HomeMy WebLinkAbout5.0 - Lido Marina Village - PA2014-002CITY OF NEWPORT BEACH
PLANNING COMMISSION STAFF REPORT
February 6, 2014 Study Session
Agenda Item 5
SUBJECT: Lido Marina Village (PA2014 -002)
Anticipated Discretionary Applications:
• Conditional Use Permit (Parking)
• Comprehensive Sign Program No. CS2014 -001
• Modification Permit (Signage)
• Conditional Use Permit(Restaurants)
SITE 3600 -3700 Newport Boulevard, 3400 -3444 Via Lido, and 3400 -3505 Via
LOCATION: Oporto
APPLICANT: Lido Group Retail, LLC
PLANNER: Makana Nova, Assistant Planner
(949) 644 -3249, mnova @newportbeachca.gov
PROJECT SUMMARY
Lido Marina Retail Associates (Lido Group Retail, LLC) is proposing a renovation of the
existing Lido Marina Village. The project will be re- branded to create an upscale casual
atmosphere while retaining the coastal charm of the Lido community. Interior and exterior
of buildings, streetscape, and waterfront boat slips will be renovated, remodeled and
rejuvenated over an eight phase development process.
The applicant will provide a detailed overview of the project, which includes the following
elements:
1. Parking structure - Exterior fagade improvements, new signage, and lighting are
proposed. Interior improvements include restriping of the existing parking
configuration, the addition of valet parking areas, and new interior lighting and
wayfinding signage.
2. 3444 Via Lido - Exterior renovation including paint, lighting, signage, and retail
display. Interior improvements include tenant improvements to accommodate new
office and retail tenants.
3. 3700 Newport Boulevard - Exterior renovation including new paint and materials,
landscape, lighting, signage, and window replacement. Interior improvements
include tenant improvements to accommodate new office /retail tenants.
4. 3400 -3442 Via Lido - Exterior fagade improvements of existing tenant spaces
including new paint, awnings, landscape, signage, and lighting. Interior
improvements include tenant improvements to accommodate new retail tenants or
maintain existing tenants in place.
1
Lido Marina Village Study Session (PA2014 -002)
February 6, 2014
Page 2
5. 3400 -3448 Via Oporto- Exterior renovations including new paint, roof, doors and
windows, landscape and hardscape, and lighting. Interior improvements include
tenant improvements to accommodate new office, retail, and restaurant tenants
consistent with the existing mix of uses.
6. 3450 Via Oporto- Exterior renovation of the existing building including new facades,
doors and windows, the structure, landscape, lighting, and outdoor dining.
Proposed interior improvements include a proposal to subdivide the existing
building into two separate restaurant uses along with limited retail space at the
ground floor level.
7. Rights -of- way - Eliminate parallel parking on Central Avenue and increase the
number of parking stalls by adding angled parking. Renovate the entire streetscape
along Via Oporto by demolishing the existing circular planter /round -about to
improve traffic flow and adding parallel parking along the northeast street side with
curved landscape planters to separate pedestrian and vehicular traffic. Additionally,
sidewalk improvements, signage, landscaping, and new street lighting are
proposed throughout the project site.
8. Boat Slips- Renovation of the existing boardwalk frontage and reconfiguration of
the existing slip configuration to reduce the number of slips from 47 slips to
approximately 43 slips.
Staff will provide an overview of ministerial actions and anticipated discretionary
applications that are needed for the project as well as a status update of the existing use
permit approvals for restaurants within Lido Marina Village.
RECOMMENDATION
Staff recommends that the Planning Commission discuss the proposed project and
provide direction to staff as necessary.
PUBLIC NOTICE
Although not required, a courtesy notice of this review was published in the Daily Pilot,
mailed to all owners of property within 300 feet of the boundaries of the site (excluding
intervening rights -of -way and waterways) including the applicant and posted on the
subject properties at least 10 days prior to the decision date, consistent with the
provisions of the Municipal Code for public hearings. Additionally, the item appeared on
the agenda for this meeting, which was posted at City Hall and on the City website.
Prepared by:
Ma ana V0va
Assistant Planner
Submitted by:
r n a Wisnes i, r C1CP,1Jpu�tyDirecto_r
2
ATTACHMENTS
PC 1 Vicinity Map
PC 2 Project Narrative
PC 3 Phasing Plan
Lido Marina Village Study Session (PA2014 -002)
February 6, 2014
Page 3
3
4
Attachment No. PC 1
Vicinity Map
5
0
i'
q
Attachment No. PC 2
Project Narrative
I
10
PROJECT NARRATIVE
sa %q
ARCHITECTS
949.757.3240
LIDO MARINA VILLAGE
JANUARY 13, 2014
17848 SKY PARK CIRCLE, SUITE 8 IRVINE CA 92614
WWW.SMS- ARCH.COM
PAGE 1 OF 15
I 1
PROJECT NARRATIVE
Lido Marina Village
Newport Beach, California
r_19]�f?k1ilY�
Lido Group Retail, LLC
3700 Newport Blvd
Newport Beach, California
PROJECT INFORMATION
r(ONNIPLaILTA llIIINDI li9leq XIMAVaJ'_11 :11MaaWl1:110]
SITE AREA 12.052 SF (0.277 AC)
BUILDING AREA 122,395 SF
PROJECT LOCATION
949.757.3240
AREA OF WORK
..... ...............................
............
VIA LIM
17848 SKY PARK CIRCLE, SUITE B IRVINE CA 92614
F4,kq � "�hqnq
iai
ARCHITECTS
WWW.SMS- ARCH.COM
PAGE 2 OF 15
12
PROJECY OVERVIEW
Lido Marina Retail Associates (Lido Group Retail, LLC) is proposing a major renovation and re-
positioning at the existing Lido Marina Village in Newport Beach. The project will be re branded
to create an upscale casual atmosphere while retaining the coastal charm of the Lido
community. Buildings, streetscape and waterfront will be renovated, remodeled and
rejuvenated to create a transformation of a place long in need of a major facelift. Lido Marina
Village will become a wonderful place to live, shop in interesting and different stores, bring the
kids, run into friends, and have a great time.
PROJECT PHASING
We intend to implement a phased approach to the renovation to Lida Marina Village. Eight
segmental phases of work are proposed.
949.757.3240
F4,kq � "�hqnq
iai
ARCHITECTS
LOGISTIC/ PHASING PLAN
17848 SKY PARK CIRCLE, SUITE B IRVINE CA 92614
WWW.SMS- ARCH.COM
PAGE 3 OF 15
2�
PHASE 1: PARKING STRUCTURE
F444 � "�hqnq
iai
ARCHITECTS
EXTERIOR RENOVATION
New Paint
Signage - New project identity signs
- New parking structure identity and directional signage
- New tenant signage
Storefronts - Renovate or replace existing tenant storefronts along Via Oporto
- Add new awnings
Lighting - Replace existing light fixtures
- New light fixtures to improve visibility
Landscape - Add new planting material at existing planters
- Add additional landscape and planters to soften the parking structure
INTERIOR RENOVATION
New Paint - Paint interior bright white
Signage - New directional signage and graphics
Lighting - Provide photometric study
- Replace and add new lighting throughout parking structure to improve
lighting levels.
949.757.3240
17848 SKY PARK CIRCLE, SUITE B IRVINE CA 92614
WWW.SMS- ARCH.COM
PAGE 4 OF 15
14
PHASE 2: 3444 BUILDING
F4,kq � "�hqnq
iai
ARCHITECTS
Wk
EXTERIOR RENOVATION
New Paint
Entry renovation
New green wall
Display windows
INTERIOR RENOVATION
- New wall tile
- New light fixtures
- New planting
New green wall at building corner
New tenant signage
Add four new retail display windows along Central Avenue
Demolish interior, clean and repair for future tenant
Structural upgrades
New HVAC system
949.757.3240
17848 SKY PARK CIRCLE, SUITE B IRVINE CA 92614
WWW.SMS- ARCH.COM
PAGE 5 OF 15
2,5
PHASE 3: 3636 AND 3700 BUILDING
NEWPORT BLVD
3636
CENTRALAVE
AIM O190JIdC4I
EXTERIOR RENOVATION
F.
3700 \
Complete exterior building renovation including new fagade design, window and door
replacement.
I►wr�eu�:�a���re►i rrr.���i
Demolish interior, clean and repair for future tenant.
3700 BUILDING
i� rr�areaa���rm rrrm�i
New paint and graphics
New acoustical windows
New landscaping
949.757.3240
17848 SKY PARK CIRCLE, SUITE B IRVINE CA 92614
4IF44 � "�hqnq
iai
ARCHITECTS
WWW.SMS- ARCH.COM
PAGE 6 OF 15
10
PHASE 4: VIA LIDO
kv
EXTERIOR RENOVATION
F444 � "�qnq
1111111110 "Ift
iai
ARCHITECTS
Fagade renovations including new paint and awnings, some storefront replacement, new
signage, lighting and landscape.
Lido Group Retail controls the 3418, 3420, 3422 and 3424 buildings. They are currently in
negotiations with adjacent property owners to participate in the renovation of the entire
building block.
PHASE 5: 3400- 3442 VIA OPORTO
949.757.3240
17848 SKY PARK CIRCLE, SUITE B IRVINE CA 92614
WWW.SMS- ARCH.COM
PAGE 7 OF 15
z7
EXTERIOR RENOVATION
New paint
New roofing
Facade renovations; new board and batten wood siding in selected areas
Replacement doors and windows
Upgrade or replace lighting
Renovation of building alleys including new landscape, hardscape and lighting
Additional public restrooms
Renovation of waterfront including new light poles, planters and furnishings
INTERIOR RENOVATION
Demolish interior, clean and repair non leased spaces to prepare for future tenants
PHASE 6: 3450 BUILDING
1jMCARY
949.757.3240
17848 SKY PARK CIRCLE, SUITE B IRVINE CA 92614
!4144 , rihqnq
iui
ARCHITECTS
WWW.SMS- ARCH.COM
PAGE 8 OF 15
18
EXTERIOR RENOVATION
Complete building renovation within existing building footprint
New exterior siding, roofing, windows and doors
New outdoor dining areas
EXTERIOR RENOVATION
Demolish interior, clean and repair spaces for future tenant
Structural upgrades
New HVAC
Add new elevator
!qklq� M�hnq
ias
ARCHITECTS
949.757.3240 17848 SKY PARK CIRCLE, SUITE B IRVINECA92614 WWW.SMS- ARCH.COM
PAGE 9 of 15
19
PHASE 7: STREETS
949.757.3240
17848 SKY PARK CIRCLE, SUITE B IRVINE CA 92614
F4ftftq � "�nq
iai
ARCHITECTS
WWW.SMS- ARCH.COM
PAGE 10 OF 15
20
CENTRALAVENUE
We are proposing to eliminate the parallel on street parking and increase the number of
parking stalls by adding angled parking along Central Avenue in addition redo the sidewalks
and add additional landscaping and new street lighting.
Streets shall remain two way.
SID
!qklq� M�hqnq
ias
ARCHITECTS
141:10111 1.7-11 W_/ MI I G19 :10:1411 M L I
VIA OPORTO
We are proposing to renovate the entire streetscape and hardscape along Via Oporto.
Eliminate the large circular planter/ round about to improve traffic flow.
Extend the corner of Via Oporto and the alley to add additional landscaped public/ pedestrian
area.
Add on street parallel parking along the northeast street side with curved landscape planters
to separate pedestrian and vehicular traffic.
Along the northwest side, add at grade landscape planters to separate pedestrian and
vehicular traffic.
Provide designated pedestrian crosswalks.
New wood decking at sidewalks and crosswalks
New street lights
New street trees and landscaping
Streets shall remain two way
949.757.3240
17848 SKY PARK CIRCLE, SUITE B IRVINE CA 92614
WWW.SMS- ARCH.COM
PAGE 11 OF 15
21
VIA OPORTO STREET SECTION
949.757.3240
24'
TWO WAY STREET
ON STREET
PARKING
!qklq� M�hnq
ias
ARCHITECTS
2' 8'
PLANTER
WITH
CURB
SIDEWALK
17848 SKY PARK CIRCLE, SUITE B IRVINE CA 92614
WWW.SMS- ARCH.COM
PAGE 12 OF 15
22
PHASE 8: BOAT SLIPS
Background
The existing Lido Village Marina is composed of a series of old wood and concrete docks that
have been in existence for over 50 years, maintained and /or altered over the years, and is in
very poor condition. This marina has been the focal point of the Newport Beach Boat Show for
many years and gets heavy use during that event, and safety of the visiting public has become
a major concern due to the age and condition of these docks. The existing marina is a
combination of slips facing the Main Channel ranging from 36ft to over 100ft, and a series of
small internal basins that are utilized for multi -use purposes, generally for small boats. The
City of Newport Beach Fire Department has voiced concern about these small internal existing
Basins being unsafe if a small boat were to catch fire, since the limited access to the
endangered boat presents an impediment to the Fire Department. We are planning to solve
this issue with the Proposed New Plan.
The existing Bulkhead was built in the late 1950's. It is also in need of some repair, particularly
to the tie backs that support the upper portion of the wall. Since these tiebacks are
underground and beneath the existing buildings, they cannot be properly assessed to
determine condition. Based on our experience with other seawalls in So Cal and in Newport
Beach particularly, we believe that these tiebacks are probably in quite poor condition at this
time and should be supplemented.
The existing landside Boardwalk is a major amenity of the Lido Village Complex. Currently, the
Boardwalk meanders between water -based floating headwalks and land -based walkways that
in some cases interact with outdoor seating for restaurants.
Proposed Plan (Still in Development)
Floating Docks
The floating docks will be replaced with new docks ranging from 38ft in length to over 100ft in
length, in a few isolated locations will serve charter vessel operations with vessels over 100ft.
We are currently evaluating the best type of dock for this marina, since dredging is not desired
because of its impact to seawall stability. Water depth can be a deciding factor in the type of
dock system selected, and candidate dock systems include both concrete and wood -type
systems.
In lieu of the many internal basins that currently exist in the marina; we are planning to include
no more than two of these basins, and limit their use to rental (human - powered) or electric
boats, thus limiting the potential fire danger that would be associated with the storage of fuel.
These basins may be of the Valet- operation type, although this decision has not been finalized.
Seawall
To augment support of the seawall, it is proposed to install new tieback earth anchors along
the outside face of the wall (a few feet below top of seawall), drilled -in to sufficient depth
underneath the property to provide full upper support for the seawall, assuming the existing
tiebacks have lost their supporting capability and have limited remaining useful life. This type
of seawall repair is common in Newport Beach, and can be seen at many marinas along the
949.757.3240
17848 SKY PARK CIRCLE, SUITE B IRVINE CA 92614
F4ftq � "�qnq
11111111110 "Ift
iai
ARCHITECTS
WWW.SMS- ARCH.COM
PAGE 13 OF 15
2_2�
coastline. The remaining structural elements of the seawall, concrete sheets and cap, are in
acceptable conditions and will require some structural repair as part of this Proposed Project.
Boardwalk
We are planning to extend the Boardwalk over the top of existing seawall, to gain a few feet of
Boardwalk width, wherever possible. These locations are shown on the attached exhibit. It is
anticipated that this extension of Boardwalk will relate to an additional 3ft of Boardwalk width
in several locations.
Agency Coordination
We are currently in discussion with the City of Newport Beach Harbor Resources Department
to discuss all aspects of this Proposed Project, and ultimately these proposals will be presented
to the Newport Beach Harbor Commission and Newport Beach Planning Department, before
final design commences and the plans are submitted to Newport Beach Public Works and
Building Plan Check authorities. All project elements also will be submitted to the California
Coastal Commission and Army Corp of Engineers, since both of these State and Federal
agencies have approval authority over these types of waterfront projects.
F444 � "�qnq
ARCHITECTS
EXISTING BOAT SLIP PLAN
949.757.3240
17848 SKY PARK CIRCLE, SUITE B IRVINE CA 92614
WWW.SMS- ARCH.COM
PAGE 14 OF 15
24
ARCHITECTS
PROPOSED BOAT SLIP PLAN
949.757.3240 17848 SKY PARK CIRCLE, SUITE B IRVINECA92614 WWW.SMS- ARCH.COM
PAGE 15 OF 15
215
g�
'J� JP
PROPOSED BOAT SLIP PLAN
949.757.3240 17848 SKY PARK CIRCLE, SUITE B IRVINECA92614 WWW.SMS- ARCH.COM
PAGE 15 OF 15
215
20
Attachment No. PC 3
Phasing Plan
27
M
CAPITAL PARTNERS, INC.
September 26, 2013
Logistics /Phasing
NEWPORT BEACH, CALIFORNIA
I
0%/13/2012
F
(/p0
Project Site
r •`
Al
1 7
3 }i
4
J k
la _
� V v ELKS
IL o s°
k
G. t+ d
o.�
D,In c
7 Doug John
Judy Brier
' Dryer ^�tl
07/13/2012 C mmunity Development Department- Planning Division \' -- 3
Parking structure and building painting
(no permits required)
Interior demolition
■ Storefront and facade improvements
• Interior tenant improvements
• Right -of -way improvements
Lighting and landscape improvements
New awnings
07/13/2012
Community Development Department- Planning Division
4
m
_z
,C9< /�FOaN�I
Parking
■ Conditional use permit -to address parking for all uses in a parking management
program.
Restaurants
• Use Permits -to address individual operations of new restaurant tenants.
• Operator license -if late hours of operation are proposed
Signage
• Comprehensive Sign Program -to reflect fagade improvements and all new
signage
• Modification Permit -for signage that exceeds standard Zoning Code
requirements
07/13/2012
Community Development Department- Planning Division
5
H
i
,
l
,
111
1,
4
'6
Ii:
. ice"
a
Work identified as ministerial to be submitted into
plan check for permitting immediately.
• Comprehensive sign program has been submitted.
• CUP application for parking expected to be
submitted within the next two weeks.
L Discretionary approvals will proceed to Planning
Commission for review and approval.
ir Marina work will proceed on a separate track for
review by the Harbor Commission.
07/13/2012
Community Development Department- Planning Division
7
1
For more information contact:
Makana Nova, Assistant Planner
949-644 -3249
mnova@newportbeachca.gov
www.newportbeachca.gov
Address parking comprehensively for the entire
village.
Uses, including restaurants will be
interchangeable between tenant spaces for
parking purposes.
Flexibility in managing tenant leasing.
Individual restaurant operations will be
maintained separately.
07/13/2012
Community Development Department- Planning Division
N
Pedestrian walk -up traffic
Multi- destination trips
Street parking
Restaurant spaces waived
Off -set peak hours for uses
Capping or limiting more intense uses
07/13/2012
Community Development Department- Planning Division
10
Use Permit No. UPi906 and Variance No. VAsoSi
Gross Floor Area: 685 sq ft
Net Public Area: Zoo sq ft
■ Outdoor Dining Patio: Zoo sq ft (non - exclusive)
Parking
• Required:3
• Parking Spaces Waived: 13
Use
Operational Characteristics: take -out, no late hours of
operation, live entertainment after 6:oo p.m.
■ Alcohol License: Type 41. (Beer & Wine)
07/13/2012
Community Development Department- Planning Division
11
Use Permit No. UP1738
• Gross Floor Area: 625 sq ft
• Net Public Area: approximately 250 sq ft
Parking
■ 6 spaces required in structure
■ Parking Spaces Waived: 7
Use
• Operational characteristics: walk -up, take -out
• No alcohol
07/13/2012
Community Development Department- Planning Division
-yz
Use Permit No. UP3-9o5A (3-994)
Gross Floor Area: 2,238 sq ft
■ Net Public Area: 1,899 sq ft
■ Outdoor Dining Patio: 240 sq ft (non - exclusive)
Parking
Required: 28
Parking Spaces Waived: 20
Use
Operational Characteristics: full- service dining, valet until
9:0o p.m., no late hours of operation, no live
entertainment or dancing
Alcohol License: Type 4-1 (Beer & Wine)
07/13/2012
Community Development Department- Planning Division
13
Use Permit No. UP2020
Gross Floor Area: 2,763 sq ft
■ Net Public Area: 631 sq ft
■ Outdoor Dining Patio: 174 sq ft
Parking
Required:
16 spaces
■ Parking Spaces Waived: 5
Use
Operational Characteristics: full- service dining,
hours of operation, and no live entertainment
a. Alcohol License: Type 41 (Beer & Wine)
07/13/2012
Community Development Department- Planning Division
i4
Use Permit No. 3626
Gross FloorArez
■ Net Public Area:
■ Outdoor Dining
17,499 sq ft
9,236 sq ft
Patio: 2,162 sq ft
Parking
a. Required: Zoo day, 175 night (after 6:oo p.m.)
■ Parking Spaces Waived: 41
Use
Operational Characteristics: full- service dining, live
entertainment /dancing and late hours of operation
a. Alcohol License: Type 47 (Beer, Wine, & Liquor)
07/33/2012
Community Development Department - Planning Division
Floor plan was limited for gaming use (no dining).
These areas were not parked.
The Planning Commission took action to revoke
the CUP. The revocation was appealed but was
never heard by City Council because the operation
went out of business. The status of the CUP
remains in limbo.
DJM Capital may instead seek approval for two
new restaurants, one on each floor level.
07/33/2012
Community Development Department - Planning Division
6
F
07/13/2012
Community Development Department- Planning Division
17
Lido Marina Retail Associates (Lido Group Retail, LLC) is proposing a major renovation and re- positioning at the existing Lido Marina Village in Newport Beach. The project will be re branded to create an upscale
casual atmosphere while retaining the coastal charm of the Lido community. Buildings, streetscape and waterfront will be renovated, remodeled and rejuvenated to create a transformation of a place long in
need of a major facelift. Lido Marina Village will become a wonderful place to shop in interesting and different stores, bring the kids, run into friends, and have a great time.
LIDO MARRINA VILLAGE
Planning Area Boundaries
LIDO VILLAGE DESIGN GUIDELINES
DESIGN AREAS & GOALS
Lido Village is divided into five distinct Design Areas having unique phys-
ical attributes and design influences. Improvements should be inspired by
improving physical interface of buildings, landscape, and circulation within
each design area. It is also important to address the surrounding or adjacent
land uses to ensure compatibility with form, function, and programming.
Lido Marina Village
At the northern point of Lido Village, the Lido Marina Village is the most
visible gateway to the Balboa Peninsula. This Design Area is currently
occupied by an eclectic mix of building types. Land uses include commer-
cial office buildings, retail storefronts, a
parking structure, and pedestrian- oriented
businesses on the northern portion of
Via Oporto and fronting onto the harbor.
Development should strive to improve the
edge conditions along major streets and
improve the pedestrian experience along
the waterfront, thereby attracting new
tenant mixes to revitalize the Village.
Lido Marina Village Goals:
• Respect and complement existing taller
buildings and massing.
• Implement quality building design and the
use of authentic materials to influence
design solutions.
• Improve edge conditions with Newport
Harbor, Newport Boulevard, and Via Lido,
reinforcing the gateway element.
• Use high quality materials for public space
improvements that reinforce Village character.
Maximize promenade and waterfront access to improve the public/
visitor experience.
Encourage the upgrade of dock and ramp systems with the reorganization
of docks further away from pedestrian boardwalk to maximize views of the
access to the harbor.
PROJECT PHASING
We intend to implement a phased approach to the renovation to Lido Marina Village. Eight segmental phases of work are proposed.
13635 BUILDING
NEW PAIM,LNTERINB.'MNIXYN6 EHIIIV. WIOWRMFA, IAINSLAPE �L„ ` e
E e
1. PARKING STRGUTURE
FJREMORREN)WX,N �� 0
NEWPART.SIIXUGE, LANLSLAPE MdI LgNIING, NEW AWNMG4, I� y� .1
NI PMR OR REPLACE STOREFRONTS
11 F RENOVAKgV / _ � el
NFN PMNT.LIGMING. SIGNK£AIAGNP➢IIKS _ ' �i�
3, 3H BUILDING
NMPAIRRFNOVAGIS
WNDP Si, LIGNIING. SIGNA(+E AIA RETAIL MWAV • Soh
UHDa S. T( �
Winnows Doug John TllObdS M..
a U" F
� Judy Brier '.
�• 7R�
. L I. MAUDO
FAGOE REWVATIPV
\ V �� � i �) _ i NFM PNM.AWHING8.LW8YME.8bNAGE
��/��'' /�
lMMIIIYA
LIDO MARRINA VILLAGE
BIIIIdNG �AVVA,NW
>.smEETs
IELVUPARKI FG WI�.:Pf£8IRFki UGHlINGANGON
NEWFAGPLE.WMSANGIWNW Si
URE.UNO.S LIdTNGANG
SINELT PNBPHG
OUTIN%.'ROINING
JII
8. BOAT BLIPS
`�C
MONSOA,, &IPOIXiYdNBATEIN
v
ELKS
5.3W631APVWOPORTO
NENOVAT(M
3.3MDoFFIGE BUILDING
\\
NEINRbN
LFVV PALM. RMF. GCgtS M
FXIFWORRWO"A
\
MD
NEWPAINTANOIMTERVdS, LVOSGWE LI
REr CEMENT
G,SIGNAGE, MNW
I
\
fin,
13635 BUILDING
NEW PAIM,LNTERINB.'MNIXYN6 EHIIIV. WIOWRMFA, IAINSLAPE �L„ ` e
E e
1. PARKING STRGUTURE
FJREMORREN)WX,N �� 0
NEWPART.SIIXUGE, LANLSLAPE MdI LgNIING, NEW AWNMG4, I� y� .1
NI PMR OR REPLACE STOREFRONTS
11 F RENOVAKgV / _ � el
NFN PMNT.LIGMING. SIGNK£AIAGNP➢IIKS _ ' �i�
3, 3H BUILDING
NMPAIRRFNOVAGIS
WNDP Si, LIGNIING. SIGNA(+E AIA RETAIL MWAV • Soh
UHDa S. T( �
Winnows Doug John TllObdS M..
a U" F
� Judy Brier '.
�• 7R�
. L I. MAUDO
FAGOE REWVATIPV
\ V �� � i �) _ i NFM PNM.AWHING8.LW8YME.8bNAGE
��/��'' /�
lMMIIIYA
LIDO MARRINA VILLAGE
PHASE 1: PARKING STRUCTURE
-LIDO-
INTERIOR RENOVATION
New Paint
• Paint interior bright white
Signage
Lighting
• New directional signage
and graphics
Provide photometric study
Replace and add new
lighting throughout parking
structure to improve
lighting levels
EXTERIOR RENOVATION
New Paint
Signage
• New project identity signs
• New parking structure
identity and directional
signage
• New tenant signage
Storefronts
• Renovate or replace
existing tenant storefronts
along Via Oporto
• Add new awnings
Lighting
• Replace existing light
fixtures
• New light fixtures to
improve visibility
Landscape
• Add new planting material
at existing planters
• Add landscape and planters
to soften the parking
structure
LIDO MARRINA VILLAGE
PHASE 2: 3444 BUILDING
EXTERIOR RENOVATION
New Paint
Entry renovation
• New wall the
• New light fixtures
• New planting
New green wall
• New green wall at
building corner
• New tenant signage
Displaywindows
• Add four new display
windows along Central
Avenue
INTERIOR RENOVATION
Demolish interior, clean and repair for
future tenant
Structural upgrades
New HVAC system
LIDO MARRINA VILLAGE
PHASE 3: 3636 AND 3700 BUILDING
bxfta S
t
3636 BUILDING
EXTERIOR RENOVATION
Complete exterior building renovation
including new fa4ade design, windows
and door replacement.
INTERIOR RENOVATION
Demolish interior, clean and repair for
future tenant.
3700 BUILDING
EXTERIOR RENOVATION
New paint and graphics
New acoustical windows
New landscaping
LIDO MARRINA VILLAGE
PHASE 4: VIA LIDO
�M% -- — 'i'Ipm"MMFr wm;�I�
EXTERIOR RENOVATION
Fa4ade renovations including new paint
and awnings, some storefront
replacement, new signage, lighting and
landscape.
Lido Group Retail controls the 3418,
3420, 3422 and 3424 buildings. They
are currently in negotiations with
adjacent property owners to participate
in the renovation of the entire building
block.
LIDO MARRINA VILLAGE
PHASE 5: 3400 -3442 VIA OPORTO
EXTERIOR RENOVATION
New paint
New roofing
Facade renovations; new board and
batten wood siding in selected areas
Replacement doors and windows
Upgrade or replace lighting
Renovation of building alleys including
new landscape, hardscape and lighting
Additional public restrooms
Renovation of waterfront including new
light poles, planters and furnishings
INTERIOR RENOVATION
Demolish interior, clean and repair non
leased spaces to prepare for future
tenants
i
LIDO MARRINA VILLAGE
PHASE 6: 3450 BUILDING
6
r t
I ANNoWMMMMynirm
milt _ V 07 Ht:CAHY
r F
owl
I _
EXTERIOR RENOVATION
Complete building renovation within
existing building footprint
New exterior siding, roofing, windows
and doors
New outdoor dining areas
INTERIOR RENOVATION
Demolish interior, clean and repair
spaces for future tenant
Structural upgrades
New HVAC
Add new elevator
LIDO MARRINA VILLAGE
PHASE 7: STREETS
It
,/
I � .
tint �
CENTRAL AVENUE
We are proposing to eliminate the
parallel on street parking and increase
the number of parking stalls by adding
angled parking along Central Avenue in
addition redo the sidewalks and add
additional landscaping and new street
lighting.
Streets shall remain two way
VIA OPORTO
We are proposing to renovate the
entire streetscape and hardscape along
Via Oporto.
Eliminate the large circular planter/
round about to improve traffic flow.
Extend the corner of Via Oporto and the
alley to add additional landscaped
public/ pedestrian area.
Add on street parallel parking along the
northeast street side with curved
landscape planters to separate
pedestrian and vehicular traffic.
Along the northwest side, add at grade
landscape planters to separate
pedestrian and vehicular traffic.
Provide designated pedestrian
crosswalks.
New wood decking at sidewalks and
crosswalks
New street lights
New street trees and landscaping
Streets shall remain two way
LIDO MARRINA VILLAGE
PHASE 8: BOAT SLIPS
a,Y
�'77 7-1111-1
it
FLOATING DOCKS
The floating docks will be replaced with
new docks ranging from 38ft in length
to over 100ft in length, in a few isolated
locations will serve charter vessel
operations with vessels over 100ft.
SEAWALL
To augment support of the seawall, it is
proposed to install new tieback earth
anchors along the outside face of the
wall (a few feet below top of seawall).
BOARDWALK
We are planning to extend the
Boardwalk over the top of existing
seawall, to gain a few feet of Boardwalk
width, wherever possible. These
locations are shown on the attached
exhibit. It is anticipated that this
extension of Boardwalk will relate to an
additional aft of Boardwalk width in
several locations.
AGENCY COORDINATION
We are currently in discussion with the
City of Newport Beach Harbor
Resources Department to discuss all
aspects of this Proposed Project, and
ultimately these proposals will be
presented to the Newport Beach
Harbor Commission and Newport Beach
Planning Department, before final
design commences.
LIDO MARRINA VILLAGE