PUBLIC INFRASTRUCTURE /STREETSCAPE is an
important aspect of the Balboa Village Master Plan
• Current Maintenance Program
• Maintenance Area Map
• Opportunities for Improvement
• Enhancement Cost Breakdown
• Review
0
`' BALBOA
VILLAGE
Cm ur
N E W P O R T B E A C H
Current Maintenance Program
• Sidewalks & Boardwalk
— Steamcleaning
• 2x /month (summer), As- needed (non- summer)
— Inspection
• Weekly
• Trash Receptacles
— Empty
• Daily
— Repair /Replace
• As- needed
• Plants & Containers
— Watering
• Daily (summer), 2x /week (non- summer)
3
Maintenance Area Map
F
A!
Enhancement
Existing
V `{
2
i �
Sidewalks 8, Boardwalk
Current
• Size:
— 13 5, 740 sq ft
• Location:
— Edgewater PI to Ocean
Front including Pier
— Adams St to Main St
• Material:
— Concrete
— Designer Concrete
— Designer Lithocrete
k4
Enhancement
• Size:
— 162,910 sq ft
• Location:
— Edgewater PI to Ocean
Front including Pier
— Adams St to A St
• Frequency:
— Weekly (summer)
— As- needed (non -
summer)
Trash Receptacles
Current
• 135 total
• Location:
— Street ends, Pier,
Washington St
• Types:
— Plastic
— Concrete
— Designer concrete
C
Enhancement
• 12 replacements
— Designer concrete
• Location:
— Boardwalk
• Designer Concrete:
— Stenciled kelp design
— Sandblasted concrete
— Fiberglass lid
Plants 8v Containers
Current
• Maintenance Program
— Watering daily
• Plants
— Ivy Geranium
Enhancement
• Maintenance Program
— Watering 3x /week
(drought - tolerant plants)
— Paint /Replace containers
— Flax
— Spider plant •
Containers _ -
- 63 Standing Planters
— 29 Hanging Baskets
as- needed
Plants
— Floribunda Roses
— Birds of Paradise
— Martha Washington
Geraniums
Enhancement Cost Breakdown
Sidewalks & Boardwalk
• On -going steamcleaning
Boardwalk Trash Receptacles
• Replacement trash receptacles*
• On -going maintenance of trash receptacles
Main St /Balboa Blvd Plants & Containers
• Install new plant material in all pots & basl<ets*
• Paint terra cotta planters
• On -going maintenance of plant material
Total Enhancement Costs
u
$23,520 annually ($980 each)
$11,779 total ($981 each)
$2,500 annually
$2,090 total
$1,100 annually ($55 each)
$5,342 annually
$13,869 initial*
$32,462 on -going annually
Review
• Enhanced Maintenance Program
— Steamclean private Boardwalk areas
— Replace & repair trash receptacles
— Replace plant material & paint plant containers
• Total Costs
— Initial: $13,869
— On- going: $32,462 annually
• Future Costs
— Replacement of designer lithocrete sidewalks
• Questions
— Mark Harmon, Municipal Operations Director
— mharmon @newportbeachca.gov
— (949) 644 -3055