Project Status Update
Regulatory Permitting
✓ CEQA Completed
✓ Secured Regional WQ Control Board 404 Permit
✓ Secured Army Corps 401 Permit
✓ Obtained Boundary Agreement with CA State Lands Commission
✓ Project Approved by California Coastal Commission
❑ California Coastal Commission Staff Issue CDP
❑ Issue 90-day notice to residents
Three Other Optional Separate Items
Pursuing CLUP Amendment for desired Tower Height
Negotiating New Girl Scout House Agreement
Pursuing Possible Purchase Adjacent SCE Property
� 2EW �R>
a �
C9(i FoaN�'
Project Status Update
Project Design Packaqes
Demolition Permit Ready for Issuance
Marina /Seawall Design Packaqe is 95% Complete
Dry Utility Underqroundinq Packaqe 75% Complete
Buildings /Park Design is 60% Complete
Dock Design Packaqe 30% Complete
Getting Underway
Beginning Constructability Review and Construction Phasing /Scheduling
Coordination
Selection and Retention of Construction Manaqement Firm
Contractor Pre-Qualifications
4 SEW ART
u
C9[iFOM1N
IF
Construction Management Services
Selection Process
Selection
and
Retention
of Construction
Management
Firm
➢ Quality
Based Selection
Process (California
Mini Brooks Act)
' 18 Construction Management Consultants were Considered
' 10 Request for Proposals (RFPs) were Issued
' 6 Proposals were Received & Reviewed
' 3 Consultant Teams were Invited for Interviews
' 1 Consultant Team was Unanimously Selected as Most Qualified
4 SEW ART
o
u � i
C9[�FOM1N`'
Construction Management Services
Selection Process
SELECTION PANEL
II . 7 - TJI:2:I01
Fm 1 e 11 e
CRITERIA
Laura Detweiler
Iris Lee
Construction Management Capabilities & Style
Qualifications & Technical Capabilities
Previous Firm /Team Experience
Cost Control /Financial Management
References
Marina Park Protessional Construction Management Services
GRIFFIN STRUCTURES, Inc. (Laguna Beach)
' Specialize in Municipal Buildings and Parks
' Thirty-two (32) years in Orange County
' Completed 80+ Parks, 20 Community Centers
' Highly Recommended by Local Agencies
' Retained by Girl Scouts of OC as Program /CM for New Marina Park GS
House
TRANSYSTEMS (Long Beach)
' Specialize in Coastal /Harbor Development, Marina Design &
Construction Management
' More than 25 California Marinas Completed
' Award-Winning Marinas Southern CA
4 SEW ART
o
u � i
C9(i FoaN�'
Construction Management Services
Selection Process
Reference Checks done by City staff
• City of Brea • City of Santa Ana
• City of Irvine • City of Fullerton
• City of Hesperia • City of Lake Forest
• City of Oranqe • City of Tustin
• City of San Dimas • Good Standinq with CA Contractor's
• A+ Ratinq Better Business Bureau Licensing Board
Frank Martinez
Griffin Exec VP
Steven Schmucker
TranSystems VP
r
Jon Hughes
Griffin
uction Management Services
Gary Chubb
Griffin
Dave Well
Public Works Director
Iris Lee
Senior Civil Engineer
I
Glenn Estrella
TranSystems
nt Services
Serve as Extension of Staff to Manage Construction of Marina Park Project
• Provide Pre-Construction Value Engineering (VE), Constructability Reviews & Coordination
of the Bid Packages.
• Pre-Qualify Contractors in Advance of the Bidding Process.
• Manage the Public Bidding and Award Process.
• Conduct On-Site Administration, Observation and Management.
• Continually Manage Project Construction Cost and Control.
• Continually Manage. Analyze and Update Construction Schedule and Coordinate Phasing
Plans.
• Provide Quality Assurance and Quality Control.
• Hold, Manage & Document Weekly Construction Coordination Meetings with the
Contractor, Design Consultants, and City.
nt Services
• Review, Approve, and Process Proqress and Final Payment Invoices.
• Manage, Track, Follow-Up, Closeout all Requests for Information (RFIs),
Submittals,..
• Review Chanqe Orders and Facilitate Negotiations.
• Coordinate Enerqy Efficiency, LEED, and Operation Efficiency.
• Provide & Arrange for Specialty Inspection Services, Testing, & Quality Control
Items.
• Provide Post- Construction Services, includinq Construction Punch-List
Manaqement & Completion, 90 and 360-day follow-up Punch Lists.
• Assist City Staff and Design Team with FF &E Coordination and Installation.
• Manage Final Completion Processes. Project Acceptance, & Close-Out.
� 2 R>
Fees
ui
C9L�/F„o QN� Marina Park Professional Construction Management Services
Total Not-To-Exceed Project Fee Proposed
$1,368,100
Staff & Griffin /TranSystems Agreed to 10.6% Reduction or -$145,240
Final Total Project Not-To-Exceed Fee
$1,222,860
■ Negotiated Fee is Very Comparable and In-Line with other Top Two Firms
■ Fee in the lower Industry Ranqe at 5.8% of Estimated $21,000,000
Construction Cost
?R Marina Park Project
Professional Construction Management Services
Questions or Comments?
* Representatives and proposed Team Members from both Griffin
Structures and TranSystems are also available tonight for questions.