Loading...
HomeMy WebLinkAboutSS2 - Master Fee Schedule UpdateReceived After Agenda Printed CITY OF Q SEW PORT a NEWPORT EACH Study Session Staff Report Agenda Item No. SS2 October 8, 2013 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Finance Department Dan Matusiewicz, Finance Director 949 - 644 -3123, tmatusiewicz @newportbeachca.gov PREPARED BY: Evelyn Tseng, Revenue Manager APPROVED: A.A TITLE: Master Fee Schedule Update - Fire Department ABSTRACT: Chapter 3.36 of the Newport Beach Municipal Code ( "Municipal Code ") requires that user fees for municipal services be recovered at 100 %, unless otherwise provided for in Municipal Code Section 3.36.030. A comprehensive update to the Newport Beach Fire Department ( "NBFD ") user fees was last completed in 2008. After careful analysis and review by MGT of America, Inc. ( "MGT') and NBFD, staff developed and proposes the attached update (Exhibit "A ") to the Fire fee schedule. The proposed fee schedule reflects costs for work performed and, in furtherance of the City Charter, Municipal Code and the City's 15 -Point Fiscal Sustainability Plan ( "FSP "), aligns revenues with the actual (direct and indirect) cost of providing NBFD services. For example, Fire fees related to planning and development are currently calculated by using a percentage of building permit fees. The proposed fees are based on a flat rate, calculated by estimating staff time for plan review and field inspections. Proposed additional fee line items are not new fees, but are instead the result of an analysis and refinement of the nature of the work performed, which, in turn, more accurately reflects the actual cost of service. The proposed fee schedule does not impose any new fees for service. RECOMMENDATION: Staff welcomes input and recommendations on the proposed Fire fee schedule. Based on the direction of City Council, staff will return at a later date with a proposed Fire fee schedule for formal approval. Master Fee Schedule Update - Fire Department October 8, 2013 Page 2 DISCUSSION: Background The City Council has adopted prudent fiscal policies concerning its investments, reserves, budget administration, competitive contracting, facility replacement planning, and revenue initiatives. The City of Newport Beach's City Charter, Municipal Code and FSP serve as the foundation for the City's financial planning and management. Council Policy F -4 (Revenue Measures) and Item 11 of the FSP requires the City to establish appropriate cost - recovery targets and adjust the fee structure to ensure that fees continue to meet those mandated cost recovery targets. Municipal Code Section 3.36.030 provides that the cost recovery for user services shall be at 100 %, except for the services listed in Exhibit A of Section 3.36.030. As a general rule, the City may not recover from service users more than the cost incurred by the City to provide the service. The NBFD fees under current consideration are categorized and described in the sections that follow. NBFD provides several different services to the public and has also established programs for the benefit of certain individuals and /or entities that do not necessarily benefit the general public. The fees associated with each of these services and programs are charged directly to the parties requesting the specific services, participating in these programs or incurring these costs. The actual fees charged for each service are listed in the master fee schedule, which is established by resolution of the City Council. In order to establish fees on the basis of full cost recovery, it is necessary to determine the cost of services. In 2010, the City entered into an agreement with MGT for a phased six -year comprehensive review and update of the City -wide cost allocation plan and direct user fee calculations, by department. The current phase of this agreement required MGT to perform a comprehensive review of the NBFD user fees. Pursuant to the City's cost recovery policies, staff was tasked with accurately reporting the true cost of providing NBFD user fee - related services, and analyzing whether current fees needed to be updated as a result of MGT's findings. As part of this process, NBFD reviewed the current fee schedule and concluded that it no longer accurately reflected the services being provided by the NBFD. Using the Orange County Fire Authority ( "OCFA ") fee schedule as a model for analyzing Life Safety Planning, Development, and Inspection Service fees, NBFD provided MGT with the list of services to be cost - studied. Working with Fire Department staff, MGT performed the following tasks for all fee categories: • Calculated the fully burdened cost (labor- based) to provide user services; • Applied fully burdened labor rates to time requirement estimates; Master Fee Schedule Update - Fire Department October 8, 2013 Page 3 • Reviewed and cross checked results to ensure data validity; and • Benchmarked existing and proposed fees against those charged by the OCFA. NBFD staff then reviewed MGT's findings for accuracy and reasonableness, and based upon this review, made its fee and subsidy recommendations pursuant to NBMC Section 3.36.030. On June 24, 2013, the Finance Committee reviewed the proposed fee schedule and offered its recommendations. The attached proposed fee schedule and this staff report address the recommendations by the Finance Committee. As a result of this review, staff proposes an update for all Fire Department fees with the exception of fees for Emergency Medical Services. The exception is recommended because a certified public expenditure program (State Plan Amendment 09 -024), just recently approved by the federal government and adopted by the State on September 4, 2013, introduces a new process for eligible public ambulance providers to apply for supplemental payments for Medi -Cal claims without cost to the State General Fund. Participation is voluntary, but in order to qualify, the City must adopt the State's standardized methodology for calculating emergency transportation services. This new legislation could potentially decrease the City's subsidies to Medi -Cal through funds provided by the State's certified public expenditure program. The City meets the eligibility requirements for participation. Staff intends to bring Emergency Medical Services fees to Council early next year, after reviewing the full impacts of the federal program. The recommended modifications to fees are attributable to utilizing a methodology to calculate fees based on increases in direct and indirect costs since the last fee study. Indirect overhead costs are costs that are not directly accountable to the expenses incurred for a user fee service, but are necessary and contribute to the total cost of that service delivery, i.e. - managerial administration, utilities, insurance, legal, information technology, payroll, and finance, which are all valid components to the analysis of what it costs the City to provide municipal services. The update recommended by staff will include an increase in other non -Fire related fees by the Consumer Price Index ( "CPI ") - All Urban Consumers for the Los Angeles - Riverside- Orange County area from April to April of each year. As a result, staff recommends that these fees be adjusted 2.44% upon Council's adoption of the Master Fee Schedule. Fire Safety Services (previously referred to as "Fire Response Services ") (Exhibit "B ") The Fire Safety Services section of the proposed fee schedule lists the hourly rates for all fire personnel that may be called upon to provide reimbursable services such as hazardous material incident response, private lifeguard services, and fire safety officers Master Fee Schedule Update - Fire Department October 8, 2013 Page 4 at special events that are not required to be permitted pursuant to Municipal Code Section 11.03 - Special Events. This cost analysis reflects salaries, equipment, materials, and the associated overhead to provide these standby safety services. Certain hourly rates within this category are decreasing between $17 and $25, while others are increasing between $9 and $188, to reflect the current cost of staff time, equipment, materials, and associated overhead. The largest increase, $188, is associated with the cost of a fire truck and four personnel. Staff proposes adding the positions indicated below to provide more cost information for potential users of the services that would require them. Life Safety Specialist II Lifeguard I Lifeguard Officer Lifeguard II Lifeguard Captain Rescue Boat (two persons) Lifeguard Battalion Chief Junior Guards Program (Exhibit "C ") The Newport Beach Junior Lifeguard Program was started in 1984 with about 50 participants made up of mainly friends and family of then current City employees. The program grew over the next decade into hundreds of participants until it finally reached over 1,000 participants in 1997. The program fills to capacity every year, which included over 1,409 participants this year - the most ever in a single session. Since its inception, it is estimated that over 28,000 children of our community, ages 9 -16, have benefited from this program. The program reaches out to the community by hosting events like the Hot Dog Dinner, Monster Mile, and Graduation, where attendance is generally over 5,000 per event. Through extended families and friends, the Junior Lifeguard Program has become one of the most popular programs the City of Newport Beach offers annually. The objective of the Junior Guard Program is to provide children between the ages of 9 and 15 with training in ocean safety. The program content consists of 50% ocean safety, 15% physical development, 15% personal development, 10% emergency response skills, and 10% competition. To accomplish the program's goals, the Fire Department utilizes a combination of a classroom type environment and outside activities to teach ocean safety and provide instruction to the Junior Guard how to properly prevent injuries and respond correctly in emergency situations. MGT's analysis reflects that the cost of the Junior Guard Program has increased from $809 to $853. Residents have historically been provided an approximate 15% discount from the cost of the Junior Guard registration fee. NBFD recommends continuing this subsidy to encourage local participation. The Finance Committee has recommended Master Fee Schedule Update - Fire Department October 8, 2013 Page 5 that the Junior Guard — Resident registration fee be reduced to $700, rather than using the 15% discount, which would have been $725.00. Staff is therefore recommending a 17.50% subsidy, which will establish the Junior Guard — Resident fee at $700. Staff also recommends the inclusion of a Junior Guard — Administrative Fee ($200) to the fee schedule for any cancellations prior to June 1 (if the applicant cancels after June 1, the entire Junior Guard fee is forfeited). This Administrative Fee has historically been assessed as a matter of policy and its inclusion in the master fee schedule will provide more transparency. The Administrative Fee discourages facetious registrations, which may shut out other participants in the program, and helps to reimburse the City for equipment and items already delivered based on the number of registrations. Under current policy, the entire Junior Guard fee may be refunded due to unforeseen circumstances, i.e. — valid medical or hardship reasons. Life Safety Planning and Development (Exhibit "D) The Life Safety Services Division focuses on educating the community about the benefits of proper safety practices and identifying and eliminating all types of hazardous conditions, which pose a threat to life, the environment, and property. Furthermore, proper and effective enforcement of fire and life safety codes helps prevent fires from starting and minimizes the size and impact of fires that cannot be prevented. For example, hazardous processes in a manufacturing building can increase the probability of a fire starting, or a small fire in a crowded theater can have a devastating impact on the occupants. Fire codes decrease direct and indirect costs of fire by reducing the amount of fire associated damage. Life Safety Planning and Development fees are imposed by NBFD for services associated with new construction projects or facility improvements. These services include building plan reviews and on -site inspections to ensure compliance with the California Fire Code ( "CFC ") and the Municipal Code. The proposed fee structure is based upon OCFA's fee schedule, which is relied upon by 23 of the 34 cities in Orange County. Because the proposed service types and descriptions are similar to most other county jurisdictions, the new fee structure will be more easily understood and utilized by the developer /builder community. Staff recommends revising the current fee schedule to better reflect the actual work performed and align revenues with the actual costs associated with providing these services. These costs include staff time for plan review and field inspections and will no longer be based on a percentage of building fees. The additional service line items that appear in the proposed schedule are NOT new fees, but are the result of refining the nature of the work performed, which in turn, more accurately reflects the actual cost of the service being performed. Master Fee Schedule Update - Fire Department October 8, 2013 Page 6 Because Life Safety Planning and Development fees are currently based on a percentage of permit fees, and the proposed fees are based on actual staff time, it is difficult to predict exactly which and how many fees will increase or decrease as the result of the proposed changes. However, to get a feeling for the impact of the change, staff created the sample table below using actual permit examples, to compare the costs of service between the current fee schedule and the proposed fee schedule. As column E indicates, some of the sample fees are projected to increase between $130 and $478, while other fees, such as Plan Review Fire and Life Safety will decrease as the result of changing the fee calculation methodology from a percentage of building fees to the fully burdened cost of providing (labor- based) user fee services. Although several fees may increase, the updated methodology is more cost efficient when compared to OCFA for similar services. According to the comparison table, the examples below are projected to be between $57 and $246 lower than OCFA's current fees (see column G). Fee Comparison Chart: Current to Proposed - Proposed to OCFA A B c D E F G Name Description Proposed Current Fee: Fee Difference: OCFA Difference: Fee: Cost of Actual Proposed (C) - Fee OCFA (F) - Service Example - Current (D) Proposed Based Valuation (E) Based Fixed Fire Fire sprinkler Protection monitoring Extinguishing system, water Systems Flow & tamper $300 $170 +$130 $415 -$115 switches (includes 5 devices) Fixed Fire Tenant Protection Improvement Extinguishing NFPA 13/138 $339 $94 +$245 $396 -$57 Systems fire sprinkler system: 4 -20 heads Fire Alarm Fire alarm Systems system: 11 -60 $631 $153 +$478 $694 -$63 devices Fire and Life Mixed Use Safely Plan (A,B,S) Review Occupancy $1,009 $2,667 - $1,658 $1,255 -$246 >10.000 square feet After conferring with City staff and reviewing the proposed fees, the Director and Governmental Affairs Officer of the Building Industry Association ( "BIA ") of Orange Master Fee Schedule Update - Fire Department October 8, 2013 Page 7 County appreciated the transparency provided by staff, and understood the methodology used to calculate the proposed fees. Staff also met with representatives of The Irvine Company to review the proposed fees. Additionally, staff worked directly with several stakeholders from a user group comprised of local architects, builders and designers and incorporated their suggested modifications. Life Safety Inspection Services (Exhibit "E ") These fees reflect the cost of services to provide various services including issuance of annual operational permits, special event permits, and providing State mandated inspections, and other inspection services related to the hazardous material inventory disclosure program. Although a few increases are proposed based on the actual cost of service, as with Life Safety Planning and Development, NBFD's methodology reflects a cost savings when compared to OCFA for like services (see comparison table below). The City's sample fees below are projected to be between $146 and $2,649 less than OCFA's current fees (see column G). Life Safety Inspection Services - Fee Comparison Chart A B C D E F G Name Description Proposed Fee: Current Fee: Fee Difference: OCFA Difference: Cost of Service Actual Proposed (C) - Fee OCFA (F) - Based Example - Current (D) Proposed Valuation (E) Based Operational Liquefied Permit Level 1 Petroleum Gas $140 $162 -$22 $418 -$278 LPG)Issuance Hazardous Operational Materials - $192 $138 +$54 $338 $146 Permit Level 2 Corrosive Renewal Pyrotechnics — Special Events ground display $306 $530 base 4779 $657 -$351 < 15 minute fee + hourly duration Pyrotechnics — Special Events aerial bursts $778 $530 base -$307 $3,427 - $2,649 > 15 minute fee + hourly duration Mandated Inspections High Rise— Residential $964 $815 +S149 $1,120 $156 Mandated Ins pections High Rise— Buildings $964 $1,160 $196 $1,120 $156 Master Fee Schedule Update - Fire Department October 8, 2013 Page 8 Operational Permits These annual permits are required pursuant to the CFC in order for certain businesses to operate in the City. No new operational permits are proposed by City staff. Level 1 permits are required for simple operations that need minimal staff time to review. The CFC defines these operations as those involving cutting and welding carts, dry cleaning plants with 1 to 2 machines, liquefied petroleum gases and tents. By streamlining the review of these operations, staff was able to reduce the amount of time estimated for Level 1 Operational Permit reviews. Based on this cost -of- services analysis, staff recommends that the City reduce the fee for new Level 1 permits from $162 to $140 and reduce the fee for annual renewals from $138 to $114. Level 2 permits are required for complex operations often requiring many hours of staff time to complete. Staff recommends increasing the fee for new Level 2 permits from $162 to $258 and increasing the fee for annual renewals from $138 to $192. The proposed fee increases will, in furtherance of Council policy, align revenues with the actual costs associated with providing review services. These costs cover the staff time necessary to review these complex operations. Special Event Permits Special event services are related to one -time events that require inspection and permitting by NBFD due to the type, size, and nature of the event. The special event permitting process begins with an application to the Recreation & Senior Services Department, and the application is then routed to NBFD for fire inspection services, recommendations and general oversight. Not all special event permits require NBFD services. Staff recommends the reduction of the single event permit from $195 to $140 and the public display (small ground based firework display) from $530 +hourly to a flat fee of $306 to align the cost with actual amount of staff time to review these permits. Staff also recommends changing the fee for the public display of fireworks (greater than 10 minutes) from a $530 base fee + hourly to a flat fee of $778. This change will result in lower fees due to the elimination of the hourly component and NBFD's streamlining of its workflow. Staff recommends an hourly rate -based "Level 3" special event permit fee for large scale events. This modification is consistent with the current practice of hourly billing for NBFD personnel for events of this size. Level 3 inspections typically consist of attending planning meetings, the issuance of required permits, and required field inspections. Finally, staff recommends the elimination of numerous special permit fees due to the Master Fee Schedule Update - Fire Department October 8, 2013 Page 9 limited frequency and duration of such activities and, as stated above, NBFD's improvement of its staffing workflow. Examples (special event fire fees only, does not include other departmental fees): Level 1 or 2 Permit without tents or candles, on a weekday: Current Proposed Special Event Permit fee: $195 Single Event Permit fee: $140 Inspection fee: $240 Total: $435 Total: $140 Level 1 or 2 Permit, with tents, on a weekend: Current Special Event Permit fee: $195 Operational Permit: $162 Weekend inspection fee (for 2 hours): $530 Total: $887 Proposed Special Event Permit fee: $140 Operational Permit, Level 1 (tent): $140 Weekend inspection fee $312 (hourly for Life Safety Specialist II, 2 hour minimum, 2 hours x $156.00) * Note: if on a weekday during business Total: $592 hours, the inspection fee is $240 with no minimum. * Note: if on a weekday during business hours, no separate inspection fee is imposed and the total is $280. Level 3 Permit, with tents, on a weekend (ex. Race for the Cure): Current Proposed (These are time estimates based upon this Special Event Permit fee: $195 year's event, actual fees will vary) Weekend, Holiday request: $530 Hourly for Life Safety Specialist II: $156 Total: $725 Process permit: 1 hour Meetings: 1 hour Pre -event meeting: 1 hour Inspection: 2 hours Total (5 hours x $156): $780 Master Fee Schedule Update - Fire Department October 8, 2013 Page 10 Non - Permitted special events (ex. HOA barbecue with tent with inspection during business hours): Current Proposed Operational Permit: $162 Operational Permit, Level 1: $140 Inspection fee: $240 Total: $140 Total: $402 State Mandated Inspections State mandated inspection fees include the inspection of facilities such as high -rise buildings, care facilities, hospitals, surgery centers, and hotels. NBFD staff conducts these inspections on an annual basis. Staff recommends the reduction of three fees relating to the inspection of hospitals, high -rise buildings and certain commercial occupancies due to greater staff efficiencies within the NBFD. Staff also recommends combining residential and non - residential inspections as one fee type because the work for each is very similar, and eliminating the 'Places of Assembly" fee because it is captured under the existing operational permit Level 2 fee. Due to the staff time required to inspect certain care and hotel /motel facilities, there are seven fees that are proposed to increase between $5 and $187. These proposed fee increases will, in furtherance of Council policy, align revenues with the actual costs associated with providing the inspection services of these larger facilities. Hazardous Material Inventory Disclosure Program Hazardous material inventory disclosures are required by State and Federal statutes. All the fees in this category have been reduced due to staff efficiencies and a change from an annual to triennial inspection cycle as allowed by State statue. No new fees are proposed. Conclusion Based on the input and comments from the Study Session, Finance staff will bring the proposed recommendations to the City Council for formal approval. Master Fee Schedule Update - Fire Department October 8, 2013 Page 11 Prepared by: Evelyn Tseng Revenue Manager Submitted by: Finance Director Attachments: A. Proposed Fire Fee Schedule B. Fire Standby Services C. Junior Guards D. Life Safety Planning and Development E. Life Safety Inspection Services F. Response to BIA Newport Beach Fire Analysis 255 256 257 258 259 260 260 261 262 263 2" 265 2% 267 268 269 270 271 272 273 274 275 PROPOSED FIRE FEE SCHEDULE EXHIBIT 'A" 2012 plus 2013 adjustments Rounded down m nearest dollar Adjustment From Previous rear SERVICE NAME DESCRIPTION Totalfor Basc Total or Base Fee FIRE DEPARTMENT & LIFEGUARDS Fire Safety Services Battalion Chief Unit jone person) 1 Hr. Minimum To The Nearest 15 Min. Increment Over 1 Hr. , Fee Per Hour S 259.00 $ 00.00 Paramedic Unit two persons) I Hr. Minimum To The Nearest 15 Min. Increment Over 1 Hr. , Fee Per Hour $ 378.00 S 101.00 Fire En ne three persons) 1 Hr. Minimum To The Nearest IS Min. Increment Over 1 Mr. , Fee Per Hour $ 575.00 S 156.00 Fire Truck four persons) 1 Hr. Minimum To The Nearest 15 Min. Increment Over I Hr., Fee Per Hour $ 711.00 $ 188.00 Stand-by Firefighter (per person) 1 He. Minimum To The Nearest 15 Min. Increment Over I Hr. , Fee Per Hour 5 135.00 $ 31.00 Life Safety Specialist II 1 Hr. Minimum To The Nearest IS Min. Increment Over 1 Hr. , Fee Per Hour 5 156.00 N/A Lifeguard Officer 1 Hr. Minimum To The Nearest 15 Min. Increment Over 1 Hr. Fee Per Hour $ 138.00 $ 72.00 Lifeguard Captain 1 Hr. Minimum To The Nearest 15 Min. Increment Over 1 Hr. Fee Per Hour $ 161.00 $ 9.00 Lifeguard Battalion Chief 1 Hr. Minimum To The Nearest 15 Min. Increment Over 1 Hr. Fee Per Hour $ 205.00 S3.00 Lifeguard 1 1 Hr. Minimum To The Nearest 15 Min. Increment Over 1 Hr., Fee Per Hour $ 05.00 $ 21.00 Lifeguard II 1 Hr. Minimum To The Nearest 15 Min. Increment Over I Hr. Fee Per Hour $ 09.00 $ 17.00 Rescue Boat two persons) 1 H, Minimum To The Nearest 15 Min. Increment Over I Hr. Fee Per Hour $ 175.00 5 25.00 Emergency Operations Services Advanced Life Support Response & Transport S 359.00 $ Basic We Support - Response & Transport S 203.00 Emergency Arbulance Transportation Transportation Charge $ 72S.00 S Emergency Ambulance Transportation Mileage Charge S 17.00 $ EmergencV Ambulance Transportation Expendable Medical Supplies $ 32.00 $ EmergencV Ambulance Transportation OXygen $ 81.00 Medical Supplies Other Than Expendable Medical Supplies Actual Cost N/A Paramedic Subscription Service Annual Fee - Resident Paramedic Subscription Service Annual Fee - Business +l0 employees Paramedic Subscription Service Annual Fee - Business each additional 10 employees Iunior Guards Program 276 277 278 279 280 281 282 283 284 'f:N Fill 287 288 289 290 291 292 293 294 295 296 297 298 299 PROPOSED FIRE FEE SCHEDULE 2012 plus 2013 adjustments Rounded down Adjustment From to nearest dollar Previous Year TotalBase SERVICE NAME DESCNPTION Total or Base Fee Fee Junior Guard-Resident/City Em to ee Per Participant $ 700.00 5 5.00 Junior Guard- Nonresident Per Participant $ 853. DO 5 44. D0 Administrative Fee Cancellation Per Participant $ 200.00 N/A FIRE DEPARTMENT IS UFEGUARDS Life Safety Planning and Development All Assembly (A), Factory IFI <or equal 10 1500 square feet (also used for Business (B), Mercantile (M), and Storage (S) Plan Review Fire and life Safer a' occu ancies when re aired 5 509.00 N/A All Assembly (A), factory (F) > 1,500 < or equal to 10,000 square leer aggregate (also used for Business (B), Mercantile It. M and Stoca e S occu ances when required) $ 675.00 N/A All Assembly (A), Factory (F)>10,000 s.f. aggregate (also used for Business (8), Mercantile (M), and Storage (S) occupancies when re uiretl 5 1009.00 N/A d. High-Hazard Groups H1 H2 H3 H4 or Laboratory 1. 5 1,369.00 N/A e. Hi -Rise: Structures that are 75 k. or hi her measured from lowest point of fire department access 5 3,340.00 N/A Day Care Educational (E) or Institutional Day Care (14) < 1,000 square feet aggregate or Day Care Educational (EI or 14: f Portable or re- locatable 5 176.00 N/A g' Day Care Educational E or Institutional Day Care N > 1,000 square feet aggregate $ $64.00 N/A h. Educational other than day care S 509.00 NA Residential Rl or Residential R2: Hotels, motels, apartments, condominiums with <or equal to 20 dwelling units per bulltlin $ 259.00 N/A J' Residential R1 or Residential R2: Hotels motels a anments, condominiums with 21- 50 dwelling units per building 5 342.00 N/A E. Residential R1 or Residential R2: Hotels, motels, apartments, condominiums with 51 to 150 dwelling units per building S 509.00 N/A Residential R4: licensed residential care /assisted living facilities and similar uses serving 7 49 clients S 942.00 N/A m' Residential 1114: licensed residential pare /assisted living facilities and similar uses serving >19 clients 5 1.508.00 N/A n Misc. Plan Reviewuricluding elevators, elevator lobbies generators, cans Les awnings Hourly N/A All Assembly JA), Factory (F) <or equal to 1500 square feet (also used for Business (B),Mercantile (M), and Storage (S) Inspection Fire and Ufe Safer a' occu ancies when re cored S 323.00 N/A All Assembly lA), Factory (F) > 1,500 < or equal to 10,000 square feet aggregate (also used for Business (B),Mercantile (M), b' and Storage 5 occu ant, when required) S 402.00 N/A All Assembly (A), Factory (F) >10,000 sE. aggregate (also used for Business (B),Merantile (M), and Storage (S) occupancies C, when req. red 5 559.00 N/A d. High-Hazard Groups HI H2 H3 H4 or Laboratory L $ 402.00 N/A e. Hi -Rise: Structures that are 75 k. or higher measured from lowest point of fire department access $ 1343.00 N/A Day Care Educational (E) or Institutional Day Care (44) < 1,000 square feet aggregate or Day Care Educational (E) or 14: f Portable or re- locatable 5 205.00 N/A 9 Day Care Educational E or Institutional Day Care 1.4 > 1,000 square feet aggregate 5 297.00 N/A 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 PROPOSED FIRE FEE SCHEDULE 2012 plus 2013 adjustments Rounded down Adjustment From to nearest dollar Pr.mms Year SERM NAME DESCRIPTION Toni or Base Total or Base Fee Fee h. Educational other than day care 5 297.00 N/A Residential R1 or Residential R2: Hotels, motels, apartments, condominiums wah <or equal to 20 dwelling units per building 5 323.00 N/A f' Residential R1 or Residential R2: Hotels, motels, apartments, condominiums with 21- 50 dwelling units per building $ 428.00 N/A Is. Residential R1 or Residential R2: Hotels, motels, apartments, condominiums wish 51 to 150 dwelling units per building 5 559.00 N/A L Residential R4: licensed residential pre /assisted living facilities and similar uses sm.unt 7.19 Clients S 402.00 N/A m' Residential R4: licensed residential care assisted living facilities and similar uses serving >19 Rlents 5 611.00 N/A n' Misc. Inspection including elevators, elevator lobbies, generators, canopies, awnings Houfty N/A FIRE DEPARTMENT& UFEGUARDS Inspection Special Fire Protection Equipment a. Spray BOOth, Spraying area 5 428.00 N/A b. Commercial Cooking Hood and Duct jper em $ 192.00 N/A C. Special ealn uishin system: dry chemical, CO2 fosm liquid system, inert gas Halon, merger, etc. $ 179.00 N/A d. Prc -achon firesprinkler system, includes alarm system $ 245.00 N/A Man Review Special Fire Protection Equipment a. Spraj, Booth, Spraying area $ 564.00 N/A b. Commercial Cooling Hood and Dun (per system) 5 120.00 N/A C. Special eAin idihin system: dry chemical, CO2, foam liquid system, inert gas Halon Iner en etc. $ 287.00 N/A d. Pre-action Oresprinkler system. includes alarms stem 5 426.00 N/A Inspection Fixed Fhe Eginguishing Extinguishing Systems a. Commercial firesprinkler f stem jNFPA 13: 100 heads or less per system 5 297.00 N/A b. Commercial firesprinkler system jNFPA 13): > 100 heads per system 5 349.00 N/A C Commercial firesprinkler system jNFPA 13j: each additional identical system or per floor in buildings >3 stories $ 349.00 N/A d' Multi-family dwelling residential firesprinkler System NFPA 130.: 3 to 16 units per building $ 402.00 N/A e' Multi-family dwelling residential firesprinkler system NFPA 13R): s16 units per building $ 506.00 N/A f. Tenant Improvement I NFPA 13 or 13R fire sprinkler system: 4-20 heads 5 205.00 N/A & Tenant Improvement NFPA 13 or 13R fire sprinkler system: 21.100 heads no calculations 5 297.00 N/A h. Tenant Improvement (111 NFPA 13 or 13R firesprinkler system: >100 heads or requiring calculations $ 349.00 N/A i' Firesprinkler monitoring stem water flow &tamper switches < 11 notification devices $ 166.00 N A Underground fire prolmion - New 5 349.00 N/A 323 326 327 329 329 330 331 332 333 334 335 336 337 am 339 340 301 342 343 344 303 346 347 3a9 349 PROPOSED FIRE FEE SCHEDULE 2012 plus 2013 adjustments Rounded down Adjustment From to nearest dollar Previous year Total or Base SERVICE NAME DESCRIPTION Total ar Base Fee Fe e Fee k' Underground fire protection - Re air 5 205.00 N /. ^. 1' Fire pump installation 5 30900 N/A m' Standpipes: NFPA 10 Class I, II or III and includes all standpipes within a single building or boat dock 5 002.00 N/A Plan Review Fixed Fire Extinguishing Systems a. Commercial firesprinkler system NFPA 13): 100 heads or less per system 5 302.00 N/A b' Commercial firesprinkler system NFPA 13:> 100 heads per system S 675.00 N/A C. Multi-family dwelling residential fires rinkler system NFPA 13R;: 3 to 16 units per building 5 287.00 N/A d. Multi-family dwelling residential firesprinkler s stem NFPA 131t): >16 units per building 5 026.00 N/A e. Tenant Improvement TI NFPA 13 or 138 firesprinkler system: 4 -20 heads 5 134.00 N/A f. Tenant Improvement I NFPA 13 or 13R firesprinkler system: 21.100 heads no calculations $ 176,00 N/A 9 Tenant Improvement I NFPA 13 or 13R fires rinkler s em:>300 heads or requiring calculations 5 342.00 N/A h' Firesprinkler monitoring stem water flow & tamper switches < 11 notification devices 5 134.00 N/A i' Underground fire protection - New $ 342.00 N/A I' Underground fire protection -Repair $ 134.00 N/A k' Fire pump installation 5 342.00 N/A 1' Standpipes: NFPA 14 Class I, II or III and includes all standpipes within a single budding or boat dock 5 31500 N/A FIRE DEPARTMENT & LIFEGUARDS Inspection Fire Alarm Systems a. Fire alarms stem: >60 devices 5 402.00 N/A b' Fire alarms stem: 11-60 devices $ 205.00 N/A Plan Review Fire Alarm Systems a' Fire alarm system : >60 devices 5 675.00 N/A b. Fire alarms stem: 11.60 devices 5 426.00 N/A Fuel Modification New and/or Change to Esisting Plan a' Inspection 5 114.00 N/A b. Plan Review/Update 5 127.00 N/A Fire Access Gate a. Inspection 5 140.00 N/A b. Plan Review 5 176.00 N/A Technical Assistance of Complex Fire Protection Systems Code Compliance Review- Man Review and/or Inspection Services Hourly N/A Service to privately owned bi-directional amplification systems bythe Orange County Sheriff- Coroner Communications In Service Building Public Radio Coverage System Service in Private Division on behalf of the City Police and Fire Departments. 100% pass through of OC Sheriff- Coroner Communications Structures Division Charge Pass Through N/A 360 351 352 353 354 355 356 357 358 359 360 363 362 363 364 365 366 367 368 369 370 371 372 PROPOSED EIRE FEE SCHEDULE 2012 plus 2013 adjustments Roundeddown to nearest dollar Adjustment From PrevlousVWr SERVICE NAME DESCRIPTION Total or Base Total or Base Fee Pre - submittal Review Per Hour -1 Hour Minimum; Includes CEOA, EIR, and advanced planning requests Hourly N/A Fire. Life Safety Or Special Hazard Consultation Per Hour -1 Hour Minimum Hourly N/A Closure Repo" Review Per Hour - I Hour Minimum Hourly N/A Fire Lane Plan Review (Fire Mager Plan ) Per Hour- 1 Hour Minimum Hourly N/A Inspection Tank Installation Or Removal Above Or Below Ground Per Tank 5 323.00 N/A Plan Review Tank Installation Or Removal Above Or Below Ground, Per Tank 5 426.00 N/A FIRE DEPARTMENT& LIFEGUARDS Operational and Special Event Permits Operational Permits - New Level new - Cutting and welding carts, Dry cleanin lams -1 to 2 machines Liquefied petroleum gases, and Tents $ 140.00 $ 22.00 Level new -all other operations pursuant to CFC Seaton 105.6 $ 258.00 5 96.00 Operational Permits - Renewal Level 1 renewal - Cutting and welding carts Dry cleaning lams -1 to 2 machines, Liquefied petroleum gases, and Tents $ 114.00 $ 24.00 Level 2 renewal - all other operations pursuant to CFC Section 105.6 192.00 $ 54.00 Candle Permit Program First time andspecial event 46.00 $ 5.00 Special Event Permits level 1 & 2 $ 140.00 $ SSAO Level JLSS II Inspector) Includes Candle Permit Hourly N/A Public Display - Fireworks- ground display only e.. homecoming 5 -10 minutes $ 284.00 N/A Public Display - Fireworks - aerial display P 10 minutes $ 778.00 N/A Weekend, Holiday, or Non Contiguous & After Hours Inspection Request 2 Hour Minimum; hourly if contilluous to normal business hours. Hourly N/A Nuisance Abatement Service Weeds Rubbish And Other Nuisance. Actual costs: pass through contract cogs plus gaff time. Actual Cost. gaff time N/A Temporary Change Of Use Use Of Retail Occupancy as a place of assembly - Special Use Hourly N/A State Mandated Inspection, State Fire Clearance Requests for commercial occupancies, Clinics, Offices, and Treatment Facilities $ 75.00 S 8.00 Care Facilities Annual Fee 7 -99 clients as defined in the California Building Code $ 336.00 $ 163.00 Care Facilities Annual Fee> 99 clients as defined in the California Building Code $ 428.00 S 175.00 Surgery Centers Annual Fee $ 362.00 $ 187.00 Hospitals Annual Fee 200 Or More Beds $ 6499.00 $ 684.00 3n 374 375 376 377 379 379 380 381 382 383 394 PROPOSED IMF FEE SUrt DU1F rnumr.A- 2012 plus 2013 adjustments Founded down to nearest dollar Adjustmem from PreNOUS Year SERVICE NAME DESCRIPTION Total or Base Fee Total or Base Fee Hotels /Motels Annual Fee 50 299 Rooms 5 192.00 5 6.00 Hotels /Motels Annual Fee 300 Or More Rooms 5 336.00 $ 21.00 Commercial Day Care Facilities Annual Fee $ 192.00 S 65.00 High Rise Buildings Annual Fee 964.00 S 1196.00 Residential Care Facility Pre - License Inspection California Health and Safety Code Section 13235 S 245.00 S 5.00 Hazardous Materials Irrientory Disclosure Proliparn 14 Chemicals > or = 55 Gallons 200 Cubic Feet 500 Pounds S 128.00 5 455.00 5.6 Chemicals >or - 55 Gallons, 200 Cubic Feet 500 Pounds $ 149.00 $ 530.00 7 -10 Chemicals > or =55 Gallons 2D0 Cubic Feet 500 Pounds $ 162.00 S 534.00 11 -14 Chemicals > or =55 Gallons, 200 Cubic Feet 500 Pounds $ 209.00 $ 588.00 1530 Chemicals > or =55 Gallons, 200 Cubic Feet, 500 Pounds 5 260.00 $ 632.00 2140 Chemicals > or =55 Gallons, 200 Cubic Feet, 500 Pounds 312.00 614.00 More Than 40 Chemicals > or =5S Gallons, 200 Cubic Feet. 500 Pounds $ 419.00 $ (760.001 PROPOSED FIRE FEE SCHEDULE FIRE SAFETY SERVICES EXHIBIT "B" REFERENCE NO FIRE SAFETY SERVICE NAME DESCRIPTION Proposed Fee Current Fee Difference Cumentl s d OCFAFee Difference OCFAI Prop osed FIRE SAFETY SERVICES 255 Battalion Chief Una (one person) 1 Hr. Minimum To The Nearest 15 Mm. Increment Over 1 Hr., Fast Per Hour $259 $219 $ao WA WA 256 Paramedic Unit (Iwo persons) 1 Hr. Minimum To The Nearest 1 5 Min. Increment Over 1 Hr.. Fee Per Hour $078 $277 S 1 u 1 WA WA 257 Fire Engine (three persons) i Hr. Minimum To The Nearest 15 Min. Increment Over 1 Hr.. Fee Per Hour $575 5419 $ 156 WA WA 258 Fee Truck (four Persons) I Hr, Minimum To The Nearest 15 Min. Increment Over 1 Hr.. Fee Per Hour $711 $523 Sigh WA WA 258 Stand -by Freighter (per parson) 1 Hr. Minimum To The Nearest 15 Mtn. Increment Over 1 Hr., Fee Per Hour $135 $104 531 WA WA 260 Life Safety Specialist 11 1 Hr, Minimum To The Nearest 15 Min. Increment Over, 1 Hr., Fee Per Hour $156 WA WA WA NIA 261 Lifeguard Omcer 1 Hr. Minimum To The Nearest 15 Min. Increment Over 1 Hr.. Fee Per Hour $138 $1511 $72 WA WA 262 Lifeguard Captain 1 Hr. Minimum To The Nearest 15 Min. Increment Over 1 Hr.. Fee Per Hour $161 $152 $9 WA WA 263 Lifeguard Balla6on Chief i HL Minimum To The Nearest 15 Min. Increment Over 1 Hr., Fee Per Hour $205 $152 $53 WA WA 264 Lifeguard I 1 Hr. Minimum To The Nearest 15 Min. Increment Over 1 Hr., Fee Per Hour S45 $06 321 WA WA 265 Lifeguard II 1 Hr. Minimum To The Nearest 15 Min. Increment Over 1 Hr.. Fee Per Hour $49 $66 -$17 WA NIA 266 Rescue Boat (MO Persons) 1 Hr. Minimum To The Nearest 15 Min. Increment Over 1 Hr.. Fee Per Hour $175 $200 325 WA NIA PROPOSED FIRE FEE SCHEDULE JUNIOR GUARDS PROGRAM EXHIBIT "C" REFERENCE Difference Difference JUNIOR GUARDS SERVICE NAME DESCRIPTION Proposed Fee Current Fee Current / OCFA Fee OCFA / NO Promised JUNIOR GUARDS PROGRAM __-Proposed 276 Junior Guard- Resident/City Employee Per Participant $700 $695 $5 NIA N/A 277 Junior Guard -Non Resident Per Participant $853 $809 $aa N/A NIA 278 Admi ustratrve Fee Cancellation Per Participant $200 $200 NIA N/A N/A PROPOSED FIRE FEE SCHEDULE LIFE SAFETY PLANNING AND DEVELOPMENT EXHIBIT "D" REFEREN PWN A OEVLOMEM SERE M PfoW FN summers. OWanrw Cumy OCFA FM NO oud /prop se Ufa Safety Planning and Development All Assembly (A), Farnry (F) . or equal 10 1500 swam feet (aIse used for Buvneaa (B). Meman4la IN), and $509 20% 0.4in, WA 888) 31]8 270 Plan Regrew Fee and Lire Safety A. Store 5 ecru naea when toed Plan Cited Fee b Ai Assembly (A). Factory (F) > 1,500 a °rental 110.000 square feet aggragare (also used fdr Buwmess (B), S675 20% Buido, WA 8875 -8200 280 Merunule (MI. and Shen S ecru es%Anmn used Plan Lhad Fee All Assembly (AI. Factory (F),10.000 if. aggregate (also used for Business (B). MarunW (M), and Stomp (S) 20% Building WA $1255 281 G occt ndes wenro u 11'109 Plan Ched Fee -8246 282 A Wgh-Halard Groups Ht, H2, H3, H4. or Laboratory (LI $two 20% Bu"i Plan Check Fee WA $1,525 31% 283 e. HisRom Stutlurea Mal are 75 It a higher meawre0 from Intent pan Of Mot depnment access 83,340 20% Sued., Plan Check Fee WA 84,417 -1110T7 I. Day Gee Eloutanal Et or InsNUtanal Day Care (H) a 1.= squaw feel...... to o Dry Care Educational $176 20% Building WA 3561 5185 284 or Id: Portable er re- WCarebla Plan Check Fee 205 ¢ NY Cart Eduutenal (E) or motivlional Do, C nd (N) a 1,000 aqua. last aggreple 5564 20% Building Plan Chet Fee WA $1,054 -8190 h. Educational other than day cam 5509 20 %8.41.9 WA $]18 3209 286 Plan Chad Fee 1 Residental Ft or ResidenualR2'. Hotels, ( mama, apmmenn. eenmomWms wait. or equal to 20 imaging units 5259 20 %Bummg WA WA WA 257 r Dols Plan Chess Fee 205 ). Resident al Rl or Revdenpl R2'. Hotels, motels, aMM nts. random wms wit 21.50 dwW g unis pr thdi ng S342 20% SuMM9 Plan CMd Fee WA WA WA L Resident.( At dr Roeem al R2. Hotels, manla, a moral comemmema rout 51 W 150 swing units pr 4509 20% Bu9dotq WA WA WA 259 building plan CMd Fee 2gg I. ResiOential R4' gwn d mseenuH umlas fisted long fadlaws and sboiar uses senadg 7 -19 q oM 11542 20 CMUd�Fas WA 8919 ST 291 m Residential R4 icenaed residential careemo is ed flying families and vmJar uses varying 419 door $1,508 pan Cited Fee WA $1,54] 339 292 I. MsA Plan Renew oedudng blayabM, ela%aWr Nbdas.9 movau,..0pms, awn, HduM p20%C,Bu F�a WA WA WA a. AN Assembly (A). Factory (F) . or equal 10 1500 swan fast (at. used for Buvnus (BEMacantle N. and 5321 Hourly WA 8534 3211 293 Nspecten -Fee and We Safely St.... S occupansm. when required) My AY Assembly (A) Factory (F) >1, 500" or equal W 10,000 square feel aggreple (also used for Business 1402 Hourly WA 2553 -5151 291 B Meruntie M and Store e (S) mw gum aea when Ind a' >I0000 s.f. aggregate (also used for Business (B).MarunW(M), and Storage (S) $Sao Hourly WA $687 312a 295 emncies M)enrrHOry(F) 288 at HNh+w; nI Groups Ht, H2, H3, H4, or La d ralary (Lt $402 Hourly WA $]OS 33N 297 a. Hi- RIM: Structures that art 758. or higher measured from bwfl pnl of five depahmenl sett 71.243 Hourly WA Woof, -ffi60 Day Can Eduubonal (E) or Institutional Day Co. (H) < 1,000 whose leas aggmgote or Day Can EduumnM $20 HouM WA $256 -851 298 E o 14: Panable or rHOCatsek 299 g. NY Can Educamnn(E)of InMWtwnd WY CO. M) a 1.000 "Us. fan agBrepM S297 HeuM WA $324 327 MO h. Eduutwnal onto than day um 3297 Hourly WA 5313 -546 I. Re' deal RI or Residential R2. HOW, moMb, apmmenM, mnd°mnwma rah. or equal la 20 it"" units 8123 Hourly WA WA WA ]p 302 I. Residential Of or Residential R2. HnaM, heask , apMents. condomnwms rem 21-50 dw9.g units pr budding 1428 Hourly WA WA WA N Residential Ri or Residential R2: Hoels, moot apmpnts, conmmniums win 51 W 150 doming units pr IHN HouM WA WA WA N3 304 I. RasiOentsi Rl flunMd roseentialuroreasulad bong lsuNws and s.flaruses aerw9 ] -19 diesels $402 Hourly WA 8458 356 305 in Residential R4: licensed residential earofasM3ned Who facSbas and 311nlar uses Mining e19 dents 2611 HWIy WA ll 3196 We a. feat. Impression nWdap ee%alom, ekwrer lobbks,generelos, ea mism, swW9s Hourly Hourly WA WA WA 30] Melanesian Spwl Fire Promotion Equipment a. Spiny Booth, Spaying area SRB 72% Of BP� g WA $158 330 308 b. Commercial Cooking Hood and Dud (ps system) 8192 72% Of Building Fee WA $210 318 309 c. Sloclal extinguishing system: dry ctaniol, CO2. foam liquid sysem.lman gas (Hahn. Inergen, alt) 5179 72pa°�Feeeng WA $191 312 310 d. Pre-action In apmklar system. Includes slam rysiem 5245 72%ofBF„ng Permit WA 1481 3219 311 Plan Rasfew Spars Fire Preredeh Eppnena a. Spray Boot. SWaunga.a 5564 36% of undidng Fee WA 5717 3153 PROPOSED FIRE FEE SCHEDULE LIFE SAFETY PLANNING AND DEVELOPMENT EXHIBIT "0" REFERENCE LA PNMNG ANI) OEVELOPMEM SERVICE NAME DESCRIPTION Prop osed Fee Curnm Fn 01"wence Cunene/ OCFA Fee ,Berm WA NO L2 0. C °mmerwl COOknq NODE and N. (par syslem) $120 M% of Buddng Pamir Fea WA $491 Slit 313 c Spaotel emergalls, tystem. dry cdemW, CO2, foam bean system, ern ga. Habit, bier,.., tin) 3287 W% of Burderg Pear Faa WA 33rd 33i S11 d Pre -aae°n Ore spnnMbr a,.l nrLdes alarm ayalem "m 36% of BF�ra WA 5142 -323 SlS laspcaon Fared Fea Eaun9u1zem9 Syssims a. Corrarwrwllnfpnnkersyelem (NFRA13). 100 heads chaise persystem nn 72% of mBurdng Para Fea WA 5388 191 316 b. Commercial fee sprinkler system(NFFA 13):> IN heads parsptem W9 72o�tmBF.rd. °g WA $aga 3135 31] G Coimrefwllw spnnkbrsysWn (NWA IS)eaNW algont"sy&emorper rnbuidmps 3ssi"s $319 72% �an9 WA 3434 3135 S18 d. hatiWamlydv-a8n9 residential fire toreador system OR): J to 18 unrs par Watling 1402 72% of BFegg WA $MS -MJ 3191 a. WW&miy dowl'vl9 residential lira spnnader Salem (NFPA I3R): a 16 units per d ibmq 3508 12% 1 Feeng NIA 3838 4110 g i. Tanmflrrpiowmanl (TO NFPA 13 or 13R fn apmadrt syslem: 420 Matli t205 72% Fanie Fee ng WA $217 312 321 9. Ta "m brponmam RO NFPA 13 or 13R fve spnnWr system' 21 -100 "ads, no ukulauons 5297 72% of Building Perms Fee WA 3368 -S]3 h. Tanant lrryronmanl R9 NFPA 13 or 13R fire spreader syslem'. >100 heads or m°umg nkeblronf 11349 72% of Fee WA $415 -198 323 L Fee sWid.,m°nn°rd, system water lbw 6 simper swilches. a ll notification bawces 5188 72% of Budding Permd Fee NIA $191 325 (. Underorourtd fn pmlaced. - Hew �a9 72% of Building WA "is 31M R1 Permit Fee It. Underground fn proleni°n- Repair nos of 12Farms Feang WA 5330 3125 325 L Fee installation 3149 72% Of BFcn, WA "Of 352 JM purrs, 327 m Ssindps,as NFPA 14 Class I. II or III a" Imith es al slancippes "Ida a &note Wilding or boat dock 5/02 72%.1 Building WA M17 3215 Plan Be.. Foods Fm Enmgulshng Stralamf a. Connrwllre fpnnkbr system (NFPA IJ)'. 100haadsorlesapersystem 5312 M% of BUJenp WA 3583 3241 ]28 Permll Fee 3" b. Commerwl lire sprerkler ols. NFPA 13). o 100 heads parsysbm 3875 3BPerhat Feeerg WA (1391 318 3>D c.tatiWamiy dva9ng rasiden"Ifre sponger apbm(NFPA I3R). 3 w 16 units Par Wilding S267 us, of nFeecig WA 5393 31% d.MUN-famiy dea9rp esidential Tea sprnadar problem (NFPA IJA). alb was per Wrdln9 3126 X% of Bass" WA 3466 Sat 331 Pa.. Fee 3U a. Tanantlmponmanl(To NFPA 13 or 13R fire fpmkler system: 4.20 heads $134 Waist Binding WA $1]9 -f15 333 I. Tenant Np °nmanl(TI) NFPA 13 or 13R fire spmrder system 21-100 heads, ho desolations $176 36% of BuiMf, Parch Fee WA fSla -9138 tie g. Tanant brproeamem(TO NFPA 13 or 13R fire Vishider affirm, >100 heads or re °ui "g delineations $140 36 % °f Border, Pend Fee NIA We 3197 ]l5 h. Fn stmkter mndering system wafer "w6pampa, sewlCAes. s ll hWiodaon de woes 51]4 38pe °F Building WA 5224 390 3>e L UnMryrountl fn Droleceon -New 2312 >BPartia Feeerg WA 5124 382 337 2 Underground fn .led. slu 36% Of BFeeerg WA 2253 3119 k FN neuYtien W2 36GenBFaeerg WA 2762 3420 338 purls, 339 L Suand2yas. NFPA 14 Class 1.11or l9 shad ewLEaa al awdepae wnhn• eloped Wrdbp or boat choose 5315 315% P..d Feeerg WA 3581 3288 3e01nspae0°n Fee Mo.13,04ma a. Fnalarm,ras.. a6p defiui 5102 72% of Building NIA 8120 318 341 b. Fn alarm system. ItEO davkaa $205 72PamN Fee NIA $248 -L3 342 Plan Revww Fn Alan3 eteon y a. Fsealansyflam: a Gdewns U75 W% of Building Parmh Fee NIA nn 353 343 b. Fore.W. yslitrr 1110d... 5126 M% .1 1 Bellisario WA Saab 320 344 F1ial NOdlfiGbpn Nawandlor Chad, to E.alating pan a.Inspeslbn 5114 5705 WA ftba 320 345 b. Plan R°v1MUptlate 2127 WA WA E 3318 PROPOSED FIRE FEE SCHEDULE LIFE SAFETY PLANNING AND DEVELOPMENT EXHIBIT "D" REFERENCE NO PlMHNO MID DEVELOPMENT SERVICE NAPE DESCRIPTION PsgpawSFN 4aasafaa 9lnwar a Corms/ OCFpfp IN1lrrmw06A /presented US Fee Arreas GMe a. Impeect.. $140 Hes"i WA 5191 S51 Say e. Plan Review $195 Hourly WA 5335 3180 US Temniul Asessimce of Compbs Fee Protection Systems Cosa Compliance Re... Plan Rew.anobr lnapetlwn Samcea mount 120 %el uldor WA WA We 349 In Semis BWdvlp Puolm Ride Coverage System Sarvice in Pmata Svuctures So. to pm any treated brdratUDntl amplification rysbmf W Ina Ormu County, SbM-Celpd.I Co.,.00na D .0 on W haM of dH Ca Poky and Fos Dapmmanls. 100% pass Trough of CC Sheriff- Pau Thrppn Pass Through WA WA WA 360 pre- aP9RHMl Rep. Per Haw -1 Hour Mountain, includes CEOA. EIR and advanced ptennng requests rody, 1555 WA WA WA 351 Me, life Safety Or SPewl HuarO Conswestern Per Hour -1 Hour Ma miss. Hoist// 5a04 WA WA WA 353 Cbswa Repen Raww Par Hour - I Hour Minimum Hourly $155 WA WA WA 353 Fee Lana Plan Raw.(F. Minter Plan) Par How -1 How Maur". slowly 5401 WA WA WA 3641nucaen Tank bsla5alwn Or RmpvM AWm Q Saba, Ground. Par Tank 5593 ti�w M� N/A 3515 N/A 355 Plan R. .TmkNwlation Or Removal station Or Saba, GrouM. PiRlank 3425 Mel Mdse, N/A 5535 MIA PW.Gyct- RNWnYaI Era OepHLMMAImGIN4� —pNww Iburly -- mannp.AewMnW Fm NMnK4dATalMy SyMan .....Wpa Pernubp NeMaeeeMFm Nainl4MfMaeFSystm* fM4ew Peree.aa P W G aM W wl Ere.. W nLN�SNaNiy W wr g5 WNmM W anMGaaUalraa'nn� W w`<anMwMnl 3evaJip 4rdualAaFPW.Raww �� seems PanapaFaianulnaMGerra 4er�s �us4Tn >NaPeaaans Ng6 µMWNM 4wIy MrapanMrlBwaul i33 Piuh w E.md+rRpwM Paella, —aJtw JYmum Sg43 bHwFwnEapeppgagrest PM+Iww— Hew -Wmwm 3280 FrN MWdgMgn Plw- HYhmYier CnapeNE.NIpPten perNW-- HNwAMlltwm SN9 pm..Pfnp.M.M. wa.rewM4aalm.N.Pam9 now, uwvM. +4a p4x.CrHOk+MagaueMManMaApwp P, ifAaMwMMa wd,:MGa4saeRrM4e4,MF4rt5 530 Alee4al<P�f.Paepe -Hrla ass bena9rvundirPrage.rar�k- PM-TaN Si)i PROPOSED FIRE FEE SCHEDULE LIFE SAFETY INSPECTION SERVICES EXH181T "E" REFERENCE NO LIFE LIFE SAFETY INSPECTION SERVICE NAME DESCRIPTION Pmpoaad Tne Cu.Fee DiNennce C.mnll OCFAF.e DtHennce 0CFA1 Oporauonal And Spacial Evonl Permill 356 Operalenal Perm(, - N.. Laval I (noel - Crony and -ski ng Ws, ON ctunrp viands- I to 2 rapnnes. LquaRed p.ntlaun pent. W Tares $140 Stu -522 3113 .$276 357 L..121nex9 -al aNer caenlionsW.ni W CFC SMnn 1053 um $162 5% N13 -5130 J53 Operatenal Peral. - RUexel LealllrAMeap- CUang and AalddW earls, Dry ckawg pants -1 tot macMes, LgwMd panobum gases. nn Tara $114 $133 -$ts Hourly WA 359 L.vN 2(n1axe0- aa~opsr . pursuant le CFC Se.. 1053 3122 3130 $54 3333 3146 380 CandH Pa. Roper. Fast Intel etW apactel eYMe 346 "I -35 3330 -3292 331 SpePal Ever PamHs Laves 162 $140 $125 355 WA WA 362 Leva131LSS II Inspector) 2sWdea Cable Perm) Hound WA WA WA 383 PuMc U.peY- Faaxons - grrnd display en] a 9. nornemmnp 110 mnNaa 5236 SS]OIeN f.e WA $657 3373 364 Puotc USpay -F,s .- asset dnplay> 10 mn.. $773 55311 naN IN WA S3.427 -52 Beg 355 Weekend. Hassles, or Non Cont puous 1 MH H.. Ina ca. R a.1 3 Hew Maunsrm: nWM d conlpww W norW W ✓na.a W.. Hound Hotel, • 2au WA WA WA 369 NWSarea AMwmnl S.. WWS. RunMSn And Over H,,twce- Acluet costs. pass IMWh contract Bova pWS staff tend. im! A ;Wd! Wit Act« %V. WA WA WA 307 Tern crary Cnarge Of Use UN OI RAW Oaupanry as a place of asserpN - Spwal U» Hound 3471 WA WA WA 6uervM Fa.x E.peMla Repro✓ EvrlYwv.4ass31'a^- }WaMrnGOar+ iaW 44" DIPHaeaMeteeten Reay.R PwMa+— sMwuMe�nwr ji90 Spaaral4earlFRKvr9JsapaFaeA iawrpaa PaNiou-- jNMSAnarwal i]AO Oca -load nu sredNfwsw- wp'swure perearelN N 330°...7.. NwwOaewarrer PMXaW-- 1- HwJr9rlehwr Si0.MFWme Fw i136aP RMPP(.wrpraalpr- -Rpre+ AWaIi�WDepwrsMesnexiLgOp HeVIF State Mandated Inspactldns 309 Slate Fee OWarare Reewsl.IH7anWwruet orapanFwa. OWCa. O@ces. and Traalmenl Facs.. $75 303 -b WA WA 369 Cara FaoWas Amual Fee 7.99 taints as wfned n 3e Cations. Bu4durp Cade 3 333 $173 Siti3 WA WA 370 Care F.M., Amuel Fee > 99 pars as de5md n lne CaSfonii BpWng Code We $253 5175 WA WA 371 Sm Cenla. Anmet FU 3392 3175 $1.7 WA WA 372 kW.NMI. Amuet FAA 200 d Mery fled. 316,492 $7.103 .5664 WA WA 313 HOlet ✓lamps Anuet Fee W -MA. 3192 $116 So WA WA 374 Ho1Ns7M.Iels Annuet Fee 300 Or More Reera 5333 3315 $:1 WA WA 375 Cameruet Dry Can Fables Annawl Fee $192 $127 $35 3211 -519 376 14n Rne Buds,. Amuet Fn I 5934 31,160 -$IN $1.120 4156 PROPOSED FIRE FEE SCHEDULE LIFE SAFETY INSPECTION SERVICES EXHIBIT "E" REFERENCE NO LIFE SAFETY INSPECTION SERVICE NAME DESCRIPTION Proposed Fee C. ,Fee Difference Culren t l OCFA Fee Caere... OCFAI 377 Resmenuw Care F.6,1 PIILmcose Ins d Caldomm Heats wld Set* Cole Sedlon Inn $245 $240 .. Hourly WA ReHeeMeHrgl�RrwBuWrme /wwlFee- <mGinW too High Rise Bufinp 5964 Wi6 $149 $1,120 .$11 ft— 0. AwnWy 4xruuGw- Re6unUenL N Level ll Operalbml PwmMS 51F2 Hasardous Materials Inventory Diwimum Pmgmm 526 1.4 Cnemcals > or • 55 Gabs. 200 Cu Fee, 500 Pw 5126 5563 -S455 WA WA 379"cm.can >or• 55 Gears, 200 Cvow Feet, 500 P9urMs 5149 5619 $530 WA NIA 3s0 1.10 Chem is > or • 55 Galena, 200 Cube F.M. 504 Pow16s $162 use -5531 WA WA 361 11 -v Cmm .I' > or e 55 Geller.. 200 Cu Fe4 500 Pa WS 3209 6197 5569 WA WA 3821S20C".K >w= SS Gesons. 200 Cube Fast SW PO 5280 5992 032 NIA WA 383 2140 Ch..It > e1. 0 Gelons. 2W CU Feel, SW PO s 012 5926 .5614 WA WA 3M Mwe Tnan 40 Oto c >w• 55 Gabor, 2W Cub¢ Feet. 500 Pouros 3419 61,179 -5160 WA WA GeeoYwKervaeiWwPwirle EID ...... F sISNwW- Fee - Redundant. U•eI Il Opw~W PwrMS it To EXHIBIT F. RESPONSE TO BIA NEWPORT BEACH FIRE ANALYSIS Copies of Exhibit F will be made available on Monday, October 7, 2013. Received After Agenda Printed SS2 10 -8 -13 Exhibit F: Response to BIA Newport Beach Fire Analysis We have appreciated the dialogue we've been able to have with stakeholders like the Building Industry Association (BIA) via the development of our municipal fee schedule over the years. City staff conferred and reviewed the proposed Fire fees with a representative of the Orange County BIA recently. We also met and reviewed the proposed fees with representatives of The Irvine Company. We also obtained input from several other stakeholders such as local architects, builders and designers. The BIA provided a written response to the fee proposals as indicated on the attachment, which in part disagrees with the methodology used to calculate cost and fees. Staffs responses to the BIA comments are as follows: BIA Comment: The current hourly rate fire fees are $160 per hour, which are the second highest fees next to Orange County Fire Authority. A more accurate comparison to municipal fire agencies reveals that the proposed fee increases would be 37% higher than Huntington Beach and 53% higher than Anaheim on an hourly basis. They are dramatically more when comparing the total cost to the customer. City Staff Response to Comment 1: The City utilized the Orange County Fire Authority ( "OCFA ") fee schedule as a model for analyzing Life Safety Planning, Development, and Inspection Service fees. The proposed fee structure for these fee categories is based upon OCFA's fee schedule, which is relied upon by 23 of the 34 cities in Orange County. Because the proposed service types and descriptions are similar to most other county jurisdictions, City staff believes that the new fee structure will be easily understood and utilized by the regional developerlbuilder community. Fee levels are reflective of the cost recovery policies set forth within each jurisdiction. In the City of Newport Beach, Council Policy F -4 (Revenue Measures) and Item 11 of the City Council Fiscal Sustainability Plan requires the City to establish a 100% cost - recovery target and adjust the fee structure to ensure that fees continue to meet the mandated cost recovery targets. Exceptions to this policy are established by the City Council and subsidized fees are codified in the municipal code. Comment 2: Proposed Fee Increase Exceeds Rate of Inflation BIA Comment: Many public agencies evaluate Consumer Price Index (CPI) data as a primary factor for fee adjustments. The proposed rate increase of 10.6% is almost double the rate of inflation over the last three years. The Los Angeles -Santa Ana Metropolitan region's CPl only grew by 5.6 %. City Staff Response to Comment 2: The proposed changes to the fire fee schedule are not based on the CPI escalation factor. Changes to fee schedule are instead based on the results of the total cost of service analysis, which is in furtherance of Chapter 3.36 of the Newport Beach Municipal Code, Policy F -4 (Revenue Measures) and Item 11 of the City Council Fiscal Sustainability Plan, which require the City to establish a 100% cost- recovery target and adjust the fee structure to ensure that fees continue to meet the mandated cost recovery targets. Fire fees have not been evaluated or updated on the total cost of service basis for 5 years. The proposed fees will align revenues with the total cost of services in a more accurate manner that CPI. Comment 3: Over 54% of Service Does Not Direct Serve the Customer BIA Comment: A breakdown of hourly rate demonstrates that a majority (545o) of service does not directly impact the customer. Salary & Benefits Internal Dept Admin Citywide Support Total: Dollar $81.41 $46.06 550.19 177.66 Percent 46% 26% 28% Direct vs. Indirect 460/6 64% City Staff Response to Comment 3: Indirect overhead costs are costs that are not directly accountable to the expenses Incurred for a user fee service, but they still clearly contribute to the total cost of that service delivery, i.e. - managerial administration, utilities, insurance, legal, information technology, payroll, and finance. These are all valid components to the analysis of what it costs the City to provide municipal services. The inclusion of Indirect overhead costs to determine the total cost of service is a well - established cost accounting methodology which we use and so do other communities. Comment 4: 100% Cost of Recovery is Unorthodox Amonq Orange County Fire Departments BIA Comment: Among all municipal fire agencies in Orange County, the cost of recovery is between 30% and 36 %. One hundred percent cost of recovery of fire prevention fees would break with an established precedent. Life Safety costs are currently met through a healthy balance between user fees and general funds. Given the good stewardship of the City's finances, maintaining the fees at current levels will continue to foster a stable public safety and business environment. City Staff Response to Comment 4: Setting Fire fees at 100% cost recovery does not break precedence here. Further, the conclusions one can draw by comparing fee levels across cities are fairly limited due to agencies' differences in defining and structuring their respective fees. For example, certain services included in fees may be combined in some cities but separated in others; fees in other cities may be based on historical or other subjective factors unrelated to costs; and fees are also affected by differences in cost factors such as cost 2 allocations of indirect support costs, employee benefit costs, and service efficiencies (the overall time necessary to complete a particular service or activity). If a user fee primarily benefits the fee payer, the fee is typically set at, or close to 100% cost recovery. Development related fees generally fall into this category. If a user fee service benefits the community as a whole to some extent, it is appropriate to subsidize a portion of the fee or charge no fee at all, such as with police patrolling or fire suppression services. The following flow chart helps illustrate these economic and policy considerations that are common among municipalities: DECISION- MAKING FLOW CHART Who Type of Tax vs. Fees Example Benefits I! Service Policy Services CWMMN ly Pubic 100% taxes Pobco palrol servrcos PMltly an Yl owstal Mostly taxes Code enforcement wm Sam Corehisinity bansib Public t Private 6 soma tees servtms Mostly Ices with song comm rt ity- Private / Public 8 soma taxes Youth sports We berie is —i trdvidod boneit only Private 100% fees Developmanl services Source: MGT of America, Inc. A] Comment 5: Fact: Fee Increases Will Result in Longer Time and Higher Cost to the Customer BIA Comment: Table A is an example of the extreme costs of a specific service. The customer's total cost is compounded by higher rates and longer times. Newport Beach Fire provided the following analysis of fees. Table A: Comparison of Cost and Time for Plan 76 Head Sprinkler System Service New ort Beach Anaheim Point Variance %Variance Plan Check Rate S342 Plan Check Tane 125 min Inspection ate 5297 Inspection Tune 115 min City Staff Response to Comment 5: Service times are not increasing from the last time the fees were updated, but may or may not be longer when compared to another fire agency. It is unclear on what basis the BIA asserts that the City's Fire Department response times vary from other fire departments. In fact, service times are irrelevant to this discussion given that fire operations, population, traffic circulation, financial resources, and policy vary from city to city. However, tracking service time is a critical task, and the proposed changes to methodology will allow for more accurate and detailed tracking of service time by breaking service types into their sub - groups. Again, fees are affected by differences among cities in cost factors such as cost allocations of indirect support costs, employee benefit costs, and service efficiencies (the overall time necessary to complete a particular service or activity). Comment 6: Questionable Costs Associated with hire Prevention BIA Comment: There is potential redundancy of costs among fire administration, training, insurance, and "all other materials and support" specified in the Citywide Allocation Plan and Life Safety Planning & Development Indirect Cost Rate Proposal (Exhibit B). For example, fire training is identified and billed twice among different cost segments resulting in higher indirect costs for the department and fees to customers. Various indirect administrative costs are broadly labeled, not well documented, and potentially overlap. If the City were to adopt a 100% cost of recovery, we ask for due diligence pursuant to State law that fees shall not exceed the estimated reasonable cost of providing the service. City Staff Response to Comment 6: Working with the Fire and Finance Departments, the City's cost recovery consultant from the firm "MGT of America, Inc." reviewed and cross checked results to ensure data validity and found no instances of double counting. MGT is a well- respected consultant with a well - established methodology. The particular consultant utilized by the City of Newport Beach is one of the most experienced cost analysts in the western United States, having completed hundreds of cost plans, user fee studies, and other studies for local governments. 4 There are line items that coincidentally have the same dollar amount. With respect to the referenced training item, the $6,500 in training expense is specific to the Life Safety Services division and is directly budgeted to that division. The $18,351 that is allocated to Life Safety Services division is the pro rata share from the Department's Training Section and is independent from Life Safety Service division's directly budgeted training expense. The cost allocation plan is derived from a fairly complex Excel model. We welcome the opportunity to meet again with any BIA representative to demonstrate the accuracy and validity of the cost allocation plan model. The MGT study establishes the cost incurred by the City to provide services. The purpose of the recommended action is to update the City's fees and set them at a level that does not exceed the cost to provide the services. BIA Comment: Our primary recommendation is to maintain fees at their current levels. Alternatively, City Council may explore a cost of recovery that reaches a level of compromise between the City staff and BIA/OC recommendations. City Staff Response to Comment 7: Chapter 3.36 of the Newport Beach Municipal Code ( "Municipal Code ") requires that user fees for municipal services be recovered at 100 %, unless otherwise provided for in Municipal Code Section 3.36.030 (Cost Recovery Percentages). Staff welcomes input and recommendations on the proposed Fire fee schedule. Based on the direction of City Council, staff will return at a later date with a proposed Fire fee schedule for formal approval. Conclusion The purpose of the study was to develop fees that accurately reflect the costs for the services performed. Because Life Safety Planning and Development fees are currently based on a percentage of permit fees, and the proposed fees are based on actual staff time, it is difficult to predict exactly which and how many fees will increase or decrease as the result of the proposed changes. We see some component fees rising while others are falling and believe that Life Safety Planning and Development fees will result in less cost overall when all the fee subcomponents for a particular task are aggregated. The following two examples demonstrate the likely cost impact on Life Safety Planning and Development evaluations under the new calculation methodology. Such evaluations typically include architectural, fire sprinkler, alarm system, and fire service underground plan review, as well as field inspections. Example 1: Plan review inspection of a five story 20,838 square foot retail /residential mixed use development: Plan Review CURRENT PROPOSED VARIANCE Architectural $2,710 $934 -$1,776 Fire Sprinkler System $191 $675 $464 Fire Underground Service Line $60 $342 $282 Fire Alarm System L56 $426 370 Total $3,017 $2,377 4640 Example 2: Applicant seeking plan review and safety inspections for a 4 unit residential $150,000 improvement project: When considering the changes to all Fire service fee categories, we estimate that 23% of the proposed changes will likely result in a fee increase and 29% of fees will likely decrease. In addition, 26% of fire fees are proposed to be eliminated altogether and 4% will remain unchanged. The remainder of fees (in the Life Safety Planning and Development category) will either increase or decrease as the result of changing our fee calculation methodology. We have thoughtfully evaluated each of the BIA's concerns and we thank them again for their input. However, after going through each of them, we believe that our fee proposals are appropriate and that they most accurately represent the cost of the specific services delivered. Attachment 1: BIA Correspondence: "Concerns regarding agenda #SS.2 updates to the master fee schedule as it relates to fire fees," dated 104-13 21 CURRENT PROPOSED (VALUATION BASED) (FLAT FEE) VARIANCE Plan Review $354 $259 -$95 Inspections (estimated) $985 $323 -$662 Fire sprinklers Plan review $102 $176 $74 Fire sprinklers Inspections $188 $297 $109 Fire service underground plan review $58 $342 $284 Fire Service Underground Inspections $160 $349 $189 Total $1,847 $1,746 4101 When considering the changes to all Fire service fee categories, we estimate that 23% of the proposed changes will likely result in a fee increase and 29% of fees will likely decrease. In addition, 26% of fire fees are proposed to be eliminated altogether and 4% will remain unchanged. The remainder of fees (in the Life Safety Planning and Development category) will either increase or decrease as the result of changing our fee calculation methodology. We have thoughtfully evaluated each of the BIA's concerns and we thank them again for their input. However, after going through each of them, we believe that our fee proposals are appropriate and that they most accurately represent the cost of the specific services delivered. Attachment 1: BIA Correspondence: "Concerns regarding agenda #SS.2 updates to the master fee schedule as it relates to fire fees," dated 104-13 21 October 4, 2013 The Honorable Keith Curry and City Council City of Newport Beach 100 Civic Center Newport Beach, CA 92660 Re: CONCERNS REGARDING AGENDA zSS.2 UPDATES TO THE MASTER FEE SCHEDULE AS IT RELATES TO FIRE FEES Dear Mayor Curry, On behalf of our membership, we would like to thank Newport Beach Fire staff for an opportunity to review the Life Safety Fee proposal. After careful review of fee proposal, we express concern over the proposed increase of Newport Beach Fire fees. Our primary recommendation is to maintain development - related fees at their current fee level. The Building Industry Association of Southern California, Orange County Chapter (BIA/OC) is a non -profit trade association of nearly 1,000 companies employing over 100,000 people affiliated with the home building industry. The Orange County Chapter represents the largest member base within BIA Southern California. Our mission is to champion housing as the foundation of vibrant and sustainable communities. BIA/OC remains committed to fees adjustments that are consistent with our Fair Share Principles (Exhibit A). We agree in part with the need for new categories of fees to keep up with new building trends. In contrast, we disagree with methodology used to calculate cost and fees. Maintaining fire fees at a reasonable level is vital to promoting a healthy housing and business environment. We recommend re- evaluating the proposed fee increase based on the following seven points: 1. Newport Beach Fire Department currently has the 2 ^d highest fees in the County — The current hourly rate fire fees are $160 per hour, which are the second highest fees next to Orange County Fire Authority. A more accurate comparison to municipal fire agencies reveals that the proposed fee increases would be 37% higher than Huntington Beach and 53% higher than Anaheim on an hourly basis. They are dramatically more when comparing the total cost to the customer. 2. Proggsed Fee Increase Exceeds Rate of Inflation — Many public agencies evaluate Consumer Price Index (CPI) data as a primary factor for fee adjustments. The proposed rate increase of 10.6% is almost double the rate of inflation over the last three years. The Los Angeles -Santa Ana Metropolitan region's CPI only grew by 5.6 %. 131 R Orange Count;, Chapter 17744 SAA Pads Circle Sidle 1711 Irvine. Cafililmia 0614 949.551.95(11) IaA 949.769.8943 w .bu uyxom PRESIDENT DAVE BULLOCK STANDARD PACIFIC HOMES VICE PRESIDENT DONNA KELLY LENNAI TREASURER JOAN MARCUS{OLVIN THE NEW NOME COMPANY SECRETARY BRIAN GETS BROOKFIELDHOMES IMMEDIATE PAST PRESIDENT MICHAEL MCCANN ALLIANCE RESIDENTIAL TRADE CONTRACTOR COU14CIL V P TOM RHODES tWR ENTERPRISES ASSOCIATE VICE PRESIDENT MARK HMMELSTEIN NE"EYER&DILLIOI4 LLP MEMBER.AT.LARGE MIKE'MNTER SARESREGIS GROUP MEMIERATiARGE JIM YATES RANCHO MISSION VIEJO CHEF EXECUTIVE OFFICER MICHAEL BALSAMO 3. Over54e /u of Service Does Not Direct Serve the Customer - A breakdown of hourly rate demonstrates that a majority (54'9x) of service does not directly impact the customer. Salary d Benefits Internal Dept. Admin Citywide Support Total: Dollar S8141 S4606 S50. 19 177.66 Percent 46% 26% 28% Direct vs. Indirect 46% 54% 4. 100% Cost of Recovery is Unorthodox Among Orange County Fire Deoartments - Among all municipal fire agencies in Orange County, the cost of recovery is between 301/6 and 36 %. One hundred percent cost of recovery of fire prevention fees would break with an established precedent. Life Safety costs are currently met through a healthy balance between user fees and general funds. Given the good stewardship of the City's finances, maintaining the fees at current levels will continue to foster a stable public safety and business environment. 5. Fact: Fee Increases Will Result in Longer Time and Higher Cost to the Customer - Table A is an example of the extreme costs of a specific service. The customer's total cost is compounded by higher rates and longer times. Newport Beach Fire provided the following analysis of fees. Table A: Comparison of Cost and Time for Plan 75 Head Sprinkler System Service Newport Beach Anaheim I Point Variance % Variance $225 259% 80 min 178% Plan Check Rate $342 125 min 5297 Plan Check rime Inspo cVon Rate Inspection Tim 115 min 55 min 92% 6. Ouestionable Costs Associated with Fire Prevention - There is potential redundancy of costs among fire administration, training, insurance, and "all other materials and support" specified in the Citywide Allocation Plan and Life safety Planning & Development Indirect Cost Rote Proposal (Exhibit B). For example, fire training is identified and billed twice among different cost segments resulting in higher indirect costs for the department and fees to customers. Various indirect administrative costs are broadly labeled, not well documented, and potentially overlap. If the City were to adopt a 100'Y, cost of recovery, we ask for due diligence pursuant to State law that fees shall not exceed the estimated reasonable cost of providing the service.' I Govemmenl Code § 66014 et seq. -2- 7. BIA Remains Open to Alternative Cost of Recovery Structures — Our primary recommendation is to maintain fees at their current levels. Alternatively, City Council may explore a cost of recovery that reaches a level of compromise between the City staff and BIA/OC recommendations. Based on the merits of our concerns, we encourage you to maintain Newport Beach Fire Fees at their current levels. We would welcome the opportunity to further study this matter with the City. As always, we remain a resource to the City on important issues that are related to the well -being of our local communities. Thank you for time and thoughtful consideration Respectfully, Michael Balsamo Chief Executive Officer Cc: City Council Mr. David Kiff, City Manager Mr. Kevin Kitch, Assistant Fire Chief Enclosures (2) ism Exhibit A BUILDING INDUSTRY ASSOCIATION OF SOUTHERN CALIFORNIA/ ORANGE COUNTY CHAPTER LAND DEVELOPMENT FEE SURVEY THE FAIR SHARE PRINCIPLES It is recommended that Jurisdictions: Notice. Provided sixty (60) days notice if effective date of any fee increases. 2. Public Hearing. Publish notice and hold hearing prior to consideration of fee increase along with mailed notice to any petitioning party pursuant to Section 54992 of the Government Code. 3. Resolutions. Do not amend enabling resolutions. Work for the inclusion of all development fees in one new, comprehensive resolution. 4. Volume Adjustment. Adopt reduced rates for subsequent plan check and inspection of identical buildings. 5. Source Documents. Insure that the actual fee authorization document with official signature is available for distribution by development services agency or city clerk upon request. 6. Other Agencies. Publish, and clearly display, contact list of any other known agency that may claim regulatory jurisdiction. 7. Payment Timing. Honor deferred payment rules under Government code Section 53077.5. 8. Nexus and Need. Provide evidence of fee nexus and Identified need through generation of nexus study and a needs assessment in accordance with State Law. 9. Establish Specific Benefit Areas. Assessment fees are within clearly defined boundaries for benefited properties and not be utilized to subsidize other tax - supported facilities or services. An adopted plan of expenditures and implementation schedule should be in place prior to adoption according to State Law. 10. Documents Kept Current. Cost -of- living increase is documented in newly published schedules. No undisclosed, intermediate calculations are required to determine one's probable liability. 11. School Fees. School fees only be implemented with a school facilities master plan, adopted budget, and specific spending plans adopted after public hearing. Indirect Cost Rate Proposal Agency: City of Newport Beach Department: Life Safety Planning & Development Fiscal Year 2012/2013 DESCRIPTION OF COST 40M. Tofal Costs Excluded Allowable Allowabfe Indlrect Direct _ A) Personnel Costs 1 Salary and Wages $ 1,028,074 $ 280,770 $ 747,304 Da0bufion %: 100% 27% 735k 2 Temporary 8 Overtime $ 81.529 $ 81.529 3 Benefits .00% s - $ - S $ 1,109.603 s 81.529 $ 280,770 $ 747,304 B) 0111w Operating Eglerws 4 Training 6,500 6,500 5 Vehicle Maint 20.414 20,414 6 Jr Firefighter camp 00 6,500 - 7 Prof Svcs 46,114 - 8 Fuel Mod <34. 00 190.000 - 9 Insurance 38 34.238 10 All other mall 8 supp 80,920 80,920 11 12 13 14 15 16 17 18 19 - 20 Capital Outlay - Subtotal: S 384.686 $ 242,614 S 142.072 S - Total Dept Expenditures S 1,494.289 S 324.143 S 422.842 S 747,304 C) Indirect Costs 21 citywide cap 460,785 4n0.7;5 22 ?3 24 25 Subtotal S 460,785 S - 5 460,785 - Total Costs of all Divisions: $ 1,955.074 $ 324,143 $ 883,627 S 747.304 D) Internal Admin/Indirect Rate: Dept Indirect Costs: $422,842 Direct Sal 8 Benes: $747,304 Internal Indirect Cost Rate: 56.6% E) External AdmiNlndiract Rate: Indirect Costs: $460.785 Direct Sal 8 Benes: 8747,304 External Indirect Cost Rata: 61.7% 7/232013 MGT of America, Inc. Page 34 of 149