HomeMy WebLinkAboutSS2 - Master Fee Schedule Update - PowerPointReceived After Agenda
10.8.13 Item #SS2
Municipal Fee Schedule Update
City Council Study Session
October 8, 2013
City of Newport Beach
F'i're Department
Summary of Proposed Fee
Schedule
A number of fees are decreasing or are being
eliminated. No new fees proposed.
In furtherance of Council policy, fee schedule
aligns revenues with the actual (direct and
indirect) costs of providing services.
Fees are better defined to reflect the nature of
work performed.
Proposed Changes '
}
U "
Fire Standby Services
Junior Guards
Life Safety Planning
and Development
Life Safety Inspection
Services
• 20 (24%) Change %.
Calculation Method
• 19 (230) Increasing
• 24 (290) Decreasing
• 21 (26 %) Eliminated
• 2 (2 %) No Change
• 3 (4 %) Combined
w /existing fees
• All lower than
OCFA Fees
• No New Fees
Proposed Changes
• Fire Standby Services
• Junior Guards
• Life Safety Planning
and Development
• Life Safety Inspection
Services
Emergency Medical
Services
Presentation Outline
Background (authority, Council policy, fee
administration)
Fee for Service Methodology
Proposed Fees by Service Category
Background
Purpose
Authority - NBMC 3.36.030 mandates 100% cost recovery
(except for subsidies identified in the code)
Council Policy Directive - 15 -Point Fiscal Sustainability
Plan:
Item 11: Establish appropriate cost - recovery targets and adjust
fee structure to ensure that the fees continue to meet cost
recovery targets.
Council Policy Directive - F -4 Revenue Measures:
The Finance Department may study, internally or using an
outside consultant, the costs of providing services and
recommend fees to each department.
Fee for Service Methodology
MGT of America performs cost of service analysis for
developing user fees.
MGT Scope of Work:
• Calculate the fully burdened cost of providing (labor -
based) user fee services;
• Applied fully burdened labor rates to time requirement
estimates and annual workload figures;
• Review and cross check results to ensure data validity;
and
• Benchmark existing and proposed fees against those
charged by the OCFA.
Phased Approach - Fire fees last updated in 2008
Fee Calculation Example o�
(Fire Pump Installation - Inspection) Cri
Fee Calculation Example
(Fire Pump Installation - Inspection)
Step 1: Calculate Hourly Staffing Rates and Burdened Factors
Salary and Bens
Hourly Rate
Administrative Assistant $51.10
Burdened Factors
Hourly Rate
+ $60.42
Total
Burdened Rate
_ $111.51
Life Safety Specialist II $71.92 + $85.04 = $156.96
Fee Calculation Example o�
(Fire Pump Installation - Inspection) Cri
Step 2: Calculate Time Spent on the Service
Task Descriotion & Time Estimates (in minutes):
Research/
Permit/
Total
Re-
Counter
Clerical
Meeting
Phone
Re-
Time
Inspection
inspection
Drive Time
Time
Support
Time
Time
issuance
Min
Administrative Assistant
5.00
5.00
Life Safety Specialist II
100.00
20.00
10.00
130.00
Fee Calculation Example o�
(Fire Pump Installation - Inspection) Cri
Step 3: Calculate the Cost to Provide the Service
Proposed Fee $349.00
Fully
Total
Burdened
Total Cost
Total
Hours per
Hourly
to Provide
Minutes
Unit
Rates
the Service
Administrative Assistant 5.00
0.08 X
$111.51 _
$9.29
Life Safety Sepcialist II 130.00
2.17
$156.96
$340.08
Proposed Fee $349.00
Proposed Fees by Service
Category
Fire Safety Services
Junior Guards
Life Safety Planning and Development
Life Safety Inspection Services
e JQTeT)/� �VIGeS
�4:,4
0
Fire Safety Services
Fee Service Description: Fire personnel rates for
reimbursable services. These costs include staff time,
equipment, materials, and the associated overhead
provide requested fire safety services.
Proposed Changes: Certain hourly rates within this
category are deceasing while others are increasing to
reflect the current cost of staff time, equipment,
materials, and associated overhead.
w
Junior Guards
U
Junior Guards
Fee Service Description:
Provide
children with
training
ocean safety
and
responding
to
emergency
situatior
Proposed Changes: Non - resident fee increasing $44 to
align revenues with the actual cost of services. Resident
rate subsidy increased to 17.5% per Finance Committee
recommendation.
r,f
yi
'M
e 03are
De
,r Planning a, nC
PlonmPnt
Life Safety Planning and
Development
Fee Service Description: Staff services associated witr
new construction and tenant improvements. Services
include plan review and site inspection to ensure
compliance with fire and life safety minimum
requirements.
Proposed Changes:
Fees structure aligned with OCFA and will better define the
nature of the work performed.
Fees based on actual staff time to perform plan review and
inspections, not percent of building permit fee.
Due to change in methodology, it is difficult to predict
exactly which and how many fees will increase or decrease,
but staff has made likely assumptions in examples that follow.
Life Safety Planning and o�
Development Cont. Ui
Example 1: Plan review inspection of a five story 20,838
square foot retail /residential mixed use development:
Plan Review
Architectural
Fire Sprinkler System
Fire Underground Service Line
Fire Alarm System
Tota I
CURRENT PROPOSED VARIANCE
$2,710
$934
- $1,776
$191
$675
$484
$60
$342
$282
56
426
370
$3,017
$2,377
-$640
Life Safety Planning and ��'
Development Cont.
Example 2: Applicant seeking plan review and safety
inspections for a 4 unit residential $150,000 improvement
project:
CURRENT
PROPOSED
(VALUATION
BASED)
(FLAT FEE)
VARIANCE
Plan Review
$354
$259
-$95
Inspections (estimated)
$985
$323
-$662
Fire sprinklers Plan review
$102
$176
$74
Fire sprinklers Inspections
$188
$297
$109
Fire service underground plan review
$58
$342
$284
Fire Service Underground Inspections
160
349
189
Total
$1,847
$1,746
-$101
•Iz
FA
•
oA
}e
U %d
Life Safety Inspection
Fee Service Description: Staff services associated with
providing annual and special event permits, state
mandated inspections, hazardous material inspection!
and state - mandated operating permits.
Proposed Changes:
Various fees decreasing due to change in fee calculation
methodology.
Other fees increasing primarily to align revenues with the
actual cost of services.
Several fees are eliminated due to redundancy and
combination with other existing fees.
Life Safety Inspection cont. �I
Example 1: Inspection of auto dealer /service facility
that has 10 chemicals that require inspection
CURRENT PROPOSED VARIANCE
Inspection of 7 -10 chemicals each
greater than or equal to 55
$696 $162 -$534
gallons, 200 cubic feet, or 500
pounds
TOTAL $696 $162 -$534
ft
9 �
Life Safety Inspection cont. �I
Example 2: Annual permit renewal that requires
inspection of dry cleaning plant with 2 or fewer
machines using hazardous solvents
Operational permit renewal - dry
cleaning plants with 1 -2 machines
TOTAL
CURRENT
ME
$138
AN
PROPOSED
$114
$114
1'1
VARIANCE
-$24
Life Safety Inspection cont. �I
Example 3: Special event that requires a tent
inspection
CURRENT PROPOSED
Operational permit $162 $140
Special event permit $195 $140
Inspection fee during business hours* 240
Total $597 $280
`Cost of inspection is included in the proposed special event permit fee
VARIANCE
-$22
-$55
-$240
-$317
Conclusion and Questions
,4a
Municipal Fee Schedule Update
City Council Study Session
October 8, 2013