Brief History
West Newport Citizen Advisory Panel (Fa►►lW►nter 201 1)
I St Priority — Landscaping Improvements
2nd Priority — Underground Utilities on Balboa Blvd.
March 26, 2013 City Council Study Session
Council Desire to Form UUD No. 22 (Balboa Blvd.)
Review of Area between Balboa Blvd. & 22nd St.
Use Rule 20A Funds for Design /Construction
Determine how Private Conversions would be Funded
September 10,
2013 City
Council
Study Session
Proceed
with
Preparation of
UUD
No.
22
District
(Balboa Blvd. - WCH to 22nd St.)
Use Rule 20A Funds for Design /Construction of Mainline
Undergrounding of all Private Overhead Service Lines to be
Funded by Property Owners
Rule 20A Funds
California Public Utilities Commission sets Rule 20A policies to use
allocations for utility underground areas that satisfy one or more of
the following criteria:
• Unusually Heavy Concentration of Overhead Facilities
• Heavily Traveled
• Designated as an Arterial or Major Collector Road
• Within, or Passes Through Civic, Recreational or Scenic
Area
20a Funds can pay for 100% of design and construction cost of
mainline along street and up to 100 feet of service connections
along both sides of the street, if warranted.
Residential and Business
Service Connections
Municipal Code 15.32. 100
Responsibility of Property Owners.
A. Every person owning, operating, leasing, occupying or
renting a building or structure within a district shall
construct and provide that portion of the service
connection on his property between the facilities referred
to in Section 15.32.090 and the termination facility on or
within said building or structure being served, all in
accordance with the applicable rules, regulations and tariffs
of the respective utility or utilities on file with the
Commission.
UUD No. 22 Design Basics
Improve the Aesthetic Appearance of Balboa Blvd.
while Maximizing the Value of Rule 20A Funds.
150 Properties Planned to be in the District
Exact Boundaries will be Refined in Design Phase
Include All Properties Needed to Underground Utilities on
Balboa Blvd.
Work with SCE to Create Logical Boundaries (Account for
Utility Distribution and Support Guy Wire Needs)
/ Proposed UUD No. 22 Boundary
- r l I I I I I I I
/ Balboa Blvd.@ River Ave. - Looking East
X111 r_
111111 AMN
Elm WE
BALBDA IBL
:v.11.'T.F.1:
F T�
42nd /43rd St.Alley — Looking South
,
�n Turn Fn-M
4M ANN -.-
:r:
F-VL��
33rd Street - Looking East
y
ft __
wral maim..
22nd and 23rd Streets and Adjoining Alley
� 1
2
WEST
1�
Cost Analysis
Current 2013 Rule 20A Balance
$1,705,300
5 -Year Mortgage $1,3749805
Funding Currently Available
Plus 3 increment years @ --$274,960
Total Funding Available in 2016
Estimated Project Cost
Total Project Cost Estimate
Mainline Design /Construction
Private Service Conversion * **
$3,080,105
$824,880
$3,904,985
$4,400,000
$3,800,000
$600,000 (approx. 150 properties)
Service Conversion Cost to be Borne by Property Owners
* ** Private Conversion Costs Average $3,000 to $5,000 per typical SFR
What's next...
Begin Underground Utility District Design
Tentative Schedule
District Formation Public Hearing
Design
Undergrounding Construction
Private Conversion
Pole Removals /Completion
November 2013
Spring 2015
Spring 2016
Spring 2017
Fall 2017