Loading...
HomeMy WebLinkAboutSS2 - Rule 20A - PowerPointAgenda Item No. SS2 September 10, 2013 Proposed Underground Utility District No. 22 Along Balboa Boulevard Between West Coast Highway and 22nd Street G � ' i Brief History Resident Request for Undergrounding Over the Years Assessment District 69 (Completed in 2008) Area along Seashore Drive from Summit St. to 30th St. • Approximately 660 Properties Involved • Funded by Property Owners, including Private Conversion Boundary Stopped 2 -3 Properties North of Seashore Drive from 46th St. to 33rd St. Brief History West Newport Citizen Advisory Panel (Fa►►/winter2011) 1st Priority — Landscaping Improvements 2nd Priority — Underground Utilities on Balboa Blvd. March 26, 2013 City Council Study Session Council Desire to Form UUD No. 22 (Balboa Blvd.) Review of Area between Balboa Blvd & 23rd St. Use Rule 20A Funds for Design /Construction How would Private Conversions be Funded? Rule 20A Funds California Public Utilities Commission sets Rule 20A policies to use allocations for utility underground areas that satisfy one or more of the following criteria: Unusually Heavy Concentration of Overhead Facilities Heavily Traveled Designated as an Arterial or Major Collector Road Within, or Passes Through Civic, Recreational or Scenic Area Fund can pay for 100% of design and construction cost of mainline along street and up to 100 feet of Service Connections along both sides of the street, if warranted. UUD No. 22 Formation Goals Balboa Boulevard Between West Coast Highway & 22nd Street Improve the Aesthetic Appearance of Balboa Blvd. Maximize the Value of City Rule 20A Funds so as to: Meet West Newport CAP's Aesthetic Goals Build a Fund Balance for next UUD Priority Project Determine a Logical District Boundary that Meets Appearance and Funding Goals Determine the Level of Owner Participation Residential and Business Service Connections Municipal Code 15.32.100 Resaonsibility of Pronerty wners. Itr I A. Every person owning, operating, leasing, occupying or renting a building or structure within a district shall construct and provide that portion of the service connection on his property between the facilities referred to in Section 15.32.090 and the termination facility on or within said building or structure being served, all in accordance with the applicable rules, regulations and tariffs of the respective utility or utilities on file with the Commission. Can be Included in Rule 20A Cost Upon the City's Request UUD No. 22 Boundary Options Option 1 Option 2 LJ_L1�1JJ owl WE WE 109 ���"�% __�..:..��■'i■ ■■■■ ■■ m■irm1111111 1111111 11111111 m UUD No. 22 Boundary Options Option 1 Option Z a Ent-" Balboa @ River Avenue - Looking East 71 F�I !1 BLV Balboa @Channel - Looking North ���I BLV 42nd /43rd St. Alley - Looking South L� , °, „ �MMM: ✓fin H t:�] LJ I -, �T BLV 33''d Street - Looking East N �V NeWp�R? �C �D 22nd and 23rd Street and Adjoining Alley UUD No. 22 Design Basis Potentially 150 -225 Properties in the District Exact Boundaries will be Refined in Design Phase Include All Properties Needed to Underground Utilities on Balboa Blvd. Work with SCE to Create Logical Boundaries (i.e., not leaving only one pole in alley) Account for Utility Distribution and Support Guy Wire Needs Cost Analysis Current 2013 Rule 20A Balance $1,705,300 5 -Year Mortgage $1,374,805 Funding Available Now $3,080,105 Plus 3 increment years @ ^'$274,960 $824,880 Total Funding Available in 2016 $3,904,985 Estimated Protect Cost Option 1 Option 2 Total Project Cost Estimate $4,400,000 $5,500,000 Mainline Design /Construction $3,800,000 $4,600,000 Private Service Conversion * ** $600,000 $900,000 (approx. 150 properties) (approx. 225 properties) Service Conversion Cost Borne by Property Owners or City? * ** Private conversion costs average ^'$4,000 per typical SFR Staff Recommendations Form UUD 22 Based on Option 1 Boundary Require Property Owners to Bear Private Conversion Cost (From Right -of Way Line back to their Service Panel) What's next... Work With SCE to Develop Exact Boundary Map. Prepare and Send Out Notice of Public Hearing. Hold Public Hearing to Establish UUD No. 22 through City Council Resolution. Begin Underground Utility District Design. Continue to Acquire Rule 20A funds, as available so as to Start Next Rule 20A District. Schedule Option 1 District Formation Public Hearing Design Undergrounding Construction Private Conversion Pole Removals /Completion Option 2 District Formation Public Hearing Design Undergrounding Construction Private Conversion Pole Removals /Completion October 2013 Spring 2015 Spring 2016 Spring 2017 F a l l 2017 October 2013 Spring 2015 Spring 2016 F a l l 2017 Spring 2018 Questions &Comments s, c0 Your Public Works Department A Well- Engineered Machine Protecting and Providing Quality Public Improvements and Services