee schedule, and any other documentation required by the permit shall be sent to the State Water Resource Control Board (SWRCB). The SWRCB will send a Waste Discharger Identification (WDI) to the project sponsor and the Regional Water Quality Control Board Santa Ana Region for use during site inspection, if needed. Mitigation Measure 15: Project Sponsor shall strictly comply with its Hazardous Material and Waste Management Program and its Infectious Control Manual for all new activities associated with the proposed Master Plan, as well as strictly comply with all new regulations enacted between now and completion of the proposed Master Plan development. LAND USE AND PLANNING PROGRAMS Mitigation Measure 24: The proposed project is subject to all applicable requirements of the City of Newport Beach General Plan, Zoning Code, and Local Coastal Program (LCP). Those requirements that are superseded by -the PCDP and District Regulations are not considered applicable. The following discretionary approvals are required by the City of Newport Beach: EIR certification, adoption of an amendment to the Planned Community Development Plan and District Regulations, approval of an amendment to the Development Agreement, grading permits, and building permits for some facilities. The California Coastal Commission has the discretionary responsibility to issue a Coastal Development Permit for the Lower Campus. Mitigation Measure 118: For any building subject to the issuance of a building permit by the California Office of Statewide Health Planning and Development (OSHPD), Hoag Hospital shall submit to OSHPD a letter from the City of Newport Beach indicating that review of the development plans has been completed and that the plans are in compliance with all City requirements. NOISE Mitigation Measure PDF 3.4-1: Within six months following approval of the Master Plan Update Project by the City of Newport Beach and the expiration of any appeals, statute of limitations or referendum periods for challenging any of the Project approvals, the Applicant shall offer a window/sliding glass door upgrades (dual pane windows) and balcony barrier extensions to the owners of the residences (Owners) of 12 condominium units at 260 Cagney Lane, Newport Beach, in units 202 through 207 and 302 through 307. With respect to the balcony barrier extensions, the extensions shall be 3/8-inch-thick tempered glass with a frame. The top of the extensions shall extend approximately 5 to 6 feet above the balcony deck. Where windows and/or sliding glass doors would be located behind a balcony barrier, the Applicant would not be required to provide window and/or sliding glass door upgrades. Other windows/sliding glass doors of the identified condominium units would be upgraded with dual pane glass. Units with cedar siding may require wall sound insulation such as high performance gypsum board (e.g., QuietRock or Suppress) to provide a 4 dB exterior to interior noise Page 19 • • Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. reduction. Wall insulation can be provided to the exterior or interior wall affected and would be subject to the approval of the Homeowners Association and Owner. The Applicant shall be responsible for the implementation of the noted upgrades pursuant to the following provisions and guidelines: (i) in order to participate in the program and receive new balcony barrier extensions and/or windows/sliders and wall insulation, each Owner must provide written notice to the Applicant within 45 days following receipt of the proposed program from Applicant, that the Owner wants to participate in the program; (ii) failure to respond within such time period shall mean the Owner desires not to participate; (iii) the replacement balcony barrier extensions/windows/sliders and wall insulation shall be installed by a third -party contractor as part of one overall program pursuant to a contract between the Villa Balboa Homeowners Association (Association) and such third -party contractor selected by the Association; (iv) the Association shall provide the Applicant with a written estimate from the contractor stating that the total cost of the replacement program and obtain Applicant's written approval of such work prior to executing a contract with the contractor; (v) the total cost of the balcony barrier extensions and window/slider replacement, wall insulation, and related patch -up work to be reimbursed by the Applicant to the Association for all Owners shall not exceed the total cost identified in a Bid Estimate approved by the City prepared by a qualified and licensed contractor plus reasonable administrative costs to manage the contract and construction effort; and (vi) provided the Applicant receives the reimbursement request from the Association within 60 days following completion of the work, the Applicant shall reimburse the Association for the cost of the work within 30 days of the Applicant's receipt of a final receipt, bill or invoice from the Association evidencing that the balcony barrier extensions, wall insulation, and window/slider replacement work was completed pursuant to the approved estimate. Mitigation Measure PDF 3.4-2: Within 12 months following approval of the Master Plan Update Project by the City of Newport Beach and the expiration of any appeals, statute of limitations or referendum periods for challenging any of the Project approvals and subject to the City's issuance of a building permit, the Applicant shall have constructed a sound wall of approximately 470 linear feet along West Hoag Drive within the boundaries of the Applicant's property. The sound wall would be constructed adjacent to Hoag Drive and set back approximately 3 to 6.5 feet from the edge of the existing curb. The sound wall shall range in height from approximately 17 to 23 feet between West Hoag Drive and the 280 Cagney Lane condominium building; and approximately 14 to 18.5 feet at the 260 Cagney Lane condominium. The location of the sound wall is provided in Exhibit 1. The sound wall shall be constructed using the Sound Fighter® LSE Wall System (or a sound wall system with the same sound attenuation capability and construction implementation capability). • To the maximum degree feasible, the sound wall shall be constructed to retain existing vegetation which serves as a visual screen. Vegetation that is required to be removed associated with installation of the sound wall shall be replaced in -kind with specimen plant material as designated on a landscape and irrigation plan prepared by a licensed landscape architect. The plan shall be subject to review by the Villa Balboa Community Association, and review and approval by the City. The Applicant shall be responsible for the maintenance of landscaping within the property boundaries of Hoag. Any future modifications made to the sound wall and/or landscaping shall be reviewed and approved by the Planning Director. Page 20 • • • Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. If the removal of vegetation is scheduled to proceed between March 1 and July 31, no more than seven days prior to the onset of construction activities that would impact trees associated with the sound wall, a qualified Biologist shall conduct a pre -construction bird nesting survey for the trees scheduled for removal to determine the presence of any active bird nest. If an active bird nest is found, the tree cannot be removed until the nest is deemed no longer occupied by the qualified Biologist. If no active nests are found, tree removal may commence. Trees removed anytime between August 1 and February 28 do not require any nesting bird surveys, or corresponding avoidance measures for nesting bird species. Mitigation Measure SC 3.4-1: During construction, the Applicant shall ensure that all noise - generating activities be limited to the hours of 7:00 AM to 6:30 PM on weekdays and 8:00 AM to 6:00 PM on Saturdays. No noise -generating activities shall occur on Sundays or national holidays in accordance with the City of Newport Beach Noise Ordinance. Mitigation Measure 42: The City of Newport Beach shall send a letter to each emergency vehicle company that delivers patients to Hoag Hospital requesting that, upon entrance to either the Upper or Lower Campus, emergency vehicles turn off their sirens to help minimize noise impacts to adjacent residents. Hoag Hospital will provide the City with a list of all emergency vehicle companies that deliver to Hoag Hospital. Mitigation Measure 111: The Project Sponsor shall ensure that all internal combustion engines associated with construction activities shall be fitted with properly maintained mufflers and kept in proper tune. Mitigation Measure 117: Use of the heliport/helipad shall be limited to emergency medical purposes or the transportation of critically ill patients in immediate need of medical care to and from Hoag Hospital. Helicopters shall, to the extent feasible, arrive at, and depart from the helipad, from the northeast, to mitigate noise impacts on residential units to the west and south. Mitigation Measure 119: Non -vehicular activities, such as the operation of the trash compactor, which occur in the vicinity of the service/access road shall be operated only between the hours of 7:00 AM and 7:00 PM daily. Mitigation Measure 3.4-1: Prior to the initiation of vibration -generating demolition and construction activities, the Hoag Construction Project Manager shall notify building/department representatives that these activities are planned. This notification will allow for the relocation of vibration -sensitive equipment in portions of buildings that could be affected. The Hoag construction staff shall work with the Project Contractor to schedule demolition and construction activities that use heavy equipment and are located within 50 feet of buildings where vibration -sensitive medical procedures occur, such that demolition and construction activities are not scheduled concurrent with sensitive medical operations. A system of communications would be established between selected vibration -sensitive uses/areas and Construction Managers so that noise or vibration which would affect patient care or research activities can be avoided. Mitigation Measure 3.4-2: The final plans for heating, ventilation, and air conditioning (HVAC) equipment for the Ancillary Building and West Tower shall be submitted to the City for review Page 21 • • • Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. and approval. The plans shall be reviewed by an Acoustical Engineer to ensure that they will achieve 55 dBA (Leq) at the property line adjacent to the loading dock area. These plans need to be submitted within six months of the certification of the Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental EIR (SEIR). If Hoag does not pursue the redesign of the HVAC systems for the Ancillary Building and West Tower, Hoag shall submit within six months of the certification of the Final SEIR a plan to the City that details how Hoag will bring the current equipment into compliance with the 55 dBA nighttime noise limit when measured at the property line adjacent to the loading dock area. Mitigation Measure 3.4-3: Prior to issuance of building permits for any project that includes HVAC equipment, an acoustical study of the noise generated by the HVAC equipment shall be performed and a report that documents the results shall be submitted. This report shall present the noise levels generated by the equipment and the methodology used to estimate the noise levels at nearby residential uses or property boundary, as applicable; the report will also demonstrate that combined noise levels generated by all new HVAC equipment does not exceed applicable regulations. This study shall be reviewed and approved by the City prior to issuance of building permits. After installation of the equipment, noise measurements shall be performed and provided to the City that demonstrates compliance with applicable noise level limits. Mitigation Measure 3.4-4: Truck deliveries to the loading dock area are restricted to the hours of 7:00 AM to 8:00 PM. It is noted that special situations may arise that require delivery outside of these hours. Mitigation Measure 3.4-5: Sound absorption panels on the east wall of the loading dock shall be installed. Approximately 450 square feet of absorptive panels shall be used to cover major portions of the back wall of the loading dock area. The Noise -Foil panels by Industrial Acoustics or a panel with an equivalent or better sound rating shall be used. Mitigation Measure 3.4-6: The trash compactor shall be relocated within the loading dock. The trash compactor and baler shall be enclosed in a three -sided structure. The walls shall be concrete block or similar masonry construction. The roof shall be lightweight concrete roof or a plywood surface with concrete tiles; a built-up roof with 5' 5" of insulation on the inside would be an acceptable alternative. The open side shall face away from the residents. Doors may be on the side of the enclosure facing the residents, but must be closed when the baler or compactor are operating. The compactor and baler should only be operated between the hours of 7:00 AM and 7:00 PM. Mitigation Measure 3.4-7: "No Idling" signs shall be posted in the loading dock area and any area where the trucks might queue. Mitigation Measure 3.4-8: Grease trap cleaning operations shall be limited to Saturday between the hours of 11:00 AM and 3:00 PM. Mitigation Measure 3.4-9: Upon installation of the fourth cooling tower at the cogeneration facility, additional noise measurements shall be performed to determine compliance with the City's Noise Ordinance. The measurements shall be made and a report submitted to the City within three months of commencement of operations of the fourth cooling tower. If a violation is Page 22 • • • Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. noted, the problem must be corrected and a second set of measurements submitted to the City showing compliance within one year of commencement of operations of the fourth cooling tower. Mitigation Measure 3.4-10: Prior to the issuance of building permits for any Hoag patio use proposed to be located closer to the roadway then the 65 CNEL contour distance shown in Table 3.4-7, a detailed acoustical analysis study shall be prepared by a qualified Acoustical Consultant and a report shall be submitted to the City for review and approval. The Acoustical Analysis Report shall describe and quantify the noise sources impacting the area and the measures required to meet the 65 CNEL exterior residential noise standard. The final building plans shall incorporate the noise barriers (wall, berm, or combination wall/berm) required by the analysis and Hoag shall install these barriers prior to issuance of a Certificate of Occupancy. Mitigation Measure 3.4-11: Prior to issuance of building permits, a detailed acoustical study using architectural plans shall be prepared by a qualified Acoustical Consultant and a report shall be submitted to and approved by the City for Hoag buildings that are proposed to be located closer to the roadway than the 65 CNEL contour distance shown in Table 3.4-7 and for office buildings that are proposed to be located closer to the roadway than the 70 CNEL contour distance (Table 3.4-7). This report shall describe and quantify the noise sources impacting the building(s); the amount of outdoor -to -indoor noise reduction provided by the design in the architectural plans; and any upgrades required to meet the City's interior noise standards (45 CNEL for hospital uses and 50 CNEL for office uses). The measures described in the report shall be incorporated into the architectural plans for the buildings and implemented with building construction. PUBLIC SERVICES Mitigation Measure 91: Prior to the issuance of grading permits, emergency fire access to the site shall be approved by the City Public Works and Fire Departments. Mitigation Measure 94: Prior to the issuance of building permits, the Project Sponsor shall demonstrate, to the satisfaction of the City Fire Department, that all buildings shall be equipped with fire suppression systems. TRANSPORTATION AND CIRCULATION Mitigation Measure 25: The Project Sponsor shall conduct a Traffic Phasing Ordinance (TPO) analysis for each Master Plan development project. The analysis shall identify potential intersection impacts, the proposed project traffic volume contributions at these impacted intersections, and the schedule for any intersection improvements identified as necessary by the study to ensure a satisfactory level of service as defined by the TPO. This report shall be approved by the City prior to commencement of construction of the development project. Page 23 • • • Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. Mitigation Measure 27: For each Master Plan development project, the Project Sponsor shall conduct a project trip generation study prepared in accordance with the Traffic Phasing Ordinance (TPO) guidelines and to be reviewed and approved by the City Traffic Engineer prior to permit issuance for future phases. Mitigation Measure 28: The Project Sponsor shall continue to comply with all applicable regulations adopted by the South Coast Air Quality Management District that pertain to trip reductions such as Rule 2202. Mitigation Measure 29: The project shall comply with the City of Newport Beach Transportation Demand Management Ordinance approved by the City Council pursuant to the County's Congestion Management Plan. Mitigation Measure 30: In order to ensure accessibility to the available transit services for employees, visitors and patrons of the Hospital, the following transit amenities shall be incorporated into the Master Plan Project: Bus turnouts shall be installed if required by the City Traffic Engineer, after City consultation with OCTA, at all current bus stop locations adjacent to the project site. Bus turnouts shall be installed in accordance with standard design guidelines as indicated in OCTA's Design Guidelines for Bus Facilities. Mitigation Measure 32: Prior to issuance of approvals for development projects, the applicant shall submit to the City Traffic Engineer for his/her review and approval, a study that identifies the appropriate parking generation rates. The findings of this study shall be based on empirical or survey data for the proposed parking rates. Mitigation Measure 33: Prior to issuance of precise grading permits for Master Plan development that includes new, or modifications to existing, internal roadways (other than service roads), the Project Sponsor will prepare an internal circulation plan for submittal to and approval by the City Traffic Engineer that identifies all feasible measures to eliminate internal traffic congestion and facility's ingress and egress to the site. All feasible measures identified in this study shall be incorporated into the site plan. Mitigation Measure 34: Depending on actual site build -out, intersection improvements may be required at the Hoag Drive -Placentia Avenue/Hospital Road intersection (Upper Campus access), Newport Boulevard/Hospital Road intersection, and at the Hoag Drive/West Coast Highway intersection (Lower Campus access). The need for these improvements shall be assessed during subsequent traffic studies to be conducted in association with Mitigation Measure 25. Improvements could include restriping, traffic signal timing, etc. Mitigation Measure 35: As each Master Plan project is constructed, the Project Sponsor shall provide each new employee a packet outlining the available ridesharing services and programs and the number of the Transportation Coordinator. All new employees shall be included in the yearly update of the trip reduction plan for Hoag Hospital in compliance with the City of Newport Beach Trip Reduction Plan. Mitigation Measure 38: Prior to the issuance of building permits for each Master Plan development, the Project Sponsor shall provide evidence that site plans incorporate the site development requirements of Ordinance No. 91-16, as appropriate, to the Traffic Engineering Page 24 Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. • Division and Planning Department for review and Planning Commission approval. Requirements outlined in the Ordinance include: a. A minimum of five percent of the provided parking at new facilities shall be reserved for carpools. These parking spaces shall be located near the employee entrance or at other preferred locations. b. A minimum of two bicycle lockers per 100 employees shall be provided. Additional lockers shall be provided at such time as demand warrants. c. A minimum of one shower and two lockers shall be provided. d. Information of transportation alternatives shall be provided to all employees. e. A rideshare vehicle loading area shall be designated in the parking area. f. The design of all parking facilities shall incorporate provisions for.access and parking of vanpool vehicles. Bus stop improvements shall be coordinated with the Orange County Transportation Authority, consistent with the requirements of Mitigation Measure 30. The exact number of each of the above facilities shall be determined by the City during review of building permit applications for each development project. The types and numbers of facilities required of the project will reflect the content of the Ordinance at the time that a permit application is deemed complete by the Planning Department. Mitigation Measure 91: Prior to the issuance of grading permits, emergency fire access to the site shall be approved by the City Public Works and Fire Department. Mitigation Measure 95: Prior to issuance of building permits, the Project Sponsor shall demonstrate to the City Fire Department that all existing and new access roads surrounding the project site shall be designated as fire lanes, and no parking shall be permitted unless the accessway meets minimum width requirements of the Public Works and Fire Departments. Parallel parking on one side may be permitted if the road is a minimum 32 feet in width. Mitigation Measure 101: In conjunction with the application for a grading permit, the Project Sponsor shall submit a construction phasing and traffic control plan for each phase of development. This plan would identify the estimated number of truck trips and measures to assist truck trips and truck movement in and out of the local street system (i.e., flagmen, signage, etc.). This plan shall consider scheduling operations affecting traffic during off-peak hours, extending the construction period and reducing the number of pieces of equipment used simultaneously. The plan will be reviewed and approved by the City Traffic Engineer prior to issuance of the grading permit. Mitigation Measure 102: The Project Sponsor shall ensure that all haul routes for import or export materials shall be approved by the City Traffic Engineer and procedures shall conform with Chapter 15 of the Newport Beach -Municipal Code. g. • • Page 25 Hoag Memorial Hospital Presbyterian Master Plan Update Final Supplemental Environmental Impact Report Mitigation Measures, Cont. Mitigation Measure 103: The Project Sponsor shall provide advance. written notice of temporary traffic disruptions to affected area business and the public. This notice shall be provided at least two weeks prior to disruptions. Mitigation Measure 104: The Project Sponsor shall ensure that construction activities requiring more than 16 truck (i.e., multiple axle vehicle) trips per hour, such as excavation and concrete pours, shall be limited between June 1 and September 1 to avoid traffic conflicts with beach and tourist traffic. At all other times, such activities shall be limited to 25 truck (i.e., multiple axle vehicle) trips per hour unless otherwise approved by the City Traffic Engineer. Haul operations will be monitored by the Public Works Department and additional restrictions may be applied if traffic congestion problems arise. Mitigation Measure 108: Prior to issuance of any grading and building permit, the Project Sponsor shall submit a Trip Reduction Plan for construction crew members where the number of construction employees would be 50 or greater. This plan shall identify measures, such as ride -sharing and transit incentives, to reduce vehicle miles traveled by construction crews. The plan shall be reviewed and approved by the City Traffic Engineer. UTILITIES AND SERVICE SYSTEMS Mitigation Measure 92: Prior to the issuance of building permits, the Project Sponsor shall demonstrate that final design of the project shall provide for the incorporation of water -saving devices for project lavatories and other water -using facilities. The Project Sponsor will also comply with any other City adopted water conservation policies. Mitigation Measure 93: Prior to issuance of grading permits, the City of Newport Beach shall review individual development projects for consistency with master plan of water and sewer facilities. The Project Sponsor shall construct any modifications or facilities necessitated by the proposed project development. Mitigation Measure 6.13.1: During project construction, the contractor shall be required, to the extent practicable, to take concrete and asphalt from project demolition to an off -site recycling location to minimize impacts to existing landfills. The contractor shall provide the City of Newport Beach General Services Department verification of materials that have been recycled. Page 26 iioag Hospital Project: Heart and Vascular Institute Projects • • • Mitigation Measure: 88 The Project Sponsor shall submit plans to the City Building Department prior to the issuance of a building permit for each phase of development, verifying that energy efficiency will be achieved by incorporating appropriate technologies and systems into future structures, which may include: • High efficiency cooling/absorption units • Thermal storage and ceramic cooling towers • Cogeneration capabilities • High efficiency water heaters • Energy efficient glazing systems • Appropriate off -hour heating/cooling/lighting controls • Time clocks and photovoltaic cells for lighting controls • Efficient insulation systems • Light colored roof and building exteriors • PL lighting and fluorescent lighting systems • Motion detector lighting controls • Natural interior lighting -skylights, clerestories • Solar orientation, earth berming and landscaping Standard for Compliance: Shown on approved building plans and associated calculations. Method of Verification: Plan check for permits issued by the City; verification of compliance for permits issued by OSHPD. Timing of Verification: Prior to the issuance of a building permit for each phase of development. Responsible Party(ies): Applicant; Building Director or designated representative; Planning Director or designated representative. Verification Date: City of Newport Beach Verification Approved on: Approved by: Signature: q-'23in q2.rfw Hoag Hospital Project: Heart and Vascular Institute Projects • Approved by: Signature: • • Mitigation Measure: 106 Project Sponsor shall ensure that all project related grading shall be performed in accordance with the City of Newport Beach Grading Ordinance, which contains procedures and requirements relative to dust control, erosion and siltation control, noise, and other grading related activities. Standard for Compliance: Shown on approved building plans, documented in contractor/subcontractor supplemental general conditions. Method of Verification: Plan check. Timing of Verification: Prior to the issuance of each grading permit. Responsible Party(ies): Applicant; Building Department; Planning Director or designated representative Verification Date: City of Newport Beach Verification Approved on: gj23 111 f , OstCr— • S • Hoag Hospital Project: Heart and Vascular Institute Projects Mitigation Measure: 110 The Project Sponsor shall ensure that low emission mobile and stationary equipment is utilized during construction, and low sulfur fuel is utilized in stationary equipment, when available. Evidence of this fact shall be provided to the City of Newport Beach prior to issuance of any grading or building permit. Standard for Compliance: Documented in contractor/subcontractor supplemental general conditions. Method of Verification: Site visit Timing of Verification: Prior to issuance of any grading or building permit. Responsible Party(ies): Applicant. Verification Date: City of Newport Beach Verification Approved on: s j7 11 I Approved by: •tA Signature: • • • Hoag Hospital Project: Heart and Vascular Institute Projects Mitigation Measure: 3.3-1 During construction of the Project, the Applicant and its Contractors shall be required to comply with regional rules established by the South Coast Air Quality Management District (SCAQMD), which assist in reducing short-term air pollutant emissions. The SCAQMD's Rule 403 requires that fugitive dust be controlled with best available control measures so that the presence of such dust does not remain visible in the atmosphere beyond the property line of the emission source. Two options are presented in Rule 403: monitoring of particulate concentrations or active control. Monitoring involves a sampling network around the project with no additional control measures unless specified concentrations are exceeded. The active control option does not require any monitoring, but requires that a list of measures be implemented starting with the first day of construction. Rule 403 requires that "No person shall conduct active operations without utilizing the best available control measures included in Table 1 of this Rule to minimize fugitive dust emissions from each fugitive dust source type within the active operation." The measures from Table 1 of Rule 403 are presented in this SEIR as Table A. It is required that all applicable and feasible measures in Table A are implemented. At this time, specific construction projects are not specified so it is unknown which measures will be applicable. All applicable and feasible control measures for each source category used during construction shall be implemented. Prior to permit issuance, the Applicant shall submit a list of applicable measures that will be implemented along with a list of inapplicable measures that will not be implemented for the specific construction project. Rule 403 requires that "Large Projects" implement additional measures. A Large Project is defined as "any active operations on property which contains 50 or more acres of disturbed surface area, or any earthmoving operation with a daily earthmoving or throughput volume of 5,000 cubic yards for more than three times during the most recent 365 day period." Grading of the project is not considered a Large Project under Rule 403. However, the project shall implement all applicable and feasible measures specified in Table 2 (presented in this SEIR as Table B) to the greatest extent possible. This results in a higher reduction of fugitive dust emissions than would be achieved through complying solely with Table A. At this time, specific construction projects are not specified so it is unknown which measures will be feasible. Prior to permit issuance, the Applicant shall submit a list of applicable measures that will be implemented for the specific construction project along with justification for the infeasibility finding. Rule 403 also requires that the construction activities "shall not cause or allow PM10 levels to exceed 50 micrograms per cubic meter when determined by simultaneous sampling, as the difference between upwind and downwind sample." Projects that cannot meet this "performance standard are required to implement the applicable actions specified in Table 3 of Rule 403 (presented in this SEIR as Table C). Rule 403 requires that that the project shall not "allow track -out to extend 25 feet or more in cumulative length from the point of origin from an active operation." All track -out from an active operation is required to be removed at the conclusion of each workday or evening shift. Any active operation with a disturbed surface area of five or more acres or with a daily import or export of 100 cubic yards or more of bulk materials must use at least one of the measures listed in Table D at each vehicle egress from the site to a paved public road. Mitigation Measure: 3.3-1 (continued) TABLE A REQUIRED BEST AVAILABLE CONTROL MEASURES (RULE 403 TABLE 1) Source Category Control Measure Guidance Backfilling 01-1 Stabilize backfill material when not actively handling; and 01-2 Stabilize backfill material during handling; and 01-3 Stabilize soil at completion of activity. • • • • Mix backfill soil with water prior to moving Dedicate water truck or high capacity hose to backfilling equipment Empty loader bucket slowly so that no dust plumes are generated Minimize drop height from loader bucket Clearing and Grubbing 02-1 Maintain stability of soil through pre -watering of site prior to clearing and grubbing; and 02-2 Stabilize soil during clearing and grubbing activities; and 02-3 Stabilize soil immediately after clearing and grubbing activities. • • Maintain live perennial vegetation where possible Apply water in sufficient quantity to prevent generation of dust plumes Clearing Forms 03-1 Use water spray to clear forms; or 03-2 Use sweeping and water spray to clear forms; or 03-3 Use vacuum system to clear forms. • Use of high pressure air to clear forms may cause exceedance of Rule requirements Crushing 04-1 Stabilize surface soils prior to operation of support equipment; and 04-2 Stabilize material after crushing. • • • • Follow permit conditions for crushing equipment Pre -water material prior to loading into crusher Monitor crusher emissions opacity Apply water to crushed material to prevent dust plumes Cut and Fill 05-1 Pre -water soils prior to cut and fill activities; and 05-2 Stabilize soil during and after cut and fill activities. • • For large sites, pre -water with sprinklers or water trucks and allow time for penetration Use water trucks/pulls to water soils to depth of cut prior to subsequent cuts Demolition — Mechanical/Manual 06-1 Stabilize wind erodible surfaces to reduce dust; and 06-2 Stabilize surface soil where support equipment and vehicles will operate; and 06-3 Stabilize loose soil and demolition debris; and 06-4 Comply with AQMD Rule 403. • Apply water in sufficient quantities to prevent the generation of visible dust plumes Disturbed Soil 07-1 Stabilize disturbed soil throughout the construction site; and 07-2 Stabilize disturbed soil between structures • • • Limit vehicular traffic and disturbances on soils where possible If interior block walls are planned, install as early as possible Apply water or a stabilizing agent in sufficient quantities to prevent the generation of visible dust plumes Earth -Moving Activities 08-1 Pre -apply water to depth of proposed cuts; and 08-2 Re -apply water as necessary to maintain soils in a damp condition and to ensure that visible emissions do not exceed 100 feet in any direction; and 08-3 Stabilize soils once earth -moving activities are complete. • • • Grade each project phase separately, timed to coincide with construction phase Upwind fencing can prevent material movement on site Apply water or a stabilizing agent in sufficient quantities to prevent the generation of visible dust plumes Mitigation Measure: 3.3-1 (continued) • • • Source Category Control Measure Guidance Importing/Exporting of Bulk Materials 09-1 Stabilize material while loading to reduce fugitive dust emissions; and 09-2 Maintain at least six inches of freeboard on haul vehicles; and 09-3 Stabilize material while transporting to reduce fugitive dust emissions; and 09-4 Stabilize material while unloading to reduce fugitive dust emissions; and 09-5 Comply with Vehicle Code Section 23114. • • • • Use tarps or other suitable enclosures on haul trucks Check belly -dump truck seals regularly and remove any trapped rocks to prevent spillage Comply with track -out prevention/mitigation requirements Provide water while loading and unloading to reduce visible dust plumes Landscaping 10-1 Stabilize soils, materials, slopes • • • • Apply water to materials to stabilize and maintain materials in a crusted condition Maintain effective cover over materials Stabilize sloping surfaces using soil binders until vegetation or ground cover can effectively stabilize the slopes Hydroseed prior to rain season Road Shoulder Maintenance 11-1 11-2 Apply water to unpaved shoulders prior to clearing; and Apply chemical dust suppressants and/or washed gravel to maintain a stabilized surface after completing road shoulder maintenance. • • Installation of curbing and/or paving of road shoulders can reduce recurring maintenance costs Use of chemical dust suppressants can inhibit vegetation growth and reduce future road shoulder maintenance costs Screening 12-1 12-2 12-3 Pre -water material prior to screening; and Limit fugitive dust emissions to opacity and plume length standards; and Stabilize material immediately after screening. • • • Dedicate water truck or high capacity hose to screening operation Drop material through the screen slowly and minimize drop height Install wind barrier with a porosity of no more than 50% upwind of screen to the height of the drop point Staging Areas 13-1 Stabilize staging areas during use; and 13-2 Stabilize staging area soils at project completion. • • • Limit size of staging area Limit vehicle speeds to 15 miles per hour Limit number and size of staging area entrances/exists Stockpiles/ Bulk Material Handling 14-1 Stabilize stockpiled materials. 14-2 Stockpiles within 100 yards of off -site occupied buildings must not be greater than eight feet in height; or must have a road bladed to the top to allow water truck access or must have an operational water irrigation system that is capable of complete stockpile coverage. • • Add or remove material from the downwind portion of the storage pile Maintain storage piles to avoid steep sides or faces Mitigation Measure: 3.3-1 (continued) • • • TABLE A (Continued) REQUIRED BEST AVAILABLE CONTROL MEASURES (RULE 403 TABLE 1) Source Category Control Measure Guidance Traffic Areas for Construction Activities 15-1 Stabilize all off -road traffic and parking areas; and 15-2 Stabilize all haul routes; and 15-3 Direct construction traffic over established haul routes. • • Apply gravel/paving to all haul routes as soon as possible to all future roadway areas Barriers can be used to ensure vehicles are only used on established parking areas/haul routes Trenching 16-1 Stabilize surface soils where trencher or excavator and support equipment will operate; and 16.2 Stabilize soils at the completion of trenching activities. • • • Pre -watering of soils prior to trenching is an effective preventive measure. For deep trenching activities, pre -trench to 18 inches, soak soils via the pre -trench, and resume trenching Washing mud and soils from equipment at the conclusion of trenching activities can prevent crusting and drying of soil on equipment Truck Loading 17-1 Pre -water material prior to loading; and 17.2 Ensure that freeboard exceeds six inches (CVC 23114) • • Empty loader bucket such that no visible dust plumes are created Ensure that the loader bucket is close to the truck to minimize drop height while loading Turf Overseeding 18-1 Apply sufficient water immediately prior to conducting turf vacuuming activities to meet opacity and plume length standards; and 18-2 Cover haul vehicles prior to exiting the site. • Haul waste material immediately off -site Unpaved Roads/Parking Lots 19-1 Stabilize soils to meet the applicable performance standards; and 19-2 Limit vehicular travel to established unpaved roads (haul routes) and unpaved parking lots. • Restricting vehicular access to established unpaved travel paths and parking lots can reduce stabilization requirements Vacant Land 20-1 In instances where vacant lots are 0.10 acre or larger and have a cumulative area of 500 square feet or more that are driven over and/or used by motor vehicles and/or off - road vehicles, prevent motor vehicle and/or off -road vehicle trespassing, parking and/or access by installing barriers, curbs, fences, gates, posts, signs, shrubs, trees or other effective control measures. Source: SCAQMD. Mitigation Measure: 3.3-1 (continued) • TABLE B DUST CONTROL MEASURES FOR LARGE OPERATIONS (RULE 403 TABLE 2) Fugitive Dust Source Category Control Actions Earth -moving (except construction cutting and filling areas, and mining operations) (1 a) Maintain soil moisture content at a minimum of 12 percent, as determined by ASTM method D2216, or other equivalent method approved by the Executive Officer, the California Air Resources Board, and the U.S. EPA. Two soil moisture evaluations must be conducted during the first three hours of active operations during a calendar day, and two such evaluations each subsequent four-hour period of active operations; OR (1a-1) For any earth -moving which is more than 100 feet from all property lines, conduct watering as necessary to prevent visible dust emissions from exceeding 100 feet in length in any direction. Earth -moving: Construction fill areas: (1 b) Maintain soil moisture content at a minimum of 12 percent, as determined by ASTM method D2216, or other equivalent method approved by the Executive Officer, the California Air Resources Board, and the U.S. EPA. For areas which have an optimum moisture content for compaction of less than 12 percent, as determined by ASTM Method 1557 or other equivalent method approved by the Executive Officer and the California Air Resources Board and the U.S. EPA, complete the compaction process as expeditiously as possible after achieving at least 70 percent of the optimum soil moisture content. Two soil moisture evaluations must be conducted during the first three hours of active operations during a calendar day, and two such evaluations during each subsequent four-hour period of active operations. Earth -moving: Construction cut areas and mining operations: (1 c) Conduct watering as necessary to prevent visible emissions from extending more than 100 feet beyond the active cut or mining area unless the area is inaccessible to watering vehicles due to slope conditions or other safety factors. Disturbed surface areas (except completed grading areas) (2a/b) Apply dust suppression in sufficient quantity and frequency to maintain a stabilized surface. Any areas which cannot be stabilized, as evidenced by wind driven fugitive dust must have an application of water at least twice per day to at least 80 percent of the unstabilized area. Disturbed surface areas: Completed grading areas (2c) Apply chemical stabilizers within five working days of grading completion; OR (2d) Take actions (3a) or (3c) specified for inactive disturbed surface areas. Inactive disturbed surface areas (3a) Apply water to at least 80 percent of all inactive disturbed surface areas on a daily basis when there is evidence of wind driven fugitive dust, excluding any areas which are inaccessible to watering vehicles due to excessive slope or other safety conditions; OR (3b) Apply dust suppressants in sufficient quantity and frequency to maintain a stabilized surface; OR (3c) Establish a vegetative ground cover within 21 days after active operations have ceased. Ground cover must be of sufficient density to expose less than 30 percent of unstabilized ground within 90 days of planting, and at all times thereafter; OR (3d) Utilize any combination of control actions (3a), (3b), and (3c) such that, in total, these actions apply to all inactive disturbed surface areas. Unpaved Roads (4a) Water all roads used for any vehicular traffic at least once per every two hours of active operations [3 times per normal 8 hour work day]; OR (4b) Water all roads used for any vehicular traffic once daily and restrict vehicle speeds to 15 miles per hour; OR (4c) Apply a chemical stabilizer to all unpaved road surfaces in sufficient quantity and frequency to maintain a stabilized surface. Mitigation Measure: 3.3-1 (continued) • • • TABLE B (Continued) DUST CONTROL MEASURES FOR LARGE OPERATIONS (RULE 403 TABLE 2) Fugitive Dust Source Category Control Actions Open storage piles (5a) Apply chemical stabilizers; OR (5b) Apply water to at least 80 percent of the surface area of all open storage piles on a daily basis when there is evidence of wind driven fugitive dust; OR (5c) Install temporary coverings; OR (5d) Install a three -sided enclosure with walls with no more than 50 percent porosity which extend, at a minimum, to the top of the pile. This option may only be used at aggregate -related plants or at cement manufacturing facilities. All Categories (6a) Any other control measures approved by the Executive Officer and the U.S. EPA as equivalent to the methods specified in Table 2 may be used. TABLE C CONTINGENCY CONTROL MEASURES FOR LARGE OPERATIONS (RULE 403 TABLE 3) Hoag Memorial Hospital Presbyterian Master Plan Update Project Mitigation Monitoring and Reporting Program Mitigation Measure: 3.3-1 (continued) Fugitive Dust Source Category Control Actions Earth -moving (1A) Cease all active operations; OR (2A) Apply water to soil not more than 15 minutes prior to moving such soil. Disturbed surface areas (0B) On the last day of active operations prior to a weekend, holiday, or any other period when active operations will not occur for not more than four consecutive days: apply water with a mixture of chemical stabilizer diluted to not less than 1/20 of the concentration required to maintain a stabilized surface for a period of six months; OR (1 B) Apply chemical stabilizers prior to wind event; OR (2B) Apply water to all unstabilized disturbed areas 3 times per day. If there is any evidence of wind driven fugitive dust, watering frequency is increased to a minimum of four times per day; OR (3B) Take the actions specified in Table 2, Item (3c); OR (4B) Utilize any combination of control actions (1 B), (2B), and (3B) such that, in total, these actions apply to all disturbed surface areas. Unpaved Roads (1 C) Apply chemical stabilizers prior to wind event; OR (2C) Apply water twice per hour during active operation; OR (3C) Stop all vehicular traffic. Open Storage Piles (1 D) Apply water twice per hour; OR (2D) Install temporary coverings. Paved Road Track -Out (1 E) Cover all haul vehicles; OR (2E) Comply with the vehicle freeboard requirements of Section 23114 of the California Vehicle Code for both public and private roads. All Categories (1 F) Any other control measures approved by the Executive Officer and the U.S. EPA as equivalent to the methods specified in Table 3 may be used. Source: SCAQMD. TABLE D TRACK OUT CONTROL OPTIONS (A) Install a pad consisting of washed gravel (minimum -size: one inch) maintained in a clean condition to a depth of at least six inches and extending at least 20 feet wide and 50 feet long. (B) Pave the surface extending at least 100 feet and a width of at least 20 feet wide. (C) Utilize a wheel shaker/wheel spreading device consisting of raised dividers (rails, pipe, or grates) at least 24 feet long and 10 feet wide to remove bulk material from tires and vehicle under carriages before vehicles exit the site. (D) Install and utilize a wheel washing system to remove bulk material from tires and vehicle undercarriages before vehicles exit the site. (E) Any other control measures approved by the Executive Officer and the U.S. EPA as equivalent to the methods specified items (A) through (D) above. • • .• Source: SCAQMD. Standard for Compliance: Documented in contractor/subcontractor supplemental general conditions. Method of Verification: Contractor specifications check; field inspection. Timing of Verification: Ongoing during construction. Responsible Party(ies): Applicant; Planning Director or designated representative. Verification Date: City of Newport Beach Verification %123 f i' Approved by: (• CI Approved on: Signature: hog • • July 13, 2011 HOAG MEMORIAL HOSPITAL PRESBYTERIAN One Hoag Drive, PO Bor. 6100 Newport Beach, CA 9265E-6100 Mrs. Rosalinh Ung City of Newport Beach 3300 Newport Blvd. Newport Beach, CA 92663 RE: Compliance with .SCAQMD Rule 403 for Airborne Pollutants Hoag Hospital One South Exterior Improvements Project — TI 125925 Rosalinh: During construction of the HVI Exterior Improvements, the Applicant and its Contractors shall adhere with SCAQMD rules and regulations. Specifically and in response to SCAQMD rule 403 regarding fugitive dust and air pollutant control. The aforementioned project team has decided to adopt the active controls measures outlined in SCAQMD rule 403 in lieu of monitoring of particulate concentrations and will ensure that all air pollutants and fugitive dust are addressed with the following BMP's to control dust and other air pollutants created from construction activities. The mitigation measure is referenced in the agreement between the owner and contractor as Exhibit L. The following list will also be attached as a supplementary exhibit to the agreement between Hoag and the selected contractor that will perform the work for the Heart and Vascular Institute Exterior Improvements. The owner and / or their chosen representative as well as the contractor will conduct ongoing and daily monitoring of the project and implement all BMP's to ensure that this project adheres to rule 403. Below is a list of foreseen activities and how the owner and contractor will address the issues: Source Category Control Measure I BMP Backfilling 01-1 Stabilize backfill material when not actively handling; and 01-2 Stabilize backfill material during handling; and 01-3 Stabilize soil at completion of activity. • • • • Mix backfill soil with water prior to moving Dedicate water truck or high capacity hose to backfllling equipment Empty loader bucket slowly so that no dust plumes are generated Minimize drop height from loader bucket Clearing and Grubbing Hoag Hospital Newport Beach Hoag Hospital Irvine One Hoag Drive 16200 Sand Canyon Avenue Newport Beach, CA 92663 Irvine, CA 92618 wwwhoag.org EPi .' 63 t;C. ro) .tfl (1 u Q JnL 9L 3e! LJ '±' .(7' q 5 k t<, 4l I; I;a D iA. fv! • Source Category Control Measure BMP 02-1 Maintain stability of soil through pre -watering of site prior to clearing and grubbing; and 02-2 Stabilize soil during clearing and grubbing activities; and 02-3 Stabilize soil immediately after clearing and grubbing activities. • • Maintain live perennial vegetation where possible Apply water in sufficient quantity to prevent generation of dust plumes Clearing Forms 03-1 Use water spray to clear forms; or 03-2 Use sweeping and water spray to clear forms; or 03-3 Use vacuum system to clear forms. • Use of high pressure air to clear forms may cause exceedance of Rule requirements Cut and Fill 05-1 Pre -water soils prior to cut and fill activities; and 05-2 Stabilize soil during and after cut and fill activities. • • For large sites, pre -water with sprinklers or water trucks and allow time for penetration Use water trucks/pulls to water soils to depth of cut prior to subsequent cuts Demolition — Mechanical/Manual 06-1 Stabilize wind erodible surfaces to reduce dust; and 06-2 Stabilize surface soil where support equipment and vehicles will operate; and 06-3 Stabilize loose soil and demolition debris; and 06-4 Comply with AQMD Rule 403. • Apply water in sufficient quantities to prevent the generation of visible dust plumes • Disturbed Soil 07-1 Stabilize disturbed soil throughout the construction site; and 07-2- Stabilize disturbed soil between structures • . . Limit vehicular traffic and disturbances on soils where possible If interior block walls are planned, install as early as possible Apply water or a stabilizing agent in sufficient quantities to prevent the generation of visible dust plumes Earth -Moving Activities 08-1 Pre -apply water to depth of proposed cuts; and 08-2 Re -apply water as necessary to maintain soils in a damp condition and to ensure that visible emissions do not exceed 100 feet in any direction; and 08-3 Stabilize soils once earth -moving activities are complete. • . . Grade each project phase separately, timed to coincide with construction phase Upwind fencing can prevent material movement on site Apply water or a stabilizing agent in sufficient quantities to prevent the generation of visible dust plumes Importing/Exporting of Bulk Materials 09-1 Stabilize material while loading to reduce fugitive dust emissions; and 09-2 Maintain at least six inches of freeboard on haul vehicles; and 09-3 Stabilize material while transporting to reduce fugitive dust emissions; and 09-4 Stabilize material while unloading to reduce fugitive dust emissions; and 09-5 Comply with Vehicle Code Section 23114. • • • • Use tarps or other suitable enclosures on haul trucks Check belly -dump truck seals regularly and remove any trapped rocks to prevent spillage Comply with track -out prevention/mitigation requirements Provide water while loading and unloading to reduce visible dust plumes A NOT -FOR -PROFIT COMMUNITY HOSPITAL ACCREDITED BY THE JOINT COMMISSION ON ACCREDITATION OF HEALTHCARE ORGANIZATIONS IUYI I7 Q G3 it 11 Qo C Q Il >S 7•iY\fit • • Source Category Control Measure BMP Landscaping 10-1 Stabilize soils, materials, slopes Staging Areas • Apply water to materials to stabilize and maintain materials in a crusted condition • Maintain effective cover over materials • Stabilize sloping surfaces using soil binders until vegetation or ground cover can effectively stabilize the slopes • Hydroseed prior to rain season 13-1 Stabilize staging areas during use; and 13-2 Stabilize staging area soils at project completion. • • • Limit size of staging area Limit vehicle speeds to 15 miles per hour Limit number and size of staging area entrances/exists Stockpiles! Bulk Material Handling 14-1 Stabilize stockpiled materials. 14-2 Stockpiles within 100 yards of off -site occupied buildings must not be greater than eight feet in height; or must have a road bladed to the top to allow water truck access or must have an operational water irrigation system that is capable of complete stockpile coverage. Trenching • Add or remove material from the downwind portion of the storage pile • Maintain storage piles to avoid steep sides or faces 16-1 Stabilize surface soils where trencher or excavator and support equipment will operate; and 16.2 Stabilize soils at the completion of trenching activities. Truck Loading • Pre -watering of soils prior to trenching is an effective preventive measure. • For deep trenching activities, pre -trench to 18 inches, soak soils via the pre -trench, and resume trenching • Washing mud and soils from equipment at the conclusion of trenching activities can prevent crusting and drying of soil on equipment 17-1 Pre -water material prior to loading; and 17.2 Ensure that freeboard exceeds six inches (CVC 23114) • • Empty loader bucket such that no visible dust plumes are created Ensure that the loader bucket is close to the truck to minimize drop height while loading Source: SCAQMD. Regards, Cary Brooks Senior Project Manager REFCO A NOT -FOR -PROFIT COMMUNITY HOSPITAL ACCREDITED BY THE JOINT COMMISSION ON ACCREDITATION OF HEALTHCARE ORGANIZATIONS • • • Hoag Hospital Project: Heart and Vascular Institute Projects Mitigation Measure: 3.3-2 Prior to issuance of each grading permit, the Applicant shall include the following notes on the contractor specifications submitted for review and approval by the City of Newport Beach Department of Public Works: To reduce construction equipment emissions, the following measures shall be implemented: • Maintain construction equipment engines by keeping them tuned. • Use existing power sources (i.e., power poles) when available. This measure would minimize the use of higher polluting gas or diesel generators. • Configure construction parking to minimize traffic interference. • Minimize obstruction of through -traffic lanes. Construction shall be planned so that lane closures on existing streets are kept to a minimum. • Schedule construction operations affecting traffic for off-peak hours to the best extent when possible. • Develop a traffic plan to minimize traffic flow interference from construction activities (the plan may include advance public notice of routing, use of public transportation, and satellite parking areas with a shuttle service). Standard for Compliance: Documented in contractor/subcontractor supplemental general conditions. Method of Verification: Contractor specifications check. Timing of Verification: Prior to issuance of each grading permit. Responsible Party(ies): Applicant; Public Works Director or designated representative; Planning Director or designated representative. Verification Date: City of Newport Beach Verification Approved on: 1043/i( Approved by: Signature: Hoag Hospital Project: Heart and Vascular Institute Projects • • Approved on: Approved by: Signature: • Mitigation Measure: 3.3-2 Prior to issuance of each grading permit, the Applicant shall include the following notes on the contractor specifications submitted for review and approval by the City of Newport Beach Department of Public Works: To reduce construction equipment emissions, the following measures shall be implemented: • Maintain construction equipment engines by keeping them tuned. • Use existing power sources (i.e., power poles) when available. This measure would minimize the use of higher polluting gas or diesel generators. • Configure construction parking to minimize traffic interference. • Minimize obstruction of through -traffic lanes. Construction shall be planned so that lane closures on existing streets are kept to a minimum. • Schedule construction operations affecting traffic for off-peak hours to the best extent when possible. • Develop a traffic plan to minimize traffic flow interference from construction activities (the plan may include advance public notice of routing, use of public transportation, and satellite parking areas with a shuttle service). Standard for Compliance: Method of Verification: Timing of Verification: Responsible Party(ies): Verification Date: Documented in contractor/subcontractor supplemental general conditions. Contractor specifications check. Prior to issuance of each grading permit. Applicant; Public Works Director or designated representative; Planning Director or designated representative. City of Newport Beach Verification eZfr3/tr f. ArM" 424&tQt-C26 Hoag Hospital Project: Heart and Vascular Institute Projects Mitigation Measure: 3.3-3 Prior to issuance of each building permit for the proposed Master Plan Update Project, the Applicant shall include the following notes on the contractor specifications submitted for review and approval by the City of Newport Beach Building Department: • Minimize the amount of paint used by using pre -coated, pre -colored, and naturally colored building materials. • Use high transfer efficiency painting methods such as HVLP (High Volume Low Pressure) sprayers and brushes/rollers were possible. Standard for Compliance: Documented in contractor/subcontractor supplemental general conditions. Method of Verification: Contractor specifications check. Timing of Verification: Prior to issuance of each building permit or City approval for a project subject to OSHPD approval. Responsible Party(ies): Applicant; Building Director or designated representative; Planning Director or designated representative. Verification Date: City of Newport Beach Verification Approved on: glZ3ltI Approved by: f41,x_ou)(D. (n\37 Signature: • Hoag Hospital Project: Heart and Vascular Institute Projects • • • Mitigation Measure: 1 Prior to the issuance of a grading permit, the Project Sponsor shall document to the City of Newport Beach Building Department that grading and development of the site shall be conducted in accordance with the City of Newport Beach Grading Ordinance and with plans prepared by a registered civil engineer. These plans shall incorporate the recommendations of a soil engineer and an engineering geologist, subsequent to the completion of a comprehensive soil and geologic investigation of the site. Permanent reproducible copies of the "Approved as Built" grading plans shall be furnished to the Building Department by the Project Sponsor. Standard for Compliance: Shown on approved grading plans, permanent reproducible copies to be provided at project completion. Method of Verification: Plan check. Timing of Verification: Prior to the issuance of a grading permit. Responsible Party(ies): Applicant; Building Director or designated representative; Planning Director or designated representative. Verification Date: City of Newport Beach Verification Approved on: `61Z? Ill Approved by: Signature: f-. „„ 62RokQk''6 Hoag Hospital Project: Heart and Vascular Institute Projects • • • Mitigation Measure: 1 Prior to the issuance of a grading permit, the Project Sponsor sha'll document to the City of Newport Beach Building Department that grading and development of the site shall be conducted in accordance with the City of Newport Beach Grading Ordinance and with plans prepared by a registered civil engineer. These plans shall incorporate the recommendations of a soil engineer and an engineering geologist, subsequent to the completion of a comprehensive soil and geologic investigation of the site. Permanent reproducible copies of the "Approved as Built" grading plans shall be furnished to the Building Department by the Project Sponsor. Standard for Compliance: Shown on approved grading plans, permanent reproducible copies to be provided at project completion. Method of Verification: Plan check. Timing of Verification: Prior to the issuance of a grading permit. Responsible Party(ies): Applicant; Building Director or designated representative; Planning Director or designated representative. Verification Date: City of Newport Beach Verification Approved on: Approved by: Signature: / Hoag Hospital Project: Heart and Vascular Institute Projects • Mitigation Measure: 3 Prior to the issuance of a grading permit, the Project Sponsor shall provide to the City of Newport Beach a comprehensive soil and geologic investigation and report of the site prepared by a registered grading engineer and/or engineering geologist. This report shall also identify construction excavation techniques which ensure no damage and minimize disturbance to adjacent residents. This report shall determine if there are any on -site faults which could render all or a portion of the property unsafe for construction. All recommendations contained in this investigation and report shall be incorporated into project construction and design plans. This report shall be submitted to the City for review and approval. Standard for Compliance: Approval of comprehensive soil and geologic report. Method of Verification: Documentation of approved soil and geologic report. Timing of Verification: Prior to the issuance of a grading permit. Responsible Party(ies): Applicant; Building Director or designated representative, Planning Director or designated representative. Verification Date: City of Newport Beach Verification Approved on: n . % / )( 1110 Approved by: Signature: • • • Approved on: Approved by: Signature: Hoag Hospital Project: Heart and Vascular Institute Projects Mitigation Measure: 3 Prior to the issuance of a grading permit, the Project Sponsor shall provide to the City of Newport Beach a comprehensive soil and geologic investigation and report of the site prepared by a registered grading engineer and/or engineering geologist. This report shall also identify construction excavation techniques which ensure no damage and minimize disturbance to adjacent residents. This report shall determine if there are any on -site faults which could render all or a portion of the property unsafe for construction. All recommendations contained in this investigation and report shall be incorporated into project construction and design plans. This report shall be submitted to the City for review and approval. Standard for Compliance: Approval of comprehensive soil and geologic report. Method of Verification: Documentation of approved soil and geologic report. Timing of Verification: Prior to the issuance of a grading permit. Responsible Party(ies): Applicant; Building Director or designated representative, Planning Director or designated representative. Verification Date: City of Newport Beach Verification . JN7 G E O T E K GeoTek, Inc. 710 East Parkridge Avenue, Suite 105, Corona, CA 92879-1097 95 1-710-1160 Office 951-710- 1167 Fax www.geotekusa.com September 13, 2011 Project No. 0775-CR3 Hoag Memorial Hospital Presbyterian 500 Superior Avenue, Suite 300 Newport Beach, California 92663 Attention: Mr. Cary Brooks Subject: Response to City Geotechnical Review Comments Hoag Hospital HVI Entry Improvements, One Hoag Drive Newport Beach, Orange County, California References: See Page 7 Dear Mr. Brooks: GeoTek, Inc. (GeoTek) is pleased to present herein our response to review comments dated July 27, 2011 by the City of Newport Beach reviewer, Mr. Ken Bagahi. Review comments were provided to GeoTek by the project architect. For clarity and ease of review, each of the reviewer's comments is reiterated below and is followed by this firm's response. Item No. I "Page 2. Report is based on previous findings by Crandall and MACTEC. Please provide relevant portions of the previous reports utilized in this study including boring locations, logs and relevant lab data." Response Relevant portions of the referenced reports are included in Appendix A of this response report. Item No. 2 "Page 5. Passive earth pressures and coefficient of friction exceed code values. Please provide supporting computations." GEOTECHNICAL I ENVIRONMENTAL I MATERIALS • • • HOAG MEMORIAL HOSPITAL PRESBYTERIAN Project No. 0775-CR3 Response to City Geotechnical Review Comments September 13, 2011 Hoag Hospital HVI Entry Improvements, Newport Beach, Orange County, California Page 2 Response Based on the information from the referenced reports (LeRoy Crandall, 1971; MACTEC, 2006) a friction angle of 29 degrees and a moist unit weight of 105 pcf were selected to represent the on -site formational materials. Using those values the following can be calculated: Rankine passive coefficient (Kp) = 2.882; Passive resistance = (2.882) x (105) = 302.6 psf/ft, USE 250; Maximum passive resistance = 15 x 250 = 3,750 psf/ft; Coefficient of Friction = tan-1(29)/1.5 = 0.37, USE 0.35. Item No.3 "Pages 6 and 7. Please provide computations for recommended earthquake forces for active and restrained cases. Please note that Section 1601.1 deals with static loading. Seismic loading is discussed in Section 1803.5.12." Response The earthquake forces were computed for the active condition using the Mononobe- Okabe/Seed-Whitman procedure using Kh=0.15. Therefore, the additional seismic increment, iPae, equals 0.75 x (Kh) x (y) x H2 = 0.75 x (0.15) x (105) x H2 = 11.8 H2, use 12 H2. Similarly, using Wood (1973) for restrained condition, APae, equals (Kh) x (y) x H2 = (0.15) x (105) x H2 = 16.5 H2, use 17 H2. Note this value was incorrectly reported as 32H2 in the referenced report by GeoTek (20 I I ). Item No. 4 "Page 6. Wall backfill. Please provide separation fabric between crushed rock and on -site soil backfill." Response The first paragraph under the heading "Wall Backfill and Drainage" on page 6 of the referenced report (GeoTek, 201 I) has been revised as indicated below. The added text relevant to the reviewer's request is underlined. The onsite soils characterized as having "very low" to "low" expansion potential may be used for backfill provided they are screened of greater than 3-inch size gravels. Wall backfill should include a minimum one foot wide section of 3/4 to I -inch clean crushed rock (or approved equivalent). The rock should be placed immediately adjacent to the back of wall and extend up from the back drain to within approximately 12 inches of finish grade. A geotextile fabric, such as Mirafi 140N (or approved equivalent), should be placed between the crushed rock and the backfill materials. The upper 12 inches should consist of compacted onsite materials. Presence of other materials might necessitate revision to the parameters provided and modification of GEOTEK • • • HOAG MEMORIAL HOSPITAL PRESBYTERIAN Project No. 0775-CR3 Response to City Geotechnical Review Comments September 13, 2011 Hoag Hospital HVI Entry Improvements, Newport Beach, Orange County, California Page 3 wall designs. The backfill materials should be placed in lifts no greater than 8-inches in thickness and compacted to a minimum of 90% relative compaction in accordance with ASTM Test Method D 1557. Proper surface drainage needs to be provided and maintained. Item No. 5 "Page 7. Caisson Design. Please review Structural Plans Sheets S-2.01 and S3.02 and supporting computations for conformance with your recommendations and in particular provide (a) passive earth pressure for caissons in close proximity of the basement wall and resulting surcharge loading and its distribution on the wall (b) in caisson supported footings, provide footing surcharge (vertical and lateral) on caissons below (c) vertical and lateral bearing for footings located in the active failure plane behind the caissons (d) provide computations for the axial capacity of the belled caissons (e) expected differential settlement between the wall supported on caissons and wall supported on footings and (f) provide subsurface profile on a typical section. Response GeoTek's responses to the reviewer's comments 5(a) through 5(f) are presented below. (a) It is this firm's understanding that the passive resistance for those caissons near the wall (i.e. Details L 13, A I , A5 and Al 3 on Sheet S3.02 of the structural plans) will be provided by the concrete keyways depicted on the details. (b) In situations where two rows of caissons are utilized (i.e. Section L I on Sheet 3.02), GeoTek suggests deepening the upper caisson below a 45 degree projected from the bottom portion of the caisson bell located furthest away from the wall in order to reduce the surcharge on the lower, adjacent caisson. (c) Since the lateral resistance is being provided by the keyway on the conventional footing, it is not anticipated that an active failure plane will develop behind the caissons. (d) See attached computations for the axial capacity of caissons in Appendix B. (e) Assuming an allowable bearing of 6000 psf for the caissons and 2000 psf for the continuous footings, a differential settlement of approximately I -inch over 40 horizontal feet has been estimated. (f) The subsurface materials anticipated to be encountered at the site consist primarily of Pleistocene -aged Terrace Deposits and possibly some fill materials. The Terrace Deposits are generally massive and have a typical near -surface weathered profile (approximately 2-3 feet thick). Detail AS from Sheet S3.02 of the structural plans has been modified to depict the anticipated subsurface profile on a typical section. See below. GEOTEK • • HOAG MEMORIAL HOSPITAL PRESBYTERIAN Project No. 0775-CR3 Response to City Geotechnical Review Comments September 13, 2011 Hoag Hospital HVI Entry Improvements, Newport Beach, Orange County, California Page 4 Geotechnical Legend pt - Terrace Deposit at Note: Section is from Detail AS on Sheet S3.02 of the Structural Mans by MAD Taylor Gaines Item No. 6 "Page 7. Please provide recommendations for caisson installation including caving, temporary shoring maximum diameter of the bell, minimum embedment required, and bell clean out and inspection. Response The diameter of the caisson bell should not exceed three and one-half (3 V2) times that of the caisson. The caisson excavation bottoms should be cleared of loose soil at the completion of drilling and reaming. Temporary casing of the shafts and shoring of the bells must be provided to allow for personnel to clean and observe the excavations. Prior to concrete or steel placement, the caisson excavations should be observed a by GeoTek representative to confirm the anticipated geologic conditions, depth, and loose soil removal. Caissons should be embedded a minimum of two (2) feet into dense formational material. Concrete placed for the caissons should not be allowed to fall more than four (4) feet. A tremie tube should be used to place concrete deeper than four (4) feet. Excavations should be free of loose soil at the time of concrete placement. Item No. 7 "Page 7. Sulfate. Please revise to read Type V cement." Response The paragraph under the heading "Sulfate and Corrosion Testing" on page 9 of the referenced report (GeoTek, 201 1) has been revised as indicated below. The revised wording relevant to the reviewer's request is underlined. G EOTEK • HOAG MEMORIAL HOSPITAL PRESBYTERIAN Project No. 0775-CR3 Response to City Geotechnical Review Comments September 13, 201 1 Hoag Hospital HVI Entry Improvements, Newport Beach, Orange County, California Page 5 Concrete utilizing Type V cement with a maximum water to cement ratio of 0.45 and minimum strength of 4,500 psi is recommended for the site, due to the site's proximity to the ocean and industry standards used in the area. The MACTEC (2006) report includes a "Soil Corrosivity Study" performed by M.J. Schiff and Associates, Inc. The project design team should incorporate the recommendations presented in the "Soil Corrosivity Study" into the proposed improvements, as appropriate. Item No. 8 "Please provide a statement that the proposed construction is feasible and would not adversely impact adjoining improvements." Response Provided that the recommendations presented herein and this firm's referenced report are incorporated into the design and construction, it is our opinion that the proposed construction is feasible and is not anticipated to adversely impact adjoining improvements. Geotechnical observation and testing should be performed during construction. If field conditions differ from those anticipated based on the referenced field investigative work and laboratory test results, additional recommendations may be necessary. Item No. 9 "Review. Please review and comment upon the geotechnical aspects of the grading and foundation plans and verify that the plans are in conformance with the geotechnical recommendations in the referenced report. Please include a copy of the plans with your response." Response GeoTek has reviewed the civil plans titled "HVI Entry Improvements" by Halladay and Mimmack, Inc. and the structural plans by TMAD Taylor Gaines, both with latest revision dates of September 13, 201 1, and found them to be in general conformance with the geotechnical recommendations presented in this and the referenced report (GeoTek, 201 1). It is this firm's understanding that the project architect will submit copies of the plans with this response. GEOTEK • HOAG MEMORIAL HOSPITAL PRESBYTERIAN Project No. 0775-CR3 Response to City Geotechnical Review Comments September 13, 2011 Hoag Hospital HVI Entry Improvements, Newport Beach, Orange County, California Page 6 LIMITATIONS Our findings are based on site conditions observed and the stated sources. Thus, our comments are professional opinions that are limited to the extent of the available data. These opinions have been derived in accordance with current City/County standards of practice and no warranty is expressed or implied. Standards of practice are subject to change with time. The opportunity to be of service is sincerely appreciated. If you should have any que • s, please do not hesitate to call our office. Respectfully submitted, GeoTek, Inc. "'VC - Edward H. LaMont CEG 1892, Exp. 7/31 / 12 Principal Geologist Distribution: (3) Q�Q: R ���� �. W No.1892 a `� Exp...__ —04 g 9�J/B R9G `i. '°A, CAL Addressee Enclosures: Appendix A — Excerpts from Previous Reports Appendix B — Caisson Axial Capacity Computations Ronald A. Reed GE2524, Exp. 6/30/13 Senior Project Engineer GAProjects10751 to 0800\0775CR3 Hoag Hospital, HVI Entry Improvements10775CR3 Hoag Hospital, Response to Geotechnical Review Comments, HVI Entry Improvements l.doc ,G, GEOTEK • • HOAG MEMORIAL HOSPITAL PRESBYTERIAN Project No. 0775-CR3 Response to City Geotechnical Review Comments September 13, 2011 Hoag Hospital HVI Entry Improvements, Newport Beach, Orange County, California Page 7 CITED REFERENCES Geotek, Inc., 2011, "Supplemental Geotechnical Evaluation, Hoag Hospital HVI Entry Improvements, One Hoag Drive, Newport Beach, Orange County, California," Project No. 0775CR3, dated June 14 (revised July 20, 2011). LeRoy Crandall and Associates, 1971, "Report of Foundation Investigation, Proposed Parking Structure, 301 Newport Boulevard, Newport Beach, California," Job No. A-7I235, dated November 23. MACTEC, 2006, "Report of Geotechnical Investigation, Proposed South Building, Hoag Memorial Hospital Presbyterian, One Hoag Drive, Newport Beach, California," Project 4953-05-2451, dated February 20. .0 GEOTEK • • • APPENDIX A EXCERPTS FROM PREVIOUS REPORTS ..G. GEOTEK INDICATES AePnbx1_ COMPACT ED , FILL APPRO, L.MIT LONTROLLED FILL; L.C. & A-, REPORT a-7003i GATED 4- VS. b HOSp!TAL BOR/NO ')VO. • BORING DATE. oRtt.LED : Octocer 28 8, 29, 1971 EQUTMENT- USED: 18 D arneter ticket PILL -SILTY SAND'SAND and SANDY SILT'.. MIXTURE - mottled brown and grey Elevations refer to datum of reference drawing; see Plate 1 for location of benchmark, 40 (CONTINUED ON FOLLOWING PLATE) LOG OF BORING .E;ROY" `CR DALL {AND A_SSOCIA1 BORING I (CONTINUED) 4T October 28 & 29, 197 18"-Diameter aucket BORING 2 DRILLED ; October 25, 1971 EQUIPMENT USED; 18"-Diameter 3uvket ATtON 69.0 1'. Asphaltic Paving - 3 Base Course FILL - SILTY SAND and SAND MIXTURE - light brown SAND - fine, brown ne; light grey on brown Few: shells 3.4 103 3.1 94 40 (CONTINUED ON FOLLOWING PLATE) LOG OF BORING LEROY CRANDALL AND ASSOCIATES zz a BORING 2 (CONTINUED) TE DR L LE D . October 25, 1971 EQUiPMEN I USED. 18'-Dio,neter BLcket old 'grey:an o alic matt er gr Layer of:San+ BORING TERMINATED DUE TO HEAVY SLOU ING I - SIight water seepage encountered at a depth Water level at a depth,of°59'-15 Minutes after `aom- pletion of drilling. :Raveling from 17' to 43' (to24" 'in diameter}, and heavy sloughing below 59'. LOG OF BORING S 2 - 35 40 / tL`,. ok o,o //c 34.3 2.1. 3.5 2.3 5.0 3.7 4.9 117 90 95 91 95 93 I I • BORING 3 : October 26, 1971 P`,'.EN . =- 18"-Dicmeter Bucket ELEV^,TiON 73.2 1" As hattic Paving -? " oncrete SA,N ,- fine, light greyis-brown (CONTINUED ON FOLLOWING PLATE) LOG OF BORING ' E R O Y- CR A O AL AN r ASSOCIATE. 'BORING 3 (CONTINUED) D TE R _LE . October 26, 197i F w "' ��a : ' `SE� : 18'°`_� ameter Bucket MI CO ceo'us, MO' NOTE: Water level at a depth of 70' 10 minutes after completion of drilling. Raveling from 15' to 40' (to24" in diameter).Methane gas fumes encountered below 60'. LOG OF BORING LEROYCRANDALL. ANDAS,SbC BORING 4 F. . October 33, 1971 _ L MENT USE 18'-Dicmeter Buckex 62.2 SAND 3O ._ Patches of Silty Clay 3U- 6.4 �4' Reddish -brown (CONTINUED ON FOLLOWING PLATE) LOG OF BORING _LEROY CR D -L -AND ASSo.c• r S` r° BORING 4 (CONTINUED) SATE t.:;Ri [..LED: October 30, 1971 UdJIP.MENT USED : 18'-Dicrneter Becket 1L SANDY SILT - micaceous, brown and grey TE: Water not encountered. Raveling from 3' and from;26` to 28' (to 30" in diameter). BORING 5 DATE DR;LLED: October 25, 1971 EQUIPMENT USED: 18"-Diameter Bucket ELEVATION 66.4 � 5s8 94 (CONTINUED ON FOLLOWING PLATE) LOG OF BORING LEROY CRANDALL'_ :ANJD _ASSOCJATES �z C 25— -' 4.4 1i33 72 21:.2 ° 107 DAT EDU(P BORING 5 (CONTINUED) DR L LED : October 25, 1971 ENT USED. 18"-Diameter Bucket NOTE: Wafer level at -a depth of 62' 1 day after completion n c of drilling. Raveling from 16'-to 28' (to 24" in dhia- z 3 meter) and From 31' to 48' (to 36" in diameter). LOG OF BORING LEROY CRANDALL AIUDASSocIA 45 4.4 4i 3.2 93 6.88 (CONTINUED 0 BORING D,R<_ : October 28, 1971 ;,!E - USED: 1 S Diameter Bucket ELEVA IO,N 67.6 Patches of Silt FOLLOWING PLATE) LOG OF BORING BORING 6 (CONTINUED) DATEOctcber 28, 1971 EQUI �=�°��LED � M .. a ; USE . 1 S"-✓ iameter 8u ket Layers of Silty Sand e qnd- coors,e out 0° gravel, few cobbles to SW SAND - well graded, few gravel, grey NOTE: Water encountered at a depth of 69'; water level at a depth of 611 1 hour after completion of drilling. Caving from 10' to 15' (to 36" in diameter),, ravel- ing from 15' to 30' (to 22" in diameter) and caving from 45' to 50' (to 36" in diameter). Methane gas Fumes encountered below 50'. A reading in excess of 100 was noticed on M.I.S. Explosimeter. LOG OF BORING BORING 7 ,4.-.\ �\`4, O�.T;E EjR; L LEG , October 27, 1971 y/ Vic;`fr, ©F. 0- Q�' EQL P.M ENT USL�: l3'`-Diameter Bucket 27.5 SANDY CLAY -sdr ed brown SP SAND fine, greyish -brown BORING TERMINATED DUE TO HEAVY SLOUG ING) NOTE: Water level at a depth of 19i' l 0 minutes after completion of drilling.Sloughing from 15' to 16' and below 23'. LOG OF BORING BORING 8 DATE DR L LEC , ©cicber.27, 971 EQU! P Al! \. *i' USED l 8"-Diameter Bucket TIO N 57„9 a 4 E3ORING 8 (CONTINUED) Tc_ E . October 27, 1971 1 3'-Di•umeter Bucket Water not encountered. Raveling from 15to 25'. (to 24" in diameter) and from 25' to 30' (to 36" in diameter): LOG OF BORING :LEROY CRAN DALL AND A.SSQCI:AT GORING 9 '= R -LED : October 27, 1971 L—RMENT USED: 1."-Diameter aucket LOG OF BORING Li0 I. r BORING 9 (CCNTfNUED) FDRILLED: October 27, 1971 E Q:J; ENTFNT USED 18"-D wneter Buckeh cies of Silt NOTE: 'Water not encountered. Caving .from 15' to 30' (to 30" in diameter) and from 31' to 38' (to 48" in diameter). SC?CiAT MAJOR DIVISIONS COARSE GRAINED SOILS (More than 50% of material is LARGER than. No: 200 sieve size) FINE,: GRAINED SOILS (More than 50% of material is SMALLER than No.200 sieve size) GRAVELS (More than 50 % of coarse fraction is LARGER than the No. 4 sieve size) SANDS More than 50% of coarse fraction is SMALLER than the No. 4 sieve size) GROUP SYMBOLS CLEAN GRAVELS (Little or no fines GRAVELS WITH FINES (Appreciable amt. of fines) CLEAN SANDS (Little or no fines } SANDS WITH FINES -• (Appreciable amt.: of fines) :. SILTS AND CLAYS (Liquid limit LESS than 50) SILTS AND CLAYS (Liquid limit GREATER than 50) HIGHLY ORGANIC SOILS GW GP SM CH Pt TYPICAL NAMES Well graded gravels, gravel -sand mixtures, little or no fines. Poorly graded gravels or gravel -sand mixtures, little or no fines. Silty gravels,' gravel- sand - silt mixtures. Clayey gravels, grovel- sand -cloy mixtures. Well graded sands, gravelly sands, little or no fines. Poorly graded sands or gravelly sands , little or no fines. Silty sands sand -silt mixtures. Clayey sands, sand- clay mixtures. Inorganic silts and very fine sands, rock flour, silty or clayey fine sands or clayey silts withslight: plasticity. Inorganic clays of low to medium plasticity, gravelly clays, sandy clays, silty clays, lean clays. Organic silts and organic silty clays of low plasticity . Inorganic silts, micaceous ordiatomaceous fine sandy or silty soils, elastic silts. Inorganic clays of highplasticity, fat clays: Organic clays of medium to high plasticity , organic silts. Peat and other highly organic soils. BOUNDARY CLASSIFICATIONS: Soils possessing characterist'cs of two groups are designated by combinations of group symbols P A' RTICLE SIZE LIMITS SILT OR CLAY SAND GRAVEL i COBBLESI I BOULDERS FINE MEDIUM COARSE FINE COARSE. NO.200 NO.40 NO 10 N0.4 %in. U. S. STANDARD SIEVE SIZE Sin. (12 in.) UNIFIED SOIL CLASSIFICATION SYSTEM Reference : The Unified Soil Classification System, Corps of Engineers, U.S. Army Technical Memorandum No. 3-357, Vol. I, March, 1953. (Revised April, 1960) LEROY CRANDALL & ASSOCIATES PLATE B w S. O 5000 CC SHEAF; STRENGTH in Pounds per Square Foot 000 2000 3000 4000 z5 3es¢ ; 5mZ9 603d 24'3Z Q 3e38 3�7 p 1".06 It av, 1000 r e4 a \ L • r63 f/ 214 so:, ye/a \ s • L. 4yl$cl get$ 2000 6E022. f‘3023 1023 9025 a it • 3(07 o C. 7PZ8 3000— a 2.3O • • Li) d 033 • 5033 CC • • 70•lC�34 3. Le (I) (I) 20 37• L1J 6E0 y 5438s 4000 VALUES iJ ANALYSES. KEY: • Tests at field moisture content o Tests at increased moisture content DIRECT SHEAR TEST DATA PLATE C LOAD l ' K; PS PER SQUARE FOOT 0.4 0.5 0.5 07 0.8 0.9 I.0 0.07_ NOTE: Samp es testedat _Field moisture con 2.0 3.0 4.0 5,0 5.0 CONSOLIDATION TEST DATA LEROY CR 4DALL_ a Assoc t T LOAD IN KIPS FEF S; 'APE FOOT 0.4 0.5 0.6 0.7 0.8 C.9 !.0 0 NOTE: Samples tested of field moisture Content, 4.0 of 0 6.0 Bari rig 7 -af. ,i SlLTY;CLAY- CONSOLIDATION TEST DATA LEROY=„CRAN.QALL LOAD IN KIPS PER SQ .RARE FOOT 0. 0.5 06 0.7 0.8 0.9 1.0 0.01 I U z 0.02 0.04 0 I0.0 0.06r 0.07 2.0 NOTE: Samples tested at field moisture content, CONSOLIDATION TEST DATA 4' 5,0 8,0 7.0 8.0 LEROY CRANDALL 8 ASSOCIATES LOAD 1N KiPS PER SQUARE FOOT 0.4 0.5 0.6 0.7 0.8 0.9 1.0 i 0 0.0 a 0.03- v 0.06- 0.07 2.0 3.0 4.0 5.0 6.0 NOTE: Sample tested at field moisture content. CONSOLIDATION TEST DATA n �.EvY CRANDALL a -°',SS,`�.c:ATLS PLATE D-4 • f( lifli"flflfiill:HI!!Ifl "OsIrAL RO 43 SOUTH HOAG DRIVE (( 3" i 'jO �; - PROPOSED SOUTH BUILDING REFERENCE. SITE 2 PLAN PROVIO� KAPLAN McLAUGHLI MA E-MAIL ON 7/22/05 LEGEND: 3 CURRENT INVESTIGATION (4953-05-2451) PREVIOUS INVESTIGATION (70131.7-0254.0001) 134 PREVIOUS INVESTIGATION (70131-54362.0002) 2e PREVIOUS INVESTIGATION (59000AO) 3 PREVIOUS INVESTIGATION (A-54159) 30 PREVIOUS INVESTIGATION (A-71235) 19,9 PREVIOUS INVESTIGATION (A-6BOE0) I--- BORING LOCATION AND NUMBER B _ B' 6 GEOLOGIC SECTION LINE MACTEC pL0t]CRAM. MM LOZ ANOELE S.CAuFoitml 140Mfo FAX OM 65943fe FIGURE 2 PLOT PLAN PROPOSED SOUTH BUILDING HOAG MEMORIAL HOSPITAL PRESBYTERIAN NEWPORT BEACH. CALIFORNIA YROS'CT NO. 4955-05-7451 : I*LYN EWE:OS/bt/04 MN it LI, moo ar, a • LA DATA CR 52451.GPJ LAW CRAN.GDT 2/20/06 za 0 F< 00ua gg y3 ELI CA as 0z 0 Oz 0 0 o a a< H Q Al CFI li Off 0 ra m zW ox NF w0 as en F ELEVATION (ft) 95—_ 90—_ 10 85- - 15 80 —_ 20 75 —_ 25 70— • — 30 65- 60- 35 40 32 41 52 48 52 00 8.1 1.7 6.0 3.3 1.9 4.5 120 105 104 93 93 R9 32 28 19 64 64 64 64 (C BORING 1 DATE DRILLED: September 1, 2005 EQUIPMENT USED: Hollow Stem Auger HOLE DIAMETER (in.): 8 • ELEVATION: 97.7** 3" Thick Asphalt Concrete over 6" Thick Base Course FILL - SILTY SAND - moist, brown, fine to medium, some coarse SILTY SAND - medium dense, moist, brown, fine to medium, some coarse 16% Passing No. 200 Sieve Becomes dense and light brown Layer of Sandy Silt POORLY GRADED SAND - very dense, moist, light brown, somelight gray, fine to medium Becomes dense Becomes very dense * Number of blows required to drive the Crandall sampler 12 inches using a 140 pound hammer failing 30 inches. ** Boring elevation based on assumed datum with Elevation 100. (please see Plot Plan). Becomes dense Some iron staining Becomes very dense ONTINUED ON FOLLOWING FIGURE) Field Tech: AR Prepared By: JR Checked By: HOAG HOSPITAL Newport Beach, California tyiMACTEC LOG OF BORING Project: 4953-05-2451 Figure: A-1.1 a • a v ELEVATION (ft) V � w + * Li H N 3 r4, ,,,1 4: F, ek >Ao W 11? v Z' " az A e4 •rn BORING 1 (Continued) DATE DRILLED: September 1, 2005 EQUIPMENT USED: Hollow Stem Auger HOLE DIAMETER (in.): 8 ELEVATION: 97.7** 55 —_ 45 50—_ 50 45— - 55 ti 40- ▪ - 60 35—_ 65 30- 70 25— a. -- 75 20— SO 6.4 • 41 93 46 5.8 43 26.0 16 38.5 32 89 89 78 51 34 38 SM • • .1&••••SP 39.1 78 45 ML • ML Becomes light brown and light gray Becomes dense SILTY SAND - very dense, moist, brown to dark brown, very fine POORLY GRADED SAND - dense, moist, light brown and light gray, fine to medium Layers of Silty Sand SANDY SILT - hard, moist, brown and gray, very fine, lenses of Silt 75.6% Passing No. 200 Sieve, LL = 35.8, P1= 9.4 Some Clay CLAYEY SILT - hard, moist, dark gray, very fine sand END OF BORING AT 75 FEET NOTE: Hand augered upper 5 feet. Water not encountered. Boring backfilled with soil cuttings and tamped. Field Tech: AR Prepared By: JR Checked By: HOAG HOSPITAL Newport Beach, California IMACTEC LOG OF BORING Project: 4953-05-2451 Figure: A-1.1b LA DATA CL�[$R 5245LGPJ LAW CRAN.GDT 2/20/06 0 U 0 o� F <0 ELEVATION (ft) W� E. � w ¢3 u ✓a Ow A y c a4 0 CA 2 �A A d 95 - 5 90- 10 85- 15 80- 20 75- 25 70- -- 30 65- 60- - 35 40 BORING 2 DATE DRILLED: September 1, 2005 EQUIPMENT USED: Hollow Stem Auger HOLE DIAMETER (in.): 8 ELEVATION: 96.5** rig ML 11.3 113 32 22 47 53 76 45 20.0 3.6 5.8 5.8 8.6 101 97 93 102 90 45 35 54 28 45 SP ML •:' ML SP 3" Thick Asphalt Concrete over 6" Base Course CLAYEY SILT -moist, light brown, fine sand POORLY GRADED SAND - moist, light brown to yellow, fine to medium, some coarse CLAYEY SILT - hard, moist, light brown, very fine sand Becomes very stiff SANDY SILT - bard, moist, light brown and light gray, fine to medium POORLY GRADED SAND - medium dense, moist, light brown and gray, fine to medium Becomes very dense Becomes medium dense Becomes dense (CONTINUED ON FOLLOWING FIGURE) Field Tech: AR Prepared By: At Checked By: HOAG HOSPITAL Newport Beach, California �'MACTEC LOG OF BORING Project: 4953-05-2451 Figure: A-1.2a z T 0 u 0 Xa 0 O ELEVATION (ft) 55 - 50- 45- WN ,. ZZ� ci BORING 2 (Continued) w P 3 i W'- O x ¢z wo w a . W En ti- A < o ,..4 DATE DRILLED: September 1, 2005 A gypp` O y ,.c EQUIPMENT USED: Hollow Stem Auger Z F� C'Z ` HOLE DIAMETER (in.): 8 v A W ELEVATION: 96.5** — 45 50 55 40- 35- 30- 25 — 20 — 60 65 70 — 75 80 75 7.1 68 27.1 37 31.0 35 95 90 87 .64 55 22 11.6 50/6" 122 64 ML Becomes very dense CLAYEY SILT - hard, moist, light brown to brown, fine sand Becomes dark gray Becomes very stiff Some fine shell fragments Becomes hard WELL -GRADED SAND and SILT - very dense, moist, dark gray, fine to coarse END OF BORLNG AT 75 FEET NOTES: Water encountered at 72.8 feet 10 minutes after completion of boring. Boring backfilled with soil cuttings and tamped. Field Tech: AR Prepared By: JR Checked By: HOAG HOSPITAL Newport Beach, California ftMACTEC LOG OF BORING • Project: 4953-05-2451 Figure: A-1.2b • 0 0 ¢ 0 O <0 ELEVATION (ft) WWc/DH aEW., P 3 inSci ,a x ¢z H z� �a w w >a 00 Aa ?›o zo o azE rn A PL1- BORING 3 DATE DRILLED: January 5, 2006 EQUIPMENT USED: Rotary Wash HOLE DIAMETER (in.): 5 ELEVATION: 96.5** 95 — 5 90 10 85- — 15 80— 20 75 — ML 15 : : : SW 17 ML — 25 - -I 70 — 65 — 60 — 30 35 40 31 30 HOAG HOSPITAL Newport Beach, California (C SP 3" Thick Asphalt Concrete over 6" Base Course CLAYEY SILT - moist, light brown WELL -GRADED SAND - moist, light brownish gray, fine to coarse CLAYEY SILT - stiff, moist, light brown Becomes very stiff, very fine sand POORLY GRADED SAND - dense, moist, light gray, fine to medium Some coarse *Number of blows required to drive the Crandall sampler 12 inches using a 300 pound hammer falling 24 inches. ONTINUED ON FOLLOWING FIGURE) glitMACTEC Field Tech: AR Prepared By: JR Checked By: a LOG OF BORING Project: 4953-05-2451 Figure: A-1.3a ELEVATION (ft) 55— 50 — 45- 40- W �' ._. ,_ H aH 3 rn a0 x �z z w W,Oaal-1- al. ox�Azo o az in A LLI - cn 45 — 50 - 55 60 35 -- J 65 30 - 70 25- 20- 75 40 30 BORING 3 (Continued) DATE DRILLED: January 5, 2006 EQUIPMENT USED: Rotary Wash HOLE DIAMETER (in.): 5 ELEVATION: 96.5*4' SM 7 so sale" (C • • • • • • ML SW Becomes light brownish gray Layers of silt and some clay SILTY SAND - dense, moist, light brown, fine 6" gravel SANDY and CLAYEY SILT - medium stiff, moist, light brown Becomes dark gray, organic smell WELL -GRADED SAND - very dense, moist, dark gray, fine to coarse, up to 25% gravel and small cobbles 40% gravel Fewer gravel ONTINUED ON FOLLOWING FIGURE) Field Tech: AR Prepared By: JR, Checked By: 1, HOAG HOSPITAL Newport Beach, California ffMACTBC LOG OF BORING Project: 4953-05-2451 Figure: A-1.3b ELEVATION (ft) 15- 10- c10$ rn Wad Oa x �z If W� A� j1pzA v a 0,z rn A W - rn 85 - 90 5- 50/4" — 95 0—r 100 -5- 105 -10- -20- 115 I20 18 25 25/10" 25 (C HOAG HOSPITAL Newport Beach, California ON BORING 3 (Continued) DATE DRILLED: January 5, 2006 EQUIPMENT USED: Rotary Wash HOLE DIAMETER (in.): 5 ELEVATION: 96.5** X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X ) X X 7 X X 7 X X 7 X X 7 X X X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 .X X X X 7 X X 7 X X X X X X X X X X 7 X X 7 X X X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X X X X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X ) X X 7 X X X X 7 X X 7 X X 7 X X X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X X 7 X NCr2 Layer of sandy clayey silt Becomes 50% gravel SILTSTONE - medium dense, moist, greenish gray, slightly bedded, caliche pods Less weathered, dark grayish green, massive Becomes unoxidized, clayey TINUED ON FOLLOWING FIGURE) �MACTEC Field Tech: AR Prepared By: !g Checked By: U LOG OF BORING Project: 4953-05-2451 Figure: A-1.3 c • ELEVATION (ft) H .. F v ,, W r 3 v) W 1�1 �- P zca Z° p.il v) A W = 0 -25- -30— 125 130 — 135 j^ 140 -45- - 145 -50- -- 150 -55 — -60 — 155 160 20/10" 25/10" 25/10" X 7 X X X 7 X X X X 7 X X 7 X X 7 X X X X X X X X X X 7 X X X X 7 X X 7 X X X x X X X X 7 X X X X X X 7 X X 7 X X X X X X X X X X 7 Xx$ X X X X X X X X 7 X X 7 X X 7 X X X X X X X X 7 X X X X X X X X X X X X 7 X X 7 X X X X X X 7 x x 7 X X 7 X X ISLX X i HOAG HOSPITAL Newport Beach, California BORING 3 (Continued) DATE DRILLED: January 5, 2006 EQUIPMENT USED: Rotary Wash HOLE DIAMETER (in.): 5 ELEVATION: 96.5** END OF BORING AT 141 FEET NOTE: Water level not established. Boring backfilled with soil cuttings and tamped. ifiMACTEC Field Tech: AR Prepared By: JR Checked By: 1,1 LOG OF BORING Project: 4953-05-2451 Figure: A-1.3d • MAJOR DIVISIONS COARSE GRAINED SOILS (More than 50% of material is LARGER than No. 200 sieve size) GRAVELS (More than 50% of' coarse traction is LARGER than the No. 4 sieve size) • SANDS (More than 50% of coarse fraction is SMALLER than the No. 4 Sieve Size) CLEAN GRAVELS (Little or no fines)' GRAVELS -WITH FINES (Appreciable amount of fines) CLEAN SANDS (Little or no fines) SANDS WITH FINES (Appreciable amount of fines) GROUP SYMBOLS 0 GP GM GC SW • SP SM Sc. • TYPICAL NAMES Weil graded gravels, gravel - sand mixtures, little or no fines. Poorly graded gravels or grave - sand mixtures, little or no fines. Silty gravels, gravel - sand - silt mixtures. Clayey gravels, gravel - sand - clay mixtures. Well graded sands, gravelly sands, little or no fines. Poorly graded sands or gravelly sands, little or no fines. FINE GRAINED SOILS (More than 50% of material is SMALLER than No. 200 sieve size) SILTS AND CLAYS (Liquid limit LESS than 50) SILTS AND CLAYS (Liquid limit GREATER than 50) r/A ML CL OL Fi CH Silty sands, sand - silt mixtures Clayey sands, sand - clay mixtures. Inorganic silts and very fine sands, rock flour, silty of clayey fine sands or clayey silts and withjligt plasticity, Inorganic lays of low to medium plasticity, gravelly clays, -sandy clays, silty clays, lean clays. Organic silts and organic silty clays of low plasticity. Undisturbed Sample Standard Penetration Test Rock Core Dilatometer Packer SZ, Water Table at time of drilling A A 0 • Auger Cuttings Bulk Sample . Crandall Sampler Pressure Meter No Recovery Water Table after 24 hours Correlation of Penetration Resistance with Relative Density and Consistency • • SAND & GRAVEL No. of Blows 0-4 5-10 Relative Density Very Loose Loose SILT & CLAY No. of Blows 0-1 2-4 Consistency Very Soft MH OH Inorganic silts, micaceous or diatomaceous fine sandy or silty soils, elastic silts. Inorganic clays of high plasticity, fat clays Organic clays of medium to high plasticity, organic silts. HIGHLY ORGANIC SOILS PT Peat and other highly organic soils. BOUNDARY CLASSIFICATIONS: Soils possessing characteristics of two groups are designated by combinations of group symbols. SILT OR CLAY " SAND GRAVEL • Cobbles Boulders Fine Medium Coarse Fine Coarse o.200 No.40 No.10 No.4 3/4" U.S. STANDARD SIEVE SIZE 3" 12" Reference: The Unified Soil Classification System, Corps of Engineers, U.S. Army Technical Memorandum No. 3-357, Vol. 1, March, 1953 (Revised April, 1960) 11-30 31-50 Over 50 Medium Dense Dense Very Dense 5-8 9-15 16-30 Over 30 Soft Medium Stiff Stiff Very Stiff Hard KEY TO SYMBOLS .AND DESCRIPTIONS MACTEC FIGURE A-2 SHEAR STRENGTH in Pounds per Square Foot • 0 Lcl 0 0 U a w a 4953-05-2451 0 • 1000 2000 3000 4000 5000 6000 KEY: 0 1000 2000 3000 4000 5000 6000 \ \ 2071/z \I©28% \o . \ \ 1Q16%2 \\ O1Q10% \ \ ° Boring Number and \ 2@19i \ \ \ \ / 2Q31%s • 1Q16%3 Sample Death (ft.) \ \ \ O 1©46%s • \2®59%: , 2Q19%: 0 Values Used in Analyses \ \ \ 1Q28%• • N \ \ \ \, • Samples tested at field moisture content ° Samples tested after soaking to a moisture content near saturation DIRECT SHEAR TEST DATA MACTEC FIGURE A - 3 • O r 0.0 0.0 6 0.04 4 0.06 4 E'"i 0.08 O , O 0.10 0.12 0.14 LOAD IN KIPS PER SQUARE FOOT 04 0.5 0.6 0.7 08 0.91.0 2.0 3.0 40 50 60 7.0 8.0 J Boring POORLY 2at19% GRADED SAND • Boring 2 at 31'h' %1 POORLY GRADED SAND / NOTE: Water added to samp e after consolidation under a load of 1.8 kips per square foot. CONSOLIDATION TEST DATA MACTEC if( FIGURE A-4.1 0 0 0 0 CV • LOAD IN KIPS PER SQUARE FOOT • 0.4 0.5 0.6 0.7 08 091.0 0.0 0.0 U 0.04 Ai rn U 0.06 C y 0.08 0 0 0.10 0.12 0.14 2.0 30 4.0 5.0 6.0 7.0 8.0 •POORLY �� Boring 1 at GRADED 34'/2' SAND Boring CLAYEY ..... ''' • 2 at 59.4' SILT —i -- .� • • • ti ♦ \ ♦ ti • • ♦ ♦ , NOTE: Samples tested at field moisture content. CONSOLIDATION TEST DATA MACTEC FIGURE A - 4.2 BORING NUMBER AND SAMPLE DEPTH: SOIL TYPE: MAXIMUM DRY DENSITY: (lbs./cu.ft) OPTIMUM MOISTURE CONTENT: (%) TEST METHOD: ASTM Designation D1557 COMPACTION TEST DATA 1at0'to5' FILL - SILTY SAND 134.9 6.3 MACTEC FIGURE A - 5 • U 2 U 0 a • co 0 • BORING NUMBER AND SAMPLE DEPTH: SOIL TYPE: CONFINING PRESSURE: (lbs./sq. ft.) INITIAL MOISTURE CONTENT: (% dry wt.) FINAL MOISTURE CONTENT: (% dry wt.) DRY DENSITY: (lbs/cu.ft.) EXPANSION INDEX: 1at16%2 POORLY GRADED SAND 144 11.1 21.7 EXPANSION INDEX TEST DATA 96 MACTEC FIGURE A - 6 to O 7 0 Z a) 70 - 65 - 60 - I I- a, a a I- BORING 6 oa. . DATE DRILLED: June 6, 1997 '°o Q EQUIPMENT USED: 8" - Diameter Hollow Stem Auger m to ELEVATION: 79 4" Concrete Slab SILTY SAND - fine, brown CLAYEY SAND - fine to medium, fight reddish brown Thin layers of Sand and Silty Sand Lenses of Silty Clay SAND - fine to medium, light brown SILTY CLAY - light brownish grey Layer of Clayey Sand END OF BORING AT 20'. NOTE: Water not encountered. * Number of blows required to drive the Crandall sampler 12 inches using a 140 pound hammer -falling 30 inches. LOG OF BORING • LAW/CRANDALL A • • FIGURE A-1.6 . Q • • 2 .u3 O • C • 75 — 70 — 65 — 60 55 50 — 45 — h 35 40 •� - 40 aw w: • n 5 - 10 - 75 - 20 0 7.2 123 38 7.9 113 41 36 23:3 102 • 45 30 34 26.9 100 50 SAMPLE TYPE BORING 7 DATE DRILLED: June 6, 1997 'EQUIPMENT USED: 8" - Diameter•Hoflow Stem Auger ELEVATION: • 78 •°: SP 50 Tit . . 25 • ra0 a 55?; .-s •4.i: - 30 erg' 7.4 95 48' 1164f;.;. • 4. .tip 51 .Lowe a 53 4" Asphalt Paving - 6" Base course •SILTY SAND - fine to medium, light brown Some Clay Thin layers of Clayey Sand CLAYEY SAND - 'fine, light reddish brown SILTY CLAY - light brownish grey SILTY SAND - fine, light brown SILTY CLAY - fight grey SAND - fine, Tight brown (CONTINUED ON FOLLOWING FIGURE) LOG OF BORING LAW/CRANDALL • FIGURE A-1.7a. :• U U ` a. 0 35 — 45 30 — - 50 6.9 104 67 81 for 11" ur o- J aa... C 82 BORING 7 (Continued) DATE DRILLED: June 6, 1997 EQUIPMENT USED: 8" - Diameter Hollow Stem Auger ELEVATION: 78 • SILTY SAND - fine to medium, Light brown Some coarse Sand, few Gravel • END OF BORING AT 51 W. NOTE: Water measured at a'depth of 49', 10 minutes after completion'of drilling. • LOG OF BORING LAW/CRANDALL A. FIGURE A-1.7b • v 0 r 0 U u 0 z 0 w 75 -- c 50— co o oa 30 : F ie w •ate C ; -• �� (0 m ° 45 — a m n c -35 me 07 F z 1-- a Cr =- F >. a• o N,- BORING 8 A V 515 us o= g a c" DATE DRILLED: June 4, 1997 2p t -� z� OA . EQUIPMENT USED: 18" - Diameter Bucket ' cn in U3 ELEVATION: 79 SILTY SAND.- fine, brown CLAYEY SAND - fine to medium, light brown Thin layer of Sand SILTY CLAY - light grey and light brown • SAND - fine, some Silt, tight brown Thin layers of Silty Sand END OF BORING AT 35'. NOTE: Water not encountered': .No caving. • Number of blows required to drive the. Crandall sampler 12 inches for depths of: 0' to 25' using a 1600 pound hammer falling 12 inches; Below 25' using an 800 pound hammer fang 12 inches. • LOG OF BORING LAW/CRANDALL FIGURE A-1.8 a • • . 2 • U w 0 Q o. CO O 1. • 2@3,\• •I .6) \O7@2 6@g O 17h1 4@6 •5015 1@21t�• 4@f8 1000 2@24 wawa 0 O u. cr (13 a . Q 200d O c ceuz 3000 W G. 4000 r. SHEAR STRENGTH in Pounds per Square Foot 00 1000 2000 3000 • 4000 5000 8000 •3@12 BORING NUMBER & SAMPLE DEPTH (FT) 0 Ij VALUES USED IN ANALYSES 5000 6000 O 6@9 4r@i60\ • 741 1i • 3@i2 • 2@3 0 \ ♦ 1@21 • 5015 t •4@18 I • 2Q24 •8@18 • KEY: • Samples tested atfleld moisture content 0 Samples tested after soaking to a moisture content near saturation '—Natural soils DIRECT SHEAR TEST DATA • LAW/CRANDALL FIGURE A-3 i • • • • • • • • LOAD IN KIPS PER SQUARE FOOT 0.4 0.5 0.6 0.7 0.8 0.91.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 0.00 • 0,01 Z 0.02 QE. ELF 0.03 z Z 0.04 F-- a O Z 0.05 • 0.06 0.07 Boring 5 at 18' SILTY CLAY Boring 7 at 11' SILTY CLAY • NOTE: Sates tested -afield =Isere content CONSOLIDATION TEST DATA LAW/CRANDALL FIGURE A - 4.2 • a w 0 Ui • w S. a, LOAD IN KIPS PER SQUARE FOOT 0.4 0.5 0.6 0.7 0.8 0.9 1.0 2.0 3.0 4.0 0.00 0.01 z 0.02 iY EV a. tL! 0.03 C, Z 0 0.04 0 J 0 0.05 0 C, 0.06 0.07 5.0 , 6 0 7.0 8.0 Boring 8 at 18' SAND NOTE: Water added to sample after consolidation under a load of 1.8 kips per square foot CONSOLIDATION TEST DATA LAW/CRANDALL FIGURE A - 4.3 • PERCENT PAS PERCENT PASSING B 1 SIEVE ANALYSIS • U.S. Std. Sieee Openings U.S. Standard Siere Numbers 3" 1-1/2" 3/4" 3/8" #4 CO : #20 #40 #100 #200 HYDROMETER ANALYSIS ivv 90 0 ..---.....s\\ '\\,,. 80 70 60 50 r0 b- • . Boring 3 at29ta 30W SANDW ,1 AJ 90 a e.\\\ _ _ . 80 70 •• 60 50 40 30 Boring7at46 ta47Yt• ' • SILTY SAND 0- o 0 ... . . r ...., .. , . i n2, . �q , p ,rr. (No• co o) N n $. II 'IQ 8 ti ((0 r CO .- of .a: ., v 0 0 ' 0 m R O 0 0 o 0 i'�, 0 0 0 C 11 0 0 0 o . PARTICLE SIZE IN MILLIMETERS GRAVEL ' Coarse Fine SAND .• • Coarse! Medium I Fine SILT OR CLAY PARTICLE SIZE DISTRIBUTION i 0 i0 20 0 w a0 ›- CO 40 rU 50 Z 1- 60 In 70 U 80 W n. 90 00 0 10 20 30 40 50 B0 70 80 90 00 LAW/CRANDALL Ak FIGURE A - 6 • • APPENDIX B CAISSON AXIAL CAPACITY COMPUTATIONS ,CT, GEOTEK PILE CAPACITY PROGRAM USING ALPHA METHOD E I I i M ; 1 PROJECT NAME: HOAG HVI ENTRY PILE GAMA COH PHI Khc FRICTION UPLIFT END TOTAL ELEV LENGTH (PCF) (PSF) DEG (KIPS) (KIPS) BEAR (KIPS) (Ft.) Project NO:0775. CR3 (FEET) (KIPS) STRUCTURE: 1.00 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m <Tt cn cn U 1 cn Ch cn cn cn CJI in cn CJt cn 6 C» 6 U1 6 6 cn 6 cn cn CA m cn cn (n Cn in U1 6 in in 6 in in 6 0.0 0.0 0.0 0.0 0.6 1.3 2.1 2.9 3.9 5.0 6.1 7.4 8.7 10.2 11.7 13.4 15.1 16.9 18.9 20.9 23.0 25.2 27.5 29.9 32.4 35.0 37.7 40.5 43.4 46.4 49.5 52.6 55.9 59.3 62.7 66.3 69.9 73.7 77.5 81.5 0.0 0.0 0.0 0.0 0.4 0.9 1.4 2.0 2.7 3.5 4.3 5.2 6.1 7.1 8.2 9.4 10.6 11.9 13.2 14.6 16.1 17.7 19.3 21.0 22.7 24.5 26.4 28.4 30.4 32.5 34.6 36.9 39.1 41.5 43.9 46.4 49.0 51.6 54.3 57.0 0.0 0.0 0.0 0.0 10.6 12.5 14.5 16.5 18.4 20.4 22.3 24.3 26.2 28.2 30.2 32.1 34.1 36.0 38.0 39.9 41.9 42.4 42.4 42.4 42.4 42.4 42.4 42.4 42.4 42.4 42.4 42.4 42.4 42.4 42.4 42.4 42.4 42.4 42.4 42.4 0.0 0.0 0.0 0.0 11.2 13.8 16.5 19.4 22.3 25.3 28.4 31.7 35.0 38.4 41.9 45.5 49.2 53.0 56.8 60.8 64.9 67.6 69.9 72.3 74.8 77.4 80.1 82.9 85.8 88.8 91.9 95.0 98.3 101.7 105.1 108.7 112.3 116.1 119.9 123.9 99 98 97 96 95 94 93 92 91 90 89 88 87 86 85 84 83 82 81 80 79 78 77 76 75 74 73 72 71 70 69 68 67 66 65 64 63 62 61 60 2.00 PILE SHAPE(1=ROUND,2=SQUARE) 1.0 3.00 j 4.00 5.00 PILE DIMENSION(FEET) 3.00 �- PILE AREA (SQFT) j 7.07 6.00 COEF. OF FRIC: UPLIFT(0 TO 1) 0.70 7.00 I 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 25.00 26.00 27.00 28.00 29.00 30.00 31.00 32.00 33.00 34.00 35.00 36.00 37.00 38.00 39.00 40.00 FRICTIONAL FACTOR OF SAFETY: 3.00 I- END BEARING FACTOR OF SAFETY: 4.00 EFFECTIVE GROUND ELEVATION: 100 I PILE CUT-OFF ELEVATION: 100 j DENSITY OF FILL ABOVE 110 CUT-OFF CALCULATION LAYER 1.00 IHICKNESS(ft.) DATE: Allowable Bearing Per Report (psf) 6000 Max End Bearing (ksf) 42.39 SOIL INPUT DATA DEPTH TO GAMA C PHI Khc LAYER (pcf) (psf) (deg) BOTTOM(ft) 40.0 110.0 50 29 0.5 0.5 • Pile Capacity by Friction.XLS G E O T E K PILE CAPACITY PROGRAM USING ALPHA METHOD 111 H PROJECT NAME: HOAG HVI ENTRY PILE GAMA COH PHI Khc FRICTION UPLIFT END TOTAL ELEV LENGTH (PCF) (PSF) DEG (KIPS) (KIPS) BEAR (KIPS) (Ft.) Project NO:0775. CR3 1 (FEET) (KIPS) I STRUCTURE: 24" DIA. PILE 1.00 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.0 0.0 0.0 0.0 0.4 0.8 1.4 2.0 2.6 3.3 4.1 4.9 5.8 6.8 7.8 8.9 10.1 11.3 12.6 13.9 15.3 16.8 18.4 20.0 21.6 23.4 25.2 27.0 28.9 30.9 33.0 35.1 37.3 39.5 41.8 44.2 46.6 49.1 51.7 54.3 0.0 0.0 0.0 0.0 0.3 0.6 1.0 1.4 1.8 2.3 2.9 3.4 4.1 4.8 5.5 6.2 7.1 7.9 8.8 9.7 10.7 11.8 12.9 14.0 15.1 16.4 17.6 18.9 20.3 21.7 23.1 24.6 26.1 27.7 29.3 30.9 32.6 34.4 36.2 38.0 0.0 0.0 0.0 0.0 4.7 5.6 6.4 7.3 8.2 9.1 9.9 10.8 11.7 12.5 13.4 14.3 15.1 16.0 16.9 18.8 18.8 18.8 18.8 18.8 18.8 18.8 18.8 18.8 18.8 18.8 18.8 18.8 18.8 18.8 18.8 18.8 18.8 18.8 18.8 18.8 0.0 0.0 0.0 0.0 5.1 6.4 7.8 9.3 10.8 12.4 14.0 15.7 17.5 19.3 21.2 23.2 25.2 27.3 29.5 32.7 34.1 35.6 37.2 38.8 40.4 42.2 44.0 45.8 47.7 49.7 51.8 53.9 56.1 58.3 60.6 63.0 65.4 67.9 70.5 73.1 99 98 97 96 95 94 93 92 91 90 89 88 87 86 85 84 83 82 81 80 79 78 77 76 75 74 73 72 71 70 69 68 67 66 65 64 63 62 61 60 2.00 PILE SHAPE(1=ROUND,2=SQUARE) 1.0 3.00 j I 4.00 PILE DIMENSION(FEET) 2.00 5.00 PILE AREA (SQFT) 3.14 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 25.00 26.00 27.00 28.00 29.00 30.00 31.00 32.00 33.00 34.00 35.00 36.00 37.00 38.00 39.00 40.00 COEF. OF FRIC: UPLIFT(0 TO 1) 0.70 I I FRICTIONAL FACTOR OF SAFETY: 3.00 I I END BEARING FACTOR OF SAFETY: 4.00 I I EFFECTIVE GROUND ELEVATION: 100 L_ PILE CUT-OFF ELEVATION: 100 I DENSITY OF FILL ABOVE 110 CUT-OFF CALCULATION LAYER 1.00 FHICKNESS(ft.) DATE: Allowable Bearing Per Report (psf) 6000 Max End Bearing (ksf) 18.84 SOIL INPUT DATA DEPTH TO GAMA C PHI Khc LAYER (pcf) (psf) (deg) BOTTOM(ft) 40.0 110.0 50 29 0.5 0.5 • Pile Capacity by Friction.XLS GEOTEK • • GeoTek, Inc. 4130 Flat Rock Drive, Suite 140, Riverside, CA 92505-5864 951-710-1160 Office 951-710-1167 Fax www.geotekusa.com June 14, 201 1 * Project No. 0775-CR3 Hoag Memorial Hospital Presbyterian 500 Superior Avenue, Suite 300 Newport Beach, California 92663 Attention: Mr. Cary Brooks Subject: Supplemental Geotechnical Evaluation Hoag Hospital HVI Entry Improvements, One Hoag Drive Newport Beach, Orange County, California References: See Page 12 Dear Mr. Brooks: In accordance with your request, GeoTek, Inc. (GeoTek) is providing this Supplemental Geotechnical Report for currently proposed improvements at the subject site. This report presents 2010 CBC seismic design parameters, foundation, flatwork and pavement design recommendations, and earthwork considerations. The referenced reports by LeRoy Crandall and Associates (1971) and MACTEC (2006) provide preliminary geotechnical information for the site area completed by their respective firms and are the primary basis for this firm's recommendations. This report presents a statement of geotechnical consultant of record for the currently proposed improvements. Upon review of the referenced reports, GeoTek generally concurs with the findings, conclusions and recommendations provided. The recommendations provided are considered suitable from a geotechnical perspective, unless otherwise superseded herein or in future reports by this firm. GeoTek herein assumes the responsibility as geotechnical consultant of record henceforth for the subject improvements. SITE DESCRIPTION EXISTING CONDITIONS The project site, Hoag Hospital — Heart and Vascular Institute (HVI), is located at One Hoag Drive in the City of Newport Beach, Orange County, California. The area of currently proposed site improvements is located within and adjacent to an existing driveway area between an existing multi -story parking structure to the south, and an existing hospital building *Revised 7/20/201 I to correct a typographical error on page 10. GEOTECHNICAL I ENVIRONMENTAL MATERIALS HbAG MEMORIAL HOSPITAL PRESBYTERIAN Supplemental Geotechnical Evaluation, Hoag Hospital HVI Entry Improvements Newport Beach, Orange County. California Project No. 0775-CR3 June 14, 201 1 * Page 2 structure (HVl) to the north. It is not precisely known the age of the existing site improvements, but the parking. structure and related improvements were likely constructed in the early 1970's, and the existing HVI building is on the order of roughly 20± years old. Based on review of the referenced reports by LeRoy Crandall & Associates (1971) and MACTEC (2006), and our recent site reconnaissance, the area of currently proposed improvements is likely underlain by some engineered fill and/or Pleistocene age marine terrace deposits. Based on the descriptions of materials presented in the boring logs in the referenced reports, the terrace deposits are predominantly comprised of silty sand materials, with some silty clay interbeds. No report of previous grading activities for the area of currently proposed improvements was provided or reviewed by this firm. However, based on field observations and our review of the referenced reports, the existing site fills are likely relatively shallow (pre-existing and existing site grades are similar, and previously described site conditions did not appear to necessitate deep over -excavations prior to site development). No obvious signs of settlement, distress, or slope instabilities were noted during our site reconnaissance, nor have such occurrences been reported to us for the subject site area. CURRENTLY PROPOSED DEVELOPMENT Currently proposed improvements include the widening and realigning of a portion of the existing site driveway, associated landscape and hardscape improvements. The proposed driveway widening will require the construction of a retaining wall along an existing 5-20± foot high I'/:1 (h:v) gradient slope that descends from the HVI drive area to the existing parking structure. The proposed retaining wall is on the order of roughly 150 lineal feet and is understood to range from approximately 2 to 12± feet in height. Based on conversations with the project team, and review of preliminary site plans, it is our understanding that the proposed retaining wall will be partially founded on caissons in order to avoid surcharging the existing subterranean parking garage wall. The entry drive will likely be reconstructed with Portland cement concrete (PCC). EARTHWORK CONSIDERATIONS Earthwork associated with the currently proposed site improvements will likely include foundation excavations, retaining wall backfill, and pavement and flatwork subgrade preparation. All earthwork should be performed in accordance with the applicable grading ordinances of the City of Newport Beach, County of Orange, the 2010 California Building Code (CBC), and recommendations contained in this report. *Revised 7/20/20I I to correct a typographical error on page 10 ..-Cr"--, GEOTEK HbAG MEMORIAL HOSPITAL PRESBYTERIAN Supplemental Geotechnical Evaluation, Hoag Hospital HVI Entry Improvements Newport Beach, Orange County, California Site Clearing Project No. 0775-CR3 June 14, 2011* Page 3 Proposed site improvement areas should be cleared of existing improvements, vegetation, roots, trash, and debris prior to earthwork activities. These materials should be properly disposed of offsite. Grading Based the information in the referenced reports and our recent site observations, we recommend that the existing site area be scarified to a minimum depth of 12 inches, moisture conditioned to at or above optimum moisture content, and then re -compacted to at least 90% relative compaction (as determined per ASTM D 1557) subsequent to removals of any existing site improvements. Reprocessing should extend to a depth where soils are sufficiently compacted and have moisture contents of optimum or above. The depth of reprocessing may need to be increased beyond a depth of 12 inches based on the results of the field density testing, moisture content testing, or observations of the soils during the construction process. Also, additional removals beyond the 12 inch scarification depth may be required in the locally weathered areas in order to expose dense/firm engineered fill soils or competent native materials, prior to placement of additional engineered fill materials. Street, parking, driveway and flatwork areas will need to be similarly reprocessed prior to placement of additional fill materials. Engineered fill materials should be evenly spread, moisture conditioned, processed and compacted in thin lifts, six (6) to eight (8) inches in compacted thickness, to obtain a uniformly dense layer. The fill should be placed and compacted on a nearly horizontal plane, unless otherwise found acceptable by our representative. A representative of GeoTek should perform observation and testing services during the grading procedures. If import soils are proposed for use as engineered fill, GeoTek should observe, test and approve prior to importing in order to confirm that these materials are suitable for the subject site. Underground Utility Construction Utility trench excavations should be shored or laid back in accordance with applicable CAUOSHA standards. All utility trench and/or irrigation line backfill should be compacted to at least 90% relative compaction (as determined per ASTM D 1557). Under -slab trenches should also be *Revised 7/20/2011 to correct a typographical error on page 10 GEOTEK HbAG MEMORIAL HOSPITAL PRESBYTERIAN Supplemental Geotechnical Evaluation, Hoag Hospital HVI Entry Improvements Newport Beach, Orange County, California Project No. 0775-CR3 June 14, 201 1 * Page 4 compacted to project specifications. On -site materials may not be suitable for use as bedding material, but should be suitable as backfill provided it is placed in accordance with recommendations provided herein. Compaction should be achieved with a mechanical compaction device. Jetting of native soils will not be acceptable. If backfill soils have dried out, they should be thoroughly moisture conditioned prior to placement in trenches. SEISMIC DESIGN CONSIDERATIONS 2010 CBC Criteria The site is located at approximately 33.6236 Latitude and - 117.929199 Longitude. Site spectral accelerations (Ss and Si), for 0.2 and 1.0 second periods for a Class "D" site, were determined from the USGS Website, Earthquake Hazards Program, Interpolated Probabilistic Ground Motion for the Conterminous 48 States by Latitude/Longitude, 2009 Data. The results are presented in the following table: SITE SEISMIC PARAMETERS Mapped 0.2 sec Period Spectral Acceleration, Ss 1.827 Mapped 1.0 sec Period Spectral Acceleration, S I 0.684g Site Coefficient for Site Class "D", Fa 1.0 Site Coefficient for Site Class "D", Fv 1.5 Maximum Considered Earthquake Spectral Response Acceleration Parameter at 0.2 Second, SMS 1827g Maximum Considered Earthquake Spectral Response Acceleration Parameter at I second, SM I 1,026g Design Spectral Response Acceleration for Parameter for 0.2 Second, SDS 1218g Design Spectral Response Acceleration for Parameter 1.0 Second, SD I 0.684g RETAINING WALL DESIGN AND CONSTRUCTION Foundation design criteria for a conventionally reinforced foundation system, in general conformance with the 2010 CBC, are presented below. These are typical design criteria and are not intended to supersede the design by the structural engineer. Based on the test results of Expansion Index testing and descriptions presented in the referenced reports the onsite soils near subgrade may generally be classified having potential expansion ranging from "very low" to "low" in general accordance with ASTM D 4829. *Revised 7/20/2011 to correct a typographical error on page 10 GEOTEK HOAG MEMORIAL HOSPITAL PRESBYTERIAN Supplemental Geotechnical Evaluation, Hoag Hospital HVI Entry Improvements Newport Beach, Orange County, California Project No. 0775-CR3 June 14, 2011* Page 5 The following criteria for design of foundations should be implemented into design. General Design Criteria Recommendations presented herein apply to typical masonry or concrete vertical retaining walls to a maximum height of up to 13 feet. Additional review and recommendations should be requested for higher walls. These are typical design criteria and are not intended to supersede the design by the structural engineer Retaining wall foundations embedded a minimum of 24 inches into engineered fill or dense formational materials should be designed using an allowable bearing capacity of 2,000 psf (minimum two feet embedment below lowest adjacent grade). The passive earth pressure may be computed as an equivalent fluid having a density of 250 psf per foot of depth, to a maximum earth pressure of 3,750 psf. A coefficient of friction between soil and concrete of 0.35 may be used. The upper one foot of soil below the adjacent grade should not be used in calculating passive pressure. Passive pressure and frictional resistance may be combined as allowed by code. Passive resistance for sloping conditions should be reduced by 50 percent for those elements near the slope face. The above values may be increased as allowed by Code to resist short-term transient loads (e.g. seismic and wind loads). Continuous footings should have a minimum reinforcement consisting of four (4) No. 4 reinforcing bars, two (2) top and two (2) bottom. Structural concerns may govern and are under the purview of the structural engineer. Cantilevered Walls The recommendations presented below are for cantilevered retaining walls up to 13 feet high. Active earth pressure may be used for retaining wall design, provided the top of the wall is not restrained from minor deflections. An equivalent fluid pressure approach may be used to compute the horizontal pressure against the wall. Appropriate fluid unit weights are given below for specific slope gradients of the retained material. These do not include other superimposed loading conditions such as traffic, structures, seismic events, or adverse geologic conditions. *Revised 7/20/2011 to correct a typographical error on page 10 „CT_. GEOTEK HOAG MEMORIAL HOSPITAL PRESBYTERIAN Supplemental Geotechnical Evaluation, Hoag Hospital HVI Entry Improvements Newport Beach, Orange County, California Project No. 0775-CR3 June 14, 2011* Page 6 ACTIVE-EARTH.PRESSURES Surface Slope of Retained .Materials . ,(hw).., Equivalent Fluid Pressure (pdf) - Select Backfill* Equivalent Fluid Pressure .(pcf) Native Backfill (El 5 50) Level 35 45 2:1 50 60 * Select backfill may consist of Class 2 permeable filter materials, Class 2 aggregate base or imported Sand with an SE>30. Backfill zone includes area between back of wall to plane (I: I, h:v) up from back of wall foundation to ground surface. Additional lateral forces can be induced on retaining walls during an earthquake. For level backfill and a Site Class "D", the minimum earthquake -induced force (Feq) should be 12H2 (Ibs/linear foot of wall). This force can be assumed to act at a distance of 0.6H above the base of the wall, where "H" is the height of the retaining wall measured from the base of the footing (in feet). Wall Backfill and Drainage The onsite soils characterized as having "very low" to "low" expansion potential may be used for backfill provided they are screened of greater than 3-inch size gravels. Wall backfill should include a minimum one foot wide section of 3/4 to 1-inch clean crushed rock (or approved equivalent). The rock should be placed immediately adjacent to the back of wall and extend up from the back drain to within approximately 12 inches of finish grade. The upper 12 inches should consist of compacted onsite materials. Presence of other materials might necessitate revision to the parameters provided and modification of wall designs. The backfill materials should be placed in lifts no greater than 8-inches in thickness and compacted to a minimum of 90% relative compaction in accordance with ASTM Test Method D 1557. Proper surface drainage needs to be provided and maintained. Retaining walls should be provided with an adequate pipe and gravel back drain system to prevent build up of hydrostatic pressures. Backdrains should consist of a 4-inch diameter perforated collector pipe embedded in a minimum of one cubic foot per lineal foot of 3/4 to one inch clean crushed rock or equivalent, wrapped in filter fabric. The drain system should be connected to a suitable outlet. A minimum of two outlets should be provided for each drain section. Spacing between drain outlets should not exceed 100 feet. Waterproofing of site walls should be performed where moisture migration through the wall is undesirable. *Revised 7/20/201 I to correct a typographical error on page 10 „C-T, GEOTEK HOAG MEMORIAL HOSPITAL PRESBYTERIAN Supplemental Geotechnical Evaluation, Hoag Hospital HVI Entry Improvements Newport Beach, Orange County, California Restrained Retaining Walls Project No. 0775-CR3 June 14, 201 1* Page 7 Retaining walls that will be restrained prior to placing and compacting backfill material or that have reentrant or male corners, should be designed for an at -rest equivalent fluid pressure of 65 pcf, plus any applicable surcharge loading. For areas of male or reentrant corners, the restrained wall design should extend a minimum distance of twice the height of the wall laterally from the corner. Additional lateral forces can be induced on restrained walls during an earthquake. If required by Section 1610.1 of 2010 CBC, for level backfill and a Site Class "D", the minimum earthquake -induced force (Feq) should be 32H2 (lbs/linear foot of wall). This force can be assumed to act at a distance of 0.6H above the base of the wall, where "H" is the height of the retaining wall measured from the base of the footing(in feet). CAISSON DESIGN PARAMETERS GeoTek understands that caissons will be used to support the proposed retaining wall located near the existing parking structure, in order to not surcharge the existing structure. Design parameters for such a system are presented below. Proposed caissons can be designed to resist passive pressures of 500 psf per foot of depth to a maximum of 6,000 psf (dead plus live load), plus 1/3 increase for seismic (at least four feet embedment into competent natural ground). The per foot depth passive resistance values should be reduced by 50 percent for caissons founded on slope faces or near top of slopes. Passive pressures should be ignored in the upper five (5) feet for caissons located on slope faces or near the top of slopes or within the upper one (I) foot for caissons located on level areas. If caissons extend to depths below the toe of slope, no reduction in passive resistance is necessary for that portion of the caisson embedded below the toe of slope. The passive values presented incorporate "3-dimensional" effects. Thus, passive values should not be increased to account for an "effective width" beyond the actual width of the caissons. The 500 psf passive resistance and 6000 psf lateral capacity is applicable for caissons located a minimum distance of 8 diameters from the existing retaining wall. Caissons located a distance of 5 diameters from the wall should use 50 percent of those values; values for intermediate locations may be interpolated. In order to reduce the potential imposition of additional lateral loads on the wall, placement of caissons (that are subject to lateral loads) closer than 5 times the caisson diameter should be avoided. If passive resistance of the caissons and the wall key are combined, then the passive resistance of the caisson at the same elevations as the key should be ignored. *Revised 7/20/2011 to correct a typographical error on page 10 GEATEK HOAG MEMORIAL HOSPITAL PRESBYTERIAN Supplemental Geotechnical Evaluation, Hoag Hospital HVI Entry Improvements Newport Beach, Orange County, California Project No. 0775-CR3 June 14, 2011* Page 8 Caissons should not be spaced closer than 3 diameters, center -to -center. Caissons should be connected with a grade beam designed by the structural engineer. Friction along the bottom of the grade beam may be considered when evaluating lateral resisting forces. A coefficient of friction between soil and concrete of 0.35 may be used. Depth of fixity for caissons on the order of 2 to 3 feet in diameter can be approximated as 5 times the caisson diameter. Axial load capacity versus depth plots for 2 and 3 foot diameter caissons are attached as Plates I through 4. Other Design Considerations • Retaining wall foundation elements should be designed in accordance with building code setback requirements. • Passive earth pressure coefficients used in the design of retaining walls should consider descending slope conditions. Passive pressures should be reduced by one-half in the case of descending 2:1 (h:v) gradient slopes. • Retaining wall design should consider the additional surcharge loads from superjacent slopes and/or footings, where appropriate. • No backfill should be placed against concrete until minimum design strengths are evidenced by compression tests of cylinders. • The retaining wall footing excavations, backcuts, and backfill materials should by approved the project geotechnical engineer or their authorized representative. SULFATE AND CORROSION TESTING Type 5 concrete with a maximum water to cement ratio of 0.45 and minimum strength of 4,500 psi is recommended for the site, due to the site's proximity to the ocean and industry standards used in the area. The MACTEC (2006) report includes a "Soil Corrosivity Study" performed by M.). Schiff and Associates, Inc. The project design team should incorporate the recommendations presented in the "Soil Corrosivity Study" into the proposed improvements, as appropriate. *Revised 7/20/20I I to correct a typographical error on page 10 ,G. G EOTEK H6AG MEMORIAL HOSPITAL PRESBYTERIAN Supplemental Geotechnical Evaluation, Hoag Hospital HVI Entry Improvements Newport Beach, Orange County, California PAVEMENT DESIGN AND CONSTRUCTION Project No. 0775-CR3 June 14, 2011* Page 9 Based on the results of our evaluation and field observations, we recommend that subgrade materials in areas where existing flatwork/pavement is to be razed be over -excavated a minimum one foot below final subgrade elevation subsequent to removal of the existing concrete pavement. The removal bottom should be scarified a minimum of 12 inches after over -excavation, and then re -compacted to project standards (see below). The subgrade soils may need to be allowed to dry out if overly moist or pumping. The recommended concrete pavement section provided below is based on the known site use (driveway area, with potential for heavy traffic loads). Performance of this pavement section will ultimately be based largely on construction methods and traffic loading, and subgrade performance. Asphaltic Concrete Pavement The recommended pavement section provided below is based on the laboratory testing of the subgrade soils and the resulting R-Value (41) by MACTEC (2006). Performance of this pavement section will ultimately be based largely on construction methods and traffic loading, and subgrade performance. The traffic index assumed for pavement design should be reviewed by a traffic/civil engineer. Additional testing may be necessary depending on exposed conditions during earthwork construction. MINIMUM RECOMMENDED ASPHALTIC CONCRETE PAVEMENT SECTION Location Assumed Traffic Index R-Value Depth of Asphaltic Concrete (inches) Depth of Aggregate Base (inches) Drive and Parking Areas 6 41 4.0 4.5 Drive and Parking Areas 8 4I 5.0 8.0 Drive and Parking Areas 10 4 I 7.0 10.0 Portland Cement Concrete Pavement It is recommend that 6 inches of Portland Cement Concrete (PCC) pavement be used in heavy truck traffic areas such as fire lanes, trash dumpster pads and approaches. The PCC pavement should have a minimum compressive strength of 3000 psi and be placed on a minimum of 4 inches of aggregate base. For concrete paved areas with other than occasional traffic, the following PCC pavement sections are presented. The recommended pavement section provided below is based on the laboratory testing of the subgrade soils and the resulting R- Value (41) by MACTEC (2006). Performance of this pavement section will ultimately be based *Revised 7/20/2011 to correct a typographical error on page 10 GEOTEK HOAG MEMORIAL HOSPITAL PRESBYTERIAN Supplemental Geotechnical Evaluation, Hoag Hospital HVI Entry Improvements Newport Beach, Orange County, California Project No. 0775-CR3 June 14, 2011* Page 10 largely on construction methods and traffic loading, and subgrade performance. The traffic index assumed for pavement design should be reviewed by a traffic/civil engineer. Additional testing may be necessary depending on exposed conditions during earthwork construction. MINIMUM RECOMMENDED PORTLAND CEMENT CONCRETE PAVEMENT SECTION Location Assumed Traffic Index R-Value Depth of Portland Cement Concrete (inches) Depth of Aggregate Base (inches) Drive and Parking Areas 6 41 7V2 4.0 Drive and Parking Areas 8 41 8 4.0 Drive and Parking Areas 10 4 I 81/2 4.0 Requirements of Section 90 of Caltrans Standard Specifications regarding mixing and placing concrete should be followed. Keyed joints should be provided in the longitudinal direction spaced at a maximum of 10 feet on center. Crack control joints should be provided in the transverse direction spaced at a maximum of 10 feet on center and at corners. Proper reinforcement should be considered for the concrete construction. Utilization of #3 rebar, placed on 24" centers, is recommended to be considered to PCC sections. Pavement Construction Considerations All pavement installation, including preparation and compaction of subgrade, compaction of base material, placement and rolling of asphaltic concrete, should be done in accordance with City of Newport Beach and County of Orange specifications, and under the observation and testing of GeoTek. The aggregate base should consist of crushed rock with an R-Value and gradation in accordance with Class II Aggregate Base (Section 26 of the Standard Caltrans Specification) or Crushed Aggregate Base (Section 200.0.0 of the Standard Specification for Public Works Construction). Minimum compaction requirements should be 90 percent for subgrade and 95 percent for aggregate base, as per ASTM D 1557 (modified proctor). *Revised 7/20/20 i 1 to correct a typographical error on page 10 GEOTEK HOAG MEMORIAL HOSPITAL PRESBYTERIAN Supplemental Geotechnical Evaluation, Hoag Hospital HVI Entry Improvements Newport Beach, Orange County, California ADDITIONAL TESTING, PLAN REVIEW AND ANALYSES Project No. 0775-CR3 June 14, 201 1 * Page I I Plans should be provided to GeoTek to review and comment on as the project progresses. Such plans include, but are not limited, to those covering: grading, foundations, retaining walls, and utilities. LIMITATIONS Our findings are based on site conditions observed and the stated sources. Thus, our comments are professional opinions that are limited to the extent of the available data. These opinions have been derived in accordance with current City/County standards of practice and no warranty is expressed or implied. Standards of practice are subject to change with time. The opportunity to be of service is sincerely appreciated. If you should have any questions, please do not hesitate to call our office. Respectfully submitted, GeoTek, Inc. Edward H. LaMont CEG 1892, Exp. 7/31 / 12 Principal Geologist Ronald A. Reed GE2524, Exp. 6/30/13 Senior Project Engineer Distribution: (3) Addressee Enclosures: Axial Load Capacity versus Depth for Caissons - Plates I through 4 G:•\Projects\0751 to 0800\0775CR3 Hoag Hospital, HVI Entry Improvements10775CR3 Hoag Hospital, Limited Geotechnical Report HV1 Entry Improvements l.doc *Revised 7/20/201 I to correct a typographical error on page 10 ,G, GEOTEK HOAG MEMORIAL HOSPITAL PRESBYTERIAN Supplemental Geotechnical Evaluation, Hoag Hospital HVI Entry Improvements Newport Beach, Orange County, California CITED REFERENCES Project No. 0775-CR3 June 14, 2011* Page 12 LeRoy Crandall and Associates, 1971, "Report of Foundation Investigation, Proposed Parking Structure, 301 Newport Boulevard, Newport Beach, California," Job No. A-7I235, dated November 23. MACTEC, 2006, "Report of Geotechnical Investigation, Proposed South Building, Hoag Memorial Hospital Presbyterian, One Hoag Drive, Newport Beach, California," Project 4953-05-2451, dated February 20. *Revised 7/20/201 I to correct a typographical error on page 10 GEOTEK • • • 0.00 5.00 10.00 - 15.00 w m E • 20.00 d .a is V. 25.00 0 .o o 30.00 35.00 40.00 45.00 24" Dia. CIDH PILE CAPACITY Allowable Axial Capacity (kips) 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 GEOTEK Plate 1 Proj. No. 0775-CR3 • • • ; 5 0.00 5.00 10.00 15.00 c m E i 20.00 w .a E 125.00 0 t 0 30.00 35.00 40.00 45.00 36" Dia. CIDH PILE CAPACITY Allowable Axial Capacity (kips) 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 • .•‘CE GEOTEK Plate 2 Proj. No. 0775CR3 • • • 0.00 5.00 10.00 $ 15.00 i-a 20.00 a, .a E ttl 25.00 0 t 0 30.00 35.00 40.00 45.00 24" Dia. CIDH PILE UPLIFT CAPACITY Uplift Capacity (kips) 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 • I. le OD „Cac. G EOTEK Plate 3 Proj. No. 0775-CR3 • • • 0.00 5.00 10.00 g 15.00 m 20.00 d .c E w 25.00 0 G 30.00 35.00 40.00 45.00 36" Dia. CIDH PILE UPLIFT CAPACITY Uplift Capacity (kips) 0.0 10.0 20.0 30.0 40.0 50.0 60.0 • • • ID • • M. In • I. Ep • MI IN M. M. M. ,G, GEOTEK Plate 4 Proj. No. 0775-CR3 Hoag Hospital Project: Heart and Vascular Institute Projects o • • Approved on: Approved by: Signature: Mitigation Measure: 4 Prior to the completion of the final design phase, the Project Sponsor shall demonstrate to the City of Newport Beach Building Department that all facilities will be designed and constructed to the seismic standards applicable to hospital related structures and as specified in the then current City adopted version of the California Building Code. Standard for Compliance: Shown on approved building plans (Note that hospital buildings require OSHPD review and approval; issuance of a building permit by OSHPD is evidence of compliance with the California Building Code applicable to hospital -related structures). Method of Verification: Plan check. Timing of Verification: Prior to the issuance of each grading permit. Responsible Party(ies): Applicant; Building Director or designated representative; Planning Director or designated representative. Verification Date: City of Newport Beach Verification 11AIl1 • • • Hoag Hospital Project: Heart and Vascular Institute Projects Mitigation Measure: 6 Prior to the issuance of a grading permit, the Project Sponsor shall conduct a soil corrosivity evaluation. This evaluation shall be conducted by an expert in the field of corrosivity. This site evaluation shall be designed to address soils to at least the depth to which excavation is planned. At a minimum, at least one sample from each soil type should be evaluated. Appropriate personnel protection shall be worn by field personnel during the field evaluation. In the event soils are found to be corrosive, the source and extent of the corrosive soils shall be determined, and all buildings and infrastructure shall be designed to control the potential impact of corrosive soils over time. Standard for Compliance: Approval of soil corrosivity report. Method of Verification: Documentation of approved soil corrosivity report. Timing of Verification: Prior to the issuance of a grading permit. Responsible Party(ies): Applicant; Building Director or designated representative or Planning Director or designated representative. Verification Date: City of Newport Beach Verification Approved on: Approved by: Signature: �--- --= • • • Hoag Hospital Project: Heart and Vascular Institute Projects Mitigation Measure: 6 Prior to the issuance of a grading permit, the Project Sponsor shall conduct a soil corrosivity evaluation. This evaluation shall be conducted by an expert in the field of corrosivity. This site evaluation shall be designed to address soils to at least the depth to which excavation is planned. At a minimum, at least one sample from each soil type should be evaluated. Appropriate personnel protection shall be worn by field personnel during the field evaluation. In the event soils are found to be corrosive, the source and extent of the corrosive soils shall be determined, and all buildings and infrastructure shall be designed to control the potential impact of corrosive soils over time. Standard for Compliance: Approval of soil corrosivity report. Method of Verification: Documentation of approved soil corrosivity report. Timing of Verification: Prior to the issuance of a grading permit. Responsible Party(ies): Applicant; Building Director or designated representative or Planning Director or designated representative. Verification Date: City of Newport Beach Verification Approved on: Approved by: Signature: 12/97 1(1 (4. q,,T7(- iwx-a°6 ENVIRONMENTAL REVIEW MITIGATION MEASURES #6, 7 & 8 UPPER CAMPUS HOAG MEMORIAL HOSPITAL PRESBYTERIAN HVI ENTRY IMPROVEMENTS NEWPORT BEACH, CA Prepared for: Prepared by • Hoag Memorial Hospital Presbyterian One Hoag Drive Newport Beach, CA June 1, 2011 GEOSCIENCE ANALYTICAL, INC. Geochemical, Environmental & Litigation Consultants Established March 1981 GSA GeoScience Analytical, Inc. "established March 1981" • • 608 HAILEY COURT SIMI VALLEY, CA 93065 (805) 526-6532 FAX 526-3570 EMAIL GEOSCII O@AOL.COM May 31, 2011 Mr. Cary Brooks Project Manager Facilities Design & Construction Hoag Memorial Hospital Presbyterian One Hoag Drive Newport Beach, CA 92658 RE: Upper Campus HVI Entry Improvements - Mitigation Measures #6, 7 & 8 Dear Mr. Brooks: Hoag Hospital Master Plan Project Mitigation Measures #6, 7 & 8 state: "Prior to the issuance of a grading permit, the Project Sponsor shall conduct a soil corrosivity evaluation. This evaluation shall be conducted by an expert in the field of corrosivity. The site evaluation shall be designed to address soils to a least the depth to which excavation is planned. At a minimum, at least one sample from each soil type should be evaluated. Appropriate personnel protection shall be worn by field personnel during the field evaluation. In the event soils are found to be corrosive, the source and extent of the corrosive soils shall be determined, and all buildings and infrastructure shall be designed to control the potential impact of corrosive soils over time. Based on the corrosion assessment and source determination, a soils and construction material compatibility evaluation shall also be undertaken concluding with the appropriate mitigation measures and design criteria. Corrosion resistant construction materials are commonly available and shall be used where the evaluation/assessment concludes that corrosive soils conditions could adversely impact normal construction materials or the materials used for the mitigation of subsurface gas conditions. For example, there are many elastomers and plastics, like PVC, which are resistant to corrosion by up to 70 percent sulfuric acid at 140 degrees Fahrenheit. Environmental Audits Hazardous Gas Mitigation Litigation Consulting Petroleum Geochemistry • • Should the soil be identified as hazardous due to the severeness of their corrosivity (i. e., a pH less than 2.5), on - site remediation by neutralization shall be undertaken prior to construction. Appropriate regulatory agency approvals and permits shall also be obtained" A report entitled "Upper Campus HVI Entry Improvements Hoag Memorial Hospital Presbyterian Mitigation Measures #6, 7 and 8" has been completed and attached hereto. This report fulfills requirements imposed by Mitigation Measures #6, 7 and 8. Sincerely yours, 1"), eci4. Louis J. Pandolfi President Environmental Audits Hazardous Gas Mitigation Litigation Consulting Petroleum Geochemistry • • CONTENTS 1. Contractor's Disclaimer . 3 2. Executive Summary 2.A. Site History 3. Summary . 4. Findings . 5. Analytical Protocol: Corrosivity . 6. Results and Discussion 7. Mitigation . 8. Tables and Figures 8.A. Figure 1: Site Plan 6 8 . 10 . 11 . 12 . 13 . 14 • • • 2 8.B. Figure 2: Soil Boring Locations 8.C. Table 1: Soil Boring Data - Corrosivity 9. Appendices 9.A. Appendix I: Analytical Data, QA/QC & Chain -of -Custody . 9.B. Appendix II: "Preliminary geochemical site evaluation of existing relief wells, gaseous flare, soil, water, and air on a portion of Hoag Memorial Hospital Presbyterian property, Newport Beach, California" by GeoScience Analytical, Inc. April 22, 1992. 9.C. Appendix III: Text of Mitigation Measures 6, 7 and 8 . • • CONTRACTOR'S DISCLAIMER PROFESSIONAL SERVICES HAVE BEEN PERFORMED BY GEOSCIENCE ANALYTICAL, INC. USING THAT DEGREE OF CARE AND SKILL ORDINARILY EXERCISED, UNDER SIMILAR CIRCUMSTANCES, BY REPUTABLE GEOCHEMISTS PRACTICING IN SOUTHERN CALIFORNIA. NO OTHER WARRANTY, EXPRESSED OR IMPLIED, IS MADE AS TO THE INFORMATION AND ADVICE INCLUDED IN THIS REPORT. WE HAVE NOT INSPECTED OR PASSED JUDGMENT UPON THE WORK OF ANY OIL COMPANY, THEIR CONTRACTORS OR THEIR SUBCONTRACTORS, IN CAPPING OIL OR GAS WELLS LOCATED ON THE SUBJECT PROPERTIES WHICH ARE IDENTIFIED IN THIS REPORT. WE HAVE NOT REVIEWED ANY PUBLIC OR PRIVATE RECORDS, IN SEARCH OF THE EXISTENCE OR LOCATION OF OTHER OIL OR GAS WELLS, HIDDEN, VISIBLE, OLD OR INADEQUATELY CAPPED, WHICH MIGHT BE LOCATED ON OR NEAR THE SUBJECT PROPERTY, WHETHER SUCH WELLS MIGHT BE KNOWN OR UNKNOWN TO THE CALIFORNIA DIVISION OF OIL, GAS AND GEOTHERMAL RESOURCES. WITHOUT IN ANY WAY LIMITING OR QUALIFYING THE FOREGOING, BY REQUESTING OR RELYING UPON THIS REPORT, YOU WILL BE DEEMED TO ACKNOWLEDGE: (1) WE ARE NOT TO BE HELD LIABLE BY YOU, OR ANY PARTY CLAIMING THROUGH YOU, OR ANY PERSON INJURED UPON THE PROPERTY, FOR ANY LOSS, COST, LIABILITY, EXPENSE, ATTORNEYS FEES AND COSTS, OR CONSEQUENTIAL DAMAGES OCCURRING AS A RESULT OF ERRORS OR OMISSIONS ON THE PART OF THE STATE OF CALIFORNIA, THE CITY OF NEWPORT BEACH, THE REDEVELOPMENT AGENCY OF THE CITY OF NEWPORT BEACH, OR ANY OIL COMPANY, OR THEIR CONTRACTORS OR • • SUBCONTRACTORS IN CAPPING THE OIL OR GAS WELL(S) IDENTIFIED IN THIS REPORT, OR: (2) AS A RESULT OF BREAKAGE OF OR SEEPAGE FROM UNDER THOSE OIL OR GAS WELL CAPS, OR AS A RESULT OF THE MIGRATION AND SUBSEQUENT EXPLOSION OF BIOGENIC GAS, AS A RESULT OF EARTH -SHAKING ASSOCIATED WITH EARTHQUAKES, EXPLOSIONS, EXCAVATION, DEMOLITION, SEISMIC VELOCITY TESTING, SOIL TESTING, WELL DRILLING OR THE LIKE; AND (3) WE HAVE DISCLOSED TO YOU THAT, IN OUR OPINION AS PROFESSIONAL GEOCHEMISTS, IT IS UNWISE TO BUILD STRUCTURES OR PAVED SURFACES OVER ABANDONED OIL OR GAS WELLS, OR WITHIN A HIGH POTENTIAL METHANE ZONE, GIVEN THE RISKS DESCRIBED IN (2) ABOVE, WITHOUT SATISFACTORY MITIGATION. FURTHERMORE, THE INFORMATION CONTAINED HEREIN IS SUBMITTED FOR THE SOLE AND EXCLUSIVE USE OF HOAG MEMORIAL HOSPITAL PRESBYTERIAN AND THE CITY OF NEWPORT BEACH AND SHALL NOT BE DISCLOSED OR FURNISHED TO ANY OTHER ENTITY, CORPORATION, OR THIRD PARTY, FOR PURPOSES OUTSIDE THE SPECIFIC SCOPE AND INTENT OF THIS CONTRACT, WITHOUT THE EXPRESS WRITTEN CONSENT OF GEOSCIENCE ANALYTICAL, INC. ANY UNAUTHORIZED DISSEMINATION OR REUSE OF THIS DOCUMENT WILL BE AT THE USER'S SOLE RISK AND WITH THE CONDITION THAT GEOSCIENCE ANALYTICAL, INC. BE HELD HARMLESS FROM ANY AND ALL CLAIMS FOR LOSSES OR DAMAGES AND EXPENSES ARISING OUT OF OR RESULTING FROM SUCH UNAUTHORIZED DISCLOSURE OR REUSE. ONLY LIMITED SAMPLING AND CHEMICAL ANAYSES WERE INCLUDED IN THIS ASSESSMENT. IN THE EVENT ANY CONDITIONS DIFFERING FROM, OR ADDITIONAL TO, THOSE DESCRIBED IN THIS ASSESSMENT ARE ENCOUNTERED AT A LATER TIME, GEOSCIENCE • • • ANALYTICAL, INC. RESERVES THE RIGHT TO REVIEW SUCH CONDITIONS AND TO MODIFY, AS APPROPRIATE, THE ASSESSMENTS AND ANY CONCLUSIONS PROVIDED IN THIS REPORT. • • EXECUTIVE SIJMMARY At the request of Hoag Memorial Hospital Presbyterian ("Client"), GeoScience Analytical, Inc. has evaluated soil corrosivity on property proposed on property proposed for Site Development (Upper Campus) located immediately west of Hoag Drive and within the main campus of Hoag Memorial Hospital Presbyterian (see Figure 1). The subject report addresses the requirements of Mitigation Measures 6, 7 & 8 (Appendix III) of the Hoag Upper Campus HVI Entry Improvements Project as adopted by the City of Newport Beach. SI1 E HISTORY While the Lower Campus property has been known to contain methane and hydrogen sulfide in the near surface soils for several decades, the Upper Campus is void of these contaminants. Groundwater seepage on a part of the Lower Campus north of the intersection of Hoag Drive and West Coast Highway also occurs. The source of the water is thought to be groundwater seepage along the contact between the terrace materials which overlie the Monterey Formation bedrock. The Monterey Formation is most likely the source of the methane and hydrogen sulfide gases which are being produced from various sand horizons. Hydrogen sulfide is acidic and in the presence of oxygen may be converted to sulfuric acid. In 1976, three gas extraction wells were installed along West Coast Highway on the Lower Campus. The gas from these wells currently is extracted with a suction pump system and flows through a series of pipes into a burner or to a gas fired boiler. In 1989, two of the extraction wells were relocated to allow for the widening of West Coast Highway. The existing gas extraction system serves as partial mitigation to a potentially hazardous situation for the subject property and, to a much larger extent, the surrounding • • • public and private properties offsite. In the absence of the gas extraction system, potentially hazardous and noxious concentrations of hydrogen sulfide and methane would vent naturally into the atmosphere and structures. The chemically reactive hydrogen sulfide could additionally create elevated concentrations of corrosive chemical agents which may negatively impact site development. No evidence has been found for the presence of hazardous substances with respect to corrosive soils (pH<2 or >12.5: Title 22 of the California Administrative Code). Soils do not require design mitigation to prevent deleterious effects to construction materials (see Mitigation Measure 7). Soil corrosivity (pH) ranged from 8.48 to 8.70. With respect to soil corrosivity, no limitations exist which will render the site unsuitable for development with adequate mitigation for construction materials. • • SUMMARY At the request of Hoag Memorial Hospital Presbyterian, GeoScience Analytical, Inc. has conducted a Phase II Environmental Audit on property proposed for Site Development (Upper Campus) located immediately west of Hoag Drive on the main campus of Hoag Memorial Hospital Presbyterian (see Figure 1). This study has been undertaken to satisfy mitigation measures 6, 7 and 8 (see Appendix III) for the Upper Campus HVI Entry Improvements Project which require the completion of a soil sampling and monitoring program which shall address the presence of corrosive soils. Conditions imposed by mitigation measures 6, 7 and 8 have been addressed and no hazardous substances have been identified based on corrosivity. A review of appropriate construction materials is not required based on the corrosivity assessment. A previous study, "Preliminary Geochemical Site Evaluation of Existing Relief Wells, Gaseous Flare, Soil, Water and Air on a Portion of Hoag Memorial Hospital Presbyterian Property Newport Beach, California (22 April 1992)" which contains related information and pertinent data is attached hereto as Appendix II. Mitigation measure 8 does not apply based on the degree of corrosivity identified. One (1) soil boring was advanced to a depth of twenty (20') feet below existing grade in the developed portion of the Upper Campus on property proposed for Site Development (Upper Campus) located immediately west of Hoag Drive on the main campus of Hoag Memorial Hospital Presbyterian (see Figure 2). The subject report addresses the requirements of Mitigation Measures 6, 7 & 8 (Appendix III) for the Upper Campus HVI Entry Improvements Project as adopted by the City of Newport Beach. Soil samples were collected at depths of 10.0' and 20.0'. Hoag Memorial Hospital Presbyterian, as Client, placed no constraints on the Contractor, nor did it suggest any interpretation of the data which were generated prior to completion of this report. The pH of soil samples ranged from a low of 8.48 to a high of 8.70. Corrosivity at the subject site does not, therefore, classify the soil as containing hazardous materials or excess residual hazardous substances. o • 10 • • FINDINGS GeoScience Analytical, Inc. has conducted a Phase II evaluation of a portion of the Upper Campus of Hoag Memorial Hospital Presbyterian. The property evaluated is proposed for Site Development (Upper Campus) located immediately west of Hoag Drive within the main campus of Hoag Memorial Hospital Presbyterian (see Figure 1). One (1) boring was advanced to a depth of twenty (20') feet below existing grade and soil samples were taken for geochemical characterization of the site with respect to corrosivity. There was no evidence found for the presence of corrosive soils (pH<2 or>12.5) as defined by Title 22 of the California Administrative Code. No hazardous materials or excess residual hazardous substances have been identified under the scope of the subject investigation. 11 o • • ANALYTICAL PROTOCOL Laboratory Analyses Corrosivity of Soil (pH) EPA method 9045C was used to quantify the pH (corrosivity) of soil samples. 12 • • • RESULTS AND DISCUSSION A previous geochemical investigation has been completed by GeoScience Analytical, Inc. covering the undeveloped area of the Lower Campus of Hoag Memorial Hospital Presbyterian and in close proximity to the subject site. The results are reported in "Preliminary Geochemical Site Evaluation of Existing Relief Wells, Gaseous Flare, Soil, Water and Air on a Portion of Hoag memorial Hospital Presbyterian Property Newport Beach, California" dated 22 April 1992. That investigation found noncorrosive soils in the upper one foot. The current study reports on soil corrosivity to depths as great as twenty (20') feet. One (1) soil boring has been advanced to a depth of twenty (20') feet below existing grade (FIG. 2). The borehole location was chosen to cover the site under those limitations imposed by the topography and existing underground utilities. Chain -of - Custody (Appendix I) was maintained throughout the investigation. Soil samples were analyzed for corrosivity (pH) and were found within the range of 8.48 — 8.70 or nearly neutral (TAB. 2). The soils sampled are therefore not classified as a hazardous substance. No hazardous materials or excess residual hazardous substances have been identified under the scope of the subject investigation. 13 • • MITIGATION No soils were encountered that require mitigation for corrosivity with respect to site grading. The study required by Mitigation Measure 7 relating to construction material compatibility with subject soils is needed and not made a part of the subject investigation. This report did not include a construction compatibility report. The scope of the subject report has been limited to testing for corrosivity as it relates to California Code of Regulations' Title 22 definition of hazardous substances for disposal purposes. • • FIGURE 9 GEOSCIENCE ANALYTICAL, INC. 608 Halley Court Simi Valley, CA 93065 TEL. (805) 526-6532 FAX: 526-3570 SHEET TITLE: SITE PLAN PROJECT.' ONE HOAG DRIVE NEWPORT BEACH, CA No 4069 DWN. BY: LIP CHKD BY: FER DATE 06/01/11 DWG. NO: hoag.hvi.entry FIGURE 2 • LEGEND Soil Borehole Location GEOSCIENCE ANALYTICAL, INC. 608 Halley Court Simi Valley, CA 93065 TEL. (805) 526-6532 FAX: 526-3570 SHEET TITLE:SOIL BORING LOCATION MAP PROJECT: ONE HOAG DRIVE NEWPORT BEACH, CA JOB NO. 4069 DWN. Br LJP CHKD Br FER DATE* 06/01/11 DWG. NO: hoag.hvIentry • • • TABLE 1: SOIL CORROSI V1 TY (pH UNITS) Sail Bo?7na,10.^end bed Anatyte 5E1- . ` °SS-T ^' ,. . _ • . . ~ 1`Vak�;�. 'r,--,'3 �(:{Ja cr t w.��.. as�. f•`d .... +4 ... a: ..... ... -• .•. ... - pH 8.7 8.5 reHOAG. HVI. Entry.Improvements. mm#6, 786.060111 • • • APPENDIX I ANALYTICAL DATA, QA/QC & CHAIN -OF - CUSTODY AMERICAN SCIENTIFIC LABORATORIES, LLC A Y 1 Environmental Testing Services I f 1vY, f Ordered By 2520 N. Sw: Fernando Rd., Los Angeles. CA 90065 Yid: 1323; 233-9700 Fax. (323) 22.3 500 Peosceace. AnalytM a,L, 6U 1 a e r ocni rt, Sams Val» ey, A . 93665 Telephone Attn (805)526-6532 F. Rust 23t�rabex tE *Pages 'S Pat. e'1 ece irrd '0.5/ 1.tJ,/20 .1 bate,Be s ted . 05-J ,6/201:1. aoip ,Ni2.615,ar 49798 05/09/2011 04irz .1 GEOSCI I Project ID: HOSPITAL ENTRANCE Project Name: Hospital Entrance Upgrade Site: Newport Beach Enclosed are the results of analyses on 2 samples analyzed as specified on attached chain of custody. Amolk MOLKY Brar Laboratory Manager Laboratory Director Rojert G. Araghi -% nedcoi- deb noltihdratories,-Lt:: %a�a Cssa, .tortaceri, sfromctiehtsforan9t siswith'tile,asaftniptioit;tli44:.flthe(0604110it.0Y14e4 tb lSl r Xbkin 1 'M titigbY•oprctients.(andrefitreir geit*Te�at�in sainpte0$eia*-sd ioittEdio}�$L,iScomp1eteand?acctj . `,Laccepts m tsnp7esaubjtctdaiha fotlo ngawieiitiang:. .. ij. ASL notCspQ10itafor'vr;rf{t'Pg`:?n�!tiiEd6pib :0:4: •�ii!ibn,t'hgasclingahsa+ ,ples lxnittdatb'thtl8bggatat'' . - • 2)- islidri&sitaitstblc.ttSr Ycdtt iencesl i3iifi iroti►;in3ft?cciirat3e amissoiis oYuusr resetitai'ronscdjifaipcdipc1iCnt3 tti9diirbnSiBtiatfie 04 sampies su-6,0 ctl to iitr;vtarata : Client Sample _ Date Sampled Date Prepared Preparation Method Date Analyzed Matrix Units 0 C `. i 1. Environinenuzi Testing Services 1 : AMERICAN SCIENTIFIC LABORATORIES, LLC ...",...#-.1,.,,' , ,_,....,—,..„.............-. 2520,v. sun Fernando Rd- Los Angelo. CA 90065 Tel- .C32.3) 223-47110 Fax: (32$) 21.3-9.5n0 ...e...,..0,4,....., .,. T,,t4.t,.., : ANALYTICAL RESULTS Ordered By Site i : Q(iseierice•Analytieal,„ TAP, NeWport'Heaeb .. - , 608 Bailey Co . • ' ' '. -- i Simi Valley, CA:93065:, t _ _ Telephone: (805)526-6532 Attn: F. Rust Page: Project ID: Project Name: 5 HOSPITAL ENTRANCE Hospital Entrance Upgrade LObi? .-NgebetI submttedYThiient 49798 05/09/2011 GEOSCI Method: 9045C, Soil and Waste pH QC Batch No: 051111-1 I ' • /6818 168$*: ' 10' 20' 05/11/2011 .05/11/2011 .05/11/2011 ,05/11/2011 Soil Soil Dilution Factor 0_- donventiohalt pH pH Units pH Units 1 1 ,es*i1ts iteurtg 1.00 8.70 8.46 ' QUALITY CONTROL REPORT QC Batch No: 051111-1 , • .,. Tr LCS LCS DUP LCS RPD LCS/LCSD LCS RPD AilablOs " . . I % REC % REC % REC % Limit ; % Limit ., Con,$ieritiona1$ -, , . . „ , .. , pH .... 100 100 <1 1 80-120 • i A $ AMERICAN SCIENTIFIC LABORATORIES, LLC S L\ l l l $ Environmental* Testing Services J���1 taut' 2520 N. San Fernando Road, LA, CA 90065 Tel: (323) 223-9700 • Fax: (323) 223-9500 oc# N? 58995 GLOBAL ID • E REPORT: ❑ PDF ❑ EDF • Page Of LI EDD ASL JOB# 149798 Company: , . p �j o,M -c..lL- � ` 4 Re ort To: c u S vc r�- ANALYSIS REQUESTED Address: \ c ., c Project Name: � ` t a A • dire s. -, `.. \ �An rk ter. �a._ �.� Site Addre til ark 6,-(.0 .4. - ` 5' �„__Q,. q p ;'� (J .' cl A Telephone: *(5 V �5-• 6 S i Th— Fa`x: ` .sla S s.> `1,--v 3 5-1 Li Special Instruction: Project ID: �,` 14,, ,�� ` E-mail: e.,� j G\ 0 G`, �, p A Project • r ` Manager• - • LAB USE ONLY SAMPLE DESCRIPTION Container(s) �° x. i Remarks E M Lab ID Sample ID Date Time # Type tab C ‘A l } 9 6 g 5' 9 , `)' a 5 `6 . y()1 IA S 0 A c.0\ `f. -/. , ' r ollected By: V , �r \-1-A Date S VI \ \ Time l F•�9." Relinquished By: Date Time TAT _ linquished By: , Date ' Time - Received �— Date Time For Laboratoryj0•,.'•j of 44-� 5- 1 c1 1 I{ ; 2S Deceived By: Date Time • Wh,ea - l7n nn.r volt..... 1 .. I......s.... ne-1_ �..-._a Condition of Sample: / •` • • • • APPENDIX II PRELIMINARY GEOCHEMICAL SITE EVALUATION OF EXISTING RELIEF WELLS, GASEOUS FLARE, SOIL, WATER, AND AIR ON A PORTION OF HOAG MEMORIAL HOSPITAL PRESBYTERIAN PROPERTY, NEWPORT BEACH, CALIFORNIA APRIL 22, 1992 • PRELIMINARY GEOCHEMICAL SITE EVALUATION OF EXISTING RELIEF WELLS, GASEOUS FLARE, SOIL, WATER AND AIR ON A PORTION OF HOAG MEMORIAL HOSPITAL PRESBYTERIAN PROPERTY NEWPORT BEACH, CALIFORNIA 22 APRIL 1992 PREPARED FOR: LSA ASSOCIATES INC. IRVINE, CALIFORNIA PREPARED BY: GEOSCIENCE ANALYTICAL, INC. 4454 INDUSTRIAL STREET SIMI VALLEY, CA 93063 • • THE INFORMATION CONTAINED HEREIN IS SUBMITTED FOR THE SOLE AND EXCLUSIVE USE OF LSA ASSOCIATES INC. AND THE CITY OF NEWPORT BEACH AND SHALL NOT BE DISCLOSED OR FURNISHED TO ANY OTHER ENTITY, CORPORATION, OR THIRD PARTY, FOR PURPOSES OUTSIDE THE SPECIFIC SCOPE AND INTENT OF THIS CONTRACT, WITHOUT THE EXPRESS WRITTEN CONSENT OF GEOSCIENCE ANALYTICAL, INC. ANY UNAUTHORIZED DISSEMINATION OR REUSE OF THIS DOCUMENT WILL BE AT THE USER'S SOLE RISK AND WITH THE CONDITION THAT GEOSCIENCE ANALYTICAL, INC. BE HELD HARMLESS FROM ANY AND ALL CLAIMS FOR LOSSES OR DAMAGES AND EXPENSES ARISING OUT OF OR RESULTING FROM SUCH UNAUTHORIZED DISCLOSURE OR REUSE. THE ENVIRONMENTAL SERVICES OUTLINED IN THIS REPORT HAVE BEEN CONDUCTED IN ACCORDANCE WITH CURRENT PRACTICE AND THE STANDARD OF CARE EXERCISED BY ENVIRONMENTAL CONSULTANTS PERFORMING SIMILAR TASKS IN THE SOUTHERN CALIFORNIA AREA. ONLY LIMITED SAMPLING AND CHEMICAL ANALYSES WERE INCLUDED IN THIS ASSESSMENT. IN THE EVENT ANY CONDITIONS DIFFERING FROM, OR ADDITIONAL TO, THOSE DESCRIBED IN THIS ASSESSMENT ARE ENCOUNTERED AT A LATER TIME, GEOSCIENCE ANALYTICAL, INC. RESERVES THE RIGHT TO REVIEW SUCH CONDITIONS AND TO MODIFY, AS APPROPRIATE, THE ASSESSMENTS AND ANY CONCLUSIONS PROVIDED IN THIS REPORT. Fleet E. Rust, Ph.D. Registered Environmental Assessor • • • • CONTENTS 1.0 Contractor's Disclaimer 2.0 Summary • • • • 3.0 Field Sampling Procedure . 4.0 Analytical Methods.. 5.0 Results and Discussion 6.0 Appendices 6.A. 6.B. 6.C. 6.D. 6.E. 6.F. 6.G. 6.H. 6.I. 6.J. 6.K. 6.L. . Figure 1: Figure 2: Table 1: Table 2: Table 3: Table 4: Table Table Table • • Site Plan Flare Thermal Gradient Sampling Site Locations C1-C4 Hydrocarbons in Gas C5-C7 Hydrocarbons in Gas CO2, 02 and N2 in Gas 5: Hydrogen Sulfide and Sulfur Dioxide in Gas . 6: Corrosivity of Water • and Soil 7: Aromatic Hydrocarbons in Gas Appendix Appendix Appendix 6 ▪ 10 • 13 • 16 B: Health and Safety Plan • . C: Chain -of -Custody Records . D: Laboratory Results . 21 22 23 24 31 34 37 41 43 44 46 69 77 • • 1.0 CONTRACTOR'S DISCLAIMER PROFESSIONAL SERVICES HAVE BEEN PERFORMED BY GEOSCIENCE ANALYTICAL, INC. USING THAT DEGREE OF CARE AND SKILL ORDINARILY EXERCISED, UNDER SIMILAR CIRCUMSTANCES, BY REPUTABLE GEOCHEMISTS PRACTICING IN SOUTHERN CALIFORNIA. NO OTHER WARRANTY, EXPRESSED OR IMPLIED, IS MADE AS TO THE INFORMATION AND ADVICE INCLUDED IN THIS REPORT. WE HAVE NOT INSPECTED OR PASSED JUDGMENT UPON THE WORK OF ANY OIL COMPANY, THEIR CONTRACTORS OR THEIR SUBCONTRACTORS, IN CAPPING OIL OR GAS WELLS LOCATED ON THE SUBJECT PROPERTIES WHICH ARE IDENTIFIED IN THIS REPORT. WE HAVE NOT REVIEWED ANY PUBLIC OR PRIVATE RECORDS, IN SEARCH OF THE EXISTENCE OR LOCATION OF OTHER OIL OR GAS WELLS, HIDDEN, VISIBLE, OLD OR INADEQUATELY CAPPED, WHICH MIGHT BE LOCATED ON OR NEAR THE SUBJECT PROPERTY, WHETHER SUCH WELLS MIGHT BE KNOWN OR UNKNOWN TO THE CALIFORNIA DIVISION OF OIL AND GAS. WITHOUT IN ANY WAY LIMITING OR QUALIFYING THE FOREGOING, BY REQUESTING OR RELYING UPON THIS REPORT, YOU WILL BE DEEMED TO ACKNOWLEDGE: (1) WE ARE NOT TO BE HELD LIABLE BY YOU, OR ANY PARTY CLAIMING THROUGH YOU, OR ANY PERSON INJURED UPON THE PROPERTY, FOR ANY LOSS, COST, LIABILITY, EXPENSE, ATTORNEYS FEES AND COSTS, OR CONSEQUENTIAL DAMAGES OCCURRING AS A RESULT OF ERRORS OR OMISSIONS ON THE PART OF THE STATE OF CALIFORNIA, THE CITY OF NEWPORT BEACH, THE REDEVELOPMENT AGENCY OF THE CITY OF NEWPORT BEACH, OR ANY OIL COMPANY, OR THEIR CONTRACTORS OR SUBCONTRACTORS IN CAPPING THE OIL OR GAS WELL(S) IDENTIFIED IN THIS REPORT, OR: (2) AS A RESULT OF BREAKAGE OF OR SEEPAGE FROM UNDER THOSE OIL OR GAS WELL CAPS, OR AS A RESULT OF THE MIGRATION AND SUBSEQUENT EXPLOSION OF BIOGENIC GAS, AS A RESULT OF EARTH -SHAKING ASSOCIATED WITH EARTHQUAKES, EXPLOSIONS, EXCAVATION, DEMOLITION, SEISMIC VELOCITY TESTING, SOIL TESTING, WELL DRILLING OR THE LIKE; AND (3) WE HAVE DISCLOSED TO YOU THAT, IN OUR OPINION AS PROFESSIONAL GEOCHEMISTS, IT IS UNWISE TO BUILD STRUCTURES OR PAVED SURFACES OVER ABANDONED OIL OR GAS WELLS, OR WITHIN A HIGH POTENTIAL METHANE ZONE, GIVEN THE RISKS DESCRIBED IN (2) ABOVE, WITHOUT SATISFACTORY MITIGATION. • • • 2.0 SUMMARY Hoag Memorial Hospital Presbyterian (Hoag Hospital) has submitted an application for development which is the subject of a Draft Environmental Impact Report dated October 1991 that is currently undergoing review by the City of Newport Beach. Part of that Master Plan addresses future development of the "Lower Campus": a parcel of land immediately to the north of West Coast Highway, east of Superior Avenue and below the Newport Bluffs which is the site of Villa Balboa and Sea Faire Condominiums. Concerns have been raised about possible adverse affects soil gas conditions on the.Lower Campus may have during construction of new facilities and further into the future. In order to address those concerns GeoScience Analytical, Inc. was retained by LSA Associates, Inc. to undertake a preliminary soil, surface water and atmospheric gases sampling and analytical program. Neither LSA Associates, Inc. as Client, nor Hoag Hospital, as property owner, placed any constraints on the Contractor, nor did they suggest any interpretation of the data which were generated prior to completion of this report. On account of the preliminary nature of this study and the limited number of locations sampled hereunder, individual results may vary due to wind velocity, wind direction, barometric pressure, air temperature, and other variables. Three gas extraction wells currently exist on the Lower Campus • • site which are removing approximately 5,000 MCF of subterranean gas per month from well depths as great as 100 feet below grade (Ninyo & Moore, "Assessment of Hydrogen Sulfide and Methane Gas Hoag Hospital Master Plan", January 14, 1992). Currently this gas is being flared. Before combustion, the gas contains approximately 4,000 ppm (v/v) of hydrogen sulfide and is 46.0% by volume methane along with carbon dioxide (14.0%), nitrogen and oxygen. The nitrogen and oxygen are thought to be derived from ambient air. The oxygen concentration has been significantly depleted as a result of bacterial methane oxidation. The gas was extremely "dry" in that it contained only trace levels of heavier homologues of methane indicative of an early diagenetic production and/or in situ biodegradation. After flaring, preliminary results indicate that the methane is reduced to background levels and hydrogen sulfide is below the limits of detection in the air (0.1 ppm v/v). The combustion product of hydrogen sulfide, sulfur dioxide, is also beneath the limits of detection (0.1 ppm v/v) in all samples analyzed. Air samples collected from both the building interiors and roof vents of subterranean vent systems beneath the Child Care and Cancer Centers contained only background concentrations of methane with hydrogen sulfide below the limits of detection. Soil gas samples collected from the area of the wetlands and surrounding near surface soils contained methane concentrations from 8.1 ppm to 3,360 ppm or 6.3% of the lower explosive limit. • • Prior to the installation of gas remediation systems along West Coast Highway and within the Newport Beach Townhomes, this same area of the wetlands and surrounding soils contained concentrations of methane as high as 536,000 ppm (GeoScience Analytical, Inc., "Geochemical Investigation of near Surface Hydrocarbon Gas Accumulatlions in Soil on a Portion of Newport Beach Townhomes and 43rd and 44th Streets", March 22, 1990). With installation of two passive gas extraction systems, however, the surficial combustible gas concentrations have been reduced by more than 99.0% from 536,000 ppm to a high of 4,762 ppm. Carbon dioxide (CO2) concentrations within the Child Care Center and Cancer Center interior air spaces and outside in the open atmosphere were determined. Within the Child Care Center and Cancer Center the carbon dioxide concentration ranged from 1,800 to 3,000 ppm v/v and outside ambient air at 4' above ground level was 1,200 ppm. Samples recovered from the roof elevations downwind of the flare contained approximately 6,000 ppm v/v of carbon dioxide. Interior carbon dioxide concentrations were below levels of concern according to applicable Federal governmental standards (Occupational Safety & Health Administration, "Limits for Air Contaminants", July 1989, Table Z-1-A) . Measurements were made for the presence of benzene, toluene, ethylbenzene and xylenes in samples recovered from within the Child Care Center and Cancer Center as well as ambient air • • and subslab vents. In all cases concentrations were less than the limit of detection of 0.5 ppm v/v. Flare feedstock was also analyzed for these aromatic hydrocarbons. Feedstock gas contained less than the detection limits of benzene, toluene and ethylbenzene. Xylenes were present at less than 2.0 ppm v/v in the feedstock gas. The absence of these compounds is in agreement with an immature shallow source for the gas which is produced by early diagenetic reactions at low temperature. Samples collected from the wetlands contained no aromatic hydrocarbons above the limits of detection. Soil and water.corrosivities were determined on samples taken from the wetlands. All pH measurements were within the neutral range being neither acidic nor basic. A comprehensive Health and Safety Plan, attached herewith as Appendix B, assured all aspects of site safety during all sampling activities. Anticipated elevated levels of hydrogen sulfide and methane were of primary importance. • • 3.0 FIELD SAMPLING PROCEDURES Applicable EPA protocol was adhered to during all phases of the sampling activities (U.S. Environmental Protection Agency, "Test Methods for Evaluating Solid Wastes", Third Addition, 1986, SW-846; California Dept. of Health Services, "California Site Mitigation Decision Tree Manual", 1986). Chain -of -Custody records were maintained and are included herewith as Appendix C. A comprehensive Health and Safety Plan, attached herewith as Appendix B, assured all aspects of site safety during all sampling activities. Anticipated elevated levels of hydrogen sulfide and methane were of primary importance. Gaseous samples were of two types: those collected in 1 liter Tedlar bags and those collected in 250 cc glass containers sealed with inert teflon stoppers. Tedlar bags (SKC Type 232-01 equipped with a polypropylene valve) were filled with an oiless Dayton Speedaire pump model 2Z866. Connections between the pump and the Tedlar bag were made with 1/8" O.D. teflon tubing type TD2-03420. For sampling in remote areas such as roof vents, teflon tubing was used for the intake. For air sampling in accessible spaces such as rooms, ground level atmosphere or open space on roofs the pump intake was directly open to the atmosphere. All Tedlar bag samples, once collected, were stored in the dark. Glass sampling vessels were filled with distilled water and • • stoppered with a teflon septum leaving no headspace gas. Gas sampling was accomplished with a gas tight syringe and samples were stored in the glass vessels by water displacement. No atmospheric contamination or outgassing of the teflon occurs with this method. In some cases, ambient atmosphere was sampled by opening the vessel and draining the water. The container was then stoppered with a sample of ambient air within. Soil gas samples were collected by driving a four (4) foot probe into the soil with a slide hammer. A 1/8" teflon tube, described above, attached to a thin stainless steel rod was then lowered 4' into the probe hole. An air tight 60cc syringe was affixed to the uphole end of the tubing and one sample withdrawn to flush the tubing. Samples were withdrawn and injected into glass containers described previously. Soil samples were collected for pH measurements by removing the top 6" of soil with a spade. The soil was further disaggregated with a spatula and approximately 400 grams of soil removed with a teflon spatula and placed in a precleaned jar. The jar was sealed with a teflon lined lid and stored at ten (10) degrees Celsius in a cooler. Water samples were collected in 200cc precleaned containers by simple submergence, and were also stored at ten (10) degrees Celsius. Extraction well gas is pumped at a pressure higher than atmospheric. Therefore gas well samples required no use of secondary pumping. For tedlar bag samples, a 1/8" teflon tube was utilized to connect the well valve on the high pressure side • • of the pump to the polypropylene valve on the tedlar bag. The well pump valve was "cracked" open to flush the teflon tubing of atmospheric contamination and then the inlet of the polypropylene valve on the tedlar bag was affixed to the teflon tubing and opened, allowing the bag to fill. The valve was then closed and the tedlar bag stored in the dark. The glass containers were inverted over the teflon tubing and the incoming gas simply displaced the water. The tubing was then removed and the containers stoppered. A composite sample of all the wells was obtained in this fashion. Individual wells were sampled by isolating two (2) wells and letting the in line compressor operate for five (5) minutes to flush all composite gas from the lines. Samples were then taken as described above. Temperature measurements of the flare and thermal plume were also taken. Since the flame is approximately 20' above ground surface, the thermocouple was attached to, but insulated from, a 20' long metal pole. The thermocouple was moved to various locations within the flame and plume. At each position of a desired temperature measurement, the thermocouple was held in place until the voltage measurement stabilized. • • 4.0 ANALYTICAL METHODS Samples were analyzed by Certified Testing Laboratories, an independent testing laboratory certified by numerous California governmental agencies in addition to the Environmental Protection Agency. Chain -of -Custody forms were maintained during all aspects of the program and are made a part of the record as Appendix C, attached. Analyses were performed according to applicable EPA protocol (U.S. Environmental Protection Agency, "Test Methods for Evaluating Solid Wastes", Third Addition, 1986, SW-846) or ASTM Methods where no EPA protocol has been established. Hydrogen Sulfide/Sulfur Dioxide Tedlar bag samples were analyzed for their H2S and/or SO2 content with a gas chromatograph equipped with a Hall detector according to EPA Method 15(mod.). All samples were analyzed within 72 hours of collection. Results are reported as parts -per -million (ppm) volume/volume. Applicable QA/QC protocol was followed including standardization, blanks and replicate analyses. Benzene/Toluene.Ethylbenzene/Xvlenes (BTXE) Tedlar bag samples were analyzed for their applicable aromatic hydrocarbon content by gas chromatography using a photo - ionization detector according to EPA Method 8020. Results are reported as parts -per -million (ppm) volume/volume. Applicable • • QA/QC protocol was followed including standardization, blanks and replicate analyses. Corrosivity (PH) The corrosivity of the soil and water samples was measured according to EPA Method 9040 using a calibrated electrode. Results are reported as standard pH units. Applicable QA/QC protocol was followed including standardization, blanks and replicate analyses. Carbon Dioxide, Oxygen and Nitrogen Samples were analyzed according to ASTM Method D1946. Gas container samples were analyzed for their CO2, 02 and N2 content using a Carle Model 8700 gas chromatograph equipped with a thermal conductivity detector. The carrier gas is helium at a flow rate of 30 cc/min. Two stainless steel 1/8" 0.D. packed columns in tandem are used for the separation: an 8.0' 50/80 mesh mixture of 80% PPN/20% PPQ porapack followed by a 6.0' molecular sieve 5A 60/80 mesh. Quantitation is with an HP Model 3390A electronic integrator. Results are reported as parts -per -million (ppm) volume/volume. Applicable QA/QC protocol was followed including standardization, blanks and replicate analyses. Cl-C7 Hydrocarbons Glass container samples were analyzed for their methane, ethane, • • ethylene, propane, propylene, isobutane, n-butane, isopentane, n-pentane, isohexane, n-hexane, isoheptane and n-heptane content using a model 2400 dual column Varian gas chromatograph equipped with flame ionization detectors. The separation is achieved with an 8.0' stainless steel 1/8" O.D. column packed with 100/120 mesh alumina. Temperature programming occurs from 70 - 240 degrees Celsius at 15 degrees per minute. Quantitation is with an HP 3390A electronic integrator. Results are reported as parts -per -million (ppm) volume/volume. Applicable QA/QC protocol was followed including standardization, blanks and replicate analyses. Flame Temperature The flame and thermal gradient plume was measured with an Omega Engineering Inc. Type K nickel -chromium alloy/ nickel -aluminum alloy thermocouple (Cromel-Alumel) affixed to a 20' steel tube. The voltage output was measured with a Model 9176 Varian strip chart recorder set at 50 mV full scale deflection. Power for the recorder was supplied by a 3500 watt generator. Results are reported as degrees Celsius. Calibration was performed before, during, and following field measurments. • 5.0 RESULTS AND DISCUSSION Hoag Memorial Hospital Presbyterian (Hoag Hospital) has submitted.a Master Plan development application which is the subject of a Draft Environmental Impact Report dated October 1991 that is currently undergoing review by the City of Newport Beach. Part of that Master Plan addresses future development of the "Lower Campus", a parcel of land immediately to the north of West Coast Highway, east of Superior Avenue and below the Newport Bluffs which is the site of Villa Balboa and Sea Faire Condominiums. Seventy-three (73) samples were collected from the soil and air of the subject property as part of the current study. Sample types and locations are identified in Table 1. The gas being supplied to the existing flare contains 46.0% methane (TAB. 2) and approximately 4,000 ppm of hydrogen sulfide (TAB. 5). These values, measured on four (4) distinct samples of flare feedstock, are in good agreement with previous studies of the well gas. The flare is currently combusting approximately 50 lbs. of sulfur, as hydrogen sulfide, per day from the production of the shallow gas extraction wells. This effluent is not creating any detectable levels of hydrogen sulfide or sulfur dioxide in the ambient air. Anticipated scrubbing of the feedstock to remove hydrogen sulfide will reduce the possibility of future atmospheric pollution due to sulfur from the extraction wells. • • • Air samples taken at the Child Care Center and the Cancer Center, as well as samples from throughout the site did not detect hydrogen sulfide or sulfur dioxide above the limits of detection (TAB. 5). Only trace levels of methane are present on the subject site, except for the area of the wetlands and in decaying surface vegetation. Four (4) samples taken from the roof and interior of the Child Care Center and Cancer Center were analyzed for an expected combustion product of methane, carbon dioxide, and a hydrogen sulfide combustion product, sulfur dioxide, and aromatic hydrocarbons. The background concentration of carbon dioxide in the atmosphere is approximately 350 ppm v/v in pristine environments ("Handbook of Chemistry & Physics", 53rd Addition, CRC Press). Automobiles, power plants and sewage decay are known large producers of carbon dioxide. Five (5) air samples taken at an elevation of approximately 15 - 35 feet above grade contained carbon dioxide concentrations of approximately 5,500 ppm v/v (TAB. 4). The existing flare effluent was calculated to contain roughly 600,000 ppm v/v of carbon dioxide which is apparently undergoing dilution by a factor of 100 in the ambient air downwind of the flare. Nine (9) samples were analyzed for sulfur dioxide and did not contain SO2 above the level of detection of 0.1 ppm v/v which suggests that the SO2 reacted by conversion to sulfate (TAB. 5). Five (5) air samples which were collected from subsiab vents did not contain levels of methane or other hydrocarbons above • • background. Carbon dioxide concentrations were similar to that found in the surrounding air. No sulfur dioxide or hydrogen sulfide were detected in the vent gases above the limit of detection of 0.1 ppm v/v (TAB. 5). The maximum temperature of the flare was measured at approximately 600 degrees Celsius (FIG. 2) which means that the gas density is about one half its normal atmospheric value. Therefore,• the flare plume rises very quickly thereby mitigating any negative adverse impact on neighboring on -site buildings. The relatively low combustion temperature of the flare is caused by the very low BTU content of the gas (less than 500 BTU) which means that the formation of oxides of nitrogen is highly unlikely. The thermal gradient has been measured and is schematically represented in Figure 2. Sixteen (16) gas samples were collected at ground level throughout the Upper and Lower Campus areas and contained carbon dioxide concentrations ranging as high as 1,800 ppm v/v in a few cases during periods of reduced sea breezes (TAB. 4). These levels are the probable result of automobile exhaust and other combustion processes and do not pose a health risk. Existing governmental standards identify threshholds of 5,000 - 20,000 ppm v/v as levels of concern over extended periods of time within enclosed spaces. Five (5) representative gas samples were collected at shallow depths throughout the wetlands and surrounding areas. No samples contained hydrogen sulfide and/or sulfur dioxide at - 19 - • • levels above the detection limit of 0.1 ppm v/v. Methane in the air samples was less than 10.0 ppm v/v and methane in soil samples was less than 100 ppm v/v in most cases. At the far west end of the wetlands near the toe of the bluff a concentration of 3,360 ppm v/v methane was observed in the shallow soil gas and in the median of West Coast Highway across from the east gate of Newport Beach Townhomes a concentration of 4,762 ppm v/v of methane was observed. Two years ago, shallow methane soil gas concentrations in this area were found to be 536,000 ppm by volume. At that time two methane mitigation systems were installed that have reduced the soil gas concentrations of methane by more than 99.0%. Both systems were financed as the result of funds appropriated through the actions of. State Senator Marian Bergeson. One system was installed on the north side of West Coast Highway by Merrill Wright and the other system by GeoScience Analytical, Inc. on property owned by Newport Beach Townhomes. One gas sample was taken in a pile of composting grass clippings• and contained 2,317.0 ppm v/v of methane (TAB. 2). Carbon dioxide was present at a concentration of almost 81,000 ppm v/v (TAB. 4). .The grass pile was noticably warm and emitted an organic odor typically associated with composting vegetation. Decaying vegetation is a potent source of methane and carbon dioxide found in and around the wetlands. It is possible that the wetlands contribute substantially to near surface methane found in the surficial soils and atmosphere. - 20 - • • • Carbon dioxide concentration of the wetlands airspace, measured at seven (7) locations, was somewhat elevated over background levels of 350 ppm v/v. The carbon dioxide in the -grass clippings would indicate that some comes from decaying vegetation in the wetlands. The balance may be from urban activities such as automobile exhaust, home heating, commercial heating, etc. as suggested by the elevated levels along West Coast Highway and within parking lots of the Upper Campus (TAB. 4). Of seven (7) locations sampled, no ambient air samples or shallow soil gas samples contained benzene, toluene, ethylbenzene or xylenes at levels greater than the detection limit (TAB. 7). The flare feedstock was also void of these compounds with the exception of trace levels of xylene far below levels of concern: OSHA standards for xylene in the work place are from 100.0 - 150.0 ppm v/v while the flare feedstock contains less than 2.0 ppm v/v. Hydrocarbons are all flammable and are consumed by the flare. There is no detectable release of aromatic hydrocarbons on the site nor has a source been identified. The pH of three (3) soil and four (4) water samples recovered from the wetlands was measured (TAB. 6). Soil samples were retrieved from a depth of 6" below grade and water was taken from the surface. All samples were. neutral. In no case was an acidic or alkaline soil or water identified on the subject site. • APPENDIX A DATA TABLES AND FIGURES • • • FIGURE 1 SITE PLAN SAMPLING LOCATIONS O AIR SAMPLE A SOIL SAMPLE. WATER SAMPLE / sospral. •; ieoHWAY„ two CANCER CENTER uI= 0 m 0 0 WIND DIRECTION • • FROM COMPRESSOR/VACUUM PUMP - 23 - FIGURE 2 FLARE EFFLUENT TEMPERATURE GRADIENT • rki:j • 600° C 500° C 400° C 300° C 200° C 100° C O TEMPERATURE MEASUREMENT LOCATION ! 5.0 ft. I 4.4 - TABLE 1 SAMPLING SITE LOCATIONS • • Sample No. Sample Type Location Date Time 92-04-04-1337-1 Bottle Child Care Center Roof April 4, 1992 1000 Subslab Vent Pipe 43.5' N of S Wall of Building 53' E of W Wall of Building 92-04-04-1337-2 Tedlar Child Care Center Roof April 4, 1992 1015 Subslab Vent Pipe 43.5' N of S Walt of Building 53' E of W Walt of Building 92-04-04-1337-3 Tedlar Child Care Center Roof April 4, 1992 1021 Subslab Vent Pipe 43.5' N of S Walt of Building 53' E of W Wall of Building 92-04-04-1337-4 Bottte Child Care Center Roof April•4, 1992 1046 Subslab Vent Pipe 8' S of N Wall of Building 26' W of E Wall of Building Roof Elevation of 12.5' Above Grade 92-04-04-1337-5 Tedlar Child Care Center Roof April 4, 1992 1059 Subslab Vent Pipe 8' S of N Watt of Building 26' W of E Wall of Building Roof Elevation of 12.5' Above Grade 92-04-04-1337-6 Tedlar Child Care Center Roof April 4, 1992 1120 Subslab Vent Pipe 8' S of N Wall of Building 26' W of E Wall of Building Roof Elevation of 12.5' Above Grade 92-04-04-1337-7 Bottle Child Care Center Roof April 4, 1992 1140 Atmosphere 4' Above Roof 21'S of N Walt of Building 15' E of W Wall of Building 92-04-04-1337-8 Tedlar Child Care Center Roof April 4, 1992 1143 Atmosphere 4' Above Roof 21'S of N Wall of Building 15' E of W Wall of Building 92-04-04-1337-9 Tedlar Child Care Center Roof April 4, 1992 1155 Atmosphere 4' Above Roof 21'S of N Wall of Building 15' E of W Wall of Building 92-04-04-1337-10 Bottle Cancer Center Roof April 4, 1992 1220 Subslab Vent Pipe 18' NE of SW Wall 17' NW of SE Wall Roof Elevation of 29' Above Grade - 25 - • Sample No. Sample Type TABLE 1 (cont.) SAMPLING SITE LOCATIONS Location Date Time 92-04-04-1337-11 Bottle Cancer Center Roof Subslab Vent Pipe 76' W of E Wall 40' N of S Wall 92-04-04-1337-12 Bottle Cancer Center Roof Subslab Vent Pipe 2' S of N Wall 11' W of E Walt 92-04-04-1337-13 Tedlar Cancer Center Roof Subslab Vent Pipe 76' W of E Walt 40' N of S Wa t l 92-04-04-1337-14 Tedlar Cancer Center Roof Substab_Vent Pipe 76' W of E Wall 40' N of S Wall 92-04-04-1337-15 Bottle Cancer Center East End Elevator Shaft 92-04-04-1337-16 Tedlar Cancer Center East End Elevator Shaft 92-04-04-1337-17 Tedlar Cancer Center East End Elevator Shaft 92-04-04-1337-18 Bottle Child Care Center Interior Air Space Preschool 1 Room April 4, 1992 1225 April 4, 1992 1245 April 4, 1992 1300 April 4, 1992 1312 April 4, 1992 1315 April 4, 1992 1330 April 4, 1992 1345 April 4, 1992 1403 92-04-04-1337-19 Tedlar Child Care Center April 4, 1992 1410 Interior Air Space Preschool 1 Room 92-04-04-1337-20 Tedlar Child Care Center April 4, 1992 1415 Interior Air Space Preschool 1 Room 92-04-04-1337-21 Bottle Relief Well Gas April 4, 1992 1445 Composite of All Wells 92-04-04-1337-22 Tedlar Relief Well Gas April 4, 1992 1450 Composite of All Wells • 92-04-04-1337-23 Tedlar Relief Well Gas April 4, 1992 1455• Composite of All Wells 92-04-04-1337-24 Bottle Relief Well Gas April 4, 1992 1459 Well A5 - 26 - TABLE 1 (cont.) SAMPLING SITE LOCATIONS • Sample No. Sample Type Location Date Time 92-04-04-1337-25 Tedlar Relief Well Gas April 4, 1992 1505 Well #5 - 92-04-04-1337-26 Tedlar Relief Well Gas April 4, 1992 1508 Well #5 92-04-04-1337-27 Bottle Relief Well Gas April 4, 1992 1510 Well #6 92-04-04-1337-28 Tedlar Relief Well Gas April 4, 1992 1515 Well #6 92-04-04-1337-29 Tedlar Relief Well Gas April 4, 1992 1518 Well #6 92-04-04-1337-30 Bottle Relief Well Gas April 4, 1992 1520 Welt #7 92-04-04-1337-31 Tedlar Relief Well Gas April 4, 1992 1532 Well #7 • 92-04-04-1337-32 Tedlar Relief Well Gas April 4, 1992 1540 Well #7 92-04-04-1337-33 Bottle Flare Plume April 4, 1992 1545 Air Sample 24' Above Grade .21' Down Wind from Flare 92-04-04-1337-34 Tedlar Flare Plume April 4, 1992 1549 Air Sample 24' Above Grade 21' Downwind from Flare 92-04-04-1337-35 Tedlar Flare Plume April 4, 1992 1555 Air Sample 24' Above Grade 21' Downwind from Flare 92-04-04-1337-36 Bottle Flare Plume April 4, 1992 1610 Air Sample 24' Above Grade 41' Downwind from Flare 92-04-04-1337-37 Tedlar Flare Plume April 4, 1992 1632 Air Sample 24' Above Grade 41' Downwind from Flare _27- • • Sample No. Sample Type TABLE 1 (cont.) SAMPLING SITE LOCATIONS Location Date Time 92-04-04-1337-38 Tedlar Flare Plume April 4, 1992 1645 Air Sample 24' Above Grade 41' Downwind from Flare 92-04-04-1337-39 Bottle Flare Plume April 4, 1992 1655 Air Sample 24' Above Grade 20' Upwind from Flare 92-04-04-1337-40 Tedlar Flare Plume April 4, 1992 1710 Air Sample 24' Above Grade 20' Upwind from Flare 92-04-04-1337-41 Tedlar Flare Plume April 4, 1992 1720 Air Sample 24' Above Grade 20' Upwind from Flare 92-04-04-1337-42 Bottle Flare Plume April 4, 1992 1735 Air Sample 24' Above Grade 40' Upwind from Flare 92-04-04-1337-43 Tedlar Flare Plume April 4, 1992 1745 Air Sample 24' Above Grade 40' Upwind from Flare 92-04-04-1337-44 Tedlar Flare Plume April 4, 1992 1759 Air Sample 24' Above Grade 40' Upwind from Flare 92-04-04-1337-45 Bottle Grass Cuttings in Pile April 4, 1992 1810 60' S of Flare on Ground 6" Inside of Pile 92-04-04-1337-46 Bottle Wetlands Soil April 4, 1992 1815 6" Below Grade 78' N of Well 7 130' W of Well 7 92-04-04-1337-47 Bottle Wetlands Water April 4, 1992 1826 78' N of Well 7 130' W of Well 7 11111 92-04-04-1337-48 Bottle Wetlands Soil Probe Gas April 4, 1992 1835 4' Below Grade 78' N of Well 7 130' W of Well 7 - 28 - • • • Sample No. Sample Type TABLE 1 (cont.) SAMPLING SITE LOCATIONS Location Date Time 92-04-04-1337-49 Bottle Wetlands Water April 4, 1992 1841 100' N of West Coast Highway 300' W of Well 7 92-04-04-1337-50 Bottle Wetlands Soil Probe Gas April 4, 1992 1849 4' Below Grade 100' N of West Coast Highway 300' W of Well 7 92-04-04-1337-51 Bottle Wetlands Soil April 4, 1992 1855 6" Below Grade 100' N of West Coast Highway 300' W of Well 7 92-04-04-1337-52 Bottle Wetlands Water April 4, 1992 1901 40' N of West Coast Highway Directly N of Newport Townhomes' East Gate 92-04-04-1337-53 Bottle ' Wetlands Soil April 4, 1992 1905 6" Below Grade 40' N of West Coast Highway Directly N of Newport Townhomes' East Gate 92-04-04-1337-54 Bottle Wetlands Soil Probe Gas April 4, 1992 1909 4' Below Grade 40' N of West Coast Highway Directly N of Newport Townhomes' East Gate 92-04-04-1337-55 Tedlar Wetlands Atmosphere April 4, 1992 1915 4' Above Grade 40' N of West Coast Highway Directly N of Newport Townhomes' East Gate 92-04-04-1337-56 Tedlar Wetlands Atmosphere April 4, 1992 1921 4' Above Grade 40' N of West Coast Highway Directly N of Newport Townhomes' East Gate 92-04-04-1337-57 Tedlar Wetlands Soil Probe Gas April 4, 1992 1928 4' Below Grade 40' N of West Coast Highway Directly N of Newport Townhomes' East Gate - 29 - • TABLE 1 (cont.) SAMPLING SITE LOCATIONS Sample No. Sample Type Location Date Time 92-04-04-1337-58 Bottle Wetlands Atmosphere April 4, 1992 1935 4' Above Grade 40' N of West Coast Highway Directly N of Newport Townhomes' East Gate 92-04-04-1337-59 Bottle Wetlands Soil Probe Gas April 4, 1992 1942 4' Below Grade 70' W of Existing Gas Vent 25' N',of West Coast Highway Toe of Bluff at W End 92-04-04-1337-60 Bottle Wetlands Water April 4, 1992 1950 65' W of Existing Gas Vent 40' N of West Coast Highway Toe of Bluff at W End 92-04-04-1337-61 Bottle Soil Probe Gas April 4, 1992 1956 4' Below Grade Median on West Coast Highway S of Existing Gas Vent Directly N of Newport Townhomes' East Gate 92-04-06-1337-1 Bottle Atmosphere April 6, 1992 1600 4' Above Grade Base of Flare 92-04-06-1337-2 Bottle Atmosphere April 6, 1992 1610 4' Above Grade Base of Flare 50' Upwind of Flare 92-04-06-1337-3 Bottle Atmosphere April 6, 1992 4' Above Grade on Bike Trail Directly N of Flare 92-04-06-1337-4 Bottle Atmosphere April 6, 1992 4' Above Grade on Bike Trail 300' E of Flare 92-04-06-1337-5 Bottle Atmosphere April 6, 1992 Child Care Center Playground 4' Above Grade 92-04-06-1337-6 Bottle Atmosphere April 6, 1992 Child Care Center Employee Lounge Room Interior 4' Above Grade 1618 1622 1634 1640 - 30 - • • Sample No. Sample Type TABLE 1 (cont.) SAMPLING SITE LOCATIONS Location Date Time 92-04-06-1337-7 Bottle Atmosphere April 6, 1992 1648 4' Above Grade on Bike Trait Terminus with Main Hospital Visitor Parking Road 92-04-06-1337-8 Bottle Atmosphere April 6, 1992 1655 4' Above Grade Upper Campus Fishbeck Building Parking Lot 92-04-06-1337-9 Bottle• Atmosphere April 6, 1992 1659 4' Above Grade Upper Campus Entrance to Emergency Room Parking Lot 92-04-06-1337-10 Bottle Atmosphere April 6, 1992 1705 4' Above Grade Cancer Center Entrance 92-04-06-1337-11 Bottle Atmosphere 4' Above Grade Child Care Center E End of Parking Lot April 6, 1992 1710 92-04-06-1337-12 Bottle .Atmosphere April 6, 1992 1722 4' Above Grade Cancer Center W End of Staff Parking Lot - 31 - TABLE 2 C1-C4 HYDROCARBONS IN GAS SAMPLE (ppm) Sample No. Location C1 C2 C2: C3 C3: iso-C4_ n-C4 92-04-04-1337-1 92-04-04-1337-4 92-04-04-1337-7 92-04-04-1337-10 • 92-04-04-1337-11 92-04-04-1337-12 92-04-04-1337-15 Child Care Center Roof Substab Vent Pipe 43.5' N of S Wall of Building 53' E of W Wall of Building Child Care Center Roof Substab Vent Pipe 8' S of N Wall of Building 26' W of E Wall of Building Roof Elevation of 12.5' Above Grade Child Care Center Roof Atmosphere 4' Above Roof 21'S of N Walt of Building 15' E of W Wall of Building - Cancer Center Roof Substab Vent Pipe 18' NE of SW Wall 17' NW of SE Wall Roof Elevation of 29' Above Grade Cancer Center Roof Substab Vent Pipe 76' W of E Wall 40' N of S Wall Cancer Center Roof Substab Vent Pipe 2' S of N Walt 11' W of E Wall Cancer Center East End Elevator Shaft 1.8 50.2 1.9 1.9 2.9 1.9 3.5 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 0.5 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 0.1 0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 92-04-04-1337-18 Child Care Center 2.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 Interior Air Space Preschool 1 Room 92-04-04-1337-21 Relief Well Gas Composite of All Wells S4_04_1337_24 Relief Well Gas Well #5 92-04-04-1337-27 Relief Well Gas Well #6 458,330.0 406.0 <0.5 27.9 <0.5 5.2 6.7 576,100.0 480.0 <0.5 26.5 <0.5 5.1 5.2 407,390.0 382.0 <0.5 27.4 <0.5 5.2 7.5 - 32 - • TABLE 2 (cont.) C1-C4 HYDROCARBONS IN GAS SAMPLE (ppm) Sample No. Location C1 C2 C2: C3 C3: iso-C4 n-C4 92-04-04-1337-30 Relief Well Gas 412,730.0 405.0 <0.5 29.8 <0.5 5.7 8.0 Well #7 92-04-04-1337-33 Flare Plume 13.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 Air Sample 24' Above Grade 21' Down•Wind from Flare 92-04-04-1337-36 Flare Plume 20.7 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 Air Sample 24' Above Grade 41' Downwind from Flare 92-04-04-1337-39 flare Plume 52.2 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 Air Sample 24' Above Grade 20' Upwind from Flare 4-04-1337-42 Flare Plume 25.7 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 Air Sample 24' Above Grade 40' Upwind from Flare 92-04-04-1337-45 Grass Cuttings in Pile 2,317.0 0.4 0.1 0.2 <0.1 <0.1 <0.1 60' S of Flare on Ground 6" Inside of Pile 92-04-04-1337-48 Wetlands Soil Probe Gas 4' Below Grade 78' N of Well 7 130' W of Well 7 92-04-04-1337-50 Wetlands Soil Probe Gas 4' Below Grade 100' N of West Coast Highway 300' W of Well 7 92-04-04-1337-54 Wetlands Soil Probe Gas 4' Below Grade .40' N of West Coast Highway Directly N of Newport Townhomes' East Gate ._04_1337-58 Wetlands Atmosphere 4' Above Grade 40' N of West Coast Highway Directly N of Newport Townhomes' 8.1 30.5 91.3 3.2 0.3 0.1 0.2 0.1 <0.1 <0.1 0.5 <0.1 0.2 <0.1 0.2 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 0.4 - 33 - • TABLE 2 (cont.) C1-C4 HYDROCARBONS IN GAS SAMPLE (ppm) Sample No. Location C1 C2 C2: C3 C3: iso-C4 n-C4 92-04-04-1337-59 92-04-04-1337-61 • • Wetlands Soil Probe Gas 4' Below Grade 70' W of Existing Gas Vent 25' N of West Coast Highway Toe of Bluff at W End Soil Probe Gas 4' Below Grade Median on West Coast Highway S of Existing Gas Vent Directly N of Newport Townhomes' East Gate 3,360.0 4,762.0 2.7 0.4 <0.1 <0.1 1.7 0.2 <0.1 <0.1 0.3 0.4 <0.1 <0.1 J-I TABLE 3 • Sample No. Location C5-C7 HYDROCARBONS IN GAS SAMPLE (ppm) Iso-05 N-05 Iso-C6 N-C6 lso-C7 N-C7 92-04-04-1337-1 92-04-04-1337-4 92-04-04-1337-7 92-04-04-1337-10 • 92-04-04-1337-11 92-04-04-1337-12 92-04-04-1337-15 92-04-04-1337-18 • 92-04-04-1337-21 0,-04-04-1337-24 • 92-04-04-1337-27 Child Care Center Roof Subslab Vent Pipe 43.5' N of S Wall of Building 53' E of W Wall of Building Child Care Center Roof Subslab Vent Pipe 8' S of N Walt of Building 26' W of E Walt of Building Roof Elevation of 12.5' Above Grade Child Care Center Roof Atmosphere 4' Above Roof 21'S of N Wall of Building 15' E of W Wall of Building Cancer Center Roof Subslab Vent Pipe 18' NE of SW Wall 17' NW of SE Wall Roof Elevation of 29' Above Grade Cancer Center Roof Subslab Vent Pipe 76' W of E Wall 40' N of S Wall Cancer Center Roof Subslab Vent Pipe 2' S of N Wall 11' W of E Wall Cancer Center East End Elevator Shaft Child Care Center Interior Air Space Preschool 1 Room Relief Well Gas Composite of All Wells Relief Well Gas Well #5 Relief Well Gas Well *5 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 2.7 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 5.9 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 3.7 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 2.8 1.9 6.9 <0.5 3.3 <0.5 2.2 1.5 3.2 <0.5 <0.5 <0.5 3.0 2.2 , 7.2 1.0 0.9 <0.5 • TABLE 3 (cont.) C5-C7 HYDROCARBONS IN GAS SAMPLE (ppm) Sample No. Location Iso-05 N-05 Iso-C6 N-C6 Iso-C7 N-C7 92-04-04-1337-30 Relief Well Gas Well #7 92-04-04-1337-33 .flare Plume Air Sample 24' Above Grade 21' Down.Wind from Flare 92-04-04-1337-36 Flare Plume Air Sample 24' Above Grade 41' Downwind from Flare 92-04-04-1337-39 Flare Plume Air Sample 24' Above Grade 20' Upwind from Flare •_04_1337_42 Flare Plume Air Sample 24' Above Grade 40' Upwind from Flare 92-04-04-1337-45 Grass Cuttings in Pile 60' S of Flare on Ground 6" Inside of Pile 3.3 2.3 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 0.2 5.3 0.8 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 0.2 <0.5 <0.5 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 92-04-04-1337-48 Wetlands Soil Probe Gas <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 4' Below Grade 78' N of Welt 7 130' W of Well 7 92-04-04-1337-50 Wetlands Soil Probe Gas <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 4' Below Grade 100' N of West Coast Highway 300' W of Welt 7 92-04-04-1337-54 Wetlands Soil Probe Gas <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 4' Below Grade 40' N of West Coast Highway Directly N of Newport Townhomes' East Gate •04133758 Wetlands Atmosphere 4' Above Grade 40' N of West Coast Highway Directly N of Newport Townhomes' <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 - 36 - • TABLE 3 (cont.) C5-C7 HYDROCARBONS IN GAS SAMPLE (ppm) Sample No. Location Iso-05 N-05 Iso-C6 N-C6 Iso-C7 N-C7 92-04-04-1337-59 92-04-04-1337-61 • • Wetlands Soil Probe Gas 4' Below Grade 70' W of Existing Gas Vent 25' N of West Coast Highway Toe of Bluff at W End Soil Probe Gas 4' Below Grade Median on West Coast Highway S of Existing Gas Vent Directly N of Newport Townhomes' East Gate 0.1 0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 if — TABLE 4 • • • Sample No. CO2, 02 & N2 IN GAS SAMPLE (ppm) Location CO2 02 N2 N2/02 92-04-04-1337-1 92-04-04-1337-4 92-04-04-1337-7 92-04-04-1337-10 92-04-04-1337-11 Child Care Center Roof Subslab Vent Pipe 43.5' N of S Wall of Building 53' E of W Wall of Building Child Care Center Roof Substab Vent Pipe 8' S of N Wall of Building 26' W of E Wall of Building Roof Elevation of 12.5' Above Grade Child Care Center Roof Atmosphere 4' Above Roof 21'S of N Walt of Building 15' E of W Watt of Building Cancer Center Roof Subslab Vent Pipe 18' NE of SW Wail 17' NW of SE Wall Roof Elevation of 29' Above Grade Cancer Center Roof Subs tab Vent Pipe 76' W of E Wall 40' N of S Wall 92-04-04-1337-12 -' Cancer Center Roof Substab Vent Pipe 2' S of N Watt 11' W of E Wall 92-04-04-1337-15 92-04-04-1337-18 92-04-04-1337-21 92-04-04-1337-24 92-04-04-1337-27 Cancer Center East End Elevator Shaft Child Care Center Interior Air Space Preschool 1 Room Relief Well Gas Composite of All Wells Relief Well Gas Well #5 Relief Well Gas Well #6 6,349.0 215,910.0 768,320.0 6,578.0 216,110.0 767,460.0 5,451.0 215,270.0 765,460.0 6,479.0 206,590.0 762,410.0 6,503.0 211,810.0 764,950.0 6,421.0 209,320.0 766,230.0 3,207.0 215,120.0 765,380.0 2,929.0 217,610.0 768,520.0 137,600.0 12,690.0 338,000.0 138,640.0 7,476.0 233,670.0 142,390.0 8,254.0 381,410.0 3.6 3.6 3.6 3.7 3.6 '3.7 3.6 3.5 26.6 31.3 46.2 • TABLE 4 (cont.) CO2, 02 & N2 IN GAS SAMPLE (ppm) Sample No. Location CO2 02 N2 N2/02 92-04-04-1337-30 Relief Well Gas 141,360.0 8,811.0 377,540.0 42.8 Well #7 92-04-04-1337-33 Flare Plume 744.0 219,630.0 763,720.0 3.5 Air Sample 24' Above Grade 21' Down Wind from Flare 92-04-04-1337-36 Flare Plume 946.0 216,580.0 752,970.0 3.5 Air Sample 24' Above Grade 41' Downwind from Flare 92-04-04-1337-39 Flare Plume 1,039.0 214,920.0 746,890.0 3.5 Air Sample 24' Above Grade 20' Upwind from Flare 92-04-04-1337-42 Flare Plume 783.0 • 219,210.0 761,520.0 3.5 Air Sample 24' Above Grade 40' Upwind from Flare 92-04-04-1337-45 Grass Cuttings in Pile 80,852.0 102,340.0 796,610.0 7.8 60' S of Flare on Ground 6" Inside of Pile 92-04-04-1337-48 Wetlands Soil Probe Gas 4' Below Grade 78' N of Well 7 130' W of Well 7 92-04-04-1337-50 Wetlands Soil Probe Gas 4' Below Grade 100' N of West Coast Highway 300' W of Well 7 92-04-04-1337-54 Wetlands Soil Probe Gas 4' Below Grade 40' N of'West Coast Highway Directly N of Newport Townhomes' East Gate 92-04-04-1337-58 Wetlands Atmosphere 4' Above Grade 40' N of West Coast Highway Directly N of Newport Townhomes' 5,879.0 211,016.0 759,970.0 3.6 6,847.0 211,760.0 760,370.0 3.6 7,070.0 213,810.0 757,300.0 3.5 1,207.0 215,690.0 755,290.0 3.5 • TABLE 4 (cont.) CO2, 02 & N2 IN GAS SAMPLE (ppm) Sample No. Location CO2 02 N2 N2/02 92-04-04-1337-59 92-04-04-1337-61 Wetlands Soil Probe Gas 4' Below Grade 70' W of Existing Gas Vent 25' N of West Coast Highway Toe of Bluff at W End Soil Probe Gas 4' Below Grade Median on West Coast Highway S of Existing Gas Vent Directly N. of Newport Townhomes' East Gate 97,019.0 128,700.0 754,750.0 5.9 10,371.0 206,990.0 753,170.0 3.6 92-04-06-1337-1 Atmosphere 963.0 210,810.0 732,190.0 3.5 4' Above Grade Base of Flare 92-04-06-1337-2 Atmosphere 1,248.0 214,630.0 747,960.0 3.5 4' Above Grade Base of Flare 50' Upwind of Flare 92-04-06-1337-3 Atmosphere 868.0 213,200.0 741,250.0 3.5 4' Above Grade on Bike Trail Directly N of Flare 92-04-06-1337-4 Atmosphere 860.0 215,690.0 751,880.0 3.5 4' Above Grade on Bike Trail 300' E of Flare 92-04-06-1337-5 Atmosphere 1,114.0 213,930.0 748,000.0 3.5 Child Care Center Playground 4' Above Grade 92-04-06-1337-6 Atmosphere 1,846.0 210,990.0 748,130.0 3.5 Child Care Center Employee Lounge Room Interior 4' Above Grade 92-04-06-1337-7 Atmosphere 1,069.0 215,040.0 747,320.0 3.5 4' Above Grade on Bike Trail Terminus with Main Hospital Visitor Parking Road 92-04-06-1337-8 Atmosphere 1,321.0 208,330.0 745,720.0 3.6 4' Above Grade Upper Campus Fishbeck Building Parking Lot • • — 40 — TABLE 4 (cont.) CO2, 02 & N2 IN GAS SAMPLE (ppm) Sample No. Location CO2 02 N2 N2/02 92-04-06-1337-9 Atmosphere 878.0 213,850.0 745,900.0 3.5 4/ Above Grade Upper Campus Entrance to Emergency Room Parking Lot 92-04-06-1337-10 Atmosphere 860.0 213,610.0 744,460.0 3.5 41 Above Grade Cancer Center Entrance 92-04-06-1337-11 Atmosphere 477.0 216,540.0 749,770.0 3.5 4/ Above Grade Child Care Center E End of Parking Lot 92-04-06-1337-12 Atmosphere 919.0 214,480:0 747,890.0 3.5 4' Above Grade Cancer Center W End of Staff Parking Lot TABLE 5 HYDROGEN SULFIDE AND SULFUR DIOXIDE IN GAS (ppm v/v) Sample No. Location Hydrogen Sulfide Sulfur Dioxide 92-04-04-1337-2 Child Care Center Roof <0.1 n/a Subslab.Vent Pipe 43.5' N of S Wall of Building 53' E of W Wall of Building 92-04-04-1337-5 Child Care Center Roof <0.1 n/a Subslab Vent Pipe 8' S of N Wall of Building 26' W of E Wall of Building Roof Elevation of 12.5' Above Grade 92-04-04-1337-8 Child Care Center Roof Atmosphere 4' Above Roof 21'S of N Walt of Building 15' E of W Wall of Building 92-04-04-1337-13 Cancer Center Roof Subslab Vent Pipe 76' W of E Wall 40' N of S Wall 92-04-04-1337-16 Cancer Center East End Elevator'Shaft 92-04-04-1337-19 Child Care Center Interior Air Space Preschool 1 Room 92-04-04-1337-22 Relief Well Gas Composite of All Welts 92-04-04-1337-25 Relief Well Gas Well #5 92-04-04-1337-28 Relief Well Gas Well #6 92-04-04-1337-31 Relief Well Gas Well #7 92-04-04-1337-34 Flare Plume Air Sample 24' Above Grade 21' Downwind from Flare 92-04-04-1337-37 Flare Plume Air Sample 24' Above Grade 41' Downwind from Flare <0.1 <0.1 <0.1 <0.1 <0.1 n/a <0.1 <0.1 4,800.0 <0.1 3,600.0 n/a 4,100.0 n/a 2,880.0 n/a <0.1 <0.1 <0.1 <0.1 - 42 - • • • TABLE 5 (cont.) HYDROGEN SULFIDE AND SULFUR DIOXIDE IN GAS (ppm v/v) Sample No. Location Hydrogen Sulfide Sulfur Dioxide 92-04-04-1337-40 Flare Plume <0.1 <0.1 Air Sample 24' Above Grade 20' Upwind from Flare 92-04-04-1337-43 Flare Plume ' <0.1 <0.1 Air Sample 24' Above Grade 40' Upwind from Flare 92-04-04-1337-55 Wetlands Atmosphere <0.1 <0.1 4' Above Grade 40' N of West Coast Highway Directly N of Newport Townhomes' East Gate 92-04-04-1337-57 Wetlands Soil Probe Gas <0.1 n/a 4' Below Grade 40' N of West Coast Highway Directly N of Newport Townhomes' East Gate , . 4.5 — TABLE 6 • • Sample No. CORROSIVITY OF WATER AND SOIL (pH Units) Location pH (units) 92-04-04-1337-46 Wetlands Soil 6" Below Grade 78''N of Well 7 130' W of Well 7 92-04-04-1337-47 Wetlands Water 78' N of Well 7 130' W of Welt 7 92-04-04-1337-49 Wetlands Water 100' N of West Coast Highway 300' W of Well 7 92-04-04-1337-51 .Wetlands Soil 6" Below Grade 100' N of West Coast Highway 300' W of Well 7 92-04-04-1337-52 Wetlands Water 40' N of West Coast Highway Directly N of Newport Townhomes' East Gate 92-04-04-1337-53 Wetlands Soil 6" Below Grade 40' N of West Coast Highway Directly N of Newport Townhomes' East Gate 92-04-04-1337-60 Wetlands Water 65' W of Existing Gas Vent 40' N of West Coast Highway Toe of Bluff at W End 6.1 6.8 7.2 6.6 7.1 6.6 7.5 TABLE 7 • • BENZENE, TOLUENE, ETHYLBENZENE AND XYLENES IN GAS (PPM) Sample No. Location Benzene Toluene Ethyl Benzene Xylene (total) 92-04-04-1337-3 92-04-04-1337-6 Child Care Center Roof Subslab Vent Pipe 43.5' N of S Wall of Building 53' E of W Wall of Building Child Care Center Roof Subslab Vent Pipe 8' S of N Wall of Building 26' W of E Wall of Building Roof Elevation of 12.5' Above Grade <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 92-04-04-1337-9 Child Care Center Roof <0.5 <0.5 <0.5 <0.5 Atmosphere 4' Above Roof 21'S of N Walt of Building 15' E of W Walt of Building 92-04-04-1337-14 Cancer Center Roof <0.5 <0.5 <0.5 <0.5 Subslab Vent Pipe 76' W of E Wall 40' N of S Wall 92-04-04-1337-17 Cancer Center <0.5 <0.5 <0.5 <0.5 East End Elevator Shaft 92-04-04-1337-20 Child Care Center <0.5 <0.5 <0.5 <0.5 Interior Air Space Preschool 1 Room 92-04-04-1337-23 Relief Well Gas <0.5 <0.5 <0.5 1.4 Composite of ALL Wells 92-04-04-1337-26 Relief Well Gas <0.5 <0.5 <0.5 1.4 Well #5 92-04-04-1337-29 Relief Welt Gas <0.5 <0.5 <0.5 1.4 Welt #6 92-04-04-1337-32 Relief Well Gas <0.5 <0.5 <0.5 1.9 Well #7 92-04-04-1337-35 Flare Plume <0.5 <0.5 <0.5 <0.5 Air Sample 24' Above Grade 21' Downwind from Flare TABLE 7 (cont.) BENZENE, TOLUENE, ETHYLBENZENE AND XYLENES IN GAS (PPM) • Sample No. Location Benzene Toluene Ethyl Benzene Xylene (total) 92-04-04-1337-41 Flare Plume Air Sample 24' Above Grade 20' Upwind from Flare 92-04-04-1337-44 Flare Plume Air Sample • 24' Above Grade 40' Upwind from Flare 92-04-04-1337-56 Wetlands Atmosphere 4' Above Grade 40' N of West Coast Highway Directly N of Newport Townhomes' East Gate • • <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 • APPENDIX B HEALTH AND SAFETY PLAN DRAFT 0 • • DRAFT SITE HEALTH AND SAFETY PLAN OF GEOSCIENCE ANALYTICAL, INC. April 4, 1992 4454 INDUSTRIAL STREET SIMI VALLEY, CA 93063 TELE.: (805) 526-6532 FAX: (805) 526-3570 • • • GENERAL INFORMATION Administrative Information Site Name: Hoag Memorial Hospital Prebyterian Site Location: 301 Newport Blvd. Newport Beach, CA Project Manager: Fleet E. Rust, Ph.D. Project Health and Safety Officer: Cynthia M. Pandolfi, MT ASCP Site Manager: Fleet E. Rust, Ph.D. Site Health and Safety Officer: Susan Chasen Effective Date: 4 April 1992 Expiration Date 4 June 1992 Safety Equipment Requirements Hard Hat Steel Toed Rubber Boots Gloves/Neoprene/Butyl First Aid Kit Fire Extinguisher Eye Protection Uncoated Tyvek Coveralls Saranex Coveralls Disposable earplugs Respirator (half -face with high -efficiency combination organic vapor cartridges) Explosimeter Varian 1400 Gas Chromatograph • • INTRODUCTION This plan establishes requirements and provides guidelines for worker safety during the drilling, excavation and sampling operations on West Coast Highway in Newport Beach for a methane gas flare program on property owned by Hoag Memorial Hospital Presbyterian and housing Cancer Center and Child Care Center. The purpose of this plan is to identify procedures for avoiding unknown hazards, avoiding personnel injury from equipment present on site, monitoring possible exposures, and responding to serious exposure or accident. The safety rules given in this plan cannot cover every eventuality. It is expected, therefore, that all workers involved will exercise good judgment in all safety matters, even though not specifically mentioned. Site Information The site is located in Newport Beach, California, as shown in Figure 1. The site covers approximately 10 acres and is comprised of two (2) buildings and vacant land. Site History The site geochemistry has been studied by GeoScience Analytical, Inc. and most recently presented in a Draft Environmental Impact Report prepared by LSA Associates Inc. Chemicals of Concern Preliminary assessment of the chemicals potentially on site has found them to be light hydrocarbons, carbon dioxide, H2S, SO2 and primarily related to a flare, vent wells and a leaking shallow subsurface sand. Methane and heavier hydrocarbons are known to exist in the surficial soils of the site with methane concentrations exceeding the Lower Explosive Limits (5.0%). Non -methane hydrocarbons are in low concentration. Hydrogen sulfide concentration has been found to be approximately 4,000 ppm in near surface soils and flare feedstock gas. WORK ACTIVITIES • GeoScience Analytical, Inc. (GSA) is contracted by LSA Associates Inc. to drill boreholes and collect soil and air samples for chemical analyses as well as to sample existing wells and the associated flare. The sampling operations will begin immediately with only shallow 4' soil probes conducted at this time in lieu of deeper borings. • • • • • HAZARD ASSESSMENT Chemical Hazards At this time, the chemical hazard onsite has not been adequately identifed. However, the chemicals found in the soil and the past and present use of the site clearly indicate that caution is necessary. Inhalation Hazard Inhalation hazards are unknown in terms of nature and extent. The Site Health and Safety Officer will ensure that monitoring of the breathing zone be conducted during the drilling operations. If the measurements exceed 20% LEL (methane) in the breathing zone, all personnel will be required to wear respirators. If the measurements exceed 25% LEL in the breathing zone, work will be stopped and the site will be evacuated. If hydrogen sulfide concentration is found to exceed 100ppm in the breathing zone within the work zone, work will be stopped and the site will be evacuated until the concentration is reduced. If hydrogen sulfide odor becomes noxious to nearby residents who are within their homes, the residents will be advised to leave the area and the Newport Beach Fire Department will be notified. If hydrogen sulfide readings exceed 100ppm in the breathing zone within the work area, all personnel are to evacuate the work area and notify the Corporate Health and Safety Officer. Hydrogen sulfide concentration will be monitored in the work zone. In the event hydrogen sulfide concentration exceeds 100ppm in the breathing zone of the work area, the Fire Department will be notified and the area subjected to evacuation. All trenches will be immediately filled with suitable material and capped with bentonite hole plug. The existing ventilation systems will be kept on during all operations. An additional exhaust blower will be utilized during boring or trenching operations and will be ducted to the atmosphere. Dermal Exposure Hazard Protective neoprene gloves shall be worn during the • • • handling of the soil or soil contaminated tools in the event soil contamination is encountered. No dermal hazards are expected on -site. Protective goggles must be worn if contaminated soils are identified by visual observations. Saranex coveralls must be worn when drilling in wet conditions. If unexpected liquids are encountered, drilling must be halted while personnel change into Saranex coveralls. Further splash protection will be augmented by taping the cuff of the pant legs to the boot and likewise the sleeve to the wrist. Uncoated Tyvek will be used only during dry conditions. Heat Stress Due to the coastal conditions in which drilling activities will take place, heat stress will not be a concern. Water will be made available near the drilling rig so workers can conveniently consume fluids. Heat stress can result when protective clothing decreases natural body ventilation. If temperatures on -site exceed 85 degrees F while protective coveralls are being worn, then heat stress monitoring may be required. Noise Hearing protection should be worn by personnel within the 25' exclusion zone when the drill rig or backhoe is operating. • • • SAFETY GUIDELINES FOR DRILLING Drill rig and backhoe maintenance and safety is the responsibility of the drill rig and backhoe operators, respectively. The following information is provided as general guidelines for safe practices onsite. Off -Road Movement of Drill Rigs and Backhoes The following safety guidelines relate to off -road movement: Before moving a drill rig and backhoe, first walk the route of travel, inspecting for depressions, slumps, gulleys, ruts and similar obstacles. "None of these are expected on the subject site." Always check the brakes of a drill rig or backhoe carrier before traveling, particularly on rough, uneven or hilly ground. Discharge all passengers before moving a drill rig and backhoe on rough or hilly terrain. Engage the front axle when traveling off highway on hilly terrain. Use caution when traveling side -hill. Conservatively evaluate side -hill capability of Drill Rigs and Backhoes, because the arbitrary addition of drilling tools may raise the center of mass. When possible, travel directly uphill or downhill. Attempt to cross obstacles such as small logs and small erosion channels or ditches squarely, not at an angle. Use the assistance of someone on the ground as a guide when lateral or overhead clearance is close. After the drilling rig has been moved to a new driliz._g site, set all brakes and/or locks. When grades are steep, block the wheels. Never travel off -road with the mast (derrick) of the drill rig in the raised or partially raised position. Tie down loads on the drill rig and backhoe and support trucks during transport. • • • Overhead and Buried Utilities The use of a drill rig or backhoe near electrical power lines and other utilities requires that special precautions be taken by both supervisors and members of the exploration crew. Electricity can shock, it can burn and it can cause death. Overhead and buried utilities should be located, noted and emphasized on all boring location plans and boring assignment sheets. When overhead electrical power lines exist at or near a drilling site or project, consider all wires to be live and dangerous. Watch for sagging power lines before entering a site. Do not lift power lines to gain entrance. Call the utility and ask them to lift or raise the lines and deenergize. Before raising the drill rig mast on a site in the vicinity of power lines, walk completely around the drill rig. Determine what the minimum distance from any point on the drill rig to the nearest power line will be when the mast is raised and/or being raised. Do not raise the mast or operate the drill rig if this distance is less than 20 ft. Keep in mind that both hoist lines and overhead power lines can be moved toward each other by the wind. If there are any questions whatsoever concerning the safety of drilling on sites in the vicinity of overhead power lines, call the power company. The power company will provide expert advice at the drilling site as a public service and at no cost. Underground electricity is as dangerous as overhead electricity. Be aware and always suspect the existence of underground utilities such as electrical power, gas, petroleum, telephone, sewer and water. Always contact the owners of utility lines or the nearest undergound utility location service before drilling. The utility personnel should determine the location of underground lines, mark and flag the locations, and determine jointly with utility personnel what specific precautions must be taken to assure safety. If a sign warning of underground utilities is located on a site boundary, do not assume that underground utilities are located on or near the boundary or property line under the sign. Call the utility and check it out. The underground utilities may be a considerable distance away from the warning sign. • • Clearing the Work Area Prior to drilling or digging, adequate site cleaning and leveling should be performed to accommodate the drill rig or backhoe and supplies and provide a safe working area. Drilling should not be commenced when tree limbs, unstable ground or site obstructions cause unsafe tool handling conditions. Note: In coordination with the Drilling Crew, the Site Health and Safety Officer will review the precautions taken to insure that the drill rig or backhoe is leveled and stabilized. Housekeeping On and Around the Drill Rig or Backhoe The first requirement for safe field operations is that the Site Safety Officer understands and fulfills the responsibility for maintenance and "housekeeping" on and around the drill rig or backhoe. Suitable storage locations should be provided for all tools, materials and supplies so that they can be conveniently and safely handled without hitting or falling on a member of the drill crew or a visitor. Avoid storing or transporting tools, materials or supplies within or on the mast of the drill rig or backhoe. Pipe, drill rods, bits casing, augers and similar drilling tools should be neatly stacked on racks or sills to prevent spreading, rolling or sliding. Penetration or other driving hammers should be placed at a safe location on the ground or be secured to prevent movement when not in use. Work areas, platforms, walkways, scaffolding and other access ways should be kept free of materials, obstructions and substances such as ice, excess grease, or oil that could cause a surface to become slick or otherwise hazardous. Keep all controls, control linkages, warning and operation lights and lenses free of oil, grease and/or ice. Do not store gasoline in any portable container other than a non -sparking, red container with a flame arrester in the fill spout and having the word "gasoline" easily visible. • • • Safe Use of Hand Tools There are almost an infinite number of hand tools that can be used on or around a drill rig or backhoe. "Use the tool for its intended purpose" is the most important rule. The following are a few specific and some general suggestions which apply to safe use of several hand tools that are often used on and around Drill Rigs and Backhoes. * When a tool becomes damaged, either repair it before using it again or get rid of it. * When using a hammer, any kind of hammer for any purpose, wear safety glasses and require all others near you to wear safety glasses. * When using a chisel, any kind of chisel, for any purpose, wear safety glasses and require all others around you to wear safety glasses. * Keep all tools cleaned and orderly stored when not in use. * Replace hook and heel jaws when they become visibly worn. * When breaking tool joints on the ground or on a drilling platform, position your hands so that your fingers will not be smashed between the wrench handle and the ground or the platform, should the wrench slip or the joint suddenly let go. Safe Use of Wire Line Hoists, Wire Rope and Hoisting Hardware The use of wire line hoists, wire rope, and hoisting hardware should be as stipulated by the American Iron and Steel Institute's Wire Rope Users Manual. All wire ropes and fittings should be visually inspected during use and thoroughly inspected at least once a week for abrasion, broken wires, wear, reduction in rope diameter, reduction in wire diameter, fatigue, corrosion, damage from heat, improper weaving, jamming, crushing, bird caging, kinking, core protrusion and damage to lifting hardware and any other feature that would lead to failure. Wire ropes should be replaced when inspection indicates excessive damage according to the wire rope users manual. If a ball -bearing type hoisting swivel is used to hoist • • drill rods, swivel bearings should be inspected and lubricated daily to assure that the swivel freely rotates under load. If a rod slipping device is used to hoist drill rods, do not drill through or rotate drill rods through the slipping device, do not hoist more than 1 foot of the drill rod column above the top of the mast, do not hoist a rod column with loose tool joints and do not make up, tighten or loosen tool joints while the rod column is being supported by a slipping device. If drill rods should slip back into the borehole, do not attempt to brake the fall of the rods with your hands. Most sheaves on drill rigs are stationary with a single part line. The number of parts of line should not ever be increased without first consulting with the manufacturer of the drill rig. Wire ropes must be properly matched with each sheave. The following procedures and precautions must be understood and implemented for safe use of wire ropes and rigging hardware. Use tool handling hoists only for vertical lifting of tools. Do not use tool handling hoists to pull on objects away from the drill rig or backhoe; however, drills may be moved using the main hoist as the wire rope is spooled through proper sheaves according to the manufacturer's recommendations. When stuck tools or similar loads cannot be raised with a hoist, disconnect the hoist line and connect the stuck tools directly to the feed mechanism of the drill. Do not use hydraulic leveling jacks for added pull to the hoist line or the feed mechanism of the drill. When attempting to pull out a mired down vehicle or drill rig or backhoe carrier, only use a winch on the front or rear of the vehicle or drill rig or backhoe carrier and stay as far away as possible from the wire rope. Do not attempt to use tool hoists to pull out a mired down vehicle or drill rig or backhoe carrier. Minimize shock loading of a wire rope - apply loads smoothly and steadily. * Protect wire rope from sharp corners or edges. * Replace faulty guides and rollers. * Replace worn sheaves or worn sheave bearings. * Replace damaged safety latches on safety hooks before using. • • * Know the safe working load of the equipment and tackle being used. Never exceed this limit. * Clutches and brakes of hoists should be periodically inspected and tested. * Know and do not exceed the rated capacity of hooks, rings, links, swivels, shackles and other lifting aids. * Always wear gloves when handling wire ropes. * Do not guide wire ropes on hoist drums with your hands. * Following the installation of a new wire rope, first lift a light load to allow the wire rope to adjust. * Never carry out any hoisting operations when the weather conditions are such that hazards to personnel, the public or property are created. * Never leave a load suspended in the air when the hoist is unattended. * Keep your hands away from hoists, wire rope, hoisting hooks, sheaves and pinch points as slack is being taken up and when the load is being hoisted. * Never hoist the load over the head, body or feet of any personnel. Safe Use of Augers The following general procedures should be used when advancing a boring with continuous flight or hollow -stem augers: * Prepare to start an auger boring with the drill rig level, the clutch or hydraulic rotation control disengaged, the transmission in low gear and the engine running at low RPM. * The operator and tool handler must establish a system of responsibility for the series of various activities required for auger • Start Up drilling, such as connecting and disconnecting auger sections, and inserting and removing the auger fork. The operator must assure that the tool handler is well away from the auger column and that the auger fork is removed before starting rotation. * Only use the manufacturer's recommended method of securing the auger to the power coupling. Do not touch the coupling or the auger with your hands, a wrench or any other tools during rotation. * Whenever possible, use tool hoists to handle auger sections. * Never place hands or fingers under the bottom of an auger section when hoisting the auger over the top of the auger section in the ground or other hard surfaces such as the drill rig platform. * Never allow feet to get under the auger section that is being hoisted. * When rotating augers, stay clear of the rotating auger and other rotating components of the drill rig. Never reach behind around a rotating auger for any reason whatever. * Never use your hands or feet to move cuttings away from the auger. * Augers should be cleaned only when the drill rig is in neutral and the augers are stopped from rotating. All drill rig or backhoe personnel and visitors should be instructed to "stand clear" of the drill rig or backhoe immediately prior to and during starting of an engine. Make sure all gear boxes are in neutral, all hoist levers are disengaged, all hydraulic levers are in the correct nonactuating positions and the cathead rope is not on the cathead before starting a drill rig or backhoe engine. • • • Safety During Drilling and Backhoe Operations Safety requires the attention and cooperation of every worker and site visitor. Do not drive the drill rig or backhoe from hole to hole with the mast in the raised position. Before raising the mast look up to check for overhead obstructions. Before raising the mast, all drill rig personnel and visitors should be cleared from the areas immediately to the rear and the sides of the mast. All drill rig personnel and visitors should be informed that the mast is being raised prior to raising it. Before the mast of a drill rig is raised and drilling is commenced, the drill rig must be first leveled and stabilized with leveling jacks and/or solid cribbing. The drill rig should be releveled if it settles after initial set up. Lower the mast only when leveling jacks are down and do not raise the leveling jack pads until the mast is lowered completely. Before starting drilling operations, secure and/or lock the mast if required according to the drill manufacturer's recommendations. The operator of a drill rig or backhoe should only operate a drill rig or backhoe from the position of the controls. The operator should shut down the drill engine before leaving the vicinity of the drill. Do not consume alcoholic beverages or other depressants or chemical stimulants prior to starting work on a drill rig or backhoe or while on the job. Watch for slippery ground when mounting/dismounting from the platform. All unattended boreholes and trenches must be adequately covered or otherwise protected to prevent drill rig or backhoe personnel, site visitors or animals from stepping or falling into the hole. All open boreholes should be covered, protected, or backfilled adequately and according to local or state regulations on completion of the drilling project. "Horsing around" within the vicinity of the drill rig or backhoe and tool and supply storage areas should never be allowed, even when the drill rig or backhoe is shut down. Before lifting a relatively heavy object, approach the object by bending at the knees, keeping your back vertical and • • • unarched while obtaining a firm footing. Grasp the object firmly with both hands and stand slowly and squarely while keeping your back vertical and unarched. In other words, perform the lifting with the muscles in your legs, not with the muscles in your lower back. A flame ionization gas chromatograph will operate real time during the entire drilling operation. Prior to concrete cutting, excavation or welding operations, free soil gas combustible hydrocarbons will be vented or diluted to a concentration less than 25% LEL. The Project Manager will stop all remediation activities in the event free soil gas gas combustible hydrocarbons exceed 25% LEL. • • GENERAL HEALTH AND SAFETY REQUIREMENTS Physical Examinations and Site Training All GeoScience Analytical, Inc. (GSA) personnel are required to have undergone a complete physical examination where the examining physician has declared them physically able to work on a hazardous waste site and to participate in all activities required of them in that position. All GSA personnel are also required to have completed a basic hazardous waste training class wherein they are fit tested for a respirator. Site Safety Meeting Site safety orientation/training meetings must be convened a) before the field team begins work at the site, b) when there are modifications to the site safety plan that are applicable to the field personnel, and c) when additional staff of subcontractors begin field work. Meetings will be attended by personnel involved in carrying out the project and presided over by the Site Health and Safety Officer. A list of attendees will be provided to the Project Health and Safety Officer. At a minimum, the meeting agenda must include: a. a review of the Site Safety Plan; b. distribution of Site Safety Plan modifications; c. attendee signatures, acknowledging receipt and understanding of the plan and agreement to comply. • • • The Site Safety Officer The Site Health and Safety Officer is responsible for carrying out the health and safety requirements detailed in this plan and has the authority to halt work or dismiss people from the site if they do not adhere to the plan. The Site Health and Safety Officer should maintain a list of addresses and telephone numbers of emergency assistance units (ambulance services, police, hospitals, etc.) and inform other members of the drill crew of the existence and location of this list. He will maintain a copy of the Health and Safety Plan on site. Safety Completion Reports The Site Health and Safety Officer will prepare a Safety Completion Report to be submitted at the end of the project to the Project Health and Safety Officer. These reports will include a documented list of meter readings, protection decisions, actions, etc. as required by HS-509. Visitor Clearances Maximum efforts will be made to restrict unauthorized personnel from entering within 25 feet of the work area unless they comply with the safety requirements of this plan. • • SITE SPECIFIC HEALTH AND SAFETY REQUIREMENTS Drilling and Digging Operations A section of this health and safety plan has outlined general safety guidelines for drilling which should be followed. Further requirements are as follows. Where necessary, level pads must be constructed to ensure that the rig is in no danger of tipping over during operation. A work area will also be defined around the drilling rig with barricades (25 foot radius) and no one will be allowed inside without appropriate protective gear. During drilling operations personnel within the work zone (25 feet) must wear steel -toed rubber boots, Tyvek coveralls, butyl -neoprene gloves, hard hat, and safety goggles or glasses. The Site Health and Safety Officer must be present at the rig during drilling and will have monitored the work areas with a combustible gas meter. If sustained readings exceed 20% LEL methane in the breathing zone, respirators (half face) must be worn if drilling is to continue. If readings exceed 25% LEL methane the area must be evacuated until vapor levels dissipate. If liquids are encountered, drilling must be halted while personnel change into coated Saranex coveralls. Uncoated Tyvek will be used only during dry conditions. A flame ionization gas chromatograph will operate real time during the entire drilling operation. Prior to concrete cutting, excavation or welding operations, free soil gas combustible hydrocarbons will be vented or diluted to a concentration less than 25% LEL. The Project Manager will stop all remediation activities in the event free soil gas gas combustible hydrocarbons exceed 25% LEL. Air Duality and Personnel Exposure Monitoring The Site Health and Safety Officer (or his designee) will be required to monitor the initial work areas with a combustible gas meter. If the readings exceed 20% LEL methane in the breathing zone, half -face respirators must be worn to continue the exploration. If readings exceed 25% LEL in the breathing zone, all personnel are to evacuate the work area and notify the Corporate Health and Safety Officer. If hydrogen sulfide readings exceed 100ppm in the breathing zone within the work area, all personnel are to • • evacuate the work area and notify the Corporate Health and Safety Officer. Hydrogen sulfide concentration will be monitored within the work zone. In the event hydrogen sulfide concentration exceeds 100ppm in the breathing zone, the Fire Department will be notified and the area subjected to evacuation. All trenches will be immediately filled with suitable material and capped with bentonite hole plug. Heat Stress Due to the Southern California climate, heat stress may be a concern. Commercially available water and GatorAde will be made available. Heat stress can result when protective clothing decreases natural body ventilation. If temperatures on -site exceed 85 degrees F while protective coveralls are being worn, then heat stress monitoring will be required. Noise Hearing protection must be worn by the drill rig or backhoe operator and helper and all others within the work zone of the rig while the rig is in operation. Personnel and Equipment Decontamination A decontamination station and procedure will be established by the Site Health and Safety Officer during site mobilization. This will consist of a liquid soap and warm water wash for boots, gloves, respirators, and hard hat. Tyvek will be placed in a plastic bag and then disposed of. Prior to eating or drinking, the hands and face will be washed with soap and water. Traffic When a work site encroaches upon public streets, the possibility of an individual being injured or struck by vehicular traffic must be considered. At all times, personnel must be aware when moving from a protected area. Barricades and devices must be used to warn traffic. • • • EMERGENCY RESPONSE PROCEDURES In the event of fire, explosion, injury, or accident, contact the appropriate site emergency response group from the list below: Fire Department: Hospital: Ambulance: Paramedics: Poison Control: GeoScience Analytical, Inc. 911 (714) 645-8600 911 911 (714) 634-5988 (805) 526-6532 Directions to the Nearest Hospital The nearest hospital to the site is: Hoag Memorial Hospital 301 Newport Blvd. Newport Beach, CA Directions to the hospital from the site are as follows: Enter hospital directly from work area by going north on Newport Blvd. from West Coast Highway. • Position APPROVAL/DISTRIBUTION OF HEALTH AND SAFETY PLAN Name Signature Project Manager: Fleet E. Rust, Ph.D. Project H/S Officer: Cynthia M. Pandolfi, MT ASCP Corporate Cynthia M. Pandolfi, MT ASCP H/S Officer: Site H/S Officer: Susan Chasen The following have read this plan and understand its provisions: • Company Name Signature GSA Susan Chasen GSA Fleet E. Rust GSA Louis J. Pandolfi GSA Cynthia M. Pandolfi HOAG Merrill Wright • • Project Manager: Project H/S Officer: Site H/S Officer: • • RESPONSIBLE INDIVIDUALS Fleet E. Rust, Ph.D. Cynthia M. Pandolfi, MT ASCP Susan Chasen - 69 - • APPENDIX C CHAIN -OF -CUSTODY RECORDS • Simi. ley, CA 93063 PROJECT* :a • REFERENCE ADDRESS CHAIN-OF0 JODY RECORD SAMPLERS (SIGNATURE) LABORATORY Lie v./c-,`e a �i SAMPLE NO. DATE 7l_oy_oy /�37�/ 1 TIME LOCATION ANALYSIS N a O Y r /22/ /osy //2 0 ti x PROJECT NO: / DATE, /A/9e- GU 0 F—z, NUMBER OF C cy-/s3740 RELINOUIS BY IQE )mid J PRINTED NAME -(7)- COMPANY //Y3 ,/ /.s—u' CI,;%V ei , , /2.2 0 Ca k c (e, DATE cu RELINQUISHED Y 92_ SIGNATURE PRINTED NAME COMPANY •">g->-0.)a c- aRECEIVED BY SIGNATURE PRINTED NAME SJC70.J C-1 Fes •-f �^i , t COMPANY TIME z/G� DATE ///2, TIME 7100 DATE TIME Pim TIME El RELINQUISHED BY SIGNATURE PRINTED NAME COMPANY VED BY LAB SI NATURE DATE COMMENTS/ CONTAINER TYPE /( TOTAL NUMBER OF CONTAINERS SAMPLE CONDITIONS TIME RECEIVED ON ICE ( YES, NO . SEALED YES, NO DA3ESPECIAL SHIPMENT/HANDLING OR STORAGE REQUIREMENTS: TIME • . Simi " ley, CA 93063 PROJECT Q REFERENCE ADDRESS CHAIN-OF411 ODY RECORD SAMPLERS (SIGNATURE) LABORATORY 4�, .J`.'{,t r t Gt 14-L • SAMPLE NO. jz-1'-'-/.;U 7 /f DATE TIME /22.' LOCATION ANALYSIS d PROJECT NO: l ✓ J DATE Y/Y/7 Z. •GE.20E-.Z NUMBER OF CONTAINERS /S / (5- /7 9L-0y-0Y- /S! ?- 20 I / Y/4 L . HE RELINQUISD BY /300 /3 / Z /3/J,- /3 30 /3Y1" /yo3 ti/O SIC,NATUFy 1..v a %J ✓ . 09f2/ A04,./ PRINTED NAME COMPANY 0 R C IYED SIGNATURE ?LL4L PRINTE67 NAME 6 aesf /901 COMPANY C`- e 1-. C P•t ��.. c1 .' e 6 re (A,s/e/ . Ch//J 61, CC DATE DATE ® RELINQUI HED BY TIME DATE Y /L TIME 2/60 ItZr WaJiL SIGNATURE PRINTED NAME C /i.[Jf 6-c,,, fc_,`cgt F ih,� � COMPANY ECEIVED BY SIGNATURE PRINTED NAME COMPANY DATE RELINQUISHED BY �ry 2. SIGNATURE DATE 642' SIGNATURE x PRINTED NAME COMPANY TIME A C ANY COMMENTS/ CONTAINER TYPE 9 Tc d /r /7,2/,2 -- 9 /1 // / ed /r 7d/a /a> DATE TOTAL NUMBER OF CONTAINERS SAMPLE CONDITIONS TIME RECEIVED ON ICE YE ' NO SEALED YES NO SPECIAL SHIPMENT/HANDLING DATE OR STORAGE REQUIREMENTS: TIME • Simi '.1ey,^CA 93063 PROJECT REFERENCE ADDRESS rr✓( G..r.-6- SAMPLERS (SIGNATURE) .�. LABORATORY .e `Ps. / -� c ' cc. SAMPLE NO. CHAIN-OR•rODY RECORD 92-056may+/332-2 / LL DATE Y/y/q L TIME LOCATION /Yu , Oa 6 J /Y,S v 23 ly�r LY Z.i 26 2) 2�P itior-oy-m)-3" 17k) 2- RELINO hSIID BY ATU /vf, /f r /Jod' /J'/c7 /,/Zt7 DATE fL TIME -/00 PRINTED NAME • COMPANY RECEIVED BY DATE SIGN URE.y� /cL tZ -E/ TIME PRINTED NAME r r f tlJLNcE rto/ . Co.. 4m COMPANY i ANALYSIS 0 REI INQUISH5D BY SIGNATURE DATE RELINQUISHED BY `it SIGNATURE PRINTED NAME TIME of. ef e,..g..1111 COMPANY PliA El D BY SI ATURE Jo PRINTED NAME G-rx. COMPANY DATE ��lCC (Z tr- x x PRINTED NAME COMPANY DATE PROJECT NO://f� DATE ,'/ 5/7i QGt2OF2 NUMBER OF CONTAINERS COMMENTS! CONTAINER TYPE icd'/ - f? / —' // v & OTAL NUMBER OF CONTAI SAMPLE CONDITIONS TIME RECEIVED ON ICE YENO SEALED ( YES NO SPECIAL SHIPMENT/HANDLING DATE OR STORAGE REQUIREMENTS: TIME A TIME IGNA EIVE Y (LAB) • 3Z 3Y, 36 37 i Simi -. leq, CA 93063 PROJECT Ai //y. u REFERENCE J ADDRESS CHAIN -OF 1,ODY RECORD ANALYSIS SAMPLERS (SIGNATURE) LABORATORY Iris [ t� may f; << SAMPLE NO. DATE ?2-o7-,v-JJ32-31 Y/0 ATU c,..r5.1 J' PRINTED NAME 614 COMPANY RECEIVED SIGNATURE CR C PRINTED NAME h. COMPANY TIME /fY7 /6 /0 /32 /6sr //o DATE TIME 2/00 DATE y//L LOCATION I<A1(6co Gve SIGNATURE /a•c I PRINTED .1? -Gy.Q COMPANY SIGN LIRE PRINTED NAME COMPANY :45' ift4A COMPANY DATE 44 iZ TIME 11.. J., n- ANY GNA ORGANIC Pb X DATEDATE RELINQUISHED BY YM2 SIGNATURE TIME. . PRINTED NAME Fkk DATE TIME DATE PROJECT NO* / j •GEOF. DATE // V/9U NUMBER OF CONTAINERS COMMENTS/ CONTAINER TYPE /ec'l/ 12?,/0 I ?aj 3-iv ( T° d /4,- Ike- /?l2-0, OTAL NUMBER OF CONTAINERS SAMPLE CONDITIONS RECEIVED ON ICE SEALED (*SI- YES SPECIAL SHIPMENT/HANDLING OR STORAGE REQUIREMENTS: NO NO 4L 4 — Simi, ley, CA 93063 NA1�i hIa �. REFERENCE ADDRESS PROJECT ,e Lik CHAIN-OF1110DY RECORD ANALYSIS SAMPLERS (SIGNATURE) LABORATORY SAMPLE NO. /-or-ey-/332- `// r3 fY ys RELINQUISHED By 'BIGNATU DATE TIME /220 /7.. /2 y.l- /257 /1/' ief/r /124 1ljs /1ri (IV? PRINTED NAME COMPANY - RECtEIVED Y SIGNATURE al PRINTED N AME 4cLfe;C p COMPANY U a/ << LOCATION f%r( 174 on.P Pl4, r e e are.JJ /'i'e lv� f/a, is. Pc6Ck L. DATE Q RELINQUISHED B 72.04(at /7 G L SIGNATURE TIME /e-f / C; /t t ✓%L ,y PRINTED NAME /J % 2/(i"O d6 t/G e . LC %4.-A`t COMPANY DATE 9L TIME /cam ci RjCiIYED BY SIGNAIfURE o io si a O DATE lal RELINQUISHED BY TIME ` 11 .(151 )11A4 COMPANY a �-1 y SIGNATURE PRINTED NAME PROJECT NO: / s 'S DATE Y/5//9 L *GE _Ed F NUMBER OF CONTAINERS COMMENTS/ CONTAINER TYPE , 3-13 par oafv(iy /l 6V t (7 (/ /72)3i9 72_)/ /Z21/ 2 / 2,i--3 DATE ^ r^ (� TOTAL NUMBER OF CONTAINERS SAMPLE CONDITIONS TIME RECEIVED ON ICE YES NO SEALED Y NO - V PRINTED NAME COMPANY pTETE TIME V ' BY S GNA 111=1115=76.."."" (LA SPECIAL SHIPMENT/HANDLING DATE OR STORAGE REQUIREMENTS: TIME PRO JECT REFERENCE ADDRESS AA .o .i ..l �\ • Simi ley, CA 93063 W A y oet CHAIN -OF 0 ODY RECORD SAMPLERS (SIGNATURE) LABORATORY C. t g 43— SAMPLE NO. L -oy-o y-VJ 3 2.-,rt J3 J—Y DATE TIME 1 /d'J'.� /7°/ /y 0,r LOCATION I )e /mow clr O si 5? Sd° 2-ny-0-133?- 6o RELINQUISNM By NATO Y/i/f I if 2-(f /? J" /fyz ANALYSIS y PnOJkCT O: • LI.-' / DATE Y//.92 •GE 0 F NUMBER OF CONTAINERS COMMENTS/ CONTAINER TYPE 1017/ /721)1/ igivi-C — �� 172ll-4 l/ /9s 1ierlak �l f DATE RELINQUISHED BY /.+ utitJ ' LT.iebtlidt9 cam/ PRINTED NAME COMPANY ORECEIVED BY SIGNAtURE TIME SIGNATURE fie-ef C. PRINTED NAME ,f bey jc cio.' �aa�7%�'(cJ��.y�c. COMPANY J t2y 0104 DATE El RELINQUISHED BY VI0 SIGNATURE TIME PRINTED NAME COMPANY DATE /4/ 1Z2, / 1, %TOTAL NUMBER OF CONTAINERS SAMPLE CONDITIONS TIME RECEIVED ON ICE PRINTED NAME COMPANY DATE TIME 2/6-x) D :Y SIG AFIJ .P4t ( doh PRINTED NAME COMPANY 12, DATE TIME PRINTED NAME IVED pY (LA COMPANY DATE TIME SEALED SPECIAL SHIPMENT/HANDLING OR STORAGE REQUIREMENTS: NO NO CHAIN -OF ODY RECORD PROJECT REFERENCE ADDRESS r e . .I :t Simi Ley, CA 93063 SAMPLERS (SIGNATURE) LABORATORY l tr` 4.1 e,,, SAMPLE NO. f.l-oy ny-/.r.3 2- 6. RELINQUISHED BY GNA LoufJ PRINTED NAME CJ4 COMPANY DATE RECEIVED By SIGNATUR 6, /Cuff PRINTED NAME <9 N L COMPANY f TIME DATE TIME 2/Vc_p DATE TIME 2/o v -G LOCATION /L7 4-4 RELINQUISHED BY SIGNATURE -Xc71. Xt,,Jr PRINTED NAME COMPANY SIG ATUR c D By ANALYSIS c1or PRINT 0 NAME CjL1 COMPANY DATE �d 9z TIME TE 73-. TIME 1 i0 IRE 0.4 0 O RELINQUISHED BY SIGNATURE PRINTED NAME COMPANY DATE TIME • • NA ANY IVED B LAB A DATE IME PROJECT NO: / DATE y/y//' L GP 7 0'F_ 7 TOTAL NUMBER OF CONTAINERS SAMPLE CONDITIONS RECEIVED ON ICE YES Y� NO SEALED NO SPECIAL SHIPMENT/HANDLING OR STORAGE REQUIREMENTS: • APPENDIX D LABORATORY RESULTS • • Certified Testing Laboratories, Inc. - 2648 East 28th Street • Signal Hill, CA 90806 • TEL: (310) 424-9992 • FAX: (310) 492-1203 Page 1 of 2 LABORATORY NO. 17211 REPORTED 04-07-92 CLIENT GeoScience Analytical, Inc. RECEIVED 04-06-92 4454 Industrial Street Simi Valley, CA 93063 Attn: Louis J. Pandolfi SAMPLE Water and Sludge MARKS Project # 1337 Hoag Base Line BASED ON SAMPLE As received RESULTS Analyte 17211-1 92-04-04-1337-46 4/4/92 18:15 Wetlands Analyses Results Method Corrosivity (pH) 33% slurry 6.1 units EPA 9040 17211-2 92-04-04-1337-47 4/4/92 18:26 Wetlands Corrosivity (pH) 6.8 units EPA 9040 17211-3 92-04-04-1337-49 4/4/92 18:41 Wetlands Corrosivity (pH) 7.2 units EPA 9040 17211-4 92-04-04-1337-51 4/4/92 18:55 Wetlands Corrosivity (pH) 33% slurry 6.6 units EPA 9040 17211-5 92-04-04-1337-52 4/4/92 19:01 Wetlands Corrosivity (pH) 7.1 units EPA 9040 This report applies only to the sample, or samples investigated and is not necessarily indicative of the quality or condition of apparently identical or similar material or products. As a mutual protection to clients, the public and these Laboratories, this report is submitted and accepted for the exclusive use of the client to whom it is addressed and upon the condition that It is not to be used. In whole or in part, in any advertising or publicity matter without prior written authorization from these Laboratories. • • • Page 2 of 2 LABORATORY NO. 17211 REPORTED 04-07-92 CLIENT GeoScience Analytical, Inc. RECEIVED 04-06-92 SAMPLE Water and Sludge MARKS Project # 1337 Hoag Base Line BASED ON SAMPLE As received RESULTS Analyte • 17211-6 92-04-04-1337-53 4/4/92 19:05 Wetlands Corrosivity (pH) 33% slurry Analyses Results Method 6.6 units EPA 9040 17211-7 92-04-04-1337-60 4/4/92 19:50 Wetlands Corrosivity (pH) 7.5 units EPA 9040 Attachment: Ch& • of Custody Respectfu CERTIFI t a -' . Sa ot, Ph.D. President /j lc ORIES, INC. 14111111U Certified Testing Laboratories, Inc, — 2648 East 28th Street • Signal Hill, CA 90806 • TEL: (310) 424-9992 • FAX: (310) 492-1203 • • • Page 1 of 4 LABORATORY NO. 17212 REPORTED 04-07-92 CLIENT GeoScience Analytical, Inc. RECEIVED 04-06-92 4454 Industrial Street Simi Valley, CA 93063 Attn: Louis J. Pandolfi SAMPLE Air (Tedlar Bag) MARKS Project # 1337 Hoag Base Line BASED ON SAMPLE As sampled RESULTS Analyte Analyses Results Method 17212-1 92-04-04-1337-2 4/4/92 10:15 Children's Center Hydrogen Sulfide <.1 ppmV 17212-2 92-04-04-1337-5 4/4/92 10:59 Children's Center Hydrogen Sulfide <.1 ppmV 17212-3 92-04-04-1337-8 4/4/92 11:43 Children's Center Hydrogen Sulfide <.1 ppmV Sulfur Dioxide <.1 ppmV 17212-4 92-04-04-1337-13 4/4/92 13:00 Cancer Center Hydrogen Sulfide Sulfur Dioxide <.1 ppmV <.1 ppmV GC/Hall Modified EPA 15 This report applies only to the sample, or samples investigated and is not necessarily indicative of the quality or condition of apparently Identical or similar material or products. As a mutual protection to clients, the public and these Laboratories, this report is submitted and accepted for the exclusive use of the client to whom it is addressed and upon the condition that's i_ ;t to be used. In whole or in part, in any advertising or publicity matter without prior written authorization from these Laboratories. • • Page 2 of 4 LABORATORY NO. 17212 REPORTED 04-07-92 CLIENT GeoScience Analytical, Inc. RECEIVED 04-06-92 SAMPLE Air (Tedlar Bag) MARKS Project # 1337 Hoag Base Line BASED ON SAMPLE As sampled RESULTS Analyte Analyses Results Method 17212-5 92-04-04-1337-16 4/4/92 13:30 Cancer Center Hydrogen Sulfide <.1 ppmV 17212-6 92-04-04-1337-19 4/4/92 14:10 Child Care Center Hydrogen Sulfide <.1 ppmV Sulfur Dioxide <.1 ppmV 17212-7 92-04-04-1337-22 4/4/92 14:50 Well Gas Hydrogen Sulfide 4800 ppmV Sulfur Dioxide <.1 ppmV 17212-8 92-04-04-1337-25 4/4/92 15:05 Well Gas Hydrogen Sulfide 3600 ppmV 17212-9 92-04-04-1337-28 4/4/92 15:15 Well Gas Hydrogen Sulfide 4100 ppmV GC/Hall Modified EPA 15 • • Page 3 of 4 LABORATORY NO. 17212 REPORTED 04-07-92 CLIENT GeoScience Analytical, Inc. RECEIVED 04-06-92 SAMPLE Air (Tedlar Bag) MARKS Project # 1337 Hoag Base Line BASED ON SAMPLE As sampled RESULTS Analyte Analyses Results Method 17212-10 92-04-04-1337-31 4/4/92 15:32 Well Gas Hydrogen Sulfide 2880 ppmV 17212-11 92-04-04-1337-34 4/4/92 15:49 Flare Plume Hydrogen Sulfide <.1 ppmV Sulfur Dioxide <.1 ppmV 17212-12 92-04-04-1337-37 4/4/92 16:32 Flare Plume Hydrogen Sulfide <.1 ppmV Sulfur Dioxide <.1 ppmV 17212-13 92-04-04-1337-40 4/4/92 17:10 Flare Plume Hydrogen Sulfide <.1 ppmV Sulfur Dioxide <.1 ppmV 17212-14 92-04-04-1337-43 4/4/92 17:45 Flare Plume Hydrogen Sulfide <.1 ppmV Sulfur Dioxide <.1 ppmV GC/Hall Modified EPA 15 • • Page 4 of 4 LABORATORY NO. 17212 REPORTED 04-07-92 CLIENT GeoScience Analytical, Inc. RECEIVED 04-06-92 SAMPLE Air (Tedlar Bag) MARKS Project # 1337 Hoag Base Line BASED ON SAMPLE As sampled RESULTS Analyte Analyses Results Method 17212-15 92-04-04-1337-55 4/4/92 19:15 Wetlands Hydrogen Sulfide <.1 ppmV Sulfur Dioxide <.1 ppmV 17212-16 92-04-04-1337-57 4/4/92 19:28 Wetlands Hydrogen Sulfide <.1 ppmV Attachment: Chaff. of Custody Respectful CERTIFIES TE 'G ABO';'CRIES, INC. President / j lc GC/Hall zi; 1 • • rim r FA/ Certified Testing Laboratories, Inc. - 2648 East 28th Street • Signal Hill, CA 90806 • TEL: (310) 424-9992 • FAX: (310) 492-1203 Page 1 of 4 LABORATORY NO. 17213 REPORTED 04-10-92 CLIENT GeoScience Analytical, Inc. RECEIVED 04-06-92 4454 Industrial Street Simi Valley, CA 93063 Attn: Louis J. Pandolfi SAMPLE Air (Tedlar Bag) MARKS Project # 1337 Hoag Base Line BASED ON SAMPLE As received RESULTS Analyte Analyses Results Method Detection Limits 17213-1 92-04-04-1337-3 0.5 ppmV Benzene ND ppmV GC PID Toluene ND ppmV GC PID Ethyl Benzene ND ppmV GC PID Xylene (total) ND ppmV GC PID 17213-2 92-04-04-1337-6 0.5 ppmV Benzene ND ppmV GC PID Toluene ND ppmV GC PID Ethyl Benzene ND ppmV GC PID Xylene (total) ND ppmV GC PID 17213-3 0.5 ppmV 92-04-04-1337-9 Benzene ND ppmV GC PID Toluene ND ppmV GC PID Ethyl Benzene ND ppmV GC PID Xylene (total) ND ppmV GC PID 17213-4 0.5 ppmV 92-04-04-1337-14 Benzene ND ppmV GC PID Toluene ND ppmV GC PID •Ethyl Benzene ND ppmV GC PID Xylene (total) ND ppmV GC PID this report applies only to the sample, or samples investigated and is not necessarily indicative of the quality or condition of apparently identical or similar material or products. As a mutual protection to clients, the public and these Laboratories, this report is submitted and accepted for the exclusive use of the client to whom ft is addressed and upon the condition that it is not to be used. In whole or in part, in any advertising or publicity matter without prior written authorization from these Laboratories. • Page 2 of 4 LABORATORY NO. 17213 REPORTED 04-10-92 CLIENT GeoScience Analytical, Inc. RECEIVED 04-06-92 SAMPLE Air (Tedlar Bag) MARKS Project # 1337 Hoag Base Line BASED ON SAMPLE As received Analyte Analyses Results Method Detection Limits 17213-5 92-04-04-1337-17 0.5 ppmV Benzene ND ppmV GC PID Toluene ND ppmV GC PID Ethyl Benzene ND ppmV GC PID Xylene (total) ND ppmV GC PID 17213-6 92-04-04-1337-20 0.5 ppmV Benzene ND ppmV GC PID Toluene ND ppmV GC PID Ethyl Benzene ND ppmV GC PID Xylene (total) ND ppmV GC PID 17213-7 92-04-04-1337-23 0.5 ppmV Benzene ND ppmV GC PID Toluene ND ppmV GC PID Ethyl Benzene ND ppmV GC PID Xylene (total) 1.4 ppmV GC PID 17213-8 92-04-04-1337-26 0.5 ppmV Benzene ND ppmV GC PID Toluene ND ppmV GC PID Ethyl Benzene ND ppmV GC PID Xylene (total) 1.4 ppmV GC PID • • Page 3 of 4 LABORATORY NO. 17213 REPORTED 04-10-92 CLIENT GeoScience Analytical, Inc. RECEIVED 04-06-92 SAMPLE Air (Tedlar Bag) MARKS Project # 1337 Hoag Base Line BASED ON SAMPLE As received Analyte Analyses Results Method Detection Limits 17213-9 92-04-04-1337-29 0.5 ppmV Benzene ND ppmV GC PID Toluene ND ppmV GC PID Ethyl Benzene ND ppmV GC PID Xylene (total) 1.4 ppmV GC PID 17213-10 92-04-04-1337-32 0.5 ppmV Benzene ND ppmV GC PID Toluene ND ppmV GC PID Ethyl Benzene ND ppmV GC PID Xylene (total) 1.9 ppmV GC PID 17213-11 92-04-04-1337-35 0.5 ppmV Benzene ND ppmV GC PID Toluene ND ppmV GC PID Ethyl Benzene ND ppmV GC PID Xylene (total) ND ppmV GC PID 17213-12 92-04-04-1337-38 0.5 ppmV Benzene ND ppmV GC PID Toluene ND ppmV GC PID Ethyl Benzene ND ppmV GC PID Xylene (total) ND ppmV GC PID • • Page 4 of 4 LABORATORY NO. 17213 REPORTED 04-10-92 CLIENT GeoScience Analytical, Inc. RECEIVED 04-06-92 SAMPLE Air (Tedlar Bag) MARKS Project # 1337 Hoag Base Line BASED ON SAMPLE As received Analyte Analyses Results Method Detection Limits 17213-13 92-04-04-1337-41 0.5 ppmV Benzene ND ppmV GC PID Toluene ND ppmV GC PID Ethyl Benzene ND ppmV GC PID Xylene (total) ND ppmV GC PID 17213-14 92-04-04-1337-44 0.5 ppmV Benzene ND ppmV GC PID Toluene ND ppmV GC PID Ethyl Benzene ND ppmV GC PID Xylene (total) ND ppmV GC PID 17213-15 92-04-04-1337-56 0.5 ppmV Benzene ND ppmV GC PID Toluene ND ppmV GC PID Ethyl Benzene ND ppmV GC PID Xylene (total) ND ppmV GC PID ND - Not Detected Attachment: Chain of Custody Respectfully s Jam' CERTIFIED ORATORIES, INC. Start E. Salot, Ph.D. •1,nesident /j is • • • APPENDIX III TEXT OF MITIGATION MEASURES 6, 7 AND 8 • • MITIGATION MEASURE NO. 6, 7 AND 8 "Prior to the issuance of a grading permit, the project sponsor shall conduct a soil corrosivity evaluation. This evaluation shall be conducted by an expert in the field of corrosivity. The site evaluation shall be designed to address soils to at least the depth to which excavation is planned At a minimum, at least one sample from each soil type should be evaluated. Appropriate personnel protection should be worn by field personnel during the field evaluation. In the event soils are found to be corrosive, the source and extent of the corrosive soils should be determined and fully understood This is important for the development of mitigation measures to control the potential impact of corrosive soils over time." "Based on the corrosion assessment and source determination, a soils and construction material compatibility evaluation should also be undertaken, concluding with the appropriate mitigation measures and design criteria. Corrosion resistant construction materials are commonly available and should be used where design specifications require protection. For example, there are many elastomers and plastics, like PVC, which are resistant to corrosion by up to 70 percent acid at 140 degrees Fahrenheit." Should the soil be identified as hazardous due to the severeness of their corrosivity (i.e., a pH less than 2.5), on -site remediation by neutralization should be undertaken prior to construction. Appropriate regulatory agency approvals and permits should also be obtained" • • • Hoag Hospital Project: Heart and Vascular Institute Projects Mitigation Measure: 7 Based on the corrosion assessment and source determination, a soils and construction material compatibility evaluation shall be undertaken, concluding with the appropriate mitigation measures and design criteria. Corrosion resistant construction materials are commonly available and shall be used where the evaluation/assessment concludes that corrosive soils conditions could adversely impact normal construction materials or the materials used for the mitigation of subsurface gas conditions. For example, there are many elastomers and plastics, like PVC, which are resistant to corrosion by up to 70 percent sulfuric acid at 140 degrees Fahrenheit. Standard for Compliance: Method of Verification: Timing of Verification: Approval of soils and construction evaluation. Documentation of approved soils and compatibility evaluation. Prior to the issuance of a grading permit. material compatibility construction material Responsible Party(ies): Applicant; Building Director or designated representative Planning Director or designated representative. Verification Date: City of Newport Beach Verification Approved on: Approved by: Signature: II/(//( / ciertt7 or • • Hoag Hospital Project: Heart and Vascular Institute Projects Mitigation Measure: 7 Based on the corrosion assessment and source determination, a soils and construction material compatibility evaluation shall be undertaken, concluding with the appropriate mitigation measures and design criteria. Corrosion resistant construction materials are commonly available and shall be used where the evaluation/assessment concludes that corrosive soils conditions could adversely impact normal construction materials or the materials used for the mitigation of subsurface gas conditions. For example, there are many elastomers and plastics, like PVC, which are resistant to corrosion by up to 70 percent sulfuric acid at 140 degrees Fahrenheit. Standard for Compliance: Approval of soils and construction material compatibility evaluation. Method of Verification: Documentation of approved soils and construction material compatibility evaluation. Timing of Verification: Prior to the issuance of a grading permit. Responsible Party(ies): Applicant; Building Director or designated representative or Planning Director or designated representative. Verification Date: City of Newport Beach Verification Approved on: 4/L3/(I Approved by: Signature: t's'cr 111 J. SCHIFF & ASSOCIATES, INC. 431 West Baseline Road Claremont, CA 91711 TEL (909) 626-0967/FAX (909) 626-3316 E-mail: mJsa@mjschiffcam http://►vww.mJschecom TRANSMITTAL LETTER DATE: September 26, 2005 ATTENTION: Ms. Lan-Anh Tran To: Mactec, Inc. 200 Citadel Drive, Suite 200 Los Angeles, CA 90040 SUBJECT: Laboratory Test Data Hoag Hospital - South Building Your # 4953-05-2451 MJS&A # 05-1352LAB COMMENTS: Enclosed are the results for the subject project. es T. Keegan , Laboratory Manager • M. J. Schiff & Associates, Inc. • Consulting Corrosion Engineers -.Since 1939 431 W. Baseline Road Claremont, CA 91711 Phone: (909) 626-0967Fax: (909) 626-3316 E-mail tab(nrjschiff cons website: nijsc1iffcom Table 1 - Laboratory Tests on Soil Samples MACTEC Hoag Hospital -South Building, Newport Beach, CA Your #4953-OS-2451, MJS&A #05-1352LAB 19-Sep-OS Sample ID 1 2 @ 19' @ 10' SP ML '_:i �1'�'?S::n'«?'.°:,..�ti�`�`+.ri't._...... ,:%'•iJlx+:s'-=;::,L-E"�''cS:.3i�'•*R';3i:!'"`^:1;;'�.:^..c_r,�',T�i.`°�S�'v.�'.L:'i�".`�v T:t.:«ti:t++�:•�ar.t:,�'�i'� 'Fti:� 2� '^i4 Resistivity Units as -received ohm -cm 43,000 14,000 saturated ohm -cm 9,500 1,800 pH 7.9 8.3 Electrical Conductivity mS/cm 0.04 0.28 Chemical Analyses Cations calcium Cu`' mg/kg 16 28 magnesium Mg2'. mg/kg ND 10 sodium Na'` mg/kg 4 221 Anions carbonate C032' mg/kg ND 35 bicarbonate HCO;i' mg/kg 24 519 chloride Cll. mg/kg 20 40 sulfate SO42" mg/kg ND 50 Other Tests ammonium NH4I+ mg/kg nitrate NO3'' mg/kg sulfide S2' qual 1.4 ND na 1.4 ND na Redox mV na na �� ar-tal•..a' Fn%i1�.' n.i�' �•' r.Empta.u'-s'.. F;etsii"�drf:t4t..,. �.�t..+,,,i'�- 4?, S+jiBkian _:. art•^ry".�'.Kc�.:'7,c. Electrical conductivity in millisiemens/cm and chemical analysis were made on a 1:5 soil -to -water extract. mg/kg = milligrams per kilogram (parts per million) of dry soil. Redox = oxidation-reduction potential in millivolts ND = not detected na = not analyzed Page 1 of l • • • M. J. SCHIFF & ASSOCIATES, INC. Consulting Corrosion Engineers - Since 1959 June 25;1997 LAW/CRANDALL, II�iC. 200 Citadel Drive Los Angeles, California 90040-1554 Attention: lv&. Mike Shahabi 1291 North Indian Hill Boulevard Claremont, California 91711.3897 Phone 909-6264967 FAX 809•521-1418 E•marf SCHIFFCORR@AOL.COM Re: Soil Corrosivity Study Hoag Hospital Parking Structure, East Addition Newport Beach, California Your #70I 31.7-0254, MJS&A #97185 INTRODUCTION • Laboratory tests have been completed on five soil samples we selected from your boring logs for the referenced parking structure project. Also included is soil corrosivity test data from this site that we tested in 1995 for Hoag Hospital. The purpose of these tests was to determine if the soils may have deleterious effects on underground utilities, hydraulic elevator cylinders, and concrete foundations. • The scope of this study is limited to a determination of soil corrosivity and general corrosion control recomrhendations for materials likely to be used for construction.. If the architects and/or engineers desire more spedfie information, designs, specifications, or review of design, we will be happy to work with them as a separate phase of this project. TEST PROCEDURES The electrical resistivity of each sample was measured in a soil box per ASTM 057 in its as - received condition and appin after saturation with distilled water. Resistivities arc at about their lowest value when the soil is saturated, The•pH. of the saturated samples was measured. A 5:1 water:soil extraet from, each sample was chemically analyzed for the major anions and cations. Test results are shown on Table 1. CORROSION AND CATHODIC PROTECTION ENGINEERING SERVICES PLANS AND SPECIFICATIONS ' FAILURE ANALYSIS ' EXPERT WITNESS ' CORROSIVFIYAND DAMAGE ASSESSMENTS • • • LAW/CRANDALL MIS&A #97185 SOIL CORROSWITY .tune 25, 1997 Page 2 A major factor in determining soil corrosivity is electrical resistivity. The electrical resistivity of a soil is a measure of its resistance to the :low of electrical current. Corrosion of buried metal is an electrochemical process in which the amount of metal loss due to corrosion is directly -proportional to the flow of electrical current (DC) from the metal into the soil. Corrosion currents, following Ohm's Law, are inversely proportional to soil resistivity. Lower electrical resistivities result from higher moisture and chemical contents and indicate corrosive soil. A correlation between electrical resistivity and corrosivity toward ferrous metals.is: Soil Resistivity in ohm -centimeters Corrosivity Category .over 10,000 mildly corrosive 2,000 to 10,000 moderately corrosive 1,000 to 2,000 corrosive below 1,000 severely corrosive Other soil characteristics that may influence corrosivity towards metals are pH, chemical content, soil types, aeration, anaerobic conditions, and site drainage, Electrical resistivities were in moderately to severely corrosive categories with as -received moisture and at saturation. Soil pH values varied from 6.5 to 7.5. This range is slightly acidic to mildly alkaline and does not particularly enhance corrosivity. The chemical content of the sarnples was low. Tests were not made for sulfide or negative bxidation-reduction (redox) potentials because they would not exist in these aerated samples. This soil is classified as severely corrosive to ferrous metals. CORROSION CONTROL The life of buried materials depends on thickness, strength, loads, construction details, soil moistures etc., in addition to soil corrosivity, and is, therefore, difficult to predict. Of more practical value are corrosion control methods.that will increase the life of materials that would be subject to significant corrosion, • • LAW/CRANDALL MJS&A #97185 June 25, 1997 Page 3 • Steel Pipe Abrasive blast underground steel utilities and apply a high quality dielectric coating such as extruded polyethylene, a tape coating system, hot applied coal tar enamel, or fusion bonded epoxy. Bond underground steel pipe with rubber gasketed, mechanical, grooved end, or other nonconductive type joints for electrical continuity. Electrical continuity is necessary for corrosion monitoring and cathodic protection. Electrically insulate each buried steel pipeline from dissimilar metals, cement -mortar coated and • concrete encased steel, and•above ground steel pipe to prevent dissimilar metal corrosion cells and to facilitate the application of cathodic protection. Apply cathodic protection to steel piping asper NACE International RP-0169-92. As an alternative to dielectric coating and cathodic protection, apply a 3/4 inch cement mortar coaling or encase in cement -slurry or concrete 3 inches thick, using any type of cement. Hydraulic Elovator Coat hydraulic elevator cylinders as described .above. Electrically insulate each cylinder from building metals by installing dielectric material between the piston platen and car, insulating the bolts, and' installing an insulated joint in the oil line. Apply cathodic protection to hydraulic cylinders as per NACE International RP-0169-92. As an alterative to electrical insulation and cathodic protection, place each cylinder in a plastic casing with a plastic watertight seal at the bottom. The elevator oil line should be placed above ground if possible but, if underground, should be protected es described above for steel utilities. Iron Pipe Encase ductile .iron water piping in 8 mil thick low -density polyethylene or 4 mil thick high - density, cross -laminated polyethylene plastic tubes or wraps per AWWA Standard CI05 or coat with a high quality dielectric coating such as polyurethane or coal tar epoxy. As an alternative, encase iron piping with cement slurry or concrete at least 3 inches thick surrounding the pipe, using any type of cement. Bond all nonconductive type joints for electrical continuity. Electrically insulate underground iron pipe from dissimilar metals' and above ground iron pipe with insulated joints. Encase cast iron drain lines in 8 mil thick low -density polyethylene or 4 mil thick high -density, cross -laminated polyethylene plastic tubes or wraps per AWWA Standard C105. As an alternative, encase iron piping with cement slurry or concrete at least 3 inches thick' surrounding the pipe, using any type of cement. Electrically insulate underground iron pipe 'from dissimilar metals and above ground iron pipe with insulated joints. . • • LAW/CRANDALL MJS&A 497185 June 25, 1997 Page 4 - Copper Tube Bare copper tubing for cold water should be bedded and backf lied in the silty sand at Ieast 2 inches thick surrounding the copper. Hot water tubing may be subject to a higher corrosion rate. The best corrosion control measure would be to place the hot copper tubing above ground. If buried, encase in plastic pipe to prevent soil contact or apply cathodic protection. Plastic and Vitrified Clay Pipe No special precautions are required for plastic and vitrified clay piping placed underground from a corrosion viewpoint. Protect any iron valves and fittings with a double polyethylene wrap per AWWA C105 or as described below for bare steel appurtenances. Where concrete thrust blocks are to be placed against iron, use a single polyethylene wrap to prevent concrete/iron contact and to eliminate the slipperiness of a double wrap. All Pipe On all pipe, coat bare steel appurtenances such as.bolts, joint harnesses, or flexible couplings with a coal tar or elastomer based mastic, coal tar epoxy, moldable sealant, wax tape, or equivalent after assembly. Where metallic pipelines penetrate concrete structures such. as building floors or walls, use plastic sleeves, rubber seals, or other dielectric material to prevent pipe contact with the concrete and reinforcing steel. Concrete Any type of cement and standard concrete cover over reinforcing steel may be used for concrete structures and pipe in contact with these soils. Please call if you have any questions. Respectfully Submitted, M.J. SCHIPF' & ASSOCIATES, INC. Reviewed by, Q.vc_4 ad le James T. Keegaa Eric: Table I zAdocs-9719718S.doc Paul R. Smith, P.E. • • NI. J. SCHIFF & ASSOCIATES, INC. Consulting Corrosion Engineers - Since 1959 Sample m 9S' 3.5' silty clay sand Soil Type B-5 B-7 B-7 2'-7' ® 2.5' Q.14' - 15.5' silty sand silty sand clay Resistivity Units as -received ohm -cm S00 .6,400 7,600 6,300 775 saturated ohm -cm 720 3,650 4,800 4,400 740 pH • Electrical • Conductivity m S/ern 6.5 7.0 6.7 6:5 6.6 0.09 0,05 0.06 0.06 0.15 Chemical Analyses Cations calcium Ca'-` mg/kg 16 ND • • ND ND 32 magnesium Mg'` mg/kg ND ND ND ND 10 sodium Na" mg/kg 86 • 104 77 96 116 . Anions carbonate CO3i' mg/kg ND ND ND ND ND . bicarbonate HC031- mg/kg 73 122 85 85 183 chloride CI" mg/kg 60 43 • 39 57 57 sulfate 50,12. mg/kg 79 63 41. 56 137 Other Tests sulfide . Redox amminjuin nitrate 1291 North Indian Hill Boulevard Claremont, California 917 H-3897 Phone 909.826.0967 ' FAX 909-621.1419 E•rnall SCHIFFCORR(BiAOLCOM Table 1- Laboratory Tests an Soil Samples Page 1 of 2 Hoag Memorial Hospital Presbyterian, Newport,l3eueh, California Your R70I31-7-0254, N'JS&r! 497185 JURE'20,1997 B-? B-3 na na na na e ^L'1=—'7.—�.�-__._�=,.__r.-_mod: _�_ _�___. _ .-. ..r?•. .?h—=�--3 fa= ..}=3i :�:�:-r S=' qual atv Ni•1.r` mg/kg mg/kg NO3 r- na na na na na na an na Ile na 112. na Ile na na na Electrical conductivity in millisiemens/cm and chemical analysis are of a 1:5 soil -to -water extraci mg/lcg milligrams per kilogram (parts per million), of dry soil. Redox = oxidation-reduction potential hi millivolts ND = not detected na aot analyzed ilops97197185.45 CORROSION AND CATHODIC PROTECTION ENGINEERING SERVICES . PLANS AND SPECIFICATIONS • FAILURE ANALYSIS • EXPERT WITNESS • CORt{OSIVITY AND DAMAGE ASSESSMENTS • I 1 1 • • M. J. SCHIFF & ASSOCIATES, INC. Consulting Corrosion Engineers - Since 1959 1291 North Indian Hill Boulevard Claremont, California,91711.-3897 Phone 909-626-0967 FAX 909-621-1419 E-mail SCHIFFCORROAOL.COM Table 1- Laboratory Tests on Soil Sanmples Page 2 of 2 Haag Memorial Hospital Presbyterian, Newport . ead:, CaGforala Your #70131-7-0254, MJS&A.#97,185 Jm e 20, 1997 Sample ID . ��t�'HA 1, 4' Soil Type • Resistivity as -received saturated silty sand Units ohm -cm 4,100 ohm -cm 3,300 pFl 7.5 Electrical Conductivity mS/cm .0.15 Chemical Analyses Cations calcium Caa' mg/kg 60 magnesium Mg=+ mg/kg ND sodium • Nat' mg/kg 83 Anions ' carbonate CO mg/kg ND bicarbonate HC031' mg/kg 195 chloride CI' mg/kg 28 sulfate SO,=- mg/kg ' 124 Other Tests sulfide Sz. qual Redox my ammonium NH4t+ mg/lcg nitrate NO31' mg/kg na na na na Electrical conductivity in millisielnens/cm and chemical analysis are of a 1:5 soil -to -water extract. rag/kg = milligrams per kilogram (parts per million) of dry soil. Redox = oxidation-reduction potential in millivolts ND = not detected na = not analyzed dacs97197I85xls CORROSION AND CATHODIC PROTECTION ENGINEERING SERVICES PLANS AND SPECIFICATIONS • FAILURE ANALYSIS •EXPERT WITNESS • CORROSIVITY AND DAMAGE ASSESSMENTS • Hoag Hospital Project: Heart and Vascular Institute Projects Mitigation Measure: 8 Should the soil be identified as hazardous due to the severeness of their corrosivity (i.e., a pH less than 2.5), on -site remediation by neutralization shall be undertaken prior to construction. Appropriate regulatory agency approvals and permits shall also be obtained. Standard for Compliance: Obtain approvals/permits, if remediation is required, subsequent remediation. Method of Verification: Compliance with Mitigation Measure 6 and if remediation is required, approval by the appropriate regulatory agency in accordance with their rules Timing of Verification: Prior to the issuance of a building permit. Responsible Party(ies): Applicant; Planning Director or designated representative. Verification Date: City of Newport Beach Verification c,. (pa- ll Signature: YlirAt)D • Approved on: Approved by: • • Hoag Hospital Project: Heart and Vascular Institute Projects Mitigation Measure: 9 Prior to issuance of grading permits, the Project Sponsor shall ensure that a construction erosion control plan is submitted to and approved by the City of Newport Beach that is consistent with the City of Newport Beach Grading Ordinance and includes procedures to minimize potential impacts of silt, debris, dust and other water pollutants. These procedures may include: • the replanting of exposed slopes within 30 days after grading or as required by the City Engineer. • the use of sandbags to slow the velocity of or divert stormflows. • the limiting of grading to the non -rainy season. The project Sponsor shall strictly adhere to the approved construction erosion control plan and compliance shall be monitored on an ongoing basis by the Newport Beach Building Department. Standard for Compliance: Construction erosion control plan shown on approved grading plans, documented in contractor/subcontractor supplemental general conditions. Method of Verification: Plan check. Timing of Verification: Prior to issuance of grading permits, ongoing throughout construction. Responsible Party(ies): Applicant; Building Director or designated representative; Planning Director or designated representative. Verification Date: City of Newport Beach Verification Approved on: tJ23I11 Approved by: • Signature: ,,,,,, i'tAief), Hoag Hospital Project: Heart and Vascular Institute Projects Mitigation Measure: 9 Prior to issuance of grading permits, the Project Sponsor shall ensure that a construction erosion control plan is submitted to and approved by the City of Newport Beach that is consistent with the City of Newport Beach Grading Ordinance and includes procedures to minimize potential impacts of silt, debris, dust and other water pollutants. These procedures may include: • the replanting of exposed slopes within 30 days after grading or as required by the City Engineer. • the use of sandbags to slow the velocity of or divert stormflows. • the limiting of grading to the non -rainy season. The project Sponsor shall strictly adhere to the approved construction erosion control plan and compliance shall be monitored on an ongoing basis by the Newport Beach Building Department. Standard for Compliance: Method of Verification: Timing of Verification: Responsible Party(ies): Verification Date: Construction erosion control plan shown on approved grading plans, documented in contractor/subcontractor supplemental general conditions. Plan check. Prior to issuance of grading permits, ongoing throughout construction. Applicant; Building Director or designated representative; Planning Director or designated representative. City of Newport Beach Verification Approved on: Approved by: Signature: 9- 34- (I e-,-/ 4/ A(if • • Hoag Hospital Project: Heart and Vascular Institute Projects Mitigation Measure: 49 In the event that hazardous waste is discovered during site preparation or construction, the Project Sponsor shall ensure that the identified hazardous waste and/or hazardous materials are handled and disposed in the manner specified by the State of California Hazardous Substances Control Law (Health and Safety Code Division 20, Chapter 6.5), standards established by the California Department of Health Services, Office of Statewide Health Planning and Development, and according to the requirements of the California Administrative Code, Title 30, Chapter 22. Standard for Compliance: Documented in contractor/subcontractor supplemental general conditions and subsequent handling and disposal of any identified hazardous waste/materials in accordance with regulations, if required. Method of Verification: Contractor specifications check. Timing of Verification: Ongoing during site preparation and construction. Responsible Party(ies): Applicant; Planning Director or designated representative. Verification Date: City of Newport Beach Verification Approved on: 4' I23 I�� Approved by: 1 • U'I'rr•r" )1141°Q6' Signature: Hoag Hospital Project: Heart and Vascular Institute Projects Mitigation Measure: 53 A site safety plan shall be developed that addresses the risks associated with exposures to methane and hydrogen sulfide. Each individual taking part in the sampling and monitoring program shall receive training on the potential hazards and on proper personal protective equipment. This training shall be at least at the level required by CFR 2910.120. Standard for Compliance: Approval of site safety plan. Method of Verification: Plan check; provision of approved site safety plan. Timing of Verification: Prior to the issuance of a grading permit. Responsible Party(ies): Applicant; Planning Director or designated representative. Verification Date: City of Newport Beach Verification Approved on: g'Z3 I (I Approved by: (1� Signature: • •