HomeMy WebLinkAboutSS3 - Newport Bay Flood Levels - PowerPointiTi i ►� :
- , • • i 40
A Presentation on Newport Harbor's Base Flood
Elevation (BFE)
Balboa Island Sea Wall Height
�I
0
s,
�resentatic
Changes to the National Flood Insurance Program.
Biggert- Waters Flood Insurance Reform Act of 2012
Results of the Base Flood Elevation Study by DHI.
Balboa Island - Sea Wall Replacement.
Hurricane
Season in 2005 - Katrina, Rita,
Wilma
cost
the nation
$17.713illion. Then came Sandy
in 2012.
Government paid out more $ in claims than premiums
received.
Additional financial burden
to Taxpayers.
Biggert - Waters Flood Insurance Reform Act of 2012
,x Rates are going to reflect current RISK.
❖ The Higher the Risk the Higher the Premium.
Same concept as auto insurance.
Risk will
be based
on whether the
property is above
or
below
the
Base
Flood
(BFE).
Elevation
Establishing the height of the BFE and the height of
the property in reference to the BFE is critical.
Current Base Flood Elevation is 9.0'.
Rate comparisons
$2.23&yr
$2.235/yr
Non-Actuarial $2.23&yr
I fool above BFE
toot below 8F E
feet below BFE
$OIWYr
$5,6231yr
Actuarial $25,000,ayr
Lj
84Ading- $200,000 Contents- $80,000(2201224 Ratesi J
I�F.tii �
iZ1iT1MAffrel" - 1ira: M40 M
single -story structure:
Subsidized Premium Rates before
Premium Rates following elimination of
BW12
subsidies— after October 1, 2013
Pre -BW 12 Subsidized Rates for
Post -BW12 non- subsidzed Rates for
$250K /$100K Building /Contents Policy
$250K/$100K Building /Contents Policy in
in high risk, non - coastal AE zones (no
high -risk non - coastal AE zones (with
elevation certificate) .
Elevation Certificate).
Lowest floor of property is 4 feet
$3,600
$553
above base flood elevation
Lowest floor of property is at
$3,600
$1,815
base flood elevation
Lowest floor of property is 4
$3,600
$10,723
feet below base flood elevation
Insurance will increase at a rate of 25% per year until
at adjusted rate.
Non - primary residence
Owners of businesses
Change of Ownership / New Loan
New Policy
Insurance Lapse
deduce Insurance Cc
How do you Address your Risk?
Know your property elevation compared to BFE.
-You may need to hire a surveyor.
Speak to your Insurance Agent.
www.newportbeachca.gov
Search: surveyors elevation
y
��� �� ` ` ` 1' - I ■III IIII i IIII II 11' II11 1111_1 � -, * =��
-�� • `� � � .`4Q III 11111 II III 111 _ �� C_ _� �_ == ��i��� � ®,�
��I_' IIIIIIII 11■ 1111■ 111.1. 111 1 1111 1111 1111 111111 1111 111 1 111 _ 1 1 \, _ _
y
L
KIN
•:• •
7 Unit 19M - 7 Unit IM - 12 Unit 12 Unft 11 Unit Parcels vAlh EC's - 269 Total or 19%
INI Unt; 9WAUnts M1 - 6 Unit � - 13 Unfts Mll - 8 Unit Parcels wthout ECS - 1,148 Total or 81%
7�
deduce Insurance Cc
HOW DO YOU REDUCE INSURANCE RATES?
Elevate the building;
Discuss mitigation measures with your Agent;
Increase the deductible;
More information can be found at:
www.fema.gov 1bw12
Current Congressional Spending bill & future bills.
May delay rate increase for some property owners.
Base Flood Elevation Study
:1�: j.�a r@lGl• ■ ra�f: j j [Gj fi ■ ■:
Study (public copy provided)conducted by DHI w/
help from Lyle Engineering:
To Determine if FEMA's BFE of 9.0' is
correct?
To Determine BFE based on recent data?
Minimum Seawall height so Balboa Island is
no longer in a flood zone.
:1�: j.�a r@l6l• ■ ra�f: j j r6j fi ■ ■:
TERMINOLOGY:
NGVD29 — Established in 1929, as the vertical
control datum establishing vertical control
surveying.
NAVD88 — Proposed in 1988, a more
sophisticated method for vertical control
surveying.
Conversion between NGVD29 and NAVD88 is
an increase of 2.3' for our area.
:1�: j.�a r@lGl• ■ ra�f: j j [Gj fi ■ ■:
❖ Determine if FEMA's BFE of 9.0' is correct?
1978 The Flood Map showed a Base Flood
Elevation of
6.0' NGVD29. oe AM, � \
ZONE A '
a a>
ION :6
\I n
AVr
ZONES
ALVAPAnl) WA
1't fVPl�l �i5
Island
. O L UNS
/ Avr
y WPOVOIYC
Ae
AY ZONE B
B 1. •.:
(ON CSI
• • re ■2r
-�i �riTiTl
In Late 2003 FEMA Converted its paper Flood
Maps to Digital Maps, but at the same time
converted the maps to '�AVD33.
Flood
Levels
were converted and
rounded
using
various
conservative assumptions.
• • re ■2r
-�i �riTiTl
NGVD29 was converted to NAVD88:
6.0' + 2.3'= 8.3' NAVD88
For some reason this was rounded UP to
9.0' instead of DOWN to 8.0'.
Confirmed Error by FEMA's Contractor.
• • re ■2r
-�i �riTiTl
Determine BFE based on recent Data.
DHI performed engineering analysis of
National Oceanic Atmospheric Administration
(NOAH) tide gages using FEMA approved
methods.
Consultants analyzed the data two different
ways.
• • re ■2r
Results:
-�i �riTiTl
Base Flood Elevation is 7.7' today. (8.0')
Waves in harbor from ocean are minimal.
Waves generated from wind require further
analysis.
r -1
40
r
r]
L
To be considered as a coastal levee, a
2 -foot freeboard is required on the seawall.
Top of
Seawall - 11.0'
BFE - 9.0'
Proposed
Top of
Seawall - 10.0 Min
Proposed
n
u
i�
California Coastal Analysis and Mapping Project
-A study to update the Flood Insurance Rate Maps.
Open a dialogue with FEMA and share the results of
our study so as to ensure the BFE is at 8.0'.
Balboa Island Sea Wall
Height &Drainage
Existing Drainage System on Balboa Island
INS
BALBOA
ND
v'
v`
P JV
4ie `P
PO
uPP
P
(yP/ aW
BALBOA AVE
E�
V
QPP Q > C
o
s Q
a
a
w
O m
x
z
u
d PARRAVE
+.,� �P
♦QeP �P�
o�
�e
BAY FRONT ALL Y S
lS /'s.,
\ O
f/
1
4 } }
BALBOA ISLAND
Tide Valves
Protects the Island from Flooding due to High Tides
Currently Manually Operated
Manually Operated
with Valve Key
Power Assisted with
Manually Operated Up /Down Switch
New Rubber Tide Valve (Check Valve)
➢ No Moving Mechanical Parts - Silent, Non - Slamming
➢ Non — Corrosive - Durable Rubber Construction
➢ Minimal Maintenance and Periodic Inspection Needed
➢ Around 1" of Water Pressure Opens Valve helping Eliminate Standing Water
➢ Simple Installation.
Estimated 25 -Year Life
I
S
i
Low Flow Open
Full Flow Open
Closed Against Tide
New Rubber Tide Valve (Check Valve)
1'
,IM `
hik"
HOP 13 2012
Existing Island Seawall and Flood Protection Conditions
Existing FEMA Base Flood Elevation = 9.0' (NAVD88)
Finish Floor's at or above 9.0' will pay a lower Flood Insurance Rate.
Finish Floor's below 9.0' will pay a higher Flood Insurance rate..
Existing Base Flood
Elevation (BFE) = 9.0'
EL7.6'to87
Top Existing Seawall
EL65'
'Nalkwa /'
EL 9.tY (Ex. 6Y-11.6')
Finish Floor
EL 6.4'
Top of Curti
'hater Table
Existing Island Seawall and New FEMA Base Flood Elevation
Possible New FEMA Base Flood Elevation = 8.0' (NAVD 88)
Requires Letter of Map Revision (LOMR) by FEMA
Finish Floor's at or above 8.0' will pay a lower Flood Insurance Rate.
Finish Floor's below 8.0' will pay a higher Flood Insurance Rate.
Existing Base Flood Elevation
Possible New FEMA Base Flood
Elevation (BFE) = 8.0;
EL. 7.6' fo 8.7'
Top Existing Seawall
--- -- - - --
.............. —.J
EL 9.0' (Ex 6.1' - 11.6)
Finish Floor
EL 6.4'
Top of Curb
■,,, ........................... ...............
Water Table
EL 6.5'
Walkway
Proposed New FEMA Certified Island Seawall with Drainage System
That would provide 100 Year Storm Protection
♦ Island Removed from prior FEMA Flood Plain with Seawall Elev. = MY
(Stillwater Elev. of 8.0' + 2.0` of Freeboard)
* Base Flood Elevation Determined by Drainage System -100 Year Storm Water Elevation.
• Adjacent Grade of Structure must be above 100 Year Storm Water Elevation to be out of the
Flood Plain and will pay a lower Flood Insurance Rate
Top of New Seawall
EL 10.0'
All Water EL a.0
Adjacent Grade Elev. needs to
be above 100 food Eley.
EL 6.4'
Tap of Curb
Water Table
EL 6.5'
Walkway N
New Base Flood Elevation Proposed
at or below Street Curb Elevation +-
NEW DRAINGE
SYSTEM
CONCEPT
J�
Q
F'
9
>
>
> w
PP
Q
Q
Q >
a
e9� QQ�
PARK
AVE
O
X102
Y
O
>
z
L
SOUTH
CONSOLIDATE GRAVITY DISC
POINT WITH AUTO TIDE GATE
PUMP STATION BACK UP pd
➢ Reduce Number of Discharge Points
➢ Automate Tide Values
➢ Provide High Water Pump -Out Capacity
Sub - Terrain
Storm Water
Pump Station
Will also Need to Develop Acceptable
Flood Proof Solution for Ferry Landing
1114, 11
L J tv
r .E
M�
A
R
K
I _ I ,►
I_
USE
OTHER
AUYU FERRY I W
"1%
�s
i
1
FEMA to Process a Letter of Map Revision (LOMR) to
Lower Base Flood Elevation from 9.0' to 8.0' &
Collaborate with FEMA during the California Coastal
Analysis and Mapping Project to ensure 8.0' BFE.
Review and Provide Comments to the pending Sea
Level Rise Policy Guidance Document to Ensure
Ability to Construct and /or Maintain Necessary
City /Harbor Flood Protection Improvements.
Work toward the Eventual Upgrading or Replacement
of Balboa Island and Other Critical Sea Wall Flood
Structures.
Duesti�
Community Development Department
Public Works Department
Protecting and Providing
Quality Public Improvements and Services