Loading...
HomeMy WebLinkAbout13 - Newport Blvd Water Transmission Main Replacement�EWFpRT CITY OF BEACH G=1�C I] I1 �qt /GOR�A City Council Staff Deport Agenda Item No. 13 November 26, 2013 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department David A. Webb, Public Works Director 949- 644- 3330,dawebb @newportbeachca.gov PREPARED BY: Andy Train, Senior Civil Engineer 949 - 644 -3315, atran newportbeachca.gov APPROVED: n v y TITLE: Amendment No. 1 to Professional Services Agreement with Tetra Tech, Inc. for Newport Boulevard Water Transmission Main Replacement Project ABSTRACT: The City entered into a Professional Services Agreement (PSA) with Tetra Tech, Inc. for preliminary engineering services for the Newport Boulevard Water Transmission Main Replacement project. A preferred alternative has been identified and final engineering services are needed to complete the construction documents. Pursuant to Council Policy F -14, City Council approval is required in order to process Amendment No. 1 to the PSA with Tetra Tech for final engineering services. RECOMMENDATION: Approve Amendment No. 1 to the Professional Services Agreement (PSA) with Tetra Tech, Inc. to provide final engineering services for the Newport Boulevard Water Transmission Main Replacement project at a cost not to exceed $152,400.00 and authorize the Mayor and City Clerk to execute Amendment No. 1 to the PSA. FUNDING REQUIREMENTS: The current adopted budget includes sufficient funding for Amendment No. 1. Funds will be expended from the Water Enterprise account (7511- C6002014) for this project. DISCUSSION: The proposed water transmission main replacement project is located on the northbound side of Newport Boulevard between Via Oporto and 28th Street. The existing pipeline consists of 16 -inch and 20 -inch cast iron pipe that was installed in the mid 1920's. This transmission main is vital to the City's water distribution system as it Amendment No. 1 to Professional Services Agreement with Tetra Tech, Inc. for Newport Boulevard Water Transmission Main Replacement Project. November 26, 2013 Page 2 provides water supply and fire flow protection to businesses and residents on the Balboa Peninsula. In addition to replacing the aging pipeline in Newport Boulevard, various cast iron mains in Finley Avenue and 32nd Street will also be replaced. The City is currently administering a separate street improvement project on Newport Boulevard within the limits of this water transmission main project. Replacement of the water main at this time will eliminate the potential of damaging the existing water main during construction of the street improvements. The City selected Tetra Tech, Inc. to provide preliminary engineering services based on their response to a Request for Proposals for the MacArthur Boulevard Water Transmission Main project. Tetra Tech was ranked a close second on the MacArthur Boulevard project and has successfully completed other similar design projects for the City. Preliminary engineering services have been completed and the preferred alternative was identified. The proposed not -to- exceed fee for final engineering services is $152,400.00. ENVIRONMENTAL REVIEW: Staff recommends the City Council find this action is not subject to the California Environmental Quality Act ( "CEQA ") pursuant to Sections 15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect physical change in the environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential for resulting in physical change to the environment, directly or indirectly. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). Suhmitted by Public Works Director Attachments: A. Amendment No. 1 with Tetra Tech, Inc. B. Location Map Attachment A AMENDMENT NO. ONE TO PROFESSIONAL SERVICES AGREEMENT WITH TETRA TECH EC, INC. FOR NEWPORT BOULEVARD WATER MAIN REHAB THIS AMENDMENT NO. ONE TO PROFESSIONAL SERVICES AGREEMENT ( "Amendment No. One ") is made and entered into as of this 27th day of November, 2013 ( "Effective Date "), by and between the CITY OF NEWPORT BEACH, a California municipal corporation and charter city ( "City "), and TETRA TECH EC, INC., a Delaware corporation ( "Consultant "), whose address is 17885 Von Karman Avenue, Suite 500, Irvine, CA 92614, and is made with reference to the following: RECITALS A. On July 15, 2013, City and Consultant entered into a Professional Services Agreement ( "Agreement ") for engineering services for the City's Newport Boulevard (Central Avenue to 19th Street) Transmission Pipeline Replacement Preliminary Design Project ( "Project "). B. City desires to enter into this Amendment No. One to reflect additional services not included in the Agreement for the Via Oporto to 28th Street portion of the Project, to extend the term of the Agreement to June 30, 2014 and to increase the total compensation. C. City and Consultant mutually desire to amend the Agreement, as provided below. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. TERM Section 1 of the Agreement is amended in its entirety and replaced with the following: "The term of this Agreement shall commence on the Effective Date, and shall terminate on June 30, 2014, unless terminated earlier as set forth herein." 2. SERVICES TO BE PERFORMED Exhibit A to the Agreement shall be supplemented to include the Scope of Services, attached hereto Exhibit A and incorporated herein by reference ( "Services" or "Work "). Exhibit A of the Agreement and Exhibit A of Amendment No. One shall collectively be known as "Exhibit A." The City may elect to delete certain Services within the Scope of Services at its sole discretion. 3. COMPENSATION TO CONSULTANT Exhibit B to the Agreement shall be supplemented to include the Schedule of Billing Rates, attached hereto as Exhibit B and incorporated herein by reference ( "Services" or "Work "). Exhibit B of the Agreement and Exhibit B of Amendment No. One shall collectively be known as "Exhibit B." Section 4.1 of the Agreement is amended in its entirety and replaced with the following: "City shall pay Consultant for the Services on a time and expense not -to- exceed basis in accordance with the provisions of this Section and the Schedule of Billing Rates attached hereto as Exhibit B and incorporated herein by reference. Consultant's compensation for all Work performed in accordance with this Agreement, including all reimbursable items and subconsultant fees, shall not exceed One Hundred Eighty Nine Thousand Dollars ($189,000.00), without prior written authorization from City. No billing rate changes shall be made during the term of this Agreement without the prior written approval of City." The total amended compensation reflects Consultant's additional compensation for additional Services to be performed in accordance with this Amendment No. One, including all reimbursable items and subconsultant fees, in an amount not to exceed One Hundred Fifty Two Thousand Four Hundred Dollars and 00/100 ($152,400.00). 4. INTEGRATED CONTRACT Except as expressly modified herein, all other provisions, terms, and covenants set forth in the Agreement shall remain unchanged and shall be in full force and effect. [SIGNATURES ON NEXT PAGE] Tetra Tech EC, Inc. Page 2 IN WITNESS WHEREOF, the parties have caused this Amendment No. One to be executed on the dates written below. APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Date: By: ~I Aaron CV Harp City Attorney 11P ATTEST: Leilani I. Brown City Clerk CITY OF NEWPORT BEACH, a California municipal corporation Date: By: Keith D. Curry Mayor CONSULTANT: Tetra Tech EC, Inc., a Delaware corporation Date: By: Tom Epperson, P.E. Vice President Date: By: Steve Tedesco, P.E. Senior Vice President [END OF SIGNATURES] Attachments: Exhibit A — Scope of Services Exhibit B — Schedule of Billing Rates Tetra Tech EC, Inc. Page 3 EXHIBIT A SCOPE OF SERVICE Tetra Tech EC, Inc. Page A -1 CITY OF NEWPORT BEACH Newport Boulevard Transmission Main Replacement (Via Oporto io 281' Street) SCOPE OF WORK FOR AMENDMENT NO. I Members of the project team have performed an in -depth review of the project. We have also visited the project site and have discussed the project with the City. Based on this information and our previous experience working with the City, we propose to provide the following scope of work: Phase 1 — Preliminary Design A. Project Kick -off Attend project kick -off meeting to review project scope, schedule, budget and work plan. B. Data Gathering, Utility Research and Base Mapping 1. Complete base mapping and plot existing utilities based on information obtained from the available record documents unless revised due to USA markings. 2. Perform field work to confirm above ground features. 3. Meet with City Public Works to discuss: project overview; permit requirements; working hours; lane closures; storage of equipment; construction access; trench backfill requirements; pavement removal and replacement; and future projects. Prepare meeting minutes and distribute to all attendees for their concurrence. 4. Send second utility notice including final plans requesting the utility verify locations of their facilities, identify any possible utility conflicts, and coordinate construction activities. 5. Maintain a complete record of all utility contacts and responses and copy all correspondence to the City. C. Alignment Alternatives 1. Evaluate alignment alternatives considering utility location, constructability, traffic assessments, citizen impacts, community concerns, and City requirements. 2. Provide strip plot and typical cross sections for the recommended alignment. 3. Meet with the City to discuss the recommended alignment. D. Pipe Material Evaluation 1. Evaluate alternative pipe materials (i.e.: C -905 PVC; HDPE, DIP; or CML &C steel pipe with cathodic protection). The evaluation will include the proposed bends, restraint joints, etc. 2. Meet with the City to discuss the alternative pipe materials. Phase 2 — Final Design A. Finalize Base Maps 1. Perform field walk to verify plotting of utilities for the recommended alignment. P:\0937843001T,Mgml \CortespTinal Design RsWerf Propoaalieu -4- TETRA TECH CITY OF NEWPORT BEACH Newport Boulevard 1'ransmission Main Replacement (Via Oporto to 28" Street) 2. Finalize design concepts including pipe material and traffic control, pavement replacement, work hours, construction phasing, etc. 3. Perform any necessary field survey work to compliment the City survey data from the street improvement project and the OCSD's sewer rehabilitation project. For this proposal, we have assumed one day of survey work may be required. B. Pothole Investigation Tetra Tech will have a subconsultant provide subsurface utility services to determine the horizontal and vertical position of critical utilities that cross the proposed pipeline. We have assumed that the "Watch Manual" can be used for the necessary traffic control plans for the pothole investigation. The subconsultant performing the potholing will provide traffic control and will backfill the hole with slurry and hot permanent AC paving. For this proposal, we have assumed a total of ten (10) critical utility crossings that may need to be potholed during the final design. C. Geotechnical Investigation I. Review pertinent existing geotechnical reports made available and within Leighton's in -house library and perform a detailed site reconnaissance of the alignment. Leighton has previously performed geotechnical explorations at the following sites: the old City Hall site; a commercial property at 3424 Via Lido; and a redevelopment project at 3355 Via Lido. 2. Apply for an encroachment permit from the City of Newport Beach. 3. Premark the proposed boring locations and contact USA. Provide traffic control during the course of the field exploration in the street right -of -way. 4. Perform a subsurface exploration consisting of three hollow -stem auger borings to a depth of 15 feet below the existing grade. 5. Perform laboratory testing and geotechnical analysis of the collected data. 6. Prepare a geotechnical report presenting the findings and recommendations including: alignment and groundwater conditions; geologic hazards; sulfate potential on concrete; corrosivity; construction dewatering; temporary excavations; and temporary shoring. D. Construction Plans 1. We envision the construction plan set to include the following drawings: • Title Sheet including vicinity map, location map, and sheet index • Second Sheet including general notes, domestic water notes, abbreviations, legends, and contact information • Horizontal Control Plan • Typical Street Sections • Plan and Profile sheet — Newport Boulevard (3 sheets) • Plan and Profile sheet — Finley Avenue • Plan and Profile sheet — 32nd Street Pa09378- 1300IWmjMgmt\Cornp\Final Design Revised Proposal text -5- TETRATECH CITY OF NEWPORT BEACH 4a Newport Boulevard Transmission Main Replacemonl (yla Oporto to 28'n Street) • Plan and Profile sheet — 29h Street and Alley between 280' and 29h Streets • Connection Details — 8 connection details (2 sheets) • Trench and Miscellaneous Details • Miscellaneous Pipe Details • Miscellaneous Appurtenances and Details (2 sheets) • Traffic Control Plans (16 sheets) • Detour Sheets — Finley, Finley alley, 29th Street and 28'h to 29h Alley (2 sheets) 2. All drawings and design specifications will be prepared in accordance with the City of Newport Beach "Design Criteria, Standard Special Provisions and Standard Drawings" and the Standard Specifications for Public Works Construction ( "Green Book "). 3. Plans will be prepared in 2010 version of AutoCAD and using the City's drafting standards. Each plan sheet will be on City standard 24 -inch by 36 -inch bond sheet. E. Specifications 1. Tetra Tech will prepare the detailed special provisions, technical specifications and a bid schedule (including quantity estimates). The special provisions will be prepared in accordance with the requirements of the City's design criteria. 2. Tetra Tech will prepare an itemized opinion of probable construction cost for submittal at the 90 percent and final design completion levels. F. Project Schedule 1. Tetra Tech will prepare and update the project schedule throughout the course of the design. The schedule shall include the pre - design, design, bid and construction phases. 2. Tetra Tech will identify pipeline manufacturing and delivery times for all long -lead items. G. Submittals 1. Construction plans and specifications shall be submitted to the City for review at the 75- and 90- percent completion level. Eight (8) full -size copies shall be provided for the submittal. 2. 90 Percent Design Review will include: Tetra Tech will submit, as a minimum, the final plans reflecting 75 percent design review corrections, a complete and detailed cost estimate on the contractor's bid proposal form (with cost estimate back -up detail), complete and bound special provisions, contract documents and any appendices for review and comment by the City. 3. Final Approval Review: Tetra Tech will submit final plans reflecting 90 percent design review corrections, complete and bound special provisions, contract documents and any appendices, for final approval and plan signature by the City. 4. Upon resolution of all City review comments, the final signed plan set shall consist of a mylar for the title sheet and bond plots for the remaining sheets. This plan set shall be submitted for the City's approval. 5. We have assumed a minimum period of two (2) weeks for City plan review for each submittal, except for the traffic control plans. We have assumed that the traffic control plan review will take a minimum of three (3) weeks. PM9378- 13001TrNMgm0CorrespT1na1 Design Revised Proposal we -6- T'E'TRA TECH CITY OF NEWPORT BEACH Newport Boulevard Transmission Main Replacement (via Oporto to 28'" Street) Tetra Tech will preview each plan submittal with the City staff in a preview meeting. The Project Manager will attend the meeting for the City's approval to explain or answer any remaining questions. 6. Tetra Tech will submit the final electronic files to the City on two separate compact disks: the AutoCAD files will be contained on one CD, while the second CD will contain a single PDF file of the entire construction drawing set including the construction specifications. H. Team Meetings Schedule and lead status meetings with the City. Prepare meeting's agenda and provide meeting minutes and action items. For this proposal, we have assumed a total of six (6) meetings will be required. I. Addenda Preparation During the bidding period, Tetra Tech will provide information and answer questions. Tetra Tech will prepare two (2) addenda, if so requested by the City. J. Corrosivity Evaluation We have assumed that a corrosion evaluation is not part of our scope of work. During the discussion of the alternative pipe materials, the City and Tetra Tech will discuss the necessary details for corrosion protection of the selected pipe material. Tetra Tech can provide a scope and fee for the corrosion evaluation if desired by the City. Phase 3 — Construction Phase Services A. Project Meetings Tetra Tech will attend ten (10) project meetings of one (1) hour each during the construction period of the project and provide meeting minutes. B. Contractor's Requests for Information Tetra Tech will respond to approximately twenty (20) contractor requests for information for the project. C. Minor Plan Revisions Tetra Tech will provide forty (40) hours of staff time for minor plan revisions to the construction drawings for the project. D. Shop Drawing Review Tetra Tech will review forty (40) shop drawing submittals, assuming that we will be required to perform a second review of half of the shop drawing submittals for the project. r :\0937E- 13001TmjMgmncortevpTi.II osig.Revl Noposalwt -7- TETRA CITY OF NEWPORT BEACH Newport Boulevard Transmission Main Replacement (Via Oporto to 28'h Street) E. Record Drawings Tetra Tech will prepare record drawings on 24 -inch by 36 -inch mylar for the title sheet and bond copies for the remaining sheets at construction completion using the contractor's and City Inspector's redlines for both the project. Final record drawing mylar and bond sheets, AutoCAD electronic files, and PDF files of the final as -built mylar and bond sheets will be submitted to the City at the completion of construction. CITY'S RESPONSIBILITIES 1. City will furnish all City plans and record drawings, geotechnical reports and related materials as are available and appurtenant to the project. 2. City will furnish survey records and easement information, as are available and appurtenant to the project. 3. City will furnish the design criteria, hydraulic data and other technical information necessary to complete the design tasks. 4. City will fulfill all environmental requirements. 5. City staff will be available to answer questions during all phases of the project and will facilitate coordination with the Operations staff. 6. The City will reproduce the bid set and addenda that are made available to the contractors, and be responsible for bid advertisement and selling of the plans and specifications. 7. The City will conduct the bid opening. 8. The City will reimburse Tetra Tech for the actual cost plus 10% for all outside expenses including those for material costs authorized in advance by the City and other reasonable expenses, where such costs have been advanced by Tetra Tech and approved in advance by the City. 9. Payment of all fees for permits and applications. PROJECT SCHEDULE We have evaluated and considered our current and future work load and are committed to the following schedule. The Notice to Proceed will be receipt of the payment for the design. Notice to Proceed December 2, 2013 Preliminary Alignment Meeting December 19, 2013 75% Submittal January 9, 2014 Receive City comments January 22, 2014 90% Submittal February 13, 2014 Receive City comments February 26, 2014 Receive City Traffic comments March 5, 2014 Final Submittal March 20, 2014 P: to937 &-13001tProJMgmncomptFina1 Design Revised Proposal text -8 - TETRA TECH EXHIBIT B SCHEDULE OF BILLING RATES Tetra Tech EC, Inc. Page B -1 CITY OF NEWPORT BEACH Newport Boulevard Transmission Main Replacement (Via Oporto to 28 "i Street) Tetra Tech will perform this work for Amendment No. 1 on a "Time and Material" basis with the following "Not -to- Exceed" amount. Attached is our labor plan including the estimate of staff hours by job title required to complete each task in the scope of work. The following is a summary of our fee estimate: Phase 1 — Preliminary Design $ 8,600 Phase 2 — Final Design $ 109,400 Phase 3 — Construction Phase Services 34.40 Total Not -to- Exceed Amount $152,400 P:10318- 13001TMJM6tanCortep\Final Oeslsn ReNsM Proposal text -9- TETRA 'TECH Clly of Neween Beach Newpon Blvd TM Replacement (Via OpOd0 to 281, Street) Fee Summery TaekO.Optioa 6cape of Sarvtova Project Ma.gt..nt lwwlnp QA 12 0 0 0 0 12 $3,561 80 $3,564 MeelinW(6) 4 B 0 0 0 12 82,500 6122 $2,89D Dela peeavl% WE, end Sew Mepping 0 0 6 24 2 34 $4,236 Sea $4,300 Alignment AltemaliveceM Pipe Matadd 2 4 8 16 0 30 .$4.270 $22 $4,390 Flee U.B.eMa,smthtrv, 0 0 0 0 0 16 $2,W $3,700 55332 POW. t..T,11. 0 2 4 0 1 7 1960 $11,000 $11,960 Rnolechnicel lay.4,11an 0 2 4 0 1 7 $960 $1$660 $13.610 Tdle Sheeebemnd Sheet 0 2 4 10 0 18 $2,090 $0 $2,090 HcahOmah COMmI e,M$ImM extlom 0 0 4 18 0 20 $2,504 $0 v.se,: Plan and Pmille - Nelryon BNd(3) 2 8 16 30 0 64 $7,384 ED $7.084 Plan aM Pmtlla - Reley AVe. and May 0 2 6 12 0 20 $2,690 $0 $21580 me am Pmiile -02nd Slrect 0 2 6 12 0 20 $2,598 $0 $2,598 Planaadpyotile- 2tthmMAlhy 0 2 6 12 0 20 $2,598 $0 $2,69(1 Ocnnedlen Dilate (2) 0 4 8 16 0 28 93,884 $0 $3,604 Tmneh end Mlev. Pip Battle (21 0 2 0 12 0 20 $2,598 50 52$99 MW. Apputm... Well. (2) 0 4 la 20 0 34 $4,440 $0 $4,440 Tre0b Cammt Plmo(18) 0 0 0 80 0 Be $91920 $16.000 $25,920 Delam Plane he 0 0 0 1D 0 10 $1,240 ac ette $3240 6peaificw1c a 6 20 4 0 0 38 $6,462 $0 $5,462 6uhmhhlseM Pcoasting D 2 4 0 1 15 $Lou SO $1,962 Adde,Me Pmpatmlon 9 6 0 4 1 1a 32,190 $0 52,190 Pdcft.a A,nad alon 0 0 0 0 0 0 $0 $1.826 $1.626 PreIlMnary aM Flnvl Dwi6n 6ablohi2B '• 68 ;106 280': 14 "' 600 x..$70,010;if4]184 '16110,000. %'. ConaVUeXOn Ph.. Samc. Pro(aAMae1in,(f0) 0 20 0 0 0 20 $3.300 $200 $3,500 C.ahamt0 RF6v(20) 4 30 10 0 0 4A 57,438 EO $7,430 MOnon ph. Awlsoce(401rouc) a 0 4 30 0 d0 ¢1.934 30 $4,884 Shop Dmntn, Revlew(40) 0 40 6D 0 8 108 $15,060 $266 $15.340 R.4 O.Mop 0 0 4 t8 0 22 $2,752 $388 $1,138 Conanucc.n Phoee S.Icecl 9 BO 1 76 60 _''6 2$2' ' W,634_ r .'C$688 TOTAL 32 ise I `184 - ;944'" 20 .738 X5104,060 "$40,060 .6162,460 1114 \ \OpORTO 411)0 32ND STREET Attachment B PROJECT LOCATION - I I n 31 T STREET Q 30TH STREET L=71 29TH STR ET L 2a�\A S� Water Transmission Main Replacement CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT Newport Blvd. — Via Oporto to 28th Street 11/26/13