Loading...
HomeMy WebLinkAbout08 - Shorecliff Road Catch Basin NOC— CITY OF NEWPORT BEACH City Council Staff Report Agenda Item No. 8 September 10, 2013 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department David A. Webb, Public Works Director 949- 644 -3311, dawebb @newportbeachca.gov PREPARED BY: Bob Stein, AssistanliCity Engineer APPROVED: TITLE: ShoWcliff Road Catch Basin Modification, Reef Point Biofiltration System, Los Trancos Creek Maintenance — Notice of Completion of Contract 5287 ABSTRACT: On April 9, 2013, City Council awarded Contract No. 5287, Shorecliff Road Catch Basin Modification, Reef Point Biofltration System, Los Trancos Creek Maintenance to Ted Enterprises, Inc. for a total contract cost of $265,691.00 plus a 10% allowance for contingencies. The required work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATIONS: 1. Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project. 2. Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 3. Release the Faithful Performance Bond one year after acceptance by the City Council. FUNDING REQUIREMENTS: Funds for the construction contract were expended from the following accounts: Account Description Account Number Amount Newport Coast ASBS Protection Program 7255- C5002006 229,500.00 Newport Coast ASBS Protection Program 7014- C5002006 27,442.50 Total: $256,942.50 1 of 6 Shorecliff Road Catch Basin Modification, Reef Point Biofiltration System, Los Trancos Creek Maintenance — Notice of Completion of Contract 5287 September 10, 2013 Page 2 DISCUSSION: Overall Contract Cost /Time Summary Awarded Final Cost at Contingency Actual % Due to % Due to Contract Amount Completion Allowance Contract Directed Unforeseen Change Change Change $241,691.00 $256,942.50 10% or less +6.3% 6.3% 0.0% Allowed Contract Time (days) 50 Actual Time 0 Under(-) or Over ( +) The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: $241,691.00 Actual cost of bid items constructed: $249,142.50 Total change orders: Final contract cost: $ 7,800.00 $256,942.50 The work necessary for completion of this water quality improvement contract consisted of constructing a catch basin biofiltration screen and infiltration gallery at the Shorecliff Road site, constructing three infiltration galleries at the Reef Point site, and refurbishing and replanting the ponds at the mouth of Los Trancos Creek. The final construction contract cost was approximately 6.3 percent above the original bid amount. Approximately half the additional cost was associated with slightly higher quantities of bid items, while the other half was due to minor changes made to facilitate construction. A summary of the project schedule is as follows: Estimated Completion Date per 2012 Baseline Schedule August 8, 2013 Project Awarded for Construction April 9, 2013 Contract Completion Date with Approved Extensions July 3, 2013 Actual Substantial Construction Completion Date July 3, 2013 ENVIRONMENTAL REVIEW: City Council found this project exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15301 (minor alteration of existing public structures, facilities or topography involving negligible expansion of use). This exemption covers the minor 2 of Shorecliff Road Catch Basin Modification, Reef Point Biofiltration System, Los Trancos Creek Maintenance — Notice of Completion of Contract 5287 September 10, 2013 Page 3 alteration of existing public facilities with negligible expansion of the facilities in areas that are not environmentally sensitive. NOTICING: This agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). In addition, the City Clerk will be filing a Notice of Completion for the project as a result of this action. The Notice Inviting Bids was advertised in the City's official publication and in construction industry publications. Submitted by: David J,/e- bb Public Works Director Attachment: A. Project Location Map 3 of ATTACHMENT A 4 of s °o O -A O 9° n PROJECT LOCATION ROAD o= v2� CVFF I I I I I I I ORE�'�\FF ROAD I I SN PROJECT LOCATION ICI I2I I Ld Iwl Itz IMI ICI — I I /TRACT BOUNDARY / PACIFIC OCEAN C -5287 LOCATION MAP �e 6 *> CITY OF NEWPORT BEACH DEPARTMENT OF PUBLIC WORKS DATE: 03/20/13 SHORECLIFF ROAD CATCH -' 3300 NEWPORT BEACH BLVD. SCALE: N.T.S. BASIN MODIFICATIONS PROJECT p NEWPORT BEACH, CA 92663 SHEET 1 OF 1 4 of ATTACHMENT A 5 of \ RIGHT -OF -WAY (TYP.) AsTgrsrq� \ � q��tiOAq k GF \ CRYSTAL COVE gfFq D \ PROMENADE T CogST 4eo\ yiCy�gr Q�� C) O PROJECT LOCATION 0 /1'o�Th CO qS ryCyx qr � C,pr OASlgjSTgC CRYSTAL COVE gP� //Io -%P, to STATE PARK gPFq C -5287 LOCATION MAP o; ^� ° "O> ._ CITY OF NEWPORT BEACH DEPARTMENT OF PUBLIC WORKS i 3300 NEWPORT BEACH BLVD. , ' NEWPORT BEACH, CA 92663 u:nn DATE: 03/20/13 REEF POINT PARKING LOI - BIOFILTRATION SYSTEM PROJECT SCALE: N.T.S. SHEET 1 OF 1 5 of C -5287 ATTACHMENT A oy 1 ` CRYSTAL COVE \ STATE PARK ` PUBLIC PARKING LOT rn C F�rT C o X�\ IN iC 0 .3 MILES "' TO SITE CRYSTAL COVE MA ACCESS " = STATE PART( p ROAD / �\ 0.3 MILES \ V \ Af TO HIGHWAY A TV R A ACCESS ROAD y n CRYSTALCOVE \ STATE PARK \ m \ fb N \. no IGHT-CF-WAY �(TYP.) O vo V (TYP.) O ROAD \ \ r o a \ 9 \ no 9 PROJECT ❑ \ �y \ LOCATION T \ \ COTTAGE (TYP.) O \ ` O \ �C CRYSTAL COVE 0 CF9 STATE PARK � \ ti LOCATION MAP DATE: 03/20/13 LOS TRANCOS CREEK SCALE: N.T.S. MAINTENANCE PROJECT SHEET 1 OF 1 CITY OF NEWPORT BEACH DEPARTMENT OF PUBLIC WORKS 3300 NEWPORT BEACH BLVD. NEWPORT BEACH, CA 92663 6 of