HomeMy WebLinkAbout14 - Big Canyon Reservoir - Award of C-5027= CITY OF
NEWPORT REACH
[I FOP
City Council Staff Report
Agenda Item No. 14
February 26, 2013
• ' '1��ll1G1' 7 L0I][1111
FROM: Public Works Department
David Webb, Public Works Director
949 - 644 -3311, dawebb()newportbeachca.gov
PREPARED BY: Michael J. Sinacori, P.E.
949 - 644 -3342, msinacori(anewportbeachca.gov
APPROVED: �✓a G� 1r.iM
v
TITLE: Big Canyon Reservoir Floating
Contract No. 5027
ABSTRACT:
Cover Replacement - Award of
The Big Canyon Reservoir (BCR) in Corona del Mar is a 200 - Million Gallon domestic water
reservoir which serves the entire City of Newport Beach and is equipped with a floating
cover. The floating cover has shown signs of extensive deterioration and inspection
reports have recommended that it be replaced. Staff received favorable construction bids
for the BCR Cover Replacement Project and is requesting City Council's approval to award
a contract to MPC Containment International (MPC).
RECOMMENDATIONS:
1. Approve the project drawings and specifications.
2. Award Contract No. 5027 to MPC for the total bid price of $5,720,500.00 and
authorize the Mayor and City Clerk to execute the contract.
3. Establish a contingency of $300,000 to cover the cost of unforeseen work not
included in the original contract.
4. Approve Budget Amendment No. 13BA- 033appropriating $2,347,723.00 from the
Water Enterprise Capital Improvement Fund (510) to the Big Canyon Cover
Replacement CIP Account No. 7511- C6002011.
FUNDING REQUIREMENTS:
Upon approval of the proposed Budget Amendment, sufficient funding will be available for
the award of this contract. Funding in the amount of $3,932,814.00 is currently budgeted
for this project in the FY 12 -13 CIP budget. This budget amendment essentially advances
necessary water CIP funding to replace this cover ahead of the Master Plan schedule of
FY 2025/26 due to the pre- mature failure of the existing cover material. As a result of this
1 of 4
Big Canyon Reservoir Floating Cover Replacement - Award of Contract No. 5027
February 26, 2013
Page 2
advancement of funding, it will be necessary to postpone or adjust the amount of Master
Planned water main replacement work over the next couple of years, including lines in the
Newport Heights and Via Lido areas. Staff is in the process of reevaluating water CIP
funding needs to ensure the Master Planned projects are being completed in a timely
manner. The following funds are planned to be expensed:
Account Description
Water Enterprise — BCR Cover
Proposed uses are as follows:
Vendor
MPC Containment Int.
MPC Containment Int.
MWH Global
Various
DISCUSSION:
Account Number
7511- C6002011
Purpose
Construction Contract
Construction Contingency
Const. Support Services
Printing & Incidentals
Total:
Amount
$ 6,280,537.00
Amount
$ 5,720,500.00
300,000.00
250,037.00
10,000.00
$ 6,280,537.00
The City -owned and operated BCR is a 600 -acre foot (200M- gallon) potable water storage
reservoir located in Corona del Mar. This reservoir at full capacity provides enough water
to supply the City with 10 days of average water usage. This facility was originally
constructed in the early 1960's as a main delivery point for imported water from the
Metropolitan Water District. When it was constructed, an open water reservoir was a more
typical and acceptable facility. However, as water quality standards have became more
stringent over the years, the Department of Health Services (DHS) mandated that the City
cover the reservoir or abandon the facility. In 2005 the City completed the installation of
the current floating cover to satisfy this state requirement.
The cover was intended to last 20 years; however, City staff noticed a significant amount
of degradation to the cover after approximately 5 years of the 20 -year lifespan. In
December of 2011, the City filed a complaint against the contractor and subcontractors
associated with the manufacturing and installation of the BCR cover. In summary, the
City's complaint alleges the contractor and subcontractors failed to properly manufacture
and install the cover. Thus they violated contractual and other legal duties to the City. The
litigation is still ongoing.
Due to the significant amount of degradation, staff and contract inspection firms
recommend replacing the cover to avoid a failure that may result in taking the reservoir out
of service and possibly interfering with normal water system operations. The project
contract documents were completed in the fall calling for replacement of the existing
polypropylene cover with a new Chlorosulfonated Polyethylene (CSPE) cover. The
project also includes the introduction of a new baffle curtain to improve circulation
throughout the reservoir.
CSPE cover material has been utilized in the water industry for more than 40 years.
Polypropylene has been used for just over 20 years. The City chose polypropylene in
2004 due to the lower cost, lighter weight and expected 20 year lifespan. Unfortunately,
2 of 4
Big Canyon Reservoir Floating Cover Replacement - Award of Contract No. 5027
February 26, 2013
Page 3
the polypropylene cover material experienced premature failure. Staff presented the
options to the Council Finance Committee on September 12, 2012, and recommended
proceeding with the cover replacement project utilizing the longer lasting CSPE material,
with an expected lifespan of 30 years. After their review, the committee concurred with the
staff recommendation.
At 10:00 A.M. on February 12, 2013, the City Clerk opened and read the following bids for
this project:
BIDDER
AS -BID AMOUNT CORRECTED AMOUNT
Low MPC Containment Int.
$5,720,500.00
2 Layfield
$5,799,528.00
3 SCCI Spiess Const.
$6,656,500.00
4 Vido Samarzich, Inc.
$7,478,000.00
The low total bid amount is 12 percent below the Engineer's Estimate of $6,500,000. The
low bidder, MPC possesses a California State Contractors License Classification "C -61" as
required by the project specifications. A check of the contractor's references indicates
satisfactory completion of similar projects for other public agencies. The work necessary to
complete this contract consists of removal of the existing polypropylene cover, installation
of a new CSPE floating cover, side slope chafer, a water quality separation baffle and
other incidental work to complete the replacement. Project plans call for work to be
completed within 175 working days, which includes time for material manufacturing and
fabrication.
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this project exempt from the California
Environmental Quality Act ( "CEQA ") pursuant to Section 15302(c) (Replacement and
reconstruction of existing utility systems and /or facilities involving negligible or no
expansion of capacity) of the CEQA Guidelines, California Code of Regulations, Title 14,
Chapter 3, because it has no potential to have a significant effect on the environment.
NOTICING:
This agenda item has been notico according to the Brown Act (72 hours in advance of the
meeting at which the City Counc/f onsiders the item).
Submitted
4
Public Works Director
Attachment: A. Location Map
3of4
A
OA
A
PROJECT LOCATION MAP ATTACHMENTA
���P O
010
�O ZIP
SAN /
81G CANYON RESERVOIR i
vp
G �
Z
f� y
04� I WNp
R
q0
qq
J
O -
000 e
BIG CANYON RESERVOIR FLOATING COVER REPLACEMENT
City of Newport Beach NO. BA- 13BA -033
BUDGET AMENDMENT
2012 -13
EFFECT ON BUDGETARY FUND BALANCE:
Increase Revenue Estimates
X Increase Expenditure Appropriations AND
Transfer Budget Appropriations
SOURCE:
from existing budget appropriations
from additional estimated revenues
PX from unappropriated fund balance
EXPLANATION:
This budget amendment is requested to provide for the following:
AMOUNT: $2,347,723.00
Increase in Budgetary Fund Balance
X Decrease in Budgetary Fund Balance
No effect on Budgetary Fund Balance
To increase expenditure appropriations from advances in Water Capital CIP funding allocations for FY13 -14
to replace the Biq Canvon Reservoir Cover.
ACCOUNTING ENTRY:
BUDGETARY FUND BALANCE
Fund Account
510 3605
REVENUE ESTIMATES (360 1)
Fund/Division Account
EXPENDITURE APPROPRIATIONS (3603)
Amount
Description Debit Credit
Water Capital Fund - Fund Balance $2,347,723.00 '
Description
AvIometic
Signed: //a
v FinaYrcial Approval: Finance Director
Signed:
Adminisha ive Approval: City M ager
Signed:
City Council Approval: City Clerk
$2,347,723.00
1'2.
Date
2 11 .-' z
Date
Date
Description
Division
Number
7511 Distribution & Piping
Account
Number
C6002011 Big Canyon Reservoir Cover
Division
Number
Account
Number
Division
Number
Account
Number
Division
Number
Account
Number
Division
Number
Account
Number
AvIometic
Signed: //a
v FinaYrcial Approval: Finance Director
Signed:
Adminisha ive Approval: City M ager
Signed:
City Council Approval: City Clerk
$2,347,723.00